5,011,492.80
B. LANTAI 2
1 Lantai keramik 40 x 40 29.75 m2 151,440.00 4,505,340.00
4,661,666.40
VI PEKERJAAN FINISHING DINDING
Keramik Dinding
1 KM / WC ukr. 25x40 6.72 m2 180,000.00 1,209,600.00
2 Dinding Dapur dan meja dapur 1.92 m2 146,160.00 280,627.20
1,490,227.20
VII PEKERJAAN PLAFOND
A. LANTAI 1
Plafond Gypsum board t. 9mm + rangka
1 28.00 m2 132,240.00 3,702,720.00
hollow 60 x 60mm galv. Finish cat putih
2 Cornice gypsum 27.50 m' 36,480.00 1,003,200.00
3 Perapihan Beton Expose 1.80 m2 173,680.00 312,624.00
5,018,544.00
A. LANTAI 2
Plafond Gypsum board t. 9mm + rangka
1 hollow 60 x 60mm galv. Finish cat putih 36.00 m2 132,240.00 4,760,640.00
2 Pek. Daun Pintu Double Triplek & Acesoris 5.00 unit 564,880.00 2,824,400.00
3 Pek. Kusen Km/Wc 2.00 unit 896,080.00 1,792,160.00
4 Pek. Daun Jendela Alm. & Acesoris 10.08 m2 360,000.00 3,628,800.00
Pek. Daun Pintu Almunium + Kaca &
5 2.80 m2 466,640.00 1,306,592.00
Acesoris
6 Pek. Kaca Mati 0.16 m2 117,200.00 18,752.00
13,590,704.00
XI PEKERJAAN PENGECETAN
1 Cat Dinding Dalam ex. Vinilex 186.63 m2 30,720.00 5,733,181.44
2 Cat Dinding Luar ex. Avitex 73.14 m2 34,640.00 2,533,569.60
3 Cat Beton Exposed 1.80 m2 77,760.00 139,968.00
4 Cat Plafond (incld. Cat cornice) 64.00 m2 33,520.00 2,145,280.00
5 Cat Listplank Kayu + grc 14.00 m' 32,000.00 448,000.00
10,999,999.04
XII PEKERJAAN SANITASI DAN SALURAN
1 KM/WC:
- Closet Duduk terpasang lengkap + accs 2.00 bh 2,500,000.00 5,000,000.00
- Shower set 2.00 bh 96,000.00 192,000.00
- Jet Spray u/ closet 2.00 bh 47,040.00 94,080.00
2 Dapur
- Kran Leher Angsa 1.00 bh 88,080.00 88,080.00
- Kicthen Sink 1.00 bh 196,240.00 196,240.00
3 Kran Taman (Carport ) 1.00 bh 60,720.00 60,720.00
4 Floor Drain 2.00 bh 84,080.00 168,160.00
5 Instalasi Air Bersih tipe AW:
- 1/2" 24.03 m' 23,360.00 561,340.80
- 3/4" 21.40 m' 27,280.00 583,792.00
4 Inst. AC (incl.stop kontak, Outlet, pipa drain, 3.00 titik 235,120.00 705,360.00
MCB + accs excld Unit ac)
5 Saklar Single 3.00 bh 39,520.00 118,560.00
6 Saklar Ganda 5.00 bh 42,640.00 213,200.00
7 Sparing SR Listrik dari Jar Kota ke Box MCB 1.00 lot 280,000.00 280,000.00
LUAS 64.00
HARGA PER M2 3,000,000.00
TERBILANG : TIGA JUTA RUPIAH
-
B. LANTAI 2
1 Lantai keramik 40 x 40 29.75 m2 -
-
VI PEKERJAAN FINISHING DINDING
Keramik Dinding
1 KM / WC ukr. 25x40 6.72 m2 -
2 Dinding Dapur dan meja dapur 1.92 m2 -
-
VII PEKERJAAN PLAFOND
A. LANTAI 1
Plafond Gypsum board t. 9mm + rangka
1 28.00 m2 -
hollow 60 x 60mm galv. Finish cat putih
2 Cornice gypsum 27.50 m' -
3 Perapihan Beton Expose 1.80 m2 -
-
A. LANTAI 2
Plafond Gypsum board t. 9mm + rangka
1 hollow 60 x 60mm galv. Finish cat putih 36.00 m2 -
I PEKERJAAN PERSIAPAN -
II PEKERJAAN GALIAN -
III PEKERJAAN PONDASI -
IV PEKERJAAN STRUKTUR -
V PEKERJAAN FINISHING LANTAI -
VI PEKERJAAN FINISHING DINDING -
VII PEKERJAAN PLAFOND -
VIII PEKERJAAN PAS. HEBEL DAN PLESTERAN -
IX PEKERJAAN ATAP -
X PEKERJAAN PINTU DAN JENDELA -
XI PEKERJAAN PENGECETAN -
XII PEKERJAAN SANITASI DAN SALURAN -
XIII PEKERJAAN INSTALASI LISTRIK -
XIV PEKERJAAN LAIN LAIN -
TOTAL -
PEMBULATAN -
TERBILANG : …………………………………………………………….
LUAS 64.00
HARGA PER M2 -
TERBILANG : ……………………………………………….