VI PEKERJAAN ATAP
1 Pek. Pas. Rangka Atap Baja ringan M2 125.00 156,000.00 19,500,000.00
2 Pek. Pas. Atap Multiroof M2 128.00 115,000.00 14,720,000.00
3 Pek. Pas. Kusen Aluminium Pada Bidang Atap M 85.00 87,284.50 7,419,182.50
Jumlah 41,639,182.50
IX PEKERJAAN SANITAIR
1 Pek. Instalasi Air Bersih Pipa PVC 1/2" M' 10.00 21,534.00 215,340.00
2 Pek. Instalasi Air Kotor Pipa PVC 3" M' 5.00 43,502.40 217,512.00
3 Pek. Pasangan Floor Drain Bh 1.00 24,505.00 24,505.00
4 Pek. Pasangan Kran Air Bh 2.00 34,880.00 69,760.00
5 Pek. Pas. Kloset Jongkok Bh 1.00 371,000.00 371,000.00
6 Pek Pas Septik Tank Unit 1.00 3,000,000.00 3,000,000.00
Jumlah 3,898,117.00
TOTAL 340,419,891.44