PERKIRAAN BIAYA PEMBUKAAN LAHAN PER HEKTAR

0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

1. Lahan Bekas Hutan :


Survey dan Blocking (Manual) 3 Peralatan, Bahan dll (PO)
Babat - Imas (Manual) 10 o Excavator 6 JK 250,000 1,500,000 250000 1,500,000
Tebang 8 o Chainsaw 15 JK 10,000 150,000 10000 150,000
Stacking 13 o Alat Bantu 1 Ls 15,000 15,000 15000 15,000
Rumpuk 10 o Herbisida 3 Lt 30,000 90,000 30000 90,000
Pemberantasan Lalang 4 Sub Jumlah 1,755,000 1,755,000
Upah (PK)
Sub Jumlah 48 o Tanaga Harian 48 HK 18,000 864,000 18000 864,000
o Mandor 4 HK 21,600 86,400 21600 86,400
Sub Jumlah 950,400 950,400
Jumlah 2,705,400 2,705,400
2. Lalang Sheet :
Babat - Imas (Manual) 4 Peralatan, Bahan dll
Tebang 2 o Herbisida 7 Lt 30,000 210,000 30000 210,000
Semprot Lalang 4 o Alat Bantu 1 Ls 5,000 5,000 5000 5,000
Koreksi Semprot Lalang 1 o Air & Transportasi 1 Ls 6,250 6,250 9765.625 9,766
Lain-lain 1 Sub Jumlah 221,250 224,766
Upah
Sub Jumlah 12 o Tanaga Harian 12 HK 18,000 216,000 18000 216,000
o Mandor 0.5 HK 21,600 10,800 21600 10,800
Sub Jumlah 226,800 226,800
Jumlah 448,050 451,566
Rata-rata :
o Lahan Bekas Hutan 80 % 2,705,400 2,164,320 2705400 2,164,320
o Lahan Lalang 20 % 448,050 89,610 451565.625 90,313
Jumlah 2,253,930 2,254,633
Jumlah Dibulatkan 2,254,000 2,255,000
LAMPIRAN V.2

< MENU PERKIRAAN BIAYA PEMBIBITAN (SETARA SATU HEKTAR MAIN NURSERY)
0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

PRE NURSERY
Persiapan Bedeng 8 Peralatan, Bahan dll
Peteduh 4 o Kecambah 16,000 biji 2,250 36,000,000 2250 36,000,000
Pengumpulan Tanah 10 o Bahan Peteduh 1 Ls 50,000 50,000 50000 50,000
Persiapan & Penyaringan Tanah 10 o Polybag 25 x 14 x 0,1 16,000 lembar 55 880,000 55 880,000
Pengisian Polybag 85 o NPK 15.15.5.4 375 Kg 2,250 843,750 1700 637,500
Penanaman Kecambah 16 o Pestisida 1 Lt 35,000 35,000 35000 35,000
Penyiangan 17 o Alat Bantu 1 Ls 40,000 40,000 40000 40,000
Merumput 40 o Transportasi 1 Ls 400,000 400,000 400000 400,000
Seleksi 8 Sub Jumlah 38,248,750 38,042,500
Penjaga 12
Pemberantasan hama penyakit 8 Upah
Pemupukan 40 o Tanaga Harian 288 HK 18,000 5,184,000 18000 5,184,000
Saluran Drainase 15 o Mandor 14 HK 21,600 302,400 21600 302,400
Lain-lain 15 Sub Jumlah 5,486,400 5,486,400
Sub Jumlah 288 Jumlah 43,735,150 43,528,900

< MENU LAMPIRAN V.2. (LANJUTAN)


PERKIRAAN BIAYA PEMBIBITAN PER HEKTAR
0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

MAIN NURSERY
Persiapan tempat 69 Peralatan, Bahan dll
Penggalian & pengangkutan tanah 168 o Polybag 50 x 40 x 0,2 14,000 lembar 565 7,910,000 565 7,910,000
Pengayakan tanah 64 o NPK 12.12.17.2 3,010 Kg 2,250 6,772,500 1700 5,117,000
Penempatan Polybag 127 o Kieserite 665 Kg 1,400 931,000 1400 931,000
Pengisian kantong 140 o Pestisida 1 lt 35,000 35,000 35000 35,000
Pengajiran 12 o Alat Bantu 1 Ls 90,000 90,000 90000 90,000
Pemeliharaan jalan & saluran 30 o Transportasi 1 Ls 25,000 25,000 39062.5 39,063
Pemindahan 140 Sub Jumlah 15,763,500 14,122,063
Pemeliharaan tanah 80
Pemberantasan hama penyakit 20 Upah
Pemupukan 80 o Tanaga Harian 1,440 HK 18,000 25,920,000 18000 25,920,000
Penyiraman 360 o Mandor 72 HK 21,600 1,555,200 21600 1,555,200
Pengangkutan & seleksi 80 Sub Jumlah 27,475,200 27,475,200
Sensus & seleksi 20
Penjaga 40 Jumlah 43,238,700 41,597,263
Lain-lain 10
Sub Jumlah 1,440
PENYEDIAAN BIBIT (Setara 1 Ha Tanam)
Pembukaan Lahan 1 Ha 2,253,930 2,253,930 2,254,633 2,254,633
Persiapan Lahan o Dozer 15 JK 300,000 4,500,000 300000 4,500,000
o Grader 15 JK 200,000 3,000,000 200000 3,000,000
Pre Nursery 1 Ls 43,735,150 43,735,150 43735150 43,735,150
Main Nursery 1 Ls 43,238,700 43,238,700 43238700 43,238,700
Beban investasi penyiraman 1 Ls 3,500,000 3,500,000 3500000 3,500,000
Jumlah 100,227,780 100,228,483
Bibit Siap Salur 11,440 11,440
Nilai per Pokok Bibit 8,761 8,761
Nilai Pembibitan Setara 1 Ha Tanam 1,252,847 1,252,856
Jumlah Dibulatkan 1,253,000 1,253,000

LAMPIRAN V.

< MENU PERKIRAAN BIAYA PENANAMAN LCC PER HEKTAR


0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

Tanam LCC 8 Peralatan, Bahan dll


Pemeliharaaan LCC 15 o Benih LCC
Memupuk LCC 4 PJ 2 Kg 23,650 47,300 23650 47,300
Lain-lain 2 CM 4 Kg 4,720 18,880 4720 18,880
CP 4 Kg 3,650 14,600 3650 14,600
Sub Jumlah 29 o RP 357.143 Kg 900 321,429 900 321,429
o Alat Bantu 1 Ls 5,000 5,000 5000 5,000
o Transportasi 1 Ls 15,500 15,500 15500 15,500
Sub Jumlah 422,709 422,709

Upah
o Tenaga Harian 29 HK 18,000 522,000 18000 522,000
o Mandor 2 HK 21,600 43,200 21600 43,200

Sub Jumlah 565,200 565,200

Jumlah 987,909 987,909


Jumlah Dibulatkan 988,000 988,000

LAMPIRAN V.3

< MENU PERKIRAAN BIAYA PENANAMAN KELAPA SAWIT (TBM-0) PER HEKTAR
0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

Mengukur dan Pancang 6 Peralatan, Bahan dll


Melubang 2 o Excavator 1.2 JK 250,000 300,000 250000 300000
Memupuk Lubang Tanam 1 o Pupuk
Penanaman 11 Urea 47.6 Kg 1,450 69,020 1150 54,740
Rawat TBM-0 RP 68 Kg 900 61,200 900 61,200
o Pemupukan 2 MOP 20.4 Kg 1,800 36,720 1800 36,720
o Dongkel Anak Kayu 1 Kieserite 13.6 Kg 1,400 19,040 1400 19,040
o Piringan 5 Borat 0 Kg 5,025 0 5025 0
o Gawangan Maual 6 CuSO4 0 Kg 4,570 0 4570 0
Lain-lain 2 ZnSO4 0 Kg 2,550 0 2550 0
Dolomit 0 Kg 250 0 250 0
Sub Jumlah 36 o Herbisida 0.125 Lt 30,000 3,750 30000 3,750
o Rodentisida 1 Kg 14,650 14,650 14650 14,650
o Alat Bantu 1 Ls 5,000 5,000 5000 5,000
o Transportasi 1 Ls 19,000 19,000 29687.5 29,688
Sub Jumlah 528,380 524,788
Upah
o Tanaga Harian 36 HK 18,000 648,000 18000 648,000
o Mandor 2 HK 21,600 43,200 21600 43,200
Sub Jumlah 691,200 691,200
Jumlah 1,219,580 1,215,988
Jumlah Dibulatkan 1,220,000 1,216,000

LAMPIRAN V.4

< MENU PERKIRAAN BIAYA PEMELIHARAAN TBM-1 PER HEKTAR


0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

Pemupukan 6 Peralatan, Bahan dll


Piringan Manual 22.5 o Pupuk
Gawangan Manual 21 Urea 136 Kg 1,450 197,200 1150 156,400
Dongkel Anak Kayu 3 RP 170 Kg 900 153,000 900 153,000
Kontrol Lalang 9 MOP 115.6 Kg 1,800 208,080 1800 208,080
Konsolidasi (Pembumbunan) 6 Kieserite 81.6 Kg 1,400 114,240 1400 114,240
Pemeliharaan Parit 3 Borat 2.72 Kg 5,025 13,668 5025 13,668
Lain-lain 2 CuSO4 0 Kg 4,570 0 4570 0
ZnSO4 0 Kg 2,550 0 2550 0
Dolomit 0 Kg 250 0 250 0
o Herbisida 0.125 Lt 30,000 3,750 30000 3,750
o Insektisida 0.5 Lt 35,000 17,500 35000 17,500
Sub Jumlah 72.5 o Rodentisida 3 Kg 14,650 43,950 14650 43,950
o Titi Panen 1.2 Unit 120,000 144,000 120000 144,000
o Alat Bantu 1 Ls 5,000 5,000 5000 5,000
o Transportasi 1 Ls 37,750 37,750 58984.375 58,984
Sub Jumlah 938,138 918,572
Upah
o Tanaga Harian 72.5 HK 18,000 1,305,000 18000 1,305,000
o Mandor 3 HK 21,600 64,800 21600 64,800
Sub Jumlah 1,369,800 1,369,800
Lain-lain
o Sisip Kelapa Sawit 5 % 1,220,000 61,000 1,216,000 60,800
Sub Jumlah 61,000 60,800
Pemeliharaan Jalan 1 Ls 226,000 226,000 226,000 226,000
Jumlah 2,594,938 2,575,172
Jumlah Dibulatkan 2,595,000 2,575,000

LAMPIRAN V.5

< MENU PERKIRAAN BIAYA PEMELIHARAAN TBM-2 PER HEKTAR


0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

Pemupukan 7 Peralatan, Bahan dll


Piringan Manual 24 o Pupuk
Gawangan Manual 16 Urea 204 Kg 1,450 295,800 1150 234,600
Dongkel Anak Kayu 4 RP 136 Kg 900 122,400 900 122,400
Kontrol Lalang 9 MOP 238 Kg 1,800 428,400 1800 428,400
Konsolidasi (Pembumbunan) 6 Kieserite 204 Kg 1,400 285,600 1400 285,600
Pemeliharaan Parit 3 Borat 10.88 Kg 5,025 54,672 5025 54,672
Pemangkasan & Kastrasi 6 CuSO4 0 Kg 4,570 0 4570 0
Lain-lain 2 ZnSO4 0 Kg 2,550 0 2550 0
Dolomit 0 Kg 250 0 250 0
o Herbisida 0.125 Lt 30,000 3,750 30000 3,750
Sub Jumlah 77 o Insektisida 0.5 Lt 35,000 17,500 35000 17,500
o Rodentisida 3 Kg 14,650 43,950 14650 43,950
o Alat Bantu 1 Ls 5,000 5,000 5000 5,000
o Transportasi 1 Ls 40,000 40,000 62500 62,500
Sub Jumlah 1,297,072 1,258,372
Upah
o Tanaga Harian 77 HK 18,000 1,386,000 18000 1,386,000
o Mandor 3 HK 21,600 64,800 21600 64,800
Sub Jumlah 1,450,800 1,450,800
Pemeliharaan Jalan 1 Ls 226,000 226,000 226,000 226,000
Jumlah 2,973,872 2,935,172
Jumlah Dibulatkan 2,974,000 2,935,000

LAMPIRAN V.6

< MENU PERKIRAAN BIAYA PEMELIHARAAN TBM-3 PER HEKTAR


0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

Pemupukan 8 Peralatan, Bahan dll


Piringan Manual 20 o Pupuk
Gawangan Manual 16 Urea 204 Kg 1,450 295,800 1150 234,600
Dongkel Anak Kayu 4 RP 136 Kg 900 122,400 900 122,400
Kontrol Lalang 6 MOP 238 Kg 1,800 428,400 1800 428,400
Konsolidasi (Pembumbunan) 6 Kieserite 204 Kg 1,400 285,600 1400 285,600
Pemeliharaan Parit 3 Borat 0 Kg 5,025 0 5025 0
Pemangkasan & Kastrasi 4 CuSO4 0 Kg 4,570 0 4570 0
Pembuatan TPH 2 ZnSO4 0 Kg 2,550 0 2550 0
Lain-lain 4 Dolomit 0 Kg 250 0 250 0
o Herbisida 0.125 Lt 30,000 3,750 30000 3,750
Sub Jumlah 73 o Insektisida 0.5 Lt 35,000 17,500 35000 17,500
o Rodentisida 3 Kg 14,650 43,950 14650 43,950
o Alat Bantu 1 Ls 5,000 5,000 5000 5,000
o Transportasi 1 Ls 37,500 37,500 58593.75 58,594
Sub Jumlah 1,239,900 1,199,794
Upah
o Tanaga Harian 73 HK 18,000 1,314,000 18000 1,314,000
o Mandor 2 HK 21,600 43,200 21600 43,200
Sub Jumlah 1,357,200 1,357,200
Jumlah 2,597,100 2,556,994
Jumlah Dibulatkan 2,597,000 2,557,000

LAMPIRAN V.7

< MENU PERKIRAAN BIAYA PEMELIHARAAN TM-1 DAN TM-2 PER HEKTAR
0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

Pemeliharaan Parit 3 Peralatan, Bahan dll


Konsolidasi (Pembumbunan) 6 o Pupuk
Circles & Path Manual 6 Urea 408.0 Kg 1,450 591,600 1150 469,200
Circles & Path Chemical 4 RP 204.0 Kg 900 183,600 900 183,600
Rawat LCC 0 MOP 340.0 Kg 1,800 612,000 1800 612,000
Pemupukan 6 Kieserite 136.0 Kg 1,400 190,400 1400 190,400
Sensus Produksi 1 Borat 13.6 Kg 5,025 68,340 5025 68,340
Deteksi & Pengendalian HPT 2 CuSO4 - Kg 4,570 0 4570 0
Rawat TPH 0.5 ZnSO4 - Kg 2,550 0 2550 0
Pruning Kastrasi 3 Dolomit - Kg 250 0 250 0
LSU 0.5 o Herbisida 0.125 Liter 30,000 3,750 30000 3,750
Lain-lain 2 o Pestisida 0.25 Liter 35,000 8,750 35000 8,750
o Rodentisida 0.5 Kg 14,650 7,325 14650 7,325
Sub Jumlah 34 o Alat Bantu 1 Ls 10,000 10,000 10000 10,000
o Transportasi 1 Ls 18,000 18,000 28125 28,125
Sub Jumlah 1,693,765 1,581,490
Upah
o Tanaga Harian 34 HK 18,000 612,000 18000 612,000
o Mandor 2 HK 21,600 43,200 21600 43,200
Sub Jumlah 655,200 655,200
Pemeliharaan Jalan 226,000 226,000
Jumlah 2,574,965 2,462,690
Jumlah Dibulatkan 2,575,000 2,463,000

LAMPIRAN V.8

< MENU PERKIRAAN BIAYA PEMELIHARAAN TM-3 S/D TM-9 PER HEKTAR
0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

Pemeliharaan Parit 3 Peralatan, Bahan dll


Konsolidasi (Pembumbunan) 6 o Pupuk
Circles & Path Manual 7 Urea 442.0 Kg 1,450 640,900 1150 508,300
Circles & Path Chemical 4 RP 204.0 Kg 900 183,600 900 183,600
Rawat LCC 0 MOP 408.0 Kg 1,800 734,400 1800 734,400
Pemupukan 6 Kieserite 204.0 Kg 1,400 285,600 1400 285,600
Sensus Produksi 1 Borat 0.0 Kg 5,025 0 5025 0
Deteksi & Pengendalian HPT 2 CuSO4 0.0 Kg 4,570 0 4570 0
Rawat TPH 0.5 ZnSO4 0.0 Kg 2,550 0 2550 0
Pruning Kastrasi 5 Dolomit 0.0 Kg 250 0 250 0
LSU 0.5 o Herbisida 0.125 Liter 30,000 3,750 30000 3,750
Lain-lain 2 o Pestisida 0.25 Liter 35,000 8,750 35000 8,750
o Rodentisida 1 Kg 14,650 14,650 14650 14,650
Sub Jumlah 37 o Alat Bantu 1 Ls 10,000 10,000 10000 10,000
o Transportasi 1 Ls 19,500 19,500 30468.75 30,469
Sub Jumlah 1,901,150 1,779,519
Upah
o Tanaga Harian 37 HK 18,000 666,000 18000 666,000
o Mandor 2 HK 21,600 43,200 21600 43,200
Sub Jumlah 709,200 709,200
Pemeliharaan Jalan 226,000 226,000
Jumlah 2,836,350 2,714,719
Jumlah Dibulatkan 2,836,000 2,715,000

LAMPIRAN V.9

< MENU PERKIRAAN BIAYA PEMELIHARAAN TM-10 S/D TM-22 PER HEKTAR
0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

Pemeliharaan Parit 3 Peralatan, Bahan dll


Konsolidasi (Pembumbunan) 6 o Pupuk
Circles & Path Manual 6 Urea 408.0 Kg 1,450 591,600 1150 469,200
Circles & Path Chemical 4 RP 136.0 Kg 900 122,400 900 122,400
Rawat LCC 0 MOP 408.0 Kg 1,800 734,400 1800 734,400
Pemupukan 6 Kieserite 408.0 Kg 1,400 571,200 1400 571,200
Sensus Produksi 1 Borat 0.0 Kg 5,025 0 5025 0
Deteksi & Pengendalian HPT 2 CuSO4 0.0 Kg 4,570 0 4570 0
Rawat TPH 0.5 ZnSO4 0.0 Kg 2,550 0 2550 0
Pruning Kastrasi 6 Dolomit 0.0 Kg 250 0 250 0
LSU 0.5 o Herbisida 0.125 Liter 30,000 3,750 30000 3,750
Lain-lain 2 o Pestisida 0.25 Liter 35,000 8,750 35000 8,750
o Rodentisida 1 Kg 14,650 14,650 14650 14,650
Sub Jumlah 37 o Alat Bantu 1 Kg 10,000 10,000 10000 10,000
o Transportasi 1 Ls 19,500 19,500 30468.75 30,469
Sub Jumlah 2,076,250 1,964,819
Upah
o Tanaga Harian 37 HK 18,000 666,000 18000 666,000
o Mandor 2 HK 21,600 43,200 21600 43,200
Sub Jumlah 709,200 709,200
Pemeliharaan Jalan 226,000 226,000
Jumlah 3,011,450 2,900,019
Jumlah Dibulatkan 3,011,000 2,900,000

LAMPIRAN V.10

< MENU PERKIRAAN BIAYA PEMBUATAN JALAN PER KILOMETER


0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

JALAN UTAMA / PRODUKSI


Pengupasan & Pembersihan 7.5 Peralatan, Bahan dll
Daerah Milik Jalan, ROW 9 m o Dozer 36 JK 300,000 10,800,000 300000 10,800,000
Membentuk Badan Jalan o Grader 5 JK 200,000 1,000,000 200000 1,000,000
(Galian dengan Excavator) o Vibrator Roller 10 JK 175,000 1,750,000 175000 1,750,000
Pembuatan Parit Samping o Laterit 144 M3 43,750 6,300,000 43750 6,300,000
Penyiapan Tanah Dasar (5 m) 20.0 o Alat Bantu 1 Ls 50,000 50,000 50000 50,000
(Pembentukan dengan Grader, Sub Jumlah 19,900,000 19,900,000
dan dipadatkan dengan Upah
Vibrator Roller) o Tanaga Harian 30 HK 18,000 540,000 18000 540,000
Membentuk Badan Jalan 62.5 o Mandor 2 HK 21,600 43,200 21600 43,200
dengan Timbunan Sub Jumlah 583,200 583,200
(Material dihampar dan Dipadatkan) Jumlah 20,483,200 20,483,200

Sub Jumlah 60.0 Jumlah Dibulatkan 20,483,000 20,483,000

JALAN KOLEKSI
Pengupasan & Pembersihan 5.0 Peralatan, Bahan dll
Daerah Milik Jalan, ROW 7 m o Dozer 24 JK 250,000 6,000,000 250000 6,000,000
Membentuk Badan Jalan o Grader 3.3 JK 200,000 660,000 200000 660,000
(Galian dengan Excavator) o Vibrator Roller 6.7 JK 175,000 1,172,500 175000 1,172,500
Pembuatan Parit Samping o Laterit 96 M3 43,750 4,200,000 43750 4,200,000
Penyiapan Tanah Dasar (5 m) o Alat Bantu 1 Ls 50,000 50,000 50000 50,000
(Pembentukan dengan Grader, Sub Jumlah 12,082,500 12,082,500
dan dipadatkan dengan 16.0 Upah
Vibrator Roller) o Tanaga Harian 20 HK 18,000 360,000 18000 360,000
Membentuk Badan Jalan o Mandor 1 HK 21,600 21,600 21600 21,600
dengan Timbunan 50.0 Sub Jumlah 381,600 381,600
(Material dihampar dan Dipadatkan) Jumlah 12,464,100 12,464,100
Jumlah Dibulatkan 12,464,000 12,464,000
Sub Jumlah 6.0
LAMPIRAN V.11

< MENU PERKIRAAN BIAYA PENINGKATAN JALAN PER KILOMETER


PROYEKSI BIAYA PEMELIHARAAN TANAMAN MENGHASILKAN - INTI
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

JALAN UTAMA / PRODUKSI


Penyiapan Tanah Dasar 2 Peralatan, Bahan dll
Perkerasan Jalan 5 o Grader 5 JK 200,000 1,000,000 200000 1,000,000
(Material dihampar, disiram o Vibrator Roller 10 JK 175,000 1,750,000 175000 1,750,000
dan dipadatkan minimum o Laterit 180 M3 43,750 7,875,000 43750 7,875,000
8 kali lintasan) o Alat Bantu 1 Ls 25,000 25,000 25000 25,000
Sub Jumlah 10,650,000 10,650,000
Sub Jumlah 40 Upah
o Tanaga Harian 20 HK 18,000 360,000 18000 360,000
o Mandor 1 HK 21,600 21,600 21600 21,600
Sub Jumlah 381,600 381,600
Jumlah 11,031,600 11,031,600
Jumlah Dibulatkan 11,032,000 11,032,000

JALAN KOLEKSI
Penyiapan Tanah Dasar 2 Peralatan, Bahan dll
Perkerasan Jalan 5 o Grader 3.3 JK 200,000 666,667 200000 666,667
(Material dihampar, disiram o Vibrator Roller 3 JK 175,000 525,000 175000 525,000
dan dipadatkan minimum o Laterit 120 M3 43,750 5,250,000 43750 5,250,000
8 kali lintasan) o Alat Bantu 1 Ls 25,000 25,000 25000 25,000
Sub Jumlah 6,466,667 6,466,667
Sub Jumlah 6 Upah
o Tanaga Harian 13 HK 18,000 234,000 18000 234,000
o Mandor 1 HK 21,600 21,600 21600 21,600
Sub Jumlah 241,400 255,600
Jumlah 6,708,067 6,722,267
Jumlah Dibulatkan 6,708,000 6,722,000

LAMPIRAN V.12

< MENU PERKIRAAN BIAYA PEMELIHARAAN JALAN PER KILOMETER; PER HEKTAR
0
(Rupiah)

INTI PLASMA
PEKERJAAN HK URIAN VOLUME HARGA JUMLAH HARGA JUMLAH
SATUAN BIAYA SATUAN BIAYA

JALAN UTAMA / PRODUKSI


Penyiapan Tanah Dasar 1 Peralatan, Bahan dll
Perkerasan Jalan 2 o Grader 5 JK 200,000 1,000,000 200000 1,000,000
o Vibrator Roller 10 JK 175,000 1,750,000 175000 1,750,000
Sub Jumlah 6 o Laterit 60 M3 43,750 2,625,000 43750 2,625,000
o Alat Bantu 1 Ls 5,000 5,000 5000 5,000
Sub Jumlah 5,380,000 5,380,000
Upah
o Tanaga Harian 20 HK 18,000 360,000 18000 360,000
o Mandor 1 HK 21,600 21,600 21600 21,600
Sub Jumlah 381,600 381,600
Jumlah 5,761,600 5,761,600
Jalan Produksi per Hektar 12.0 M 5,762 69,139 5,762 69,139
Dibulatkan 69,000 69,000

JALAN KOLEKSI
Penyiapan Tanah Dasar 1 Peralatan, Bahan dll
Perkerasan Jalan 2 o Grader 5.0 JK 200,000 1,000,000 200000 1,000,000
o Vibrator Roller 10.0 JK 175,000 1,750,000 175000 1,750,000
Sub Jumlah 6 o Laterit 40 M3 43,750 1,750,000 43750 1,750,000
o Alat Bantu 1 Ls 5,000 5,000 5000 5,000
Sub Jumlah 4,505,000 4,505,000
Upah
o Tanaga Harian 13 HK 18,000 234,000 18000 234,000
o Mandor 1 HK 21,600 21,600 21600 21,600
Sub Jumlah 255,600 255,600
Jumlah 4,760,600 4,760,600
Jalan Koleksi per Hektar 33.0 M 4,761 157,100 4,761 157,100
Dibulatkan 157,000 157,000
0
0
0
0
0

0
0
0
0

0
0
3515.625
3515.625

0
0
0
3515.625

0
703.125
703.125
1000
0
0
0
-206250
0
0
0
-206250

0
0
0
-206250

0
-1655500
0
0
0
14062.5
-1641437.5
0
0
0

-1641437.5

703.125
0
0
0
0
0
703.125
0
0.061462
8.7890625
0

0
0
0
0
0
0
0

0
0

0
0

-14280
0
0
0
0
0
0
0
0
0
0
10687.5
-3592.5

0
0
0
-3592.5
-4000
-40800
0
0
0
0
0
0
0
0
0
0
0
0
21234.375
-19565.625

0
0
0

-200
-200
0
-19765.625
-20000

-61200
0
0
0
0
0
0
0
0
0
0
0
22500
-38700

0
0
0
0
-38700
-39000

-61200
0
0
0
0
0
0
0
0
0
0
0
21093.75
-40106.25

0
0
0
-40106.25
-40000
-122400
0
0
0
0
0
0
0
0
0
0
0
10125
-112275

0
0
0
0
-112275
-112000

-132600
0
0
0
0
0
0
0
0
0
0
0
10968.75
-121631.25

0
0
0
0
-121631.25
-121000

-122400
0
0
0
0
0
0
0
0
0
0
0
10968.75
-111431.25

0
0
0
0
-111431.25
-111000

0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0

Anda mungkin juga menyukai