iv
2.5.6.2 Mandor Batu…………………………………………………………15
2.6 Sistem Koordinasi dan Laporan Pekerjaan…………………………………………..15
2.6.1 Rapat Koordinasi………………………………………………………………..16
2.6.2 Laporan Pekerjaan………………………………………………………………16
BAB III. PENGENDALIAN PROYEK………………………………………………………17
3.1 Uraian Umum………………………………………………………………………..17
3.1.1 Pengendalian Kualitas…………………………………………………………..17
3.1.2 Pengendalian Waktu……………………………………………………………19
3.1.3 Pengendalian Biaya……………………………………………………………..21
3.2 Permasalahan dan Pemecahannya…………………………………………………...22
BAB IV. BAHAN DAN PERALATAN……………………………………………………….22
4.1 Uraian Umum………………………………………………………………………...22
4.2 Spesifikasi Bahan Bangunan………………………………………………………....22
4.2.1 Air………………………………………………………………………………..23
4.2.2 Pasir……………………………………………………………………………....23
4.2.3 Split……………………………………………………………………………....24
4.2.4 Portland Cement (PC)…………………………………………………………....25
4.2.5 Baja Tulangan…………………………………………………………………....26
4.2.6 Kawat Pengikat…………………………………………………………………..26
4.2.7 Beton Ready Mix………………………………………………………………...27
4.3 Peralatan Kerja……………………………………………………………………….28
4.3.1 Bar Bender……………………………………………………………………….29
4.3.2 Truk Pengaduk Beton…………………………………………………………....29
4.4 Jenis Tenaga Kerja…………………………………………………………………...30
4.5 Waktu Kerja………………………………………………………………………….31
4.6 Sistem Pengupahan…………………………………………………………………..32
BAB V. PELAKSANAAN PEKERJAAN…………………………………………………….33
5.1 Tinjauan Umum……………………………………………………………………...33
v
5.2 Pemasangan bekisting Lc …………………………………………………………….33
5.2.1 Pekerjaan Lean Concrete(Lc)…………………………………….…………….34
5.2.2 Finishing beton Lc ……………………………………………………………..35
5.2.3 Pemadatan beton Lc……………………………………………………............35
5.2.4 Pemasngan Bekisting Fs 45……………………………...……………………...36
vi