ENGINEER ESTIMATE
Harga
No Uraian Pekerjaan Volume Satuan KETERANGAN
( Rp ) Jumlah Harga ( Rp )
PEKERJAAN PENDAHULUAN
VI PEKERJAAN FINISHING
1 Pek. Pintu Pintu Kayu Keras 80 x 200 cm + finish cat 1.00 unit 2,750,000.00 2,750,000.00
2 Pek. Pintu multiplek 80 x 200 cm 1.00 unit 1,500,000.00 1,500,000.00
3 Pek. UPVC kamar mandi 70 x 200 cm 1.00 unit 1,250,000.00 1,250,000.00
4 Pek. Folding gate tinggi 250 cm 11.68 m2 650,000.00 7,588,750.00
5 Pek. Glass Blok 16.00 bh 37,500.00 600,000.00
Sub Jumlah 13,688,750.00
A Pekerjaan elektrikal
B Pekerjaan Mekanikal
A Pekerjaan elektrikal
B Pekerjaan Mekanikal
Kegiatan : Renovasi Atap Rumah, Plafon, dan Pekerjaan Kamar Mandi Baru
Lokasi / Wilayah :
Harga
No Uraian Pekerjaan Volume Satuan KETERANGAN
( Rp ) Jumlah Harga ( Rp )
I PEKERJAAN PENDAHULUAN
3 Pemasangan Rangka hollow Galvanis 1x40.40.2mm, modul 60 x 60 cm, (flat) 51.91 m² 85,000.00 4,412,350.00 ###
4 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm (flat) 51.91 m² 80,000.00 4,152,800.00 ###
5 List Langit-Langit Gypsum 34.40 m1 25,000.00 860,000.00 ###
6 Pas. Kramik 30 x 30 lantai kamar mandi 4.50 m² 150,000.00 675,000.00 ###
7 Pas. Keramik dinding km 30 x 60 cm 16.60 m² 190,000.00 3,154,000.00 ###
Sub Jumlah 30,298,300.00 ###
###
VIII PEKERJAAN MEKANIKAL & ELEKTRIKAL
A Pekerjaan elektrikal
…................................................ …...............................................
REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB )
RUMAH TINGGAL
DUKUHWALUH
###
…................................................ …...............................................
RENCANA ANGGARAN BIAYA ( RAB )
RUMAH TINGGAL
DUKUHWALUH
###
Harga
No Uraian Pekerjaan Volume Satuan KETERANGAN
( Rp ) Jumlah Harga ( Rp )
I PEKERJAAN PENDAHULUAN
1 Pondasi batu kali 1 : 3 : 10 (untuk tembok samping dan gerbang) 11.52 m3 850,000.00 9,792,000.00 ###
Sub Jumlah 9,792,000.00
II PEKERJAAN STRUKTUR BETON BERTULANG
1 Pek. Cor Plat Topi ( semua topian di atas jendela / teras) 1.00 ls 6,500,000.00 6,500,000.00 ###
2 Pek. Cor Rabat lantai Carport ( tannpa kramik ) 3.38 m3 1,250,000.00 4,218,750.00 ###
3 Pek. Cor dak water toren ( hanya daknya saja) 1.25 ls 4,000,000.00 5,000,000.00 ###
4 Pek. ring balok praktis 15x20cm (untuk lengking puntu samping belakang) 3.00 m' 125,000.00 375,000.00 ###
5 Pek. sloof praktis 15x20cm untuk tembok samping sebelah barat dan gerbang 28.00 m' 115,000.00 3,220,000.00 ###
6 Pek. kolom praktis 15x20cm untuk tembok samping sebelah barat dan gerbang 28.00 m' 115,000.00 3,220,000.00 ###
7 Pek. Balok praktis 15x20cm untuk tembok samping sebelah barat dan gerbang 28.00 m' 115,000.00 3,220,000.00 ###
Pasang batu bata 1 : 3 : 10 untuk tembok samping sebelah barat ,gerbang, dan
1 91.20 m² 110,000.00 10,032,000.00 ###
finishing
2 Plesteran 1:3:10 497.55 m² 40,000.00 19,902,000.00 ###
3 Pemasangan Acian 497.55 m² 30,000.00 14,926,500.00 ###
Sub Jumlah 44,860,500.00
IV PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP
1 Pas.Granit Tile 60 x 60 lantai utama + teras depan 88.50 m² 250,000.00 22,125,000.00 ###
2 Pas. Kramik 30 x 30 kamar mandi 4.00 m² 200,000.00 800,000.00 ###
3 Pas. Keramik dinding km 30 x 60 cm 52.00 m² 190,000.00 9,880,000.00 ###
4 Meja dapur + grait meja + Kramik 1.00 ls 3,500,000.00 3,500,000.00 ###
Pemasangan Rangka hollow Galvanis 1x40.40.2mm, modul 60 x 60 cm, plafon
5 103.50 m² 70,000.00 7,245,000.00 ###
(flat)
Pemasangan Rangka hollow Galvanis 1x40.40.2mm, modul 60 x 60 cm, plafon
6 40.50 m² 80,000.00 3,240,000.00 ###
(drop cilling) / variasi hanya di ruang tamu, ruang keluarga
7 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 144.00 m² 80,000.00 11,520,000.00 ###
8 List Langit-Langit Gypsum 207.12 m1 25,000.00 5,178,000.00 ###
Sub Jumlah 63,488,000.00 ###
###
V PEKERJAAN FINISHING ###
###
Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup)
1 303.37 m² 35,000.00 10,617,950.00 ###
interior
Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup)
2 194.18 m² 45,000.00 8,738,100.00 ###
eksterior
3 Cat langit-langit 207.12 m² 35,000.00 7,249,200.00 ###
Profil Beton Fariasi ( finishing façade/ bagian muka bangunan luar pembuatan
4 1.00 unit 9,500,000.00 9,500,000.00 ###
umpak , ban banan )
Sub Jumlah 36,105,250.00 ###
###
VI PEKERJAAN PINTU JENDELA + AKSESORIS ###
###
1 Pintu Kayu model lengkung + kusen + finishing ( kayu laban ) 1.00 ls 4,500,000.00 4,500,000.00
2 Pek. Pintu kmr mandi (UPVC) 2.00 unit 1,300,000.00 2,600,000.00 ###
3 slot pintu ( untuk pintu lengkung ) 1.00 unit 250,000.00 250,000.00 ###
4 engsel 4 inch ( pintu )(untuk pintu lengkung) 6.00 bh 50,000.00 300,000.00 ###
5 grendel panjang (untuk pintu lengkung) 2.00 set 80,000.00 160,000.00 ###
Sub Jumlah 7,810,000.00 ###
kaca mati
VII JASA ( TENAGA ) ###
###
1 Tenaga Pasang Kusen ( Pintu / Jendela ) 4.00 unit 150,000.00 600,000.00
2 Tenaga Pasang Daun Pintu 4.00 unit 125,000.00 500,000.00 ###
3 Tenaga Pasang Daun Jendela 6.00 unit 100,000.00 600,000.00 ###
Sub Jumlah 1,700,000.00 ###
A Pekerjaan elektrikal
…................................................ …...............................................
RENCANA ANGGARAN BIAYA ( RAB )
Grand Safira City Slawi Blok AC-1
###
A. PEKERJAAN RUMAH
Luas bangunan Lantai 1 dan 2 = 240 m2
Harga
No Uraian Pekerjaan Volume Satuan KETERANGAN
( Rp ) Jumlah Harga ( Rp )
PEKERJAAN PENDAHULUAN
1 Pas.Granit Tile 60 x 60 lantai utama + teras depan 145.35 m² 225,000.00 32,703,750.00 ###
3 Pas.Granit Dining tampak 60 x 60 8.56 m² 300,000.00 2,569,200.00 ###
3 Pas.Granit Lantai carport 30 x 60 15.00 m² 300,000.00 4,500,000.00 ###
3 Pas.Granit Lantai selasar depan dan samping 30 x 60 15.60 m² 300,000.00 4,680,000.00 ###
4 Pas. Kramik 30 x 30 kamar mandi 3.00 m² 180,000.00 540,000.00 ###
5 Pas. Keramik dinding km 30 x 60 cm 23.40 m² 200,000.00 4,680,000.00 ###
6 Pas. Kramik lantai 30 x 60 ruang belakang 7.00 m² 180,000.00 1,260,000.00 ###
7 Meja dapur + grait meja + Kramik 2.00 ls 6,500,000.00 13,000,000.00 ###
8 Pas. Keramik Tangga 11.40 m² 225,000.00 2,565,000.00 flat
Pemasangan Rangka hollow Galvanis 1x40.40.2mm, modul 60 x 60
9 181.35 m² 70,000.00 12,694,500.00 ###
cm, plafon
10 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 181.35 m² 80,000.00 14,508,000.00 ###
11 List Langit-Langit Gypsum 180.14 m1 30,000.00 5,404,200.00 ###
Sub Jumlah 99,104,650.00 ###
###
VI PEKERJAAN FINISHING ###
###
Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat
1 724.81 m² 35,000.00 25,368,280.00 ###
Penutup) interior
Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat
2 194.18 m² 45,000.00 8,738,100.00 ###
Penutup) eksterior
3 Cat duco 146.11 m² 300,000.00 43,831,800.00 ###
4 Cat langit-langit 180.14 m² 35,000.00 6,304,900.00 ###
5 Profil Beton Fariasi 1.00 unit 15,000,000.00 15,000,000.00 ###
Sub Jumlah 99,243,080.00 ###
###
VII PEKERJAAN PINTU JENDELA + AKSESORIS ###
###
1 Pek. Pintu Pintu Utama 72,5x220 cm 2.00 unit 2,500,000.00 5,000,000.00 ###
2 Pek. Pintu kamar 80x220 cm 4.00 unit 2,500,000.00 10,000,000.00 ###
3 Pek. Pintu kamar mandi 70x220 cm 1.00 unit 2,500,000.00 2,500,000.00 ###
4 Pek. Pintu Kaca 75x300 cm 4.00 unit 2,500,000.00 10,000,000.00 ###
5 Pek. Jendela 60x160 cm 4.00 unit 800,000.00 3,200,000.00 ###
6 Pek. Kusen 111.55 m1 90,000.00 10,039,500.00 ###
7 Body Pelor 1.00 set 350,000.00 350,000.00 ###
8 Kaca tebal 5mm ( untuk jendela kaca mati ) 20.86 m2 200,000.00 4,171,500.00 ###
9 Handel pintu utama 4.00 psg 300,000.00 1,200,000.00 ###
10 slot pintu 4.00 set 275,000.00 1,100,000.00 ###
11 engsel pintu 24.00 set 45,000.00 1,080,000.00 ###
12 engsel jendela 8.00 set 35,000.00 280,000.00 ###
13 grendel jendela 4.00 bh 35,000.00 140,000.00 ###
14 Kait angin 8.00 set 45,000.00 360,000.00 ###
15 tangga besi putar 1.00 set 7,000,000.00 7,000,000.00 ###
15 grendel panjang 2.00 set 80,000.00 160,000.00 ###
16 grendel tanam 2.00 set 125,000.00 250,000.00 ###
17 Reling Tangga 22.13 m2 3,500,000.00 77,437,500.00
18 Kanopi Pergola carport 30.00 m2 1,150,000.00 34,500,000.00 ###
19 Kanopi belakang dan samping 4.80 m2 1,150,000.00 5,520,000.00
Sub Jumlah 174,288,500.00 ###
kaca mati
VIII PEKERJAAN MEKANIKAL & ELEKTRIKAL
A Pekerjaan elektrikal
1 Pek. ring balok praktis 15x20cm 52.10 m' 115,000.00 5,991,500.00 ###
2 Pek. ring balok dudukan rangka atap 15x20cm 38.85 m' 115,000.00 4,467,750.00 ###
3 Pek. Balok struktur 15x30cm 0.86 m' 3,000,000.00 2,565,000.00 ###
4 Pek. kolom praktis 15x20cm 126.00 m' 115,000.00 14,490,000.00 ###
5 Pek. kolom praktis 15x20cm dudukan rangka atap 14.40 m' 115,000.00 1,656,000.00 ###
6 Pek. Plat atap (talang) 1.80 m3 3,000,000.00 5,400,000.00 ###
7 Pek. Cor Plat Topi 1.00 ls 7,500,000.00 7,500,000.00 ###
1 Pas.Granit Tile 60 x 60 lantai utama + teras depan 80.08 m² 225,000.00 18,018,000.00 ###
2 Pas.Granit Dining tampak 60 x 60 8.56 m² 300,000.00 2,569,200.00 ###
3 Pas. Kramik 30 x 30 kamar mandi 9.00 m² 180,000.00 1,620,000.00 ###
4 Pas. Keramik dinding km 30 x 60 cm 57.60 m² 200,000.00 11,520,000.00 ###
5 Pas. Kramik lantai 60 x 60 ruang jemuran 6.00 m² 180,000.00 1,080,000.00 ###
Pemasangan Rangka hollow Galvanis 1x40.40.2mm, modul 60 x 60
6 174.38 m² 70,000.00 12,206,600.00 ###
cm, plafon
7 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 174.38 m² 80,000.00 13,950,400.00 ###
A Pekerjaan elektrikal
Harga
No Uraian Pekerjaan Volume Satuan KETERANGAN
( Rp ) Jumlah Harga ( Rp )
…....................., …......................................................
…................................................ …...............................................
RENCANA ANGGARAN BIAYA TYPE 58
Grand Safira City Slawi Tahap 2
1 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) interior 261.59 m² 22,500.00 5,885,775.00 3.98
2 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) eksterior 261.59 m² 27,740.00 7,256,506.60 4.90
3 Cat melamin 94.81 m² 65,000.00 6,162,780.00 4.17
4 Cat langit-langit 89.05 m² 22,500.00 2,003,625.00 1.35
5 Profil Beton Fariasi 1.00 unit 3,395,000.00 3,395,000.00 2.29
Sub Jumlah 24,703,686.60
A Pekerjaan elektrikal
B Pekerjaan Mekanikal
1 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) interior 322.15 m² 22,500.00 7,248,375.00 4.08
2 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) eksterior 322.15 m² 27,740.00 8,936,441.00 5.03
3 Cat melamin 127.54 m² 65,000.00 8,290,100.00 4.67
4 Cat langit-langit 99.05 m² 22,500.00 2,228,625.00 1.25
5 Profil Beton Fariasi 2.00 unit 3,395,000.00 6,790,000.00 3.82
Sub Jumlah 33,493,541.00
A Pekerjaan elektrikal
B Pekerjaan Mekanikal
1 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) interior 455.05 m² 22,500.00 10,238,625.00 5.21
2 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) eksterior 455.05 m² 27,740.00 12,623,087.00 6.43
3 Cat melamin 94.81 m² 65,000.00 6,162,780.00 3.14
4 Cat langit-langit 99.51 m² 22,500.00 2,238,975.00 1.14
5 Profil Beton Fariasi 1.00 unit 5,000,000.00 5,000,000.00 2.55
Sub Jumlah 36,263,467.00
A Pekerjaan elektrikal
B Pekerjaan Mekanikal
1 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) interior 565.37 m² 22,500.00 12,720,825.00 5.85
2 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) eksterior 565.37 m² 27,740.00 15,683,363.80 7.22
3 Cat melamin 100.17 m² 65,000.00 6,511,180.00 3.00
4 Cat langit-langit 103.55 m² 22,500.00 2,329,875.00 1.07
5 Profil Beton Fariasi 1.00 unit 5,000,000.00 5,000,000.00 2.30
Sub Jumlah 42,245,243.80
A Pekerjaan elektrikal
B Pekerjaan Mekanikal
Jumlah Harga
NO Uraian Pekerjaan
( Rp )
1 Pengukuran dan Pemasangan Bouwplank 60.00 SNI - A.2.2.1.4 m' 42,510.00 2,550,600.00 1.03
2 Membersihkan Lapangan dan Perataan 90.00 SNI - A.2.2.1.9 m² 7,000.00 630,000.00 0.26
Sub Jumlah 3,180,600.00
II PEKERJAAN TANAH DAN PASIR
1 Menggali Tanah Biasa Sedalam 1 m 15.54 SNI - A.2.3.1.1 m3 48,250.00 749,805.00 0.30
2 Pengurugan Kembali 5.13 SNI - A.2.3.1.2 m3 41,500.00 212,820.30 0.09
3 Urugan Pasir 0.97 SNI - A.2.3.1.11 m3 158,800.00 154,234.50 0.06
Sub Jumlah 1,116,859.80
III PEKERJAAN PONDASI
1 Pemasangan Pondasi Batu Belah 1SP : 8 PP 32.31 SNI - A.3.2.1.5 m3 520,235.00 16,810,093.44 6.81
Sub Jumlah 16,810,093.44
1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP 191.41 SNI - A.4.4.1.5 m² 203,155.50 38,885,994.26 15.75
2 Pemasangan Plesteran 1 SP : 3 PP Tebal 15 mm 360.02 SNI - A.4.4.2.8 m² 46,930.06 16,895,760.20 6.84
3 Pemasangan Acian 360.02 SNI - A.4.4.2.27 m² 28,745.00 10,348,774.90 4.19
Sub Jumlah 66,130,529.36
VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP
1 Pas. Granit Tile. (60 x 60 ) cm (warna tua) 56.80 SNI - A.4.4.3.35e m² 261,821.88 14,871,482.50 6.02
2 Pas. Kramik 30 x 30 3.00 SNI - A.4.4.3.54b m² 171,138.00 513,414.00 0.21
3 Keramik dinding km 30 x 60 cm 14.00 SNI - A.4.4.3.54a m² 187,163.50 2,620,289.00 1.06
4 Pemasangan Rangka hollow Galvanis 1x40.40.2mm, modul 60 x 60 cm, plafon 92.00 SNI - A.4.2.1.21 m² 63,437.50 5,836,250.00 2.36
5 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 92.00 SNI - A.4.5.1.7 m² 39,490.50 3,633,126.00 1.47
6 List Langit-Langit Gypsum 78.34 SNI - A.4.5.1.10a m² 21,035.50 1,647,921.07 0.67
7 Rangka atap (baja ringan ) 84.25 DP m² 150,000.00 12,637,500.00 5.12
8 Pas. Genteng Keramik 84.25 SNI - A.4.5.2.3a m² 133,940.00 11,284,445.00 4.57
9 Pemasangan Nok U Genteng Keramik 25.60 SNI - A.4.5.2.6a m' 133,940.00 3,428,864.00 1.39
Sub Jumlah 56,473,291.57
1 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) interior 237.52 SNI - A.4.7.1.10 m² 22,626.67 5,374,285.87 2.18
2 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) eksterior 122.50 SNI - A.4.7.1.10a m² 27,740.00 3,398,150.00 1.38
3 Cat melamin 20.16 SNI - A.4.7.1.22 m² 176,118.58 3,550,550.64 1.44
4 Cat langit-langit 92.00 SNI - A.4.7.1.10 m² 22,626.67 2,081,653.33 0.84
5 Profil Beton Fariasi 1.00 DP unit 6,500,000.00 6,500,000.00 2.63
Sub Jumlah 20,904,639.84
1 Pek. Pintu Pintu Utama Kayu kamper 2.00 DP unit 1,500,000.00 3,000,000.00 1.21
2 Pek. Pintu Wc PVC 1.00 DP unit 500,000.00 500,000.00 0.20
3 Pek. Pintu Laban 2.00 DP unit 1,250,000.00 2,500,000.00 1.01
4 Pek. Pintu Kaca Alumunium 3.00 DP unit 1,100,000.00 3,300,000.00 1.34
5 Pek. Jendela Alumunium 8.00 DP unit 1,100,000.00 8,800,000.00 3.56
6 Pek. Almumunium atas Teras 1.00 DP unit 1,100,000.00 1,100,000.00 0.45
7 Pemasangan Kusen Pintu Allumunium 4" coklat 31.10 SNI - A.4.2.1.11 m1 121,541.00 3,779,925.10 1.53
8 Body Pelor 1.00 SNI - A.4.6.2.2.a set 331,025.00 331,025.00 0.13
9 Handel pintu utama 1.00 DP psg 250,000.00
10 slot pintu 4.00 SNI - A.4.6.2.2 set 346,350.00 1,385,400.00 0.56
11 engsel pintu 12.00 SNI - A.4.6.2.5.a set 51,537.50 618,450.00 0.25
12 engsel jendela 8.00 SNI - A.4.6.2.6.a set 41,025.00 328,200.00 0.13
13 grendel jendela 8.00 SNI - A.4.6.2.6.c bh 24,525.00 196,200.00 0.08
Sub Jumlah 25,839,200.10
IX PEKERJAAN MEKANIKAL & ELEKTRIKAL
A Pekerjaan elektrikal
B Pekerjaan Mekanikal
1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP 191.41 m² 107,850.00 20,643,568.50 11.79
2 Pemasangan Plesteran 1 SP : 8 PP Tebal 15 mm 360.02 m² 28,500.00 10,260,570.00 5.86
3 Pemasangan Acian 360.02 m² 23,000.00 8,280,460.00 4.73
Sub Jumlah 39,184,598.50
VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP
1 Pas. Granit Tile. (60 x 60 ) cm (warna tua) 56.80 m² 220,000.00 12,496,000.00 7.14
2 Pas. Kramik 30 x 30 3.00 m² 125,000.00 375,000.00 0.21
3 Keramik dinding km 30 x 60 cm 14.00 m² 155,000.00 2,170,000.00 1.24
4 Pemasangan Rangka hollow Galvanis 1x40.40.2mm, modul 60 x 60 cm, plafon 92.00 m² 50,000.00 4,600,000.00 2.63
5 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 92.00 m² 45,000.00 4,140,000.00 2.36
6 List Langit-Langit Gypsum 78.34 m' 17,000.00 1,331,780.00 0.76
7 Rangka atap (baja ringan ) 84.25 m² 150,000.00 12,637,500.00 7.22
8 Pas. Genteng Keramik 84.25 m² 120,000.00 10,110,000.00 5.78
9 Pemasangan Nok U Genteng Keramik 25.60 m' 130,000.00 3,328,000.00 1.90
Sub Jumlah 51,188,280.00
1 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) interior 237.52 m² 20,000.00 4,750,400.00 2.71
2 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) eksterior 122.50 m² 25,000.00 3,062,500.00 1.75
3 Cat langit-langit 92.00 m² 20,000.00 1,840,000.00 1.05
4 Cat melamin 20.16 m² 110,000.00 2,217,600.00 1.27
5 Profil Beton Fariasi 1.00 ls 4,500,000.00 4,500,000.00 2.57
Sub Jumlah 16,370,500.00
1 Pek. Pintu Pintu Utama Kayu kamper 2.00 unit 1,000,000.00 2,000,000.00 1.14
2 Pek. Pintu Wc PVC 1.00 unit 500,000.00 500,000.00 0.29
3 Pek. Pintu Laban 2.00 unit 800,000.00 1,600,000.00 0.91
4 Pek. Pintu Kaca Alumunium 3.00 unit 1,100,000.00 3,300,000.00 1.89
5 Pek. Jendela Alumunium 8.00 unit 700,000.00 5,600,000.00 3.20
6 Pek. Almumunium atas Teras 1.00 unit 1,000,000.00 1,000,000.00 0.57
7 Pemasangan Kusen Pintu Allumunium 4" coklat 31.10 m1 110,000.00 3,421,000.00 1.95
8 Body Pelor 1.00 set 100,000.00 100,000.00 0.06
9 Handel pintu utama 1.00 psg 175,000.00 175,000.00 0.10
10 slot pintu 4.00 set 150,000.00 600,000.00 0.34
11 engsel pintu 12.00 set 50,000.00 600,000.00 0.34
12 engsel jendela 8.00 set 40,000.00 320,000.00 0.18
13 grendel jendela 8.00 bh 15,000.00 120,000.00 0.07
Sub Jumlah 19,336,000.00
A Pekerjaan elektrikal
B Pekerjaan Mekanikal
Harga
No Uraian Pekerjaan Volume Satuan
( Rp ) Jumlah Harga ( Rp )
I PEKERJAAN PENDAHULUAN
1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 224.95 m² 101,682.20 22,873,410.89
2 3PP
Pemasangan Plesteran 1 SP : 8 PP Tebal 15 mm 427.10 m² 39,875.86 17,030,979.81
3 Pemasangan Acian 427.10 m² 28,745.00 12,276,989.50
Sub Jumlah 52,181,380.20
VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP
1 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) interior 304.60 m² 22,626.67 6,892,082.67
2 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) 122.50 m² 27,740.00 3,398,150.00
3 eksterior
Cat langit-langit 92.00 m² 22,626.67 2,081,653.33
4 Profil Beton Fariasi 1.00 unit 6,500,000.00 6,500,000.00
Sub Jumlah 18,871,886.00
1 Pek. Pintu Pintu Utama Kayu kamper 2.00 unit 1,500,000.00 3,000,000.00
2 Pek. Pintu Wc PVC 1.00 unit 500,000.00 500,000.00
3 Pek. Pintu Laban 2.00 unit 1,250,000.00 2,500,000.00
4 Pek. Pintu Kaca Alumunium 3.00 unit 1,100,000.00 3,300,000.00
5 Pek. Jendela Alumunium 8.00 unit 1,100,000.00 8,800,000.00
6 Pemasangan Kusen Pintu Allumunium 4" coklat 31.10 m1 121,541.00 3,779,925.10
7 Body Pelor 1.00 bh 125,000.00 125,000.00
8 slot pintu 4.00 bh 185,000.00 740,000.00
9 engsel pintu 24.00 bh 40,000.00 960,000.00
10 engsel jendela 16.00 bh 30,000.00 480,000.00
11 grendel jendela 8.00 bh 24,525.00 196,200.00
Sub Jumlah 24,381,125.10
A Pekerjaan elektrikal
B Pekerjaan Mekanikal