Anda di halaman 1dari 39

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH MEWAH 2 LANTAI


LOKASI :
TAHUN : 2019

URAIAN KEGIATAN SATUAN VOLUME

1 2 3.00
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Bangunan M2 L
2 Pengukuran dan Pemasangan BowPlank M2 TINGGI
JUMLAH I
II. PEKERJAAN TANAH
1 Galian Tanah Pondasi M3 VOLUME
2 Urugan Tanah Kembali M3 0.00
3 Pemadatan dan Peninggian Lantai Bangunan M3 0.00
4 Pasangan Pondasi Batu Kali M3 V TOTAL
JUMLAH II
IV. PEKERJAAN STRUKTUR KONSTRUKSI BETON LT. 1
PEKERJAAN PENGECORAN K. -
1 Cor Rabat Lantai Bawah M3 #VALUE!
2 Sloof Induk 20 x 15 M3 #VALUE!
6 Kolom Praktis 15 x 15 M3 0.00
JUMLAH IV
V. PEKERJAAN DINDING
A LANTAI 1
1 Pasangan Dinding 1/2 Bata M2 4.50
2 Plesteran Dinding M2 9.00
3 Plesteran Dinding Kedap Air M2 0.90
JUMLAH V
VI. PEKERJAAN KERAMIK DAN PLAFOND
PEKERJAAN KERAMIK
A LANTAI 1
1 Keramik 30x30 untuk Kamar Mandi M2 0.00
2 Keramik 50x50 untuk Teras M2 0.00
3 Keramik 60x60 untuk Kamar M2 0.00
4 Keramik 20x20 untuk Tempat Cuci dan Jemuran M2 0.00
7 Keramik 30x30 untuk Dinding KM M2 0.00
9 Pekerjaan Nat M2 0.00
JUMLAH VI
VIIIPEKERJAAN ATAP
1 Pasang Kuda-Kuda Baja Ringan dan Rangka Atap M2 185.58
2 Pasang Atap Genteng M2 185.58
3 Pasang List Plank M2 144.00
2 Pasang Bahan Plafond Gypsumboard M2 #VALUE!
3 Pasang List Plafond M1 #VALUE!
JUMLAH VIII
IX. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pintu 350 x 250 BH 1.00
2 Pintu 200 x 90 BH 14.00
3 Pintu 190 x 80 BH 10.00
4 Pintu 185 x 200 BH 6.00
5 Jendela 120 x 120 BH 19.00
6 Jendela 120 x 60 BH 6.00
7 Jendela 160 x 200 BH 4.00
8 Jendela 20 x 40 BH 9.00
9 Jendela Oval BH 1.00
JUMLAH VIII
XI. PEKERJAAN SANITASI DAN AIR KOTOR
1 Kloset Duduk Toto dan Shower BH 2.00
3 Westafel Toto BH 2.00
5 Westafel Cuci Piring BH 1.00
6 PVC 4 in M1 91.00
7 PVC 2 in M1 118.00
8 IPAL dengan BioTank BH 1.00
9 IPAL dengan GroundTank BH 1.00
10 Bak Mandi 80 x 65 M2 0.29
11 RoofTank BH 1.00
JUMLAH XI
XII. PEKERJAAN PENGECATAN
1 Dinding M2 4.50
4 Plafond BH #VALUE!
JUMLAH XII
XIIIPEKERJAAN MECHANICAL & ELECTRIKAL
1 Steker BH 40.00
2 Lampu Downlight BH 150.00
3 Stop Kontak Telepon BH 10.00
4 Stop Kontak BH 60.00
5 Penyambungan Baru dari PLN 6600 Watt BH 1.00
6 Kabel Telepon Supreme M1 350.00
7 Kabel Antena Belden M1 20.00
8 Kabel Lampu, Steker dan Stop Kontak NYM 3X1,5mm M1 1,230.00
JUMLAH XIII
(RAB)

HARGA SAT.
JUMLAH (Rp.)
(Rp.)

4 5

198,000.00 #VALUE!
198,000.00 #VALUE!
#VALUE!

198,000.00 #VALUE!
198,000.00 -
198,000.00 -
198,000.00 #VALUE!
#VALUE!

637,375.00 #VALUE!
3,500,000.00 #VALUE!
3,500,000.00 -
#VALUE!

114,206.14 513,927.63
60,403.35 543,630.15
60,403.35 54,363.02
1,111,920.80

130,750.00 -
151,350.00 -
169,170.00 -
121,450.00 -
130,750.00 -
35,000.00 -
-
317,340.00 58,890,370.50
124,417.93 23,088,857.36
62,218.00 8,959,392.00
175,699.85 #VALUE!
42,303.00 #VALUE!
81,979,227.86

244,000.00 -
244,000.00 -
244,000.00 -
244,000.00 -
244,000.00 -
244,000.00 -
244,000.00 -
244,000.00 -
244,000.00 -
-

463,770.00 927,540.00
1,500,178.00 3,000,356.00
5,500,000.00 5,500,000.00
187,700.00 17,080,700.00
122,600.00 14,466,800.00
25,000,000.00 25,000,000.00
25,000,000.00 25,000,000.00
114,206.14 33,119.78
3,000,000.00 3,000,000.00
94,008,515.78

42,000.00 189,000.00
52,100.00 #VALUE!
#VALUE!

63,000.00 2,520,000.00
459,500.00 68,925,000.00
52,100.00 521,000.00
256,230.00 15,373,800.00
13,200,000.00 13,200,000.00
400,000.00 140,000,000.00
160,000.00 3,200,000.00
212,500.00 261,375,000.00
505,114,800.00
ANALISA HARGA SATUAN PEKERJAAN
DATA PEMBAHARUAN & PENYESUAIAN 2017-2018

Harga Upah dan


No. Jenis Pekerja Sat. Koef. Material
(Rp)

1 2 3 5. 6.
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi m2 1.000
Pekerja OH 0.100 102,920.00
Mandor OH 0.050 198,000.00
Jumlah
2 Pengukuran dan pasangan bouwplank m 1.000
Kayu meranti balok m3 0.012 3,498,000.00
Paku biasa 2" - 5 " kg 0.020 15,900.00
Kayu meranti papan (MC) 2/20 m3 0.007 6,382,500.00
Pekerja oh 0.100 102,920.00
Tukang Kayu oh 0.100 107,400.00
Kepala Tukang Kayu oh 0.010 139,754.00
Mandor oh 0.005 198,000.00
Jumlah
II. PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1m m3 1.000
Pekerja OH 0.750 102,920.00
Mandor OH 0.025 198,000.00
Jumlah
3 Urugan Pasir m3 1.000
Pasir Urug m3 1.100 136,800.00
Pekerja OH 0.300 102,920.00
Mandor OH 0.100 198,000.00
Jumlah
4 Urugan Tasirtu m3 1.000
Tasirtu m3 1.200 96,100.00
Sewa stemper hari 0.009 100,000.00
Pekerja OH 0.250 102,920.00
Mandor OH 0.025 198,000.00
Jumlah
5 Urugan Tanah Kembali m3 1.000
Pekerja OH 0.102 102,920.00
Mandor OH 0.019 198,000.00
Jumlah
6 Buangan Tanah Galian m3 1.000
Pekerja OH 0.200 102,920.00
Mandor OH 0.040 198,000.00
Jumlah
III. PEKERJAAN PASANGAN PONDASI
1 Batu kosongan Aanstampeng m3 1.000
Batu kali belah m3 1.2000 155,300.00
Pasir Urug m3 0.3000 136,800.00
Pekerja oh 0.7800 102,920.00
Tukang Batu oh 0.3900 109,300.00
Kepala Tukang Batu oh 0.0390 133,200.00
Mandor oh 0.0390 198,000.00
Jumlah
2 Pondasi Batu kali1:5 m3 1.000
Batu kali belah m3 1.100 155,300.00
Semen Portland kg 136.000 1,200.00
Pasir Pasang m3 0.544 169,100.00
Pekerja oh 1.500 102,920.00
Tukang Batu oh 0.750 109,300.00
Kepala Tukang Batu oh 0.075 133,200.00
Mandor oh 0.075 198,000.00
Jumlah
3 Pasangan Pondasi rollag batu bata 1:3 m3 1.000
Batu bata merah 5x11x22 cm bh 70.000 700.00
Semen Portland zak 0.287 61,100.00
Pasir pasang m3 0.040 169,100.00
Pekerja oh 0.300 102,920.00
Tukang Batu oh 0.100 109,300.00
Kepala Tukang Batu oh 0.010 133,200.00
Mandor oh 0.015 198,000.00
Jumlah
IV. PEKERJAAN PASANGAN DINDING TEMBOK
1 Pasang Dinding Bata 1:3 1/2 Bata m2 1.000
Batu Bata Merah bh 70.000 700.00
Semen Portland 50 kg zak 0.287 61,100.00
Pasir Pasang m3 0.040 169,100.00
Pekerja OH 0.300 102,920.00
Tukang Batu OH 0.100 109,300.00
Kepala Tukang Batu OH 0.010 133,200.00
Mandor OH 0.015 198,000.00
Jumlah
2 Pasang Dinding Bata 1:5 1/2 Bata m2 1.000
Batu Bata Merah bh 70.000 700.00
Semen Portland 50 kg zak 0.194 61,100.00
Pasir Pasang m3 0.045 169,100.00
Pekerja OH 0.300 102,920.00
Tukang Batu OH 0.100 109,300.00
Kepala Tukang Batu OH 0.010 133,200.00
Mandor OH 0.015 198,000.00
Jumlah
V. PEKERJAAN PLESTERAN, BENANGAN DAN ACIAN
1 Plesteran Tebal 15mm Campuran 1 : 3 m2 1.000
Semen Portland 50 kg zak 0.156 61,100.00
Pasir pasang m3 0.023 169,100.00
Pekerja OH 0.300 102,920.00
Tukang Batu OH 0.150 109,300.00
Kepala Tukang Batu OH 0.015 133,200.00
Mandor OH 0.015 198,000.00
Jumlah
2 Plesteran Tebal 15mm Campuran 1 : 5 m2 1.000
Semen Portland 50 kg zak 0.104 61,100.00
Pasir pasang m3 0.026 169,100.00
Pekerja OH 0.300 102,920.00
Tukang Batu OH 0.150 109,300.00
Kepala Tukang Batu OH 0.015 133,200.00
Mandor OH 0.015 198,000.00
Jumlah
3 Benangan Sudut 1 : 2 m 1.000
Semen Portland zak 0.010 61,100.00
Pasir Pasang m3 0.013 169,100.00
Pekerja OH 0.080 102,920.00
Tukang Batu OH 0.040 109,300.00
Kepala Tukang Batu OH 0.040 133,200.00
Mandor OH 0.004 198,000.00
Jumlah
4 Acian Beton m2 1.000
Semen Portland zak 0.065 61,100.00
Pekerja OH 0.200 102,920.00
Tukang Batu OH 0.100 109,300.00
Kepala Tukang Batu OH 0.010 133,200.00
Mandor OH 0.010 198,000.00
Jumlah
VII. PEKERJAAN BETON
1 Beton Lantai Kerja 1:3:5 m3 1.000
Semen Portland 40 kg zak 5.750 56,700.00
Pasir beton m3 0.558 182,400.00
Batu pecah mesin 1/2 m3 0.541 271,200.00
Air (biaya air tawar) lt 215.000 100.00
Pekerja OH 1.200 102,920.00
Tukang Batu OH 0.200 109,300.00
Kepala Tukang Batu OH 0.020 133,200.00
Mandor OH 0.060 198,000.00
Jumlah
2 Beton Rabat beton 1:3:5 m3 1.000
Semen Portland 40 kg zak 6.900 56,700.00
Pasir beton m3 0.518 182,400.00
Batu pecah mesin 1/2 m3 0.533 271,200.00
Air (biaya air tawar) lt 215.000 100.00
Pekerja OH 1.650 102,920.00
Tukang Batu OH 0.275 109,300.00
Kepala Tukang Batu OH 0.028 133,200.00
Mandor OH 0.083 198,000.00
Jumlah
3 Beton K-225 m3 1.000
Semen Portland 40 kg zak 9.275 56,700.00
Pasir beton m3 0.436 182,400.00
Batu pecah mesin 1/2 m3 0.551 271,200.00
Air (biaya air tawar) lt 215.000 100.00
Pekerja OH 1.650 102,920.00
Tukang Batu OH 0.275 109,300.00
Kepala Tukang Batu OH 0.028 133,200.00
Mandor OH 0.083 198,000.00
Jumlah
4 Beton K-300 m3 1.000
Semen Portland 40 kg zak 10.325 56,700.00
Pasir beton m3 0.426 182,400.00
Batu pecah mesin 1/2 m3 0.537 271,200.00
Air (biaya air tawar) lt 215.000 100.00
Pekerja OH 1.650 102,920.00
Tukang Batu OH 0.275 109,300.00
Kepala Tukang Batu OH 0.028 133,200.00
Mandor OH 0.083 198,000.00
Jumlah
5 Pembesian Dengan Besi Ulir ___________ kg 1.000
Besi beton ulir kg 1.050 -
Kawat beton (bendrat) kg 0.015 17,600.00
Pekerja OH 0.007 102,920.00
Tukang Besi OH 0.007 109,300.00
Kepala Tukang Besi OH 0.001 133,200.00
Mandor OH 0.000 198,000.00
Jumlah
6 Pembesian Dengan Besi Polos ____ kg 1.000
Besi beton polos kg 1.050 -
Kawat beton (bendrat) kg 0.015 17,600.00
Pekerja OH 0.007 102,920.00
Tukang Besi OH 0.007 109,300.00
Kepala Tukang Besi OH 0.001 133,200.00
Mandor OH 0.000 198,000.00
Jumlah
7 Pembesian Wiremesh __________ m2 1.000
Wiremesh M6___________ lbr 0.0900 -
Kawat beton kg 0.0300 17,600.00
Pekerja OH 0.1500 102,920.00
Tukang Besi OH 0.0300 109,300.00
Kepala Tukang Besi OH 0.0150 133,200.00
Mandor OH 0.0300 198,000.00
Jumlah
8 Bekisting Untuk Sloof, Kolom, Ring Praktis m2 1.000
Kayu meranti papan (MC) m3 0.022 1,890,000.00
Kayu meranti usuk m3 0.002 3,498,000.00
Paku biasa 2"- 5" kg 0.300 15,900.00
Minyak Begesting ltr 0.100 7,100.00
Jumlah bahan
Pekerja OH 0.520 102,920.00
Tukang Kayu OH 0.260 107,400.00
Kepala Tukang Kayu OH 0.026 136,800.00
Mandor OH 0.026 198,000.00
Jumlah upah
Bahan Begesting 2x pakai 0.500 54,056.00
Upah bgesting 2 x pakai 1.000 90,147.20
Jumlah
9 Bekisting Kolom Struktur m2 1.000
Kayu meranti usuk m3 0.010 3,498,000.00
Paku biasa 2"- 5" kg 0.400 15,900.00
Minyak Begesting ltr 0.200 7,100.00
Balok Kayu Meranti m3 0.015 4,161,000.00
Multiplek tebal 12 mm lbr 0.350 175,400.00
Dolken Kayu Gelam 8-10/400 cm btg 2.000 8,700.00
Jumlah bahan
Pekerja OH 0.660 102,920.00
Tukang Kayu OH 0.330 107,400.00
Kepala Tukang Kayu OH 0.033 136,800.00
Mandor OH 0.033 198,000.00
Jumlah upah
Bahan Begesting 2x pakai 0.500 183,965.00
Upah bgesting 2 x pakai 1.000 114,417.60
Jumlah
10 Bekisting Balok Struktur m3 1.000
Kayu meranti usuk m3 0.020 3,498,000.00
Paku biasa 2"- 5" kg 0.400 15,900.00
Minyak Begesting ltr 0.200 7,100.00
Balok Kayu Meranti m3 0.018 4,161,000.00
Multiplek tebal 12 mm lbr 0.350 175,400.00
Dolken Kayu Gelam 8-10/400 cm btg 2.000 8,700.00
Jumlah bahan
Pekerja OH 0.660 102,920.00
Tukang Kayu OH 0.330 107,400.00
Kepala Tukang Kayu OH 0.033 136,800.00
Mandor OH 0.033 198,000.00
Jumlah upah
Bahan Begesting 2x pakai 0.500 231,428.00
Upah bgesting 2 x pakai 1.000 114,417.60
Jumlah
11 Bekisting Plat Lantai m3 1.000
Kayu meranti usuk m3 0.0238 3,498,000.00
Paku biasa 2"- 5" kg 0.4000 15,900.00
Minyak Begesting ltr 0.2000 7,100.00
Balok Kayu Meranti m3 0.0150 4,161,000.00
Multiplek tebal 12 mm lbr 0.3500 175,400.00
Dolken Kayu Gelam 8-10/400 cm btg 6.0000 8,700.00
Jumlah bahan
Pekerja OH 0.660 102,920.00
Tukang Kayu OH 0.330 107,400.00
Kepala Tukang Kayu OH 0.033 136,800.00
Mandor OH 0.033 198,000.00
Jumlah upah
Bahan Begesting 2x pakai 0.500 267,037.40
Upah bgesting 2 x pakai 1.000 114,417.60
Jumlah
12 Bekisting Tangga m3 1.000
Kayu meranti usuk m3 0.030 3,498,000.00
Paku Usuk kg 0.400 16,700.00
Minyak Begesting ltr 0.150 7,100.00
Balok Kayu Kamper 3/5 m3 0.015 4,161,000.00
Multiplek tebal 9 mm lbr 0.350 119,800.00
Jumlah bahan
Pekerja OH 0.660 102,920.00
Tukang Kayu OH 0.330 107,400.00
Kepala Tukang Kayu OH 0.033 136,800.00
Mandor OH 0.033 198,000.00
Jumlah upah
Bahan Begesting 2x pakai 0.500 217,030.00
Upah bgesting 2 x pakai 1.000 114,417.60
Jumlah
13 Beton Poer PC-_______ m3 1.000
Beton K_____ m3 1.000
Begesting m2 3.790 -
Besi beton polos kg 57.750 -
Besi beton ulir kg 96.871 -
Jumlah
14 Beton Sloof Ukuran __x__ m3 1.000
Beton K_____ m3 1.000 -
Begesting 2x pakai m2 5.000 117,175.20
Besi beton polos U____ kg 49.193 -
Besi beton ulir U____ kg 89.143 -
Jumlah
15 Beton Kolom K-1 30/40 m3 1.000
Beton K_____ m3 1.000 -
Begesting 2x pakai m2 11.660 206,400.10
Besi beton polos U____ kg 49.090 -
Besi beton ulir U____ kg 156.000 -
Jumlah
16 Beton Balok Latai dan ring balk 15/15 m3 1.000
Beton K_____ m3 1.000 -
Begesting 2x pakai m2 13.330 247,936.30
Besi beton polos U____ kg 162.620 -
Jumlah
17 Beton plat lantai t= __cm m3 1.000
Beton K_____ m3 1.000 -
Begesting 2x pakai m2 6.667 247,936.30
Besi beton polos U____ kg 172.000 -
Besi beton ulir U____ kg 0.000 -
Jumlah
18 Beton plat Tangga t= __cm m3 1.000
Beton K_____ m3 1.000 -
Begesting 2x pakai m2 6.667 222,932.60
Besi beton polos U____ kg 172.000 -
Besi beton ulir U____ kg 0.000 -
Jumlah
VIII. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
1 Pemasangan Usuk Galvalum Ukuran m2 1.000
Usuk Galvalum m1 3.000 -
Paku sekrup bh 6.000 600.00
Mandor OH 0.005 198,000.00
Kepala Tukang OH 0.001 136,800.00
Tukang OH 0.100 107,400.00
Pekerja OH 0.100 102,920.00
Jumlah
2 Pemasangan Reng Galvalum Ukuran m2 1.000
Reng galvalum m1 4.000 -
Paku sekrup bh 10.000 600.00
Mandor OH 0.005 198,000.00
Kepala Tukang OH 0.001 136,800.00
Tukang OH 0.100 107,400.00
Pekerja OH 0.100 102,920.00
Jumlah
3 Lisplank Rangka Hollow Ukuran m1 1.000
Hollow galvalum m1 2.600 -
Kalsiplank lebar m1 1.100 -
Paku sekrup bh 6.000 600.000
Mandor OH 0.005 198,000.00
Kepala Tukang OH 0.020 136,800.00
Tukang OH 0.200 107,400.00
Pekerja OH 0.100 102,920.00
Jumlah
4 Pemasangan Genteng _________ m2 1.000
Genteng ___ bh 10.000 -
Pekerja OH 0.150 102,920.00
Tukang OH 0.075 107,400.00
Kepala Tukang OH 0.008 136,800.00
Mandor OH 0.008 198,000.00
Jumlah
5 Pemasangan Wuwung Genteng _____ m 1.000
Semen PC 40 kg zak 0.160 56,700.00
Pasir Pasang m3 0.032 169,100.00
Genteng Wuwung lbr 5.000 -
Pekerja OH 0.400 102,920.00
Tukang OH 0.200 107,400.00
Kepala Tukang OH 0.020 136,800.00
Mandor OH 0.002 198,000.00
Jumlah
6 Pemasangan Talang Pembuluh Pipa PVC _____ m 1.000
Pipa PVC ____ ljr 0.300 -
Pekerja OH 0.081 102,920.00
Tukang OH 0.135 107,400.00
Jumlah
IX PEKERJAAN PELAPIS LANTAI DAN DINDING
1 Pemasangan Tegel Keramik Dinding ___ x ___ m2 1.000
Semen PC 40 kg zak 0.233 56,700.00
Semen Berwarna Yiyitan kg 1.940 11,000.00
Pasir Pasang m3 0.018 169,100.00
Tegel Keramik Dinding __x__ m2 1.060 -
Pekerja OH 0.900 102,920.00
Tukang Batu OH 0.450 109,300.00
Kepala Tukang Batu OH 0.045 133,200.00
Mandor OH 0.045 198,000.00
Jumlah
2 Pemasangan Keramik Lantai __ x __ m2 1.000
Semen PC 40 kg zak 0.233 56,700.00
Semen Berwarna Yiyitan kg 1.500 11,000.00
Pasir Pasang m3 0.045 169,100.00
Tegel Keramik Lantai __x__ m2 1.068 -
Pekerja OH 0.700 102,920.00
Tukang Batu OH 0.350 109,300.00
Kepala Tukang Batu OH 0.035 133,200.00
Mandor OH 0.035 198,000.00
Jumlah
3 Pasang Lantai Homogenous Tile __x__ m2 1.000
Homogenous Tile __ x __ m2 1.050 -
Semen kg 10.000 56,700.00
Pasir Pasang m3 0.045 169,100.00
Semen Warna kg 1.500 11,000.00
Pekerja OH 0.260 102,920.00
Tukang Batu OH 0.130 109,300.00
Kepala Tukang Batu OH 0.013 133,200.00
Mandor OH 0.013 198,000.00
Jumlah
4 Pemasangan Step Noshing Tangga m1 1.000
Step Noshing __ x __ bh 3.500 -
Semen kg 11.400 56,700.00
Pasir Pasang m2 0.003 169,100.00
Semen Warna kg 0.025 11,000.00
Pekerja OH 0.090 102,920.00
Tukang Batu OH 0.090 109,300.00
Kepala Tukang Batu OH 0.009 133,200.00
Mandor OH 0.005 198,000.00
Jumlah
XII PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard __ mm Rangka Hollow m2 1.000
Besi Hollow __x__ m 0.750 -
Besi Hollow __x__ m 2.000 -
Kalsiboard EG Uk. __x__x__ mm lbr 0.382 -
Paku Asbes Skrup 4 bh 4.000 17,300.00
Pekerja OH 0.150 102,920.00
Tukang Kayu OH 0.250 107,400.00
Kepala Tukang Kayu OH 0.025 136,800.00
Mandor OH 0.075 198,000.00
Jumlah
2 Pas. Plafond Gypsumboard __ mm Rangka Hollow m2 1.000
Besi Hollow __x__ m 0.750 -
Besi Hollow __x__ m 2.000 -
Gypsum Board Uk. __x__x__ mm lbr 0.382 -
Paku Asbes Skrup 4 bh 4.000 17,300.00
Pekerja OH 0.150 102,920.00
Tukang Kayu OH 0.250 107,400.00
Kepala Tukang Kayu OH 0.025 136,800.00
Mandor OH 0.075 198,000.00
Jumlah
3 Pemasangan List Gypsum m1 1.000
Lis Gypsum m 1.050 11,400.00
Sekrup bh 4.000 600.00
Pekerja OH 0.050 102,920.00
Tukang Kayu OH 0.050 107,400.00
Kepala Tukang Kayu OH 0.005 136,800.00
Mandor OH 0.003 198,000.00
Jumlah
4 Pemasangan List Aluminium siku m1 1.000
Lis aluminium siku m 1.050 11,400.00
Sekrup bh 4.000 600.00
Pekerja OH 0.050 102,920.00
Tukang Kayu OH 0.050 107,400.00
Kepala Tukang Kayu OH 0.005 136,800.00
Mandor OH 0.003 198,000.00
Jumlah
XIII PEKERJAAN CAT
1 Pengerjaan Cat Dinding Interior m2 1.000
Alkalin kg 0.120 28,500.00
Cat Tembok Interior klg 0.360 -
Pekerja OH 0.028 102,920.00
Tukang cat OH 0.042 76,300.00
Kepala Tukang cat OH 0.004 130,800.00
Mandor OH 0.003 198,000.00
Jumlah
2 Pengerjaan Cat Dinding Exterior m2 1.000
Alkalin kg 0.120 28,500.00
Cat Tembok Exterior klg 0.360 -
Pekerja OH 0.028 102,920.00
Tukang cat OH 0.042 76,300.00
Kepala Tukang cat OH 0.004 130,800.00
Mandor OH 0.003 198,000.00
Jumlah
3 Pengerjaan Waterproofing m2 1.000
Water Proofing dan Scredding kg 0.350 -
Pekerja OH 0.050 102,920.00
Tukang cat OH 0.075 76,300.00
Kepala Tukang cat OH 0.008 130,800.00
Mandor OH 0.003 198,000.00
Jumlah
XIV PEKERJAAN SALURAN
1 Saluran PVC bawah lantai m1 1.000
PVC dia __ in m1 1.000 -
Material bantu 10 % dari bahan m1 0.100 -
Pekerja OH 0.080 102,920.00
Tukang OH 0.135 76,300.00
Kepala Tukang OH 0.014 130,800.00
Mandor OH 0.004 198,000.00
Jumlah
7-2018

Jumlah
(Rp)

10,292.00
9,900.00
20,192.00

41,976.00
318.00
44,677.50
10,292.00
10,740.00
1,397.54
891.00
110,292.04

77,190.00
4,950.00
82,140.00

150,480.00
30,876.00
19,800.00
201,156.00

115,320.00
900.00
25,730.00
4,950.00
146,900.00

10,497.84
3,762.00
14,259.84
20,584.00
7,920.00
28,504.00

186,360.00
41,040.00
80,277.60
42,627.00
5,194.80
7,722.00
363,221.40

170,830.00
163,200.00
91,990.40
154,380.00
81,975.00
9,990.00
14,850.00
687,215.40

49,000.00
17,560.14
6,764.00
30,876.00
10,930.00
1,332.00
2,970.00
119,432.14

49,000.00
17,560.14
6,764.00
30,876.00
10,930.00
1,332.00
2,970.00
119,432.14

49,000.00
11,853.40
7,609.50
30,876.00
10,930.00
1,332.00
2,970.00
114,570.90

9,501.05
3,889.30
30,876.00
16,395.00
1,998.00
2,970.00
65,629.35

6,336.07
4,396.60
30,876.00
16,395.00
1,998.00
2,970.00
62,971.67

611.00
2,198.30
8,233.60
4,372.00
5,328.00
792.00
21,534.90

3,971.50
20,584.00
10,930.00
1,332.00
1,980.00
38,797.50

326,025.00
101,797.44
146,583.60
21,500.00
123,504.00
21,860.00
2,664.00
11,880.00
755,814.04

391,230.00
94,392.00
144,441.12
21,500.00
169,818.00
30,057.50
3,729.60
16,434.00
871,602.22

525,892.50
79,581.12
149,458.32
21,500.00
169,818.00
30,057.50
3,729.60
16,434.00
996,471.04

585,427.50
77,629.44
145,742.88
21,500.00
169,818.00
30,057.50
3,729.60
16,434.00
1,050,338.92

-
264.00
720.44
765.10
93.24
79.20
1,921.98

-
264.00
720.44
765.10
93.24
79.20
1,921.98

-
528.00
15,438.00
3,279.00
1,998.00
5,940.00
27,183.00

41,580.00
6,996.00
4,770.00
710.00
54,056.00
53,518.40
27,924.00
3,556.80
5,148.00
90,147.20
27,028.00
90,147.20
117,175.20

34,980.00
6,360.00
1,420.00
62415
61,390.00
17,400.00
183,965.00
67,927.20
35,442.00
4,514.40
6,534.00
114,417.60
91,982.50
114,417.60
206,400.10

69,960.00
6,360.00
1,420.00
74,898.00
61,390.00
17,400.00
231,428.00
67,927.20
35,442.00
4,514.40
6,534.00
114,417.60
115,714.00
114,417.60
230,131.60

83,252.40
6,360.00
1,420.00
62,415.00
61,390.00
52,200.00
267,037.40
67,927.20
35,442.00
4,514.40
6,534.00
114,417.60
133,518.70
114,417.60
247,936.30

104,940.00
6,680.00
1,065.00
62,415.00
41,930.00
217,030.00
67,927.20
35,442.00
4,514.40
6,534.00
114,417.60
108,515.00
114,417.60
222,932.60

-
-
-
-
-

-
585,876.00
-
-
585,876.00

-
2,406,625.17
-
-
2,406,625.17

-
3,304,990.88
-
3,304,990.88

-
1,652,908.67
-
-
1,652,908.67

-
1,486,217.33
-
-
1,486,217.33

-
3,600.00
990.00
136.80
10,740.00
10,292.00
25,758.80

-
6,000.00
990.00
136.80
10,740.00
10,292.00
28,158.80

-
-
6,000.00
990.00
2,736.00
21,480.00
10,292.00
41,498.00

-
15,438.00
8,055.00
1,094.40
1,584.00
26,171.40

9,072.00
5,461.93
-
41,168.00
21,480.00
2,736.00
396.00
80,313.93
-
8,336.52
14,499.00
22,835.52

13,211.10
21,340.00
3,043.80
-
92,628.00
49,185.00
5,994.00
8,910.00
194,311.90

13,211.10
16,500.00
7,609.50
-
72,044.00
38,255.00
4,662.00
6,930.00
159,211.60

-
567,000.00
7,609.50
16,500.00
26,759.20
14,209.00
1,731.60
2,574.00
636,383.30

-
646,380.00
507.30
275.00
9,262.80
9,837.00
1,198.80
990.00
668,450.90

-
-
-
69,200.00
15,438.00
26,850.00
3,420.00
14,850.00
129,758.00

-
-
-
69,200.00
15,438.00
26,850.00
3,420.00
14,850.00
129,758.00

11,970.00
2,400.00
5,146.00
5,370.00
684.00
594.00
26,164.00

11,970.00
2,400.00
5,146.00
5,370.00
684.00
594.00
26,164.00

3,420.00
-
2,881.76
3,204.60
549.36
495.00
10,550.72

3,420.00
-
2,881.76
3,204.60
549.36
495.00
10,550.72

-
5,146.00
5,722.50
981.00
495.00
12,344.50

-
-
8,233.60
10,300.50
1,765.80
811.80
21,111.70
HARGA UPAH
DATA PEMBAHARUAN & PENYESUAIAN 2017-2018

No. Jenis Pekerja Sat. Koef. Harga Upah (Rp)

1 2 3 5. 6.
1 Pekerja OH 0.100 102,920.00
2 Tukang OH 0.050 121,230.00
- Kayu OH 0.050 107,400.00
- Besi OH 0.050 105,500.00
- Batu OH 0.050 109,300.00
- Cat OH 0.050 76,300.00
- Listrik OH 0.050 73,500.00
- Pipa OH 0.050 100,700.00
- Las OH 0.050 99,800.00
3 Kepala Tukang OH 0.010 139,754.00
- Kayu OH 0.010 136,800.00
- Besi OH 0.010 134,400.00
- Batu OH 0.010 133,200.00
- Cat OH 0.010 130,800.00
- Listrik OH 0.010 135,600.00
4 Mandor OH 0.005 198,000.00
5 Operator Alat Berat OH 0.065 157,901.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
Update Periode 2017-2018

Kode Region
No Uraian Bahan dan Tenaga Kerja Harga Satuan
1 2 3
A. BAHAN MENGGUNAKAN BESI/LOGAM
1 Besi Beton ulir BJTD-40 Rp. 10,900.00
2 Besi Beton polos BJTP-24 Rp. 10,600.00
3 Besi Siku Rp. 13,400.00
4 Besi WF 200.100.5,5.8 Rp. 13,400.00
5 Besi plat Rp. 13,500.00
6 Besi Kanal C 150.50.50.3,2 Rp. 13,100.00
7 Baut mur HTB A325O 5/8"X2 1/2 " Rp. 7,400.00
8 Baut angkur dia 19 mm - 60 cm Rp. 81,800.00
9 Baut keras Rp. 57,000.00
10 Base Plate steinlis dia 2 1/2 " Rp. 63,900.00
11 Suport Hand railing steinlis dia 2 1/2 " Rp. 56,000.00
12 Besi Hollow 20.20.2 MM Rp. 7,900.00
13 Besi Hollow 20.40.2 MM Rp. 14,900.00
14 Besi Hollow 40.40,2,3 MM Rp. 17,900.00
15 Besi Hollow 40.80.3,2 mm Rp. 22,900.00
16 Besi Hollow 75,75.3,8 mm Rp. 31,100.00
17 Pipa BSP dia 2 1/2 " Rp. 214,000.00
18 Pipa BSP dia 1 " Rp. 137,500.00
19 Pipa Steinlis Steel dia 2 1/2 " Rp. 381,500.00
20 Pipa Steinlis Steel dia 1 " Rp. 190,800.00
21 Elektrode Baja Rp. 38,200.00
22 Kawat Bendrat Rp. 17,600.00
23 Wire mesh M6 (210X495 cm) Rp. 428,000.00
24 Pintu Pagar Besi Rp. 981,000.00
25 Tutup Manhole besi plat t 2 mm Rp. 514,100.00
26 Pipa udara Rp. 153,700.00
B. BAHAN MENGGUNAKAN BATU, PASIR, PC
1 Pasir Beton Rp. 182,400.00
2 Pasir Pasang Rp. 169,100.00
3 Pasir Urug Rp. 136,800.00
4 Air Tawar Rp. 100.00
5 Semen Portland (1 zak = 50 Kg) Rp. 61,100.00
6 Semen Portland (1 zak = 50 Kg) Rp. 1,200.00
7 Semen Portland (1 zak = 40 Kg) Rp. 56,700.00
8 Tasirtu Rp. 96,100.00
9 Batu bata merah Rp. 700.00
10 Batako 9 x 19 x 39 Rp. 2,300.00
11 Batu kali belah 15/20 Rp. 155,300.00
12 Batu pecah mesin 1/2 Rp. 271,200.00
13 Batu pecah mesin 2/3 Rp. 199,500.00
14 Batu kerikil (bulat 1-2 cm) Rp. 224,300.00
15 Beton panel ukuran 2400x400x40 Rp. 142,500.00
16 Koral beton 2/3 Rp. 210,500.00
17 Split 2/3 Pecah Mesin Rp. 189,000.00
18 Semen PC Warna Rp. 13,400.00
19 Semen Berwaran Yiyitan Rp. 11,000.00
20 Saluran beton precast U 30 cm Rp. 148,400.00
21 Saluran beton precast U 60 cm Rp. 305,100.00
22 Bak kontrol 40x40 cm Rp. 256,500.00
23 Bak kontrol 70x70 cm Rp. 324,500.00
24 Ijuk Rp. 19,100.00
C BAHAN CAT/MINYAK/KUAS
1 Cat Besi Rp. 49,100.00
2 Cat Kayu Rp. 49,300.00
3 Cat Meni Besi Rp. 39,200.00
4 Cat Tembok Interior Rp. 23,000.00
5 Cat Tembok Exterior Rp. 130,000.00
6 Amplas Rp. 4,300.00
7 Kuas Cat 3" Rp. 10,500.00
8 Kuas Cat 6" Rp. 17,000.00
9 Minyak Cat (Thiner A) Rp. 22,400.00
10 Minyak begesting Rp. 7,100.00
11 Minyak Pelumas Rp. 30,000.00
12 Alkalin Rp. 28,500.00
13 Solar Rp. 7,000.00
14 Serat Fiber Rp. 9,500.00
15 Sealent Rp. 44,800.00
16 Oli Rp. 32,100.00
17 Silicone sealant Rp. 6,200.00
18 Waterproof Rp. 44,100.00
D BAHAN KAYU, TRIPLEK, MULTIPLEK
1 Kayu Meranti balok/usuk 5/7 Rp. 3,498,000.00
2 Kayu Meranti balok/usuk 6/15 Rp. 4,161,000.00
3 Kayu Meranti papan begesting (MC) Rp. 1,890,000.00
4 Kayu Meranti Papan 2/20,4/10 Rp. 6,382,500.00
5 Kayu Kamper (Slimar) Rp. 10,434,000.00
6 Kayu Kamper (Papan) Rp. 10,925,000.00
7 Kayu Kamper (Usuk) Rp. 10,120,000.00
8 Kayu Kamper Rp. 9,810,000.00
9 Kayu Dolken O 8- 10 Panjang 4 m1 Rp. 8,700.00
10 Kayu Gelam Ø 8 - 12 cm panjang : 4 m Rp. 15,000.00
11 Triplek tebal 4 mm uk 120x240 cm Rp. 65,400.00
12 HPL (122x244 cm) Rp. 208,700.00
13 HPL Rp. 69,800.00
14 Multiplex 12 mm 120x240 Rp. 175,400.00
15 Multiplex 9 mm 120x240 Rp. 119,800.00
16 Multiplex 4mm 120x240 Rp. 64,800.00
17 Multiplex 6mm 120x240 Rp. 82,200.00
18 Lis Gypsum Rp. 27,600.00
19 Lem Kayu Rp. 13,600.00
E BAHAN PAKU, BAUT MUR, ANGKUR
1 Paku 2 s/d 5" Rp. 15,900.00
2 Paku Asbes Rp. 17,300.00
3 Paku Reng Rp. 15,900.00
4 Paku Klem (No.4)/ Paku Usuk Rp. 16,700.00
5 Angkur pintu besi Rp. 23,800.00
6 Baut Skerup Rp. 1,100.00
7 Paku Sekrup Rp. 600.00
8 Skrup/ Ripet Rp. 500.00
9 Angkur Rp. 6,700.00
10 Dinabolt M10 Rp. 3,400.00
11 Paku triplek/Eternit Rp. 19,600.00
F BAHAN PENUTUP ATAP
1 Seng Gelombang Uk.0,8x1,5 Rp. 56,000.00
2 Seng gelombang BJLS 30 (80 x 180 cm) Rp. 58,800.00
3 Seng BJLS 30 Rp. 88,000.00
3 Asbes gelombang kecil 105x250 cm Rp. 79,500.00
4 Genteng Ex Monier Xl Rp. 8,900.00
5 Wuwung Genteng Ex Monier Xl Rp. 10,300.00
6 Kalsiboard EG Uk. 240x120x 6 mm Rp. 65,100.00
7 Gypsum Board Uk. 240x120x 9 mm Rp. 92,400.00
8 Kalsiplank lebar 20 cm t; 12 mm (panjang 3 m1) Rp. 67,200.00
9 Kalsiplank lebar 20 cm t; 12 mm ( Rp. 21,400.00
10 Usuk Galvalum 7,5x3,5 t= 0,75 mm Rp. 19,600.00
11 Reng Galvalum 3x4 cm t= 0,5 mm Rp. 8,400.00
G BAHAN KACA
1 Kaca Polos tebal 5 mm Rp. 85,600.00
2 Kaca Polos tebal 6 mm Rp. 124,400.00
3 Kaca Polos tebal 8 mm Rp. 185,500.00
4 Kaca Stopsol tebal 8 mm Rp. 593,600.00
5 Kaca Tempered Stopsol tebal 12 mm Rp. 1,312,500.00
6 Acrylic t = 8 mm Rp. 269,800.00
7 Plat steinlis penjepit Acrylic Rp. 27,300.00
8 Kaca Nako uk 15x80 cm tebal 5 mm + accesories Rp. 14,700.00
H BAHANG ENGSEL, GRENDEL, KUNCI, HANDLE
1 Cathment 12 " Rp. 74,800.00
2 Fixed Top Pin Rp. 115,500.00
3 Top Patch Fiiting Rp. 242,000.00
4 Door Closer Rp. 333,000.00
5 Door Stoper Rp. 32,400.00
6 Kunci Gembok Rp. 88,800.00
7 Floor Hinge Rp. 1,356,000.00
8 Bottom Patch Fitting Rp. 169,500.00
9 Bottom Lock Fitting Rp. 201,300.00
10 Lockase case cylinder Rp. 178,200.00
11 Lockase Window Bolt Rp. 156,800.00
12 Flush Bolt 6 " Rp. 43,600.00
13 Flush Bolt 12 " Rp. 64,200.00
14 Engsel pintu steinlish 4x3x3 mm Rp. 32,400.00
15 Full Handle HS Pull Rp. 318,000.00
16 Full Handle Stainleesstel t= 60 cm Rp. 357,000.00
17 Full Handle Rp. 289,300.00
18 Lever Handle Rp. 161,000.00
19 Handle HDS DKS Rp. 135,000.00
20 Handle Lock Jendela Rp. 67,800.00
I BAHAN TIANG PANCANG
1 Mini pile □ 250 x 250 mm, panjang 12 m Rp. 148,200.00
2 Joint sambungan tiang pancang Rp. 33,600.00
J BAHAN ALUMINIUM
1 Aluminium kusen pintu & jendela 4"X1 3/4" Rp. 93,500.00
2 Aluminium kusen pintu & jendela 3"X1 3/4" Rp. 84,000.00
3 Aluminium frame daun jendela Rp. 89,700.00
4 Aluminium frame daun pintu 4,5x6,5 cm Rp. 95,800.00
5 Aluminium frame daun pintu 4,5x11 cm Rp. 92,300.00
6 Aluminium ventilasi 1 'x 3 " Rp. 24,000.00
7 Aluminium frame vison Rp. 43,600.00
8 Spigot aluminium Rp. 13,600.00
9 Aluminium Composit Panel (ACP) Rp. 179,200.00
10 Aluminium Composit Panel Perforeted 3 mm (ACP) Rp. 253,000.00
11 Karet Kusen Aluminium Rp. 2,400.00
12 Sielent Rp. 2,500.00
13 Lis plafond aluminium siku Rp. 11,400.00
14 Base Plate 8 mm Rp. 50,300.00
15 Angkur dinabolt Rp. 10,400.00
K BAHAN PELAPIS LANTAI DAN DINDING
1 Homogenous Tile 60x60 Rp. 184,000.00
2 Keramik 40x40 Polished Rp. 76,400.00
3 Keramik 40x40 Unpolished Rp. 70,400.00
4 Tegel Keramik Dinding 20x25 cm Rp. 73,100.00
5 Tegel Keramik Lantai 20x20 cm Rp. 74,600.00
6 Step Noshing 3x 8 cm Rp. 11,200.00
L. SANITAIR
1 Closet Duduk Rp. 2,175,600.00
2 Closet Jongkok Rp. 367,300.00
3 Wastafel Meja + kran Rp. 929,500.00
4 Toilet Sprayer Rp. 294,300.00
5 Floor Drain Rp. 247,500.00
6 Soap Holder Rp. 73,500.00
7 Paper Holder Rp. 86,300.00
8 Robe Hook Rp. 96,900.00
9 Kran Rp. 148,400.00
10 Kitchen Zink + Kran Rp. 677,300.00
11 Sambungan Pipa PVC 3" Tipe AW Rp. 10,600.00
12 Sambungan Pipa Tee 3" Tipe AW Rp. 15,000.00
13 Pipa Pvc dia 6 " Type AW Rp. 107,800.00
14 Pipa Pvc dia 3 " Type AW Rp. 56,200.00
13 Klem penggantung pipa Rp. 13,700.00
14 Floor drain 3 " Rp. 247,500.00
14 Rol TBA Rp. 9,600.00
15 Klem PVC Rp. 2,700.00
N. LAIN-LAIN
1 Sewa Direksikeet dan Gudang Rp. 1,798,500.00
2 Pengadaan Air kerja Rp. 787,500.00
M UPAH TENAGA KERJA
1 Pekerja Rp. 85,500.00
2 Tukang kayu Rp. 107,400.00
3 Kepala Tukang kayu Rp. 136,800.00
4 Tukang batu Rp. 109,300.00
5 Kepala Tukang Batu Rp. 133,200.00
6 Tukang besi Rp. 105,500.00
7 Kepala tukang besi Rp. 134,400.00
8 Tukang cat Rp. 76,300.00
9 Kepala tukang cat Rp. 130,800.00
10 Tukang listrik Rp. 73,500.00
11 Kepala tukang listrik Rp. 135,600.00
12 Mandor Rp. 198,000.00
13 Operator Rp. 100,700.00
14 Tukang Pipa Rp. 100,700.00
15 Tukang Las Rp. 99,800.00
N SEWA PERALATAN
1 Sewa alat bantu (1 set @3alat) Rp. 1,000.00
2 Sewa welding set (min 5 jam) Rp. 50,000.00
3 Sewa Crane Tiang pancang Rp. 125,000.00
4 Sewa Hammer Tiang Pancang Rp. 150,000.00
5 Sewa Tamper Rp. 100,000.00
6 Sewa Alat Bantu Strauss Pile Rp. 15,000.00
7 Sewa Crane 30 ton Rp. 130,000.00
8 Sewa Genset Rp. 60,000.00
10 Mobilisasi dan Demobilisasi Tenaga kerja Rp. 3,000,000.00
11 Mobilisasi dan Demobilisasi Tiang Pancang Rp. 15,000,000.00
PAH
Region 1 Jakarta/Jabodetabek, Jawa
Region 2 Sumatra, Kalimantan
Region 3 Sulawesi, Bali, NTB
Region 4 Maluku, Papua
1 5.0 5 8
I 1 15.0 25 20
Satuan REGION HARGA
4 I II III IV

per Kg 10,900 12,400 11,700 12,000


per Kg 10,600 11,500 12,900 12,100
per Kg 13,400 14,300 16,400 14,500
per Kg 13,400 15,100 14,700 15,300
per Kg 13,500 14,900 14,600 15,600
per Kg 13,100 14,500 13,900 15,800
per bh 7,400 8,400 8,200 8,300
per bh 81,800 94,100 97,400 90,000
per bh 57,000 65,600 66,200 63,900
per bh 63,900 69,700 78,000 75,500
per bh 56,000 62,800 67,200 67,200
per m1 7,900 9,100 8,400 9,100
per m1 14,900 16,300 18,200 16,600
per m1 17,900 19,200 18,800 19,900
per m1 22,900 25,700 27,100 27,300
per m1 31,100 34,900 38,900 34,900
per m1 214,000 233,300 246,100 235,400
per m1 137,500 149,900 156,800 156,800
per m1 381,500 435,000 450,200 435,000
per m1 190,800 209,900 209,900 206,100
per Kg 38,200 42,100 42,100 45,500
per Kg 17,600 19,800 19,400 20,300
per lbr 428,000 479,400 475,100 500,800
per m1 981,000 1,030,100 1,049,700 1,128,200
per unit 514,100 575,800 642,700 606,700
per Bh 153,700 169,100 175,300 183,000

per m3 182,400 209,800 193,400 213,500


per m3 169,100 189,400 208,000 194,500
per m3 136,800 149,200 154,600 149,200
per lt 100 200 200 200
per zak 61,100 64,200 64,800 69,100
per Kg 1,200 1,300 1,500 1,500
per zak 56,700 62,400 61,300 64,100
per m3 96,100 108,600 120,200 104,800
per bh 700 800 900 900
per bh 2,300 2,700 2,600 2,800
per m3 155,300 174,000 166,200 174,000
per m3 271,200 309,200 320,100 309,200
per m3 199,500 227,500 231,500 227,500
per m3 224,300 244,500 273,700 246,800
per m1 142,500 151,100 169,600 153,900
per m3 210,500 235,800 233,700 250,500
per m3 189,000 207,900 226,800 223,100
per Kg 13,400 14,400 15,300 14,500
per Kg 11,000 12,700 13,100 12,700
per m1 148,400 166,300 167,700 163,300
per m1 305,100 332,600 323,500 363,100
per m1 256,500 279,600 292,500 305,300
per m1 324,500 350,500 379,700 389,400
per Kg 19,100 21,400 22,600 23,000

per Kg 49,100 55,500 60,400 55,500


per Kg 49,300 55,800 55,300 54,300
per Kg 39,200 41,200 44,300 45,900
per Kg 23,000 24,400 27,600 27,400
per Kg 130,000 145,600 157,300 148,200
per Lbr 4,300 4,800 5,100 5,200
per Bh 10,500 11,500 11,100 11,500
per Bh 17,000 18,400 18,700 18,700
per ltr 22,400 24,200 26,000 26,900
per ltr 7,100 7,800 7,500 8,600
per ltr 30,000 32,100 37,500 33,900
per Kg 28,500 30,000 31,700 31,400
per ltr 7,000 7,900 7,800 8,200
per m2 9,500 10,900 11,200 10,400
per tube 44,800 51,600 52,000 48,400
per ltr 32,100 35,700 34,100 37,900
per m1 6,200 7,200 7,200 6,900
per Kg 44,100 47,200 48,100 51,200

per m3 3,498,000 3,742,900 3,952,800 4,197,600


per m3 4,161,000 4,702,000 5,118,100 4,785,200
per m3 1,890,000 2,022,300 2,192,400 2,211,300
per m3 6,382,500 7,020,800 6,829,300 6,957,000
per m3 10,434,000 11,581,800 11,686,100 12,207,800
per m3 10,925,000 12,017,500 11,580,500 12,782,300
per m3 10,120,000 11,638,000 10,727,200 12,042,800
per m3 9,810,000 10,594,800 10,889,100 11,379,600
per btg 8,700 9,200 10,500 9,900
per btg 15,000 16,200 15,800 17,600
per Lbr 65,400 69,400 74,600 73,300
per lbr 208,700 240,100 254,700 250,500
per m2 69,800 77,500 82,400 82,400
per Lbr 175,400 184,200 186,000 207,000
per Lbr 119,800 134,200 137,800 129,400
per Lbr 64,800 69,400 75,200 73,900
per Lbr 82,200 88,000 97,900 98,700
per m 27,600 29,300 34,300 31,800
per Kg 13,600 15,400 14,900 15,000

per Kg 15,900 17,400 18,000 18,700


per Kg 17,300 18,600 21,000 19,600
per Kg 15,900 16,700 18,500 18,800
per Kg 16,700 17,900 20,900 19,100
per Bh 23,800 25,300 26,000 26,000
per Bh 1,100 1,300 1,300 1,400
per bh 600 700 800 700
per Bh 500 600 600 600
per Bh 6,700 7,300 7,800 7,600
per Bh 3,400 3,700 4,200 3,800
per Kg 19,600 22,000 22,800 23,400

per Lbr 56,000 58,800 61,600 62,200


per Lbr 58,800 64,700 68,800 66,500
per M2 88,000 100,400 108,300 100,400
per Lbr 79,500 86,700 97,800 88,300
per bh 8,900 9,700 10,200 9,800
per m 10,300 11,100 12,300 11,300
per Lbr 65,100 70,400 71,700 75,600
per Lbr 92,400 98,900 101,700 101,700
per Lbr 67,200 76,700 78,000 76,700
per m1 21,400 23,800 22,500 24,700
per m2 19,600 21,800 21,000 21,800
per m1 8,400 9,000 10,100 10,000

per m2 85,600 89,900 102,800 101,900


per m2 124,400 135,600 149,300 136,900
per m2 185,500 200,400 220,800 215,200
per m2 593,600 647,100 694,600 670,800
per m2 1,312,500 1,456,900 1,548,800 1,522,500
per m2 269,800 286,000 283,300 304,900
per m1 27,300 29,300 32,000 32,800
per Lbr 14,700 15,500 17,500 16,200
per bh 74,800 80,800 79,300 83,100
per set 115,500 123,600 139,800 130,600
per set 242,000 266,200 292,900 275,900
per set 333,000 363,000 399,600 393,000
per unit 32,400 36,000 34,700 36,000
per Bh 88,800 101,300 101,300 103,100
per stel 1,356,000 1,491,600 1,491,600 1,505,200
per unit 169,500 191,600 191,600 186,500
per unit 201,300 229,500 213,400 225,500
per set 178,200 192,500 219,200 205,000
per set 156,800 177,200 174,100 180,400
per Set 43,600 47,100 46,300 49,300
per Set 64,200 70,000 79,000 71,300
per stel 32,400 36,300 36,000 37,600
per stel 318,000 359,400 368,900 381,600
per stel 357,000 392,700 432,000 417,700
per stel 289,300 332,700 341,400 344,300
per stel 161,000 173,900 193,200 182,000
per stel 135,000 149,900 156,600 156,600
per stel 67,800 71,200 74,600 78,000

per m1 148,200 167,500 161,600 177,900


per bh 33,600 35,300 36,300 39,700

per m1 93,500 104,800 99,200 103,800


per m1 84,000 96,600 102,500 91,600
per m1 89,700 95,100 98,700 100,500
per m1 95,800 105,400 105,400 105,400
per m1 92,300 98,800 109,900 109,900
per m1 24,000 25,500 28,800 26,400
per m1 43,600 48,900 47,100 47,600
per m1 13,600 15,000 16,800 16,400
per m2 179,200 193,600 222,300 202,500
per m2 253,000 283,400 306,200 293,500
per m1 2,400 2,600 3,000 2,900
per m1 2,500 2,900 2,700 2,700
per m1 11,400 13,000 13,800 13,600
per m1 50,300 54,400 60,400 54,400
per bh 10,400 11,800 11,300 11,300

per m2 184,000 208,000 204,300 215,300


per m2 76,400 81,000 95,500 86,400
per m2 70,400 78,200 85,200 81,000
per m2 73,100 79,700 81,900 82,700
per m2 74,600 79,900 88,800 88,800
per bh 11,200 11,900 12,600 13,200

per unit 2,175,600 2,393,200 2,415,000 2,458,500


per unit 367,300 400,400 451,800 422,400
per unit 929,500 1,022,500 1,041,100 1,078,300
per bh 294,300 332,600 323,800 329,700
per bh 247,500 274,800 277,200 287,100
per bh 73,500 80,900 90,500 85,300
per bh 86,300 98,400 99,300 93,300
per bh 96,900 107,600 117,300 113,400
per bh 148,400 167,700 170,700 173,700
per bh 677,300 724,800 738,300 738,300
per bh 10,600 11,300 12,900 12,300
per bh 15,000 17,100 18,500 17,900
per M1 107,800 121,900 132,600 116,500
per M1 56,200 63,600 60,700 61,900
per bh 13,700 15,700 14,800 16,400
per bh 247,500 269,800 297,000 274,800
per btg 9,600 10,800 10,800 10,800
per bh 2,700 3,200 3,300 3,000

per bln 1,798,500 1,960,400 1,960,400 2,158,200


per bln 787,500 889,900 858,400 874,200

per hari 85,500 96,700 104,400 101,800


per hari 107,400 116,000 134,300 128,900
per hari 136,800 156,000 164,200 154,600
per hari 109,300 122,500 131,200 126,800
per hari 133,200 149,200 146,600 151,900
per hari 105,500 118,200 128,800 120,300
per hari 134,400 153,300 161,300 154,600
per hari 76,300 81,700 85,500 91,600
per hari 130,800 145,200 137,400 141,300
per hari 73,500 80,200 82,400 80,900
per hari 135,600 142,400 143,800 149,200
per hari 198,000 207,900 219,800 237,600
per hari 100,700 111,800 124,900 115,900
per hari 100,700 108,800 120,900 111,800
per hari 99,800 111,800 114,800 113,800

per jam 1,000 1,200 1,300 1,200


per hari 50,000 53,500 56,500 58,000
per jam 125,000 132,500 153,800 146,300
per jam 150,000 172,500 163,500 175,500
per jam 100,000 113,000 111,000 111,000
per jam 15,000 17,000 18,300 17,400
per jam 130,000 146,900 140,400 140,400
per hari 60,000 67,800 66,000 68,400
per ls 3,000,000 3,420,000 3,570,000 3,270,000
per ls 15,000,000 15,900,000 16,500,000 16,200,000