Anda di halaman 1dari 4

Jl. Cibeuti - Pst. Hidayatul Muttaqin RT/RW 003/006 Kel. Cibeuti Kec.

Kawalu Kota Tasikmalaya - 46182 - HP 085223133742

Lampiran 2 : Rencana Anggaran Biaya (RAB)

RENCANA ANGGARAN BIAYA (RAB)

Kegiatan : Bongkaran Tenant Global Teleshop


Pekerjaan : Bongkaran, Un-Install ME, Loading dan Unloading
Lokasi : LGF#12 - Plaza Asia Tasikmalaya
Tahun : 2017
Page : 1
HARGA JUMLAH JUMLAH
NO. URAIAN PEKERJAAN NOTE VOL. SAT SATUAN HARGA BIAYA
Rp. Rp. Rp.
1 2 3 3 4 5 6=3X5 7

A. PEKERJAAN PARTISI GYPSUM / HOARDING BOARD


1 Instalasi partisi gypsum/hoarding (block up) H.3560,
maju dr lease line 60cm termasuk instalasi 21,18 m2 125.000,00 2.646.875,00
aksesories (pintu dan kunci)
2 Pengecatan partisi gypsum/ hoarding (block up);
21,18 m2 25.000,00 529.375,00
cat putih
JUMLAH A 3.176.250,00 3.176.250,00

B. PEKERJAAN BONGKARAN LANTAI, DINDING & PLAFOND


1 Pek. Bongkaran Dinding Gypsum Buang 37,80 m2 32.500,00 1.228.500,00
2 Pek. Bongkaran Partisi Gypsum, Pintu & acc Buang 8,00 m2 32.500,00 260.000,00
3 Pek. Bongkaran Plafond Gypsum Buang 32,00 m2 37.500,00 1.200.000,00
4 Pek. Bongkaran Neon Sign Front & Backwall Kassa Buang 1,00 ls 500.000,00 500.000,00
5 Pek. Bongkaran lantai keramik & Screeding Buang 32,00 m2 45.000,00 1.440.000,00
JUMLAH B 4.628.500,00 4.628.500,00

C. PEKERJAAN UN-INSTALL ME
1 Pek. Un-Install Titik Lampu Buang 14,00 ttk 20.000,00 280.000,00
2 Pek. Un-Install Titik Lampu Neon Sign & Rak
Buang 7,00 ttk 30.000,00 210.000,00
Pajangan
3 Pek. Un-Install Titik Stop Kontak Buang 8,00 ttk 22.500,00 180.000,00
4 Pek. Un-Install Instalasi Listrik & Mcb Panel Listrik Buang 1,00 ls 1.000.000,00 1.000.000,00
5 Pek. Un-Install SAD/Diffuser Buang 3,00 ttk 65.000,00 195.000,00
JUMLAH C 1.865.000,00 1.865.000,00

D. PEKERJAAN BONGKARAN FURNITURE & BRANKAS


1 Pek. Bongkaran Rak Acc (besar) Pending 1,00 unit 350.000,00 350.000,00
2 Pek. Bongkaran Rak HP branding Pending 4,00 unit 200.000,00 800.000,00
3 Pek. Bongkaran Meja Pajangan HP Pending 2,00 unit 175.000,00 350.000,00
4 Pek. Bongkaran Meja Kassa Pending 2,00 unit 250.000,00 500.000,00
5 Pek. Bongkaran Rak Gudang Pending 1,00 unit 150.000,00 150.000,00
6 Pek. Bongkaran Brankas Pending 1,00 unit 1.000.000,00 1.000.000,00
JUMLAH D 3.150.000,00 3.150.000,00

Civil Engineering, Architecture, Mechanical Electrical, Furniture, Accesories, Single Letter, ect
Jl. Cibeuti - Pst. Hidayatul Muttaqin RT/RW 003/006 Kel. Cibeuti Kec. Kawalu Kota Tasikmalaya - 46182 - HP 085223133742

Page : 2
HARGA JUMLAH JUMLAH
NO. URAIAN PEKERJAAN NOTE VOL. SAT SATUAN HARGA BIAYA
Rp. Rp. Rp.
1 2 3 3 4 5 6=3X5 7

E. FINISHING
1 General Cleaning Outlet 1,00 ls 400.000,00 400.000,00
2 Loading Unloading area Plaza 1,00 ls 800.000,00 800.000,00
3 Transportasion area Plaza 1,00 ls 400.000,00 400.000,00
JUMLAH E 1.600.000,00 1.600.000,00
Total Biaya 14.419.750,00

Civil Engineering, Architecture, Mechanical Electrical, Furniture, Accesories, Single Letter, ect
Jl. Cibeuti - Pst. Hidayatul Muttaqin RT/RW 003/006 Kel. Cibeuti Kec. Kawalu Kota Tasikmalaya - 46182 - HP 085223133742

Civil Engineering, Architecture, Mechanical Electrical, Furniture, Accesories, Single Letter, ect
Jl. Cibeuti - Pst. Hidayatul Muttaqin RT/RW 003/006 Kel. Cibeuti Kec. Kawalu Kota Tasikmalaya - 46182 - HP 085223133742

REKAPITULASI RENCANA ANGGARAN BIAYA

Kegiatan : Bongkaran Tenant Global Teleshop


Pekerjaan : Bongkaran, Un-Install ME, Loading dan Unloading
Lokasi : LGF#12 - Plaza Asia Tasikmalaya
Tahun : 2017

JUMLAH
NO. URAIAN PEKERJAAN KET.
(Rp)
1 2 4 5

A. PEKERJAAN PARTISI GYPSUM / HOARDING BOARD 3.176.250,00

B. PEKERJAAN BONGKARAN LANTAI, DINDING & PLAFOND 4.628.500,00

C. PEKERJAAN UN-INSTALL ME 1.865.000,00

D. PEKERJAAN BONGKARAN FURNITURE & BRANKAS 3.150.000,00

E. FINISHING 1.600.000,00

Jumlah Total 14.419.750,00

Jumlah Dibulatkan 14.410.000,00

Terbilang Empat Belas Juta Empat Ratus Sepuluh Ribu Rupiah

Catatan :
- RAB belum termasuk Listrik Kerja
- RAB belum termasuk PPN/PPH
- Bongkaran & Unloading Furniture dan asset Global hanya sampai di area Plaza Asia Tasikmalaya

Tasikmalaya, 14 Januari 2017


Pelaksana

HIBAN KHOTIMUL BANIN ZAINI

Civil Engineering, Architecture, Mechanical Electrical, Furniture, Accesories, Single Letter, ect

Anda mungkin juga menyukai