C. PEKERJAAN UN-INSTALL ME
1 Pek. Un-Install Titik Lampu Buang 14,00 ttk 20.000,00 280.000,00
2 Pek. Un-Install Titik Lampu Neon Sign & Rak
Buang 7,00 ttk 30.000,00 210.000,00
Pajangan
3 Pek. Un-Install Titik Stop Kontak Buang 8,00 ttk 22.500,00 180.000,00
4 Pek. Un-Install Instalasi Listrik & Mcb Panel Listrik Buang 1,00 ls 1.000.000,00 1.000.000,00
5 Pek. Un-Install SAD/Diffuser Buang 3,00 ttk 65.000,00 195.000,00
JUMLAH C 1.865.000,00 1.865.000,00
Civil Engineering, Architecture, Mechanical Electrical, Furniture, Accesories, Single Letter, ect
Jl. Cibeuti - Pst. Hidayatul Muttaqin RT/RW 003/006 Kel. Cibeuti Kec. Kawalu Kota Tasikmalaya - 46182 - HP 085223133742
Page : 2
HARGA JUMLAH JUMLAH
NO. URAIAN PEKERJAAN NOTE VOL. SAT SATUAN HARGA BIAYA
Rp. Rp. Rp.
1 2 3 3 4 5 6=3X5 7
E. FINISHING
1 General Cleaning Outlet 1,00 ls 400.000,00 400.000,00
2 Loading Unloading area Plaza 1,00 ls 800.000,00 800.000,00
3 Transportasion area Plaza 1,00 ls 400.000,00 400.000,00
JUMLAH E 1.600.000,00 1.600.000,00
Total Biaya 14.419.750,00
Civil Engineering, Architecture, Mechanical Electrical, Furniture, Accesories, Single Letter, ect
Jl. Cibeuti - Pst. Hidayatul Muttaqin RT/RW 003/006 Kel. Cibeuti Kec. Kawalu Kota Tasikmalaya - 46182 - HP 085223133742
Civil Engineering, Architecture, Mechanical Electrical, Furniture, Accesories, Single Letter, ect
Jl. Cibeuti - Pst. Hidayatul Muttaqin RT/RW 003/006 Kel. Cibeuti Kec. Kawalu Kota Tasikmalaya - 46182 - HP 085223133742
JUMLAH
NO. URAIAN PEKERJAAN KET.
(Rp)
1 2 4 5
E. FINISHING 1.600.000,00
Catatan :
- RAB belum termasuk Listrik Kerja
- RAB belum termasuk PPN/PPH
- Bongkaran & Unloading Furniture dan asset Global hanya sampai di area Plaza Asia Tasikmalaya
Civil Engineering, Architecture, Mechanical Electrical, Furniture, Accesories, Single Letter, ect