Anda di halaman 1dari 45

STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA

BULAN I TAHUN ANGGARAN 2019


DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PASURUAN

A. HARGA SATUAN BAHAN BANGUNAN


HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
I. BAHAN PENUTUP ATAP & PLAFON
1 Asbes Bubungan Gelombang Besar t. 5 mm 2/m' 55,900
2 Asbes Bubungan Gelombang Kecil t. 4 mm 2/m' 29,300
3 Asbes gelombang besar t. 5 mm ( 3.00 x 1.10 ) Lbr 99,000
4 Asbes gelombang kecil t. 4 mm ( 3.00 x 1.05 ) Lbr 88,200
5 Asbes plat 1/1 m Ex Gresik (Harpleks) m2 18,200
6 Asbes plat 1/1 m Cap Kerang (ETERNIT) m2 12,000
7 Genteng bubungan Bambe (5 bj/m') bj 19,800
8 Genteng bubungan Karangpilang model layur (5 bj/m') bj 6,000
9 Genteng bubungan lokal m' 5,000
10 Genteng bubungan model Abadi (4 bj/m') bj 17,000
11 Genteng Bubungan Beton bj 8,000
12 Genteng Karangpilang model layur bh 2,200
13 Genteng model Abadi morando bh 7,000
14 Genteng model Abadi morando ALTO bh 4,700
15 Genteng model kr.pilang ex. Bambe bh 4,700
16 Genteng pres Kluntung bh 2,500
17 Genteng vlam pres lokal bh 1,300
18 Genteng Beton bh 5,500
19 Kalsi BOARD 122 x 244 cm GRC 4mm Lbr 58,500
20 Seng Gelombang BJLS 030 x 180 polos Lbr 63,000
21 Seng Gelombang BJLS 030 x 55 Lbr 50,000
22 Seng Gelombang BJLS 030 x 90 Lbr 56,000
23 Seng Gelombang BJLS 30, 80 x 180 cm Lbr 65,800
24 Seng Gelombang BJLS 30, 80 x 300 cm Lbr 101,000
25 Seng plat datar BJLS. 020 x 55 cm m' 17,000
26 Seng plat datar BJLS. 020 x 60 cm m' 23,300
27 Seng plat datar BJLS. 020 x 75 cm m' 27,900
28 Seng plat datar BJLS. 028 x 90 cm m' 34,000
29 Seng plat datar BJLS. 028 x 55 cm m' 37,000
30 Seng plat datar BJLS. 030 x 45 cm m' 34,000
31 Seng plat datar BJLS. 030 x 55 cm m' 39,000
32 Teakwood 122 x 244 x 4 mm Lbr 85,000
33 Teakwood 95 x 205 x 4 mm Lbr 78,400
34 Teakwood Lapis Aluminium 95 x 205 x 4 mm Lbr 111,100
35 Triplek 090 x 210 cm x 3 mm Lbr 57,200
36 Triplek 122 x 244 cm x 4 mm Lbr 70,400
37 Triplek 122 x 244 cm x 3 mm Lbr 55,500
38 Triplek 1,22 x 2,44 x 9 mm Lbr 134,200
39 Multiplex 9 mm Lbr 112,500
40 Formika Mellamin Putih 1,20 x 2,40 M ( t: 1 mm) Lbr 97,500
41 Lem Kayu Kg 14,500
42 Gypboard 1,2 x 2,4 x 9 mm Lbr 56,700
43 Ramset buah 7,880
44 Genteng Kaca Bh 14,900

II. BAHAN MENGGUNAKAN KAYU


1 Kayu bengkirai balok 8/15, 8/12, 6/12 x 4 m m3 7,750,000
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
2 Kayu bengkirai papan 2/20, 3/20 x 4 m m3 7,750,000
3 Kayu bengkirai usuk 5/7, 4/6 x 4 m m3 5,500,000
4 Kayu jati 5/7, 4/6, 3/5 x 2 m (Ex Pas.) m3 7,000,000
5 Kayu jati balok 8/12, 6/12 x 2 m (Ex Pas.) m3 9,200,000
6 Kayu jati papan 2/20 x 2 m (Ex Pas.) m3 9,200,000
7 Kayu jati reng 2/3, 3/5 x 2 m (Ex Pas.) m3 7,000,000
8 Kayu kamper balok 8/15, 8/12, 6/12 x 4 m m3 7,000,000
9 Kayu kamper papan 2/20, 3/20, 3/30 x 4 m m3 7,250,000
10 Kayu kamper reng 2/3, 3/5 x 4 m m3 4,900,000
11 Kayu kamper usuk 5/7, 4/6 x 4 m m3 4,900,000
12 Kayu Kruwing balok 8/15, 8/12, 6/12 x 4 m m3 5,250,000
13 Kayu Kruwing reng 2/3, 3/5 x 4 m m3 4,600,000
14 Kayu Kruwing usuk 5/7, 4/6 x 4 m m3 4,550,000
15 Kayu meranti merah balok 8/12, 6/12 x 4 m m3 4,350,000
16 Kayu meranti papan 2/20, 3/20 x 4 m m3 4,600,000
17 Kayu meranti usuk 5/7, 4/6 x 4 m m3 3,850,000
18 kayu papan begesting 2/20 x 4 m m3 2,800,000
19 Kayu Balok Meranti campuran m3 3,525,000
20 Kayu Papan Kruwing 2/20, 3/20, 3/30 m3 5,500,000
21 Bambu ljr 14,000
22 Dolken : dia10 cm bt 6,900
23 Kayu List Profil m' 8,000
24 List Gipsum L = 7,5 x 7,5 cm m' 13,000
25 List Gipsum Motif L = 15 x 15 cm ( bagus ) m' 20,000

III. BAHAN MENGGUNAKAN BESI & LOGAM


1 Baja Profil Siku kg 9,500
2 Baut Moer Ø 3/4 x 3 " bh 11,800
3 Baut Moer Ø 3/4 x 4 " bh 6,200
4 Baut Moer Ø 3/8 x 2,5 " bh 4,000
5 Baut Moer Ø 5/8 x 2,5 " bj 5,400
6 Baut Moer Ø 5/8 x 3 " bh 6,000
7 Dyna Bolt Ø 10 mm bh 2,100
8 Besi Pipa Kotak 20 x 20 ( t : 0,6 ) Ljr. 28,000
9 Besi Pipa Kotak 25 x 25 ( t : 1,6 ) Ljr. 73,300
10 Besi Pipa Kotak 30 x 30 ( t : 1,4 ) Ljr. 75,600
11 Besi Pipa Kotak 30 x 30 ( t : 1,6 ) Ljr. 89,200
12 Besi Pipa Kotak 40 x 40 ( t : 1,4 ) Ljr. 106,900
13 Besi Pipa Kotak 40 x 40 ( t : 1,6 ) Ljr. 123,700
14 Besi Pipa Kotak 50 x 50 ( t : 1,6 ) Ljr. 147,300
15 Besi Pipa Kotak 40 x 20 ( t : 1,2 ) Ljr. 64,200
16 Besi Pipa Kotak 40 x 20 ( t : 1,4 ) Ljr. 75,000
17 Besi Pipa Kotak 40 x 20 ( t : 1,6 ) Ljr. 84,300
18 Besi hollow galvanis 2x4 Ljr. 48,600
19 Besi hollow galvanis 4x4 Ljr. 60,000
20 Besi beton Ø 5 mm Ljr. 23,500
21 Besi beton Ø 6 mm Ljr. 26,400
22 Besi beton Ø 8 mm Ljr. 44,800
23 Besi beton Ø 10 mm Ljr. 67,700
24 Besi beton Ø 12 mm Ljr. 100,800
25 Besi beton Ø 16 mm ( full ) Ljr. 182,500
26 Besi beton polos kg 9,500
27 Besi beton D 10 mm Ljr. 72,900
28 Besi beton D 13 mm Ljr. 147,000
29 Besi beton D 16 mm Ljr. 225,100
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
30 Besi beton D 19 mm Ljr. 282,400
31 Besi beton D 22 mm Ljr. 373,500
32 Besi beton D 25 mm Ljr. 482,000
33 Besi beugel / baut kg 12,000
34 Besi Wiremesh Uk. 5.4 x 2.1 m (DM 6A) lbr 373,000
35 Besi Wiremesh Uk. 5.4 x 2.1 m (DM 8A) lbr 645,500
36 Besi plat 4' x 8' tebal 2 mm lbr 617,400
37 Besi plat 4' x 8' tebal 6 mm lbr 1,276,700
38 Besi plat 4' x 8' tebal 8 mm lbr 1,941,700
39 Besi plat 4' x 8' tebal 10 mm lbr 2,541,100
40 Besi plat 4' x 8' tebal 12 mm lbr 3,152,800
41 Besi Plat 12 x 40 mm x 6 m' Ljr. 235,000
42 Besi Plat 12 x 70 mm x 6 m' Ljr. 460,000
43 Besi Plat Aluminium tebal 2 mm (1 x 2 m) m2 450,000
44 Besi Plat Bordes 4" x 8" tebal 3 mm Lbr. 962,000
45 Besi Plat strip panjang 6 m (3 x 32 mm) Ljr. 50,700
46 Besi Profil WF < = 200 mm kg 9,800
47 Besi Profil WF < = 200 s/d 400 mm kg 9,600
48 Besi Profil WF > 400 mm kg 9,700
49 Besi siku L 30. 30. 3 Lokal Ljr. 28,300
50 Besi siku L 30. 30. 3 Standart Ljr. 60,900
51 Besi siku L 40. 40. 3 Lokal Ljr. 59,100
52 Besi siku L 40. 40. 4 Standart Ljr. 124,700
53 Besi siku L 50. 50. 5 Lokal Ljr. 84,300
54 Besi siku L 50. 50. 5 Standart Ljr. 214,600
55 Besi siku L 60. 60. 6 Lokal Ljr. 263,300
56 Besi siku L 60. 60. 6 Standart Ljr. 351,200
57 Besi Siku Standart Kg 9,100
58 Besi ulir U 16 Ljr. 177,200
59 Besi ulir kg 10,900
60 Canal C / CNP 125.50.20.2,3 panjang 6 m btg. 272,000
61 Canal C / CNP 150.50.20.3,2 panjang 6 m btg. 308,000
62 Daun Pintu Aluminiun standart (Silver/Coklat) bh 302,500
63 Daun Pintu PVC ( Komplit engsel + kunci ) u/ km/wc 180x60 unit 190,500
64 Roling Door Medium tebal 1,2 mm m2 525,000
65 Jarum Keras Ø12 mm bh 15,000
66 Jarum Keras Ø16 mm bh 24,000
67 Jarum Keras Ø19 mm bh 38,000
68 Jarum Keras Ø25 mm bh 90,000
69 Kawat Bronjong kg 19,100
70 Kawat duri pagar (1 Rol) 5 kg rol 78,100
71 Kawat Harmonika BWG 16 x 25 x 100 m2 25,000
72 Kawat ikat beton (Bendrat) Kg. 18,500
73 Kawat Las RB Kg 65,500
74 Kawat Galvanis dia 4 mm Kg 20,000
75 Kawat nyamuk Aluminium, L 90 m2 22,800
76 Kawat seling 8 mm m' 13,000
77 List Polycarbonite Aluminium H ( merk Edico) m' 88,500
78 Profil Almunium T m' 10,000
79 Pagar BRC 0.9 x 2,4 m ( pigora pipa 1.25 " ) lbr 230,000
80 Pagar BRC 1.2 x 2,4 m ( pigora pipa 1.25 " ) lbr 285,500
81 Gerbang Pagar dan Pintu Tralis / Besi hollow m2 575,000
82 Polycarbonate ( 2,1 x 11,8 ) m lbr 2,629,200
83 Asbes Fiber Plastic gelombang m2 25,000
84 Asbes Fiber Plastic Datar m2 37,500
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
85 Polycarbonate + Rangka Stainllesstill m2 500,000
86 Rangka atap galvalum Pendopo sudut 30 & 60, UK.100;t.0,75 m2 220,000
87 Rangka Atap Galvalume Uk. 100, Tbl : 0,55 mm Reng : 36 t: 0,5) Model LIMAS m2 210,000
88 Rangka Atap Galvalume Uk. 100, Tbl : 0,55 mm Reng : 36 t: 0,5) Model GEWEL m2 200,000
89 Rangka Atap Galvalume Uk. 75, Tbl : 0,55 mm Reng : 36 t: 0,5) Model LIMAS m2 190,000
90 Rangka Atap Galvalume Uk. 75, Tbl : 0,55 mm Reng : 36 t: 0,5) Model GEWEL m2 185,000
91 Rangka Atap Galvalume Pendopo 30º & 60º Uk.100, Tbl : 0,75 mm Uk.100, m2 220,000
92 Tbl : 0,55 mm
Sunscreen Reng : 36 t: 0,5) Model GEWEL
Aluminium m2 325,000
93 Aluminium Foil m2 4,500
94 Kalsi Plank Lengkap L.30 cm t.9mm + Rangka Hollow m' 85,000
95 Kalsi Plank Lengkap L.20 cm t.9mm + Rangka Hollow m' 75,000
96 Pas. Rangka Plafon Galvalume hollow 2x4 t.0.30 + Gypsum Board 9 mm m2 90,000
97 Pas. Rangka Plafon Galvalume hollow 2x4 - 4x4 t.0.30 + Gypsum Board 9 mm m2 95,000
98 Pas. Rangka Plafon Galvalume hollow 4x4 t.0.30 + Gypsum Board 9 mm m2 105,000
99 Pas. Rangka Plafon Galvalume hollow 2x4 t.0.30 + Kalsi Board 4 mm m2 95,000
100 Pas. Rangka Plafon Galvalume hollow 2x4 - 4x4 t.0.30 + Kalsi Board 4 mm m2 100,000
101 Pas. Rangka Plafon Galvalume hollow 4x4 t.0.30 + Kalsi Board 4 mm m2 110,000
102 sketsel/dinding rangka hollow+doubel board 9 mm ( Metal Studd) m2 135,000
103 sketsel/dinding rangka hollow+single board 9 mm ( Metal Studd) m2 110,000
104 Pas. Usuk / Reng Galvalume : Uk. 100 , t = 0,55 mm, Reng 36, t : 0.5 ( Model GE m2 95,000
105 Pas. Usuk / Reng Galvalume : Uk. 75 , t = 0,55 mm, Reng 36, t : 0.5 ( Model GEW m2 90,000
106 Tiang BRC 2" 240 cm lbr 95,000
107 Useank Woodrank m' 21,500
108 Woter Moer Ø 1 ' PVC bh 13,600
109 Woter Moer Ø 1/2 ' PVC ( biasa ) bh 5,500
110 Woter Moer Ø 16mm bh 35,000
111 Woter Moer Ø 3/4' PVC bh 6,700
112 Zincalume 25 mm m2 64,600
113 Zincalume 40 mm m2 94,900
114 Rangka atap galvalum type Channel C 100 t.1,00 tanpa sambungan (model limas m2 185,000
115 Rangka atap galvalum type Channel C80 t.1,00 tanpa sambungan (model limas) m2 200,000
116 Rangka atap galvalum type Channel C80 t.1,00 tanpa sambungan (model gewel) m2 190,000
117 Rangka atap galvalum Kombinasi type C80 t.1,00 & C80 t.0,75 tanpa sambungan m2 190,000
118 Rangka atap galvalum Kombinasi type C80 t.1,00 & C80 t.0,75 tanpa sambungan m2 185,000
119 Rangka atap galvalum type Channel C80 t.0,75 tanpa sambungan (Model Limas) m2 165,000
120 Rangka atap galvalum type Channel C80 t.0,75 tanpa sambungan (Model Gewel) m2 160,000
121 Pas. Rangka Plafond Hollow + Sika/Silica/GRC Board m2 85,000
122 Baja ringan, C.80.0,75 btg. 80,100
123 Baja ringan, reng 30.0,45 btg. 35,900
124 Pas. Kalsiplank L=20 cm + GRC Board m' 57,500
125 Pas. Kalsiplank L=30 cm + GRC Board m' 56,500
126 Paranet m' 20,000
127 Pasang Polycarbonate + Rangka Besi Hollow m2 400,000
128 Pasang Atap Galvalum + Rangka Besi Hollow m2 400,000
129 Pagar Besi Hollow / teralis besi Strip m2 525,000
130 Tralis Jendela Besi Hollow m2 375,000
131 Besi pipa galvanis medium 1/2, 6m Ljr. 84,800
132 Besi pipa galvanis medium 3/4, 6m Ljr. 121,200
133 Besi pipa galvanis medium 1, 6m Ljr. 159,500
134 Besi pipa galvanis medium 1 1/4, 6m Ljr. 232,800
135 Besi pipa galvanis medium 1 1/2, 6m Ljr. 261,800
136 Besi pipa galvanis medium 2, 6m Ljr. 318,500
137 Besi pipa galvanis medium 2 1/2, 6m Ljr. 451,800
138 Besi pipa galvanis medium 3, 6m Ljr. 517,500
139 Besi pipa galvanis tebal 4, 6m Ljr. 687,500
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4

IV. BAHAN PENGGANTUNG DAN PENGUNCI


1 Door Closer Bagus bh 270,000
2 Door Closer Biasa bh 130,000
3 Door Holder/ pegangan Pintu bh 110,000
4 Door Holder Handle stainles bh/Psg 125,000
5 Hendle Jendela ( Bagus ) bh 20,000
6 Door Stop bh 10,000
7 Engsel Angin ( Bagus / Kuningan ) bh 38,000
8 Engsel H = 80 bh 10,200
9 Engsel Jendela ARCH ( 2/stel ) : Giant ( Bagus ) 2/stel 20,000
10 Engsel Pintu Kecil bh 30,800
11 Engsel Pintu Besar bh/Psg 47,100
12 Engsel plat tanam ( Bagus ) bh 51,700
13 Engsel plat tanam untuk pintu kaca ( Floor Hinge ) set 955,400
14 Grendel biasa besar bh 13,700
15 Grendel biasa kecil bh 8,100
16 Grendel Tanam kuningan bh 64,200
17 Hak angin 4 mm sikutan Bagus stl. 81,000
18 Hak angin antik stl. 75,000
19 Kunci lemari bh 18,100
20 Kunci Silinder ( Bagus ) stel 120,000
21 Kunci selot Tanam Biasa bh 52,500
22 Kunci tanam antik set 55,000
23 Kunci tanam Besar ( Bagus ) set 305,000
24 Kunci tanam kamar mandi stel 50,000

V. BAHAN UNTUK KM/WC/URINOIR


1 Avour ( Kurasan Kamar Mandi ) Besi bh 41,300
2 Bak Air Viberglass ASTRO / Setara bh 245,900
3 Bak Cuci Stainllesstil 1 Lubang bh 175,600
4 Buat Septik Tank + Resapan ( 3 m3 ) Unit 4,700,500
5 CLOSED duduk porselin Komplit TOTO polos bh 2,900,000
6 CLOSED duduk porselin Komplit TOTO warna bh 1,900,000
7 CLOSED Jongkok porselin DUTY Muda bh 121,700
8 CLOSET Jongkok teraso lokal bh 150,000
9 CLOSED Jongkok porselin INNA warna Tua bh 166,900
10 Floor Hardener (setara Sika Floor 261) kg 15,000
11 Urinoir Keramik bh 1,300,000
12 Wastafel INA Komplit bh 400,000
13 Floor Drain ( besi ) ( Bagus ) bh 62,500
14 Ongkos Bor ( Sumur ) / Lonjor 4 m ljr 200,000
15 Tempat Sabun ( bagus ) Unit 69,000
16 Sekat Urinoir Unit 780,000

VI. BAHAN JENIS KACA


1 Daun Pintu Aluminium Coklat bh 200,000
2 Handle Pintu Kaca Stainlless Stell set 461,200
3 Kaca cermin 5 mm m2 175,000
4 Kaca Naco + Kerangka Dn 15,300
5 Kaca patri 5 mm m2 1,500,000
6 Kaca polos 3 mm m2 65,000
7 Kaca polos 5 mm m2 75,000
8 Kaca polos 8 mm m2 135,000
9 Kaca Polos 10 mm m2 225,000
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
10 Kaca Rayban 5 mm m2 85,000
11 Kaca Rayban 60 % : 12 mm m2 500,000
12 Kaca Rayban 60 % : 8 mm m2 300,000
13 Kaca es 3 mm m2 85,000
14 Kaca es 5 mm m2 100,000
15 Kaca Tempered 12 mm m2 950,000
16 Glass Block bh 13,800
17 Kusen Aluminium Uk. 3 " m' 70,000
18 Kusen Aluminium Uk. 4 " m' 77,500
19 Sealent bh 27,000
20 Silicont ( untuk Transparan & Hitam ) bh 28,900
21 Slimar aluminium 2,5 " Komplit m' 65,000
22 Slimar aluminium 3,5 " Komplit m' 75,000
23 Kusen Pintu & Jendela Aluminium 4 " m' 67,500
24 Kusen 3 " & Daun Pintu Aluminium Komplit Coklat u/KM Unit 850,000

VII. BAHAN JENIS PAKU


1 Paku asbes / Eternit kg 20,800
2 Paku beton ons 14,800
3 Paku Hak Kait 10 cm set 1,300
4 Paku Jembatan kg 13,000
5 Paku pancing set 1,000
6 Paku reng kg 17,000
7 Paku seng kg 39,100
8 Paku skrup Pak 51,700
9 Paku Triplek kg 18,900
10 Paku usuk kg 16,800

VIII. BAHAN FURNISHING INTERIOR DECORATION


1 Wall paper Luxsury Classic 10 m x 0,70 m rol 443,500
2 Wall paper Patina Galery 10 m x 0,53 m rol 364,300
3 Akustik tebal 9 mm 60 x 120 lbr 42,000

IX. BAHAN MENGGUNAKAN BATU, PASIR & SEMEN


1 Agregat halus / pasir cor m3 300,000
2 Batu belah 10/15 cm ; 15/20 cm ; 20/25 cm m3 216,600
3 Batu merah T. 6 cm biji 630
4 Batu merah T. 8 cm biji 690
5 Bata Ringan 20 x 10 x 60 84 biji/m3 711,000
6 Bata Ringan 20 x 10 x 20 250 biji/m3 500,000
7 Batu Split 0.5-1 cm (PM); 1-2 cm (PM); 2-3 cm (PM); 0.5-1 cm (PT); 1-2 cm (PT); m3 312,600
8 Kerikil Sungai m3 227,800
9 Pasir batu (sirtu) Klas C m3 100,000
10 Pasir batu (sirtu) Royalti m3 81,700
11 Pasir padas (sirdas) m3 65,800
12 Pasir pasang ( pasir kali lokal ) m3 108,000
13 Pasir urug m3 87,600
14 Portland Cement (PC) Gresik) 40 kg. 50,800
15 Semen Warna / putih ( Azano / tiga roda ) kg 3,800
16 Semen Warna selain putih/hijau kg 11,100
17 Semen untuk Bata ringan kg 2,200
18 Semen untuk Plesteran Bata Ringan kg 2,700
19 Semen Grouting (setara SIKA 215) Kg 6,600
20 Semen Injeksi (setara sikadur 31) Kg 113,900
21 Aditif Injeksi Semen (Intraplast Z) Kg 80,300
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
22 Tanah urug taman / material timbunan m3 175,000
Filler (Kapur) kg 2,000
X. BAHAN UNTUK PENGECATAN, PLITURAN
1 Cat Kayu Warna Muda (EMCO/Setara) kg 60,000
2 Cat Kayu Warna Tua (EMCO/Setara) kg 71,200
3 Cat kayu Semi Transparan (Mowilex/Setara) kg 71,500
4 Cat tembok interior Kwalitas III (DECOLITH/Paragon/Setara) 5/kg 95,500
5 Cat tembok interior Kwalitas II (Cathylac/Dulux/Setara) 5/kg 121,300
6 Cat tembok interior Kwalitas I (JOTUN/Setara) 5/kg 130,000
7 Cat Tembok Eksterior kwalitas II (Dulux Weathershield/setara) 2.5/kg 238,800
8 Cat Tembok Eksterior kwalitas I (Jotashield/setara) 5/kg -
9 Cat Genteng kg 31,800
10 Cat Titan kg 95,000
11 Cat Dasar (sealer) Lt 49,000
12 Cat Coating Beton (SIKA Top 107) Kg 41,300
13 Cat Beton (setara SIKA Seal on) kg 47,500
14 Coating Batu Alam Lt 66,300
15 Waterproofing kg 45,400
16 Serabut kasa waterproofing m2 2,800
17 Clear kg 70,000
18 Dempul 5/kg 87,700
19 Cat Khusus Marka / Glassbid kg 70,000
20 Kertas gosok Lbr 7,000
21 Kuas 2" bh. 7,400
22 Kuas 4" bh 14,400
23 Kuas 5" bh 19,900
24 Kuas roll bh 27,800
25 Meni besi kg 35,500
26 Meni kayu (cap pedang) kg 32,000
27 Minyak cat / Afduner Lt. 11,500
28 Plamir kayu kg 25,700
29 Plamir tembok kg 7,700
30 Plinkut ( Penutup Lubang Seng ) kg 10,300
31 Politur Lt. 64,200
32 Coll Teer kg 17,500
33 Thiner A Ltr 25,500
34 Thiner B Ltr 10,600
35 Vernis Lt. 28,000
36 Sabun kg 10,000
37 Soda api kg 19,900

XI. BAHAN UNTUK LANDASAN, LANTAI


1 Batako 40.20.10 bh 3,900
2 Batu Bobos / Palimanan 15x15,10x20 m2 76,000
3 Batu Bobos / Palimanan 20x20, 20X30 m2 85,000
4 Batu Granit m2 175,000
5 Batu Templek Garut Hitam 10 x 20 Cm m2 125,000
6 Batu Gilang Ex. Jember Uk. 10 x 20 m2 65,000
7 Kansteen Type DCK 421 ( 40.20.10 ) K 300 m' 56,300
8 Kanstein K.50.30 11/16 ( 50.30.15 ) K 300 bh 55,400
9 Kanstein 50.40.17/21 K.300 Pc 65,300
10 Kanstin 10.20.40 Pc 13,500
11 Keramik 20x20 Asia Kw I m2 40,000
12 Keramik 20 x 25 cm KW. 1 m2 45,000
13 Keramik 30/30 cm putih KW.1 (dop) m2 36,000
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
14 Keramik 30/30 cm putih Warna KW.1 m2 40,000
15 Keramik 40x40 cm Putih Motif KW 1 m2 43,800
16 Keramik 40x40 cm Warna Motif KW. 1 m2 45,000
17 Keramik 40x40 cm Warna Motif KW. 1 Kasar m2 50,000
18 Keramik 60x60 cm Warna Motif KW. 1 m2 76,400
19 Keramik dinding 25/40 Warna KW I m2 75,000
20 Keramik dinding 25/40 Warna Kasar KW I m2 80,000
21 Keramik List 10 / 20 cm bj 2,000
22 Keramik List 10 / 25 cm ( Frofile bagus / Khusus) bj 5,000
23 Keramik kuku Macan bj 8,200
24 Keramik Step Nosing bj 8,100
25 Paving Stone Polos K 225 ( t: 6 cm ) m2 47,500
26 Paving Stone Warna K 225 ( t: 6 cm ) m2 55,000
27 Paving Stone Polos K 225 ( t: 8 cm ) m2 40,000
28 Paving Stone Warna K 225 ( t: 8 cm ) m2 42,000
29 Paving Stone Polos K 300 ( t: 6 cm ) m2 58,000
30 Paving Stone Warna K 300 ( t: 6 cm ) m2 75,800
31 Paving Stone Polos K 300 ( t: 8 cm ) m2 89,700
32 Paving Stone Warna K 300 ( t: 8 cm ) m2 100,000
33 Paving Stone Polos K 400 ( t: 6 cm ) m2 59,000
34 Paving Stone Warna K 400 ( t: 6 cm ) m2 79,000
35 Paving Stone Polos K 400 ( t: 8 cm ) m2 100,000
36 Paving Stone Warna K 400 ( t: 8 cm ) m2 106,000
37 Paving Uskup K 300 bh 2,400
38 Rooster 40.20.10 Beton bh 15,000
39 Rooster Kayu Jati 30 / 30 bh 30,000
40 Tegel abu-abu 20/20 cm m2 180,000
41 Tegel Granit Non Solid 60 x 60 m2 200,000
42 Batu Candi Uk. 5/30 - 20/50 m2 115,000
43 Batu Alor Per 10 Kg 25,500
44 Batu Tulungagung ( Alor Garis ) m2 43,000
45 Batu Bobos ( Sukabumi ) m2 96,600
46 Batu alam koral m2 58,300
47 Batu alam koral Warna m2 60,000
48 Roster Cetak (Bata) bh 4,000
49 Batu Lempeng ( Banjar Negara ) m2 38,600

XII. BAHAN BETON CETAKAN


1 Buis beton Prestres C21 50 cm (tulangan) m' 49,500
2 Buis beton Ø 60 cm = p. 0. 50 m bt 82,500
3 Buis beton Ø 50 cm = p. 1 m m' 120,000
4 Buis beton Ø 40 cm = p. 1 m m' 105,000
5 Buis beton Ø 30 cm = p. 1 m m' 60,000
6 Buis beton Ø 20 cm = p. 1 m m' 77,500
7 Buis beton sigaran U 30 cm = p. 1 m m' 67,500
8 Buis beton sigaran U 20 cm = p. 1 m m' 60,000
REFORCED CONCRETE PIPE (RCP) Tipe LD (Light Duty) dan HD (Heavy Duty)
41 RCP Ø 300 X 1250 bt 480,700
42 RCP Ø 400 X 1250 bt 346,500
43 RCP Ø 500 X 1250 bt 528,000
44 RCP Ø 600 X 1250 bt 726,000
45 RCP Ø 300 X 2000 bt 437,000
46 RCP Ø 400 X 2500 bt 1,046,000
47 RCP Ø 500 X 2500 bt 1,526,000
48 RCP Ø 600 X 2500 bt 1,950,000
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
49 RCP Ø 700 X 2500 bt 2,170,300
50 RCP Ø 800 X 2500 bt 2,359,500
RCP Ø 900 X 2500 bt 3,333,000
RCP 1000 x 2500 x L x I bt 3,531,000
RCP 1100 x 2500 x L x I bt 5,032,500
RCP 1200 x 2500 x L x I bt 5,247,000
RCP 1300 x 2500 x L x I bt 7,269,900
RCP 1500 x 2500 x L x I bt 8,415,000
RCP 1400 x 2500 x L x I bt 9,606,300
NRCP 400 x 1250 x L x I bt 346,500
NRCP 500 x 1250 x L x I bt 528,000
NRCP 600 x 1250 x L x I bt 72,600
51 RCP Ø 1000 X 2450 CL bt 3,210,000
52 RCP - 300.2450 mm - LD bt 372,000
53 RCP - 400.2450 mm - LD bt 529,000
54 RCP - 500.2450 mm - LD bt 720,000
55 RCP - 600.2450 mm - LD bt 886,000
56 RCP - 800.2450 mm - LD bt 1,432,000
57 RCP - 1000.2450 mm - LD bt 2,084,000
58 RCP - 1200.2450 mm - LD bt 3,164,000
59 RCP - 1500.2450 mm - LD bt 5,025,000
60 RCP - 300.2450 mm - HD bt 381,000
61 RCP - 400.2450 mm - HD bt 579,000
62 RCP - 500.2450 mm - HD bt 81,000
63 RCP - 600.2450 mm - HD bt 1,128,000
64 RCP - 800.2450 mm - HD bt 1,902,000
65 RCP - 1000.2450 mm - HD bt 3,039,000
66 RCP - 1200.2450 mm - HD bt 4,147,000
67 RCP - 1500.2450 mm - HD bt 7,538,000
RCP ø 300 x 2000 bt 675,000
RCP ø 300 x 2440 bt 700,000
RCP ø 400 x 2500 bt 850,000
RCP ø 400 x 2440 bt 800,000
RCP ø 500 x 2500 bt 950,000
RCP ø 500 x 2440 bt 900,000
RCP ø 600 x 2500 bt 1,100,000
RCP ø 600 x 2440 bt 1,050,000
RCP ø 800 x 2500 bt 2,500,000
RCP ø 1000 x 2450 Type C bt 3,000,000
BOX CULVERT MONOLITH
68 BC 800/800 - 1000 ( Monolit ) HD bt 3,757,000
69 BC 800/800 - 1000 ( Monolit ) LD bt 2,188,500
70 BC 1000/1000 - 1000 ( Monolit ) HD bt 4,521,000
71 BC 1000/1000 - 1000 ( Monolit ) LD bt 3,263,700
BC 800 x 800 x 1200 (Monolit) bt 2,500,000
BC 1000 x 1000 x 1200 (monolit) bt 3,200,000
BC (400 X 400) - 1000 BM bt 872,300
BC (500 X 500) - 1000 BM bt 1,145,100
BC (600 X 600) - 1000 BM bt 1,502,600
BC (800 X 400) - 1000 BM bt 2,777,500
BC (1000 X 1000) - 1000 BM bt 3,341,800
BC (1200 X 1200) - 1000 BM bt 4,262,500
BC (1400 X 1400) - 1000 BM bt 5,529,700
BC (1500 X 1500) - 1000 BM bt 6,463,600
BC (1600 X 1600) - 1000 BM bt 6,872,800
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
BC(1800 X 1800) - 1000 BM bt 7,615,300
BC (2000 X 2000) - 1000 BM bt 8,527,200
BC (400 X 400) - 1001 bt 710,600
BC (500 X 500) - 1001 bt 907,500
BC (600 X 600) - 1001 bt 1,150,600
BC (800 X 800) - 1001 bt 1,618,100
BC (1000 X 1000) - 1001 bt 2,412,300
BC (1200 X 1200) - 1001 bt 3,440,800
BC (1400 X 1400) - 1001 bt 4,862,000
BC (1500 X 1500) - 1001 bt 5,853,100
BC (1600 X 1600) - 1001 bt 6,162,200
BC (1800 X 1800) - 1001 bt 6,800,200
BC (2000 X 2000) - 1001 bt 7,636,200
BOX CULVERT MONOLITH GANDAR 10 T
72 BC 80.80.120.11 cm bt 2,927,700
73 BC 100.100.120.12,5 cm bt 3,699,700
74 BC 150.1500.120.20 cm bt 6,862,000
75 BC 200.200.120.20 cm bt 7,385,000
BOX CULVERT MONOLITH GANDAR 20 T
78 BC 60.60.120.10 cm bt 1,916,200
77 BC 100.100.120.12,5 cm bt 3,601,400
78 BC 150.150.120.17,5 cm bt 7,348,000
UDITCH GANDAR 5 T
80 U 30.30.120.5 cm bt 285,900
81 U 30.40.120.5 cm bt 332,700
82 U 30.50.120.5 cm bt 421,900
83 U 40.40.120.6 cm bt 434,800
84 U 40.50.120.6 cm bt 341,300
85 U 40.60.120.6 cm bt 538,800
86 U 50.50.120.6 cm bt 610,800
87 U 50.60.120.6 cm bt 674,600
88 U-Ditch 80.80.120.8 Cm bt 1,061,600
89 U-Ditch 80.80.120.10 Cm bt 622,700
91 U-Ditch 100.100.120.8,5 Cm bt 1,549,800
89 U-Ditch 100.100.120.10 Cm bt 1,543,000
89 U-Ditch 100.100.120.12 Cm bt 1,685,700
90 U-Ditch 100.120.120.10 Cm bt 1,681,200
90 U-Ditch 100.120.120.12 Cm bt 1,800,900
91 U-Ditch 120.120.120.10 Cm bt 1,975,900
91 U-Ditch 120.120.120.12 Cm bt 2,001,000
UDITCH GANDAR 10 T
92 U 30.30.120.5 cm bt 351,600
93 U 30.40.120.5 cm bt 409,200
94 U 30.50.120.5 cm bt 467,000
95 U 40.40.120.6 cm bt 448,800
97 U 40.60.120.6 cm bt 602,300
98 U 50.50.120.6 cm bt 564,900
99 U 50.60.120.6 cm bt 678,700
100 U 50.70.120.6 cm bt 811,800
101 U 60.60.120.6 cm bt 718,300
103 U 60.80.120.8 cm bt 969,100
99 U 80.80.120.10 cm bt 1,254,000
100 U 80.100.120.10 cm bt 1,656,100
101 U 100.100.120.10 cm bt 1,676,400
UDITCH GANDAR 20 T
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
104 U 30.30.120.8 cm bt 445,500
105 U 30.40.120.8cm bt 534,600
106 U 30.50.120.8 cm bt 634,700
107 U 40.40.120.8 cm bt 593,500
109 U 40.60.120.8 cm bt 860,800
110 U 50.50.120.8 cm bt 797,500
111 U 50.60.120.8 cm bt 879,500
112 U 50.70.120.8 cm bt 1,125,300
113 U 60.60.120.10 cm bt 1,029,100
115 U 60.80.120.10 cm bt 1,383,300
112 U 80.80.120.12 cm bt 1,641,800
112 U 80.100.120.12 cm bt 2,168,700
113 U 100.100.120.15 cm bt 2,481,100
COVER UDITCH GANDAR 5 TON
116 Cover U-Ditch 30.6.120 Cm (5 Ton) bt 145,500
117 Cover U-Ditch 40.8.60 Cm (5 Ton) bt 89,000
117 Cover U-Ditch 40.8.120 Cm (5 Ton) bt 180,600
118 Cover U-Ditch 50.10.120 Cm (5 Ton) bt 217,500
119 Cover U-Ditch 60.10.120 Cm (5 Ton) bt 277,700
119 Cover U-Ditch 80.10.120 Cm (5 Ton) bt 399,800
119 Cover U-Ditch 100.12.120 Cm (5 Ton) bt 583,500
119 Cover U-Ditch 120.12.120 Cm (5 Ton) bt 777,700
COVER UDITCH GANDAR 10 TON
120 CU 30.8.120 cm(40) bt 178,200
121 CU 40.12.120 cm(52) bt 238,700
121 CU 40.12.120 cm(56) bt 238,700
122 CU 50.12.120 cm(62) bt 350,900
123 CU 60.12.120 cm(72) bt 434,000
123 CU 60.12.120 cm(76) bt 455,400
124 CU 80.12.120 cm(100) bt 697,400
124 CU 100.12.120 cm(120) bt 752,400
COVER UDITCH GANDAR 20 TON
125 CU 30.12.120 cm(46) bt 323,400
126 CU 40.12.120 cm(56) bt 431,200
126 CU 40.12.120 cm(60) bt 466,400
127 CU 50.15.120 cm(66) bt 590,700
128 CU 60.15.120 cm(80) bt 676,500
128 CU 80.15.120 cm(104) bt 795,400
128 CU 100.15.120 cm(130) bt 1,285,900

Cover Buis Beton


157 Cover Buis Beton 600x70x600 Pc 105,500
158 Cover Buis Beton 500x70x600 Pc 92,200
159 Cover Buis Beton 400x70x600 Pc 78,800
160 Cover Buis Beton 300x70x600 Pc 58,200
161 Cover Buis Beton 600x80x600 Pc 114,000
162 Cover Buis Beton 500x80x600 Pc 99,400
163 Cover Buis Beton 400x80x600 Pc 84,900
164 Cover Buis Beton 300x80x600 Pc 67,900
165 Cover Buis Beton 600x100x600 Pc 145,500
166 Cover Buis Beton 500x100x600 Pc 121,300
167 Cover Buis Beton 400x100x600 Pc 97,000
168 Cover Buis Beton 300x100x600 Pc 82,500
169 Cover Buis Beton 600x120x600 Pc 163,700
170 Cover Buis Beton 500x120x600 Pc 145,500
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
171 Cover Buis Beton 400x120x600 Pc 115,200
172 Cover Buis Beton 300x120x600 Pc 94,600
173 Cover Buis Beton 600x70x800 Pc 131,000
174 Cover Buis Beton 600x70x900 Pc 151,600
175 Cover Buis Beton 600x70x1000 Pc 163,700
176 Cover Buis Beton 600x80x800 Pc 145,500
177 Cover Buis Beton 600x80x900 Pc 169,800
178 Cover Buis Beton 600x80x1000 Pc 194,000
179 Cover Buis Beton 600x100x800 Pc 206,200
180 Cover Buis Beton 600x100x900 Pc 218,300
181 Cover Buis Beton 600x100x1000 Pc 230,400
182 Cover Buis Beton 600x120x1200 Pc 366,900
183 Cover Buis Beton 600x150x1200 Pc 424,500
184 Cover Buis Beton 500x120x1200 Pc 315,300
Cover Buis Beton 1000x150x1200 Pc 794,400
Cover Buis Beton 800x120x1200 Pc 436,600

XIII. BAHAN PERALATAN (SEWA ALAT)


1 Gerobag pasir bh. 462,800
2 Sikat ijuk bh. 10,500
3 Timba (ember cor) bh. 7,700
4 Cangkul Lengkap Dengan Pegangan Mata buah 78,600
5 Catut buah 27,300
6 Catut Kakak tua buah 45,000
7 Cangkul buah 82,500
8 Cetok buah 18,500
9 Daun Gergaji Best Mesin buah 8,000
10 Daun Gergaji Besi buah 16,700
11 Drip Kecil buah 7,000
12 Ganco buah 61,100
13 Garuk buah 47,500
14 Gergaji buah 67,100
15 Gunting Plat buah 100,000
16 Gunting Seng buah 34,900
17 Kikir buah 12,600
18 Sekrop buah 46,200
19 Tang buah 45,500
20 Linggis buah 46,600
21 Sabit Besar buah 45,500
22 Palu Kecil buah 21,300
23 Tong Sampah (apolo) buah 155,000

XIV. BAHAN ASPAL & BBM


1 Aspal Bitumen (drum) /155kg
- Harga tertinggi kg. 11,800
- Harga sedang kg. 11,800
- Harga terendah kg. 11,800
2 Aspal curah :
- Harga tertinggi kg. 10,300
- Harga sedang kg. 9,500
- Harga terendah kg. 8,700
3 Floix Oil Aspal Emulsi liter 11,700
4 Minyak bakar (minyak tanah) liter 17,000
5 Kayu bakar m3 250,000
6 Pertamina Dex liter 10,100
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
7 Pertamax liter 8,900
8 Minyak pelumas (Berbahan Bakar Bensin) liter 24,000
9 Minyak pelumas (Berbahan Bakar Solar) liter 24,000
10 Stempet kg. 20,000
11 Minyak Begesting liter 2,000
12 Kerosin liter 12,300
13 Base Coarse A m3 285,000
14 Base Coarse B m3 258,300
15 Urugan/Material Pilihan m3 195,000
16 CTB m3 586,700
17 ATB Ton 1,290,000
18 AC Ton 1,298,300
19 HRS Ton 1,398,300
20 SS Ton 1,515,000
ACWC L Ton 1,250,000
ACWC Ton 1,150,000
ACBC Ton 1,125,000
Prime Coat Ton 12,000
Tack Coat Ton 10,000

XV. BAHAN PLASTIK PIPA PVC+GALVANIS


1 Kran TOHO Ø ½" Bh 25,000
2 Kran TOHO Ø ¾" Bh 45,000
3 Pipa PVC Ø 1" x 4 m (D) ljr 45,000
4 Pipa PVC Ø 1½" x 4 m (D) ljr 45,000
5 Pipa PVC Ø 2" x 4 m (D) ljr 62,500
6 Pipa PVC Ø 2½" x 4 m (D) ljr 85,800
7 Pipa PVC Ø 3" x 4 m (D) ljr 116,500
8 Pipa PVC Ø 4" x 4 m (D) ljr 156,700
PVC U 15 ljr 82,500
9 Pipa PVC AW. Ø ½" MASPION TEBAL ljr 26,300
10 Pipa PVC AW. Ø ¾" MASPION TEBAL ljr 33,300
11 Pipa PVC AW. Ø 1" MASPION TEBAL ljr 43,500
12 Pipa PVC AW Ø 1 ¼" MASPION TEBAL ljr 56,900
13 Pipa PVC AW. Ø 1½" MASPION TEBAL ljr 74,400
14 Pipa PVC AW. Ø 2" MASPION TEBAL ljr 108,200
15 Pipa PVC AW. Ø 2,5" MASPION TEBAL ljr 142,400
16 Pipa PVC AW. Ø 3" MASPION TEBAL ljr 201,300
17 Pipa PVC AW. Ø 4" MASPION TEBAL ljr 255,000
18 Pipa PVC AW. Ø 5" MASPION TEBAL ljr 466,700
19 Pipa PVC AW. Ø 6" MASPION TEBAL ljr 606,300
20 Pipa PVC AW. Ø 8" MASPION TEBAL ljr 936,300
21 Pipa PVC AW. Ø 10" MASPION TEBAL ljr 210,000
22 Pipa PVC AW. Ø 12" MASPION TEBAL ljr 265,000
23 Pipa PVC AW. Ø 14" MASPION TEBAL ljr 280,000
24 Pipa PVC AW. Ø 16" MASPION ljr 310,000
25 Pipa Gas 2" x 16.A Ljr. 280,000
26 Pipa gas Tebal 3" (2.8 mm ) Ljr. 462,300
27 Pipa gas Tebal 4" Tebal 2.5 mm Ljr. 589,800
31 Soch PVC. Ø 8" ( D ) Bj. 125,000
32 TBA (Seal tape) Bj. 6,500
33 Lem Pipa PVC ( 1 Kg ) Kg. 56,900
34 Sepatu Boot Karet Stel 40,000
35 Lap Pel Ma'jun Kg. 8,700
36 Pipa PVC MOOF Ø 2" S - 10 Ljr. 181,100
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
37 Pipa PVC MOOF Ø 3" S - 10 Ljr. 369,000
38 Pipa PVC MOOF Ø 4" S - 10 Ljr. 558,000
39 Pipa PVC MOOF Ø 6" S - 10 Ljr. 1,178,800
41 Pipa PVC MOOF Ø 8" S - 10 Ljr. 1,924,400
40 Pipa PVC RRJ Ø 6" S - 10 Ljr. 121,100
42 Pipa PVC RRJ Ø 8" S - 10 Ljr. 1,978,100
43 Pipa Galvanis Ø ½" MEDIUM A Ljr. 153,700
44 Pipa Galvanis Ø ¾" MEDIUM A Ljr. 203,600
45 Pipa Galvanis Ø 1" MEDIUM A Ljr. 305,600
46 Pipa Galvanis Ø 1¼" MEDIUM A Ljr. 405,100
47 Pipa Galvanis Ø 1½" MEDIUM A Ljr. 473,800
48 Pipa Galvanis Ø 2" MEDIUM A Ljr. 633,100
49 Pipa Galvanis Ø 3" MEDIUM A Ljr. 1,008,900
50 Pipa Galvanis Ø 8" MEDIUM A Ljr. 4,827,700
51 Pipa Galvanis Ø 10" MEDIUM A Ljr. 6,375,000
52 Pipa Galvanis Ø 12" MEDIUM A Ljr. 7,481,300
59 Giboult Joint Ø 2" PVC Bj. 148,800
60 Giboult Joint Ø 3" PVC Bj. 219,500
61 Giboult Joint Ø 4" PVC Bj. 337,800
62 Giboult Joint Ø 6" PVC Bj. 537,400
63 Giboult Joint Ø 8" PVC Bj. 752,300
64 Giboult Joint Ø 10" PVC Bj. 1,074,900
67 Dop PVC MOOF Ø 2" bh 35,900
68 Dop PVC MOOF Ø 3" bh 57,300
69 Dop PVC MOOF Ø 4" bh 96,000
70 Dop PVC MOOF Ø 6" bh 245,200
71 Dop PVC RRJ Ø 6" bh 245,200
72 Bent 2" < 45˚ bh 437,900
73 Bent 2" < 90˚ bh 417,900
74 Bent 3" < 45˚ bh 517,600
75 Bent 3" < 90˚ bh 656,800
76 Bent 4" < 45˚ bh 668,900
77 Bent 4" < 90˚ bh 756,400
78 Bent 6" < 45˚ bh 1,114,800
79 Bent 6" < 90˚ bh 1,494,900
80 Bent All Flange Stell 6" < 45˚ bh 637,000
81 Tee All Socket PVC Moof 2"x2" bh 218,800
82 Tee All Socket PVC Moof 3"x2" bh 228,000
83 Tee All Socket PVC Moof 3"x3" bh 271,600
84 Tee All Socket PVC Moof 4"x2" bh 361,300
85 Tee All Socket PVC Moof 4"x3" bh 423,200
86 Tee All Socket PVC Moof 4"x4" bh 447,900
87 Tee All Socket PVC Moof 6"x2" bh 778,300
88 Tee All Socket PVC Moof 6"x3" bh 781,000
89 Tee All Socket PVC Moof 6"x4" bh 857,200
90 Tee All Socket PVC Moof 6"x6" bh 1,016,500
91 Tee All Socket PVC Moof 8"x3" bh 1,937,200
92 Tee All Socket PVC Moof 10"x10" bh 2,841,500
93 Reduser PVC Moof 3"x2" bh 109,700
94 Reduser PVC Moof 4"x3" bh 191,300
95 Reduser PVC Moof 6"x4" bh 397,900
96 Air Bersih (PDAM) m3 1,700
97 Sewa Alat Tes Pipa (u/per-meter pipa) m' 1,400
98 Sewa alat bor tanah jam 65,800
99 Sewa mesin gilas Bln. 235,300
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
100 Stamper jam 43,800
101 Mesin Gilas 3 roda 6 - 8 ton jam 92,600
102 Mesin Penyemprot Aspal 1000 ltr jam 58,900
103 Truk Bak terbuka 3, 5 ton/115 HP jam 195,300
104 Flange Socket PVC Ø 2" bh 161,500
105 Flange Socket PVC Ø 3" bh 230,700
106 Flange Socket PVC Ø 4" bh 282,000
107 Flange Socket PVC Ø 6" bh 529,700
108 Packing Karet 2" bh 10,000
109 Packing Karet 3" bh 14,300
110 Packing Karet 4" bh 16,300
111 Packing Karet 6" bh 6,300
112 Gate Valve 2" bh 918,800
113 Gate Valve 3" bh 1,575,000
114 Gate Valve 4" bh 1,837,500
115 Gate Valve 6" bh 3,937,500
116 Key Hole bh 19,800
117 Straatpoot 2" bh 125,400
118 Straatpoot 3" bh 153,800
119 Straatpoot 4" bh 223,900
120 Straatpoot 6" bh 313,500
121 Water meter 1/2" bh 128,700
122 Stop kran 1/2 " bh 10,200
123 Bow GI 3/4 " bh 7,300
124 Pipa GI dia 6" m' 370,900
125 Flange Stell dia 6" bh 186,600
126 Baut 5/8"x3 bh 4,400
127 Karet pak bh 19,500
128 Booring Croosing Jalan m' 150,000
129 Deser Joint dia 8"x6 bh 321,800
130 Pipa Gas Medium 2" x 3 m' Ljr. 229,500
131 Pipa Gas Medium 3" x 3 m' Ljr. 408,500
132 Pipa Gas Medium 4" x 3 m' Ljr. 535,000
133 Pipa Gas Medium 8" x 4 m' Ljr. 1,750,000
136 Water Meter Ø ½" bh 376,300
137 Water Meter Ø ¾" bh 612,500
138 Water Meter Ø 1" bh 857,500
139 Water Meter Ø 1½" bh 1,312,500
140 Water Meter Ø 2" bh 2,362,500
141 Water Meter Ø 3" bh 2,887,500
142 Water Meter Ø 4" bh 3,412,500
143 Water Meter Ø 6" bh 4,812,500
144 Water Meter Ø 8" bh 8,312,500
145 Water Meter Ø 10" bh 17,062,500
146 Water Meter Ø 12" bh 22,312,500
147 Water Meter Ø 14" bh 40,755,000
148 Stop Kran Ø ½" bh 41,500
149 Stop Kran Ø ¾" bh 70,700
152 Stop Kran Ø 1" bh 179,000
153 Stop Kran Ø 1¼" bh 318,500
154 Stop Kran Ø 1½" bh 417,900
155 Stop Kran Ø 2" bh 617,000
156 Stop Kran Ø 3" bh 1,662,500
157 Kran air Ø ½" G I bh 23,100
157 Kran air Ø 3/4" G I bh 36,200
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
158 Kenie Ø ½" G I bh 6,500
159 Kenie Ø ¾" G I bh 8,400
160 Kenie Ø 1" G I bh 11,600
161 Kenie Ø 1¼" G I bh 17,000
162 Kenie Ø 1½" G I bh 21,000
163 Kenie Ø 2" G I bh 32,800
158 Kenie Ø ½" PVC bh 10,800
159 Kenie Ø ¾" PVC bh 13,600
160 Kenie Ø 1" PVC bh 18,300
161 Kenie Ø 1¼" PVC bh 24,000
162 Kenie Ø 1½" PVC bh 22,400
163 Kenie Ø 2" PVC bh 30,400
163 Kenie Ø 3" PVC bh 65,800
163 Kenie Ø 4" PVC bh 102,500
163 Kenie Ø 6" PVC bh 478,800

XVI. POMPA AIR


1 Pompa Centrifugal Kapasitas : 200 watt Unit 558,200
2 Nasional 100 watt Unit 334,300
3 DAB 100 watt Unit 280,000
4 Pompa Listrik Kapasitas Unit 143,100
5 Pompa Tangan Dragon orisinil Unit 209,700
6 Pompa Air Shimizu ( model biasa ) Unit 456,300
7 Grundfos JP Basic 2 Unit 2,281,500
Spec: Pompa Semi Jet, > 100 watt
8 Grundfos JD Basic 3 Unit 2,808,000
Spec: Pompa Jet Pump, 250 watt
9 Grundfos JD Basic 4 Unit 2,925,000
Spec: Pompa Jet Pump, 375 watt
10 Grundfos JD Basic 5 Unit 4,422,600
Spec: Pompa Jet Pump, 500 watt
11 Grundfos CHJ4-40 Unit 4,153,500
Spec: Pompa Jet Pump, Stainless
12 Grundfos CHJ4-60 Unit 5,733,000
Spec: Pompa Jet Pump, Stainless
13 Sanyo PH 137A Unit 561,600
Spec: Pompa Sumur Dangkal, 125 watt
14 Sanyo PH236a Unit 772,200
Spec: Pompa Sumur Dangkal, 200 watt
15 Sanyo PH100 Unit 1,029,600
Spec: Pompa Sumur Dangkal, Tertutup
16 Sanyo PH150 Unit 1,263,600
Spec: Pompa Sumur Dangkal, Tertutup
17 Sanyo PDS-255 A Unit 3,685,500
Spec: Pompa Jet Pump, 250 watt
18 Sanyo PDH-400 Unit 9,126,000
Spec: Pompa Jet Pump, Model Tutup
20 Shimizu PS 130 BIT Unit 514,800
Spec: Pompa Sumur Dangkal, 125 watt
21 Shimizu PS-230 BIT Unit 959,400
Spec: Pompa Sumur Dangkal, 200 watt
22 Shimizu PS-103 BIT Unit 807,300
Spec: Pompa Sumur Dangkal, Tertutup
23 Shimizu Jet-100 BIT Unit 678,600
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
Spec: Pompa Semi Jet 100 watt
24 Shimizu PC-260 BIT Unit 1,638,000
Spec: Pompa Jet Pump, 250 watt
25 Shimizu PC-375 BIT Unit 1,813,500
Spec: Pompa Jet Pump, 375 watt
26 Shimizu PC-502 BIT Unit 2,983,500
Spec: Pompa Jet Pump, 500 watt
27 Shimizu PC-250 BIT Unit 2,258,100
Spec: Pompa Jet Pump, Model Tutup

TANGKI AIR
1 Tangki Air Kapasitas 1100 Liter Profil Tank Unit 1,315,000
2 Tangki Air Kapasitas 2200 Liter Profil Tank Unit 2,850,000
3 Tanki Air Stainlesssteel 2000 liter dengan Kaki Unit 4,560,000
4 Tanki Air Stainlesssteel 2500 liter dengan Kaki Unit 5,875,000

XVII. BAHAN PERALATAN LISTRIK


1 Automatys lampu hias selang (10 m) Bh 80,000
2 Bahan anti rayap kg 68,700
3 Box MCB un. 3/4 bh MCB Bh 35,000
4 Box MCB un. 7/8 bh MCB Bh 71,700
5 Box sekring biasa braco 1 Bh 44,200
6 Bundled cond connector 35/70 mm2 Bh 10,700
7 Dop Mercury 160 W Bh 56,800
8 Dop Mercury 250 W ML Bh 72,800
9 Dop Mercury 500 W ML Bh 89,700
10 Dop Brico 45 W Bh 145,000
11 Dop Visauva 85 W Spiral Bh 300,000
12 Fiting Pralon Broco Bh 13,300
13 Fiting keramik (E-40) Bh 50,000
14 Fiting keramik (E-27) Bh 37,700
15 Fiting gantung (E-40) kop ijo Bh 55,700
16 Fiting gantung (E-27) kop ijo Bh 38,300
17 Gembok besar Bh 67,500
20 Isolasi band Bh 10,000
21 Isolasi Nachi Bj 10,400
22 Isolator Bj 500
23 Kabel Arde 10 mm2 (tembaga) m' 13,700
24 Kabel Arde 25 mm2 (tembaga) m' 31,200
25 Grounding netral ttk/ Biji 28,000
26 Kabel BC dia. 50 mm2 m' 78,300
27 Grounding Earthing bar / Batang Arde (Non Corrosive Copper) Unit 71,700
31 Kabel twised 2 x 10 mm2 m' 6,000
33 Kaca kap mercury 250 W Bh 250,000
34 Kap lampu taman bulat kecil Bh 228,300
35 Kap lampu taman bulat sedang Bh 260,300
36 Kap lampu taman bulat besar Bh 341,700
37 kap mercury gantung Bh 75,000
38 Klem Kabel Arde (tembaga) Bj 13,300
39 Konektor Bh 10,000
42 Kontaktor 1 Phase (40 Ampere) Bh 565,000
43 Kontaktor 50 A Bh 665,000
44 Kotak APP type 3 (40 x 60 x 25 cm) Bh 578,300
46 Lampu TL 1 x 20 watt grill frame Philips Bh 180,000
47 Lampu TL 2 x 20 watt grill frame Philips Komplit Bh 385,000
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
48 Lampu Baret Bh 145,000
49 Lampu Baret 22 Watt (SCB 32 Kristal TL Celular 22 Watt) Bh 55,000
50 lampu dinding PL 18 Watt Bh 41,700
51 Lampu GS 150 Watt lengkap (Son) Bh 2,195,000
54 lampu HPLN - 250 W. E 40 Bh 128,300
55 lampu HPLN - 400 W. E 40 Bh 175,000
56 lampu hemat energi 45 watt Bh 171,700
57 Lampu jalan TL 40 W (lengkap) Bh 178,300
58 lampu pijar 25 watt Bh 10,000
59 lampu SL Phillips 18 Watt Bh 49,300
60 Lampu slang 100 m roll 3,200,000
61 Lampu SON - 150 W. E 40 Bh 230,000
62 Lampu SON - 250 W. E 40 Bh 280,000
64 Lampu TL 1 x 20 watt Komplit Bh 118,300
65 Lampu TL 2 x 20 watt Komplit Bh 185,000
66 Lampu TL 1 x 40 watt Komplit Bh 140,300
67 Lampu TL komplit grill frame 1 x 20 W Bh 275,000
68 Lampu TL komplit grill frame 2 x 20 W Bh 315,000
69 Lampu XL 5 watt Bh 46,700
70 Lampu XL 18 watt Bh 93,300
71 Link Bh 3,800
72 TL 2 x 36 watt / 865 Metal louvre (Reccesed) Bh 160,000
73 TL 1 x 18 watt / 865 Suport Balk Bh 350,000
74 Down Light 150 PL 18 Watt / 865 lengkap Bh 150,000
75 lampu sorot HP I - T : 250 watt Bh 1,516,000
76 Lampu sorot HP I - T : 400 watt Bh 1,755,000
77 ML 500 watt Bh 107,000
78 ML 250 watt Bh 75,000
79 Las doof Bh 500
80 MCB 10 Amp Bh 65,000
81 MCB 16 Amp Bh 71,700
82 MCB 6 Amp Bh 55,000
83 MCB 25 Ampere (sekering) Bh 72,300
84 MCB 35 Ampere (sekering) Bh 72,300
85 MCB 6A + Box Bh 58,700
86 Neon 1 x 20 watt Philip Bh 15,000
87 Neon 2 x 20 watt Philip Bh 170,000
92 Pasang instalasi listrik ttk 250,000
93 Pasang daya 2200 watt watt 2,756,700
94 Pasang daya 900 watt watt 1,238,300
95 Pasang penangkal petir 2 split Arde Unit 2,023,300
96 Pembuatan ornamen 3 m + klem (begel) 2" Bh 415,700
97 Photo swit 10 ampere Bh 147,500
98 Pitingan keramik 160 watt Bh 37,000
99 Pitingan keramik 250 watt Bh 55,000
100 Pol Bracket 6" + Bolt & Nut M 8 x 40 mm Bh 95,000
101 Pol Bracket 8" + Bolt & Nut M 8 x 40 mm Bh 135,000
102 Saklar ganda Merk BROCO Bh 17,500
103 Saklar handle 15 F (10.0) Bh 45,000
104 Saklar handle 30 A (10.3) Bh 70,000
105 Saklar handle 30 A (10.2) Bh 85,000
106 Saklar tunggal Merk BROCO Bh 13,500
107 Sekring 10 ampere automatis Bh 28,300
108 Sekring biasa Bh 5,000
109 Sekring ganda LN Bh 35,000
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
110 Sekring lengkap 6 A (bagus) Bh 42,000
111 Sekring lengkap 6 A (biasa) Bh 35,000
112 Sekring otomatis Bh 50,000
113 Sekring tunggal LN (komplit) Bh 21,000
114 Service wedge clamp 2/4 x 6/10 mm Bh 4,000
115 SON - 150 W. Sodium (kuning) Bh 242,300
116 SON - 250 W. Sodium (kuning) T Bh 285,000
117 SON BSN 250 Philips (lengkap) / kop jalan set Bh 151,700
118 Son H 250 W Bh 449,000
122 SRC 511 150 W. Son - 150 W Sodium (kuning) Bh 516,500
123 SRC 511 250 W. Son - 250 W Sodium (kuning) Bh 675,000
124 SRC 511 400 W. Son - 400 W Sodium (kuning) Bh 750,000
125 Stainless steel + stoping bucles ( /roll/50 m) m 11,600
126 Stater lampu TL Philip Bj 6,000
127 Stop kontak gandeng saklar Bh 18,300
128 Stop kontak merk BROCO Bh 12,500
129 T. Doos PVC Bh 1,300
132 Timah hitam kg 41,500
134 Timer switch Bh 550,000
135 Trafo, BHL - 150 (Mercury) Bh 165,000
136 Trafo, BHL - 250 (Mercury) Bh 181,000
137 Trafo, BHL - 400 (Mercury) Bh 452,000
138 Trafo, BSN - 150 (Sodium) Bh 197,000
139 Trafo, BSN - 250 (Sodium) Bh 335,000
140 Trafo, HPLN - 250 Bh 1,421,700
144 Sky genPro HPS250 Watt (C/w. ballast, Capasitor, Ignitor) set 4,417,000
145 SRX 086 SON-T W Ignitor SN 58 Capacitor 25 uv Ballast BSN 150 set 1,131,700
146 SRX 086 SON-T W Ignitor SN 58 Capacitor 25 uv Ballast BSN 250 set 1,445,000
147 lampu selang kotak warna 1 roll/100m 3,156,700
148 lampu selang bulat Sinyoku 1 roll/100m 3,456,700
149 Lampu GE Son 250 watt M2AR HPS 250 watt ex GE (IP 65) Unit 3,100,000
150 Lampu GE Son 150 watt M2AR HPS 150 watt ex GE (IP 65) Unit 1,930,000
151 Lampu GE Son 70 watt M2AR HPS 70 watt ex GE (IP 65) Unit 1,661,300
167 Auto switch 10 A bh 215,000
168 Auto switch 6 A bh 136,300
169 Croop bh 33,100
170 Ignitor bh 82,000
171 Anchor Bolt 16 mm set 49,400
172 Box meter bh 656,700
173 Terminal block c/w bh 53,000
174 Yuke bh 4,300
177 Kabel NYA 1000 volt 1 x 1,5 mm2 /m m' 2,500
178 Kabel NYA 1000 volt 2,5 mm (50 m) roll 4,100
179 Kabel NYA 1000 volt 4 mm (50 m) roll 7,500
180 Kabel NYA 500 volt 1 x 2,5 mm2 /m m' 4,000
181 Kabel NYM 500 volt 2 x 1,5 mm /m m' 8,500
182 Kabel NYM 500 volt 2 x 2,5 mm /m m' 12,000
183 Kabel NYM 500 volt 2 x 4 mm /m m' 21,000
184 Kabel NYM 500 volt 3 x 2,5 mm /m m' 15,000
185 Kabel NYY 2 x 1,5 mm /m m' 6,500
186 Kabel NYY 2 x 2,5 mm /m m' 9,000
187 Kabel NYY 2 x 4 mm /m m' 20,500
188 Kabel NYY 4 x 2,5 mm /m m' 25,000
189 Kabel NYY 4 x 6 mm /m m' 46,000
190 Kabel TI 4 x 16 mm /m m' 35,000
HARGA
NO. URAIAN JENIS BAHAN SATUAN SATUAN
( RP.)
1 2 3 4
191 Kabel Ti 2 x x 10 mm m' 6,000
194 Kabel Neon Zend bh 150,500
195 Exhaust fan 100 Cfm Unit 2,850,000
196 Exhaust Air Grille Unit 350,000
197 Lampu LED 9 Watt Bh 68,300
198 Lampu LED 12,5 Watt Bh 90,000
199 Lampu LED 14 Watt Bh 106,700
200 Lampu LED 20 Watt Bh 158,700
201 Lampu LED 30 Watt Bh 191,700
202 Lampu LED 40 Watt Bh 235,700
203 Lampu LED 36 Watt (Mata Banyak) set 673,300
204 Lampu LED 42 Watt (Mata Banyak) set 898,300
205 Lampu LED 56 Watt (Mata Banyak) set 1,383,300
206 Lampu LED 70 Watt (Mata Banyak) set 1,533,300
207 lampu LED 100 Watt (Mata Banyak) set 2,508,300
208 Kap Mercury (E-40) Kap Ijo Bh 55,000
209 Kap Mercury (E-27) Kap Ijo Bh 35,000
210 Lampu HPIT 250 watt (Komplet) unit 985,000
211 Lampu HPIT 400 watt (Komplet) unit 1,350,000
212 Lampu HPIT 1000 watt (Komplet) Unit 4,000,000
213 Roda besi pagar bh 177,000
B. HARGA SATUAN UPAH KERJA

NO. JENIS TENAGA KERJA SATUAN UPAH

1 2 3 4

1 Mandor Org/Hr 110,000


2 Kepala Tukang gali tanah Org/Hr 103,000
3 Kepala Tukang batu Org/Hr 103,000
4 Kepala Tukang kayu Org/Hr 103,000
5 Kepala Tukang besi Org/Hr 103,000
6 Kepala Tukang cat Org/Hr 103,000
7 Kepala Tukang listrik Org/Hr 103,000
8 Tukang batu Org/Hr 90,000
9 Tukang kayu Org/Hr 90,000
10 Tukang besi Org/Hr 90,000
11 Tukang cat Org/Hr 90,000
12 Tukang aspal Org/Hr 90,000
13 Tukang plitur Org/Hr 90,000
14 Tukang listrik Org/Hr 90,000
15 Pembantu Tukang batu / Pekerja Org/Hr 77,000
16 Pembantu Tukang kayu / Pekerja Org/Hr 77,000
17 Pembantu Tukang besi / Pekerja Org/Hr 77,000
18 Pembantu Tukang cat / Pekerja Org/Hr 77,000
19 Pembantu Tukang listrik / Pekerja Org/Hr 77,000
20 Operator Terampil Org/Hr 103,000
21 Operator Semi Terampil Org/Hr 90,000
22 Pembantu Operator Org/Hr 77,000
23 Sopir Terampil Org/Hr 103,000
24 Pembantu Sopir Org/Hr 77,000
25 Jasa Tenaga Angkut Barang Org/Hr 77,000

Pasuruan, 29 Januari 2019


KEPALA DINAS PEKERJAAN UMUM dan PENATAAN RUANG
KOTA PASURUAN

M. AGUS FADJAR, S.STP, MM


Pembina Tk. I
NIP. 19790322 199711 1 001
DAFTAR SATUAN SEWA PERALATAN PER JAM KERJA

HARGA
No. Peralatan Kode Satuan SATUAN
(Rp.)
1 Asphal Mixing Plant E 01 Jam 5,795,000.00
2 Asphal Finisher E 02 Jam 644,000.00
3 Asphal Sprayer E 03 Jam 104,000.00
4 Buldozer E 04 Jam 497,000.00
5 Compresor 4000-6500 L/M E 05 Jam 154,000.00
6 Concrete Mixer 0.3-0.6 M3 E 07 Jam 60,000.00
7 Crane 10 - 15 Ton E 05 Jam 389,000.00
8 Dump Truck 3-4 M3 E 09 Jam 275,000.00
9 Dump Truck 8-10 M3 E 10 Jam 465,000.00
10 Excavator E 08 Jam 394,000.00
11 Flat Bed Truck 3-4 M3 E 11 Jam 434,000.00
12 Generator Set E 12 Jam 342,000.00
13 Motor Grader E 13 Jam 359,000.00
14 Track Loader 75-100 HP E 14 Jam 422,000.00
15 Wheel Loader E 15 Jam 359,000.00
16 Three wheel Roller 6-8 Ton E 16 Jam 294,000.00
17 Tandem Roller 6-8 Ton E 17 Jam 384,000.00
18 Pneumatic Tyre Roller 8-10 Ton E 18 Jam 371,000.00
19 Vibrator roller 5-8 Ton E 19 Jam 319,000.00
20 Concrete Vibrator E 20 Jam 41,000.00
21 Stone Cruiser E 21 Jam 2,390,000.00
22 Water Pump 70-100 mm E 23 Jam 49,000.00
23 Water Tanker 3000-4500 L E 22 Jam 247,000.00
24 Pedestrian Roller E 24 Jam 73,000.00
25 Stamper E 25 Jam 39,000.00
26 Jack Hammer E 26 Jam 111,000.00
27 Vulvi Mixer E 27 Jam 179,000.00
28 Concrete Pump E 28 Jam 250,000.00
29 Trailer 20 ton E 29 Jam 867,000.00
30 Pile Driver E 30 Jam 259,000.00
31 Crane On Truck E 31 Jam 453,000.00
32 Mesin Las E 32 Jam 57,000.00
33 Bore Pile Machine E 33 Jam 300,000.00
34 Pick Up Truck E 34 Jam 47,000.00
35 Batching Plant E 35 Jam 354,000.00
36 Cold Milling Machine E 36 Jam 650,000.00
37 Genset Penerangan E 37 Jam 81,000.00
38 Chainsaw E 38 Unit/hari 100,000.00
39 Tripod E 39 Unit/hari 200,000.00
40 Alat pancang hammer E 40 Unit/hari 250,000.00
41 Theodholit E 41 Unit/hari 250,000.00
42 Waterpass E 42 Unit/hari 200,000.00
43 Pompa Air E 43 Unit/hari 50,000.00
1 2 3 4 5 6 7
10 1 m Pemadatan tanah ( per 20 cm )
3

A TENAGA
- Pekerja 0.500 Oh 86,625.00 43,312.50
- Mandor 0.050 Oh 131,250.00 6,562.50
B BAHAN
C PERALATAN
D Jumlah (A+B+C) 49,875.00
E Overhead & Profit (15%) 7,481.25
F Harga Satuan Pekerjaan (D+E) 57,356.25

11 1 m3 Urugan Pasir
A TENAGA
- Pekerja 0.300 Oh 86,625.00 25,987.50
- Mandor 0.010 Oh 131,250.00 1,312.50
B BAHAN
- Pasir Urug 1.200 M3 189,000.00 226,800.00
C PERALATAN
D Jumlah (A+B+C) 254,100.00
E Overhead & Profit (15%) 38,115.00
F Harga Satuan Pekerjaan (D+E) 292,215.00

12 1 m3 Urugan Sirtu Padat


A TENAGA
- Pekerja 0.250 Oh 86,625.00 21,656.25
- Mandor 0.025 Oh 131,250.00 3,281.25
B BAHAN
- Sirtu 1.200 M3 192,887.00 231,464.40
C PERALATAN
D Jumlah (A+B+C) 256,401.90
E Overhead & Profit (15%) 38,460.29
F Harga Satuan Pekerjaan (D+E) 294,862.19

3 1 m3 Pemadatan Tanah (per 20cm)


A TENAGA
- Operator 0.263 Oj 12,875.00 3,379.69
- Pembantu operator 0.263 Oj 9,625.00 2,526.56
- Pekerja 0.250 Oj 10,828.13 2,707.03
- Mandor 0.025 Oj 16,406.25 410.16
B Alat
- Vibrator roler 0.033 jam 510,135.00 16,885.47
- Bulldozer 0.016 jam 567,473.00 9,136.32
D Jumlah (A+B+C) 35,045.22
E Overhead & Profit (15%) 5,256.78
F Harga Satuan Pekerjaan (D+E) 40,302.00
ANALISA HARGA SATUAN PEKERJAAN

HARGA AHSP
JUMLAH
NO JENIS PEKERJAAN KOEF. STN SATUAN 2016
( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7
PEKERJAAN TANAH
7 1 m' Galian bor Strouze (Dia =30 cm )
A TENAGA
- Pekerja 0.735 Oh 86,625.00 63,669.38
- Mandor 0.073 Oh 131,250.00 9,581.25
B BAHAN
C PERALATAN
- Sewa Peralatan bor 0.125 unit/hari 409,500.00 51,187.50
D Jumlah (A+B+C) 124,438.13
E Overhead & Profit (15%) 18,665.72
F Harga Satuan Pekerjaan (D+E) 143,103.84

1 1 M3 Pembuangan tanah sejauh >150


A TENAGA
- Pekerja 0.5160 Oh 86,625.00 44,698.50
- Mandor 0.0500 Oh 131,250.00 6,562.50
B BAHAN
C PERALATAN
D Jumlah (A+B+C) 51,261.00
E Overhead & Profit (15%) 7,689.15
F Harga Satuan Pekerjaan (D+E) 58,950.15

IV PEKERJAAN BETON
26 1 M3 Pekerjaan plat Lantai t.12 cm
A PEKERJA + BAHAN
Beton Mutu f'c = 19,3 Mpa (K 225) 1.0000 M3 1,094,991.31 1,094,991.31
Pembesian besi polos 5.8711 Kg 19,045.81 111,818.96
Bekisting ( 1 kali pakai ) 4.0000 m2 1,151,872.33 4,607,489.32

B Jumlah ( A) 5,814,299.59
C Overhead & Profit (15%) 872,144.94
D Harga Satuan Pekerjaan (B+C) 6,686,444.53

27 1 M3 Pekerjaan plat Lantai t.10 cm


A PEKERJA + BAHAN
Beton Mutu f'c = 19,3 Mpa (K 225) 1.0000 M3 1,094,991.31 1,094,991.31
Pembesian besi polos 5.8711 Kg 19,045.81 111,818.96
Bekisting ( 1 kali pakai ) 4.0000 m2 1,151,872.33 4,607,489.32

B Jumlah ( A) 5,814,299.59
C Overhead & Profit (15%) 872,144.94
D Harga Satuan Pekerjaan (B+C) 6,686,444.53

29 1 M3 Pekerjaan plat Tangga


A PEKERJA + BAHAN
Beton Mutu f'c = 19,3 Mpa (K 225) 1.0000 M3 1,094,991.31 1,094,991.31
Pembesian besi polos 5.7810 Kg 19,045.81 110,103.83
Bekisting ( 1 kali pakai ) 4.0000 m2 670,985.84 2,683,943.36

B Jumlah ( A) 3,889,038.50
C Overhead & Profit (15%) 583,355.77
D Harga Satuan Pekerjaan (B+C) 4,472,394.27

29 Pekerjaan anak tangga


A PEKERJA + BAHAN
Beton Mutu f'c = 19,3 Mpa (K 225) 0.7300 M3 1,094,991.31 799,343.66
Pembesian besi polos 39.0060 Kg 19,045.81 742,900.86
Bekisting ( 1 kali pakai ) 3.1102 m2 2,100.00 6,531.47

B Jumlah ( A) 1,548,775.99
C Overhead & Profit (15%) 232,316.40
D Harga Satuan Pekerjaan (B+C) 1,781,092.39

30 1 titik Pondasi FootPlat


A PEKERJA + BAHAN
Beton Mutu f'c = 19,3 Mpa (K 225) 0.3840 M3 1,094,991.31 420,476.66
Analisa Harga SatuanPembesian
Pekerjaan 2016
besi UlirBidang Cipta Karya - Enginner Estimate
33.6000 Kg 27,452.11 922,390.90 25
Bekisting ( 1 kali pakai ) 13.3333 m2 481,839.68 6,424,529.11
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN (AHSP) TAHUN 2018
TRIBULAN III

NO PEKERJAAN AHSP
(Rp.)
I PEKERJAAN PERSIAPAN
1 1 m2 Pagar sementara dari seng gelombang tinggi 2 m 632,838.99
2 1 m Pengukuran dan Pemasangan Bouwplank 115,670.46
3 1 m2 Pembuatan gudang semen dan alat-alat 1,823,429.72
4 1 m2 Pembuatan rumah jaga/konstruksi kayu 2,229,725.24
5 1 m2 Pembuatan Stegger dari bambu 441,493.80
6 1 m3 Bongkaran Beton Bertulang 1,428,840.79
7 1 m3 Bongkaran Dinding tembok bata merah 714,420.39
8 1 m2 Membersihkan lapangan dan perataan 17,508.75

II PEKERJAAN TANAH
1 1 m3 Galian Tanah biasa sedalam 1 meter 78,487.50
2 1 m3 Galian Tanah biasa 2 meter 96,449.06
3 1 m3 Galian Tanah biasa 3 meter 114,712.50
4 1 m3 Galian Tanah keras 1 meter 104,448.75
5 1 m3 Galian cadas Keras 1 meter 158,484.38
6 1 m3 Galian Lumpur sedalam 1 meter 126,334.69
7 1 m' Pembuangan Tanah Sejauh 30 meter 34,383.56
8 1 m3 Urugan kembali 57,356.25
9 1 m3 Pemadatan tanah ( per 20 cm ) 57,356.25
10 1 m3 Urugan Pasir 292,215.00
11 1 m3 Urugan Sirtu Padat 294,862.19
12 1 m3 Urugan Sirdas 119,482.13

III PEKERJAAN PONDASI


1 1 m3 Pasang Pondasi Batu Kali, 1 Pc : 3 Ps 1,087,767.42
2 1 m3 Pasang Pondasi Batu Kali, 1 Pc : 4 Ps 1,028,283.39
3 1 m3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps 987,028.59
5 1 m3 Pasang Aanstampeng Batu Kali 535,690.64
6 1 m3 Pasang Pondasi sumuran, diameter 100 cm 1,078,673.95

IV PEKERJAAN BETON
1 1 M3 Membuat Beton Mutu f'c = 7,4 Mpa (K 100) 1,065,951.02
2 1 M3 Membuat Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100) 987,367.92
3 1 M3 Membuat Beton Mutu f'c = 14,5 Mpa (K 175) 1,188,969.59
4 1 M3 Membuat Beton Mutu f'c = 19,3 Mpa (K 225) 1,259,240.01
5 1 M3 Membuat Beton Mutu f'c = 26,4 Mpa (K 300) 1,326,273.66
6 1 M3 Membuat Beton Mutu f'c = 31,2 Mpa (K 350) 1,440,460.58
7 1 Kg Pembesian dengan besi polos 21,902.68
8 1 Kg Pembesian dengan besi polos ulir 31,569.93
9 1 m2 Pasang Bekisting untuk pondasi 554,115.64
10 1 m2 Pasang Bekisting untuk sloof 611,221.33
11 1 m2 Pasang Bekisting untuk kolom bebas 885,845.38
12 1 m2 Pasang Bekisting untuk balok 902,979.81
13 1 m2 Pasang Bekisting untuk plat lantai 1,324,653.18
14 1 m2 Pasang Bekisting untuk dinding 909,893.32
15 1 m2 Pasang Bekisting untuk tangga 771,633.72
16 1 m' Membuat kolom praktis beton bertulang (11 x 11) cm 3,662,439.90
17 1 m' Membuat ring balok beton bertulang (10 x 15) cm 159,068.61

V PEKERJAAN BESI DAN ALMUNIUM


1 1 Kg Pasang Besi Profil Cannal C 53,545.96
2 1 Kg Pasang Besi Profil Siku L baja 53,545.96
3 1 Kg Pasang rangka kuda-kuda baja WF 53,545.96
4 100 Kg Pekerjaan Perakitan Baja 83,610.07
5 1 m2 Pasang pintu besi plat baja tebal 2 mm rangkap, rangka baja siku 1,696,990.60
6 10 cm Pekerjaan Pengelasan 60,925.81
7 1 m2 Pasang Sunscreen Aluminium 169,292.65
8 1 M2 Pasang Rolling Door Aluminium (silver) 2,481,260.13
9 1 m' Pasang Kusen Aluminium 4 " (Coklat) 10,903.00
10 1 m' Pasang Daun Jendelan Slimar aluminium 3,5 " (coklat) 105,252.82
11 1 m' Pasang Daun jendela Slimar aluminium 2,5 "(coklat) 92,602.82
12 1 m2 Pasang Teralis besi strip (2 x 3) mm 699,423.70
13 1 m2 Pasang rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120 cm untuk partisi 119,049.44
14 1 m2 Pasang rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm untuk Plafond 151,744.51
15 1 m2 Pasang kawat nyamuk kassa 164,697.94
16 I m2 Pasang Jendela Naco + Tralist 3,232,844.45
17 1 M' Pasang talang datar, seng BJLS 28 293,982.32
18 1 M' Pasang talang 1/2 lingkaran D-15, seng BJLS 28 lebar 45 65,395.44

VI PEKERJAAN PASANGAN DINDING


1 1 m2 Pasangan Bata Merah tebal 1 Bata, 1 Pc : 2 Ps 449,031.16
2 1 m2 Pasangan Bata Merah tebal 1 Bata, 1 Pc : 3 Ps 433,428.24
3 1 m2 Pasangan Bata Merah tebal 1 Bata, 1 Pc : 4 Ps 422,473.66
4 1 m2 Pasangan Bata Merah tebal 1 Bata, 1 Pc : 6 Ps 417,135.58
5 1 m2 Pasangan Bata Merah tebal 1/2 Bata, 1 Pc : 3 Ps 211,148.56
6 1 m2 Pasangan Bata Merah tebal 1/2 Bata, 1 Pc : 4 Ps 206,906.39
7 1 m2 Pasangan Bata Merah tebal 1/2 Bata, 1 Pc : 6Ps 203,058.85
8 1 m2 Pasangan dinding roster terawang bakar (12x11x24), 1 Pc : 4 Pp 841,563.11
9 1 m2 Pasangan Dinding Bata Ringan tebal 10 cm dengan mortar siap pakai 10,843,769.20

VII PEKERJAAN PLESTERAN


1 1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm 77,195.21
2 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm 73,717.39
3 1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm 71,254.02
4 1 m2 Plesteran 1 Pc : 6 Ps, tebal 15 mm 68,906.42
5 1 m2 Plesteran 1 Pc : 8 Ps, tebal 15 mm 67,805.03
6 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm 103,335.06
7 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20 mm 98,697.96
8 1 m2 Plesteran 1 Pc : 5 Ps, tebal 20 mm 93,713.11
9 1 m2 Plesteran Ciprat 1 Pc : 2 Ps 55,321.98
10 1 m2 Finishing Siar Pas. Dinding 31,924.29
11 1 m2 Finishing Siar 1 Pc : 2 Ps, Pas. Batu Kali 67,610.66
12 1 m2 Acian 40,755.14

VIII PEKERJAAN LANTAI DAN PENUTUP DINDING


1 1 m2 Pasang Lantai Keramik 30 X 30 cm Putih KW I 227,372.34
2 1 m2 Pasang Lantai Keramik 40 x 40 cm putih KW I 226,616.54
3 1 m2 Pasang Lantai Keramik Warna KM/WC 20 x 20 cm 261,858.30
4 1 m2 Pasang Lantai Keramik 30 x 30 cm Putih Motif KW I 256,258.16
5 1 m2 Pasang Lantai Keramik 30 x 30 cm Motif Kasar KW1 286,115.38
6 1 m2 Pasang Lantai Keramik 40 x 40 cm warna KW I 339,479.73
7 1 m2 Pasang Lantai Granit 60 x 60 cm motif warna KW I 468,804.08
8 1 m1 Pasang Plint Keramik ukuran 10x20 cm 47,322.39
9 1 m2 Pasang Keramik Dinding 25 x 40 cm warna KW I 332,116.09
10 1 m2 Pasang Keramik Dinding 20 x 25 cm warna KW I 353,619.25
11 1 m1 Pasang List Keramik Dinding 5 x 20 cm warna KW I 190,391.76
12 1 m2 Pasang Dinding Bata Pelapis 3 cmx7cm x24 cm 57,259,217.49
13 1 m2 Pasang Batu Alam Candi 301,596.42
14 1 m2 Pasang Batu Alam Garis 233,640.62
15 1 m2 Pasang Batu Alam Koral/Ampyang 282,241.92
16 1 m2 Pasang Batu Alam Palimanan, Sukabumi, Lempeng 10/10 313,866.92
17 1 m2 Pasang Batu Alam Lempeng/Piring 203,305.92
18 1 m2 Pasang Wall paper lebar 50 cm 64,779.86
19 1 m2 Pasang Floor Hardener 294,632.42

IX PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 1 m2 Rangka Langit-langit Kayu Meranti 0,5 x 1 m 218,915.32
2 1 m2 Rangka Langit-langit Kayu Meranti (60x60) 223,832.95
3 1 m2 Pasang Eternit 13,302.56
4 1 m2 Pasang Langit-langit Triplek (120x240) tebal 4 mm 24,858.59
5 1 m2 Pasang langit-langit gypsum board, ( 120 X 240 X 9 ) mm 19,368.60
6 1 m2 Pasang langit-langit calsiboard, ( 120 X 240 ) mm 19,368.60
7 1 m2 Pasang langit-langit akustik, ( 60 x 120 ) mm berikut rangka almunium T 610,131.18
8 1 m' Pasang list plafond - kayu profil 21,849.11
9 1 m' Pasang list plafond gypsum lebar 15 cm 33,707.37
10 1 m' Pasang list plafond gypsum lebar 8 cm 33,707.37

X PEKERJAAN PENUTUP ATAP


1 1 m2 Pasang Atap Genteng Bambe 134,326.90
2 1 m2 Pasang Atap Genteng Model Layur 89,476.90
3 1 m2 Pasang Atap Genteng Morando 187,226.90
4 1 m2 Pasang Atap Genteng Beton 105,030.08
5 1 m Pasang Bubung Genteng Bambe 176,564.68
6 1 m Pasang Bubung Genteng Model Karang Pilang / Layur 119,984.68
7 1 m Pasang Bubung Morando 183,234.68
8 1 m Pasang Bubung Pres Beton 150,413.68
9 1 m2 Pasang Atap Asbes Gelombang 4 mm (Kecil) 63,358.50
10 1 m2 Pasang Atap Asbes Gelombang 5 mm (Besar) 67,705.50
11 1 m2 Pasang Atap Seng Gelombang BJLS 30 103,125.45
12 1 m Pasang Bubung Asbes Gelombang kecil 95,602.26
13 1 m Pasang Bubung Asbes Gelombang besar 156,782.26
14 1 m2 Pasang Atap Nok Seng 38,781.85
15 1 m2 Pasang Atap Galvalum/zinkalum/almunium 196,495.04
16 1 m2 Pasang Fiberglass Gelombang 56,648.25
17 1 m2 Pasang Fiberglass datar 72,460.75
18 1 m2 Pasang Alumunium Foil 28,301.79

XII PEKERJAAN KUNCI DAN KACA


1 1 bh Pasang kunci tanam antik 249,692.89
2 1 bh Pasang kunci tanam Besar Bagus 256,324.08
3 1 bh Pasang kunci kamr mandi 102,904.16
4 1 bh Pasang kunci pintu Silinder 321,944.66
5 1 set Pasang engsel pintu besar (Kuningan/sendok) 139,137.21
6 1 set Pasang engsel pintu kecil 74,518.06
7 1 set Pasang engsel jendela 40,885.81
8 1 set Pasang engsel angin 82,189.49
9 1 bh Pasang Kunci Selot 122,809.36
10 1 bh Pasang hak angin / Sikutan Kuningan 124,744.96
11 1 bh Pasang hak angin 4 mm lurus 123,650.66
12 1 bh Pasang Grendel 63,679.96
13 1 bh Pasang Grendel Kecil 63,679.96
14 1 bh Pasang Door Closer 368,735.28
15 1 bh Pasang Door Holder/ Pegangan Pintu 284,120.58
16 1 bh Pasang Door Stop 79,061.93
17 1 m2 Pasang Kaca, Tebal 5 mm 271,994.26
18 1 m2 Pasang Kaca, Tebal 8 mm 507,153.31
19 1 m2 Pasang Kaca Rayben, Tebal 5 mm 382,674.22
20 1 m2 Pasang Kaca cermin, Tebal 3mm 545,351.71

XIII PEKERJAAN PENGECATAN


1 1 m2 Pengikisan /pengerokan permukaan cat lama 17,528.88
2 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 19,161.88
3 1 m2 Pengecatan bidang kayu baru /warna (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 68,026.82
4 1 m2 Pengecatan bidang kayu baru /transparan (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutu 74,387.87
5 1 m2 Pelaburan Bidang Kayu dengan Politur 199,826.36
6 1 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter 10,887.99
7 1 m2 Pelaburan Bidang Kayu dengan Vernis 62,927.48
8 1 m2 Pengecatan Tembok Baru / KW III ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis cat Penutup) 37,210.37
9 1 m2 Pengecatan Tembok Baru / KW II ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis cat Penutup) 37,210.37
10 1 m2 Pengecatan Tembok Lama ( 1 Lapis Cat Dasar, 2 x pengecatan) 29,171.03
11 1 m2 Pengecatan permukaan baja dengan meni besi 38,628.93
12 1 m2 Pengecatan baja besi secara manual 4 lapis 70,690.74
13 1 m2 Coating transparan (doff) untuk batu alam 31,065.28
14 1 m2 Pengecatan Weathershield 91,812.02

XIV PEKERJAAN SANITASI


1 Memasang 1 buah kloset duduk / monoblok 3,377,111.78
2 Memasang 1 buah kloset jongkok porselen 526,550.50
3 Memasang 1 buah urinoir 2,194,335.13
4 Memasang 1 buah wastafel 1,188,201.80
5 Memasang 1 buah bak cuci stainless 684,912.98
6 Memasang 1 buah bak mandi fiber glass 6,178,409.21
7 Memasang 1 bh Floor drain 123,861.33
8 Memasang 1 buah kran diameter 3/4" atau 1/2" 55,574.81
9 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 546,344.93
10 Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm 829,059.38
11 Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm 1,055,184.25
12 Memasang 1 m' pipa PVC diameter 1/2" (AW) 36,742.21
13 Memasang 1 m' pipa PVC diameter 3/4" (AW) 48,631.49
14 Memasang 1 m' pipa PVC diameter 1" (AW) 60,016.32
15 Memasang 1 m' pipa PVC diameter 2" (AW) 99,892.39
16 Memasang 1 m' pipa PVC diameter 3" (AW) 175,059.47
17 Memasang 1 m' pipa PVC diameter 4" (AW) 258,544.64
18 Memasang 1 m' pipa PVC diameter 2" (D) 51,570.60
19 Memasang 1 m' pipa PVC diameter 3" (D) 110,042.78
20 Memasang 1 m' pipa PVC diameter 4" (D) 89,298.05
21 Memasang 1 m' pipa galvanis diameter 1/2" 140,795.88
22 Memasang 1 m' pipa Galvanis diameter 3/4" 175,911.13
23 Memasang 1 m' pipa Galvanis diameter 1" 231,703.38
24 Memasang 1 m' pipa Galvanis diameter 1 1/2" 319,293.07
25 Memasang 1 m' pipa Galvanis diameter 2" 438,954.08
26 Memasang 1 m' pipa Galvanis diameter 3" 646,147.08

XVI PEKERJAAN Non PERMEN


PEKERJAAN TANAH
1 1 m' Galian bor Strouze (Dia =30 cm ) 143,103.84
2 1 M3 Pembuangan tanah sejauh >150 58,950.15
PEKERJAAN BETON
3 1 M3 Pekerjaan plat Lantai t.12 cm 6,686,444.53
4 1 M3 Pekerjaan plat Lantai t.10 cm 6,686,444.53
5 1 M3 Pekerjaan Plat Lantai t. 7 cm 22,675,128.86
6 1 M3 Pekerjaan plat Tangga 4,472,394.27
7 1 M3 Pondasi FootPlat 8,932,506.17
8 1 M3 Pekerjaan kolom beton 15/20 14,132,930.20
9 1 M3 Pekerjaan kolom beton 15/25 11,353,903.49
10 1 M3 Pekerjaan kolom beton 15/30 6,900,182.25
11 1 M3 Pekerjaan kolom beton 20/20 9,258,458.98
12 1 M3 Pekerjaan kolom beton 25/25 12,160,130.82
13 1 M3 Pekerjaan kolom beton 30/30 bwh 9,042,887.25
14 1 M3 Pekerjaan kolom beton 30/30 atas 7,852,906.83
15 1 M3 Pekerjaan balok beton 15/20 9,625,653.11
16 1 M3 Pekerjaan balok beton 15/25 12,880,383.54
17 1 M3 Pekerjaan balok beton 15/30 9,124,142.90
18 1 M3 Pekerjaan balok beton 20/30 8,971,095.32
19 1 M3 Pekerjaan balok beton 20/40 8,609,100.73
20 1 M3 Pekerjaan balok beton 30/40 10,590,982.83
21 1 M3 Pekerjaan balok beton 30/50 9,377,543.54
22 1 M3 Pekerjaan balok beton 30/60 8,568,431.54
23 1 M3 Pekerjaan sloof beton 15/20 5,500,718.53
24 1 M3 Pekerjaan sloof beton 20/30 4,674,418.26
25 1 M3 Grouting Beton 53,366,723.13
26 1 titik Injeksi Beton 96,736.28
PEKERJAAN BESI DAN ALMUNIUM
27 1 M' Pasang talang U PVC 15 x 15 279,254.65
28 1 m2 Pasang sketsel/dinding rangka hollow+doubel board 9 mm ( Metal Studd) 115,903.90
29 1 m2 Pasang sketsel/dinding rangka hollow+single board 9 mm ( Metal Studd) 115,903.90
30 1 m2 Pasang Atap Polycarbonat tanpa rangka 503,887.74
31 1 m2 Pasang Atap Usuk Reng Baja Ringan 152,238.23
32 1 m1 Pasang Trektank 20,022.48
33 1 m1 Pasang Ikatan Angin 12,896.83
34 1 M1 Pasang Pagar BRC tinggi 90 cm 188,787.74
35 1 M1 Pasang Pagar BRC tinggi 120 cm 188,787.74
36 1 bh Pintu Kaca Rangka Alumunium (80x200) 1,443,464.25
37 1 M2 Pintu Kaca Rangka Alumunium (140x200) 408,745.48
38 1 bh Pintu Double Teakwood Rangka Alumunium (80x200) 21,910.44
39 1 M2 Pintu Double Teakwood Rangka Alumunium (140x200) 22,752.72
40 1 M2 Pas. Rangka atap galvalum type Channel C100 t.1,00 (model limas) 212,750.00
41 1 M2 Pas.Rangka atap galvalum type Channel C75 t.0,75 (model gewel) 184,000.00
42 1 M2 Pas. Rangka atap galvalum type UK.100 t.0,55 - Reng36 t.0,5 (model gewel) 230,000.00
43 1 M2 Pas. Rangka atap galvalum type UK.75 t.0,55 - Reng36 t.0,5 (GEWEL) 212,750.00
44 1 M2 Pas. Rangka Atap Galvalum Untuk Pendopo UK.100 t. 0.75 mm 253,000.00
45 1 M2 Pas. Atap Polycarbonate/Zincalum + Rangka Besi Hollow 460,000.00
46 1 M2 Pas. Pagar Besi Hollow / teralis besi strip 603,750.00
47 1 M2 Pas. Pintu Fiber KM 624,335.00
PEKERJAAN PASANGAN DINDING
48 1 m2 Pasangan Platelaag ( 1 Lapis ) 95,461.28
PEKERJAAN PLESTERAN
49 1 m1 Benangan 11,391.65
PEKERJAAN LANTAI DAN PENUTUP DINDING
50 1 Bh Pasang Glass Block 47,680.44
PEKERJAAN LANGIT-LANGIT (PLAFOND)
51 1 m2 Pasang Rangka Plafond Hollow Galvanis modul 60x60 150,150.61
52 1 m2 Pasang Rangka Plafond Hollow Galvanis modul 60x120 130,473.47
53 1 m2 Rangka Langit-langit Kayu Meranti 1 x 1 m 131,269.40
54 1 M2 Pas. Langit-langit Plafond Gipsumboard + Rangka 97,750.00
55 1 M1 Pas.Rangka Hollow + Kalsiboard 109,250.00
PEKERJAAN KAYU
56 1 m3 Pasang Konstruksi Kuda-kuda lama 1,145,316.97
57 1 m' Papan Kompres kayu Meranti 62,656.58
PEKERJAAN PENGECATAN
58 1 m2 Pengecatan bidang kayu lama 30,612.56
59 1 m2 Pengecatan Genteng Baru 31,736.98
60 1 m2 Coating Waterproffing dengan serabut 193,645.97
61 1 m2 Coating Waterproffing tanpa serabut kasa 95,329.11
62 1 m2. Lapis melamin duco (2x lapis sampai rata) 354,492.68
63 1 m2 Coating Beton 88,687.86
64 1 m2 Pengecatan Beton Waterproffing 77,532.86
PEKERJAAN SANITASI
65 Memasang 1 pintu KM PVC 717,052.89
66 1 Unit Septictank ( h = 1,7 m , L = 1,3 m , P = 2,15 m ) 6,107,761.23
67 1 Unit Resapan ( h = 2,1 m diameter 1,2 m) 6,271,952.51
68 Pasang 1 m Buis Beton U 20 81,212.45
69 Pasang 1 m Buis Beton U 30 89,837.45
70 Pasang 1 m Buis Beton O 20 101,337.45
71 Pasang 1 m Buis Beton O 30 81,212.45
PEKERJAAN PAVING
72 1 m2 Pasang Paving K 400 abu-abu tebal 6 cm 140,299.14
73 1 m2 Pasang Paving K 300 abu-abu tebal 6 cm 140,299.14
74 1 m2 Pasang Paving K 300 warna tebal 6 cm 142,563.49
75 1 m2 Pasang Paving K 300 abu-abu tebal 8 cm 143,770.99
76 1 m2 Pasang Paving K 400 polos t. 8 cm 143,770.99
77 1 m1 Pasang Kanstin 15,30,50 162,168.23
78 1 m1 Pasang Kanstin 10,20,40 88,983.55
79 1 m1 Pasang Paving Pengunci (Uskup) K300 18,229.86
PEKERJAAN LAIN-LAIN
80 1 bh Pasang Cover Precast 600x70x600 128,826.59
81 1 bh Pasang Cover Precast 600x70x500 113,531.59
82 1 bh Pasang Cover Precast 600x120x1200 921,061.59
83 1 bh Pasang Cover Precast 600x70x900 181,841.59
84 1 bh Pasang Cover Precast 600x80x1000 230,601.59
85 1 bh Pasang Cover Precast 400x70x600 98,121.59
86 1 ttk Pasang Instalasi Listrik 287,500.00
87 1 BH Pasang Stop kontak 51,198.00
88 1 BH Pasang Lampu SL 18 Watt 181,125.00
89 1 BH Pasang Lampu LED 8 Watt 55,315.00
90 1 BH Pasang Lampu Down Light 150 PL 18 Watt Lengkap 181,125.00
91 1 BH Pasang Lampu TL 1 x 20 Watt Komplet 115,460.00
92 1 BH Pasang Saklar Tunggal 30,187.50
93 1 BH Pasang Saklar Ganda 20,125.00
NO URAIAN PEKERJAAN P (m) L (m) T (m) K N Vol. (m) Jml Vol (m) JUMLAH (m) SAT
1 2 3 4 5 6 7 8 9 10
IV PEKERJAAN BETON v h
1 Pek. Beton Balok 15/30 0.15 0.30 6.00 13.00 0.05 0.855 m3
2 Pek. Beton Balok 15/35 0.15 0.35 43.32 56.50 0.05 5.241 m3
3 Pek. Beton Balok 15/50 0.15 0.50 4.86 13.00 0.06 1.152 m'
Pek. Beton Kolom 15/40 0.15 0.40 3.30 17.00 0.06 3.366
Pek. Pas. Kolom Praktis 15/15 0.15 0.15 3.30 11.00 0.02 0.817
Pek. Pas. Ring Balok 15/20 0.15 0.20 15.00 18.25 0.03 0.998
Pek. Plat Lantai

V PEKERJAAN PASANGAN
1 Pek. Pas. Dinding 1/2 Bata Merah Camp. 1pc:4ps #REF! 3.80 #REF! #REF! m2
pintu kamar mandi 2.00 0.80 4.00 6.40 14.20
pintu kupu tarung 2.00 1.20 1.00 2.40
pintu biasa 2.00 0.90 3.00 5.40
2 Pek. Pas. Rollag Bata Camp. 1pc:4ps 17.50 0.20 3.50 m2
3 Pek. Plesteran Dinding tebal 15mm Camp. 1pc:4ps #REF! 2.00 #REF! m2

VI PEKERJAAN PENUTUP ATAP


1 Pek. Pas. Rangka Atap Galvalum C75x075mm 16.50 6.70 110.55 m2
2 Pek. Pas. Genteng Asbes Gelombang 5mm 16.50 6.70 110.55 m2
3 Pek. Pas. Kalsiplank 16.50 16.50 m'

VII PEKERJAAN LANGIT-LANGIT


1 Pek. Pas. Plafond Kalsiboard 16.50 6.70 110.55 m2
2 Pek. Pas. Rangka Plafond Hollow 16.50 6.70 110.55 m2
3 Pek. Pas. List Gypsum 114.00 m'
Horizontal Denah 16.50 4.00 66.00
Vertikal Denah 6.00 8.00 48.00

VIII PEKERJAAN PENUTUP LANTAI


1 Pek. Pas. Keramik Lantai 60x60 putih 75.85 m2
Ruang Ganti Pemain 6.00 3.80 2.00 45.60
Ruang Instirahat Wasit 3.80 2.00 7.60 m2
Teras Depan 16.50 0.60 9.90 m2
Gudang 4.00 2.50 10.00 m2
Teras Depan Gudang 2.50 0.50 1.25 m2
Teras depan kamar mandi umum 1.50 1.00 1.50
2 ### 2.20 2.00 2.00 8.80 m2
3 Pek. Pas. Keramik Lantai KM/WC 20x20 23.85 m2
Ruang Bilas 4.00 2.20 2.00 17.60
Umum 1.50 1.50 2.25
Wasit 2.00 2.00 4.00
4 Pek. Pas. Keramik Dinding 25/40 80.48 m2
KM/WC Pemain 16.40 2.00 2.00 65.60
KM/WC Wasit 7.20 1.20 8.64
KM/WC Umum 5.20 1.20 6.24

IX PEKERJAAN INSTALASI AIR


1 Pek. Pas. Wastafel 2.00 2.00 bh
2 Pek. Pas. Shower Mandi 6.00 2.00 12.00 bh
3 Pek. Pas. Urinoir 2.00 2.00 bh
4 ### 4.00 4.00 bh
5 Pek. Pas. Keran 4.00 4.00 bh
7 Pek. Pas. Pipa PVC 1/2" AW 14.00 4.40 8.50 2.50 5.50 3.00 37.90 37.90 m'
8 Pek. Pas. Pipa PVC 3" AW 5.00 5.00 2.50 11.00 23.50 m'
9 Pek. Pas. Pipa PVC 4" AW 3.00 2.50 3.00 11.00 19.50 m'
10 Pek. Pas. 1 Unit Septictank 1.00 1.00 unit
11 Pek. Pas. 1 Unit Sumur Resapan 1.00 1.00 unit
12 Pek. Pas. Jetpump 500 Watt 1.00 1.00 unit
13 Pek. Pasang Floor Drain 8.00 8.00 bh

X PEKERJAAN INSTALASI LISTRIK


1 Pek. Pas. Daya Baru 1300 Watt 1.00 1.00 unit
2 Pek. Pas. Box Phanel 1.00 1.00 unit
3 Pek. Instalasi Listrik 43.00 43.00 titik
4 Pek. Pas. Lampu 22.00 22.00 titik
5 Pek. Pas. Lampu Uplight 2.00 2.00 titik
6 Pek. Pas. Stop Kontak 6.00 6.00 bh
7 Pek. Pas. Saklat Tunggal 11.00 11.00 bh
8 Pek. Pas. Saklar Ganda 2.00 2.00 bh
9 Pek. Pasang MCB 1.00 1.00 bh
XI PEKERJAAN BESI, PINTU, DAN JENDELA
1 ### 19.90 m'
Pintu Biasa 2.00 0.90 4.90 3.00 14.70
Pintu Kuputarung 2.00 1.20 5.20 1.00 5.20
2 Pek. Pas. Pintu Alumunium 3.00 3.00 unit
3 Pek. Pas. Pintu Alumunium Kuputarung 1.00 1.00 unit
4 Pek. Pas. Pintu Alumunium Kamar Mandi 4.00 4.00 unit
5 Pek. Pas. Rangka Hollow 9.60 m2
Tengah 1.00 6.40 6.40
Pinggir 1.00 3.20 3.20
6 Pek. Pasang Papan Nama Plat Baja 5 mm 1.56 #REF! #REF! kg
Tulisan font kecil 0.20 0.30 8.00 0.48
Tulisan font besar 0.30 0.40 9.00 1.08
XII PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding Eksterior ( Weathershield ) 45.00 3.80 171.00 161.40 m2
pintu kupu tarung 2.00 1.20 1.00 2.40 9.60
pintu biasa 2.00 0.90 4.00 7.20
2 Pek. Pengeatan Dinding Interior Plesteran dinding = #REF! Cat eksterior= 161.40 #REF! m2
3 Pek. Pengecatan Plafond 16.50 6.70 110.55 m2

C DIVISI PEKERJAAN PAGAR DAN SALURAN


I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan Pemasangan Bouplank 103.00 103.00 57.00 57.00 22.40 85.60 m'

II PEKERJAAN TANAH
1 Pek. Urugan Pasir Pasang 20.10 m3
pondasi pagar 342.40 0.40 0.10 13.70
Saluran luar 206.00 0.20 0.10 4.12
sisi ruang ganti 57.00 0.40 0.10 2.28
2 Pek. Galian Tanah 50.24 m3
bawah pagar 342.40 0.40 0.25 34.24
Saluran luar 206.00 0.20 0.25 10.30
sisi ruang ganti 57.00 0.40 0.25 5.70
III PEKERJAAN BETON
1 Pek. Sloof Beton 15/20 Mutu K-225 103.00 103.00 57.00 57.00 22.40 0.15 0.20 10.27 m3
2 ### 263.00 0.40 0.05 5.26 m3

IV PEKERJAAN PASANGAN
1 Pek. Pas. Batu Kali Camp. 1pc:3ps 94.91 m3
Pagar 342.40 0.30 0.40 0.55 65.91
Saluran luar 206.00 0.15 0.20 0.50 18.03
sisi ruang ganti 57.00 0.30 0.40 0.55 10.97
2 Pek. Pas Pagar BRC Keliling Lapangan 103.00 103.00 57.00 57.00 22.40 342.40 m'
RENCANA ANGGARAN BIAYA
TAHUN ANGGARAN 2019

PEKERJAAN : Rumah Tinggal 2 lantai


LOKASI : Kota Malang
BIAYA : Rp -

JUMLAH
NO URAIAN PEKERJAAN PERPOS
Rp

B DIVISI PEKERJAAN RUMAH TINGGAL LANTAI 1 747,590,220.37


I PEKERJAAN PERSIAPAN 55,509,212.04
II PEKERJAAN TANAH 9,379,762.80
III PEKERJAAN PONDASI 168,619,874.72
IV PEKERJAAN BETON 248,371,764.68
V PEKERJAAN PASANGAN 105,572,809.31
VII PEKERJAAN LANGIT-LANGIT 6,261,650.36
VIII PEKERJAAN PENUTUP LANTAI 43,876,629.82
IX PEKERJAAN INSTALASI AIR 36,978,297.99
X PEKERJAAN INSTALASI LISTRIK 32,152,559.00
XI PEKERJAAN BESI, PINTU, DAN JENDELA 10,078,015.37
XII PEKERJAAN GANTUNGAN 8,262,230.20
XIII PEKERJAAN FINISHING 22,527,414.07
B DIVISI PEKERJAAN RUMAH TINGGAL LANTAI 2 388,339,802.03
I PEKERJAAN BETON 159,288,007.73
II PEKERJAAN PASANGAN 93,451,420.65
III PEKERJAAN LANGIT-LANGIT 6,017,568.48
IV PEKERJAAN PENUTUP LANTAI 53,909,317.97
V PEKERJAAN INSTALASI AIR 16,030,488.53
VI PEKERJAAN INSTALASI LISTRIK 30,662,940.50
VII PEKERJAAN BESI, PINTU, DAN JENDELA 4,956,398.44
VIII PEKERJAAN GANTUNGAN 5,621,565.13
IX PEKERJAAN FINISHING 18,402,094.61

TOTAL BIAYA Rp 1,135,930,022.40


PAJAK 10% Rp 113,593,002.24
HARGA TOTAL Rp 1,249,523,024.64
PEMBULATAN Rp 1,249,523,000.00
RENCANA ANGGARAN BIAYA
TAHUN ANGGARAN 2020

PEKERJAAN : Rumah Tinggal 2 lantai


LOKASI : Kota Malang
BIAYA : Rp 1,249,523,000.00

HARGA JUMLAH JUMLAH


NO URAIAN PEKERJAAN VOLUME SATUAN HARGA PERPOS
Rp Rp Rp

A DIVISI PEKERJAAN RUMAH TINGGAL LANTAI 1 747,590,220.37


I PEKERJAAN PERSIAPAN
1 Pek. Pemasangan Bouplank 45.00 m' 115,670.46 5,205,170.77
2 Pek. Pembersihan lahan proyek 120.00 m2 17,508.75 2,101,050.00
3 Pagar sementara seng gelombang 56.00 m' 632,838.99 35,438,983.23
4 pembuatan gudang proyek 7.00 m2 1,823,429.72 12,764,008.05
Sub Jumlah 55,509,212.04
II PEKERJAAN TANAH
1 Pek. Galian Tanah 10.98 m3 78,487.50 861,792.75
2 Pek. Urugan Pasir Bawah Pondasi 1.21 m3 292,215.00 354,164.58
3 Pek. Urugan Pasir Bawah Lantai 21.91 m3 292,215.00 6,403,599.51
4 Pek. Pek. Urugan Kembali 4.94 m3 57,356.25 283,397.23
5 Pek. Pek. Urugan Peninggi Lantai 25.75 m3 57,356.25 1,476,808.73
Sub Jumlah 9,379,762.80
III PEKERJAAN PONDASI
1 Pek. Beton pondasi telapak 80/80 18.00 titik 8,932,506.17 160,785,110.99
3 Pek. Beton pondasi telapak 60/100 1.00 titik 7,834,763.74 7,834,763.74
Sub Jumlah 168,619,874.72
IV PEKERJAAN BETON
1 Pek. Sloof Beton 15/20 Mutu K-225 7.33 m3 5,500,718.53 40,331,268.23
2 Pek. Sloof Beton 20/35 0.11 m3 4,674,418.26 490,813.92
3 Pek. Beton Balok 15/35 5.75 m3 8,971,095.32 51,619,682.45
4 Pek. Beton Balok 15/50 2.30 m3 8,609,100.73 19,783,713.48
5 Pek. Beton Balok 15/30 0.54 m3 9,124,142.90 4,908,788.88
6 Pek. Beton Kolom 15/40 4.85 m3 6,900,182.25 33,431,382.99
7 Pek. Pas. Kolom Praktis 15/15 0.59 m3 3,662,439.90 2,175,489.30
8 Pek. Pas. Ring Balok 15/20 0.87 m3 9,625,653.11 8,374,318.20
9 Pek. Plat Lantai 12.27 m3 6,686,444.53 82,049,360.82
10 Pek. Plat Tangga 0.77 m3 4,472,394.27 3,425,854.01
11 Pek. Anak Tangga 0.73 m3 1,781,092.39 1,781,092.39
Sub Jumlah 248,371,764.68
V PEKERJAAN PASANGAN
1 Pek. Pas. Dinding 1/2 Bata Merah Camp. 1pc:4ps 184.07 m2 206,906.39 38,084,431.16
2 Pek. Pas Dinding Trasram 1/2 Bata Camp 1Pc:3Ps 59.66 m2 211,148.56 12,596,278.26
3 Pek.Plesteran Dinding tebal 15mm Camp 1pc:2ps 119.31 m2 73,717.39 8,795,369.20
4 Pek. Plesteran Dinding tebal 15mm Camp. 1pc:4ps 368.13 m2 71,254.02 26,230,883.45
5 Pek. Acian Dinding 487.44 m2 40,755.14 19,865,847.24
Sub Jumlah 105,572,809.31
VII PEKERJAAN LANGIT-LANGIT
1 Pek.Pas. Plafond Gypsum 105.75 m2 19,368.60 2,048,229.33
2 Pek. Pas. List Gypsum 125.00 m1 33,707.37 4,213,421.03
Sub Jumlah 6,261,650.36
VIII PEKERJAAN PENUTUP LANTAI
1 Pek. Pas. Keramik Lantai 60x60 putih 65.97 m2 468,804.08 30,925,129.81
3 Pek. Pas. Keramik Lantai KM/WC 30x30 16.83 m2 286,115.38 4,815,321.87
4 Pek. Pas. Keramik Dinding 25/40 23.03 m2 332,116.09 7,648,965.62
5 Pek. Pas. List Keramik 10x30 2.56 m2 190,391.76 487,212.52
Sub Jumlah 43,876,629.82
IX PEKERJAAN INSTALASI AIR
1 Pek. Pas. Wastafel 1.00 bh 1,188,201.80 1,188,201.80
2 Pek. Pas. Shower Mandi 2.00 bh 303,892.82 607,785.64
3 Pek. Pas. Kloset Duduk 2.00 bh 3,377,111.78 6,754,223.56
4 Pek. Pas. Kitchen Sink 1.00 bh 684,912.98 684,912.98
5 Pek. Pas. Keran 5.00 bh 55,574.81 277,874.05
6 Pek. Pas. Pipa PVC 3/4" galvanis 28.71 m' 175,911.13 5,049,528.99
7 Pek. Pas. Pipa PVC 3" AW 27.52 m' 175,059.47 4,816,761.28
8 Pek. Pas. Pipa PVC 4" AW 18.75 m' 258,544.64 4,847,711.98
9 Pek. Pas. 1 Unit Septictank 1.00 unit 6,107,761.23 6,107,761.23
10 Pek. Pas. 1 Unit Sumur Resapan 1.00 unit 6,271,952.51 6,271,952.51
11 Pek. Pasang Floor Drain 3.00 bh 123,861.33 371,583.98
Sub Jumlah 36,978,297.99
X PEKERJAAN INSTALASI LISTRIK
1 Pek. Pas. Daya Baru 1300 Watt 1.00 unit 2,756,700.00 2,756,700.00
2 Pek. Instalasi Listrik 48.00 ttk 287,500.00 13,800,000.00
3 Pek. Pas. Lampu Pijar 18 watt 3.00 bh 55,315.00 165,945.00
4 Pek. Pas. Lampu Pijar 12 Watt 2.00 bh 55,315.00 110,630.00
5 Pek. Pas. Lampu Downlight 28.00 bh 181,125.00 5,071,500.00
6 Pek. Pas. Stop Kontak 15.00 bh 51,198.00 767,970.00
7 Pek. Pas. Saklat Tunggal 4.00 bh 30,187.50 120,750.00
8 Pek. Pas. Saklar Ganda 6.00 bh 20,125.00 120,750.00
9 Pek. Pasang MCB 1.00 bh 64,764.00 64,764.00
10 Pek. Pasang AC 3.00 bh 3,057,850.00 9,173,550.00
Sub Jumlah 32,152,559.00
XI PEKERJAAN BESI, PINTU, DAN JENDELA
1 Pek. Pas. Pintu Alumunium PJG 1.00 unit 408,745.48 408,745.48
2 Pek. Pas. Pintu Kayu P1 1.00 unit 3,655,196.64 3,655,196.64
3 Pek. Pas. Pintu Kayu P2 1.00 unit 2,171,537.71 2,171,537.71
4 Pek. Pas. Pintu Aluminium P3 2.00 unit 21,910.44 43,820.87
5 Pek. Pas. Jendela Kaca J1 1.00 unit 408,745.48 408,745.48
6 Pek. Pas. Jendela Kaca J2 2.00 unit 506,321.24 1,012,642.49
7 Pek. Pas. Jendela Kaca J3 1.00 unit 866,190.57 866,190.57
8 Pek. Pas. Jendela Kaca J4 1.00 unit 262,466.11 262,466.11
9 Pek. Pas. Pintu Alumunium Kamar Mandi 2.00 unit 624,335.00 1,248,670.00
Sub Jumlah 10,078,015.37
XII PEKERJAAN GANTUNGAN
1 Pas. Engsel Pintu 16.00 bh 74,518.06 1,192,288.95
2 Pas. Kunci Pintu 5.00 bh 249,692.89 1,248,464.44
3 Pas. Grendel Pintu 7.00 bh 63,679.96 445,759.69
4 Pas. Engsel Jendela 22.00 bh 40,885.81 899,487.74
5 Pas. Kunci SlotJendela 11.00 bh 122,809.36 1,350,902.99
6 Pas. Handle Pintu 11.00 bh 284,120.58 3,125,326.39
Sub Jumlah 8,262,230.20
XIII PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding Eksterior ( Weathershield ) 161.70 m2 91,812.02 14,846,003.80
2 Pek. Pengeatan Dinding Interior 206.43 m2 37,210.37 7,681,410.27
Sub Jumlah 22,527,414.07

A DIVISI PEKERJAAN RUMAH TINGGAL LANTAI 2 388,339,802.03


I PEKERJAAN BETON
2 Pek. Beton Balok 15/30 0.86 m3 9,124,142.90 7,801,142.18
3 Pek. Beton Balok 15/35 5.24 m3 8,971,095.32 47,017,510.56
4 Pek. Beton Balok 15/50 1.15 m3 8,609,100.73 9,917,684.04
5 Pek. Beton Kolom 15/40 3.37 m3 6,900,182.25 23,226,013.45
6 Pek. Pas. Kolom Praktis 15/15 0.82 m3 3,662,439.90 2,992,213.40
7 Pek. Pas. Ring Balok 15/20 0.998 m3 9,625,653.11 9,606,401.80
8 Pek. Plat Lantai 8.78 m3 6,686,444.53 58,727,042.30
Sub Jumlah 159,288,007.73
II PEKERJAAN PASANGAN
1 Pek. Pas. Dinding 1/2 Bata Merah Camp. 1pc:4ps 165.23 m2 206,906.39 34,187,142.44
2 Pek. Pas Dinding Trasram 1/2 Bata Camp 1Pc:3Ps 50.51 m2 211,148.56 10,665,113.56
3 Pek.Plesteran Dinding tebal 15mm Camp 1pc:2ps 101.20 m2 73,717.39 7,460,199.84
4 Pek. Plesteran Dinding tebal 15mm Camp. 1pc:4ps 330.46 m2 71,254.02 23,546,602.16
5 Pek. Acian 431.66 m2 40,755.14 17,592,362.65
Sub Jumlah 93,451,420.65
III PEKERJAAN LANGIT-LANGIT
1 Pek.Pas. Plafond Gypsum 92.80 m2 19,368.60 1,797,405.97
2 Pek. Pas. List Gypsum 125.20 m1 33,707.37 4,220,162.50
Sub Jumlah 6,017,568.48
IV PEKERJAAN PENUTUP LANTAI
1 Pek. Pas. Keramik Lantai 60x60 putih 91.95 m2 468,804.08 43,106,534.97
3 Pek. Pas. Keramik Lantai KM/WC 30x30 9.80 m2 286,115.38 2,803,930.74
4 Pek. Pas. Keramik Dinding 25/40 19.12 m2 332,116.09 6,350,059.60
5 Pek. Pas. List Keramik 10x30 8.66 m2 190,391.76 1,648,792.66
Sub Jumlah 53,909,317.97
V PEKERJAAN INSTALASI AIR
1 Pek. Pas. Wastafel 1.00 bh 1,188,201.80 1,188,201.80
2 Pek. Pas. Shower Mandi 2.00 bh 303,892.82 607,785.64
3 Pek. Pas. Kloset Duduk 2.00 bh 3,377,111.78 6,754,223.56
5 Pek. Pas. Keran 3.00 bh 55,574.81 166,724.43
6 Pek. Pas. Pipa PVC 3/4" galvanis 21.10 m' 175,911.13 3,711,724.84
7 Pek. Pas. Pipa PVC 3" AW 8.60 m' 175,059.47 1,505,511.43
8 Pek. Pas. Pipa PVC 4" AW 7.15 m' 258,544.64 1,848,594.17
11 Pek. Pasang Floor Drain 2.00 bh 123,861.33 247,722.65
Sub Jumlah 16,030,488.53
VI PEKERJAAN INSTALASI LISTRIK
1 Pek. Instalasi Listrik 44.00 ttk 287,500.00 12,650,000.00
2 Pek. Pas. Lampu Pijar 18 watt 4.00 bh 55,315.00 221,260.00
3 Pek. Pas. Lampu Pijar 12 Watt 2.00 bh 55,315.00 110,630.00
4 Pek. Pas. Lampu Downlight 25.00 bh 181,125.00 4,528,125.00
5 Pek. Pas. Stop Kontak 13.00 bh 51,198.00 665,574.00
6 Pek. Pas. Saklat Tunggal 3.00 bh 30,187.50 90,562.50
7 Pek. Pas. Saklar Ganda 5.00 bh 20,125.00 100,625.00
8 Pek. Pasang MCB 1.00 bh 64,764.00 64,764.00
9 Pek. Pasang AC 4.00 bh 3,057,850.00 12,231,400.00
Sub Jumlah 30,662,940.50
VII PEKERJAAN BESI, PINTU, DAN JENDELA
1 Pek. Pas. Pintu Alumunium PJG 1.00 unit 408,745.48 408,745.48
2 Pek. Pas. Pintu Aluminium P3 5.00 unit 21,910.44 109,552.19
3 Pek. Pas. Pintu Aluminium P5 1.00 unit 759,645.04 759,645.04
4 Pek. Pas. Jendela Kaca J4 4.00 unit 262,466.11 1,049,864.44
5 Pek. Pas. Jendela Kaca J5 1.00 unit 1,255,840.94 1,255,840.94
6 Pek. Pas. Jendela Kaca J6 1.00 unit 124,080.35 124,080.35
7 Pek. Pas. Pintu Alumunium Kamar Mandi 2.00 unit 624,335.00 1,248,670.00
Sub Jumlah 4,956,398.44
VIII PEKERJAAN GANTUNGAN
1 Pas. Engsel Pintu 18.00 bh 74,518.06 1,341,325.07
2 Pas. Kunci Pintu 7.00 bh 249,692.89 1,747,850.21
3 Pas. Grendel Pintu 9.00 bh 63,679.96 573,119.61
4 Pas. Engsel Jendela 16.00 bh 40,885.81 654,172.90
5 Pas. Kunci Slot Jendela 6.00 bh 122,809.36 736,856.18
6 Pas. Handle Pintu 2.00 bh 284,120.58 568,241.16
Sub Jumlah 5,621,565.13
IX PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding Eksterior ( Weathershield ) 111.82 m2 91,812.02 10,266,420.19
2 Pek. Pengeatan Dinding Interior 218.64 m2 37,210.37 8,135,674.42
Sub Jumlah 18,402,094.61

JUMLAH A + B + C Rp 1,135,930,022.40
PPN 10 % Rp 113,593,002.24
JUMLAH KESELURUHAN Rp 1,249,523,024.64
DIBULATKAN Rp 1,249,523,000.00
RENCANA ANGGARAN BIAYA
TAHUN ANGGARAN 2020

PEKERJAAN : Rumah Tinggal 2 lantai


LOKASI : Kota Malang
BIAYA : Rp 1,249,523,000.00

JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA
Rp

A DIVISI PEKERJAAN RUMAH TINGGAL


I PEKERJAAN PERSIAPAN
1 Pek. Pemasangan Bouplank 45.00 m' 5,205,170.77
2 Pek. Pembersihan lahan proyek 120.00 m2 2,101,050.00
3 Pagar sementara seng gelombang 56.00 m' 35,438,983.23
4 pembuatan gudang proyek 7.00 m2 12,764,008.05
Sub Jumlah
II PEKERJAAN TANAH
1 Pek. Galian Tanah 10.98 m3 861,792.75
2 Pek. Urugan Pasir Bawah Pondasi 1.21 m3 354,164.58
3 Pek. Urugan Pasir Bawah Lantai 21.91 m3 6,403,599.51
4 Pek. Pek. Urugan Kembali 4.94 m3 283,397.23
5 Pek. Pek. Urugan Peninggi Lantai 25.75 m3 1,476,808.73
Sub Jumlah
III PEKERJAAN PONDASI
1 Pek. Beton pondasi telapak 80/80 18.00 titik 160,785,110.99
3 Pek. Beton pondasi telapak 60/100 1.00 titik 7,834,763.74
Sub Jumlah
IV PEKERJAAN BETON
1 Pek. Sloof Beton 15/20 Mutu K-225 7.33 m3 40,331,268.23
2 Pek. Sloof Beton 20/35 0.11 m3 490,813.92
3 Pek. Beton Balok 15/35 5.75 m3 98,637,193.01
4 Pek. Beton Balok 15/50 2.30 m3 29,701,397.52
5 Pek. Beton Balok 15/30 0.54 m3 12,709,931.07
6 Pek. Beton Kolom 15/40 4.85 m3 56,657,396.44
7 Pek. Pas. Kolom Praktis 15/15 0.59 m3 5,167,702.69
8 Pek. Pas. Ring Balok 15/20 0.87 m3 17,980,720.01
9 Pek. Plat Lantai 12.27 m3 140,776,403.12
10 Pek. Plat Tangga 0.77 m3 3,425,854.01
11 Pek. Anak Tangga 0.73 m3 1,781,092.39
Sub Jumlah
V PEKERJAAN PASANGAN
1 Pek. Pas. Dinding 1/2 Bata Merah Camp. 1pc:4ps 184.07 m2 72,271,573.60
2 Pek. Pas Dinding Trasram 1/2 Bata Camp 1Pc:3Ps 59.66 m2 23,261,391.82
3 Pek.Plesteran Dinding tebal 15mm Camp 1pc:2ps 119.31 m2 16,255,569.04
4 Pek. Plesteran Dinding tebal 15mm Camp. 1pc:4ps 368.13 m2 49,777,485.62
5 Pek. Acian Dinding 487.44 m2 37,458,209.90
Sub Jumlah
VII PEKERJAAN LANGIT-LANGIT
1 Pek.Pas. Plafond Gypsum 105.75 m2 3,845,635.30
2 Pek. Pas. List Gypsum 125.00 m1 8,433,583.54
Sub Jumlah
VIII PEKERJAAN PENUTUP LANTAI
1 Pek. Pas. Keramik Lantai 60x60 putih 65.97 m2 74,031,664.78
3 Pek. Pas. Keramik Lantai KM/WC 30x30 16.83 m2 7,619,252.61
4 Pek. Pas. Keramik Dinding 25/40 23.03 m2 13,999,025.21
5 Pek. Pas. List Keramik 10x30 2.56 m2 2,136,005.18
Sub Jumlah
IX PEKERJAAN INSTALASI AIR
1 Pek. Pas. Wastafel 1.00 bh 2,376,403.61
2 Pek. Pas. Shower Mandi 2.00 bh 1,215,571.28
3 Pek. Pas. Kloset Duduk 2.00 bh 13,508,447.12
4 Pek. Pas. Kitchen Sink 1.00 bh 684,912.98
5 Pek. Pas. Keran 5.00 bh 444,598.48
6 Pek. Pas. Pipa PVC 3/4" galvanis 28.71 m' 8,761,253.83
7 Pek. Pas. Pipa PVC 3" AW 27.52 m' 6,322,272.71
8 Pek. Pas. Pipa PVC 4" AW 18.75 m' 6,696,306.14
9 Pek. Pas. 1 Unit Septictank 1.00 unit 6,107,761.23
10 Pek. Pas. 1 Unit Sumur Resapan 1.00 unit 6,271,952.51
11 Pek. Pasang Floor Drain 3.00 bh 619,306.63
Sub Jumlah
X PEKERJAAN INSTALASI LISTRIK
1 Pek. Pas. Daya Baru 1300 Watt 1.00 unit 2,756,700.00
2 Pek. Instalasi Listrik 48.00 ttk 26,450,000.00
3 Pek. Pas. Lampu Pijar 18 watt 3.00 bh 387,205.00
4 Pek. Pas. Lampu Pijar 12 Watt 2.00 bh 221,260.00
5 Pek. Pas. Lampu Downlight 28.00 bh 9,599,625.00
6 Pek. Pas. Stop Kontak 15.00 bh 1,433,544.00
7 Pek. Pas. Saklat Tunggal 4.00 bh 211,312.50
8 Pek. Pas. Saklar Ganda 6.00 bh 221,375.00
9 Pek. Pasang MCB 1.00 bh 129,528.00
10 Pek. Pasang AC 3.00 bh 21,404,950.00
Sub Jumlah
XI PEKERJAAN BESI, PINTU, DAN JENDELA
1 Pek. Pas. Pintu Alumunium PJG 1.00 unit 817,490.97
2 Pek. Pas. Pintu Kayu P1 1.00 unit 3,655,196.64
3 Pek. Pas. Pintu Kayu P2 1.00 unit 2,171,537.71
4 Pek. Pas. Pintu Aluminium P3 2.00 unit 153,373.06
5 Pek. Pas. Pintu Aluminium P5 1.00 unit 759,645.04
6 Pek. Pas. Jendela Kaca J1 1.00 unit 408,745.48
7 Pek. Pas. Jendela Kaca J2 2.00 unit 1,012,642.49
8 Pek. Pas. Jendela Kaca J3 1.00 unit 866,190.57
9 Pek. Pas. Jendela Kaca J4 1.00 unit 1,312,330.55
10 Pek. Pas. Jendela Kaca J5 1.00 unit 1,255,840.94
11 Pek. Pas. Jendela Kaca J6 1.00 unit 124,080.35
12 Pek. Pas. Pintu Alumunium Kamar Mandi 2.00 unit 2,497,340.00
Sub Jumlah
XII PEKERJAAN GANTUNGAN
1 Pas. Engsel Pintu 16.00 bh 2,533,614.02
2 Pas. Kunci Pintu 5.00 bh 2,996,314.65
3 Pas. Grendel Pintu 7.00 bh 1,018,879.30
4 Pas. Engsel Jendela 22.00 bh 1,553,660.64
5 Pas. Kunci SlotJendela 11.00 bh 2,087,759.16
6 Pas. Handle Pintu 11.00 bh 3,693,567.56
Sub Jumlah
XIII PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding Eksterior ( Weathershield ) 161.70 m2 25,112,423.98
2 Pek. Pengeatan Dinding Interior 206.43 m2 15,817,084.70
Sub Jumlah

JUMLAH Rp 1,135,930,022.40
RENCANA ANGGARAN BIAYA
TAHUN ANGGARAN 2019

PROGRAM : Program Peningkatan Sarana dan Prasarana Olahraga


KEGIATAN : Peningkatan Sarana dan Prasarana Olahraga
PEKERJAAN : Rehab Lapangan Petahunan
LOKASI : Kota Pasuruan
BIAYA : #REF!

HARGA JUMLAH JUMLAH


NO URAIAN PEKERJAAN VOLUME SATUAN HARGA PERPOS
Rp Rp Rp

B DIVISI PEKERJAAN RUANG GANTI PEMAIN #REF!


I PEKERJAAN PERSIAPAN
1 Pek. Pemasangan Bouplank Err:509 m' 115,670.46 Err:509
2 Pek. Bongkar Bangunan Lama Err:509 ls 1,428,840.79 Err:509

II PEKERJAAN TANAH
1 Pek. Galian Tanah Err:509 m3 78,487.50 Err:509
2 Pek. Urugan Pasir Bawah Pondasi Err:509 m3 #REF! Err:509
3 Pek. Urugan Pasir Bawah Lantai Err:509 m3 #REF! Err:509
4 Pek. Pek. Urugan Kembali Err:509 m3 57,356.25 Err:509
5 Pek. Pek. Urugan Peninggi Lantai Err:509 m3 57,356.25 Err:509
III PEKERJAAN PONDASI
1 Pek. Pas. Batu Kosong ( Anstampang ) Err:509 m3 535,690.64 Err:509
2 Pek. Pas. Pondasi Batu Kali Camp. 1pc : 5ps Err:509 m3 987,028.59 Err:509
IV PEKERJAAN BETON
1 Pek. Sloof Beton 15/20 Mutu K-225 0.00 m3 5,500,718.53 0.00
2 Pek. Beton Balok 15/35 0.00 m' 159,068.61 0.00
3 Pek. Pas. Kolom Praktis 0.00 m' 3,662,439.90 0.00
4 Err:509 Err:509 5,500,718.53 Err:509
V PEKERJAAN PASANGAN
1 Pek. Pas. Dinding 1/2 Bata Merah Camp. 1pc:4ps #REF! m2 206,906.39 #REF!
2 Pek. Pas. Rollag Bata Camp. 1pc:4ps 3.50 m2 206,906.39 724,172.36
3 Pek. Plesteran Dinding tebal 15mm Camp. 1pc:4ps #REF! m2 71,254.02 #REF!
4 Pek. Benangan Err:509 m' #REF! Err:509
5 Err:509 Err:509 m2 841,563.11 Err:509
6 Err:509 Err:509 bh 47,680.44 Err:509
VI PEKERJAAN PENUTUP ATAP
1 Pek. Pas. Rangka Atap Galvalum C75x075mm 110.55 m2 184,000.00 20,341,200.00
2 Pek. Pas. Genteng Asbes Gelombang 5mm 110.55 m2 67,705.50 7,484,843.30
3 Pek. Pas. Kalsiplank 16.50 m' 90,000.00 1,485,000.00
VII PEKERJAAN LANGIT-LANGIT
1 Pek. Pas. Plafond Kalsiboard 110.55 m2 19,368.60 2,141,198.60
2 Pek. Pas. Rangka Plafond Hollow 110.55 m2 109,250.00 12,077,587.50
3 Pek. Pas. List Gypsum 114.00 m1 33,707.37 3,842,639.98
VIII PEKERJAAN PENUTUP LANTAI
1 Pek. Pas. Keramik Lantai 40x40 putih 75.85 m2 226,616.54 17,188,864.83
2 Pek. Pas. Keramik Lantai 40x40 motif kasar 8.80 m2 286,115.38 2,517,815.36
3 Pek. Pas. Keramik Lantai KM/WC 20x20 23.85 m2 261,858.30 6,245,320.47
4 Pek. Pas. Keramik Dinding 20/40 80.48 m2 353,619.25 28,459,277.05
IX PEKERJAAN INSTALASI AIR
1 Pek. Pas. Wastafel 2.00 bh 1,188,201.80 2,376,403.61
2 Pek. Pas. Shower Mandi 12.00 bh 303,892.82 3,646,713.85
3 Pek. Pas. Urinoir 2.00 bh 2,194,335.13 4,388,670.25
4 Pek. Pas. WC Jongkok 4.00 bh 526,550.50 2,106,202.00
5 Pek. Pas. Keran 4.00 bh 55,574.81 222,299.24
7 Pek. Pas. Pipa PVC 1/2" AW 37.90 m' 36,742.21 1,392,529.85
8 Pek. Pas. Pipa PVC 3" AW 23.50 m' 175,059.47 4,113,897.52
9 Pek. Pas. Pipa PVC 4" AW 19.50 m' 258,544.64 5,041,620.46
10 Pek. Pas. 1 Unit Septictank 1.00 unit 6,107,761.23 6,107,761.23
11 Pek. Pas. 1 Unit Sumur Resapan 1.00 unit 6,271,952.51 6,271,952.51
12 Pek. Pas. Jetpump 500 Watt 1.00 unit 4,864,860.00 4,864,860.00
13 Pek. Pasang Floor Drain 8.00 bh 123,861.33 990,890.60
X PEKERJAAN INSTALASI LISTRIK
1 Pek. Pas. Daya Baru 1300 Watt 1.00 unit 2,756,700.00 2,756,700.00
2 Pek. Pas. Box Phanel 1.00 unit 788,040.00 788,040.00
3 Pek. Instalasi Listrik 43.00 ttk 287,500.00 12,362,500.00
4 Pek. Pas. Lampu 22.00 bh 55,315.00 1,216,930.00
5 Pek. Pas. Lampu Uplight 2.00 bh 115,460.00 230,920.00
6 Pek. Pas. Stop Kontak 6.00 bh 51,198.00 307,188.00
7 Pek. Pas. Saklat Tunggal 11.00 bh 30,187.50 332,062.50
8 Pek. Pas. Saklar Ganda 2.00 bh 20,125.00 40,250.00
9 Pek. Pasang MCB 1.00 bh 66,000.00 66,000.00
XI PEKERJAAN BESI, PINTU, DAN JENDELA
1 Pek. Pas. Kusen Pintu Alumunium Coklat 19.90 m' 10,903.00 216,969.66
2 Pek. Pas. Pintu Alumunium 3.00 unit 21,910.44 65,731.31
3 Pek. Pas. Pintu Alumunium Kuputarung 1.00 unit 1,000,000.00 1,000,000.00
4 Pek. Pas. Pintu Alumunium Kamar Mandi 4.00 unit 21,910.44 87,641.75
5 Pek. Pas. Rangka Hollow 9.60 m2 151,744.51 1,456,747.32
6 Pek. Pasang Papan Nama Plat Baja 5mm #REF! kg #REF! #REF!
XII PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding Eksterior ( Weathershield ) 161.40 m2 91,812.02 14,818,460.19
2 Pek. Pengeatan Dinding Interior #REF! m2 37,210.37 #REF!
3 Pek. Pengecatan Plafond 110.55 m2 29,171.03 3,224,856.98
C DIVISI PEKERJAAN PAGAR DAN SALURAN 240,146,550.89
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan Pemasangan Bouplank 85.60 m' 115,670.46 9,901,391.50
II PEKERJAAN TANAH
1 Pek. Urugan Pasir Pasang 20.10 m3 292,215.00 5,872,352.64
2 Pek. Galian Tanah 50.24 m3 78,487.50 3,943,212.00
III PEKERJAAN BETON
1 Pek. Sloof Beton 15/20 Mutu K-225 10.27 m3 5,500,718.53 56,503,380.70
2 Pek. Rabat Beton K-100 Dasar Saluran 5.26 m3 1,065,951.02 5,606,902.38
IV PEKERJAAN PASANGAN
1 Pek. Pas. Batu Kali Camp. 1pc:3ps 94.91 m3 987,028.59 93,678,390.35
2 Pek. Pas. Pagar BRC 342.40 m' 188,787.74 64,640,921.32
TOTAL JUMLAH A + B #REF!