KOTA KUPANG
TAHUN ANGGARAN 2018
HARGA SATUAN
(Rp)
4
125,000.00
101,500.00
120,000.00
101,000.00
101,000.00
101,000.00
101,000.00
68,600.00
150,000.00
75,000.00
200,000.00
68,600.00
150,000.00
68,600.00
150,000.00
46,000.00
43,500.00
48,000.00
110,000.00
450,000.00
543,650.00
1,102,500.00
1,098,300.00
450,100.00
1,133,968.00
1,291,751.00
1,245,562.00
850,000.00
1,082,200.00
850,000.00
500,000.00
2,800.00
2,100.00
3,500.00
13,000.00
100,000.00
100,000.00
130,000.00
29,000.00
47,500.00
71,000.00
101,000.00
179,500.00
100,000.00
114,500.00
190,000.00
180,000.00
800,000.00
1,625,000.00
22,500.00
25,000.00
22,500.00
25,000.00
260,000.00
380,000.00
28,000.00
15,000.00
15,000.00
30,000.00
48,000.00
8,500.00
14,000.00
-
22,500.00
22,500.00
14,000,000.00
13,500,000.00
16,500,000.00
18,000,000.00
16,500,000.00
4,000,000.00
3,500,000.00
4,000,000.00
4,500,000.00
4,500,000.00
2,400,000.00
7,000.00
400,000.00
47,500.00
60,000.00
73,500.00
119,000.00
75,000.00
85,000.00
107,000.00
106,500.00
71,500.00
107,000.00
106,500.00
71,500.00
-
75,000.00
47,500.00
35,000.00
45,000.00
48,000.00
39,500.00
25,000.00
40,000.00
51,000.00
34,000.00
110,000.00
400,000.00
125,000.00
98,000.00
110,000.00
145,000.00
59,000.00
53,500.00
550,000.00
180,000.00
85,000.00
60,000.00
25,000.00
60,000.00
25,000.00
600,000.00
185,000.00
85,000.00
26,000.00
20,600.00
40,000.00
10,000.00
225,000.00
50,000.00
28,000.00
48,000.00
95,000.00
8,500.00
10,000.00
10,000.00
16,500.00
20,000.00
27,500.00
17,500.00
15,000.00
8,000.00
7,000.00
18,000.00
45,000.00
60,000.00
13,000.00
15,000.00
47,500.00
85,000.00
345,000.00
104,000.00
96,000.00
70,000.00
46,000.00
36,500.00
60,000.00
37,500.00
45,000.00
20,000.00
15,000.00
70,000.00
5,000.00
12,500.00
15,000.00
10,000.00
152,200.00
195,600.00
300,000.00
454,900.00
620,700.00
1,022,800.00
1,480,800.00
14,600.00
21,800.00
41,000.00
59,000.00
161,400.00
307,400.00
8,000.00
10,500.00
18,000.00
30,000.00
44,200.00
134,800.00
244,000.00
43,600.00
123,500.00
30,800.00
43,600.00
43,600.00
16,200.00
30,800.00
30,800.00
18,000.00
18,000.00
107,600.00
35,900.00
12,600.00
5,400.00
8,000.00
6,000.00
7,000.00
9,500.00
16,400.00
25,300.00
69,400.00
113,500.00
361,100.00
3,600.00
4,700.00
21,000.00
25,000.00
30,000.00
50,500.00
72,500.00
202,200.00
385,000.00
6,000.00
8,000.00
11,100.00
23,000.00
34,700.00
100,900.00
182,800.00
6,000.00
8,000.00
10,000.00
20,000.00
60,000.00
87,000.00
161,500.00
3,900.00
5,200.00
6,000.00
7,000.00
7,600.00
14,500.00
20,100.00
57,800.00
96,300.00
64,300.00
21,800.00
14,400.00
9,500.00
8,200.00
17,000.00
9,000.00
6,200.00
45,000.00
70,000.00
110,000.00
450,000.00
35,000.00
490,000.00
850,000.00
975,000.00
91,800.00
119,280.00
159,750.00
307,500.00
55,000.00
92,500.00
141,400.00
257,000.00
-
200,000.00
250,000.00
64,300.00
34,000.00
41,000.00
50,000.00
97,000.00
96,000.00
159,000.00
265,000.00
2,500.00
2,500.00
4,000.00
5,000.00
5,000.00
10,000.00
15,000.00
22,500.00
3,500.00
3,500.00
24,000.00
6,500.00
6,850.00
8,000.00
150,000.00
1,500,000.00
724,976.00
408,204.00
600,000.00
441,511.00
50,000.00
458,949.00
680,511.00
356,557.00
508,446.00
308,616.00
312,500.00
200,000.00
547,843.00
482,775.00
250,000.00
150,000.00
750,000.00
250,000.00
250,000.00
250,000.00
250,000.00
Pembersihan lahan
1 2 3 4
A TENAGA
1 Tenaga L.01 OH
2 Mandor L.04 OH
JUMLAH HAR
B BAHAN
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
Pemasangan Bowplank
1 2 3 4
A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
JUMLAH HAR
B BAHAN
Kayu Balok 5/7 M³
Paku 2'' - 3'' KG
Kayu Papan 3/20 M³
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
Galian Tanah Biasa
1 2 3 4
A TENAGA
Pekerja L.01
Mandor L.04
B BAHAN
JUMLAH HAR
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH
JUMLAH HAR
B BAHAN
Pasir Urug M³
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
1 Pekerja L.01 OH
2 Tukang Batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
JUMLAH HAR
B
1 Batu Karang M³
2 Pasir Urug M³
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Batu Karang M³
Semen Kupang zak
Pasir Pasang M³
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
Pekerjaan Rabat Beton Sebagai Lantai Kerja
1 2 3 4
A TENAGA
1 Pekerja L.01 OH
2 Tukang Batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
JUMLAH HAR
B BAHAN
Pasir Beton ( Takari) M³
Semen kupang zak
Kerikil Kg
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Tukang Kayu L.05 OH
Tukang Besi L.06 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Kawat Ikat Kg
Semen Kupang zak
Kelikir M³
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Tukang Besi L.07 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Besi Beton Polos Kg
Kawat Ikat Kg
Semen Kupang zak
Pasir Beton ( Takari) kg
Kelikir kg
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Semen Kupang zak
Pasir Beton ( Takari) kg
Kelikir kg
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Semen Kupang Zak
Pasir Beton ( Takari) M³
Kelikir M³
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Tukang Besi L.06 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Kawat Ikat Kg
Semen Kupang zak
Pasir Beton ( Takari) M³
Besi Beton Polos Kg
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Tukang Besi L.06 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Kawat Ikat Kg
Semen Kupang zak
Kelikir M³
Pasir Beton ( Takari) M³
Besi Beton Polos Kg
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Semen Kupang Zak
Pasir Pasang M³
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Semen Kupang Zak
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Pipa L.06 OH
Mandor L.05 OH
JUMLAH HAR
B BAHAN
Pipa Diameter 12 cm Batang
JUML
C PERALATAN
Mesin Las Ls
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Ubin warna Bh
Semen Kupang kg
Pasir pasang M³
JUML
C PERALATAN
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Las L.06 OH
Mandor L.05 OH
JUMLAH HAR
B BAHAN
Bersi manhole 50x50+5 plat kg
JUML
C PERALATAN
Mesin Las Ls
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Tukang Las L.01 OH
Kepala tukang L.06 OH
Mandor L.05 OH
JUMLAH HAR
B BAHAN
Besi siku l 50x50 kg
Plat Baja batang
JUML
C PERALATAN
Mesin Las Ls
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Cat L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HAR
B BAHAN
Tiner
Cat Aquaproof
JUML
C PERALATAN
kuas
JUM
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
Pembersihan lahan
5 6 7
13,110.00
15 % X D 1,966.50
15,076.50
Pemasangan Bowplank
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
5 6 7
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HA
B BAHAN
Kayu kelas III M³
aku 5 – 10 cm kg
Minyak bekisting Liter
JU
C PERALATAN
J
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
Bekisting Lantai
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HA
B BAHAN
Kayu kelas III M³
Balok kayu kelas II M³
aku 5 – 12 cm Kg
Minyak bekisting Liter
JU
C PERALATAN
J
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HA
B BAHAN
Kayu kelas III M³
aku 5 – 12 cm Kg
Minyak bekisting Liter
JU
C PERALATAN
J
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HA
B BAHAN
Kayu kelas III M³
Balok kayu kelas II M³
aku 5 – 12 cm Kg
Minyak bekisting Liter
JU
C PERALATAN
J
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
Bekisting Dinding
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HA
B BAHAN
Kayu kelas III M³
Balok kayu kelas II M³
aku 5 – 12 cm Kg
Minyak bekisting Liter
JU
C PERALATAN
J
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
1 2 3 4
A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH HA
B BAHAN
Kayu kelas III M³
aku 5 – 12 cm Kg
Minyak bekisting Liter
JU
C PERALATAN
J
D Jumlah (A + B + C)
E Overhead & Profit ( contoh 15%)
F Harga Satuan Pekerjaan ( D+ E)
g Pondasi
5 6 7
5 6 7
Sloof 15/20
5 6 7
kolom 15/15
5 6 7
5 6 7
ngbalk 15/20
5 6 7
0.520 125,000.00 65,000.00
0.260 51,000.00 13,260.00
0.026 550,000.00 14,300.00
0.026 25,000.00 650.00
JUMLAH HARGA TENAGA KERJA 93,210.00
IV PEKERJAAN ACESORIES
1 Pekerjaan rumah pompa ukuran 60x60x80 dengan gembok pengaman
2 Pekerjaan pengadaan pompa SANYO + instalasi
3 Pemasangan box sekring + panel untuk nistalasi pompa
V PEKERJAAN FINISHING
1 Pekerjaan pembersihan akhir pekerjaan
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN GALIAN DAN URUGAN
III PEKERJAAN PASANGAN DAN BETON
IV PEKERJAAN ACESORIES
V PEKERJAAN FINISHING
TOTAL JUMLAH HARGA
BOBOT RENCANA KOMULATIF (%)
BOBOT REALISASI KOMULATIF (%)
JADWAL WAKTU PELAKSANAAN ( TIME SCHEDUL) PENGGUNAAN TENAGA KERJA
BULAN KE 1 BULAN KE 2
JUMLAH HARGA (RP) BOBOT (%) MINGGU KE MINGGU KE
1 2 3 4 5 6
2,745,878.23 0.024 0.012 0.012
8,729,246.09 0.075 0.011 0.011 0.011 0.011
103,768,588.55 0.892 0.089 0.089 0.089 0.089 0.089
1,000,000.00 0.009
100,000.00 0.001
116,343,712.87 1.00 0.012 0.101 0.1 0.1 0.1 0.1
%) 0.012 0.113 0.213 0.313 0.413 0.513
(%)
KERJA
0.024 0.012
BULAN KE 2 BULAN KE 2 0.075 0.011
MINGGU KE MINGGU KE 0.892 0.089
7 8 9 10 11 12 0.009 0.002
0.001 0.0005
0.011 0.011 0.011
0.089 0.089 0.089 0.089 0.089
0.002 0.002 0.002 0.002 0.002 0.002
0.0005 0.0005
0.102 0.102 0.102 0.0915 0.0915 0.002
0.615 0.717 0.819 0.9105 1.002 1.00