DAFTAR HARGA SATUAN BAHAN DAN UPAH

NO. I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 HARGA BAHAN Tanah urug Tanah subur Pupuk kandang Limestone Pasir urug Bata merah Bata gosok Paras gosok silakarang Paras kerobokan Paras sarwa genep Paras jogja 30x30x2cm Batako buntu Zak semen (50 kg) gresik Semen warna Zak mil Pasir pasang Batu kali Pasir beton Kerikil beton Besi beton Besi strip Kawat beton Paku usuk Paku reng Paku list Paku gypsum Rangka metal furing Kayu Meranti usuk Kayu Meranti papan Kayu Kamper papan Kayu Kamper balok Kayu Kamper reng/usuk Kayu balok Kruing Kayu Usuk Kruing Kayu klas III Dolken kayu dia 8-10/4m Bambu sedang Genteng kodok setara Goodyear Bubungan genteng SL Genteng plentong Bubungan genteng plentong Eternit 1 x 1 m Teakwood 3 mm Plywood 9 mm Plywood 6 mm Plywood 4 mm Teakwood 4 mm Kalsibord 4.5 mm Gypsum 9mm Keramik 20/20 cm Asia Keramik 30/30 cm Asia Keramik 40/40 cm Asia Keramik 20/25 cm Asia Kaca polos 5 mm bening Kaca riben 5 mm hitam Kaca es 5 mm Dempul / plamur kayu Amplas Plamur tembok Cat menie kayu Cat menie besi Cat tembok vinilex Cat Emco Cat besi m3 m3 m3 m3 m3 bj bj bj bj bj m2 bj kg kg zak m3 m3 m3 m3 Kg Kg Kg Kg Kg Kg Kg m1 m3 m3 m3 m3 m3 m3 m3 m3 btg btg bh bh bh bh lbr lbr lbr lbr lbr lbr lbr lbr bh bh bh bh m2 m2 m2 Kg lbr Kg Kg Kg Kg Kg Kg 100,000.00 100,000.00 115,000.00 1,300.00 URAIAN SATUAN HARGA ( Rp )

NO. 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 II 1 2 3 4 5 6 7 8 9 10 11

URAIAN Tinner / minyak cat Cat KCA Cat antik Cat Aquaproof Minyak begesting Aluminium pintu Lem Aice Aibon Paving tebal 6 cm K-175 Paving kotak 20/20 tebal 8 cm K-225 Politur Impra Clear gloss List kayu kamper 2/4 cm List gypsum 7x7 cm List gypsum 15x15 cm Gedeg klas 1 Cool teer Asbes Gelombang 1.8 mx0.92mx5mm

SATUAN ltr Kg Kg Kg ltr lbr Kg m2 m2 ltr ltr ltr m' m' m' m2 ltr lbr lbr kg m1 m1 m1 bh bh bh bh bh bh bh bh m1 m1 m2 m1 kg kg Kmpl btng m1 m1 kg lembar m1 m1 btg lbr m2

HARGA ( Rp ) -

Seng gelombang BJLS 28


Paku Pancing 60 x 230 Pipa PVC 1/2" - 1" Pipa PVC 2" Pipa PVC 3" - 4" Kran air 3/4" - 1/2" setar Honda Seal teap Kloset duduk Urinoir Bak air fiber Bak mandi beton Washtafel Kaki washtafel keramik Kusen Aluminium 4 '' CA Rangka pintu/jendela aluminium Plat alumunium Lis karet Politur Water Base "Mowilex"acrylic Woodstain Politur Water Base "Mowilex "acrylic Gloos Enamel Koral sikat Steinless Steel 1''dan 2" Profil C 85068 Profil B41 Screw/baut Atap metal berpasir Besi 10 untuk teralis Besi plat lebar 2 cm untuk teralis Pipa GSP 1,25" Besi plat lebar 1x2m tebal 0.75mm Batu hitam Karangasem UPAH KERJA Mandor Kepala Tukang Pekerja Tukang batu Tukang besi Tukang kayu Tukang cat Tukang style bali Tukang pipa Tukang las Ongkos serut dan profil

or/hr or/hr or/hr or/hr or/hr or/hr or/hr or/hr or/hr or/hr m3

Page 3 of 19

DAFTAR ANALISA
NO URAIAN HARGA SATUAN HARGA (Rp) UPAH BAHAN JUMLAH HARGA (Rp)

A 1

PEKERJAAN PERSIAPAN 1M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT 1.7000 Btg Dolken kayu dia 8-10/4 m 0.2100 m3 Kayu Meranti 0.3000 kg Paku 2"-5" 10.5000 kg Semen Portland 0.0300 m3 Pasir beton 0.0500 m3 Koral Beton 1.5000 lbr Seng gelombang BJLS 28 2.0000 or/hr Tukang kayu 0.2000 or/hr Kepala tukang 1.0000 or/hr Pekerja 0.0500 or/hr Mandor

1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK 0.0120 m3 Usuk meranti 5/7 0.0070 m3 Papan meranti 0.0200 kg Paku 2"-5" 0.1000 or/hr Tukang kayu 0.0100 or/hr Kepala tukang 0.1000 or/hr Pekerja 0.0050 or/hr Mandor

1M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN 0.1000 or/hr Pekerja 0.0500 or/hr Mandor

1 M3 BONGKARAN BETON BERTULANG 6.6670 or/hr Pekerja 0.3330 or/hr Mandor

1 M2 PEMBONGKARAN TEMBOK DAN ATAP BANGUNAN 0.8500 or/hr Pekerja 0.0425 or/hr Mandor

1 M2 DENAH BANGUNAN PEMBONGKARAN TEMBOK (TIDAK TERMASUK ATAP) DAN PEMBERSIHAN 0.6500 or/hr Pekerja 0.0325 or/hr Mandor 1 M2 PEMBONGKARAN KERAMIK LANTAI 0.6200 or/hr Pekerja 0.0300 or/hr Mandor 1 M3 BONGKARAN BETON TIDAK BERTULANG 4.4447 or/hr Pekerja 0.3330 or/hr Mandor 1 M2 PEMBONGKARAN ATAP GETENG 0.1500 or/hr Pekerja 0.0080 or/hr Mandor PEKERJAAN TANAH DAN PASIR 1 M3 PEK. GALIAN TANAH BIASA SEDALAM 1 METER 0.7500 or/hr Pekerja 0.0250 or/hr Mandor 1 M3 PEK. GALIAN TANAH BIASA SEDALAM 2 METER 0.9000 or/hr Pekerja 0.0450 or/hr Mandor 1 M3 PEK. GALIAN TANAH BIASA SEDALAM 3 METER 1.0500 or/hr Pekerja 0.0670 or/hr Mandor

B 1

Page 4 of 19

NO 4

URAIAN 1 M3 URUGAN TANAH DIPADATKAN 1.2000 m3 Tanah Urug 0.5000 or/hr Pekerja 0.0500 or/hr Mandor 1 M3 ONGKOS NGURUG TANAH 0.5000 or/hr Pekerja 0.0500 or/hr Mandor

HARGA SATUAN 100,000.00 -

HARGA (Rp) UPAH BAHAN 120,000.00 -

JUMLAH HARGA (Rp)

120,000.00

120,000.00

1 M3 URUGAN TANAH KEMBALI GALIAN Mengurug kembali 1m3 galian dihitung dari 1/3 kali dari index pekerjaan galian 1 M3 URUGAN PASIR 1.2000 m3 Pasir Urug 0.3000 or/hr Pekerja 0.0100 or/hr Mandor 1 M3 URUGAN LIME STONE DIPADATKAN 1.2000 m3 Lime stone 0.5000 or/hr Pekerja 0.0500 or/hr Mandor 1 M3 PEMBUANGAN TANAH SEJAUH 150 M 1.6500 or/hr Pekerja 0.0500 or/hr Mandor 1 M3 PEMBUANGAN TANAH SISA GALIAN 0.5160 or/hr Pekerja 0.0500 or/hr Mandor 1.0000 Ls Sewa Truck 1 M3 PEMADATAN TANAH (Per 20 Cm) 0.5000 or/hr Pekerja 0.0500 or/hr Mandor

115,000.00 -

138,000.00 -

138,000.00 -

138,000.00

C 1

PEKERJAAN PASANGAN 1 M3 PASANGAN BATU KOSONG 1.2000 m3 Batu Kali 0.4320 m3 Pasir Urug 0.7800 or/hr Pekerja 0.3900 or/h Tukang Batu 0.0390 or/h Kepala Tukang 0.0390 or/hr Mandor 1 M3 PASANGAN BATU KALI (1PC : 5PS) 1.2000 m3 Batu Kali 136.0000 kg Semen Portland 0.5440 m3 Pasir Pasang 0.7500 or/h Tukang Batu 0.0750 or/h Kepala Tukang 1.5000 or/h Pekerja 0.0750 or/h Mandor 1 M2 PAS. BATA MERAH TEBAL 1/2 BATA (1PC : 3PS) 70.0000 bh Bata merah kls I 14.3700 kg Semen Portland 0.0400 m3 Pasir Pasang 0.1000 or/hr Tukang Batu 0.0100 or/hr Kepala Tukang 0.3000 or/hr Pekerja 0.0150 or/hr Mandor 1 M2 PAS. BATA MERAH TEBAL 1/2 BATA (1PC : 5PS) 70.0000 bh Bata merah kls I 9.6800 kg Semen Portland 0.0450 m3 Pasir Pasang 0.1000 or/hr Tukang Batu 0.0100 or/hr Kepala Tukang 0.3000 or/hr Pekerja 0.0150 or/hr Mandor 1 M2 PAS. BATA MERAH TEBAL 1 BATA (1PC : 5PS)

115,000.00 -

49,680.00 -

49,680.00 -

49,680.00

Page 5 of 19

NO 140.0000 22.2000 0.1020 0.2000 0.0200 0.6000 0.0300 6 bh kg m3 or/hr or/hr or/hr or/hr

URAIAN Bata merah kls I Semen Portland Pasir Pasang Tukang Batu Kepala Tukang Pekerja Mandor

HARGA SATUAN -

HARGA (Rp) UPAH BAHAN -

JUMLAH HARGA (Rp)

1 M2 PASANGAN DINDING BATAKO 12.5000 bh Batako 7.5000 kg Semen Portland 0.0270 m3 Pasir Pasang 0.1000 or/hr Tukang Batu 0.0100 or/hr Kepala Tukang 0.3200 or/hr Pekerja 0.0150 or/hr Mandor 1 M3 PASANGAN BATAKO = 10 x Analisa No. 6 diatas

1 M2 PLESTERAN (1PC : 2PS) TEBAL 15 MM 10.2240 kg Semen Portland 0.0200 m3 Pasir Pasang 0.1500 or/hr Tukang Batu 0.0150 or/hr Kepala Tukang 0.3000 or/hr Pekerja 0.0150 or/hr Mandor 1 M2 PLESTERAN PEPALIHAN TYPE BALI = 2 x NO 7

1 M2 PLESTERAN (1PC : 5PS) TEBAL 15 MM 5.1840 kg Semen Portland 0.0260 m3 Pasir Pasang 0.1500 or/hr Tukang Batu 0.0150 or/hr Kepala Tukang 0.3000 or/hr Pekerja 0.0150 or/hr Mandor 1M2 FINISHING SIAR PASANGAN BATU KALI (1PC:2PS) 6.3400 kg Semen Portland 0.0120 m3 Pasir Pasang 0.3000 or/hr Tukang Batu 0.1500 or/hr Kepala Tukang 0.0150 or/hr Pekerja 0.0150 or/hr Mandor 1 M2 PEKERJAAN ACIAN 3.2500 kg Semen Gresik 0.1000 or/hr Tukang batu 0.0100 or/hr Kepala tukang 0.2000 or/hr Pekerja 0.0100 or/hr Mandor

10

D 1

PEKERJAAN BETON TIDAK BERTULANG 1 M3 BETON RABAT 0.8700 m3 0.5200 m3 218.0000 kg 1.6500 or/hr 0.0800 or/hr 0.2500 or/hr 0.0250 or/hr ( 1PC : 3PS : 5KR) Kerikil Pasir Beton Semen Portland Pekerja Mandor Tukang batu Kepala tukang

E 1

PEKERJAAN BETON BERTULANG 1 M3 BETON (1PC : 2PS : 3KR) 0.9000 m3 Kerikil 0.4500 m3 Pasir Beton 280.0000 kg Semen Portland 1.6500 Oh Pekerja 0.2500 Oh Tukang batu 0.0250 Oh Kepala tukang batu 0.0800 Oh Mandor

Page 6 of 19

NO

URAIAN

HARGA SATUAN

HARGA (Rp) UPAH BAHAN -

JUMLAH HARGA (Rp) -

1 M3 KERJA BETON K-225 0.6500 m3 Kerikil 0.6500 m3 Pasir Beton 388.0000 kg Semen Portland 6.0000 or/hr Pekerja 0.3000 or/hr Mandor 1.0000 or/hr Tukang batu 0.1000 or/hr Kepala tukang 1 KG BAHAN BESI BETON POLOS/ULIR 1.0500 Kg Besi beton 0.0150 Kg Kawat beton 0.0070 or/hr Pekerja 0.0004 or/hr Mandor 0.0070 or/hr Tukang Besi 0.0007 or/hr Kepala tukang

1 M2 BEGESTING UNTUK PONDASI 0.0400 m3 Kayu klas III 0.3000 kg Paku biasa 2"-5" 0.1000 ltr Minyak begesting 0.5200 Oh Pekerja 0.2600 Oh Tukang kayu 0.0260 Oh Kepala tukang 0.0260 Oh Mandor 1 M2 BEGESTING UNTUK SLOOF 0.0450 m3 Kayu klas III 0.3000 kg Paku biasa 2"-5" 0.1000 ltr Minyak begesting 0.5200 Oh Pekerja 0.2600 Oh Tukang kayu 0.0260 Oh Kepala tukang 0.0260 Oh Mandor 1 M2 BEGESTING UNTUK KOLOM 0.0400 m3 Kayu klas III 0.4000 kg Paku biasa 2"-5" 0.2000 ltr Minyak begesting 0.0150 m3 Meranti usuk 0.3500 lbr Plywood 9 mm 2.0000 btg Bambu 0.6600 Oh Pekerja 0.3300 Oh Tukang kayu 0.0330 Oh Kepala tukang 0.0330 Oh Mandor 1 M2 BEGESTING UNTUK BALOK 0.0400 m3 Kayu klas III 0.4000 kg Paku biasa 2"-5" 0.2000 ltr Minyak begesting 0.0180 m3 Meranti usuk 0.3500 lbr Plywood 9 mm 2.0000 btg Bambu 0.6600 Oh Pekerja 0.3300 Oh Tukang kayu 0.0330 Oh Kepala tukang 0.0330 Oh Mandor 1 M2 BEGESTING UNTUK LANTAI 0.0400 m3 Kayu klas III 0.4000 kg Paku biasa 2"-5" 0.2000 ltr Minyak begesting 0.0150 m3 Meranti usuk 0.3500 lbr Plywood 9 mm 6.0000 btg Bambu 0.6600 Oh Pekerja 0.3300 Oh Tukang kayu 0.0330 Oh Kepala tukang 0.0330 Oh Mandor 1 M2 BEGESTING UNTUK PLAT DUIKER

Page 7 of 19

NO 9

URAIAN 1 M2 BEGESTING UNTUK TANGGA 0.0300 m3 Kayu klas III 0.4000 kg Paku biasa 2"-5" 0.1500 ltr Minyak begesting 0.0150 m3 Meranti usuk 0.3500 lbr Plywood 9 mm 2.0000 btg Bambu 0.6600 Oh Pekerja 0.3300 Oh Tukang kayu 0.0330 Oh Kepala tukang 0.0330 Oh Mandor

HARGA SATUAN -

HARGA (Rp) UPAH BAHAN -

JUMLAH HARGA (Rp)

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11) CM 0.0020 m3 Kayu klas III 0.0100 kg Paku biasa 2"-5" 3.0000 kg Besi beton 0.4500 kg Kawat beton 4.0000 kg Semen Potland 0.0060 m3 Pasir beton 0.0090 m3 Koral beton 0.1800 0h Pekerja 0.0200 oh Tukang batu 0.0200 oh Tukang kayu 0.0200 oh Tukang besi 0.0060 oh Kepala tukang 0.0090 oh Mandor 1 M1 MEMBUAT RING BALOK BETON BETULANG (10X15) CM 0.0030 m3 Kayu klas III 0.0200 kg Paku biasa 2"-5" 3.6000 kg Besi beton 0.0500 kg Kawat beton 5.5000 kg Semen Potland 0.0090 m3 Pasir beton 0.0150 m3 Koral beton 0.2970 0h Pekerja 0.0330 oh Tukang batu 0.0330 oh Tukang kayu 0.0330 oh Tukang besi 0.0100 oh Kepala tukang 0.0150 oh Mandor

10

1M3 BETON KANSTIN 1.0000 M3 Beton 1pc:2Psr:3krl 10.0000 m2 Begesting

F 1

PEKERJAAN PASANGAN KERAMIK 1 M2 PAS. KERAMIK 40/40 CM 6.2500 bh Keramik 40/40 cm 11.3800 kg Semen Portland 0.0420 m3 Pasir Pasang 1.5000 kg Semen warna 0.3500 or/hr Tukang Batu 0.0350 or/hr Kepala Tukang 0.6200 or/hr Pekerja 0.0300 or/hr Mandor 1 M' PAS. KERAMIK PLINT 10/40 0.6875 bh Keramik 10/40 cm 1.6500 kg Semen Portland 0.0032 m3 Pasir Pasang 0.1000 kg Semen warna 0.0300 or/hr Tukang Batu 0.0030 or/hr Kepala Tukang 0.0600 or/hr Pekerja 0.0030 or/hr Mandor 1 M2 PAS. KERAMIK 30/30 CM 6.2500 bh Keramik 30/30 cm

1,300.00 -

1,950.00 -

1,950.00 130.00

1,950.00

1,300.00 -

130.00 -

130.00

Page 8 of 19

NO 11.3800 0.0420 1.5000 0.3500 0.0350 0.6200 0.0300 4 kg m3 kg or/hr or/hr or/hr or/hr

URAIAN Semen Portland Pasir Pasang Semen warna Tukang Batu Kepala Tukang Pekerja Mandor

HARGA SATUAN 1,300.00 -

HARGA (Rp) UPAH BAHAN 1,950.00 -

JUMLAH HARGA (Rp)

1,950.00 130.00

1,950.00

1 M' PAS. KERAMIK PLINT 10/30 1.2222 bh Keramik 10/30 cm 1.6500 kg Semen Portland 0.0032 m3 Pasir Pasang 0.1000 kg Semen warna 0.0300 or/hr Tukang Batu 0.0030 or/hr Kepala Tukang 0.0600 or/hr Pekerja 0.0030 or/hr Mandor 1 M2 PAS. KERAMIK 20/20CM 26.5000 bh Keramik 20/20 cm 10.4000 kg Semen Portland 0.0450 m3 Pasir Pasang 1.6200 kg Semen warna 0.3500 or/hr Tukang Batu 0.0350 or/hr Kepala Tukang 0.7000 or/hr Pekerja 0.0350 or/hr Mandor 1 M2 PAS. KERAMIK 20/25CM 20.0000 bh Keramik 20/25 cm 9.3000 kg Semen Portland 0.0180 m3 Pasir Pasang 1.5000 kg Semen warna 0.4500 or/hr Tukang Batu 0.0450 or/hr Kepala Tukang 0.6000 or/hr Pekerja 0.0300 or/hr Mandor

1,300.00 -

130.00 2,106.00

130.00

1,300.00 -

2,106.00 1,950.00

2,106.00

1,300.00 -

1,950.00

1,950.00

1 M2 PAS. PAVING 1.0000 m2 0.1000 m3 0.3000 or/hr 0.0300 or/hr 0.4000 or/hr 0.0200 or/hr

Paving 6 cm K-175 Pasir urug Tukang Batu Kepala Tukang Pekerja Mandor

115,000.00 -

11,500.00 -

11,500.00

11,500.00

1 M2 PASANGAN KORAL SIKAT 1.5000 Kmp Koral sikat 11.3800 Kg Semen 0.0420 M3 Pasir Pasang 0.3100 or/hr Tukang Batu 0.0310 or/hr Kepala Tukang 0.6250 or/hr Pekerja 0.0300 or/hr Mandor

G 1

PEKERJAAN KAYU, ATAP DAN PLAFOND 1 M1 PEKERJAAN PAPAN KOLONG/LISPLANK TEBAL 3/20 CM 0.0108 m3 Kamper Papan 3/20 0.1000 Kg Paku biasa 2'-5' 0.2000 or/hr Tukang Kayu 0.0200 or/hr Kepala Tukang 0.1000 or/hr Pekerja 0.0050 or/hr Mandor 1 M1 PEKERJAAN PAPAN KOLONG/LISPLANK TEBAL 3/30 CM 0.0110 m3 Kamper Papan 3/30 0.0500 Kg Paku biasa 2'-5' 0.2000 or/hr Tukang Kayu 0.0200 or/hr Kepala Tukang 0.1000 or/hr Pekerja 0.0050 or/hr Mandor

Page 9 of 19

NO

URAIAN

HARGA SATUAN

HARGA (Rp) UPAH BAHAN -

JUMLAH HARGA (Rp) -

1 M2 PASANGAN KERANGKA PLAFOND (50X100CM) 0.0154 m3 Usuk kruing 4/6 0.2000 kg Paku biasa 2" - 5" 0.3000 or/hr Tukang Kayu 0.0300 or/hr Kepala Tukang 0.1500 or/hr Pekerja 0.0750 or/hr Mandor 1 M2 PASANGAN KERANGKA PLAFOND (30X60CM) 0.0230 m3 Usuk kruing 4/6 0.1500 kg Paku biasa 2" - 5" 0.3000 or/hr Tukang Kayu 0.0300 or/hr Kepala Tukang 0.2000 or/hr Pekerja 0.0100 or/hr Mandor 1 M2 PASANGAN KERANGKA PLAFOND (60X60CM) 0.0163 m3 Kayu usuk Kruing 4/6 0.2500 kg Paku 2"-5" 0.3000 or/hr Tukang Kayu 0.0300 or/hr Kepala Tukang 0.2000 or/hr Pekerja 0.0100 or/hr Mandor 1 M2 RANGKA PLAFOND HOLLOW/ METAL FURING 4.2000 m1 Rangka aluminium 0.1100 kg Paku sekrup 0.0550 oh Tukang kayu 0.0055 oh Kepala tukang kayu 0.1100 oh Pekerja 0.0055 oh Mandor 1 M2 PASANGAN PLAFOND KALSIBOARD 3.5 MM 0.3640 lbr Kalsiboard 0.1100 kg Paku gypsum 0.0500 or/hr Tukang Kayu 0.0050 or/hr Kepala Tukang 0.1000 or/hr Pekerja 0.0050 or/hr Mandor 1 M2 PASANGAN PLAFOND GYPSUM 0.3640 lbr gypsum 0.1100 Kg Paku gypsum 0.0500 or/hr Tukang Kayu 0.0050 or/hr Kepala Tukang 0.1000 or/hr Pekerja 0.0050 or/hr Mandor 1 M' PEKERJAAN PASANGAN LIST PLAPOND 1.0500 m1 List kamper 1,5/5 0.1000 Kg Paku List 0.0500 or/hr Tukang Kayu 0.0050 or/hr Kepala Tukang 0.0500 or/hr Pekerja 0.0030 or/hr Mandor 1 M3 PEKERJAAN KAP KAYU KRUING 1.1000 m3 Kayu Kruing balok 15.0000 kg Besi strip 5.6000 kg Paku biasa 2"-5" 12.0000 or/hr Tukang Kayu 1.2000 or/hr Kepala Tukang 4.0000 or/hr Pekerja 0.2000 or/hr Mandor 1 M2 PEK. KAP BAJA RINGAN 2.2520 m' Profil C 85068 2.5000 m' Profil B41 1.0000 set Acesories 1.0000 kg Screw/baut 1.0000 m2 Ongkos pasang 1 M2 PAS. USUK KRUING DAN RENG KAMPER 0.0140 m3 Kayu Usuk Kruing

10

11

12

Page 10 of 19

NO 0.0036 0.1000 0.1500 0.1000 0.1000 0.0100 0.0050 m3 Kg Kg or/hr or/hr or/hr or/hr

URAIAN Kayu Reng Kamper Paku reng Paku kaso Pekerja Tukang Kayu Kepala Tukang Mandor

HARGA SATUAN -

HARGA (Rp) UPAH BAHAN -

JUMLAH HARGA (Rp)

1 M2 PAS. RENG KAMPER 13 1 M2 PAS. RENG KAYU KRUING 0.0040 m3 Kayu Reng Kruing 0.1000 Kg Paku reng 0.0500 or/hr Pekerja 0.0500 or/hr Tukang Kayu 0.0066 or/hr Kepala Tukang 0.0300 or/hr Mandor 1 M2 PAS. USUK KAYU KRUING 0.0140 m3 Kayu Usuk Kruing 0.1500 Kg Paku kaso 0.0600 or/hr Pekerja 0.0600 or/hr Tukang Kayu 0.0066 or/hr Kepala Tukang 0.0300 or/hr Mandor 1 M2 PAS. ATAP GENTENG 21.0000 bh Genteng Kodok 0.0600 or/hr Tukang kayu 0.0060 or/hr Kepala Tukang 0.1500 or/hr Pekerja 0.0080 or/hr Mandor

14

15

16 1 M2 PASANG ATAP ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM 0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 0.1200 kg Paku Pancing 60 x 230 0.1400 oh Pekerja 0.0700 oh Tukang Kayu 0.0070 oh Kepala Tukang 0.0070 oh Mandor 17 1 M1 PASANG GENTENG BUBUNGAN 4.0000 bh Bubungan SL 8.0000 kg Semen Gresik 0.0320 m3 Pasir pasang 0.2000 or/hr Tukang kayu 0.0200 or/hr Kepala Tukang 0.4000 or/hr Pekerja 0.0020 or/hr Mandor 1 M2 PAS. PARTISI PLYWOOD /UNTUK DINDING 0.8600 lbr Plywood 4 mm 0.0280 m3 Kayu Kruing 0.1500 Kg Paku usuk 0.0500 Kg Paku list 0.4500 or/hr Tukang Kayu 0.0450 or/hr Kepala tukang 0.1500 or/hr Pekerja 0.0080 or/hr Mandor 1 M2 PEK. ATAP METAL BERPASIR 2.1500 lmbr Atap metal berpasir 0.6500 kg Screw/baut 1.0000 m2 Ongkos pasang

18

19

H 1

PEKERJAAN KUSEN, PINTU DAN JENDELA 1 M3 PAS. KUSEN PINTU/JENDELA KAMPER 1.1000 m3 Kayu kamper balok 1.2500 kg Paku 10cm 1.0000 kg Lem kayu 21.0000 or/hr Tukang Kayu 2.1000 or/hr Kepala Tukang 7.0000 or/hr Pekerja -

Page 11 of 19

NO 0.3500

URAIAN or/hr Mandor

HARGA SATUAN -

HARGA (Rp) UPAH BAHAN 1m' pekerjaan kusen 6/15 = 1m' pekerjaan kusen 6/12 = -

JUMLAH HARGA (Rp) -

1 M3 PAS. KUSEN PINTU/JENDELA KRUING 1.2000 m3 Kayu Kruing balok 1.2500 kg Paku 10cm 1.0000 kg Lem kayu 18.0000 or/hr Tukang Kayu 1.8000 or/hr Kepala Tukang 6.0000 or/hr Pekerja 0.3000 or/hr Mandor

1 M2 PEKERJAAN DAUN PINTU PANEL KAMPER 0.0400 m3 Kayu Kamper Papan 0.5000 m3 Lem kayu 3.0000 or/hr Tukang Kayu 0.3000 or/hr Kepala Tukang 1.0000 or/hr Pekerja 0.0500 or/hr Mandor

1 M2 PEKERJAAN DAUN PINTU/JENDELA KACA KAYU KAMPER 0.0240 m3 Kayu Kamper papan 0.8000 m2 Kaca bening 5 mm 0.3000 m3 Lem kayu 2.4000 or/hr Tukang Kayu 0.2400 or/hr Kepala Tukang 0.8000 or/hr Pekerja 0.0400 or/hr Mandor 1 M2 PEKERJAAN DAUN PINTU/JENDELA KACA KAMPER DENGAN KACA ES 0.0240 m3 Kayu Kamper papan 0.8000 m2 Kaca es 0.3000 m3 Lem kayu 0.1000 Kg Paku List 2.4000 or/hr Tukang Kayu 0.2400 or/hr Kepala Tukang 0.8000 or/hr Pekerja 0.0400 or/hr Mandor 1 M2 PEKERJAAN DAUN PINTU TEAKWOOD LAPIS ALUMINIUM 0.0250 m3 Kayu Kamper papan 1.0000 lbr Teakwood 1.0000 lbr Aluminium 0.3000 Kg Lem Aice Aibon 0.0300 Kg Paku list 0.2400 or/hr Kepala Tukang 0.8000 or/hr Pekerja 0.0400 or/hr Mandor 2.4000 or/hr Tukang Kayu 1 M2 PEKERJAAN DAUN PINTU DOUBLE PLYWOOD 0.0250 m3 Kayu Kamper papan 1.0000 lbr Plywood 0.3000 Kg Lem Aice Aibon 0.0300 Kg Paku list 0.2400 or/hr Kepala Tukang 0.8000 or/hr Pekerja 0.0400 or/hr Mandor 2.4000 or/hr Tukang Kayu 1 M2 PEKERJAAN KACA MATI 1.1000 m2 Kaca 5 mm 0.1000 Kg Paku list 0.1500 or/hr Tukang Kayu 0.0150 or/hr Kepala Tukang 0.0150 or/hr Pekerja 0.0008 or/hr Mandor 1 M1 KUSEN PINTU / JENDELA ALUMUNIUM 1.1000 m1 Aluminium 4 '' CA 1.0000 Ls Las/paku keling 1.0000 Ls Angker 0.1500 oh Tukang besi 0.0150 oh Kepala tukang

Page 12 of 19

NO 0.6500 0.0325 oh oh

URAIAN Pekerja Mandor

HARGA SATUAN -

HARGA (Rp) UPAH BAHAN

JUMLAH HARGA (Rp)

10 1 M2 DAUN PINTU ALUMINIUM 4.3600 m1 Rangka aluminium 0.3600 m2 Kaca bening 5mm 4.8600 m1 Lis karet 0.3600 lbr Triplek 6 mm 0.7200 m2 Plat aluminium 0.2500 kg Lem 1.0000 ls Las/paku keling 3.0000 oh Tukang besi 0.3000 oh Kepala Tukang 3.0000 oh Pekerja 0.1500 oh Mandor Kaca ryben 5mm Kaca es 5mm 11 1 M2 DAUN PINTU ALUMINIUM TANPA KACA 4.3600 m1 Rangka aluminium 4.8600 m1 Lis karet 0.3600 lbr Triplek 6 mm 0.7200 m2 Plat aluminium 0.2500 kg Lem 1.0000 ls Las/paku keling 2.5000 oh Tukang besi 0.2500 oh Kepala Tukang 2.5000 oh Pekerja 0.1250 oh Mandor 12 1 M2 DAUN JENDELA KACA ALUMINIUM 4.3900 m1 Rangka aluminium 0.6250 m2 Kaca ryben 5mm 3.4900 m1 Lis karet 1.0000 ls Las/paku keling 2.5000 oh Tukang besi 0.2500 oh Kepala Tukang 2.0000 oh Pekerja 0.1000 oh Mandor Kaca bening 5 mm 11 1 M2 DAUN JENDELA KACA ALUMINIUM DAN PLAT ALUMINIUM 7.0300 m1 Rangka aluminium 0.3600 m2 Triplek 6 mm 0.8900 m1 Plat aluminium 1.0000 ls Las/paku keling 2.5000 oh Tukang besi 0.2500 oh Kepala Tukang 2.0000 oh Pekerja 0.1000 oh Mandor 13 1 M2 PASANG KACA, TEBAL 5 MM 1.0500 m2 Kaca bening 5mm 4.8900 m1 Lis karet 0.2500 oh Tukang besi 0.0250 oh Kepala Tukang 0.5000 oh Pekerja 0.0250 oh Mandor Kaca ryben 5mm 1 M' RAILLING TANGGA STEINLESS STEEL 3.7000 Btg Steinless Steel 1''dan 2" 1.0000 Ls Las 0.7500 Oh Tukang Las 0.0750 Oh Kepala Tukang 1.2500 Oh Pekerja 0.0350 Oh Mandor

14

15

1 M2 SERVICE DAN PASANG KEMBALI TERALIS BESI LAMA 1.0000 Ls Las 0.7500 Oh Tukang Las 0.0750 Oh Kepala Tukang

Page 13 of 19

NO 1.2500 0.0350 Oh Oh

URAIAN Pekerja Mandor

HARGA SATUAN -

HARGA (Rp) UPAH BAHAN

JUMLAH HARGA (Rp)

16

1 M2 PASANG TERALIS BESI BARU 3.2000 Kg Besi plat 7.4400 Kg Besi bulat 1.0000 Ls Las 1.0000 Oh Tukang Las 0.1000 Oh Kepala Tukang 2.0000 Oh Pekerja 0.0350 Oh Mandor PEKERJAAN FINISHING / PENGECATAN

I 1

1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.1500 kg Dempul 0.2000 KG Cat meni 0.1700 kg Cat dasar 0.2600 kg Cat penutup 2x 0.0090 or/hr Tukang Cat 0.0060 or/hr Kepala Tukang 0.0700 or/hr Pekerja 0.0025 or/hr Mandor 1 M2 PENGECATAN BIDANG KAYU (CAT ULANG) ( 2 LAPIS CAT PENUTUP) 0.1000 kg Dempul 0.1000 KG Cat meni 0.2600 kg Cat penutup 0.0090 or/hr Tukang Cat 0.0060 or/hr Kepala Tukang 0.0700 or/hr Pekerja 0.0025 or/hr Mandor

1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.1000 Kg Plamur tembok 0.1000 Kg Cat dasar 0.2600 Kg Cat penutup 2X 0.0630 or/hr Tukang Cat 0.0063 or/hr Kepala Tukang 0.0200 or/hr Pekerja 0.0025 or/hr Mandor 1 M2 PENGECATAN TEMBOK (CAT ULANG) ( 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.1200 Kg Cat dasar 0.1800 Kg Cat Tembok Vinilex 2X 0.0420 or/hr Tukang Cat 0.0042 or/hr Kepala Tukang 0.0280 or/hr Pekerja 0.0025 or/hr Mandor 1 M2 PEKERJAAN POLITUR WATERBASE SETARA "MOWILEX" 0.2800 kg Politur Water Base "Mowilex"acrylic Woodstain 0.2800 kg Politur Water Base "Mowilex "acrylic Gloos Enamel 1.0000 lbr Amplas 0.0200 oh Tukang Cat 0.0200 oh Kepala Tukang Cat 0.2000 oh Pekerja 0.0020 oh Mandor

PEKERJAAN SANITASI 1 1 M1 MEMASANG PIPA PVC TIPE AW 1/2" - 1" 1.2000 m1 Pipa PVC 35% harga pipa Perlengkapan 0.0360 or/hr Pekerja 0.0600 or/hr Tukang pipa 0.0060 or/hr Kepala Tukang 0.0018 or/hr Mandor

Page 14 of 19

NO

URAIAN

HARGA SATUAN

HARGA (Rp) UPAH BAHAN -

JUMLAH HARGA (Rp) -

2 1 M1 MEMASANG PIPA PVC TIPE AW 2" 1.2000 m1 Pipa PVC 35% harga pipa Perlengkapan 0.0540 or/hr Pekerja 0.0900 or/hr Tukang pipa 0.0090 or/hr Kepala Tukang 0.0027 or/hr Mandor 3 1 M1 MEMASANG PIPA PVC TIPE AW 3" - 4" 1.2000 m1 Pipa PVC 35% harga pipa Perlengkapan 0.0810 or/hr Pekerja 0.1350 or/hr Tukang pipa 0.0135 or/hr Kepala Tukang 0.0041 or/hr Mandor 4 MEMASANG 1 BUAH KRAN AIR 3/4" - 1/2" 1.0000 bh Kran air 0.0250 bh seal teap 0.0100 or/hr Pekerja 0.1000 or/hr Tukang pipa 0.0100 or/hr Kepala Tukang 0.0050 or/hr Mandor 5 MEMASANG 1 BUAH KLOSET DUDUK 1.0000 bh Kloset duduk 6% harga kloset Perlengkapan 3.3000 or/hr Pekerja 1.1000 or/hr Tukang batu 0.0010 or/hr Kepala Tukang 0.1600 or/hr Mandor MEMASANG 1 BUAH URINOIR 1.0000 bh Urinoir 30% harga urinoir Perlengkapan 3.3000 or/hr Pekerja 1.1000 or/hr Tukang batu 0.0010 or/hr Kepala Tukang 0.1600 or/hr Mandor MEMASANG 1 BUAH BAK MANDI FIBERGLASS 1.0000 bh Bak fiberglass 18% harga bak Perlengkapan 1.8000 or/hr Pekerja 2.7000 or/hr Tukang batu 0.5400 or/hr Kepala Tukang 0.1100 or/hr Mandor MEMASANG 1 BUAH BAK MANDI BETON 1.0000 bh Bak mandi beton 18% harga bak Perlengkapan 1.8000 or/hr Pekerja 2.7000 or/hr Tukang batu 0.5400 or/hr Kepala Tukang 0.1100 or/hr Mandor MEMASANG 1 BUAH WASTAFEL 1.0000 bh Washtafel 12% Perlengkapan 1.0000 bh Kaki washtafel keramik 1.0000 bh Kran air washtafel 1.2000 oh Pekerja 1.4500 oh Tukang batu 0.1500 oh Kepala tukang 0.1000 oh Mandor MEMBUAT 1 BH SEPTICTANK 5.9840 m3 Galian tanah 0.3000 m3 Urugan pasir 0.1500 m3 Beton rabat 9.7300 m2 Pasangan batu bata 8.7000 m1 Kolom praktis 11 x 11 9.5000 m1 Beton ring 10 x 15 15.9000 m2 Plesteran 1pc : 2psr

41,400.00 -

10

138,000.00 -

Page 15 of 19

NO 12.9000 0.5300 53.0000 3.0000 11 m2 m3 kg m2

URAIAN Acian Tutup beton Pembesian Begesting

HARGA SATUAN -

HARGA (Rp) UPAH BAHAN

JUMLAH HARGA (Rp) 41,400.00 31,740.00 124,200.00 155,940.00

MEMBUAT 1 BH PERESAPAN 4.6818 m3 Galian tanah 0.2300 m3 Urugan pasir 0.1100 m3 Beton rabat 5.8800 m2 Pasangan batu bata 6.0000 m1 Kolom praktis 11 x 11 6.0000 m1 Beton ring 10 x 15 0.4100 m3 Tutup beton 41.0000 kg Pembesian 2.2500 m2 Begesting 0.9000 m3 Pengisian pasir 0.9000 m3 Pengisian koral 0.9000 m3 Pengisian ijuk

138,000.00 138,000.00 -

PEKERJAAN STYLE BALI 1 1 M2 PASANGAN PARAS SARWA GENEP 20.0000 bh Paras Sarwa genep 5.6000 Kg Semen 1.4000 or/hr Tukang Style Bali 0.2000 or/hr Kepala Tukang 1.8000 or/hr Pekerja 0.1000 or/hr Mandor 2 1 M2 PASANGAN PARAS JOGJA 30X30X2 CM 1.1000 m2 Batu Jogja 30x30x2 cm 5.6000 Kg Semen 1.2000 or/hr Tukang Style Bali 0.2000 or/hr Kepala Tukang 1.8000 or/hr Pekerja 0.1000 or/hr Mandor 3 1 M2 PASANGAN PARAS SILAKARANG 20.0000 bh Paras Silakarang 5.6000 Kg Semen 1.2000 or/hr Tukang Style Bali 0.2000 or/hr Kepala Tukang 1.8000 or/hr Pekerja 0.1000 or/hr Mandor 4 1 M2 PASANGAN BATA GOSOK 60.0000 bh Bata gosok 5.6000 Kg Semen 1.2000 or/hr Tukang Style Bali 0.2000 or/hr Kepala Tukang 1.8000 or/hr Pekerja 0.1000 or/hr Mandor

1 M2 PENGECATAN MOTIF BALI (1 LAPIS CAT KCA, 2 LAPIS CAT ANTIK) 0.2200 Kg Cat KCA 0.3300 Kg Cat antik 0.2000 Kg Lem 0.0800 or/hr Tukang Cat 0.0080 or/hr Kepala Tukang 0.0250 or/hr Pekerja 0.0025 or/hr Mandor 1 M2 PENGECATAN AQUAPFOOF (1 LAPIS CAT DASAR, 2 LAPIS PENUTUP) 0.1500 Kg Cat dasar 0.2600 Kg Cat penutup 0.0800 or/hr Tukang Cat 0.0080 or/hr Kepala Tukang 0.0250 or/hr Pekerja 0.0025 or/hr Mandor

1 M2 PENGECATAN BIDANG BESI (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.1500 kg Dempul 0.2000 kg Cat meni besi -

Page 16 of 19

NO 0.1700 0.2600 0.0090 0.0060 0.0700 0.0025 9 kg kg or/hr or/hr or/hr or/hr

URAIAN Cat dasar Cat penutup 2x Tukang Cat Kepala Tukang Pekerja Mandor

HARGA SATUAN -

HARGA (Rp) UPAH BAHAN -

JUMLAH HARGA (Rp)

1 M1 MEMBUAT RING BALOK BETON BETULANG (11X15) CM 0.0030 m3 Kayu klas III 0.0200 kg Paku biasa 2"-5" 3.6000 kg Besi beton 0.0500 kg Kawat beton 5.5000 kg Semen Potland 0.0090 m3 Pasir beton 0.0150 m3 Koral beton 0.2970 0h Pekerja 0.0330 oh Tukang batu 0.0330 oh Tukang kayu 0.0330 oh Tukang besi 0.0100 oh Kepala tukang 0.0150 oh Mandor 1 M2 PASANG 0.7500 0.9444 7.3411 1.0000 1.5000 0.1500 1.4000 0.0219 PINTU BESI lbr Besi plat btg Pipa GSP 1,25" kg Besi beton 16 mm Ls Las Oh Tukang Las Oh Kepala Tukang Oh Pekerja Oh Mandor

16

15

1 M2 PAS. ATAP GENTENG 25.0000 bh Genteng plentong 0.0600 or/hr Tukang kayu 0.0060 or/hr Kepala Tukang 0.1500 or/hr Pekerja 0.0080 or/hr Mandor 1 M1 PASANG GENTENG BUBUNGAN 4.0000 bh Bubungan 8.0000 kg Semen Gresik 0.0320 m3 Pasir pasang 0.2000 or/hr Tukang kayu 0.0200 or/hr Kepala Tukang 0.4000 or/hr Pekerja 0.0020 or/hr Mandor 1 M2 PEKERJAAN STYLE BALI BATU HITAM 1.0000 m2 Batu hitam karangasem 40.0000 Kg Semen 1.0000 Ls Upah Pasang 1.0000 Ls Alat bantu 1BH PADURAKSA 0.0477 m3 0.0623 kg 1.7280 m2 8.0000 bh 8.0000 bh 1.0000 bh 0.4095 m3

17

Beton cor foot plat besi 150 kg kolom 15/15 besi 218 kg Pas. Batu hitan karangasem Simbar Karang Manuk Murde Beton pengesek

1M1 TEMBOK STYLE BALI 0.0300 m3 Beton sloof15/20 besi 200 kg 0.0240 m3 Ring Balok 12x20 cm besi 200 kg/m3 2.8800 m2 Pas. Batu hitan karangasem

RENCANA ANGGARAN BIAYA (RAB)


INSTANSI PEKERJAAN LOKASI : KANTOR KEMENTERIAN AGAMA KABUPATEN TABANAN : PEMBANGUNAN TEMBOK PAGAR KANTOR KEMENTERIAN AGAMA KABUPATEN TABANAN TAHUN 2013 : JL. KATAMSO -TABANAN HARGA SATUAN ( Rp ) TOTAL HARGA ( Rp )

NO.

URAIAN PEKERJAAN

VOLUME

SAT

A I 1 2 3 4 5 6 7 8 9 10 11 12 II 1 2 3 4 5 6 7 8 9 10

PAGAR DEPAN 2 MUKA PEKERJAAN PADURAKSA 11 BUAH Galian tanah pondasi Urugan pasir bawah pondasi Pas. Batu kosong Pas. Pondasi batu kali 1pc : 5ps Pek. Urugan tanah kembali Plesteran 1pc:2psr Beton cor foot plat besi 150 kg Beton Kolom 15/15 besi 218 kg Pas. Batu hitam karangasem Simbar Karang Manuk Murde JUMLAH PADURAKSA PEKERJAAN PAGAR STYLE BALI 20,20 M' Galian tanah pondasi Urugan pasir bawah pondasi Pas. Batu kosong Pas. Pondasi batu kali 1pc : 5ps Pek. Urugan tanah kembali Plesteran 1pc:2psr Beton sloof 15/20 besi 200 kg Ring Balok 12x15 cm besi 200 kg/m3 Pas. Batu hitam karangasem Tulisan nama Kantor dari kuningan JUMLAH PAGAR STYLE BALI

4.84 0.55 1.10 2.53 1.21 1.56 0.55 0.44 28.05 88.00 88.00 11.00

m3 m3 m3 m3 m3 m2 m3 kg m2 bh bh bh

138,000.00 49,680.00 -

75,900.00 54,648.00 130,548.00 125,580.00 89,920.80 215,500.80 44,160.00 44,160.00 88,320.00 434,368.80

7.96 0.91 1.81 8.15 1.99 14.48 0.62 0.41 53.50 1.00

m3 m3 m3 m3 m3 m2 m3

m3 m2 ls

138,000.00 49,680.00 -

III 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PEKERJAAN CANDI BENTAR T. 4M (2 PASANG) Pek. Galian tanah biasa 4.17 Pek. Urugan pasir bawah pondasi 0.32 Pas. Pondasi batu kali 1pc : 5ps 5.14 Pek. Beton cor foot plat besi 150 kg/m3 0.24 Pek. Sloof 12/20 besi 200 kg/m3 0.04 Pek. Kolom 15/15 besi 200 kg/m3 0.34 Tempelan stil Bali batu hitam Karangasem 30.37 Karang asti 8.00 Karang simbar 36.00 Karang guak 28.00 Murde 12.00 Bentala atas 2.00 Bentala samping 4.00 Pengresek 1.38 Pek. Pintu besi 7.95 JUMLAH CANDI BENTAR 1 PASANG JUMLAH CANDI BENTAR 2 PASANG JUMLAH PAGAR DEPAN (A)

m3 m3 m3 m3 m3 m3 m2 bh bh bh bh bh bh m3 m2

138,000.00 -

B I 1 2 3 4 5 6 7 8 9 10 11 12

PAGAR BARAT 1 MUKA PEKERJAAN PADURAKSA 9 BUAH Galian tanah pondasi Urugan pasir bawah pondasi Pas. Batu kosong Pas. Pondasi batu kali 1pc : 5ps Pek. Urugan tanah kembali Plesteran 1pc:2psr Beton cor foot plat besi 150 kg Kolom 15/15 besi 218 kg Pas. Batu hitam karangasem Simbar Karang Manuk Murde JUMLAH - I

3.96 0.45 0.90 5.58 0.99 8.64 0.45 0.54 18.36 72.00 72.00 9.00

m3 m3 m3 m3 m3 m2 m3 m3 m2 bh bh bh

138,000.00 49,680.00 -

62,100.00 44,712.00 106,812.00

NO.

URAIAN PEKERJAAN

VOLUME

SAT

HARGA SATUAN ( Rp )

TOTAL HARGA ( Rp )

II 1 2 3 4 5 6 7 8 9 10 11

PEKERJAAN PAGAR STYLE BALI 26.20 M' Galian tanah pondasi Urugan pasir bawah pondasi Pas. Batu kosong Pas. Pondasi batu kali 1pc : 5ps Pek. Urugan tanah kembali Pas. Batako Plesteran 1pc:2psr Beton sloof 15/20 besi 200 kg Ring Balok 12x15 cm besi 200 kg/m3 Balok 20x30 cm besi 200 kg/m3 Pas. Batu hitam karangasem JUMLAH - II JUMLAH PAGAR BARAT (B)

7.96 0.91 1.81 21.72 1.99 32.75 14.48 0.54 0.36 1.73 39.30

m3 m3 m3 m3 m3 m2 m2 m3

m3 m3 m2

138,000.00 49,680.00 -

125,580.00 89,920.80 215,500.80 322,312.80

C I 1 2 3 4 5 6 7 8 9 10 11 12

PAGAR TIMUR 1 MUKA PEKERJAAN PADURAKSA 6 BUAH Galian tanah pondasi Urugan pasir bawah pondasi Pas. Batu kosong Pas. Pondasi batu kali 1pc : 5ps Pek. Urugan tanah kembali Plesteran 1pc:2psr Beton cor foot plat besi 150 kg Beton Kolom 15/15 besi 218 kg Pas. Batu hitam karangasem Simbar Karang Manuk Murde JUMLAH - I

2.64 0.30 0.60 1.38 0.66 5.76 0.30 0.24 12.24 48.00 48.00 6.00

m3 m3 m3 m3 m3 m2 m3 m3 m2 bh bh bh

138,000.00 49,680.00 -

41,400.00 29,808.00 71,208.00

II 1 2 3 4 5 6 7 8 9 10

PEKERJAAN PAGAR STYLE BALI 19.10 M' Galian tanah pondasi Urugan pasir bawah pondasi Pas. Batu kosong Pas. Pondasi batu kali 1pc : 5ps Pek. Urugan tanah kembali Pas. Batako Plesteran 1pc:2psr Beton sloof 15/20 besi 200 kg Ring Balok 12x15 cm besi 200 kg/m3 Pas. Batu hitam karangasem JUMLAH - II JUMLAH PAGAR TIMUR (C)

8.40 0.96 1.91 8.60 2.10 23.88 15.28 0.63 0.42 28.65

m3 m3 m3 m3 m3 m2 m2 m3

m3 m2

138,000.00 49,680.00 -

132,480.00 94,888.80 227,368.80 298,576.80

D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PAGAR BELAKANG Galian tanah pondasi 16.50 Urugan pasir bawah pondasi 1.88 Pas. Batu kosong 3.75 Pas. Pondasi batu kali 1pc : 5ps 16.88 Pek. Urugan tanah kembali 4.13 Pas. Batako 33.75 Pek. Pinggulan 75.00 Plesteran 1pc:2psr 122.96 Pek. Acian 122.96 Beton sloof 15/20 besi 200 kg 1.13 Kolom 15/15 besi 218 kg 0.66 Ring Balok 12x20 cm besi 200 kg/m3 0.75 Balok 20x30 cm besi 200 kg/m3 2.25 Cat Aquaproof warna bata 97.50 Cat Aquaproof warna paras 25.46 JUMLAH PAGAR SELATAN (D)

m3 m3 m3 m3 m3 m2 m' m2 m2 m3 m3

m3 m3 m2 m2

138,000.00 49,680.00 -

259,440.00 186,300.00 445,740.00

REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)


INSTANSI PEKERJAAN LOKASI : KANTOR KEMENTERIAN AGAMA KABUPATEN TABANAN : PEMBANGUNAN TEMBOK PAGAR KANTOR KEMENTERIAN AGAMA KABUPATEN TABANAN TAHUN 2013 : JL. KATAMSO -TABANAN JUMLAH HARGA (Rp)

NO

URAIAN PEKERJAAN

A I II III B I II C I II D

PAGAR DEPAN 2 MUKA PEKERJAAN PADURAKSA 11 BUAH PEKERJAAN PAGAR STYLE BALI 20,20 M' PEKERJAAN CANDI BENTAR T. 4M (2 PASANG) PAGAR BARAT 1 MUKA PEKERJAAN PADURAKSA 9 BUAH PEKERJAAN PAGAR STYLE BALI 26.20 M' PAGAR TIMUR 1 MUKA PEKERJAAN PADURAKSA 6 BUAH PEKERJAAN PAGAR STYLE BALI 19.10 M' PAGAR BELAKANG REAL COST PPN 10% TOTA COST DIBULATKAN

130,548.00 215,500.80 88,320.00

106,812.00 215,500.80

71,208.00 227,368.80 445,740.00 1,500,998.40 150,099.84 1,651,098.24 1,651,000.00

Dengan Huruf : , PT./CV..

. ..