REKAPITULASI RAB

INSTANSI : 0
PEKERJAAN : INTERIOR RUANG MEDIA CENTER DAN PERS PADA STADION PAPUA
BANGKIT

LOKASI : SENTANI - KAMP. HARAPAN


THN. ANGGARAN : 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp.)
a b c
A. INTERIOR RUANG MEDIA CENTER DAN PERS PADA STADION PAPUA BANGKIT
I PEKERJAAN PERSIAPAN 500.000,00

II PEKERJAAN RUANG MEDIA CENTER CABOR SEPAK BOLA 141.101.108,58

III PEKERJAAN RUANG MEDIA CENTER CABOR ATLETIK 113.729.225,14

IV PEKERJAAN RUANG PERS CABOR SEPAK BOLA DAN ATLETIK 182.418.164,96

V PEKERJAAN AKHIR 2.000.000,00

B REAL COST KONSTRUKSI FISIK ................... Rp. 439.748.498,68


C PPN 10% (10% x B) ................... Rp. 43.974.849,87

D TOTAL BIAYA (B+C) ................... Rp. 483.723.348,55


E DIBULATKAN ................... Rp. 483.723.000,00
TERBILANG :
- Empat Ratus Delapan Puluh Tiga Juta Tujuh Ratus Dua Puluh Tiga Ribu Rupiah -
RENCANA ANGGARAN BIAYA ( RAB )

KEGIATAN :
PEKERJAAN : INTERIOR RUANG MEDIA CENTER DAN PERS PADA STADION PAPUA BANGKIT
LOKASI : SENTANI - KAMP. HARAPAN
TAHUN : 2019
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME STN SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1,00 Ls 500.000,00 500.000,00
500.000,00
II. PEKERJAAN RUANG MEDIA CENTER CABOR SEPAK BOLA
1 Pek. Podium
Pas. Rangka Papan Kayu Lantai Podium 14,00 M2 706.475,00 9.890.650,00
Pas. Karpet Lantai 14,00 M2 285.397,00 3.995.557,99
Pas. Finish HPL 2,10 M2 582.498,75 1.223.247,37
2 Pek. Backdrop Panel Dinding HPL (Full Panel)
Pas. Panel Dinding 16,80 M2 732.996,00 12.314.332,80
Pas. Finish HPL 16,80 M2 582.498,75 9.785.978,99
Pas. Lampu Downlight + Instalasi Listrik 3,00 Ttk 351.353,75 1.054.061,25
Pas. Saklar Tunggal 1,00 Bh 110.915,75 110.915,75
Pas. Huruf Aluminium Chrome 38,00 Bh 324.000,00 12.312.000,00
3 Pek. Panel Dinding HPL (Setengah Badan)
Pas. Panel Dinding 39,35 M2 517.055,00 20.346.114,25
Pas. Finish HPL 39,35 M2 582.498,75 22.921.325,78
4 Pek. Meubleair
Pembuatan Meja Podium Finish HPL 2,00 Unit 6.857.635,76 13.715.271,53
Pembuatan Meja Pers Finish HPL 7,00 Unit 4.775.950,41 33.431.652,87
141.101.108,58
III. PEKERJAAN RUANG MEDIA CENTER CABOR ATLETIK
1 Pek. Bakcdrop Panel Dinding HPL (Full Panel)
Pas. Panel Dinding 19,26 M2 732.996,00 14.117.502,96
Pas. Pintu Kamuflase + Accessories 1,00 Ls 2.700.000,00 2.700.000,00
Pas. Finish HPL 20,26 M2 582.498,75 11.801.424,66
Pas. Lampu Downlight + Instalasi Listrik 3,00 Ttk 351.353,75 1.054.061,25
Pas. Saklar Tunggal 1,00 Bh 110.915,75 110.915,75
Pas. Huruf Aluminium Chrome 38,00 Bh 324.000,00 12.312.000,00
2 Pek. Panel Dinding HPL (Setengah Badan)
Pas. Panel Dinding 35,30 M2 517.055,00 18.252.041,50
Pas. Finish HPL 35,30 M2 582.498,75 20.562.205,85
3 Pek. Meubleair
Pembuatan Meja Podium Finish HPL 2,00 Unit 6.857.635,76 13.715.271,53
Pembuatan Meja Pers Finish HPL 4,00 Unit 4.775.950,41 19.103.801,64
113.729.225,14
IV. PEKERJAAN RUANG PERS CABOR SEPAK BOLA DAN ATLETIK
1 Pek. Backdrop TV R. Pers Sepak Bola (Full Panel)
Pas. Panel Dinding 23,93 M2 732.996,00 17.540.594,28
Pas. Finish HPL 23,93 M2 582.498,75 13.939.195,07
Pas. Ornamen Ukiran Papua 4,00 Bh 2.425.000,00 9.700.000,00
Pas. Lampu Selang 12,00 M' 160.173,75 1.922.085,00
Pas. Stop Kontak 6,00 Bh 117.075,75 702.454,50
Pas. Saklar Tunggal 1,00 Bh 110.915,75 110.915,75
2 Pek. Backdrop TV R. Pers Atletik (Full Panel)
Pas. Panel Dinding 22,64 M2 732.996,00 16.597.961,42
Pas. Finish HPL 22,64 M2 582.498,75 13.190.101,68
Pas. Ornamen Ukiran Papua 4,00 Bh 2.425.000,00 9.700.000,00
Pas. Lampu Selang 12,00 M' 160.173,75 1.922.085,00
Pas. Stop Kontak 6,00 Bh 117.075,75 702.454,50
Pas. Saklar Tunggal 1,00 Bh 110.915,75 110.915,75
3 Pek. Panel Dinding HPL (Setengah Badan)
Pas. Panel Dinding 45,38 M2 517.055,00 23.463.955,90
Pas. Finish HPL 45,38 M2 582.498,75 26.433.793,24
3 Pek. Meubleair
Pembuatan Meja Komputer 7,00 Unit 6.625.950,41 46.381.652,87
182.418.164,96
V. PEKERJAAN AKHIR
1 Dokumentasi dan Pelaporan 1,00 Ls 1.000.000,00 1.000.000,00
2 Pembersihan Akhir 1,00 Ls 1.000.000,00 1.000.000,00
2.000.000,00
ANALISA BIAYA KONSTRUKSI

Harga Jumlah
NO URAIAN PEKERJAAN Koef. Stn
Satuan Harga
1 2 3 4 5 6
1 1 M2 Pas. Panel Dinding Multipleks
1,1 Bahan
Multipleks 9 mm 0,7600 Lbr 170.000,00 129.200,00
Multipleks 18 mm 0,1086 Lbr 315.000,00 34.200,00
Lem Fox 0,1000 Kg 55.000,00 5.500,00
Paku Sekrup 0,1000 Kg 22.000,00 2.200,00
Jumlah (1) 171.100,00
1,2 Tenaga
Pekerja 0,6500 Oh 120.000,00 78.000,00
Tukang 1,3000 Oh 155.000,00 201.500,00
Kepala tukang 0,1000 Oh 175.000,00 17.500,00
Mandor 0,0100 Oh 195.000,00 1.950,00
Jumlah (2) 298.950,00
Jumlah (1)+(2) 470.050,00
Biaya umum 10% 47.005,00
Total 517.055,00
2 1 M2 Pas. Finish HPL
2,1 Bahan
HPL Wood 0,4500 Lbr 350.000,00 157.500,00
HPL List Chrome 0,1125 Lbr 455.000,00 51.187,50
Lem Aibon 0,1500 Kg 75.045,45 11.256,82
Jumlah (1) 219.944,32

2,2 Tenaga
Pekerja 0,7000 Oh 120.000,00 84.000,00
Tukang 1,3300 Oh 155.000,00 206.150,00
Kepala tukang 0,1000 Oh 175.000,00 17.500,00
Mandor 0,0100 Oh 195.000,00 1.950,00
Jumlah (2) 309.600,00
Jumlah (1)+(2) 529.544,32
Biaya umum 10% 52.954,43
Total 582.498,75
3 1 M2 Pek. Panel Dinding Setengah Badan Finish HPL
3,1 Bahan
Panel Dinding Multipleks 1,0000 M2 517.055,00 517.055,00
Finish HPL 1,0000 M2 582.498,75 582.498,75
Jumlah 1.099.553,75
4 1 M2 Pas. Panel Dinding Untuk Backdrop
4,1 Bahan
Multipleks 12 mm 0,9500 Lbr 215.000,00 204.250,00
Multipleks 18 mm 0,3800 Lbr 282.000,00 107.160,00
Lem Fox 0,1000 Kg 55.000,00 5.500,00
Paku Sekrup 0,1000 Kg 75.000,00 7.500,00
Jumlah (1) 324.410,00
4,2 Tenaga
Pekerja 0,7500 Oh 120.000,00 90.000,00
Tukang 1,5000 Oh 155.000,00 232.500,00
Kepala tukang 0,1000 Oh 175.000,00 17.500,00
Mandor 0,0100 Oh 195.000,00 1.950,00
Jumlah (2) 341.950,00
Jumlah (1)+(2) 666.360,00
Biaya umum 10% 66.636,00
Total 732.996,00
5 1 M2 Pek. Panel Dinding Backdrop Finish HPL
5,1 Bahan
Panel Dinding Untuk Backdrop 1,0000 M2 732.996,00 732.996,00
Finish HPL 1,0000 M2 582.498,75 582.498,75
Jumlah 1.315.494,75
6 1 Unit Pek. Meubleair Meja Podium (60x200cm)
6,1 Bahan
Panel Multipleks 3,9200 M2 732.996,00 2.873.344,32
Finish HPL 6,8400 M2 582.498,75 3.984.291,44
Jumlah 6.857.635,76
7 1 Unit Pek. Meubleair Meja Pers (60x200cm)
7,1 Bahan
Besi Kotak Stainless 4/4 1,9800 Btg 745.000,00 1.475.100,00
Panel Multipleks 2,2650 M2 517.055,00 1.171.129,58
Finish HPL 3,3300 M2 582.498,75 1.939.720,84
Pengelasan 30,0000 Cm 5.500,00 165.000,00
Baut Sekrup 25,0000 Bh 1.000,00 25.000,00
Jumlah 4.775.950,41
8 1 Unit Pek. Meubleair Meja Komputer (60x200cm)
8,1 Bahan
Besi Kotak Stainless 4/4 1,9800 Btg 745.000,00 1.475.100,00
Panel Multipleks 2,2650 M2 517.055,00 1.171.129,58
Finish HPL 3,3300 M2 582.498,75 1.939.720,84
Pas. Stop Kontak Meja Rotasi Manual 1,0000 Bh 1.850.000,00 1.850.000,00
Pengelasan 30,0000 Cm 5.500,00 165.000,00
Baut Sekrup 25,0000 Bh 1.000,00 25.000,00
Jumlah 6.625.950,41
Harga Jumlah
NO URAIAN PEKERJAAN Koef. Stn
Satuan Harga
1 2 3 4 5 6

9 1 Titik Pasang Downlight


9,1 Bahan
Fitting Lampu Down Light 6 watt 1,000 Set 175.000,00 175.000,00
Kabel NYM 2 x 1,5 mm 5,000 M' 12.000,00 60.000,00
Instalasi Listrik 1,000 Ls 75.000,00 75.000,00

9,2 Tenaga
Pekerja 0,050 Oh 120.000,00 6.000,00
Mandor 0,018 Oh 195.000,00 3.412,50
Sub Lampu Bulat 319.412,50
Biaya umum 10% 31.941,25
Jumlah 351.353,75
10 Pasang 1 buah stop kontak
10,1 Bahan
Stop kontak 1,000 Bh 97.020,00 97.020,00

10,2 Tenaga
Pekerja 0,050 Oh 120.000,00 6.000,00
Mandor 0,018 Oh 195.000,00 3.412,50
Jumlah 106.432,50
Biaya umum 10% 10.643,25
Total 117.075,75
11 1 M1 Pasang Lampu Selang
11,1 Bahan
Lampu Selang 1,000 M1 75.000,00 75.000,00
Kabel NYM 2 x 1,5 mm 5,100 M' 12.000,00 61.200,00

11,2 Tenaga
Pekerja 0,050 Oh 120.000,00 6.000,00
Mandor 0,018 Oh 195.000,00 3.412,50
Jumlah 145.612,50
Biaya umum 10% 14.561,25
Total 160.173,75
12 Pasang 1 buah saklar tunggal
12,1 Bahan
Saklar tunggal 1,000 Bh 91.420,00 91.420,00

12,2 Tenaga
Pekerja 0,050 Oh 120.000,00 6.000,00
Mandor 0,018 Oh 195.000,00 3.412,50
Jumlah 100.832,50
Biaya umum 10% 10.083,25
Total 110.915,75
13 Pasang 1 buah saklar ganda
13,1 Bahan
Saklar ganda 1,000 Bh 96.420,00 96.420,00

13,2 Tenaga
Pekerja 0,500 Oh 120.000,00 60.000,00
Mandor 0,175 Oh 195.000,00 34.125,00
Jumlah 190.545,00
Biaya umum 10% 19.054,50
Total 209.599,50
14 1 M2 Rangka Lantai Podium (kayu dan papan kelas 1)
14,1 Bahan
Kayu Besi Balok 5/10cm 0,0500 m3 5.200.000,00 260.000,00
Papan Ky Besi 3/20cm 0,0500 m3 5.200.000,00 260.000,00
Paku biasa 0,2500 Kg 22.000,00 5.500,00

14,2 Tenaga
Pekerja 0,2500 Oh 120.000,00 30.000,00
Tukang 0,5000 Oh 155.000,00 77.500,00
Kepala tukang 0,0250 Oh 175.000,00 4.375,00
Mandor 0,0250 Oh 195.000,00 4.875,00
Jumlah 642.250,00
Jasa 10% 64.225,00
Total 706.475,00
15 Memasang Karpet Lantai
15,1 Bahan
Karpet lantai 1,1000 M2 175.000,00 192.500,00
Lem Aibon 0,1500 Kg 75.045,45 11.256,82

15,2 Tenaga
Pekerja 0,1250 Oh 120.000,00 15.000,00
Tukang 0,2500 Oh 155.000,00 38.750,00
Kepala tukang 0,0100 Oh 175.000,00 1.750,00
Mandor 0,0010 Oh 195.000,00 195,00
Jumlah 259.451,82
Biaya umum 10% 25.945,18
Total 285.397,00
DAFTAR HARGA SATUAN UPAH DAN BAHAN

HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

I. DAFTAR UPAH
1 Mandor H/O 195.000,00
2 Kepala Tukang H/O 175.000,00
3 Tukang H/O 155.000,00
4 Pekerja H/O 120.000,00

HARGA
NO. URAIAN SATUAN
(Rp. / Unit)

II. HARGA BAHAN


1 Balok 5/10 Kayu Besi / Kelas I 5.200.000,00 M3
2 Papan 2,5/25 Kayu Besi / Kelas I 5.200.000,00 M3
3 Balok 5/5 Kayu Matoa / Kelas II 3.200.000,00 M3
4 Balok 5/10 Kayu Matoa / Kelas II 3.200.000,00 M3
5 Papan 2,5/25 Kayu Matoa / Kelas II 3.300.000,00 M3
6 Multipleks 9 mm 170.000,00 LBR
7 Multipleks 12 mm 215.000,00 LBR
8 Multipleks 16 mm 265.000,00 LBR
9 Multipleks 18 mm 315.000,00 LBR
10 HPL Taco (Natural Wood) 350.000,00 LBR
11 HPL Taco (Chrome) 455.000,00 LBR
12 Besi Hollow Kotak 40/40/1,2mm Stainless Stell 745.000,00 BTG
13 Besi Hollow Kotak 20/40/1,2mm Stainless Stell 555.000,00 BTG
14 Karpet Lantai 175.000,00 M2
15 Stop Kontak Meja Rotasi Manual 1.850.000,00 Bh
16 Lem Fox 55.000,00 KG
17 Lem Aibon 75.045,45 KG
18 Stiker Kaca 282.000,00 M2
19 Paku biasa 22.000,00 KG
20 Paku Beton 3.500,00 Bh
21 Vinyl Lantai 766.000,00 Doz
22 List Vinyl 178.000,00 M1
23 Kunci Pintu 475.000,00 BH
24 Close Door 680.000,00 BH
25 Engsel Pintu 4" 45.000,00 BH
26 Lampu DL 20 Watt (Lengkap Casing Down Light) 202.860,00 SET
27 Lampu DL 6 Watt (Lengkap Casing Down Light) 175.000,00 SET
28 Lampu Selang 15 Watt 75.000,00 M1
29 Travo 6 Amphere - BH
30 Stop Kontak Philips 97.020,00 BH
31 Saklar Tunggal Philips 91.420,00 BH
32 Saklar Ganda Philips 96.420,00 BH
33 Kabel 2x1,5 mm 21.500,00 M1