PEMASUKAN
NO SUMBER BIAYA JUMLAH
1 TABUNGAN Rp 15,000,000
2 GAJI MARET Rp 5,000,000
3 GADAI LM Rp 9,000,000
TOTAL Rp 29,000,000
PENGELUARAN
NO SUMBER BIAYA JUMLAH
1 PARTISI KAMAR+CANOPY DEPAN Rp 4,900,000
2 PINTU KAMAR Rp 1,200,000
3 AC 1/2 PK SAMSUNG Rp 2,700,000
TOTAL Rp 21,970,000
SISA UANG
PEMASUKAN - PENGELUARAN Rp 7,030,000
MATERIAL PENDUKUNG
NO MATERIAL JML BRG HARGA SATUAN
1 SEMEN 25 Rp 70,000
2 PASIR 5 Rp 300,000
3 BESI 8 CM 10 Rp 50,000
4 LEM MU 2 Rp 110,000
5 LEM PEREKAT KERAMIK LANTAI 4 Rp 20,000
6 CAT CATYLAC WARNA PUTIH 1 Rp 700,000
7 CAT RUMAH INTERIOR 1 Rp 700,000
8 CAT RUMAH EXTERIOR 1 Rp 700,000
9 COMPOUND 1 Rp 20,000
10 PERALATAN CAT( KUAS, ROLL, AMPLAS, DLL ) 1 Rp 300,000
11 BENANG 1 Rp 30,000
12 SEMEN PUTIH 1 Rp 100,000
13 LIST PLAFON 10 Rp 30,000
14 BATU BATA 9 Rp 1,500
15 LAMPU 5 Rp 60,000
16 SAKLAR 5 Rp 10,000
17 STOP KONTAK 5 Rp 15,000
18 KABEL 2 Rp 300,000
TOTAL HARGA