Anda di halaman 1dari 82

ANALISA HARGA SATUAN

PP 5'
HARGA SATUAN
NO

URAIAN PEKERJAAN
Harga Kusen PP5
Penambahan Volume 44 cm
1 Kusen alumunium 4"x 1 1/2''
2 Kaca Tempered 12 mm
3 Sealent
4 Karet

VOLUME

SAT.

1.76 m'
1.276 m2
0.4 m'
2.4 m'

( Rp )

124,000
900,000
6,000
17,000

JUMLAH HARGA
( Rp )
10776000
218,240
1,148,400
2,400
40,800

PP 6'
HARGA SATUAN
NO

URAIAN PEKERJAAN
Harga Kusen PP6
Penambahan Volume 44 cm
1 Kusen alumunium 4"x 1 1/2''
2 Kaca Tempered 12 mm
3 Sealent
4 Karet

VOLUME

SAT.

1.32 m'
2.079 m2
1.32 m'
1.76 m'

( Rp )

124,000
900,000
6,000
17,000

JUMLAH HARGA
( Rp )
19742400
163,680
1,871,100
7,920
29,920

PP 8'
HARGA SATUAN
NO

URAIAN PEKERJAAN
Harga Kusen PP8
Penambahan Volume 44 cm
1 Kusen alumunium 4"x 1 1/2''
2 Kaca Tempered 12 mm
3 Sealent
4 Karet

VOLUME

SAT.

2.64 m'
2.079 m2
3.08 m'
4.4 m'

( Rp )

124,000
900,000
6,000
17,000

JUMLAH HARGA
( Rp )
8910000
327,360
1,871,100
18,480
74,800

PP 9
HARGA SATUAN
NO

URAIAN PEKERJAAN
1 Kusen alumunium 4"x 1 1/2''
2 Kaca Tempered 12 mm
3 Sealent
4 Karet
5 Floor Hings
6 Handle
7 Kunci

VOLUME
SAT.
24.54 m'
17.0715 m2
11.48 m'
24.54 m'
1 Set
1 Set
1 Set

( Rp )
124,000
900,000
6,000
17,000
585,000
375,000
250,000

JUMLAH HARGA
( Rp )
3,042,960
15,364,350
68,880
417,180
585,000
375,000
250,000

HARGA TOTAL
( Rp )

12,185,800

HARGA TOTAL
( Rp )

21,815,000

HARGA TOTAL
( Rp )

11,202,000

HARGA TOTAL
( Rp )

20,103,400

ANALISA HARGA SATUAN PEKERJAAN


Kegiatan

LANJUTAN REHAB TOTAL KANTOR LURAH KALIANYAR

Kebutuhan

BAGIAN TATA PEMERINTAHAN SETKO ADMINISTRASI JAKARTA BAR

Lokasi
Tahun Anggaran
No Kontrrak

KOTA ADMINISTRASI JAKARTA BARAT


2015

:
:

NO

URAIAN

SAT.

(1)

(2)

(3)

KUANTITAS /
KOEFISIEN
(4)

I. Upah / tenaga kerja :


Pekerja
Tukang Batu
Tukang Besi
Tukang Kayu
Kepala Tukang
Mandor

oh
oh
oh
oh
oh
oh

1.895
0.073
0.564
0.073
0.108
0.094

kg
kg
m3
Lbr
m3

54.000
1.350
1.050
0.122
0.042

ls

1.000

Sub Jumlah I :
II. Bahan / Material :
Besi Beton
Kawat Beton
Beton K 175
Multiplek
Kaso 5/7

Sub Jumlah II :
III. Peralatan :
Alat Bantu lainnya

Sub Jumlah III :


Jumlah Harga satuan Pekerjaan (I+II+III) :

AN PEKERJAAN

KANTOR LURAH KALIANYAR

HAN SETKO ADMINISTRASI JAKARTA BARAT

ARTA BARAT

HARGA
SATUAN DASAR
(Rp)
(5)

102,920.00
121,230.00
121,213.00
121,230.00
139,574.00
157,901.00

HARGA
(6)

195,033.40
8,849.79
68,364.13
8,849.79
15,073.99
14,842.69

311,013.80
9,600.00
18,200.00
750,000.00
240,000.00
2,100,000.00

518,400.00
24,570.00
787,500.00
29,343.20
88,200.00

###
21,400.00

21,400.00

21,400.00
###

ANALISA HARGA SATUAN PEKERJAAN


Kegiatan

LANJUTAN REHAB TOTAL KANTOR LURAH KALIANYAR

Kebutuhan

BAGIAN TATA PEMERINTAHAN SETKO ADMINISTRASI JAKARTA BAR

Lokasi
Tahun Anggaran
No Kontrrak

KOTA ADMINISTRASI JAKARTA BARAT


2015

:
:

NO

URAIAN

SAT.

(1)

(2)

(3)

KUANTITAS /
KOEFISIEN
(4)

I. Upah / tenaga kerja :


Pekerja
Tukang Batu
Tukang Besi
Tukang Kayu
Kepala Tukang
Mandor

oh
oh
oh
oh
oh
oh

1.895
0.073
0.564
0.073
0.108
0.094

kg
kg
m3

55.000
1.350
1.050

ls

1.000

Sub Jumlah I :
II. Bahan / Material :
Besi Beton
Kawat Beton
Beton K 175

Sub Jumlah II :
III. Peralatan :
Alat Bantu lainnya

Sub Jumlah III :


Jumlah Harga satuan Pekerjaan (I+II+III) :

AN PEKERJAAN

KANTOR LURAH KALIANYAR

HAN SETKO ADMINISTRASI JAKARTA BARAT

ARTA BARAT

HARGA
SATUAN DASAR
(Rp)
(5)

102,920.00
121,230.00
121,213.00
121,230.00
139,574.00
157,901.00

HARGA
(6)

195,033.40
8,849.79
68,364.13
8,849.79
15,073.99
14,842.69

311,013.80
9,600.00
18,200.00
750,000.00

528,000.00
24,570.00
787,500.00

###
21,400.00

21,400.00

21,400.00
###

DAFTAR KUANTITAS DAN HARGA TAMBAH KURANG PEKERJAAN


Kegiatan
Kebutuhan
Lokasi
Tahun Anggaran
No Kontrrak

:
:
:
:
:

LANJUTAN REHAB TOTAL KANTOR LURAH KALIANYAR


BAGIAN TATA PEMERINTAHAN SETKO ADMINISTRASI JAKARTA BARAT
KOTA ADMINISTRASI JAKARTA BARAT
2015

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

I.
1
2
3
4
5

Nama Jenis Pekerjaan

PEKERJAAN PENDAHULUAN
Pembuatan papan nama proyek
Foto kegiatan 3 phase color
Direksi keet uk. 4 x 6 m2
Listrik kerja
Air kerja

Volume

1.00
3.00
24.00
3.00
3.00
Jumlah I

II
a
1

PEKERJAAN PASANGAN/PLESTERAN
LANTAI 1
Pasangan penebalan Bata pada kolom teras ad 1:4

bh
set
m2
bln
bln

Harga Satuan

Jumlah Harga
(Rp)

977,259.00
164,500.00
1,191,700.00
822,600.00
1,028,200.00

(Rp)

Volume

Harga Satuan
(Rp)

977,259.00
493,500.00
28,600,800.00
2,467,800.00
3,084,600.00
35,623,959.00

3.36 m2

109,800.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

Volume

Harga Satuan
(Rp)

b
1
2
3
4

LANTAI 2
Pasangan Bata pada tangga ad 1:5
Plesteran ad 1: 5 teb 1,5 cm
Acian
Pasang glass block

8.88
17.76
17.76
1.24

m2
m2
m2
m2

109,800.00
56,400.00
22,900.00
549,360.00

c
1
2
3
4

LANTAI 3
Pasangan Bata pada tangga ad 1:4
Plesteran ad 1:4 teb 1,5 cm
Acian
Pasang glass block

10.17
20.34
20.34
1.20

m2
m2
m2
m2

109,800.00
56,400.00
22,900.00
549,360.00

d
1
2
3

LANTAI 4
Plesteran ad 1:5 teb 1,5 cm
Plesteran ad 1:3 teb 1,5 cm
Acian
Pasangan Bata pada tangga ad 1:5
Pasang glass block
Pasang Listplank GRC Motif Betawi

23.54 m2

56,400.00

m2
m2
m2
m'

22,900.00
109,800.00
549,360.00

4
5
6

293.98 m2
95.75 m2
460.41 m2

Jumlah II

56,400.00
54,100.00
22,900.00

16,580,472.00
5,180,075.00
10,543,389.00

32,303,936.00

23.54
11.77
1.20
71.42

166,900.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
III
a
1
2
3
4
5
6
7
8

Nama Jenis Pekerjaan


PEKERJAAN LANTAI PELAPIS DINDING
LANTAI 1
Pasang keramik tangga 40/40 cm
Pasang keramik anti slip u/tangga
Pasang granit
Pasang list granit profil
Pasang railing tangga besi pipa stainless steel
Pasang Handrailing stainless steel dinding sesuai gambar
Pasang anti slip teras
Pasang batu andesit

Volume

14.44
25.20
78.40
48.90
8.80
7.80
17.10
22.52

m2
m'
m2
m2
m'
m'
m'
m2

Harga Satuan

Jumlah Harga
(Rp)

265,300.00
53,400.00
1,233,900.00
152,100.00
904,800.00
193,300.00
53,400.00
230,300.00

4
5
6
7

Lantai 2
Pasang lantai keramik 40/40 cm
Pasang lantai keramik 20/20 cm
Pasang dinding keramik 20/25 cm
'- Pasang dinding keramik 20/40 cm
Plint keramik 10/40 cm
Pasang border keramik 10/20 cm
Pasang keramik tangga 40/40 cm
Pasang keramik anti slip u/tangga

139.56 m2
17.70 m2
71.23 m2
63.90
34.50
13.52
24

m'
m'
m2
m'

3,830,932.00
1,345,680.00
96,737,760.00
7,437,690.00
7,962,240.00
1,507,740.00
913,140.00
5,186,356.00

Harga Satuan
(Rp)

44.48 m2

1,233,900.00

7.36 m2

155,600.00

46.04550 m2

216,900.00

124,921,538.00

Jumlah III A
b
1
2
3

(Rp)

Volume

265,300.00
155,600.00
199,200.00
61,900.00
41,300.00
265,300.00
53,400.00

37,025,268.00
2,754,120.00
14,189,016.00
3,955,410.00
1,424,850.00
3,586,856.00
1,281,600.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
8
9
10
11
12
13
14

16

Nama Jenis Pekerjaan


Pasang waterproffing membrant

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

47.36
7.50
18.8
7.50
242.01
18.56

m2
m2
m2
m'
m2
m2

94,500.00
904,800.00
403,000.00
193,300.00
2,000.00
318,300.00

4,475,520.00
6,786,000.00
7,576,400.00
1,449,750.00
484,020.00
5,907,648.00

Pekerjaan pembuatan slidding board :


- rangka utama kayu kamper singkil uk.5/10
- rangka penggalang kayu kamper singkil uk.4/5 cm
- listplank penutup kayu kamper samarinda uk.2/19
- list penutup kayu kamper samarinda uk.2/15 cm
- list profil kayu kamper samarinda uk.2/2 cm
- penutup dinding multiplex tebal 18 mm
- pelapis multiplex teakwood tebal 3 mm
- pelapis whiteboard
- finishing dengan melamik

0.41
0.04
7.20
7.20
3.60
23.49
5.95
5.55
13.12

m3
m3
m'
m'
m'
m2
m2
m2
m2

12,092,200.00
12,092,200.00
97,800.00
73,200.00
13,900.00
109,400.00
37,000.00
41,100.00
60,800.00

4,957,802.00
483,688.00
704,160.00
527,040.00
50,040.00
2,569,806.00
220,150.00
228,105.00
797,696.00

Pekerjaan pembuatan pelapis dinding bata :


- rangka utama kayu kamper singkil uk.5/10
- rangka penggalang kayu kamper singkil uk.3/5 cm
- penutup rangka dinding multiplex tebal 18 mm
- pelapis multiplex teakwood tebal 3 mm

0.09
0.06
12.93
12.93

m3
m3
m2
m'

12,092,200.00
12,092,200.00
109,400.00
37,000.00

1,088,298.00
725,532.00
1,414,542.00
478,410.00

Pasang railing tangga besi pipa stainless steel


Pasang railing AC
Pasang handrailing dinding sesuai gambar
Pasang AM 50 Coloured ceramic grout pengisi celah nat keramik
Pasang keramik pola

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan


- list profil kayu kamper samarinda uk.2/2 cm
- pintu double teakwood rangka kayu kamper singkil
- kunci tanam LOGO
- engsel nylon
- finishing dengan melamik dinding dan daun pintu
- Pasang bata belakang sliding board
- Plesteran ad.1:5
- Cat dinding setara ICI
- Pasang gigi batang kayu singkik
- Acian

17
18
18

Volume
8.4
1.47
1.00
3.00
12.93
17.82
35.64
17.82
13.40
17.82

m'
m'
bh
bh
m2
m2
m2
m2
m2
m2

Harga Satuan

Jumlah Harga
(Rp)

13,900.00
496,800.00
229,500.00
64,900.00
60,800.00
100,300.00
56,400.00
32,400.00
102,800.00
22,900.00

Lantai 3
Pasang lantai keramik 40/40 cm
Pasang lantai keramik 20/20 cm
Pasang dinding keramik 20/25 cm
'- Pasang dinding keramik 20/40 cm
Plint keramik 10/40 cm

139.78 m2
17.70 m2
83.24 m2
60.58 m'

Harga Satuan
(Rp)

116,760.00
730,296.00
229,500.00
194,700.00
786,144.00
1,787,346.00
2,010,096.00
577,368.00
1,377,520.00
408,078.00

Pasang Meja Beton Pantry


Pasang Keramik Meja Beton Pantry 20 x 20
Pasang waterproffing Coating Teras dan Balkon

0.14 m2
3.72 m2
33.81 m2

1,780,400.00
155,600.00
87,000.00

85.24 m2

216,900.00

113,359,535.00

Jumlah III B
c
1
2
3

(Rp)

Volume

265,300.00
155,600.00
199,200.00
61,900.00

37,083,634.00
2,754,120.00
16,581,408.00
3,749,902.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
5
6
7
8
9
10
11
12
13
14
15

Nama Jenis Pekerjaan


Pasang border keramik 10/20 cm
Pasang waterproffing membrant
Pasang AM 50 Coloured ceramic grout pengisi celah nat keramik
Pasang keramik pola
Pasang keramik tangga uk.40x40 cm
Pasang keramik anti slip u/ tangga
Pasang railing tangga besi pipa stainless steel
Pasang handrailing dinding sesuai gambar
Pasang railing AC
Pasang bak mandi 0,6 x 0, 50
Pasang waterproffing Coating Balkon

Volume
33.30
33.32
255.61
7.68
14.89
27.6
7.9
7.5
12.8
1

m'
m2
m2
m2
m2
m'
m2
m'
m2
bh

Harga Satuan

Jumlah Harga
(Rp)

41,300.00
94,500.00
2,000.00
318,300.00
265,300.00
53,400.00
904,800.00
193,300.00
403,000.00
534,600.00

4
5
6

Lantai 4
Pasang lantai keramik 40/40 cm
Pasang lantai keramik 20/20 cm
Pasang dinding keramik 20/25 cm
'- Pasang dinding keramik 20/40 cm
Plint keramik 10/40 cm
Pasang border keramik 10/20 cm
Pasang akrilik tempat wudhu

156.05 m2
26.07 m2
78.75 m2
97.00 m'
32.30 m'
1.20 m'

Harga Satuan
(Rp)

1,375,290.00
3,148,740.00
511,220.00
2,444,544.00
3,950,317.00
1,473,840.00
7,147,920.00
1,449,750.00
5,158,400.00
534,600.00
17.78 m2

87,000.00

80.75 m2

216,900.00

87,363,685.00

Jumlah III C
d
1
2
3

(Rp)

Volume

265,300.00
155,600.00
199,200.00
61,900.00
41,300.00
370,100.00

41,400,065.00
4,056,492.00
15,687,000.00
6,004,300.00
1,333,990.00
444,120.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
7
8
9
10
11
12
13
14
15

Nama Jenis Pekerjaan


Pasang waterproffing membrant
Pasang AM 50 Coloured ceramic grout pengisi celah nat keramik
Pasang gigi balang kayu singkil
Pasang Sofi-sofi GRC
Pasang keramik pola
Pasang railing AC
Pasang karpet musholla
Pasang railing stainless steel tempat wudhu 2"

Volume
41.91 m2
260.87 m2
13.40 m'

Harga Satuan

Jumlah Harga
(Rp)

94,500.00
2,000.00
102,800.00

4.80
12.80
8.84
2.00

m2
m2
m2
m'

318,300.00
403,000.00
143,900.00
193,300.00

1.00 unt
1.00 unt
23.31 m2

(Rp)

1,200,000.00

1,527,840.00
5,158,400.00
1,272,076.00
386,600.00

Pasang railing GRC Balkon


Pasang waterproffing Coating Balkon dan dak Talang

PEKERJAAN KUSEN PINTU ALUMUNIUM / PARTISI


Lantai 1
Kusen aluminium komplit type PR1
Kusen aluminium komplit type PR1'
Pasang horizontal blind
Kusen aluminium type P1
Kusen aluminum type PP2

Harga Satuan

3,960,495.00
521,740.00
1,377,520.00
1.00 Unit

8.80 m2
27.81 m2

610,200.00
87,000.00

2.00 unt
2.00 unt

6,453,700.00
7,403,400.00

83,130,638.00
408,775,396.00

Jumlah III D
Jumlah Total III
IV
a.
1
2
3
4
5

(Rp)

Volume

5,445,000.00
3,454,900.00
457,700.00

5,445,000.00
3,454,900.00
10,668,987.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

9
10

Lantai 2
Kusen aluminium komplit type P3
Kusen aluminium komplit type PS/pintu shaft
Kusen aluminium komplit type P4
Kusen aluminium komplit type P1'
Kusen aluminium komplit type PR2
Kusen aluminium komplit type PR3
Kusen partisi komplit type PP2
Kusen aluminium komplit type PP3
Pasang horizontal blind
Kusen aluminum type PP4

2.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
18.19

unt
unt
unt
unt
unt
unt
unt
unt
m2

2,961,300.00
1,069,300.00
1,233,900.00
2,303,200.00
3,663,000.00
8,966,300.00
7,403,400.00
12,092,200.00
457,700.00

Lantai 3
Kusen aluminium komplit type P1 Florhing
Kusen aluminium komplit type P3
Kusen aluminium komplit type PS/Shaft
Kusen aluminium komplit type P4
Kusen aluminium komplit type PR4
Kusen aluminium komplit type PR4 tinggi 3,2 m

1.00
2.00
2.00
3.00
1.00

unt
unt
unt
unt
unt

(Rp)

5,922,600.00
3,207,900.00
2,467,800.00
2,303,200.00
3,663,000.00
8,966,300.00
7,403,400.00
12,092,200.00
8,325,563.00
1.00 unt

7,485,600.00

1.00 unt

9,237,300.00

54,351,963.00

Jumlah IV B
c.
1
2
3
4
5

Harga Satuan

19,568,887.00

Jumlah IV A
b.
1
2
3
4
5
6
7
8

(Rp)

Volume

3,619,400.00
2,961,300.00
1,069,300.00
1,233,900.00
8,637,300.00

3,619,400.00
5,922,600.00
2,138,600.00
3,701,700.00
8,637,300.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
6
7
8
9
10
11

Nama Jenis Pekerjaan


Kusen aluminium komplit type PP4 florhing
Kusen aluminium komplit type PP5 florhing
Kusen aluminium komplit type PP5 florhing
Kusen aluminium komplit type PP6 florhing
Kusen aluminium komplit type PP6 florhing
Kusen aluminium komplit type PP8 florhing
Kusen aluminium komplit type PP8 florhing
Pasang horizontal blind
Kusen aluminum komplit type PP7

Volume
1.00 unt
1.00 unt
1.00 unt
1.00 unt
6.00 m2

Harga Satuan

Jumlah Harga
(Rp)

7,485,600.00
10,776,000.00
19,742,400.00
8,910,000.00
457,700.00

Lantai 4
Kusen aluminium komplit type P1 florhing
Kusen aluminium komplit type PS/Shaft
Kusen aluminium komplit type P3
Kusen aluminium komplit type P4
Kusen aluminium komplit type P5 florhing
Kusen aluminium komplit type PJ2 florhing
Kusen partisi komplit type PP7
Kusen aluminium komplit type PR5
Pasang horizontal blind
Kusen aluminium komplit type PP9

1.00
2.00
3.00
2.00
1.00
1.00
1.00
1.00
28.99

unt
unt
unt
unt
unt
unt
unt
unt
m2

Harga Satuan
(Rp)

7,485,600.00
10,776,000.00
1.00 unt

12,185,800.00

1.00 unt

21,815,000.00

1.00 unt

11,202,000.00

1.00 unt

12,009,900.00

1.00 unt

20,103,400.00

19,742,400.00
8,910,000.00
2,746,200.00

73,679,800.00

Jumlah IV C
d.
1
2
3
4
5
6
7
8
9
10

(Rp)

Volume

3,619,400.00
1,069,300.00
2,961,300.00
1,233,900.00
7,321,100.00
9,459,900.00
12,009,900.00
3,537,100.00
457,700.00

3,619,400.00
2,138,600.00
8,883,900.00
2,467,800.00
7,321,100.00
9,459,900.00
12,009,900.00
3,537,100.00
13,268,723.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
11
12

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

Kusen jendela J2
Kusen jendela J9

4.00 unt
1.00 unt
62,706,423.00
210,307,073.00

Jumlah IV D
Jumlah Total IV
V
a.
1
2
3
4
5

PEKERJAAN PLAFOND
Lantai 1
Plafond Gypsum tbl 9 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond GRC tbl 4 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond Gypsum
Pas. List profil gypsum uk. 8/8 cm
Pas. List profil gypsum uk. 5/5 cm

110.97
59.29
14.76
92.35
105.60

m2
m2
m2
m'
m'

148,500.00
166,600.00
123,300.00
20,500.00
26,700.00

Lantai 2
Plafond Gypsum tbl 9 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond GRC tbl 4 mm rangka besi hollow 40 x 40 x 0.1 mm
Pas. List profil gypsum uk. 8/8 cm
Pas. List profil gypsum uk. 5/5 cm
Plafond kayu sungkai

101.78
27.49
136.20
46.90
33.12

16,479,045.00
9,877,714.00
1,819,908.00
1,893,175.00
2,819,520.00
32,889,362.00

Jumlah V A
b.
1
2
3
4
5

(Rp)

Volume

m2
m2
m'
m'
m2

148,500.00
166,600.00
20,500.00
26,700.00
267,300.00

15,114,330.00
4,579,834.00
2,792,100.00
1,252,230.00
8,852,976.00

Harga Satuan
(Rp)
6,103,600.00
8,656,000.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
6
7

Nama Jenis Pekerjaan


Pas. List kayu sungkai
Pas. Gigi balang

Volume
64.30 m'
26.50 m'

Harga Satuan

Jumlah Harga
(Rp)

26,700.00
102800

Lantai 3
Plafond Gypsum tbl 9 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond GRC tbl 4 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond Gypsum
Pas. List profil gypsum uk. 8/8 cm
Pas. List profil gypsum uk. 5/5 cm

116.77
27.49
10.68
124.00
46.90

m2
m2
m2
m'
m'

148,500.00
166,600.00
123,300.00
20,500.00
26,700.00

Lantai 4
Plafond Gypsum tbl 9 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond GRC tbl 4 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond Gypsum
Pas. List profil gypsum uk. 8/8 cm
Pas. List profil gypsum uk. 5/5 cm

126.40
109.11
21.96
142.25
210.70
Jumlah V D

17,340,345.00
4,579,834.00
1,316,844.00
2,542,000.00
1,252,230.00
27,031,253.00

Jumlah V C
d.
1
2
3
4
5

1,716,810.00
2724200
37,032,480.00

Jumlah V B
c.
1
2
3
4
5

(Rp)

m2
m2
m2
m'
m'

148,500.00
166,600.00
123,300.00
20,500.00
26,700.00

18,770,400.00
18,177,726.00
2,707,668.00
2,916,125.00
5,625,690.00
48,197,609.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

145,150,704.00

Jumlah Total V
VI
a.
1
2

PEKERJAAN PENGECATAN
Lantai 1
Cat dinding & kolom beton setara ICI
Cat plafond setara ICI

447.69 m2
170.26 m2

39,100.00
39,100.00

Lantai 2
Cat dinding & kolom beton setara ICI
Cat plafond setara ICI

405.31 m2
129.27 m2

39,100.00
39,100.00

Lantai 3
Cat dinding & kolom beton setara ICI
Cat plafond setara ICI

538.29 m2
144.26 m2
Jumlah VI C

d.

Lantai 4

15,847,621.00
5,054,457.00
20,902,078.00

Jumlah VI B
c.
1
2

17,504,679.00
6,657,166.00
24,161,845.00

Jumlah VI A
b.
1
2

(Rp)

39,100.00
39,100.00

21,047,139.00
5,640,566.00
26,687,705.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
1
2

Nama Jenis Pekerjaan


Cat dinding & kolom beton setara ICI
Cat plafond setara ICI

Volume
460.41 m2
235.51 m2

Harga Satuan

Jumlah Harga
(Rp)

39,100.00
39,100.00

11

PEKERJAAN LAIN-LAIN
Pekerjaan reservoir bawah + R.pompa
Pasang papan nama kantor
Pasang Meja / lemari dapur uk.1,8/0,9 lengkap sesuai gambar
Pasang lemari gantung
Pasang tangga service
Pekerjaan kolam air mancur
Pasang logo DKI stainless steel lengkap sesuai gambar
Pekerjaan bak sampah lengkap sesuai gambar
Pasang lemari dapur 0,9/0,5 lengkap
Pekerjaan pelayanan terpadu
- Pekerjaan back drop
- Pekerjaan meja pelayanan
Pekerjaan Huruf Stainess Steel
- KANTOR LURAH tinggi 30 cm
- KALIANYAR tinggi 45 cm

(Rp)

18,002,031.00
9,208,441.00

unt
unt
unt
unt
bh
bh
unt
unit
unit

35,700,800.00
3,043,600.00
1,974,200.00
6,416,600.00
1,562,900.00
15,835,000.00
13,572,900.00
2,056,500.00
987,100.00

35,700,800.00
3,043,600.00
3,948,400.00
12,833,200.00
1,562,900.00
15,835,000.00
13,572,900.00
2,056,500.00
987,100.00

1.00 unit
1.00 unit

26,816,700.00
9,953,400.00

26,816,700.00
9,953,400.00

1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00

Harga Satuan

27,210,472.00
98,962,100.00

Jumlah VI D
Jumlah Total V
VII
1
2
3
4
5
6
7
8
9
10

(Rp)

Volume

11.00 bh
9.00 bh

510,000.00
765,000.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

126,310,500.00

Jumlah VII
VIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

TIANG BENDERA
Galian tanah pondasi
Urugan pasir t = 15 cm
Beton ad. K.225 besi 140 kg/m3
Besi angkur
Pipa besi stainless steel 3" masuk dalam coran
Pipa besi stainless steel 3" tiang bendera
Pipa besi stainless steel 2.5" tiang bendera
Pipa besi stainless steel 2" tiang bendera
Baut 10 + cesing stainless steel
Roda
Tali tiang bendera
Besi diatas tiang bendera
Reducer
Dop penutup atas 2'' stainless steel
Dop penutup stopper 3'' stainless steel

0.81
0.06
0.64
3.00
3.00
2.60
2.00
2.00
2.00
1.00
20.00
1.00
2.00
1.00
2.00
Jumlah VIII

(Rp)

m3
m3
m3
m'
m'
m'
m'
m'
bh
bh
m'
bh
bh
bh
bh

61,600.00
287,900.00
2,591,100.00
41,100.00
287,900.00
287,900.00
241,800.00
193,400.00
61,600.00
28,700.00
16,400.00
28,700.00
69,900.00
61,600.00
98,700.00

49,896.00
17,274.00
1,658,304.00
123,300.00
863,700.00
748,540.00
483,600.00
386,800.00
123,200.00
28,700.00
328,000.00
28,700.00
139,800.00
61,600.00
197,400.00
5,238,814.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

IX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

PEKERJAAN TAMAN
Tanam pohon mangga
Tanam pohon bonsai serut t.100 cm
Tanam pohon palm wodya/ekor tupai t.200 cm
Tanam pohon nanas merah t.30 cm
Tanam pohon nanas kerang t.20 cm
Tanam pohon soka singapur t.30 cm
Tanam pohon lantana saudi t.15 cm
Tanam pohon nuri t.60 cm
Tanam pohon anggrek tanah t.35 cm
Tanam pohon walisongo biasa t.50 cm
Tanam pohon lily brasil t.15 cm
Tanam pohon sansivera/pedang -pedangan t.30 cm
Tanam pohon soka jepang bunga orange t.20 cm
Tanam rumput gajah + pemeliharaan 3 bulan
Tanam pohon rambutan t.100 cm
Tanam pohon jambu air t.400 cm
Tanam pohon sikas medan t.50 cm
Tanam pohon beringin putih t.200 cm
Tanam pohon lili paris bintang t.10 cm
Tanam pohon paris kasar t.20 cm
Tanam pohon boungenville t.60 cm

Volume

2.00
2.00
2.00
20.00
20.00
20.00
20.00
10.00
20.00
5.00
20.00
10.00
5.00
61.20
1.00
1.00
2.00
2.00
20.00
20.00
1.00

phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
m2
phn
phn
phn
phn
phn
phn
phn

Harga Satuan

Jumlah Harga
(Rp)

729,400.00
251,400.00
415,900.00
4,800.00
2,600.00
3,000.00
2,400.00
4,900.00
6,500.00
9,700.00
1,400.00
10,600.00
2,400.00
15,600.00
41,900.00
246,100.00
61,300.00
157,800.00
1,800.00
1,900.00
48,600.00

(Rp)

1,458,800.00
502,800.00
831,800.00
96,000.00
52,000.00
60,000.00
48,000.00
49,000.00
130,000.00
48,500.00
28,000.00
106,000.00
12,000.00
954,720.00
41,900.00
246,100.00
122,600.00
315,600.00
36,000.00
38,000.00
48,600.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
22
23
24
25
26
27
28
29
30

Nama Jenis Pekerjaan


Tanam pohon nusa indah t.50 cm
Tanam pohon agave putih t.40 cm
Tanam pohon puring bor t.75 cm
Tanam pohon kelabang t.50 cm
Tanam pohon puring buntut t.75 cm
Tanam pohon gelatik t.75 cm
Tanam pohon soka hawai t.30 cm
Tanam pohon cemara udang
Pupuk kandang (isi 5 kg)

Volume
1.00
2.00
2.00
2.00
2.00
2.00
20.00
2.00
50.00

phn
phn
phn
phn
phn
phn
phn
phn
zak

Harga Satuan

Jumlah Harga
(Rp)

5,300.00
37,300.00
4,200.00
9,000.00
7,800.00
7,700.00
2,700.00
414,900.00
12,300.00

PEKERJAAN HALAMAN/PARKIR
Urugan tanah halaman
Penebalan lapisan sirtu pada tebal 20 cm
Penebalan lapisan pasir urug tebal 10 cm
Pasang paving block warna abu-abu tebal 8 cm
Pasang grass block tebal 8 cm
Pasang kanstin beton K400 12 x 15 x 30 x40 cm
Pasang bata dibawah kanstin ad. 1:4
Brapen bata ad. 1:4
Pasang saluran buis beton 30 cm

60.49
25.21
12.60
76.03
50.00
58.00
14.50
29.00
4.00

5,300.00
74,600.00
8,400.00
18,000.00
15,600.00
15,400.00
54,000.00
829,800.00
615,000.00
6,862,520.00

Jumlah IX
X
1
2
3
4
5
6
7
8
9

(Rp)

m2
m3
m2
m2m
m2
m'
m2
m2
m'

160,400.00
308,400.00
288,700.00
176,800.00
157,900.00
115,100.00
100,600.00
37,000.00
106,900.00

9,702,596.00
7,774,764.00
3,637,620.00
13,442,104.00
7,895,000.00
6,675,800.00
1,458,700.00
1,073,000.00
427,600.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
10
11
12
13
14
15
16
17

Nama Jenis Pekerjaan


Saluran keliling bangunan beton bertulang
Pasang sumur resapan air hujan
Pasang grill penutup saluran
Urugan tanah pada taman
Bak kontrol
Stop Car
Rabat beton keliling bangunan beton bertulang
Pasir Urug di bawah Rabat beton keliling bangunan

Volume
39.00
5.00
39.00
89.24
4.00
10.00

m'
bh
m'
m3
bh
bh

Harga Satuan

Jumlah Harga
(Rp)

904,800.00
1,434,300.00
404,900.00
160,400.00
267,300.00
180,800.00

PEKERJAAN JALAN MASUK


Galian tanah
Urugan tanah kembali
Urugan pasir tebal 10 cm
Pasang batu kali
Brapen ad. 1:5
Pasang siar timbul
Beton deuker + ramp
Lantai kerja
Urug tanah
Pasang pintu besi P.5 m'

8.53
3.23
2.90
6.05
8.00
11.00
5.20
0.98
1.23
1.00

127,528,280.00

m3
m3
m3
m3
m2
m2
m3
m3
m3
bh

61,600.00
20,500.00
288,700.00
899,800.00
37,000.00
53,400.00
3,167,000.00
732,100.00
160,400.00
8,637,300.00

Harga Satuan
(Rp)

35,287,200.00
7,171,500.00
15,791,100.00
14,314,096.00
1,069,200.00
1,808,000.00
4.46 m3
2.79 m3

Jumlah X
XI
1
2
3
4
5
6
7
8
9
10

(Rp)

Volume

525,448.00
66,215.00
837,230.00
5,443,790.00
296,000.00
587,400.00
16,468,400.00
717,458.00
197,292.00
8,637,300.00

1,702,400.00
288,700.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
11

Nama Jenis Pekerjaan


Pasang pintu besi P.1,5 m'

Volume
1.00 bh

Harga Satuan

Jumlah Harga
(Rp)

2,673,400.00

PEKERJAAN PAGAR TRALIS DEPAN T.155 CM P.41,60 M'


Pasang profil
Galian tanah pondasi
Bor lubang pondasi strouspal 30 cm
Cor beton strouspal ad.1:2:3 besi 78,70 kg/m3
Pasir urug tebal 10 cm
Pondasi batu kali ad.1:5
Brapen pondasi
Beton kolom besi 90.45 kg/m3 uk.30x30 cm
Beton sloof besi 169,42 kg/m3 uk.15x20 cm
Pasangan batu bata ad.1:5
Plesteran ad. 1:5 tebal 15 mm
Pasang ban-ban 8 cm
Plesteran beton kepala pagar ad.1:3 perapihan
Pagar tralis besi + cat
Cat tembok setara ICI
Urugan tanah merah
Pasang batu alam andesit pada kolom + clear coating

9.00
26.96
10.4
2.02
2.98
27.32
73.68
1.81
1.25
28.76
72.27
15.80
13.00
37.10
42.67
2.20
28.17

2,673,400.00
36,449,933.00

Jumlah XI
XII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

(Rp)

bh
m3
m'
m3
m3
m3
m2
m3
m3
m2
m2
m'
bh
m'
m2
m3
m2

102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
4,668,900.00
4,959,200.00
100,600.00
56,400.00
14,300.00
57,500.00
534,600.00
39,100.00
160,400.00
272,700.00

925,200.00
1,660,736.00
170,560.00
3,572,370.00
860,326.00
24,582,536.00
2,726,160.00
8,450,709.00
6,199,000.00
2,893,256.00
4,076,028.00
225,940.00
747,500.00
19,833,660.00
1,668,397.00
352,880.00
7,681,959.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
18
19
20

Nama Jenis Pekerjaan


Urugan kembali
Acian
Siar timbul

Volume
6.67 m3
51.01 m2
17.94 m2

Harga Satuan

Jumlah Harga
(Rp)

20,500.00
22,900.00
53,400.00

PEKERJAAN PAGAR TEMBOK T.2 M' P.35,90 M'


Pasang profil
Galian tanah pondasi
Bor lubang pondasi strouspal 30 cm
Cor beton strouspal ad.1:2:3 besi 78,70 kg/m3
Pasir urug tebal 10 cm
Pondasi batu kali ad.1:5
Brapen pondasi
Beton kolom uk.20x25 cm besi 167 kg/m3
Beton sloof uk.15x20 cm besi 169,42 kg/m3
Beton ring balk uk.8x20 cm ad.1:2:3 besi 230,60 kg/m3
Pasangan batu bata ad.1:5
Plesteran ad. 1:5 tebal 15 mm
Pasang skonengan 25 mm
Plesteran beton kepala pagar ad.1:3
Cat tembok setara ICI

6.00
23.25
8.8
1.82
3.05
23.37
46.67
1.10
1.08
0.53
63.12
126.34
89.80
26.17
152.51

136,735.00
1,168,129.00
957,996.00
88,890,077.00

Jumlah XII
XIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

(Rp)

bh
m3
m'
m3
m3
m3
m2
m3
m3
m3
m2
m2
m'
m2
m2

102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
5,689,100.00
4,959,200.00
5,379,800.00
100,600.00
56,400.00
51,500.00
41,100.00
39,100.00

616,800.00
1,432,200.00
144,320.00
3,218,670.00
880,535.00
21,028,326.00
1,726,790.00
6,258,010.00
5,355,936.00
2,851,294.00
6,349,872.00
7,125,576.00
4,624,700.00
1,075,587.00
5,963,141.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
16
17
18
19
20
21

Nama Jenis Pekerjaan


Pasang batu alam andesit pada kolom + clear coating
Perapihan kepala kolom pagar
Pasang nat
Urugan tanah kembali
Acian
Siar timbul

Volume
8.80
11.00
45.00
5.92
152.51
22.98

m2
bh
m'
m3
m2
m2

Harga Satuan

Jumlah Harga
(Rp)

272,700.00
57,500.00
6,100.00
20,500.00
22,900.00
53,400.00

PEKERJAAN PAGAR TEMBOK T. 1,55 M' P.7,20 M'


Pasang profil
Galian tanah pondasi
Bor lubang pondasi strouspal 30 cm
Cor beton strouspal ad.1:2:3 besi 78,70 kg/m3
Pasir urug tebal 10 cm
Pondasi batu kali ad.1:5
Brapen pondasi
Beton kolom uk.20x25 cm besi 167 kg/m3
Beton sloof uk.15x20 cm besi 169,42 kg/m3
Beton ring balk uk.8x20 cm ad.1:2:3 besi 230,60 kg/m3
Pasangan batu bata ad.1:5
Plesteran ad. 1:5 tebal 15 mm

1.00
4.66
0.8
0.16
0.61
5.07
10.08
0.08
0.22
0.11
10.22
20.43

2,399,760.00
632,500.00
274,500.00
121,360.00
3,492,479.00
1,227,132.00
76,799,488.00

Jumlah XIII
XIV
1
2
3
4
5
6
7
8
9
10
11
12

(Rp)

bh
m3
m'
m3
m3
m3
m2
m3
m3
m3
m2
m2

102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
5,689,100.00
4,959,200.00
5,379,800.00
100,600.00
56,400.00

102,800.00
287,056.00
13,120.00
282,960.00
176,107.00
4,561,986.00
372,960.00
455,128.00
1,091,024.00
591,778.00
1,028,132.00
1,152,252.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
13
14
15
16
17
18
19
20

Nama Jenis Pekerjaan


Pasang skonengan 25 mm
Cat tembok setara ICI
Pasang batu alam andesit pada kolom + clear coating
Pasang nat
Urugan tanah kembali
Acian
Plesteran beton
Siar timbul

Volume
15.80
25.11
0.62
5.70
1.19
25.11
4.68
5.33

m'
m2
m2
m'
m3
m2
m2
m2

Harga Satuan

Jumlah Harga
(Rp)

51,500.00
39,100.00
272,700.00
6,100.00
20,500.00
22,900.00
41,100.00
53,400.00

1
2
3
4
5
6
7

PEKERJAAN MEKANIKAL
PEKERJAAN INSTALASI PLUMBING
LANTAI 1
SANITAIR FIXTURES
Kran tembok 1/2" San El
Wastafel TOTO 521/237 lengkap kran + kaca cermin
Urinoir TOTO U57M type muslim lengkap flush valve
Partisi Urinoir TOTO / AW 115J W/Fitting
Closet jongkok TOTO CE. 6
Closet duduk / Mono Blok Toto CW420 J/SW420 J lengkap
Floor drain TOTO 2

5.00
4.00
2.00
2.00
2.00
1.00
6.00

813,700.00
981,801.00
169,074.00
34,770.00
24,395.00
575,019.00
192,348.00
284,622.00
13,191,032.00

Jumlah XIV
A
1
a.

(Rp)

bh
bh
bh
bh
bh
bh
bh

123,300.00
1,933,100.00
2,267,900.00
903,200.00
636,600.00
2,413,500.00
216,300.00

616,500.00
7,732,400.00
4,535,800.00
1,806,400.00
1,273,200.00
2,413,500.00
1,297,800.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
8
9
10
11

Nama Jenis Pekerjaan


Floor clean out TOTO 2""
Closet clean out TOTO 4"
Toilet shower set TOTO THX.20 White
Alat bantu dan sambung

Volume
1.00
1.00
1.00
1.00

bh
bh
bh
bh

Harga Satuan

Jumlah Harga
(Rp)

216,300.00
216,300.00
245,100.00
205,600.00

(Rp)
216,300.00
216,300.00
245,100.00
205,600.00
20,558,900.00

Jumlah PL LT 1
b.
1
2
3
4
5
6
7

PEKERJAAN INSTALASI HALAMAN DAN KRAN TAMAN


Kran kebun taman 1/2" San Ei
Dudukan kran taman
Pipa GIP medium 1/2"
Pipa GIP medium 3/4"
Pipa GIP medium 1"
Fitting dan accessories
Galian pipa + urug kembali 0,30x0,60x54 m

3.00
3.00
3.00
54.00
3.00
1.00
10.26

bh
bh
m'
m'
m'
lot
m3

140,600.00
143,900.00
22,200.00
29,600.00
45,200.00
246,700.00
51,800.00

421,800.00
431,700.00
66,600.00
1,598,400.00
135,600.00
246,700.00
531,468.00

1
2
3
4
5
6

INSTALASI TAMAN RELIEF


Pompa 150 watt taman relief/pompa celup air
Stop kontak pompa
Kabel NYY 3x2,5 mm2 + conduit
Pipa PVC/AW 3/4" pelindung cable
Pipa GIP medium 3/4"
Alat bantu dan sambung

1.00
1.00
27.00
22.00
3.00
1.00

bh
bh
m'
m'
m'
lot

390,700.00
41,100.00
13,100.00
5,700.00
29,600.00
123,300.00

390,700.00
41,100.00
353,700.00
125,400.00
88,800.00
123,300.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

4,555,268.00

Jml PL Halaman
c.
1
2

PEKERJAAN INSTALASI POMPA


Pompa Sanyo Jet Pump 400 watt
Pompa Sanyo Jet Pump 250 watt

1.00 bh
1.00 bh

6,498,500.00
5,427,100.00

1
2
3
4
5
6
7
8
9
10
11

6,498,500.00
5,427,100.00
11,925,600.00

Jumlah POMPA
d,

(Rp)

LANTAI 2
SANITAIR FIXTURES
Kran tembok 1/2" San El
Wastafel TOTO 521/237 lengkap kran + kaca cermin + kaki
Urinoir TOTO U57M type muslim lengkap flush valve
Partisi Urinoir TOTO / AW 115J W/Fitting
Closet jongkok TOTO CE. 6
Floor drain TOTO 2"
Floor clean out TOTO 2""
Closet clean out TOTO 4"
Kran leher angsa
Kitzen zink
Alat bantu dan sambung

3.00
3.00
2.00
2.00
2.00
4.00
2.00
2.00
1.00
1.00
1.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lot

123,300.00
1,933,100.00
2,267,900.00
869,400.00
636,600.00
216,300.00
216,300.00
216,300.00
224,500.00
349,600.00
205,600.00

369,900.00
5,799,300.00
4,535,800.00
1,738,800.00
1,273,200.00
865,200.00
432,600.00
432,600.00
224,500.00
349,600.00
205,600.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

16,227,100.00

Jumlah PL LT 2
e.
1
2
3
4
5
6
7
8
9
10
11
12

LANTAI 3
SANITAIR FIXTURES
Kran tembok 1/2" TOTO T.23.B13.V7N
Wastafel TOTO 521/237 lengkap kran + kaca cermin + kaki
Urinoir TOTO U57M type muslim lengkap flush valve
Partisi Urinoir TOTO / AW 115J W/Fitting
Closet jongkok TOTO CE. 6
Closet duduk / Mono Blok TOTO CW420 J/SW420 J lengkap
Shower double kran
Toilet shower Set TOTO
Floor drain TOTO 2"
Floor clean out TOTO 2""
Closet clean out TOTO 4"
Alat bantu dan sambung

5.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
7.00
2.00
2.00
1.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lot

Jumlah PL LT 3
f.

(Rp)

LANTAI 4
INSTALASI AIR BERSIH (Pipa GIP Medium Class)

123,300.00
1,933,100.00
2,267,900.00
869,400.00
636,600.00
2,410,200.00
505,800.00
245,200.00
216,300.00
216,300.00
216,300.00
205,600.00

616,500.00
3,866,200.00
4,535,800.00
1,738,800.00
1,273,200.00
2,410,200.00
505,800.00
245,200.00
1,514,100.00
432,600.00
432,600.00
205,600.00
17,776,600.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

1
2
3

Titik air bersih


Pipa GIP Medium 1"
Gate Valve 1"

13.00 ttk
4.00 m'
1.00 bh

177,600.00
45,200.00
97,800.00

2,308,800.00
180,800.00
97,800.00

1
2

INSTALASI AIR BEKAS


Titik air bekas
Pipa PVC/AW 3"

11.00 ttk
4.00 m'

132,400.00
32,900.00

1,456,400.00
131,600.00

1
2

INSTALASI AIR KOTOR


Titik air kotor
Pipa PVC/AC 4"

7.00 ttk
4.00 m'

208,900.00
50,100.00

1,462,300.00
200,400.00

123,300.00
1,933,100.00
2,267,900.00
903,200.00
636,600.00
216,300.00
216,300.00
216,300.00
205,600.00

863,100.00
5,799,300.00
6,803,700.00
2,709,600.00
1,273,200.00
1,297,800.00
432,600.00
432,600.00
205,600.00

1
2
3
4
5
6
7
8
9

SANITAIR FIXTURES
Kran tembok 1/2" San Ei
Wastafel TOTO 521/237 lengkap kran + kaca cermin
Urinoir TOTO U57M type muslim lengkap flush valve
Partisi Urinoir TOTO / AW 115J W/Fitting
Closet jongkok TOTO CE. 6
Floor drain TOTO 2 TX 1 AN
Floor clean out TOTO 2"
Closet clean out TOTO 4"
Alat bantu dan sambung

7.00
3.00
3.00
3.00
2.00
6.00
2.00
2.00
1.00

bh
bh
bh
bh
bh
bh
bh
bh
lot

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

Instalasi Air Hujan


Titik air bekas
Pipa PVC 3"
Roof drain 3 "

g.
1
2
h.
1
2

(Rp)

4.00 ttk
100.00 m'
4.00 bh

132,400.00
32,900.00
278,000.00

Instalasi Air Kotor Toilet Lurah


Titik air kotor
Pipa PVC/AC 4''

1.00 ttk
25.00 m'

208,900.00
50,100.00

Instalasi Air bekas Toilet Lurah


Titik air bekas
Pipa PVC/AW 3"

1.00 ttk
25.00 m'

132,400.00
32,900.00

Jumlah Instalasi Air Hujan


Jumlah Total PL
II
a
1

Harga Satuan

25,655,600.00

Jumlah PL LT 4
f.
1
2
3

(Rp)

Volume

96,699,068.00

PEKERJAAN AIR CONDITIONING (AC)


LANTAI 1
AC dinding 2 PK type Single Split Low Watt lengkap kompresor
terpasang

1.00 bh

9,048,600.00

9,048,600.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
2
3
4
5
6

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

AC dinding 1,5 PK type Single Split Low Watt lengkap kompresor


terpasang
AC dinding 1,2 PK type Single Split Low Watt lengkap kompresor
terpasang

1.00 bh

6,117,100.00

6,117,100.00

1.00 bh

3,084,700.00

3,084,700.00

Instalasi pemipaan refrigerant lengkap isolasi


Instalasi drain AC pipa PVC/AW 1/2"
Instalasi kabel dari CU ke FCU NYM 3x2,5 mm2

3.00 ttk
3.00 ttk
3.00 ttk

205,600.00
69,900.00
115,100.00

616,800.00
209,700.00
345,300.00
19,422,200.00

Jumlah AC LT 1
b.
1
2
3
4
5

LANTAI 2
AC dinding 1,5 PK type Single Split Low Watt lengkap kompresor
terpasang
AC dinding 1 PK type Single Split Low Watt lengkap kompresor
terpasang
Instalasi pemipaan refrigerant lengkap isolasi
Instalasi drain AC pipa PVC/AW 1/2"
Instalasi kabel dari OU ke FCU NYM 3x2,5 mm2

1.00 bh

6,117,100.00

6,117,100.00

1.00 bh

4,729,900.00

4,729,900.00

2.00 ttk
2.00 ttk
2.00 ttk

205,600.00
69,900.00
115,100.00

411,200.00
139,800.00
230,200.00

Jumlah AC LT 2
c.

(Rp)

LANTAI 3

11,628,200.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
1
2
3
4
5
6

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

AC dinding 1,5 PK type Single Split Low Watt lengkap kompresor


terpasang
AC dinding 1 PK type Single Split Low Watt lengkap kompresor
terpasang
AC dinding 3/4 PK type Single Split Low Watt lengkap kompresor
terpasang

2.00 bh

6,117,100.00

12,234,200.00

1.00 bh

4,729,900.00

4,729,900.00

1.00 bh

3,701,700.00

3,701,700.00

Instalasi pemipaan refrigerant lengkap isolasi


Instalasi drain AC pipa PVC/AW 1/2"
Instalasi kabel dari CU ke FCU NYM 3x2,5 mm2

4.00 ttk
4.00 ttk
4.00 ttk

205,600.00
69,900.00
115,100.00

822,400.00
279,600.00
460,400.00
22,228,200.00

Jumlah AC LT 3
d.
1
2
3
4
5

(Rp)

LANTAI 4
AC dinding 1,5 PK type Single Split Low Watt lengkap kompresor
terpasang
AC dinding 3/4 PK type Single Split Low Watt lengkap kompresor
terpasang
Instalasi pemipaan refrigerant lengkap isolasi
Instalasi drain AC pipa PVC/AW 1/2"
Instalasi kabel dari OU ke FCU NYM 3x2,5 mm2

3.00 bh

6,174,700.00

18,524,100.00

1.00 bh

3,701,700.00

3,701,700.00

4.00 ttk
4.00 ttk
4.00 ttk

205,600.00
69,900.00
115,100.00

822,400.00
279,600.00
460,400.00

Jumlah AC LT 4

23,788,200.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

PEKERJAAN ELEKTRIKAL
PEKERJAAN INSTALASI LISTRIK
LANTAI 1
Titik Lampu kabel NYM 3 x 2,5 mm2 lengkap conduit
Titik stop kontak NYM 3 x 2,5 mm2 lengkap conduit
ARMATURE
Lampu down Light RD 175 STD SL 18 watt
Saklar tunggal
Stop kontak biasa

1
2
3
4
5
6

INSTALASI LAMPU TAMAN


Lampu Taman type GLG Full Globe 40 ACR E 27+SL-E 18 W
Tiang lampu taman + pondasi dicor
Kabel NYFGBY 3 x 2,5 mm2
Galian kabel urug kembali 0,3 x 0,6 x 55 m'
Kabel NYM 2 x 2,5 mm2
Alat bantu dan sambung

6.00
6.00
55.00
9.90
15.00
1.00

bh
bh
m'
m3
m'
lot

Harga Satuan
(Rp)

77,066,800.00

Jumlah Total AC
B.
1
a.

(Rp)

Volume

452,400.00
199,800.00
84,700.00
51,800.00
8,200.00
164,500.00

2,714,400.00
1,198,800.00
4,658,500.00
512,820.00
123,000.00
164,500.00

2.00 ttk
1.00 ttk

296,300.00
504,700.00

2.00 bh
2.00 bh
1.00 bh

205,600.00
38,600.00
30,400.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

9,372,020.00

JUMLAH EL LT 1

1
2
3
4
5
6
7
8
9
10
11
12
13

LANTAI 2
ARMATURE
Lampu TL 5 Balk 1x28 watt/54
Lampu Linear Baten T5 RTK 2x28 w/54 TKI
Lampu down Light RD 175 STD SL 18 watt
Lampu wastafel TL 1x18 w (GMS)/54 ACR SAVY
Lampu SL 18 Watt + fitting E27 Rosset savy white
Celling Fan 50 watt
Lampu baret TL bulat 20 watt
Exhaust fan 12 " CTMFV27CD6
Saklar tunggal
Saklar seri
Stop kontak biasa
Stop kontak AC
Rak kabel trey ukuran T. 5 cm, L. 30 cm termasuk ruang shaft

2.00
5.00
24.00
3.00
5.00
2.00
5.00
4.00
4.00
11.00
12.00
6.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

bh
39.00 m'
JUMLAH EL LT 2

c.

LANTAI 3
ARMATURE

(Rp)

306,000.00
420,300.00
205,600.00
228,600.00
64,100.00
370,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00

612,000.00
2,101,500.00
4,934,400.00
685,800.00
320,500.00
740,200.00
962,000.00
1,398,400.00
154,400.00
587,400.00
364,800.00
295,800.00
9,750,000.00
22,907,200.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
1
2
3
4
5
6
7
8
9
10
11

Nama Jenis Pekerjaan


Lampu linear Baten T5 RTK 2x28 w/54 TKI
Lampu down Light RD 175 STD SL 18 watt
Lampu wastafel TL 1x18 w (GMS)
Lampu SL 18 Watt + fitting E27 Rossel savy white
Lampu baret TL bulat 20 watt
Exhaust fan 12 " CTMFV27CD6
Saklar tunggal
Saklar seri
Stop kontak biasa
Stop kontak AC
Rak kabel trey ukuran T. 5 cm, L. 30 cm termasuk ruang shaft

Volume
10.00
5.00
2.00
5.00
5.00
2.00
3.00
12.00
15.00
5.00
26.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'

Harga Satuan

Jumlah Harga
(Rp)

420,300.00
205,600.00
228,600.00
64,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00

1
2
3
1
2

LANTAI 4
Pemipaan & Pengabelan
Titik Lampu kabel NYM 3 x 2,5 mm2 lengkap conduit
Titik stop kontak NYM 3 x 2,5 mm2 lengkap conduit
Titik stop kontak AC lengkap conduit
ARMATURE
Lampu linear Baten T5 RTK 2x28 w/54 TKI
Lampu down Light RD 175 STD SL 18 watt

(Rp)

4,203,000.00
1,028,000.00
457,200.00
320,500.00
962,000.00
699,200.00
115,800.00
640,800.00
456,000.00
246,500.00
6,500,000.00

35.00 ttk
9.00 ttk
4.00 m'
11.00 bh
8.00 bh

Harga Satuan

15,629,000.00

JUMLAH EL LT 3
d.

(Rp)

Volume

420,300.00
205,600.00

4,623,300.00
1,644,800.00

296,300.00
504,700.00
651,200.00

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
3
4
5
6
7
8
9
10
11
12

Nama Jenis Pekerjaan


Lampu wastafel TL 1x18 w (GMS)
Lampu SL 18 Watt + fitting E27 Rossel savy white
Lampu baret TL bulat 20 watt
Exhaust fan 12 " CTMFV27CD6
Saklar tunggal
Saklar seri
Stop kontak biasa
Stop kontak AC
Rak kabel trey ukuran T. 5 cm, L. 30 cm termasuk ruang shaft
Test commissioning system Instalasi listrik (Meger)

Volume
3.00
6.00
4.00
3.00
5.00
10.00
9.00
4.00
26.00
1.00

bh
bh
bh
bh
bh
bh
bh
bh
m'
lot

Harga Satuan

Jumlah Harga
(Rp)

228,600.00
64,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00
411,300.00

PEKERJAAN PANEL LISTRIK


PANEL LANTAI 4 (PL-4)
Box Panel (69x59x40) cm
MCCB 20 A / 3 ph/18 K 1 bh
MCB 10 A / 1 ph/10 KA 7 bh
MCB 16 A / 1 ph/10 KA 5 bh
Pilot lamp 3bh
Rell CU 1 set

1.00 set

685,800.00
384,600.00
769,600.00
1,048,800.00
193,000.00
534,000.00
273,600.00
197,200.00
6,500,000.00
411,300.00
17,266,000.00
65,174,220.00

JUMLAH EL LT 4
TOTAL JUMLAH EL
II
1

(Rp)

3,043,600.00

3,043,600.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

Connecting & Asesoris 1 lot


3,043,600.00

Jumlah Panel Listrik

III
a.
1
2
3
4
5
6
7
8
9
10

PEKERJAAN INSTALASI FIRE ALARM


LANTAI 1
Rate of Rise heat detector
Indicator lamp
Alarm bell
Manual push button
Terminal box 12 pair
EOL Resistor
Titik Instalasi fire alarm kabel NYA 2x1,5 mm2 lengkap conduit
Kabel NYM 3 x 1,5 mm2
Alat pemadam api ringan AP-25P setara Appon
Alat-alat bantu dan alat sambung'

7.00
1.00
1.00
1.00
1.00
1.00
11.00
26.00
2.00
1.00

bh
bh
bh
bh
bh
bh
ttk
m'
bh
lot

74,800.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
200,700.00
8,200.00
524,800.00
246,700.00

5,062,300.00

JUMLAH FA LT 1
b.
1

LANTAI 2
Rate of Rise heat detector

7.00 bh

523,600.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
2,207,700.00
213,200.00
1,049,600.00
246,700.00

74,800.00

523,600.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
2
3
4
5
6
7

Nama Jenis Pekerjaan


Indicator lamp
Alarm bell
Manual push button
Terminal box 12 pair
EOL Resistor
Alat pemadam api ringan AP-25P setara Appon

Volume
1.00
1.00
1.00
1.00
1.00
2.00

bh
bh
bh
bh
bh
bh

Harga Satuan

Jumlah Harga
(Rp)

55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00

LANTAI 3
Rate of Rise heat detector
Indicator lamp
Alarm bell
Manual push button
Terminal box 12 paie
EOL Resistor
Alat pemadan api ringan Ap-25P

8.00
1.00
1.00
1.00
1.00
1.00
2.00

bh
bh
bh
bh
bh
bh
bh

74,800.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00

598,400.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
1,049,600.00
2,469,500.00

JUMLAH FA LT 3
d.
1

55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
1,049,600.00
2,394,700.00

JUMLAH FA LT 2
c.
1
2
3
4
5
6
7

(Rp)

LANTAI 4
Rate of Rise heat detector

8.00 bh

74,800.00

598,400.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.
2
3
4
5
6
7
8

Nama Jenis Pekerjaan


Indicator lamp
Alarm bell
Push button
Terminal box 12 paie
EOL Resistor
Alat pemadan api ringan Ap-25P
Test commissioning system

Volume
1.00
1.00
1.00
1.00
1.00
2.00
1.00

bh
bh
bh
bh
bh
bh
lot

Harga Satuan

Jumlah Harga
(Rp)

55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00
287,900.00

PEKERJAAN INSTALASI TELEPHONE


LANTAI 2
Outlet telpon
Box terminal cabang IDF 6 Pair

4.00 ttk
1.00 bh

90,400.00
314,200.00

LANTAI 3
Outlet telpon
Box terminal cabang IDF 6 Pair
Pesawat telepon

5.00 ttk
1.00 bh
1.00 bh

361,600.00
314,200.00
675,800.00

JUMLAH TELPON LT 2
b.
1
2
3

55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
1,049,600.00
287,900.00
2,757,400.00
12,683,900.00

JUMLAH FA LT 4
TOTAL JUMLAH FA
IV
a.
1
2

(Rp)

90,400.00
314,200.00
205,600.00

452,000.00
314,200.00
205,600.00

Volume

Harga Satuan
(Rp)

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

LANTAI 4
Outlet telpon
Box terminal cabang IDF 6 Pair
Testing commissioning system telepon

3.00 ttk
1.00 bh
1.00 lot

90,400.00
314,200.00
205,600.00

JUMLAH TELPON LT 4
TOTAL JUMLAH TELPON
TOTAL PEK. MEKANIKAL/ELEKTRIKAL
JUMLAH HARGA DASAR
PENYAMBUNGAN BARU DAYA PLN 23000 VA
PENYAMBUNGAN TELEPON 1 (SATU) LINE
PENYAMBUNGAN PDAM BARU
TOTAL BIAYA
SELISIH PEKERJAAN TAMBAH KURANG

Mengetahui,

Harga Satuan
(Rp)

971,800.00

JUMLAH TELPON LT 3

d.
1
2
3

(Rp)

Volume

271,200.00
314,200.00
205,600.00
791,000.00
2,438,600.00
257,106,188.00
1,669,500,000.00
23,000,000.00
2,000,000.00
3,500,000.00
1,698,000,000.00

Konsultan Pengawas,

KONTRAK SEMULA

PERUB
PEKERJAAN TAMBAH

No.

Nama Jenis Pekerjaan

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

Volume

Harga Satuan
(Rp)

PEJABAT PEMBUAT KOMITMEN


PADA BAGIAN TATA PEMERINTAHAN SETKO ADMINISTRASI
JAKARTA BARAT

SEWUN INDO KONSULTAN

Drs. SETYA NUSANTARA


NIP. 196203151994031002

EVI KOMALASARI, SE
Direktur Utama

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

1.00
3.00
24.00
3.00
3.00
-

368,928.00

Harga Satuan

Volume

(Rp)

Jumlah Harga
(Rp)

bh
set
m2
bln
bln

977,259.00
164,500.00
1,191,700.00
822,600.00
1,028,200.00

(Rp)

977,259.00
493,500.00
28,600,800.00
2,467,800.00
3,084,600.00
35,623,959.00

3.36 m'

109,800.00

368,928.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

Harga Satuan

Jumlah Harga
(Rp)

Harga Satuan

Volume

(Rp)

Jumlah Harga
(Rp)

(Rp)

974,749.50
1,001,382.00
406,589.50
681,206.40

8.88
17.76
17.76
1.24

m2
m2
m2
m2

109,800.00
56,400.00
22,900.00
549,360.00
-

974,749.50
1,001,382.00
406,589.50
681,206.40

1,116,830.70
1,147,345.20
465,854.70
659,232.00

10.17
20.34
20.34
1.20

m2
m2
m2
m2

109,800.00
56,400.00
22,900.00
549,360.00

1,116,830.70
1,147,345.20
465,854.70
659,232.00

1,327,374.00

317.52
95.75
483.95
11.77
1.20
71.42

m2
m2
m2
m2
m2
m1

56,400.00
54,100.00
22,900.00
109,800.00
549,360.00
166,900.00

17,907,846.00
5,180,075.00
11,082,340.50
1,292,071.50
659,232.00
11,919,998.00

538,951.50
1,292,071.50
659,232.00
11,919,998.00
22,559,745.00

Jumlah II

54,863,681.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

54,883,872.00
48.90 m2

152,100.00

54,883,872.00

7,437,690.00

7,437,690.00

41.01

265,300.00

10,879,953.00

71.23 m2

199,200.00

14,189,016.00

61,900.00
41,300.00

687,090.00
607,110.00

1,145,216.00
9,987,268.95
11.10
14.70

Harga Satuan

Volume

14.44
25.20
122.88
8.80
7.80
17.10
22.52

Jumlah Harga
(Rp)

m2
m'
m2
m2
m'
m'
m'
m2

265,300.00
53,400.00
1,233,900.00
152,100.00
904,800.00
193,300.00
53,400.00
230,300.00

3,830,932.00
1,345,680.00
151,621,632.00
7,962,240.00
1,507,740.00
913,140.00
5,186,356.00
172,367,720.00

Jumlah III A

98.55
25.06
46.05
52.80
19.80
13.52
24.00

(Rp)

m2
m2
m2
m2
m'
m'
m2
m'

265,300.00
155,600.00
199,200.00
216,900.00
61,900.00
41,300.00
265,300.00
53,400.00

26,145,315.00
3,899,336.00
9,987,268.95
3,268,320.00
817,740.00
3,586,856.00
1,281,600.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

Harga Satuan

Volume

Jumlah Harga
(Rp)

(Rp)

47.36
7.50
18.80
7.50
242.01
18.56

m2
m2
m2
m'
m2
m2

94,500.00
904,800.00
403,000.00
193,300.00
2,000.00
318,300.00

4,475,520.00
6,786,000.00
7,576,400.00
1,449,750.00
484,020.00
5,907,648.00

0.41
0.04
7.20
7.20
3.60
23.49
5.95
5.55
13.12

m3
m3
m'
m'
m'
m2
m2
m2
m2

12,092,200.00
12,092,200.00
97,800.00
73,200.00
13,900.00
109,400.00
37,000.00
41,100.00
60,800.00

4,957,802.00
483,688.00
704,160.00
527,040.00
50,040.00
2,569,806.00
220,150.00
228,105.00
797,696.00

0.09
0.06
12.93
12.93

m3
m3
m2
m'

12,092,200.00
12,092,200.00
109,400.00
37,000.00

1,088,298.00
725,532.00
1,414,542.00
478,410.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

8.40
1.47
1.00
3.00
12.93
17.82
35.64
17.82
13.40
17.82
242,134.40
578,832.00
2,941,644.00
14,895,095.35

26,363,169.00

83.24 m2
18,488,556.00

199,200.00

16,581,408.00

Harga Satuan

Volume

Jumlah Harga
(Rp)

(Rp)

m'
m'
bh
bh
m2
m2
m2
m2
m2
m2

13,900.00
496,800.00
229,500.00
64,900.00
60,800.00
100,300.00
56,400.00
32,400.00
102,800.00
22,900.00

116,760.00
730,296.00
229,500.00
194,700.00
786,144.00
1,787,346.00
2,010,096.00
577,368.00
1,377,520.00
408,078.00

0.14 m2
3.72 m2
33.81 m2
Jumlah III B

1,780,400.00
155,600.00
87,000.00

242,134.40
578,832.00
2,941,644.00
101,891,461.35

265,300.00
155,600.00
199,200.00
216,900.00
61,900.00

37,083,634.00
2,754,120.00
18,488,556.00
3,749,902.00

139.78
17.70
85.24
60.58

m2
m2
m2
m2
m'

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

bh

Harga Satuan

Jumlah Harga
(Rp)

534,600.00

(Rp)

534,600.00

1,546,860.00
20,035,416.00

17,514,675.00

17,116,008.00

78.75 m2

199,200.00

15,687,000.00

Harga Satuan

Volume
33.30
33.32
255.61
7.68
14.89
27.60
7.90
7.50
12.80
17.78

Jumlah Harga
(Rp)

m'
m2
m2
m2
m2
m'
m2
m'
m2
bh
m2

41,300.00
94,500.00
2,000.00
318,300.00
265,300.00
53,400.00
904,800.00
193,300.00
403,000.00
534,600.00
87,000.00

1,375,290.00
3,148,740.00
511,220.00
2,444,544.00
3,950,317.00
1,473,840.00
7,147,920.00
1,449,750.00
5,158,400.00
1,546,860.00
90,283,093.00

Jumlah III C

156.05
26.07
80.75
97.00
32.30
1.20

(Rp)

m2
m2
m2
m2
m'
m'
m'

265,300.00
155,600.00
199,200.00
216,900.00
61,900.00
41,300.00
370,100.00

41,400,065.00
4,056,492.00
17,514,675.00
6,004,300.00
1,333,990.00
444,120.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

13.40 m'

Harga Satuan

Jumlah Harga
(Rp)

102,800.00

(Rp)

1,377,520.00

1,200,000.00

5,369,760.00
2,419,470.00
26,503,905.00
116,318,288.35

17,064,520.00
67,981,387.00

23.31 m2
12,907,400.00
14,806,800.00

457,700.00

10,668,987.00

Harga Satuan

Volume
41.91
260.87
1.00
4.80
12.80
8.84
2.00
8.80
27.81

Jumlah Harga
(Rp)

m2
m2

94,500.00
2,000.00

m'
unit
m2
m2
m2
m'
m2
m2

102,800.00
1,200,000.00
318,300.00
403,000.00
143,900.00
193,300.00
610,200.00
87,000.00

unt
unt
m2
unt
unt

3,960,495.00
521,740.00
1,200,000.00
1,527,840.00
5,158,400.00
1,272,076.00
386,600.00
5,369,760.00
2,419,470.00
92,570,023.00
457,112,297.35

Jumlah III D
Jumlah Total III

1.00
1.00
2.00
2.00

(Rp)

5,445,000.00
3,454,900.00
457,700.00
6,453,700.00
7,403,400.00

5,445,000.00
3,454,900.00
12,907,400.00
14,806,800.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

Harga Satuan

Jumlah Harga
(Rp)

27,714,200.00

(Rp)
10,668,987.00

1.00 unt

7,403,400.00

7,403,400.00

18.19 m2

457,700.00

8,325,563.00

7,485,600.00

7,485,600.00

15,728,963.00

1.00 unt
9,237,300.00

8,637,300.00

8,637,300.00

Harga Satuan

Volume

Jumlah Harga
(Rp)

36,614,100.00

Jumlah IV A
2.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00

unt
unt
unt
unt
unt
unt
unt
unt
m2
unt

2,961,300.00
1,069,300.00
1,233,900.00
2,303,200.00
3,663,000.00
8,966,300.00
7,403,400.00
12,092,200.00
457,700.00
7,485,600.00

5,922,600.00
3,207,900.00
2,467,800.00
2,303,200.00
3,663,000.00
8,966,300.00
12,092,200.00
7,485,600.00

46,108,600.00

Jumlah IV B
1.00
2.00
2.00
3.00
1.00

(Rp)

unt
unt
unt
unt
unt
unt

3,619,400.00
2,961,300.00
1,069,300.00
1,233,900.00
8,637,300.00
9,237,300.00

3,619,400.00
5,922,600.00
2,138,600.00
3,701,700.00
9,237,300.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)
-

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

1.00 unt
1.00 unt

7,485,600.00
10,776,000.00

7,485,600.00
10,776,000.00

1.00 unt

19,742,400.00

19,742,400.00

1.00 unt

8,910,000.00

8,910,000.00

6.00 m2

457,700.00

2,746,200.00

12,185,800.00
21,815,000.00
11,202,000.00
12,009,900.00
66,450,000.00

20,103,400.00

58,297,500.00

1.00 unt

12,009,900.00

12,009,900.00

28.99 m2

457,700.00

13,268,723.00

Harga Satuan

Volume

Jumlah Harga
(Rp)

1.00
1.00
1.00
-

unt
unt
unt
unt
unt
unt
unt
m2
1.00 unt

7,485,600.00
10,776,000.00
12,185,800.00
19,742,400.00
21,815,000.00
8,910,000.00
11,202,000.00
457,700.00
12,009,900.00

12,185,800.00
21,815,000.00
11,202,000.00
12,009,900.00
81,832,300.00

Jumlah IV C
1.00
2.00
3.00
2.00
1.00
1.00
1.00
1.00

(Rp)

unt
unt
unt
unt
unt
unt
unt
unt
m2
unt

3,619,400.00
1,069,300.00
2,961,300.00
1,233,900.00
7,321,100.00
9,459,900.00
12,009,900.00
3,537,100.00
457,700.00
20,103,400.00

3,619,400.00
2,138,600.00
8,883,900.00
2,467,800.00
7,321,100.00
9,459,900.00
3,537,100.00
20,103,400.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

24,414,400.00
8,656,000.00
25,278,623.00
109,974,073.00

110.97
39.04
14.76
92.35
67.50

m2
m2
m2
m'
m'

148,500.00
166,600.00
123,300.00
20,500.00
26,700.00

16,479,045.00
6,504,064.00
1,819,908.00
1,893,175.00
1,802,250.00
28,498,442.00

Jumlah Harga
(Rp)

4.00 unt
1.00 unt

53,173,800.00
154,823,600.00

Harga Satuan

Volume

6,103,600.00
8,656,000.00

m2
m2
m2
m'
m'

148,500.00
166,600.00
123,300.00
20,500.00
26,700.00

3,373,650.00
1,017,270.00
4,390,920.00

Jumlah V A

101.78
27.49
136.20
46.90
33.12

24,414,400.00
8,656,000.00
90,601,600.00
255,156,600.00

Jumlah IV D
Jumlah Total IV

20.25
38.10

(Rp)

m2
m2
m'
m'
m2

148,500.00
166,600.00
20,500.00
26,700.00
267,300.00

15,114,330.00
4,579,834.00
2,792,100.00
1,252,230.00
8,852,976.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

Harga Satuan

Volume

(Rp)

(Rp)

64.30 m'
26.50 m'
-

Jumlah V D

(Rp)
1,716,810.00
2724200
37,032,480.00

m2
m2
m2
m'
m'

148,500.00
166,600.00
123,300.00
20,500.00
26,700.00

17,340,345.00
4,579,834.00
1,316,844.00
2,542,000.00
1,252,230.00
27,031,253.00

Jumlah V C

126.40
109.11
21.96
142.25
210.70
-

26,700.00
102800

Jumlah V B

116.77
27.49
10.68
124.00
46.90
-

Jumlah Harga

m2
m2
m2
m'
m'

148,500.00
166,600.00
123,300.00
20,500.00
26,700.00

18,770,400.00
18,177,726.00
2,707,668.00
2,916,125.00
5,625,690.00
48,197,609.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)
-

Harga Satuan

Jumlah Harga
(Rp)

Volume

(Rp)
28,498,442.00

Jumlah VI C

(Rp)
116,652,262.00

39,100.00
39,100.00

17,504,679.00
6,657,166.00
24,161,845.00

39,100.00
39,100.00

15,847,621.00
5,054,457.00
20,902,078.00

Jumlah VI B

538.29 m2
144.26 m2
-

(Rp)

Jumlah VI A

405.31 m2
129.27 m2
-

Jumlah Harga

Jumlah Total V

447.69 m2
170.26 m2
-

Harga Satuan

39,100.00
39,100.00

21,047,139.00
5,640,566.00
26,687,705.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

Harga Satuan

Volume

(Rp)

(Rp)

460.41 m2
235.51 m2
-

unt
unt
bh
bh

1,974,200.00
6,416,600.00
1,562,900.00
15,835,000.00

3,948,400.00
12,833,200.00
1,562,900.00
15,835,000.00

1.00 unit
1.00 unit

2,056,500.00
987,100.00

2,056,500.00
987,100.00

2.00
2.00
1.00
1.00

5,610,000.00
6,885,000.00

Jumlah Harga

39,100.00
39,100.00

18,002,031.00
9,208,441.00
27,210,472.00
98,962,100.00

Jumlah VI D
Jumlah Total V

1.00
1.00
1.00
-

(Rp)

unt
unt
unt
unt
bh
bh
unt
unit
unit

35,700,800.00
3,043,600.00
1,974,200.00
6,416,600.00
1,562,900.00
15,835,000.00
13,572,900.00
2,056,500.00
987,100.00

35,700,800.00
3,043,600.00
13,572,900.00
-

1.00 unit
1.00 unit

26,816,700.00
9,953,400.00

26,816,700.00
9,953,400.00

510,000.00
765,000.00

5,610,000.00
6,885,000.00

11.00 bh
9.00 bh

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

12,495,000.00

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

37,223,100.00

Jumlah Harga
(Rp)

Jumlah VIII

(Rp)

101,582,400.00

Jumlah VII

0.81
0.06
0.64
3.00
3.00
2.60
2.00
2.00
2.00
1.00
20.00
1.00
2.00
1.00
2.00
-

Harga Satuan

Volume

m3
m3
m3
m'
m'
m'
m'
m'
bh
bh
m'
bh
bh
bh
bh

61,600.00
287,900.00
2,591,100.00
41,100.00
287,900.00
287,900.00
241,800.00
193,400.00
61,600.00
28,700.00
16,400.00
28,700.00
69,900.00
61,600.00
98,700.00

49,896.00
17,274.00
1,658,304.00
123,300.00
863,700.00
748,540.00
483,600.00
386,800.00
123,200.00
28,700.00
328,000.00
28,700.00
139,800.00
61,600.00
197,400.00
5,238,814.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

2.00
2.00
2.00
20.00
20.00
20.00
20.00
10.00
20.00
5.00
20.00
10.00
5.00
61.20
1.00
1.00
2.00
2.00
20.00
20.00
1.00

phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
m2
phn
phn
phn
phn
phn
phn
phn

Harga Satuan

Jumlah Harga
(Rp)

729,400.00
251,400.00
415,900.00
4,800.00
2,600.00
3,000.00
2,400.00
4,900.00
6,500.00
9,700.00
1,400.00
10,600.00
2,400.00
15,600.00
41,900.00
246,100.00
61,300.00
157,800.00
1,800.00
1,900.00
48,600.00

(Rp)

1,458,800.00
502,800.00
831,800.00
96,000.00
52,000.00
60,000.00
48,000.00
49,000.00
130,000.00
48,500.00
28,000.00
106,000.00
12,000.00
954,720.00
41,900.00
246,100.00
122,600.00
315,600.00
36,000.00
38,000.00
48,600.00

Harga Satuan

Volume

Jumlah Harga
(Rp)

phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
m2
phn
phn
phn
phn
phn
phn
phn

729,400.00
251,400.00
415,900.00
4,800.00
2,600.00
3,000.00
2,400.00
4,900.00
6,500.00
9,700.00
1,400.00
10,600.00
2,400.00
15,600.00
41,900.00
246,100.00
61,300.00
157,800.00
1,800.00
1,900.00
48,600.00

(Rp)

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

1.00
2.00
2.00
2.00
2.00
2.00
20.00
2.00
50.00
-

phn
phn
phn
phn
phn
phn
phn
phn
zak

Harga Satuan

Jumlah Harga
(Rp)

5,300.00
37,300.00
4,200.00
9,000.00
7,800.00
7,700.00
2,700.00
414,900.00
12,300.00

(Rp)
5,300.00
74,600.00
8,400.00
18,000.00
15,600.00
15,400.00
54,000.00
829,800.00
615,000.00
6,862,520.00

Harga Satuan

Volume
-

Jumlah Harga
(Rp)

phn
phn
phn
phn
phn
phn
phn
phn
zak

5,300.00
37,300.00
4,200.00
9,000.00
7,800.00
7,700.00
2,700.00
414,900.00
12,300.00

Jumlah IX

60.49
25.21
12.60
76.03
50.00
58.00
14.50
29.00
4.00

(Rp)

m2
m3
m2
m2m
m2
m'
m2
m2
m'

160,400.00
308,400.00
288,700.00
176,800.00
157,900.00
115,100.00
100,600.00
37,000.00
106,900.00

9,702,596.00
7,774,764.00
3,637,620.00
13,442,104.00
7,895,000.00
6,675,800.00
1,458,700.00
1,073,000.00
427,600.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

1.00 m'
5.00 bh

904,800.00
1,434,300.00

904,800.00
7,171,500.00

10.00 bh

180,800.00

1,808,000.00

7,590,933.50
804,563.60
8,395,497.10

9,884,300.00

Harga Satuan

Volume
38.00
39.00
89.24
4.00
4.46
2.79

Jumlah Harga
(Rp)

m'
bh
m'
m3
bh
bh
m'
m'

904,800.00
1,434,300.00
404,900.00
160,400.00
267,300.00
180,800.00
1,702,400.00
288,700.00

34,382,400.00
15,791,100.00
14,314,096.00
1,069,200.00
7,590,933.50
804,563.60
126,039,477.10

Jumlah X

8.53
3.23
2.90
6.05
8.00
11.00
5.20
0.98
1.23
1.00

(Rp)

m3
m3
m3
m3
m2
m2
m3
m3
m3
bh

61,600.00
20,500.00
288,700.00
899,800.00
37,000.00
53,400.00
3,167,000.00
732,100.00
160,400.00
8,637,300.00

525,448.00
66,215.00
837,230.00
5,443,790.00
296,000.00
587,400.00
16,468,400.00
717,458.00
197,292.00
8,637,300.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

Harga Satuan

Volume

(Rp)

(Rp)

1.00 bh
-

Jumlah Harga

2,673,400.00

2,673,400.00
36,449,933.00

Jumlah XI

9.00
26.96
10.40
2.02
2.98
27.32
73.68
1.81
1.25
28.76
72.27
15.80
13.00
37.10
42.67
2.20
28.17

(Rp)

bh
m3
m'
m3
m3
m3
m2
m3
m3
m2
m2
m'
bh
m'
m2
m3
m2

102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
4,668,900.00
4,959,200.00
100,600.00
56,400.00
14,300.00
57,500.00
534,600.00
39,100.00
160,400.00
272,700.00

925,200.00
1,660,736.00
170,560.00
3,572,370.00
860,326.00
24,582,536.00
2,726,160.00
8,450,709.00
6,199,000.00
2,893,256.00
4,076,028.00
225,940.00
747,500.00
19,833,660.00
1,668,397.00
352,880.00
7,681,959.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

Harga Satuan

Volume

(Rp)

(Rp)

6.67 m3
51.01 m2
17.94 m2
-

50.54 m2

56,400.00

2,850,230.40

Jumlah Harga

20,500.00
22,900.00
53,400.00

136,735.00
1,168,129.00
957,996.00
88,890,077.00

Jumlah XII

6.00
23.25
8.80
1.82
3.05
23.37
46.67
1.10
1.08
0.53
63.12
75.80
89.80
26.17
152.51

(Rp)

bh
m3
m'
m3
m3
m3
m2
m3
m3
m3
m2
m2
m'
m2
m2

102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
5,689,100.00
4,959,200.00
5,379,800.00
100,600.00
56,400.00
51,500.00
41,100.00
39,100.00

616,800.00
1,432,200.00
144,320.00
3,218,670.00
880,535.00
21,028,326.00
1,726,790.00
6,258,010.00
5,355,936.00
2,851,294.00
6,349,872.00
4,275,345.60
4,624,700.00
1,075,587.00
5,963,141.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

8.80
11.00
45.00
5.92
152.51
22.98
-

2,850,230.40

8.17 m2

56,400.00

460,900.80

Harga Satuan

Volume

Jumlah Harga
(Rp)

m2
bh
m'
m3
m2
m2

272,700.00
57,500.00
6,100.00
20,500.00
22,900.00
53,400.00

2,399,760.00
632,500.00
274,500.00
121,360.00
3,492,479.00
1,227,132.00
73,949,257.60

Jumlah XIII

1.00
4.66
0.80
0.16
0.61
5.07
10.08
0.08
0.22
0.11
10.22
12.26

(Rp)

bh
m3
m'
m3
m3
m3
m2
m3
m3
m3
m2
m2

102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
5,689,100.00
4,959,200.00
5,379,800.00
100,600.00
56,400.00

102,800.00
287,056.00
13,120.00
282,960.00
176,107.00
4,561,986.00
372,960.00
455,128.00
1,091,024.00
591,778.00
1,028,132.00
691,351.20

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

15.80
25.11
0.62
5.70
1.19
25.11
4.68
5.33
-

460,900.80

Harga Satuan

Volume

Jumlah Harga
(Rp)

m'
m2
m2
m'
m3
m2
m2
m2

51,500.00
39,100.00
272,700.00
6,100.00
20,500.00
22,900.00
41,100.00
53,400.00

813,700.00
981,801.00
169,074.00
34,770.00
24,395.00
575,019.00
192,348.00
284,622.00
12,730,131.20

Jumlah XIV

5.00
4.00
2.00
2.00
2.00
1.00
6.00

(Rp)

bh
bh
bh
bh
bh
bh
bh

123,300.00
1,933,100.00
2,267,900.00
903,200.00
636,600.00
2,413,500.00
216,300.00

616,500.00
7,732,400.00
4,535,800.00
1,806,400.00
1,273,200.00
2,413,500.00
1,297,800.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

1.00
1.00
1.00
1.00
-

bh
bh
m'
m'
m'
lot

390,700.00
41,100.00
13,100.00
5,700.00
29,600.00
123,300.00

390,700.00
41,100.00
353,700.00
125,400.00
88,800.00
123,300.00

Jumlah Harga
(Rp)

bh
bh
bh
bh

216,300.00
216,300.00
245,100.00
205,600.00

(Rp)
216,300.00
216,300.00
245,100.00
205,600.00
20,558,900.00

Jumlah PL LT 1
3.00
3.00
3.00
54.00
3.00
1.00
10.26

1.00
1.00
27.00
22.00
3.00
1.00

Harga Satuan

Volume

bh
bh
m'
m'
m'
lot
m3

140,600.00
143,900.00
22,200.00
29,600.00
45,200.00
246,700.00
51,800.00

bh
bh
m'
m'
m'
lot

390,700.00
41,100.00
13,100.00
5,700.00
29,600.00
123,300.00

421,800.00
431,700.00
66,600.00
1,598,400.00
135,600.00
246,700.00
531,468.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

Harga Satuan

Volume

(Rp)

1,123,000.00

(Rp)

(Rp)

3,432,268.00

Jml PL Halaman

1.00 bh
1.00 bh
-

Jumlah Harga

6,498,500.00
5,427,100.00

6,498,500.00
5,427,100.00
11,925,600.00

3.00
3.00
2.00
2.00
2.00
4.00
2.00
2.00
1.00
1.00
1.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lot

123,300.00
1,933,100.00
2,267,900.00
869,400.00
636,600.00
216,300.00
216,300.00
216,300.00
224,500.00
349,600.00
205,600.00

369,900.00
5,799,300.00
4,535,800.00
1,738,800.00
1,273,200.00
865,200.00
432,600.00
432,600.00
224,500.00
349,600.00
205,600.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

Jumlah Harga
(Rp)

(Rp)

16,227,100.00

5.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
7.00
2.00
2.00
1.00
-

Harga Satuan

Volume

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lot

123,300.00
1,933,100.00
2,267,900.00
869,400.00
636,600.00
2,410,200.00
505,800.00
245,200.00
216,300.00
216,300.00
216,300.00
205,600.00

616,500.00
3,866,200.00
4,535,800.00
1,738,800.00
1,273,200.00
2,410,200.00
505,800.00
245,200.00
1,514,100.00
432,600.00
432,600.00
205,600.00
17,776,600.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

Harga Satuan

Volume

Jumlah Harga
(Rp)

(Rp)

13.00 ttk
4.00 m'
1.00 bh

177,600.00
45,200.00
97,800.00

2,308,800.00
180,800.00
97,800.00

11.00 ttk
4.00 m'

132,400.00
32,900.00

1,456,400.00
131,600.00

7.00 ttk
4.00 m'

208,900.00
50,100.00

1,462,300.00
200,400.00

123,300.00
1,933,100.00
2,267,900.00
903,200.00
636,600.00
216,300.00
216,300.00
216,300.00
205,600.00

863,100.00
5,799,300.00
6,803,700.00
2,709,600.00
1,273,200.00
1,297,800.00
432,600.00
432,600.00
205,600.00

7.00
3.00
3.00
3.00
2.00
6.00
2.00
2.00
1.00

bh
bh
bh
bh
bh
bh
bh
bh
lot

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

Harga Satuan

Volume

(Rp)

Jumlah Harga
(Rp)

(Rp)

25,655,600.00

529,600.00
3,290,000.00
1,112,000.00

4.00 ttk
100.00 m'
4.00 bh

132,400.00
32,900.00
278,000.00

529,600.00
3,290,000.00
1,112,000.00

208,900.00
1,252,500.00

1.00 ttk
25.00 m'

208,900.00
50,100.00

208,900.00
1,252,500.00

132,400.00
822,500.00

1.00 ttk
25.00 m'

132,400.00
32,900.00

132,400.00
822,500.00

7,347,900.00
7,347,900.00

1,123,000.00

1.00 bh

9,048,600.00

9,048,600.00

7,347,900.00
102,923,968.00

Jumlah Instalasi Air Hujan


Jumlah Total PL

bh

9,048,600.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

Jumlah Harga
(Rp)

(Rp)

1.00 bh

6,117,100.00

6,117,100.00

bh

6,117,100.00

1.00 bh

3,084,700.00

3,084,700.00

bh

3,084,700.00

3.00 ttk
3.00 ttk
3.00 ttk

205,600.00
69,900.00
115,100.00

(Rp)

Harga Satuan

Volume

18,250,400.00

616,800.00
209,700.00
345,300.00
1,171,800.00

Jumlah AC LT 1

1.00 bh

6,117,100.00

6,117,100.00

bh

6,117,100.00

1.00 bh

4,729,900.00

4,729,900.00

bh

4,729,900.00

2.00 ttk
2.00 ttk
2.00 ttk

205,600.00
69,900.00
115,100.00

10,847,000.00

Jumlah AC LT 2

411,200.00
139,800.00
230,200.00
781,200.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

Harga Satuan

Volume

Jumlah Harga
(Rp)

(Rp)

2.00 bh

6,117,100.00

12,234,200.00

bh

6,117,100.00

1.00 bh

4,729,900.00

4,729,900.00

bh

4,729,900.00

1.00 bh

3,701,700.00

3,701,700.00

bh

3,701,700.00

4.00 ttk
4.00 ttk
4.00 ttk

205,600.00
69,900.00
115,100.00

20,665,800.00

822,400.00
279,600.00
460,400.00
1,562,400.00

Jumlah AC LT 3

3.00 bh

6,174,700.00

18,524,100.00

bh

6,174,700.00

1.00 bh

3,701,700.00

3,701,700.00

bh

3,701,700.00

4.00 ttk
4.00 ttk
4.00 ttk

205,600.00
69,900.00
115,100.00

22,225,800.00

Jumlah AC LT 4

822,400.00
279,600.00
460,400.00
1,562,400.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)
-

Harga Satuan

Jumlah Harga
(Rp)

(Rp)
71,989,000.00

Harga Satuan

Volume

Jumlah Harga
(Rp)

(Rp)
5,077,800.00

Jumlah Total AC

592,600.00
504,700.00

2.00 ttk
1.00 ttk

296,300.00
504,700.00

592,600.00
504,700.00

411,200.00
77,200.00
30,400.00

2.00 bh
2.00 bh
1.00 bh

205,600.00
38,600.00
30,400.00

411,200.00
77,200.00
30,400.00

452,400.00
199,800.00
84,700.00
51,800.00
8,200.00
164,500.00

2,714,400.00
1,198,800.00
4,658,500.00
512,820.00
123,000.00
164,500.00

6.00
6.00
55.00
9.90
15.00
1.00

bh
bh
m'
m3
m'
lot

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)
1,616,100.00

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

Jumlah Harga
(Rp)

(Rp)
10,988,120.00

2.00
5.00
24.00
3.00
5.00
2.00
5.00
4.00
4.00
11.00
12.00
6.00
39.00
-

Harga Satuan

Volume

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'

JUMLAH EL LT 2

306,000.00
420,300.00
205,600.00
228,600.00
64,100.00
370,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00

612,000.00
2,101,500.00
4,934,400.00
685,800.00
320,500.00
740,200.00
962,000.00
1,398,400.00
154,400.00
587,400.00
364,800.00
295,800.00
9,750,000.00
22,907,200.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

10.00
5.00
2.00
5.00
5.00
2.00
3.00
12.00
15.00
5.00
26.00
-

10,370,500.00
4,542,300.00
2,604,800.00

Harga Satuan

Volume

Jumlah Harga
(Rp)

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'

420,300.00
205,600.00
228,600.00
64,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00

(Rp)
4,203,000.00
1,028,000.00
457,200.00
320,500.00
962,000.00
699,200.00
115,800.00
640,800.00
456,000.00
246,500.00
6,500,000.00
15,629,000.00

JUMLAH EL LT 3

35.00 ttk
9.00 bh
4.00 m'

296,300.00
504,700.00
651,200.00

10,370,500.00
4,542,300.00
2,604,800.00

11.00 bh
8.00 bh

420,300.00
205,600.00

4,623,300.00
1,644,800.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

3.00
6.00
4.00
3.00
5.00
10.00
9.00
4.00
26.00
1.00
17,517,600.00
19,133,700.00

Harga Satuan

Volume

Jumlah Harga
(Rp)

bh
bh
bh
bh
bh
bh
bh
bh
m'
lot

228,600.00
64,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00
411,300.00

(Rp)
685,800.00
384,600.00
769,600.00
1,048,800.00
193,000.00
534,000.00
273,600.00
197,200.00
6,500,000.00
411,300.00
34,783,600.00
84,307,920.00

1.00 set

3,043,600.00

3,043,600.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

Jumlah Harga
(Rp)

2.00 bh

Harga Satuan

Volume

524,800.00

1,049,600.00

(Rp)

3,043,600.00

7.00
1.00
1.00
1.00
1.00
1.00
11.00
26.00
1.00

bh
bh
bh
bh
bh
bh
ttk
m'
bh
lot

74,800.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
200,700.00
8,200.00
524,800.00
246,700.00

1,049,600.00

523,600.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
2,207,700.00
213,200.00
246,700.00
4,012,700.00

7.00 bh

74,800.00

523,600.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

2.00 bh

Harga Satuan

Jumlah Harga
(Rp)

524,800.00

1,049,600.00

1.00
1.00
1.00
1.00
1.00
-

Jumlah Harga
(Rp)

bh
bh
bh
bh
bh
bh

55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00

1,049,600.00

2.00 bh
-

(Rp)

Harga Satuan

Volume

524,800.00

1,049,600.00

(Rp)
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
1,345,100.00

8.00
1.00
1.00
1.00
1.00
1.00
-

bh
bh
bh
bh
bh
bh
bh

74,800.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00

1,049,600.00

598,400.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
1,419,900.00

8.00 bh

74,800.00

598,400.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

2.00 bh

Harga Satuan

Jumlah Harga
(Rp)

524,800.00

Harga Satuan

Volume

(Rp)

1,049,600.00

1.00
1.00
1.00
1.00
1.00
1.00

(Rp)
bh
bh
bh
bh
bh
bh
lot

55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00
287,900.00

1,049,600.00
4,198,400.00

(Rp)
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
287,900.00
1,707,800.00
8,485,500.00

4.00 ttk
1.00 bh
-

Jumlah Harga

90,400.00
314,200.00

361,600.00
314,200.00
675,800.00

5.00 ttk
1.00 bh
1.00 bh

90,400.00
314,200.00
205,600.00

452,000.00
314,200.00
205,600.00

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga

Volume

(Rp)

Harga Satuan

Jumlah Harga
(Rp)

Harga Satuan

Volume

(Rp)

(Rp)

26,481,600.00

341,073,730.45

(28,377)

90,400.00
314,200.00
205,600.00

271,200.00
314,200.00
205,600.00

77,310,400.00

791,000.00
2,438,600.00
206,277,388.00

341,045,353.20

1,669,528,377.25
###
2,000,000.00
3,500,000.00
1,698,028,377.25
(28,377)

341,045,353.20
( dianggap nol )

Konsultan Pengawas,

(Rp)

971,800.00

3.00 ttk
1.00 bh
1.00 lot

341,073,730.45

Jumlah Harga

Jakarta, 2 Desember 2015


Kontraktor,

PERUBAHAN PEKERJAAN / VOLUME / HARGA


PEKERJAAN TAMBAH

REALISASI ADDENDUM KONTRAK

PEKERJAAN KURANG

Jumlah Harga
(Rp)

Volume

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

Volume

Harga Satuan

Jumlah Harga
(Rp)

SEWUN INDO KONSULTAN

PT. BUARAN RAYA PERMAI

EVI KOMALASARI, SE

EVELINE AGUSTINA HANDINATA


Direktur Utama

(Rp)