PP 5'
HARGA SATUAN
NO
URAIAN PEKERJAAN
Harga Kusen PP5
Penambahan Volume 44 cm
1 Kusen alumunium 4"x 1 1/2''
2 Kaca Tempered 12 mm
3 Sealent
4 Karet
VOLUME
SAT.
1.76 m'
1.276 m2
0.4 m'
2.4 m'
( Rp )
124,000
900,000
6,000
17,000
JUMLAH HARGA
( Rp )
10776000
218,240
1,148,400
2,400
40,800
PP 6'
HARGA SATUAN
NO
URAIAN PEKERJAAN
Harga Kusen PP6
Penambahan Volume 44 cm
1 Kusen alumunium 4"x 1 1/2''
2 Kaca Tempered 12 mm
3 Sealent
4 Karet
VOLUME
SAT.
1.32 m'
2.079 m2
1.32 m'
1.76 m'
( Rp )
124,000
900,000
6,000
17,000
JUMLAH HARGA
( Rp )
19742400
163,680
1,871,100
7,920
29,920
PP 8'
HARGA SATUAN
NO
URAIAN PEKERJAAN
Harga Kusen PP8
Penambahan Volume 44 cm
1 Kusen alumunium 4"x 1 1/2''
2 Kaca Tempered 12 mm
3 Sealent
4 Karet
VOLUME
SAT.
2.64 m'
2.079 m2
3.08 m'
4.4 m'
( Rp )
124,000
900,000
6,000
17,000
JUMLAH HARGA
( Rp )
8910000
327,360
1,871,100
18,480
74,800
PP 9
HARGA SATUAN
NO
URAIAN PEKERJAAN
1 Kusen alumunium 4"x 1 1/2''
2 Kaca Tempered 12 mm
3 Sealent
4 Karet
5 Floor Hings
6 Handle
7 Kunci
VOLUME
SAT.
24.54 m'
17.0715 m2
11.48 m'
24.54 m'
1 Set
1 Set
1 Set
( Rp )
124,000
900,000
6,000
17,000
585,000
375,000
250,000
JUMLAH HARGA
( Rp )
3,042,960
15,364,350
68,880
417,180
585,000
375,000
250,000
HARGA TOTAL
( Rp )
12,185,800
HARGA TOTAL
( Rp )
21,815,000
HARGA TOTAL
( Rp )
11,202,000
HARGA TOTAL
( Rp )
20,103,400
Kebutuhan
Lokasi
Tahun Anggaran
No Kontrrak
:
:
NO
URAIAN
SAT.
(1)
(2)
(3)
KUANTITAS /
KOEFISIEN
(4)
oh
oh
oh
oh
oh
oh
1.895
0.073
0.564
0.073
0.108
0.094
kg
kg
m3
Lbr
m3
54.000
1.350
1.050
0.122
0.042
ls
1.000
Sub Jumlah I :
II. Bahan / Material :
Besi Beton
Kawat Beton
Beton K 175
Multiplek
Kaso 5/7
Sub Jumlah II :
III. Peralatan :
Alat Bantu lainnya
AN PEKERJAAN
ARTA BARAT
HARGA
SATUAN DASAR
(Rp)
(5)
102,920.00
121,230.00
121,213.00
121,230.00
139,574.00
157,901.00
HARGA
(6)
195,033.40
8,849.79
68,364.13
8,849.79
15,073.99
14,842.69
311,013.80
9,600.00
18,200.00
750,000.00
240,000.00
2,100,000.00
518,400.00
24,570.00
787,500.00
29,343.20
88,200.00
###
21,400.00
21,400.00
21,400.00
###
Kebutuhan
Lokasi
Tahun Anggaran
No Kontrrak
:
:
NO
URAIAN
SAT.
(1)
(2)
(3)
KUANTITAS /
KOEFISIEN
(4)
oh
oh
oh
oh
oh
oh
1.895
0.073
0.564
0.073
0.108
0.094
kg
kg
m3
55.000
1.350
1.050
ls
1.000
Sub Jumlah I :
II. Bahan / Material :
Besi Beton
Kawat Beton
Beton K 175
Sub Jumlah II :
III. Peralatan :
Alat Bantu lainnya
AN PEKERJAAN
ARTA BARAT
HARGA
SATUAN DASAR
(Rp)
(5)
102,920.00
121,230.00
121,213.00
121,230.00
139,574.00
157,901.00
HARGA
(6)
195,033.40
8,849.79
68,364.13
8,849.79
15,073.99
14,842.69
311,013.80
9,600.00
18,200.00
750,000.00
528,000.00
24,570.00
787,500.00
###
21,400.00
21,400.00
21,400.00
###
:
:
:
:
:
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
I.
1
2
3
4
5
PEKERJAAN PENDAHULUAN
Pembuatan papan nama proyek
Foto kegiatan 3 phase color
Direksi keet uk. 4 x 6 m2
Listrik kerja
Air kerja
Volume
1.00
3.00
24.00
3.00
3.00
Jumlah I
II
a
1
PEKERJAAN PASANGAN/PLESTERAN
LANTAI 1
Pasangan penebalan Bata pada kolom teras ad 1:4
bh
set
m2
bln
bln
Harga Satuan
Jumlah Harga
(Rp)
977,259.00
164,500.00
1,191,700.00
822,600.00
1,028,200.00
(Rp)
Volume
Harga Satuan
(Rp)
977,259.00
493,500.00
28,600,800.00
2,467,800.00
3,084,600.00
35,623,959.00
3.36 m2
109,800.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
Volume
Harga Satuan
(Rp)
b
1
2
3
4
LANTAI 2
Pasangan Bata pada tangga ad 1:5
Plesteran ad 1: 5 teb 1,5 cm
Acian
Pasang glass block
8.88
17.76
17.76
1.24
m2
m2
m2
m2
109,800.00
56,400.00
22,900.00
549,360.00
c
1
2
3
4
LANTAI 3
Pasangan Bata pada tangga ad 1:4
Plesteran ad 1:4 teb 1,5 cm
Acian
Pasang glass block
10.17
20.34
20.34
1.20
m2
m2
m2
m2
109,800.00
56,400.00
22,900.00
549,360.00
d
1
2
3
LANTAI 4
Plesteran ad 1:5 teb 1,5 cm
Plesteran ad 1:3 teb 1,5 cm
Acian
Pasangan Bata pada tangga ad 1:5
Pasang glass block
Pasang Listplank GRC Motif Betawi
23.54 m2
56,400.00
m2
m2
m2
m'
22,900.00
109,800.00
549,360.00
4
5
6
293.98 m2
95.75 m2
460.41 m2
Jumlah II
56,400.00
54,100.00
22,900.00
16,580,472.00
5,180,075.00
10,543,389.00
32,303,936.00
23.54
11.77
1.20
71.42
166,900.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
III
a
1
2
3
4
5
6
7
8
Volume
14.44
25.20
78.40
48.90
8.80
7.80
17.10
22.52
m2
m'
m2
m2
m'
m'
m'
m2
Harga Satuan
Jumlah Harga
(Rp)
265,300.00
53,400.00
1,233,900.00
152,100.00
904,800.00
193,300.00
53,400.00
230,300.00
4
5
6
7
Lantai 2
Pasang lantai keramik 40/40 cm
Pasang lantai keramik 20/20 cm
Pasang dinding keramik 20/25 cm
'- Pasang dinding keramik 20/40 cm
Plint keramik 10/40 cm
Pasang border keramik 10/20 cm
Pasang keramik tangga 40/40 cm
Pasang keramik anti slip u/tangga
139.56 m2
17.70 m2
71.23 m2
63.90
34.50
13.52
24
m'
m'
m2
m'
3,830,932.00
1,345,680.00
96,737,760.00
7,437,690.00
7,962,240.00
1,507,740.00
913,140.00
5,186,356.00
Harga Satuan
(Rp)
44.48 m2
1,233,900.00
7.36 m2
155,600.00
46.04550 m2
216,900.00
124,921,538.00
Jumlah III A
b
1
2
3
(Rp)
Volume
265,300.00
155,600.00
199,200.00
61,900.00
41,300.00
265,300.00
53,400.00
37,025,268.00
2,754,120.00
14,189,016.00
3,955,410.00
1,424,850.00
3,586,856.00
1,281,600.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
8
9
10
11
12
13
14
16
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
47.36
7.50
18.8
7.50
242.01
18.56
m2
m2
m2
m'
m2
m2
94,500.00
904,800.00
403,000.00
193,300.00
2,000.00
318,300.00
4,475,520.00
6,786,000.00
7,576,400.00
1,449,750.00
484,020.00
5,907,648.00
0.41
0.04
7.20
7.20
3.60
23.49
5.95
5.55
13.12
m3
m3
m'
m'
m'
m2
m2
m2
m2
12,092,200.00
12,092,200.00
97,800.00
73,200.00
13,900.00
109,400.00
37,000.00
41,100.00
60,800.00
4,957,802.00
483,688.00
704,160.00
527,040.00
50,040.00
2,569,806.00
220,150.00
228,105.00
797,696.00
0.09
0.06
12.93
12.93
m3
m3
m2
m'
12,092,200.00
12,092,200.00
109,400.00
37,000.00
1,088,298.00
725,532.00
1,414,542.00
478,410.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
17
18
18
Volume
8.4
1.47
1.00
3.00
12.93
17.82
35.64
17.82
13.40
17.82
m'
m'
bh
bh
m2
m2
m2
m2
m2
m2
Harga Satuan
Jumlah Harga
(Rp)
13,900.00
496,800.00
229,500.00
64,900.00
60,800.00
100,300.00
56,400.00
32,400.00
102,800.00
22,900.00
Lantai 3
Pasang lantai keramik 40/40 cm
Pasang lantai keramik 20/20 cm
Pasang dinding keramik 20/25 cm
'- Pasang dinding keramik 20/40 cm
Plint keramik 10/40 cm
139.78 m2
17.70 m2
83.24 m2
60.58 m'
Harga Satuan
(Rp)
116,760.00
730,296.00
229,500.00
194,700.00
786,144.00
1,787,346.00
2,010,096.00
577,368.00
1,377,520.00
408,078.00
0.14 m2
3.72 m2
33.81 m2
1,780,400.00
155,600.00
87,000.00
85.24 m2
216,900.00
113,359,535.00
Jumlah III B
c
1
2
3
(Rp)
Volume
265,300.00
155,600.00
199,200.00
61,900.00
37,083,634.00
2,754,120.00
16,581,408.00
3,749,902.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
5
6
7
8
9
10
11
12
13
14
15
Volume
33.30
33.32
255.61
7.68
14.89
27.6
7.9
7.5
12.8
1
m'
m2
m2
m2
m2
m'
m2
m'
m2
bh
Harga Satuan
Jumlah Harga
(Rp)
41,300.00
94,500.00
2,000.00
318,300.00
265,300.00
53,400.00
904,800.00
193,300.00
403,000.00
534,600.00
4
5
6
Lantai 4
Pasang lantai keramik 40/40 cm
Pasang lantai keramik 20/20 cm
Pasang dinding keramik 20/25 cm
'- Pasang dinding keramik 20/40 cm
Plint keramik 10/40 cm
Pasang border keramik 10/20 cm
Pasang akrilik tempat wudhu
156.05 m2
26.07 m2
78.75 m2
97.00 m'
32.30 m'
1.20 m'
Harga Satuan
(Rp)
1,375,290.00
3,148,740.00
511,220.00
2,444,544.00
3,950,317.00
1,473,840.00
7,147,920.00
1,449,750.00
5,158,400.00
534,600.00
17.78 m2
87,000.00
80.75 m2
216,900.00
87,363,685.00
Jumlah III C
d
1
2
3
(Rp)
Volume
265,300.00
155,600.00
199,200.00
61,900.00
41,300.00
370,100.00
41,400,065.00
4,056,492.00
15,687,000.00
6,004,300.00
1,333,990.00
444,120.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
7
8
9
10
11
12
13
14
15
Volume
41.91 m2
260.87 m2
13.40 m'
Harga Satuan
Jumlah Harga
(Rp)
94,500.00
2,000.00
102,800.00
4.80
12.80
8.84
2.00
m2
m2
m2
m'
318,300.00
403,000.00
143,900.00
193,300.00
1.00 unt
1.00 unt
23.31 m2
(Rp)
1,200,000.00
1,527,840.00
5,158,400.00
1,272,076.00
386,600.00
Harga Satuan
3,960,495.00
521,740.00
1,377,520.00
1.00 Unit
8.80 m2
27.81 m2
610,200.00
87,000.00
2.00 unt
2.00 unt
6,453,700.00
7,403,400.00
83,130,638.00
408,775,396.00
Jumlah III D
Jumlah Total III
IV
a.
1
2
3
4
5
(Rp)
Volume
5,445,000.00
3,454,900.00
457,700.00
5,445,000.00
3,454,900.00
10,668,987.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
9
10
Lantai 2
Kusen aluminium komplit type P3
Kusen aluminium komplit type PS/pintu shaft
Kusen aluminium komplit type P4
Kusen aluminium komplit type P1'
Kusen aluminium komplit type PR2
Kusen aluminium komplit type PR3
Kusen partisi komplit type PP2
Kusen aluminium komplit type PP3
Pasang horizontal blind
Kusen aluminum type PP4
2.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
18.19
unt
unt
unt
unt
unt
unt
unt
unt
m2
2,961,300.00
1,069,300.00
1,233,900.00
2,303,200.00
3,663,000.00
8,966,300.00
7,403,400.00
12,092,200.00
457,700.00
Lantai 3
Kusen aluminium komplit type P1 Florhing
Kusen aluminium komplit type P3
Kusen aluminium komplit type PS/Shaft
Kusen aluminium komplit type P4
Kusen aluminium komplit type PR4
Kusen aluminium komplit type PR4 tinggi 3,2 m
1.00
2.00
2.00
3.00
1.00
unt
unt
unt
unt
unt
(Rp)
5,922,600.00
3,207,900.00
2,467,800.00
2,303,200.00
3,663,000.00
8,966,300.00
7,403,400.00
12,092,200.00
8,325,563.00
1.00 unt
7,485,600.00
1.00 unt
9,237,300.00
54,351,963.00
Jumlah IV B
c.
1
2
3
4
5
Harga Satuan
19,568,887.00
Jumlah IV A
b.
1
2
3
4
5
6
7
8
(Rp)
Volume
3,619,400.00
2,961,300.00
1,069,300.00
1,233,900.00
8,637,300.00
3,619,400.00
5,922,600.00
2,138,600.00
3,701,700.00
8,637,300.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
6
7
8
9
10
11
Volume
1.00 unt
1.00 unt
1.00 unt
1.00 unt
6.00 m2
Harga Satuan
Jumlah Harga
(Rp)
7,485,600.00
10,776,000.00
19,742,400.00
8,910,000.00
457,700.00
Lantai 4
Kusen aluminium komplit type P1 florhing
Kusen aluminium komplit type PS/Shaft
Kusen aluminium komplit type P3
Kusen aluminium komplit type P4
Kusen aluminium komplit type P5 florhing
Kusen aluminium komplit type PJ2 florhing
Kusen partisi komplit type PP7
Kusen aluminium komplit type PR5
Pasang horizontal blind
Kusen aluminium komplit type PP9
1.00
2.00
3.00
2.00
1.00
1.00
1.00
1.00
28.99
unt
unt
unt
unt
unt
unt
unt
unt
m2
Harga Satuan
(Rp)
7,485,600.00
10,776,000.00
1.00 unt
12,185,800.00
1.00 unt
21,815,000.00
1.00 unt
11,202,000.00
1.00 unt
12,009,900.00
1.00 unt
20,103,400.00
19,742,400.00
8,910,000.00
2,746,200.00
73,679,800.00
Jumlah IV C
d.
1
2
3
4
5
6
7
8
9
10
(Rp)
Volume
3,619,400.00
1,069,300.00
2,961,300.00
1,233,900.00
7,321,100.00
9,459,900.00
12,009,900.00
3,537,100.00
457,700.00
3,619,400.00
2,138,600.00
8,883,900.00
2,467,800.00
7,321,100.00
9,459,900.00
12,009,900.00
3,537,100.00
13,268,723.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
11
12
Volume
Harga Satuan
Jumlah Harga
(Rp)
Kusen jendela J2
Kusen jendela J9
4.00 unt
1.00 unt
62,706,423.00
210,307,073.00
Jumlah IV D
Jumlah Total IV
V
a.
1
2
3
4
5
PEKERJAAN PLAFOND
Lantai 1
Plafond Gypsum tbl 9 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond GRC tbl 4 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond Gypsum
Pas. List profil gypsum uk. 8/8 cm
Pas. List profil gypsum uk. 5/5 cm
110.97
59.29
14.76
92.35
105.60
m2
m2
m2
m'
m'
148,500.00
166,600.00
123,300.00
20,500.00
26,700.00
Lantai 2
Plafond Gypsum tbl 9 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond GRC tbl 4 mm rangka besi hollow 40 x 40 x 0.1 mm
Pas. List profil gypsum uk. 8/8 cm
Pas. List profil gypsum uk. 5/5 cm
Plafond kayu sungkai
101.78
27.49
136.20
46.90
33.12
16,479,045.00
9,877,714.00
1,819,908.00
1,893,175.00
2,819,520.00
32,889,362.00
Jumlah V A
b.
1
2
3
4
5
(Rp)
Volume
m2
m2
m'
m'
m2
148,500.00
166,600.00
20,500.00
26,700.00
267,300.00
15,114,330.00
4,579,834.00
2,792,100.00
1,252,230.00
8,852,976.00
Harga Satuan
(Rp)
6,103,600.00
8,656,000.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
6
7
Volume
64.30 m'
26.50 m'
Harga Satuan
Jumlah Harga
(Rp)
26,700.00
102800
Lantai 3
Plafond Gypsum tbl 9 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond GRC tbl 4 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond Gypsum
Pas. List profil gypsum uk. 8/8 cm
Pas. List profil gypsum uk. 5/5 cm
116.77
27.49
10.68
124.00
46.90
m2
m2
m2
m'
m'
148,500.00
166,600.00
123,300.00
20,500.00
26,700.00
Lantai 4
Plafond Gypsum tbl 9 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond GRC tbl 4 mm rangka besi hollow 40 x 40 x 0.1 mm
Plafond Gypsum
Pas. List profil gypsum uk. 8/8 cm
Pas. List profil gypsum uk. 5/5 cm
126.40
109.11
21.96
142.25
210.70
Jumlah V D
17,340,345.00
4,579,834.00
1,316,844.00
2,542,000.00
1,252,230.00
27,031,253.00
Jumlah V C
d.
1
2
3
4
5
1,716,810.00
2724200
37,032,480.00
Jumlah V B
c.
1
2
3
4
5
(Rp)
m2
m2
m2
m'
m'
148,500.00
166,600.00
123,300.00
20,500.00
26,700.00
18,770,400.00
18,177,726.00
2,707,668.00
2,916,125.00
5,625,690.00
48,197,609.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
145,150,704.00
Jumlah Total V
VI
a.
1
2
PEKERJAAN PENGECATAN
Lantai 1
Cat dinding & kolom beton setara ICI
Cat plafond setara ICI
447.69 m2
170.26 m2
39,100.00
39,100.00
Lantai 2
Cat dinding & kolom beton setara ICI
Cat plafond setara ICI
405.31 m2
129.27 m2
39,100.00
39,100.00
Lantai 3
Cat dinding & kolom beton setara ICI
Cat plafond setara ICI
538.29 m2
144.26 m2
Jumlah VI C
d.
Lantai 4
15,847,621.00
5,054,457.00
20,902,078.00
Jumlah VI B
c.
1
2
17,504,679.00
6,657,166.00
24,161,845.00
Jumlah VI A
b.
1
2
(Rp)
39,100.00
39,100.00
21,047,139.00
5,640,566.00
26,687,705.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
1
2
Volume
460.41 m2
235.51 m2
Harga Satuan
Jumlah Harga
(Rp)
39,100.00
39,100.00
11
PEKERJAAN LAIN-LAIN
Pekerjaan reservoir bawah + R.pompa
Pasang papan nama kantor
Pasang Meja / lemari dapur uk.1,8/0,9 lengkap sesuai gambar
Pasang lemari gantung
Pasang tangga service
Pekerjaan kolam air mancur
Pasang logo DKI stainless steel lengkap sesuai gambar
Pekerjaan bak sampah lengkap sesuai gambar
Pasang lemari dapur 0,9/0,5 lengkap
Pekerjaan pelayanan terpadu
- Pekerjaan back drop
- Pekerjaan meja pelayanan
Pekerjaan Huruf Stainess Steel
- KANTOR LURAH tinggi 30 cm
- KALIANYAR tinggi 45 cm
(Rp)
18,002,031.00
9,208,441.00
unt
unt
unt
unt
bh
bh
unt
unit
unit
35,700,800.00
3,043,600.00
1,974,200.00
6,416,600.00
1,562,900.00
15,835,000.00
13,572,900.00
2,056,500.00
987,100.00
35,700,800.00
3,043,600.00
3,948,400.00
12,833,200.00
1,562,900.00
15,835,000.00
13,572,900.00
2,056,500.00
987,100.00
1.00 unit
1.00 unit
26,816,700.00
9,953,400.00
26,816,700.00
9,953,400.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
Harga Satuan
27,210,472.00
98,962,100.00
Jumlah VI D
Jumlah Total V
VII
1
2
3
4
5
6
7
8
9
10
(Rp)
Volume
11.00 bh
9.00 bh
510,000.00
765,000.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
126,310,500.00
Jumlah VII
VIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
TIANG BENDERA
Galian tanah pondasi
Urugan pasir t = 15 cm
Beton ad. K.225 besi 140 kg/m3
Besi angkur
Pipa besi stainless steel 3" masuk dalam coran
Pipa besi stainless steel 3" tiang bendera
Pipa besi stainless steel 2.5" tiang bendera
Pipa besi stainless steel 2" tiang bendera
Baut 10 + cesing stainless steel
Roda
Tali tiang bendera
Besi diatas tiang bendera
Reducer
Dop penutup atas 2'' stainless steel
Dop penutup stopper 3'' stainless steel
0.81
0.06
0.64
3.00
3.00
2.60
2.00
2.00
2.00
1.00
20.00
1.00
2.00
1.00
2.00
Jumlah VIII
(Rp)
m3
m3
m3
m'
m'
m'
m'
m'
bh
bh
m'
bh
bh
bh
bh
61,600.00
287,900.00
2,591,100.00
41,100.00
287,900.00
287,900.00
241,800.00
193,400.00
61,600.00
28,700.00
16,400.00
28,700.00
69,900.00
61,600.00
98,700.00
49,896.00
17,274.00
1,658,304.00
123,300.00
863,700.00
748,540.00
483,600.00
386,800.00
123,200.00
28,700.00
328,000.00
28,700.00
139,800.00
61,600.00
197,400.00
5,238,814.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
IX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
PEKERJAAN TAMAN
Tanam pohon mangga
Tanam pohon bonsai serut t.100 cm
Tanam pohon palm wodya/ekor tupai t.200 cm
Tanam pohon nanas merah t.30 cm
Tanam pohon nanas kerang t.20 cm
Tanam pohon soka singapur t.30 cm
Tanam pohon lantana saudi t.15 cm
Tanam pohon nuri t.60 cm
Tanam pohon anggrek tanah t.35 cm
Tanam pohon walisongo biasa t.50 cm
Tanam pohon lily brasil t.15 cm
Tanam pohon sansivera/pedang -pedangan t.30 cm
Tanam pohon soka jepang bunga orange t.20 cm
Tanam rumput gajah + pemeliharaan 3 bulan
Tanam pohon rambutan t.100 cm
Tanam pohon jambu air t.400 cm
Tanam pohon sikas medan t.50 cm
Tanam pohon beringin putih t.200 cm
Tanam pohon lili paris bintang t.10 cm
Tanam pohon paris kasar t.20 cm
Tanam pohon boungenville t.60 cm
Volume
2.00
2.00
2.00
20.00
20.00
20.00
20.00
10.00
20.00
5.00
20.00
10.00
5.00
61.20
1.00
1.00
2.00
2.00
20.00
20.00
1.00
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
m2
phn
phn
phn
phn
phn
phn
phn
Harga Satuan
Jumlah Harga
(Rp)
729,400.00
251,400.00
415,900.00
4,800.00
2,600.00
3,000.00
2,400.00
4,900.00
6,500.00
9,700.00
1,400.00
10,600.00
2,400.00
15,600.00
41,900.00
246,100.00
61,300.00
157,800.00
1,800.00
1,900.00
48,600.00
(Rp)
1,458,800.00
502,800.00
831,800.00
96,000.00
52,000.00
60,000.00
48,000.00
49,000.00
130,000.00
48,500.00
28,000.00
106,000.00
12,000.00
954,720.00
41,900.00
246,100.00
122,600.00
315,600.00
36,000.00
38,000.00
48,600.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
22
23
24
25
26
27
28
29
30
Volume
1.00
2.00
2.00
2.00
2.00
2.00
20.00
2.00
50.00
phn
phn
phn
phn
phn
phn
phn
phn
zak
Harga Satuan
Jumlah Harga
(Rp)
5,300.00
37,300.00
4,200.00
9,000.00
7,800.00
7,700.00
2,700.00
414,900.00
12,300.00
PEKERJAAN HALAMAN/PARKIR
Urugan tanah halaman
Penebalan lapisan sirtu pada tebal 20 cm
Penebalan lapisan pasir urug tebal 10 cm
Pasang paving block warna abu-abu tebal 8 cm
Pasang grass block tebal 8 cm
Pasang kanstin beton K400 12 x 15 x 30 x40 cm
Pasang bata dibawah kanstin ad. 1:4
Brapen bata ad. 1:4
Pasang saluran buis beton 30 cm
60.49
25.21
12.60
76.03
50.00
58.00
14.50
29.00
4.00
5,300.00
74,600.00
8,400.00
18,000.00
15,600.00
15,400.00
54,000.00
829,800.00
615,000.00
6,862,520.00
Jumlah IX
X
1
2
3
4
5
6
7
8
9
(Rp)
m2
m3
m2
m2m
m2
m'
m2
m2
m'
160,400.00
308,400.00
288,700.00
176,800.00
157,900.00
115,100.00
100,600.00
37,000.00
106,900.00
9,702,596.00
7,774,764.00
3,637,620.00
13,442,104.00
7,895,000.00
6,675,800.00
1,458,700.00
1,073,000.00
427,600.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
10
11
12
13
14
15
16
17
Volume
39.00
5.00
39.00
89.24
4.00
10.00
m'
bh
m'
m3
bh
bh
Harga Satuan
Jumlah Harga
(Rp)
904,800.00
1,434,300.00
404,900.00
160,400.00
267,300.00
180,800.00
8.53
3.23
2.90
6.05
8.00
11.00
5.20
0.98
1.23
1.00
127,528,280.00
m3
m3
m3
m3
m2
m2
m3
m3
m3
bh
61,600.00
20,500.00
288,700.00
899,800.00
37,000.00
53,400.00
3,167,000.00
732,100.00
160,400.00
8,637,300.00
Harga Satuan
(Rp)
35,287,200.00
7,171,500.00
15,791,100.00
14,314,096.00
1,069,200.00
1,808,000.00
4.46 m3
2.79 m3
Jumlah X
XI
1
2
3
4
5
6
7
8
9
10
(Rp)
Volume
525,448.00
66,215.00
837,230.00
5,443,790.00
296,000.00
587,400.00
16,468,400.00
717,458.00
197,292.00
8,637,300.00
1,702,400.00
288,700.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
11
Volume
1.00 bh
Harga Satuan
Jumlah Harga
(Rp)
2,673,400.00
9.00
26.96
10.4
2.02
2.98
27.32
73.68
1.81
1.25
28.76
72.27
15.80
13.00
37.10
42.67
2.20
28.17
2,673,400.00
36,449,933.00
Jumlah XI
XII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
(Rp)
bh
m3
m'
m3
m3
m3
m2
m3
m3
m2
m2
m'
bh
m'
m2
m3
m2
102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
4,668,900.00
4,959,200.00
100,600.00
56,400.00
14,300.00
57,500.00
534,600.00
39,100.00
160,400.00
272,700.00
925,200.00
1,660,736.00
170,560.00
3,572,370.00
860,326.00
24,582,536.00
2,726,160.00
8,450,709.00
6,199,000.00
2,893,256.00
4,076,028.00
225,940.00
747,500.00
19,833,660.00
1,668,397.00
352,880.00
7,681,959.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
18
19
20
Volume
6.67 m3
51.01 m2
17.94 m2
Harga Satuan
Jumlah Harga
(Rp)
20,500.00
22,900.00
53,400.00
6.00
23.25
8.8
1.82
3.05
23.37
46.67
1.10
1.08
0.53
63.12
126.34
89.80
26.17
152.51
136,735.00
1,168,129.00
957,996.00
88,890,077.00
Jumlah XII
XIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
(Rp)
bh
m3
m'
m3
m3
m3
m2
m3
m3
m3
m2
m2
m'
m2
m2
102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
5,689,100.00
4,959,200.00
5,379,800.00
100,600.00
56,400.00
51,500.00
41,100.00
39,100.00
616,800.00
1,432,200.00
144,320.00
3,218,670.00
880,535.00
21,028,326.00
1,726,790.00
6,258,010.00
5,355,936.00
2,851,294.00
6,349,872.00
7,125,576.00
4,624,700.00
1,075,587.00
5,963,141.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
16
17
18
19
20
21
Volume
8.80
11.00
45.00
5.92
152.51
22.98
m2
bh
m'
m3
m2
m2
Harga Satuan
Jumlah Harga
(Rp)
272,700.00
57,500.00
6,100.00
20,500.00
22,900.00
53,400.00
1.00
4.66
0.8
0.16
0.61
5.07
10.08
0.08
0.22
0.11
10.22
20.43
2,399,760.00
632,500.00
274,500.00
121,360.00
3,492,479.00
1,227,132.00
76,799,488.00
Jumlah XIII
XIV
1
2
3
4
5
6
7
8
9
10
11
12
(Rp)
bh
m3
m'
m3
m3
m3
m2
m3
m3
m3
m2
m2
102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
5,689,100.00
4,959,200.00
5,379,800.00
100,600.00
56,400.00
102,800.00
287,056.00
13,120.00
282,960.00
176,107.00
4,561,986.00
372,960.00
455,128.00
1,091,024.00
591,778.00
1,028,132.00
1,152,252.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
13
14
15
16
17
18
19
20
Volume
15.80
25.11
0.62
5.70
1.19
25.11
4.68
5.33
m'
m2
m2
m'
m3
m2
m2
m2
Harga Satuan
Jumlah Harga
(Rp)
51,500.00
39,100.00
272,700.00
6,100.00
20,500.00
22,900.00
41,100.00
53,400.00
1
2
3
4
5
6
7
PEKERJAAN MEKANIKAL
PEKERJAAN INSTALASI PLUMBING
LANTAI 1
SANITAIR FIXTURES
Kran tembok 1/2" San El
Wastafel TOTO 521/237 lengkap kran + kaca cermin
Urinoir TOTO U57M type muslim lengkap flush valve
Partisi Urinoir TOTO / AW 115J W/Fitting
Closet jongkok TOTO CE. 6
Closet duduk / Mono Blok Toto CW420 J/SW420 J lengkap
Floor drain TOTO 2
5.00
4.00
2.00
2.00
2.00
1.00
6.00
813,700.00
981,801.00
169,074.00
34,770.00
24,395.00
575,019.00
192,348.00
284,622.00
13,191,032.00
Jumlah XIV
A
1
a.
(Rp)
bh
bh
bh
bh
bh
bh
bh
123,300.00
1,933,100.00
2,267,900.00
903,200.00
636,600.00
2,413,500.00
216,300.00
616,500.00
7,732,400.00
4,535,800.00
1,806,400.00
1,273,200.00
2,413,500.00
1,297,800.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
8
9
10
11
Volume
1.00
1.00
1.00
1.00
bh
bh
bh
bh
Harga Satuan
Jumlah Harga
(Rp)
216,300.00
216,300.00
245,100.00
205,600.00
(Rp)
216,300.00
216,300.00
245,100.00
205,600.00
20,558,900.00
Jumlah PL LT 1
b.
1
2
3
4
5
6
7
3.00
3.00
3.00
54.00
3.00
1.00
10.26
bh
bh
m'
m'
m'
lot
m3
140,600.00
143,900.00
22,200.00
29,600.00
45,200.00
246,700.00
51,800.00
421,800.00
431,700.00
66,600.00
1,598,400.00
135,600.00
246,700.00
531,468.00
1
2
3
4
5
6
1.00
1.00
27.00
22.00
3.00
1.00
bh
bh
m'
m'
m'
lot
390,700.00
41,100.00
13,100.00
5,700.00
29,600.00
123,300.00
390,700.00
41,100.00
353,700.00
125,400.00
88,800.00
123,300.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
4,555,268.00
Jml PL Halaman
c.
1
2
1.00 bh
1.00 bh
6,498,500.00
5,427,100.00
1
2
3
4
5
6
7
8
9
10
11
6,498,500.00
5,427,100.00
11,925,600.00
Jumlah POMPA
d,
(Rp)
LANTAI 2
SANITAIR FIXTURES
Kran tembok 1/2" San El
Wastafel TOTO 521/237 lengkap kran + kaca cermin + kaki
Urinoir TOTO U57M type muslim lengkap flush valve
Partisi Urinoir TOTO / AW 115J W/Fitting
Closet jongkok TOTO CE. 6
Floor drain TOTO 2"
Floor clean out TOTO 2""
Closet clean out TOTO 4"
Kran leher angsa
Kitzen zink
Alat bantu dan sambung
3.00
3.00
2.00
2.00
2.00
4.00
2.00
2.00
1.00
1.00
1.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lot
123,300.00
1,933,100.00
2,267,900.00
869,400.00
636,600.00
216,300.00
216,300.00
216,300.00
224,500.00
349,600.00
205,600.00
369,900.00
5,799,300.00
4,535,800.00
1,738,800.00
1,273,200.00
865,200.00
432,600.00
432,600.00
224,500.00
349,600.00
205,600.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
16,227,100.00
Jumlah PL LT 2
e.
1
2
3
4
5
6
7
8
9
10
11
12
LANTAI 3
SANITAIR FIXTURES
Kran tembok 1/2" TOTO T.23.B13.V7N
Wastafel TOTO 521/237 lengkap kran + kaca cermin + kaki
Urinoir TOTO U57M type muslim lengkap flush valve
Partisi Urinoir TOTO / AW 115J W/Fitting
Closet jongkok TOTO CE. 6
Closet duduk / Mono Blok TOTO CW420 J/SW420 J lengkap
Shower double kran
Toilet shower Set TOTO
Floor drain TOTO 2"
Floor clean out TOTO 2""
Closet clean out TOTO 4"
Alat bantu dan sambung
5.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
7.00
2.00
2.00
1.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lot
Jumlah PL LT 3
f.
(Rp)
LANTAI 4
INSTALASI AIR BERSIH (Pipa GIP Medium Class)
123,300.00
1,933,100.00
2,267,900.00
869,400.00
636,600.00
2,410,200.00
505,800.00
245,200.00
216,300.00
216,300.00
216,300.00
205,600.00
616,500.00
3,866,200.00
4,535,800.00
1,738,800.00
1,273,200.00
2,410,200.00
505,800.00
245,200.00
1,514,100.00
432,600.00
432,600.00
205,600.00
17,776,600.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
1
2
3
13.00 ttk
4.00 m'
1.00 bh
177,600.00
45,200.00
97,800.00
2,308,800.00
180,800.00
97,800.00
1
2
11.00 ttk
4.00 m'
132,400.00
32,900.00
1,456,400.00
131,600.00
1
2
7.00 ttk
4.00 m'
208,900.00
50,100.00
1,462,300.00
200,400.00
123,300.00
1,933,100.00
2,267,900.00
903,200.00
636,600.00
216,300.00
216,300.00
216,300.00
205,600.00
863,100.00
5,799,300.00
6,803,700.00
2,709,600.00
1,273,200.00
1,297,800.00
432,600.00
432,600.00
205,600.00
1
2
3
4
5
6
7
8
9
SANITAIR FIXTURES
Kran tembok 1/2" San Ei
Wastafel TOTO 521/237 lengkap kran + kaca cermin
Urinoir TOTO U57M type muslim lengkap flush valve
Partisi Urinoir TOTO / AW 115J W/Fitting
Closet jongkok TOTO CE. 6
Floor drain TOTO 2 TX 1 AN
Floor clean out TOTO 2"
Closet clean out TOTO 4"
Alat bantu dan sambung
7.00
3.00
3.00
3.00
2.00
6.00
2.00
2.00
1.00
bh
bh
bh
bh
bh
bh
bh
bh
lot
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
g.
1
2
h.
1
2
(Rp)
4.00 ttk
100.00 m'
4.00 bh
132,400.00
32,900.00
278,000.00
1.00 ttk
25.00 m'
208,900.00
50,100.00
1.00 ttk
25.00 m'
132,400.00
32,900.00
Harga Satuan
25,655,600.00
Jumlah PL LT 4
f.
1
2
3
(Rp)
Volume
96,699,068.00
1.00 bh
9,048,600.00
9,048,600.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
2
3
4
5
6
Volume
Harga Satuan
Jumlah Harga
(Rp)
1.00 bh
6,117,100.00
6,117,100.00
1.00 bh
3,084,700.00
3,084,700.00
3.00 ttk
3.00 ttk
3.00 ttk
205,600.00
69,900.00
115,100.00
616,800.00
209,700.00
345,300.00
19,422,200.00
Jumlah AC LT 1
b.
1
2
3
4
5
LANTAI 2
AC dinding 1,5 PK type Single Split Low Watt lengkap kompresor
terpasang
AC dinding 1 PK type Single Split Low Watt lengkap kompresor
terpasang
Instalasi pemipaan refrigerant lengkap isolasi
Instalasi drain AC pipa PVC/AW 1/2"
Instalasi kabel dari OU ke FCU NYM 3x2,5 mm2
1.00 bh
6,117,100.00
6,117,100.00
1.00 bh
4,729,900.00
4,729,900.00
2.00 ttk
2.00 ttk
2.00 ttk
205,600.00
69,900.00
115,100.00
411,200.00
139,800.00
230,200.00
Jumlah AC LT 2
c.
(Rp)
LANTAI 3
11,628,200.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
1
2
3
4
5
6
Volume
Harga Satuan
Jumlah Harga
(Rp)
2.00 bh
6,117,100.00
12,234,200.00
1.00 bh
4,729,900.00
4,729,900.00
1.00 bh
3,701,700.00
3,701,700.00
4.00 ttk
4.00 ttk
4.00 ttk
205,600.00
69,900.00
115,100.00
822,400.00
279,600.00
460,400.00
22,228,200.00
Jumlah AC LT 3
d.
1
2
3
4
5
(Rp)
LANTAI 4
AC dinding 1,5 PK type Single Split Low Watt lengkap kompresor
terpasang
AC dinding 3/4 PK type Single Split Low Watt lengkap kompresor
terpasang
Instalasi pemipaan refrigerant lengkap isolasi
Instalasi drain AC pipa PVC/AW 1/2"
Instalasi kabel dari OU ke FCU NYM 3x2,5 mm2
3.00 bh
6,174,700.00
18,524,100.00
1.00 bh
3,701,700.00
3,701,700.00
4.00 ttk
4.00 ttk
4.00 ttk
205,600.00
69,900.00
115,100.00
822,400.00
279,600.00
460,400.00
Jumlah AC LT 4
23,788,200.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
PEKERJAAN ELEKTRIKAL
PEKERJAAN INSTALASI LISTRIK
LANTAI 1
Titik Lampu kabel NYM 3 x 2,5 mm2 lengkap conduit
Titik stop kontak NYM 3 x 2,5 mm2 lengkap conduit
ARMATURE
Lampu down Light RD 175 STD SL 18 watt
Saklar tunggal
Stop kontak biasa
1
2
3
4
5
6
6.00
6.00
55.00
9.90
15.00
1.00
bh
bh
m'
m3
m'
lot
Harga Satuan
(Rp)
77,066,800.00
Jumlah Total AC
B.
1
a.
(Rp)
Volume
452,400.00
199,800.00
84,700.00
51,800.00
8,200.00
164,500.00
2,714,400.00
1,198,800.00
4,658,500.00
512,820.00
123,000.00
164,500.00
2.00 ttk
1.00 ttk
296,300.00
504,700.00
2.00 bh
2.00 bh
1.00 bh
205,600.00
38,600.00
30,400.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
9,372,020.00
JUMLAH EL LT 1
1
2
3
4
5
6
7
8
9
10
11
12
13
LANTAI 2
ARMATURE
Lampu TL 5 Balk 1x28 watt/54
Lampu Linear Baten T5 RTK 2x28 w/54 TKI
Lampu down Light RD 175 STD SL 18 watt
Lampu wastafel TL 1x18 w (GMS)/54 ACR SAVY
Lampu SL 18 Watt + fitting E27 Rosset savy white
Celling Fan 50 watt
Lampu baret TL bulat 20 watt
Exhaust fan 12 " CTMFV27CD6
Saklar tunggal
Saklar seri
Stop kontak biasa
Stop kontak AC
Rak kabel trey ukuran T. 5 cm, L. 30 cm termasuk ruang shaft
2.00
5.00
24.00
3.00
5.00
2.00
5.00
4.00
4.00
11.00
12.00
6.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
39.00 m'
JUMLAH EL LT 2
c.
LANTAI 3
ARMATURE
(Rp)
306,000.00
420,300.00
205,600.00
228,600.00
64,100.00
370,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00
612,000.00
2,101,500.00
4,934,400.00
685,800.00
320,500.00
740,200.00
962,000.00
1,398,400.00
154,400.00
587,400.00
364,800.00
295,800.00
9,750,000.00
22,907,200.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
1
2
3
4
5
6
7
8
9
10
11
Volume
10.00
5.00
2.00
5.00
5.00
2.00
3.00
12.00
15.00
5.00
26.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
Harga Satuan
Jumlah Harga
(Rp)
420,300.00
205,600.00
228,600.00
64,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00
1
2
3
1
2
LANTAI 4
Pemipaan & Pengabelan
Titik Lampu kabel NYM 3 x 2,5 mm2 lengkap conduit
Titik stop kontak NYM 3 x 2,5 mm2 lengkap conduit
Titik stop kontak AC lengkap conduit
ARMATURE
Lampu linear Baten T5 RTK 2x28 w/54 TKI
Lampu down Light RD 175 STD SL 18 watt
(Rp)
4,203,000.00
1,028,000.00
457,200.00
320,500.00
962,000.00
699,200.00
115,800.00
640,800.00
456,000.00
246,500.00
6,500,000.00
35.00 ttk
9.00 ttk
4.00 m'
11.00 bh
8.00 bh
Harga Satuan
15,629,000.00
JUMLAH EL LT 3
d.
(Rp)
Volume
420,300.00
205,600.00
4,623,300.00
1,644,800.00
296,300.00
504,700.00
651,200.00
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
3
4
5
6
7
8
9
10
11
12
Volume
3.00
6.00
4.00
3.00
5.00
10.00
9.00
4.00
26.00
1.00
bh
bh
bh
bh
bh
bh
bh
bh
m'
lot
Harga Satuan
Jumlah Harga
(Rp)
228,600.00
64,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00
411,300.00
1.00 set
685,800.00
384,600.00
769,600.00
1,048,800.00
193,000.00
534,000.00
273,600.00
197,200.00
6,500,000.00
411,300.00
17,266,000.00
65,174,220.00
JUMLAH EL LT 4
TOTAL JUMLAH EL
II
1
(Rp)
3,043,600.00
3,043,600.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
III
a.
1
2
3
4
5
6
7
8
9
10
7.00
1.00
1.00
1.00
1.00
1.00
11.00
26.00
2.00
1.00
bh
bh
bh
bh
bh
bh
ttk
m'
bh
lot
74,800.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
200,700.00
8,200.00
524,800.00
246,700.00
5,062,300.00
JUMLAH FA LT 1
b.
1
LANTAI 2
Rate of Rise heat detector
7.00 bh
523,600.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
2,207,700.00
213,200.00
1,049,600.00
246,700.00
74,800.00
523,600.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
2
3
4
5
6
7
Volume
1.00
1.00
1.00
1.00
1.00
2.00
bh
bh
bh
bh
bh
bh
Harga Satuan
Jumlah Harga
(Rp)
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00
LANTAI 3
Rate of Rise heat detector
Indicator lamp
Alarm bell
Manual push button
Terminal box 12 paie
EOL Resistor
Alat pemadan api ringan Ap-25P
8.00
1.00
1.00
1.00
1.00
1.00
2.00
bh
bh
bh
bh
bh
bh
bh
74,800.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00
598,400.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
1,049,600.00
2,469,500.00
JUMLAH FA LT 3
d.
1
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
1,049,600.00
2,394,700.00
JUMLAH FA LT 2
c.
1
2
3
4
5
6
7
(Rp)
LANTAI 4
Rate of Rise heat detector
8.00 bh
74,800.00
598,400.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
2
3
4
5
6
7
8
Volume
1.00
1.00
1.00
1.00
1.00
2.00
1.00
bh
bh
bh
bh
bh
bh
lot
Harga Satuan
Jumlah Harga
(Rp)
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00
287,900.00
4.00 ttk
1.00 bh
90,400.00
314,200.00
LANTAI 3
Outlet telpon
Box terminal cabang IDF 6 Pair
Pesawat telepon
5.00 ttk
1.00 bh
1.00 bh
361,600.00
314,200.00
675,800.00
JUMLAH TELPON LT 2
b.
1
2
3
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
1,049,600.00
287,900.00
2,757,400.00
12,683,900.00
JUMLAH FA LT 4
TOTAL JUMLAH FA
IV
a.
1
2
(Rp)
90,400.00
314,200.00
205,600.00
452,000.00
314,200.00
205,600.00
Volume
Harga Satuan
(Rp)
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
LANTAI 4
Outlet telpon
Box terminal cabang IDF 6 Pair
Testing commissioning system telepon
3.00 ttk
1.00 bh
1.00 lot
90,400.00
314,200.00
205,600.00
JUMLAH TELPON LT 4
TOTAL JUMLAH TELPON
TOTAL PEK. MEKANIKAL/ELEKTRIKAL
JUMLAH HARGA DASAR
PENYAMBUNGAN BARU DAYA PLN 23000 VA
PENYAMBUNGAN TELEPON 1 (SATU) LINE
PENYAMBUNGAN PDAM BARU
TOTAL BIAYA
SELISIH PEKERJAAN TAMBAH KURANG
Mengetahui,
Harga Satuan
(Rp)
971,800.00
JUMLAH TELPON LT 3
d.
1
2
3
(Rp)
Volume
271,200.00
314,200.00
205,600.00
791,000.00
2,438,600.00
257,106,188.00
1,669,500,000.00
23,000,000.00
2,000,000.00
3,500,000.00
1,698,000,000.00
Konsultan Pengawas,
KONTRAK SEMULA
PERUB
PEKERJAAN TAMBAH
No.
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
Volume
Harga Satuan
(Rp)
EVI KOMALASARI, SE
Direktur Utama
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
1.00
3.00
24.00
3.00
3.00
-
368,928.00
Harga Satuan
Volume
(Rp)
Jumlah Harga
(Rp)
bh
set
m2
bln
bln
977,259.00
164,500.00
1,191,700.00
822,600.00
1,028,200.00
(Rp)
977,259.00
493,500.00
28,600,800.00
2,467,800.00
3,084,600.00
35,623,959.00
3.36 m'
109,800.00
368,928.00
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
Harga Satuan
Jumlah Harga
(Rp)
Harga Satuan
Volume
(Rp)
Jumlah Harga
(Rp)
(Rp)
974,749.50
1,001,382.00
406,589.50
681,206.40
8.88
17.76
17.76
1.24
m2
m2
m2
m2
109,800.00
56,400.00
22,900.00
549,360.00
-
974,749.50
1,001,382.00
406,589.50
681,206.40
1,116,830.70
1,147,345.20
465,854.70
659,232.00
10.17
20.34
20.34
1.20
m2
m2
m2
m2
109,800.00
56,400.00
22,900.00
549,360.00
1,116,830.70
1,147,345.20
465,854.70
659,232.00
1,327,374.00
317.52
95.75
483.95
11.77
1.20
71.42
m2
m2
m2
m2
m2
m1
56,400.00
54,100.00
22,900.00
109,800.00
549,360.00
166,900.00
17,907,846.00
5,180,075.00
11,082,340.50
1,292,071.50
659,232.00
11,919,998.00
538,951.50
1,292,071.50
659,232.00
11,919,998.00
22,559,745.00
Jumlah II
54,863,681.00
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
54,883,872.00
48.90 m2
152,100.00
54,883,872.00
7,437,690.00
7,437,690.00
41.01
265,300.00
10,879,953.00
71.23 m2
199,200.00
14,189,016.00
61,900.00
41,300.00
687,090.00
607,110.00
1,145,216.00
9,987,268.95
11.10
14.70
Harga Satuan
Volume
14.44
25.20
122.88
8.80
7.80
17.10
22.52
Jumlah Harga
(Rp)
m2
m'
m2
m2
m'
m'
m'
m2
265,300.00
53,400.00
1,233,900.00
152,100.00
904,800.00
193,300.00
53,400.00
230,300.00
3,830,932.00
1,345,680.00
151,621,632.00
7,962,240.00
1,507,740.00
913,140.00
5,186,356.00
172,367,720.00
Jumlah III A
98.55
25.06
46.05
52.80
19.80
13.52
24.00
(Rp)
m2
m2
m2
m2
m'
m'
m2
m'
265,300.00
155,600.00
199,200.00
216,900.00
61,900.00
41,300.00
265,300.00
53,400.00
26,145,315.00
3,899,336.00
9,987,268.95
3,268,320.00
817,740.00
3,586,856.00
1,281,600.00
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
Harga Satuan
Volume
Jumlah Harga
(Rp)
(Rp)
47.36
7.50
18.80
7.50
242.01
18.56
m2
m2
m2
m'
m2
m2
94,500.00
904,800.00
403,000.00
193,300.00
2,000.00
318,300.00
4,475,520.00
6,786,000.00
7,576,400.00
1,449,750.00
484,020.00
5,907,648.00
0.41
0.04
7.20
7.20
3.60
23.49
5.95
5.55
13.12
m3
m3
m'
m'
m'
m2
m2
m2
m2
12,092,200.00
12,092,200.00
97,800.00
73,200.00
13,900.00
109,400.00
37,000.00
41,100.00
60,800.00
4,957,802.00
483,688.00
704,160.00
527,040.00
50,040.00
2,569,806.00
220,150.00
228,105.00
797,696.00
0.09
0.06
12.93
12.93
m3
m3
m2
m'
12,092,200.00
12,092,200.00
109,400.00
37,000.00
1,088,298.00
725,532.00
1,414,542.00
478,410.00
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
8.40
1.47
1.00
3.00
12.93
17.82
35.64
17.82
13.40
17.82
242,134.40
578,832.00
2,941,644.00
14,895,095.35
26,363,169.00
83.24 m2
18,488,556.00
199,200.00
16,581,408.00
Harga Satuan
Volume
Jumlah Harga
(Rp)
(Rp)
m'
m'
bh
bh
m2
m2
m2
m2
m2
m2
13,900.00
496,800.00
229,500.00
64,900.00
60,800.00
100,300.00
56,400.00
32,400.00
102,800.00
22,900.00
116,760.00
730,296.00
229,500.00
194,700.00
786,144.00
1,787,346.00
2,010,096.00
577,368.00
1,377,520.00
408,078.00
0.14 m2
3.72 m2
33.81 m2
Jumlah III B
1,780,400.00
155,600.00
87,000.00
242,134.40
578,832.00
2,941,644.00
101,891,461.35
265,300.00
155,600.00
199,200.00
216,900.00
61,900.00
37,083,634.00
2,754,120.00
18,488,556.00
3,749,902.00
139.78
17.70
85.24
60.58
m2
m2
m2
m2
m'
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
bh
Harga Satuan
Jumlah Harga
(Rp)
534,600.00
(Rp)
534,600.00
1,546,860.00
20,035,416.00
17,514,675.00
17,116,008.00
78.75 m2
199,200.00
15,687,000.00
Harga Satuan
Volume
33.30
33.32
255.61
7.68
14.89
27.60
7.90
7.50
12.80
17.78
Jumlah Harga
(Rp)
m'
m2
m2
m2
m2
m'
m2
m'
m2
bh
m2
41,300.00
94,500.00
2,000.00
318,300.00
265,300.00
53,400.00
904,800.00
193,300.00
403,000.00
534,600.00
87,000.00
1,375,290.00
3,148,740.00
511,220.00
2,444,544.00
3,950,317.00
1,473,840.00
7,147,920.00
1,449,750.00
5,158,400.00
1,546,860.00
90,283,093.00
Jumlah III C
156.05
26.07
80.75
97.00
32.30
1.20
(Rp)
m2
m2
m2
m2
m'
m'
m'
265,300.00
155,600.00
199,200.00
216,900.00
61,900.00
41,300.00
370,100.00
41,400,065.00
4,056,492.00
17,514,675.00
6,004,300.00
1,333,990.00
444,120.00
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
13.40 m'
Harga Satuan
Jumlah Harga
(Rp)
102,800.00
(Rp)
1,377,520.00
1,200,000.00
5,369,760.00
2,419,470.00
26,503,905.00
116,318,288.35
17,064,520.00
67,981,387.00
23.31 m2
12,907,400.00
14,806,800.00
457,700.00
10,668,987.00
Harga Satuan
Volume
41.91
260.87
1.00
4.80
12.80
8.84
2.00
8.80
27.81
Jumlah Harga
(Rp)
m2
m2
94,500.00
2,000.00
m'
unit
m2
m2
m2
m'
m2
m2
102,800.00
1,200,000.00
318,300.00
403,000.00
143,900.00
193,300.00
610,200.00
87,000.00
unt
unt
m2
unt
unt
3,960,495.00
521,740.00
1,200,000.00
1,527,840.00
5,158,400.00
1,272,076.00
386,600.00
5,369,760.00
2,419,470.00
92,570,023.00
457,112,297.35
Jumlah III D
Jumlah Total III
1.00
1.00
2.00
2.00
(Rp)
5,445,000.00
3,454,900.00
457,700.00
6,453,700.00
7,403,400.00
5,445,000.00
3,454,900.00
12,907,400.00
14,806,800.00
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
Harga Satuan
Jumlah Harga
(Rp)
27,714,200.00
(Rp)
10,668,987.00
1.00 unt
7,403,400.00
7,403,400.00
18.19 m2
457,700.00
8,325,563.00
7,485,600.00
7,485,600.00
15,728,963.00
1.00 unt
9,237,300.00
8,637,300.00
8,637,300.00
Harga Satuan
Volume
Jumlah Harga
(Rp)
36,614,100.00
Jumlah IV A
2.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
unt
unt
unt
unt
unt
unt
unt
unt
m2
unt
2,961,300.00
1,069,300.00
1,233,900.00
2,303,200.00
3,663,000.00
8,966,300.00
7,403,400.00
12,092,200.00
457,700.00
7,485,600.00
5,922,600.00
3,207,900.00
2,467,800.00
2,303,200.00
3,663,000.00
8,966,300.00
12,092,200.00
7,485,600.00
46,108,600.00
Jumlah IV B
1.00
2.00
2.00
3.00
1.00
(Rp)
unt
unt
unt
unt
unt
unt
3,619,400.00
2,961,300.00
1,069,300.00
1,233,900.00
8,637,300.00
9,237,300.00
3,619,400.00
5,922,600.00
2,138,600.00
3,701,700.00
9,237,300.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
-
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
1.00 unt
1.00 unt
7,485,600.00
10,776,000.00
7,485,600.00
10,776,000.00
1.00 unt
19,742,400.00
19,742,400.00
1.00 unt
8,910,000.00
8,910,000.00
6.00 m2
457,700.00
2,746,200.00
12,185,800.00
21,815,000.00
11,202,000.00
12,009,900.00
66,450,000.00
20,103,400.00
58,297,500.00
1.00 unt
12,009,900.00
12,009,900.00
28.99 m2
457,700.00
13,268,723.00
Harga Satuan
Volume
Jumlah Harga
(Rp)
1.00
1.00
1.00
-
unt
unt
unt
unt
unt
unt
unt
m2
1.00 unt
7,485,600.00
10,776,000.00
12,185,800.00
19,742,400.00
21,815,000.00
8,910,000.00
11,202,000.00
457,700.00
12,009,900.00
12,185,800.00
21,815,000.00
11,202,000.00
12,009,900.00
81,832,300.00
Jumlah IV C
1.00
2.00
3.00
2.00
1.00
1.00
1.00
1.00
(Rp)
unt
unt
unt
unt
unt
unt
unt
unt
m2
unt
3,619,400.00
1,069,300.00
2,961,300.00
1,233,900.00
7,321,100.00
9,459,900.00
12,009,900.00
3,537,100.00
457,700.00
20,103,400.00
3,619,400.00
2,138,600.00
8,883,900.00
2,467,800.00
7,321,100.00
9,459,900.00
3,537,100.00
20,103,400.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
24,414,400.00
8,656,000.00
25,278,623.00
109,974,073.00
110.97
39.04
14.76
92.35
67.50
m2
m2
m2
m'
m'
148,500.00
166,600.00
123,300.00
20,500.00
26,700.00
16,479,045.00
6,504,064.00
1,819,908.00
1,893,175.00
1,802,250.00
28,498,442.00
Jumlah Harga
(Rp)
4.00 unt
1.00 unt
53,173,800.00
154,823,600.00
Harga Satuan
Volume
6,103,600.00
8,656,000.00
m2
m2
m2
m'
m'
148,500.00
166,600.00
123,300.00
20,500.00
26,700.00
3,373,650.00
1,017,270.00
4,390,920.00
Jumlah V A
101.78
27.49
136.20
46.90
33.12
24,414,400.00
8,656,000.00
90,601,600.00
255,156,600.00
Jumlah IV D
Jumlah Total IV
20.25
38.10
(Rp)
m2
m2
m'
m'
m2
148,500.00
166,600.00
20,500.00
26,700.00
267,300.00
15,114,330.00
4,579,834.00
2,792,100.00
1,252,230.00
8,852,976.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
Harga Satuan
Volume
(Rp)
(Rp)
64.30 m'
26.50 m'
-
Jumlah V D
(Rp)
1,716,810.00
2724200
37,032,480.00
m2
m2
m2
m'
m'
148,500.00
166,600.00
123,300.00
20,500.00
26,700.00
17,340,345.00
4,579,834.00
1,316,844.00
2,542,000.00
1,252,230.00
27,031,253.00
Jumlah V C
126.40
109.11
21.96
142.25
210.70
-
26,700.00
102800
Jumlah V B
116.77
27.49
10.68
124.00
46.90
-
Jumlah Harga
m2
m2
m2
m'
m'
148,500.00
166,600.00
123,300.00
20,500.00
26,700.00
18,770,400.00
18,177,726.00
2,707,668.00
2,916,125.00
5,625,690.00
48,197,609.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
-
Harga Satuan
Jumlah Harga
(Rp)
Volume
(Rp)
28,498,442.00
Jumlah VI C
(Rp)
116,652,262.00
39,100.00
39,100.00
17,504,679.00
6,657,166.00
24,161,845.00
39,100.00
39,100.00
15,847,621.00
5,054,457.00
20,902,078.00
Jumlah VI B
538.29 m2
144.26 m2
-
(Rp)
Jumlah VI A
405.31 m2
129.27 m2
-
Jumlah Harga
Jumlah Total V
447.69 m2
170.26 m2
-
Harga Satuan
39,100.00
39,100.00
21,047,139.00
5,640,566.00
26,687,705.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
Harga Satuan
Volume
(Rp)
(Rp)
460.41 m2
235.51 m2
-
unt
unt
bh
bh
1,974,200.00
6,416,600.00
1,562,900.00
15,835,000.00
3,948,400.00
12,833,200.00
1,562,900.00
15,835,000.00
1.00 unit
1.00 unit
2,056,500.00
987,100.00
2,056,500.00
987,100.00
2.00
2.00
1.00
1.00
5,610,000.00
6,885,000.00
Jumlah Harga
39,100.00
39,100.00
18,002,031.00
9,208,441.00
27,210,472.00
98,962,100.00
Jumlah VI D
Jumlah Total V
1.00
1.00
1.00
-
(Rp)
unt
unt
unt
unt
bh
bh
unt
unit
unit
35,700,800.00
3,043,600.00
1,974,200.00
6,416,600.00
1,562,900.00
15,835,000.00
13,572,900.00
2,056,500.00
987,100.00
35,700,800.00
3,043,600.00
13,572,900.00
-
1.00 unit
1.00 unit
26,816,700.00
9,953,400.00
26,816,700.00
9,953,400.00
510,000.00
765,000.00
5,610,000.00
6,885,000.00
11.00 bh
9.00 bh
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
12,495,000.00
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
37,223,100.00
Jumlah Harga
(Rp)
Jumlah VIII
(Rp)
101,582,400.00
Jumlah VII
0.81
0.06
0.64
3.00
3.00
2.60
2.00
2.00
2.00
1.00
20.00
1.00
2.00
1.00
2.00
-
Harga Satuan
Volume
m3
m3
m3
m'
m'
m'
m'
m'
bh
bh
m'
bh
bh
bh
bh
61,600.00
287,900.00
2,591,100.00
41,100.00
287,900.00
287,900.00
241,800.00
193,400.00
61,600.00
28,700.00
16,400.00
28,700.00
69,900.00
61,600.00
98,700.00
49,896.00
17,274.00
1,658,304.00
123,300.00
863,700.00
748,540.00
483,600.00
386,800.00
123,200.00
28,700.00
328,000.00
28,700.00
139,800.00
61,600.00
197,400.00
5,238,814.00
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
2.00
2.00
2.00
20.00
20.00
20.00
20.00
10.00
20.00
5.00
20.00
10.00
5.00
61.20
1.00
1.00
2.00
2.00
20.00
20.00
1.00
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
m2
phn
phn
phn
phn
phn
phn
phn
Harga Satuan
Jumlah Harga
(Rp)
729,400.00
251,400.00
415,900.00
4,800.00
2,600.00
3,000.00
2,400.00
4,900.00
6,500.00
9,700.00
1,400.00
10,600.00
2,400.00
15,600.00
41,900.00
246,100.00
61,300.00
157,800.00
1,800.00
1,900.00
48,600.00
(Rp)
1,458,800.00
502,800.00
831,800.00
96,000.00
52,000.00
60,000.00
48,000.00
49,000.00
130,000.00
48,500.00
28,000.00
106,000.00
12,000.00
954,720.00
41,900.00
246,100.00
122,600.00
315,600.00
36,000.00
38,000.00
48,600.00
Harga Satuan
Volume
Jumlah Harga
(Rp)
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
m2
phn
phn
phn
phn
phn
phn
phn
729,400.00
251,400.00
415,900.00
4,800.00
2,600.00
3,000.00
2,400.00
4,900.00
6,500.00
9,700.00
1,400.00
10,600.00
2,400.00
15,600.00
41,900.00
246,100.00
61,300.00
157,800.00
1,800.00
1,900.00
48,600.00
(Rp)
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
1.00
2.00
2.00
2.00
2.00
2.00
20.00
2.00
50.00
-
phn
phn
phn
phn
phn
phn
phn
phn
zak
Harga Satuan
Jumlah Harga
(Rp)
5,300.00
37,300.00
4,200.00
9,000.00
7,800.00
7,700.00
2,700.00
414,900.00
12,300.00
(Rp)
5,300.00
74,600.00
8,400.00
18,000.00
15,600.00
15,400.00
54,000.00
829,800.00
615,000.00
6,862,520.00
Harga Satuan
Volume
-
Jumlah Harga
(Rp)
phn
phn
phn
phn
phn
phn
phn
phn
zak
5,300.00
37,300.00
4,200.00
9,000.00
7,800.00
7,700.00
2,700.00
414,900.00
12,300.00
Jumlah IX
60.49
25.21
12.60
76.03
50.00
58.00
14.50
29.00
4.00
(Rp)
m2
m3
m2
m2m
m2
m'
m2
m2
m'
160,400.00
308,400.00
288,700.00
176,800.00
157,900.00
115,100.00
100,600.00
37,000.00
106,900.00
9,702,596.00
7,774,764.00
3,637,620.00
13,442,104.00
7,895,000.00
6,675,800.00
1,458,700.00
1,073,000.00
427,600.00
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
1.00 m'
5.00 bh
904,800.00
1,434,300.00
904,800.00
7,171,500.00
10.00 bh
180,800.00
1,808,000.00
7,590,933.50
804,563.60
8,395,497.10
9,884,300.00
Harga Satuan
Volume
38.00
39.00
89.24
4.00
4.46
2.79
Jumlah Harga
(Rp)
m'
bh
m'
m3
bh
bh
m'
m'
904,800.00
1,434,300.00
404,900.00
160,400.00
267,300.00
180,800.00
1,702,400.00
288,700.00
34,382,400.00
15,791,100.00
14,314,096.00
1,069,200.00
7,590,933.50
804,563.60
126,039,477.10
Jumlah X
8.53
3.23
2.90
6.05
8.00
11.00
5.20
0.98
1.23
1.00
(Rp)
m3
m3
m3
m3
m2
m2
m3
m3
m3
bh
61,600.00
20,500.00
288,700.00
899,800.00
37,000.00
53,400.00
3,167,000.00
732,100.00
160,400.00
8,637,300.00
525,448.00
66,215.00
837,230.00
5,443,790.00
296,000.00
587,400.00
16,468,400.00
717,458.00
197,292.00
8,637,300.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
Harga Satuan
Volume
(Rp)
(Rp)
1.00 bh
-
Jumlah Harga
2,673,400.00
2,673,400.00
36,449,933.00
Jumlah XI
9.00
26.96
10.40
2.02
2.98
27.32
73.68
1.81
1.25
28.76
72.27
15.80
13.00
37.10
42.67
2.20
28.17
(Rp)
bh
m3
m'
m3
m3
m3
m2
m3
m3
m2
m2
m'
bh
m'
m2
m3
m2
102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
4,668,900.00
4,959,200.00
100,600.00
56,400.00
14,300.00
57,500.00
534,600.00
39,100.00
160,400.00
272,700.00
925,200.00
1,660,736.00
170,560.00
3,572,370.00
860,326.00
24,582,536.00
2,726,160.00
8,450,709.00
6,199,000.00
2,893,256.00
4,076,028.00
225,940.00
747,500.00
19,833,660.00
1,668,397.00
352,880.00
7,681,959.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
Harga Satuan
Volume
(Rp)
(Rp)
6.67 m3
51.01 m2
17.94 m2
-
50.54 m2
56,400.00
2,850,230.40
Jumlah Harga
20,500.00
22,900.00
53,400.00
136,735.00
1,168,129.00
957,996.00
88,890,077.00
Jumlah XII
6.00
23.25
8.80
1.82
3.05
23.37
46.67
1.10
1.08
0.53
63.12
75.80
89.80
26.17
152.51
(Rp)
bh
m3
m'
m3
m3
m3
m2
m3
m3
m3
m2
m2
m'
m2
m2
102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
5,689,100.00
4,959,200.00
5,379,800.00
100,600.00
56,400.00
51,500.00
41,100.00
39,100.00
616,800.00
1,432,200.00
144,320.00
3,218,670.00
880,535.00
21,028,326.00
1,726,790.00
6,258,010.00
5,355,936.00
2,851,294.00
6,349,872.00
4,275,345.60
4,624,700.00
1,075,587.00
5,963,141.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
8.80
11.00
45.00
5.92
152.51
22.98
-
2,850,230.40
8.17 m2
56,400.00
460,900.80
Harga Satuan
Volume
Jumlah Harga
(Rp)
m2
bh
m'
m3
m2
m2
272,700.00
57,500.00
6,100.00
20,500.00
22,900.00
53,400.00
2,399,760.00
632,500.00
274,500.00
121,360.00
3,492,479.00
1,227,132.00
73,949,257.60
Jumlah XIII
1.00
4.66
0.80
0.16
0.61
5.07
10.08
0.08
0.22
0.11
10.22
12.26
(Rp)
bh
m3
m'
m3
m3
m3
m2
m3
m3
m3
m2
m2
102,800.00
61,600.00
16,400.00
1,768,500.00
288,700.00
899,800.00
37,000.00
5,689,100.00
4,959,200.00
5,379,800.00
100,600.00
56,400.00
102,800.00
287,056.00
13,120.00
282,960.00
176,107.00
4,561,986.00
372,960.00
455,128.00
1,091,024.00
591,778.00
1,028,132.00
691,351.20
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
15.80
25.11
0.62
5.70
1.19
25.11
4.68
5.33
-
460,900.80
Harga Satuan
Volume
Jumlah Harga
(Rp)
m'
m2
m2
m'
m3
m2
m2
m2
51,500.00
39,100.00
272,700.00
6,100.00
20,500.00
22,900.00
41,100.00
53,400.00
813,700.00
981,801.00
169,074.00
34,770.00
24,395.00
575,019.00
192,348.00
284,622.00
12,730,131.20
Jumlah XIV
5.00
4.00
2.00
2.00
2.00
1.00
6.00
(Rp)
bh
bh
bh
bh
bh
bh
bh
123,300.00
1,933,100.00
2,267,900.00
903,200.00
636,600.00
2,413,500.00
216,300.00
616,500.00
7,732,400.00
4,535,800.00
1,806,400.00
1,273,200.00
2,413,500.00
1,297,800.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
1.00
1.00
1.00
1.00
-
bh
bh
m'
m'
m'
lot
390,700.00
41,100.00
13,100.00
5,700.00
29,600.00
123,300.00
390,700.00
41,100.00
353,700.00
125,400.00
88,800.00
123,300.00
Jumlah Harga
(Rp)
bh
bh
bh
bh
216,300.00
216,300.00
245,100.00
205,600.00
(Rp)
216,300.00
216,300.00
245,100.00
205,600.00
20,558,900.00
Jumlah PL LT 1
3.00
3.00
3.00
54.00
3.00
1.00
10.26
1.00
1.00
27.00
22.00
3.00
1.00
Harga Satuan
Volume
bh
bh
m'
m'
m'
lot
m3
140,600.00
143,900.00
22,200.00
29,600.00
45,200.00
246,700.00
51,800.00
bh
bh
m'
m'
m'
lot
390,700.00
41,100.00
13,100.00
5,700.00
29,600.00
123,300.00
421,800.00
431,700.00
66,600.00
1,598,400.00
135,600.00
246,700.00
531,468.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
Harga Satuan
Volume
(Rp)
1,123,000.00
(Rp)
(Rp)
3,432,268.00
Jml PL Halaman
1.00 bh
1.00 bh
-
Jumlah Harga
6,498,500.00
5,427,100.00
6,498,500.00
5,427,100.00
11,925,600.00
3.00
3.00
2.00
2.00
2.00
4.00
2.00
2.00
1.00
1.00
1.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lot
123,300.00
1,933,100.00
2,267,900.00
869,400.00
636,600.00
216,300.00
216,300.00
216,300.00
224,500.00
349,600.00
205,600.00
369,900.00
5,799,300.00
4,535,800.00
1,738,800.00
1,273,200.00
865,200.00
432,600.00
432,600.00
224,500.00
349,600.00
205,600.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
Jumlah Harga
(Rp)
(Rp)
16,227,100.00
5.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
7.00
2.00
2.00
1.00
-
Harga Satuan
Volume
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lot
123,300.00
1,933,100.00
2,267,900.00
869,400.00
636,600.00
2,410,200.00
505,800.00
245,200.00
216,300.00
216,300.00
216,300.00
205,600.00
616,500.00
3,866,200.00
4,535,800.00
1,738,800.00
1,273,200.00
2,410,200.00
505,800.00
245,200.00
1,514,100.00
432,600.00
432,600.00
205,600.00
17,776,600.00
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
Harga Satuan
Volume
Jumlah Harga
(Rp)
(Rp)
13.00 ttk
4.00 m'
1.00 bh
177,600.00
45,200.00
97,800.00
2,308,800.00
180,800.00
97,800.00
11.00 ttk
4.00 m'
132,400.00
32,900.00
1,456,400.00
131,600.00
7.00 ttk
4.00 m'
208,900.00
50,100.00
1,462,300.00
200,400.00
123,300.00
1,933,100.00
2,267,900.00
903,200.00
636,600.00
216,300.00
216,300.00
216,300.00
205,600.00
863,100.00
5,799,300.00
6,803,700.00
2,709,600.00
1,273,200.00
1,297,800.00
432,600.00
432,600.00
205,600.00
7.00
3.00
3.00
3.00
2.00
6.00
2.00
2.00
1.00
bh
bh
bh
bh
bh
bh
bh
bh
lot
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
Harga Satuan
Volume
(Rp)
Jumlah Harga
(Rp)
(Rp)
25,655,600.00
529,600.00
3,290,000.00
1,112,000.00
4.00 ttk
100.00 m'
4.00 bh
132,400.00
32,900.00
278,000.00
529,600.00
3,290,000.00
1,112,000.00
208,900.00
1,252,500.00
1.00 ttk
25.00 m'
208,900.00
50,100.00
208,900.00
1,252,500.00
132,400.00
822,500.00
1.00 ttk
25.00 m'
132,400.00
32,900.00
132,400.00
822,500.00
7,347,900.00
7,347,900.00
1,123,000.00
1.00 bh
9,048,600.00
9,048,600.00
7,347,900.00
102,923,968.00
bh
9,048,600.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
Jumlah Harga
(Rp)
(Rp)
1.00 bh
6,117,100.00
6,117,100.00
bh
6,117,100.00
1.00 bh
3,084,700.00
3,084,700.00
bh
3,084,700.00
3.00 ttk
3.00 ttk
3.00 ttk
205,600.00
69,900.00
115,100.00
(Rp)
Harga Satuan
Volume
18,250,400.00
616,800.00
209,700.00
345,300.00
1,171,800.00
Jumlah AC LT 1
1.00 bh
6,117,100.00
6,117,100.00
bh
6,117,100.00
1.00 bh
4,729,900.00
4,729,900.00
bh
4,729,900.00
2.00 ttk
2.00 ttk
2.00 ttk
205,600.00
69,900.00
115,100.00
10,847,000.00
Jumlah AC LT 2
411,200.00
139,800.00
230,200.00
781,200.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
Harga Satuan
Volume
Jumlah Harga
(Rp)
(Rp)
2.00 bh
6,117,100.00
12,234,200.00
bh
6,117,100.00
1.00 bh
4,729,900.00
4,729,900.00
bh
4,729,900.00
1.00 bh
3,701,700.00
3,701,700.00
bh
3,701,700.00
4.00 ttk
4.00 ttk
4.00 ttk
205,600.00
69,900.00
115,100.00
20,665,800.00
822,400.00
279,600.00
460,400.00
1,562,400.00
Jumlah AC LT 3
3.00 bh
6,174,700.00
18,524,100.00
bh
6,174,700.00
1.00 bh
3,701,700.00
3,701,700.00
bh
3,701,700.00
4.00 ttk
4.00 ttk
4.00 ttk
205,600.00
69,900.00
115,100.00
22,225,800.00
Jumlah AC LT 4
822,400.00
279,600.00
460,400.00
1,562,400.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
-
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
71,989,000.00
Harga Satuan
Volume
Jumlah Harga
(Rp)
(Rp)
5,077,800.00
Jumlah Total AC
592,600.00
504,700.00
2.00 ttk
1.00 ttk
296,300.00
504,700.00
592,600.00
504,700.00
411,200.00
77,200.00
30,400.00
2.00 bh
2.00 bh
1.00 bh
205,600.00
38,600.00
30,400.00
411,200.00
77,200.00
30,400.00
452,400.00
199,800.00
84,700.00
51,800.00
8,200.00
164,500.00
2,714,400.00
1,198,800.00
4,658,500.00
512,820.00
123,000.00
164,500.00
6.00
6.00
55.00
9.90
15.00
1.00
bh
bh
m'
m3
m'
lot
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
1,616,100.00
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
Jumlah Harga
(Rp)
(Rp)
10,988,120.00
2.00
5.00
24.00
3.00
5.00
2.00
5.00
4.00
4.00
11.00
12.00
6.00
39.00
-
Harga Satuan
Volume
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
JUMLAH EL LT 2
306,000.00
420,300.00
205,600.00
228,600.00
64,100.00
370,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00
612,000.00
2,101,500.00
4,934,400.00
685,800.00
320,500.00
740,200.00
962,000.00
1,398,400.00
154,400.00
587,400.00
364,800.00
295,800.00
9,750,000.00
22,907,200.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
10.00
5.00
2.00
5.00
5.00
2.00
3.00
12.00
15.00
5.00
26.00
-
10,370,500.00
4,542,300.00
2,604,800.00
Harga Satuan
Volume
Jumlah Harga
(Rp)
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
420,300.00
205,600.00
228,600.00
64,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00
(Rp)
4,203,000.00
1,028,000.00
457,200.00
320,500.00
962,000.00
699,200.00
115,800.00
640,800.00
456,000.00
246,500.00
6,500,000.00
15,629,000.00
JUMLAH EL LT 3
35.00 ttk
9.00 bh
4.00 m'
296,300.00
504,700.00
651,200.00
10,370,500.00
4,542,300.00
2,604,800.00
11.00 bh
8.00 bh
420,300.00
205,600.00
4,623,300.00
1,644,800.00
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
3.00
6.00
4.00
3.00
5.00
10.00
9.00
4.00
26.00
1.00
17,517,600.00
19,133,700.00
Harga Satuan
Volume
Jumlah Harga
(Rp)
bh
bh
bh
bh
bh
bh
bh
bh
m'
lot
228,600.00
64,100.00
192,400.00
349,600.00
38,600.00
53,400.00
30,400.00
49,300.00
250,000.00
411,300.00
(Rp)
685,800.00
384,600.00
769,600.00
1,048,800.00
193,000.00
534,000.00
273,600.00
197,200.00
6,500,000.00
411,300.00
34,783,600.00
84,307,920.00
1.00 set
3,043,600.00
3,043,600.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
Jumlah Harga
(Rp)
2.00 bh
Harga Satuan
Volume
524,800.00
1,049,600.00
(Rp)
3,043,600.00
7.00
1.00
1.00
1.00
1.00
1.00
11.00
26.00
1.00
bh
bh
bh
bh
bh
bh
ttk
m'
bh
lot
74,800.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
200,700.00
8,200.00
524,800.00
246,700.00
1,049,600.00
523,600.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
2,207,700.00
213,200.00
246,700.00
4,012,700.00
7.00 bh
74,800.00
523,600.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
2.00 bh
Harga Satuan
Jumlah Harga
(Rp)
524,800.00
1,049,600.00
1.00
1.00
1.00
1.00
1.00
-
Jumlah Harga
(Rp)
bh
bh
bh
bh
bh
bh
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00
1,049,600.00
2.00 bh
-
(Rp)
Harga Satuan
Volume
524,800.00
1,049,600.00
(Rp)
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
1,345,100.00
8.00
1.00
1.00
1.00
1.00
1.00
-
bh
bh
bh
bh
bh
bh
bh
74,800.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00
1,049,600.00
598,400.00
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
1,419,900.00
8.00 bh
74,800.00
598,400.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
2.00 bh
Harga Satuan
Jumlah Harga
(Rp)
524,800.00
Harga Satuan
Volume
(Rp)
1,049,600.00
1.00
1.00
1.00
1.00
1.00
1.00
(Rp)
bh
bh
bh
bh
bh
bh
lot
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
524,800.00
287,900.00
1,049,600.00
4,198,400.00
(Rp)
55,100.00
213,800.00
99,500.00
410,400.00
42,700.00
287,900.00
1,707,800.00
8,485,500.00
4.00 ttk
1.00 bh
-
Jumlah Harga
90,400.00
314,200.00
361,600.00
314,200.00
675,800.00
5.00 ttk
1.00 bh
1.00 bh
90,400.00
314,200.00
205,600.00
452,000.00
314,200.00
205,600.00
PEKERJAAN KURANG
Jumlah Harga
Volume
(Rp)
Harga Satuan
Jumlah Harga
(Rp)
Harga Satuan
Volume
(Rp)
(Rp)
26,481,600.00
341,073,730.45
(28,377)
90,400.00
314,200.00
205,600.00
271,200.00
314,200.00
205,600.00
77,310,400.00
791,000.00
2,438,600.00
206,277,388.00
341,045,353.20
1,669,528,377.25
###
2,000,000.00
3,500,000.00
1,698,028,377.25
(28,377)
341,045,353.20
( dianggap nol )
Konsultan Pengawas,
(Rp)
971,800.00
3.00 ttk
1.00 bh
1.00 lot
341,073,730.45
Jumlah Harga
PEKERJAAN KURANG
Jumlah Harga
(Rp)
Volume
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
Volume
Harga Satuan
Jumlah Harga
(Rp)
EVI KOMALASARI, SE
(Rp)