KABUPATEN KOLAKA
RENCANA ANGGARAN
BIAYA
(R A B)
REHABILITASI INTERIOR RUANG RAPAT
PARIPURNA DEWAN PERWAKILAN RAKYAT
DAERAH KAB. KOLAKA
KONSULTAN PERENCANA :
: PEKERJAAN INTERIOR
: PEKERJAAN REHABILITASI INTERIOR RUANG SIDANG PARIPURNA DPRD KAB. KOLAKA
: 2014
: KANTOR DPRD KAB. KOLAKA
No.
JUMLAH
HARGA
A
I
II
III
IV
V
PEKERJAAN LANTAI 1
PEKERJAAN PERSIAPAN
PEKERJAAN PENUTUP LANTAI & DINDING
PEKERJAAN PLAFON
PEKERJAAN PENGECETAN
PEKERJAAN INSTALASI LISTRIK
1
2
REAL COST
PPN 10%
JUMLAH ( 1+2 )
414,199,916.28
41,419,991.63
455,619,907.91
DIBULATKAN
455,600,000.00
2,000,000.00
336,347,759.78
55,982,485.00
7,419,671.50
12,450,000.00
TERBILANG : " EMPAT RATUS LIMA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH "
Disetujui Oleh :
PEJABAT PEMBUAT KOMITMEN (PPK)
SEKRETARIAT DAERAH KAB. KOLAKA
Di Buat Oleh :
CV. YUDHA PRATAMA KONSULTAN
: PEKERJAAN INTERIOR
: PEKERJAAN REHABILITASI INTERIOR RUANG SIDANG PARIPURNA DPRD KAB. KOLAKA
TAHUN ANGGARAN
: 2014
LOKASI
NO.
VOLUME
SAT
I
1
2
PEKERJAAN PERSIAPAN
Administrasi, Dokumentasi dan P3K
Papan Proyek
II
1
2
3
4
5
6
7
8
9
HARGA
SATUAN
5
JUMLAH
HARGA
6
1.00
1.00
Ls
Ls
1,500,000.00
500,000.00
2,000,000.00
1,500,000.00
500,000.00
355.00
58.00
380.00
9.46
80.00
80.00
40.00
3.00
80.80
M2
M2
M2
M2
M2
M2
M2
M2
M2
415,659.00
369,025.00
128,264.00
44,593.00
122,280.00
550,285.00
464,069.00
464,069.00
550,285.00
336,347,759.78
147,558,945.00
21,403,450.00
48,740,320.00
421,849.78
9,782,400.00
44,022,800.00
18,562,760.00
1,392,207.00
44,463,028.00
III
1
2
3
4
PEKERJAAN PLAFON
Pek. Rangka Plafond Panggung & Balkon
Pek. Plafond Panggung Multipleks 9mm Lapis HPL
Pek. Plafond Balkon( Gipsumboard 9 mm )
Pek. List Plafond Gipsumboard Balkon
162.00
90.00
85.00
28.00
M2
M2
M2
M1
56,815.00
464,069.00
44,233.00
44,730.00
55,982,485.00
9,204,030.00
41,766,210.00
3,759,805.00
1,252,440.00
IV
1
PEKERJAAN PENGECETAN
Pek. Pengecetan Plafond Balkon & Plafon Lama
215.00
M2
34,510.10
7,419,671.50
7,419,671.50
V
1
2
3
4
5
6.00
12.00
6.00
24.00
3.00
Titik
Titik
Titik
Titik
Titik
300,000.00
220,000.00
525,000.00
200,000.00
20,000.00
12,450,000.00
1,800,000.00
2,640,000.00
3,150,000.00
4,800,000.00
60,000.00
: PEKERJAAN INTERIOR
SATUAN
3
HARGA
('Rp.)
4
Hari
Hari
Hari
Hari
Hari
Hari
64,000.00
76,000.00
83,000.00
83,000.00
83,000.00
97,000.00
M3
M3
Lbr
Lbr
Lbr
Lbr
Lbr
M1
Kg
Lbr
3,500,000.00
3,000,000.00
100,000.00
120,000.00
193,000.00
250,000.00
82,000.00
32,000.00
10,000.00
85,000.00
Kg
Kg
M1
M1
M1
M1
27,000.00
30,000.00
27,000.00
16,000.00
25,000.00
22,000.00
1
2
3
4
5
6
7
8
9
10
C. Finishing
Plamir Tembok
Cat Dasar
Cat Tembok Nippon Paint
Wall Paper
Lapisan Bahan Taco HPL
Aluminium Foil
Karpet Interior
Lem Vinyl
Lem Fox Kuning
Vinyl Motif
Kg
Kg
Kg
M2
M2
M2
M2
Kg
Kg
Lbr
10,000.00
15,000.00
95,000.00
80,000.00
250,000.00
15,000.00
310,000.00
70,000.00
70,000.00
29,000.00
1
2
3
4
5
6
7
8
9
10
11
12
D. Bahan Listrik
MBX500 2XCDMT, 2x70W
MBS145 1XCDMT 35W
Baret lamp 1 x 18 W
GMS Tangga
Lampu Sorot 150 W
Saklar Tunggal
Saklar Ganda
Neon Box 2 x 10 W
Hans Lamp Mercury 50 w
Instalasi Penerangan NYM 3 x 2,5 mm2 3/4 pip cond
Instalasi kotak kontak NYM 3 x 2,5 mm2 3/4 pip cond
Down Light 18 Watt
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
300,000.00
200,000.00
220,000.00
275,000.00
350,000.00
15,000.00
20,000.00
1,250,000.00
525,000.00
200,000.00
200,000.00
170,000.00
: PEKERJAAN INTERIOR
: PEKERJAAN REHABILITASI INTERIOR RUANG SIDANG PARIPURNA DPRD KAB. KOLAKA
: 2014
: KANTOR DPRD KAB. KOLAKA
Harga
(SNI 2835-2008)
Jumlah
Kwantitas
Satuan
Harga
TENAGA KERJA
Pekerja
Org/Hari
64,000.00
0.750
Mandor
Org/Hari
76,000.00
0.025
1,900.00
Tukang Interior
Org/Hari
83,000.00
0.170
14,110.00
Kepala Tukang
Org/Hari
97,000.00
0.017
1,649.00
65,659.00
Jumlah
B
BAHAN
Carpet
m2
310,000.00
1.050
Lem Vinyl
Kg
70,000.00
0.350
Jumlah
Harga Satuan A + B
2
No.
325,500.00
24,500.00
B
Harga
Kwantitas
Satuan
48,000.00
350,000.00
415,659.00
(SNI 2835-2008)
Jumlah
Harga
TENAGA KERJA
Pekerja
Org/Hari
64,000.00
0.0200
Mandor
Org/Hari
76,000.00
0.0025
190.00
Tukang Interior
Org/Hari
83,000.00
0.200
16,600.00
Kepala Tukang
Org/Hari
97,000.00
0.0020
Jumlah
B
BAHAN
1
2
Wall Paper
Perekat
Jumlah
Harga Satuan A + B
3
No.
A
1
2
3
4
B
1
2
m2
Kg
3
No.
80,000.00
70,000.00
Harga
Satuan
1,280.00
194.00
18,264.00
1.200
0.200
B
96,000.00
14,000.00
110,000.00
128,264.00
Kwantitas
(SNI 2835-2008)
Jumlah
Harga
Org/Hari
Org/Hari
Org/Hari
Org/Hari
64,000.00
76,000.00
83,000.00
97,000.00
0.1500
0.0080
0.050
0.0050
A
9,600.00
608.00
4,150.00
485.00
14,843.00
m2
Kg
15,000.00
70,000.00
1.050
0.200
B
15,750.00
14,000.00
29,750.00
44,593.00
Harga
Satuan
Kwantitas
(SNI 2835-2008)
Jumlah
Harga
TENAGA KERJA
Pekerja
Org/Hari
64,000.00
0.1500
Mandor
Org/Hari
76,000.00
0.0075
570.00
Tukang Interior
Org/Hari
83,000.00
0.150
12,450.00
Kepala Tukang
Org/Hari
97,000.00
0.0150
1,455.00
24,075.00
11.050
0.350
B
320,450.00
24,500.00
344,950.00
369,025.00
Jumlah
BAHAN
Vinyl Motif
Lem Vinyl
Jumlah
Harga Satuan A + B
Bh
Kg
29,000.00
70,000.00
9,600.00
4
No.
A
1
2
3
4
B
1
2
5
No.
A
1
2
3
4
B
1
2
6
No.
A
1
2
3
4
B
1
2
7
No.
A
1
2
3
4
B
1
2
8
No.
A
1
2
3
4
B
1
2
3
Anl. 6.8.
Anl. 6.7.
0.0500
0.0050
0.1000
0.0050
4,150.00
485.00
6,400.00
380.00
11,415.00
M1
Kg
16,000.00
27,000.00
2.5000
0.2000
40,000.00
5,400.00
45,400.00
56,815.00
(SNI 2839-2008)
Jumlah
Harga
83,000.00
97,000.00
64,000.00
76,000.00
0.050
0.005
0.100
0.0050
4,150.00
485.00
6,400.00
380.00
11,415.00
Lbr
Kg
82,000.00
27,000.00
0.364
0.110
29,848.00
2,970.00
32,818.00
44,233.00
Kwantitas
(SNI 2839-2008)
Jumlah
Harga
Org/Hari
Org/Hari
Org/Hari
Org/Hari
83,000.00
97,000.00
64,000.00
76,000.00
0.060
0.006
0.060
0.0030
4,980.00
582.00
3,840.00
228.00
9,630.00
M1
Kg
32,000.00
10,000.00
1.050
0.150
33,600.00
1,500.00
35,100.00
44,730.00
Kwantitas
(SNI 2839-2008)
Jumlah
Harga
Org/Hari
Org/Hari
Org/Hari
Org/Hari
83,000.00
97,000.00
64,000.00
76,000.00
0.100
0.010
0.070
0.0035
8,300.00
970.00
4,480.00
266.00
14,016.00
Lbr
Kg
85,000.00
30,000.00
0.364
0.110
30,940.00
3,300.00
34,240.00
48,256.00
TENAGA KERJA
Tukang Metal Stud
Kepala Tukang
Pekerja
Mandor
Jumlah
BAHAN
Rangka Metal Stud (MS 100) uk.100x34 mm
Rangka U Runner (U 100) uk.100x30 mm
Paku Skrup
Jumlah
Harga Satuan A + B
Kwantitas
Org/Hari
Org/Hari
Org/Hari
Org/Hari
TENAGA KERJA
Tukang Plafond Kalsiboard
Kepala Tukang
Pekerja
Mandor
Jumlah
BAHAN
Kalsiboard
Paku Sekrup
Jumlah
Harga Satuan A + B
Anl
83,000.00
97,000.00
64,000.00
76,000.00
TENAGA KERJA
Tukang List Profil Gipsum
Kepala Tukang
Pekerja
Mandor
Jumlah
BAHAN
List Gipsum profil
Tepung Gypsum
Jumlah
Harga Satuan A + B
Jumlah
Harga
Org/Hari
Org/Hari
Org/Hari
Org/Hari
TENAGA KERJA
Tukang Plafond Gipsumboard
Kepala Tukang
Pekerja
Mandor
Jumlah
BAHAN
Gipsumboard
Paku Sekrup
Jumlah
Harga Satuan A + B
Kwantitas
Harga
Satuan
Kwantitas
Jumlah
Harga
Org/Hari
Org/Hari
Org/Hari
Org/Hari
83,000.00
97,000.00
64,000.00
76,000.00
0.3500
0.1200
0.3800
0.0200
29,050.00
11,640.00
24,320.00
1,520.00
66,530.00
M1
M1
Kg
25,000.00
22,000.00
30,000.00
1.4500
0.7500
0.1000
36,250.00
16,500.00
3,000.00
55,750.00
122,280.00
9
No.
A
1
2
3
4
B
1
2
3
4
10
No.
A
1
2
3
4
B
1
2
3
4
5
11
No.
A
1
2
3
4
B
1
2
3
Anl
TENAGA KERJA
Tukang
Kepala Tukang
Pekerja
Mandor
Jumlah
BAHAN
Multipleks 9mm
Paku
Perekat
HPL
Jumlah
Harga Satuan A + B
Anl
Kwantitas
83,000.00
97,000.00
64,000.00
76,000.00
0.270
0.027
0.950
0.0350
22,410.00
2,619.00
60,800.00
2,660.00
88,489.00
Lbr
Kg
Kg
M2
193,000.00
30,000.00
70,000.00
250,000.00
0.360
0.220
0.350
1.100
69,480.00
6,600.00
24,500.00
275,000.00
375,580.00
464,069.00
Kwantitas
Jumlah
Harga
Org/Hari
Org/Hari
Org/Hari
Org/Hari
83,000.00
97,000.00
64,000.00
76,000.00
0.350
0.035
1.200
0.0400
29,050.00
3,395.00
76,800.00
3,040.00
112,285.00
Lbr
Lbr
Kg
Kg
M2
100,000.00
250,000.00
30,000.00
70,000.00
250,000.00
0.360
0.360
0.300
0.400
1.100
36,000.00
90,000.00
9,000.00
28,000.00
275,000.00
438,000.00
550,285.00
TENAGA KERJA
Tukang Cat
Kepala Tukang
Pekerja
Mandor
Jumlah
BAHAN
Plamir
Cat dasar
Cat tembok/penutup 2 X Nippon Paint
Jumlah
Harga Satuan A + B
Jumlah
Harga
Org/Hari
Org/Hari
Org/Hari
Org/Hari
TENAGA KERJA
Tukang Kayu
Kepala Tukang
Pekerja
Mandor
Jumlah
BAHAN
Multipleks 4mm
Multipleks 12mm
Paku
Perekat
HPL
Jumlah
Harga Satuan A + B
Anl. 6.14.
Harga
Satuan
(SNI 03-2002)
Jumlah
Harga
Org/Hari
Org/Hari
Org/Hari
Org/Hari
83,000.00
97,000.00
64,000.00
76,000.00
0.0630
0.0063
0.0200
0.0025
5,229.00
611.10
1,280.00
190.00
7,310.10
Kg
Kg
Kg
10,000.00
15,000.00
95,000.00
0.1000
0.1000
0.2600
1,000.00
1,500.00
24,700.00
27,200.00
34,510.10