HARGA SATUAN

NO. URAIAN PEKERJAAN VOLUME SAT


(Rp)
B PEKERJAAN ZONA A (SELASAR 1 LANTAI)

B.2 PEKERJAAN STRUKTUR

Pekerjaan Kolom Baja

Pekerjaan Kolom baja type K1 WF 200.100.5,5.8 mm

1 Pas.Base Plat 250x350x10 mm 288.49 Kg Rp 27,736.41

2 Pek. Angkur HEX M-16 mm, Grade 36, panjang total 60 cm 168.00 set Rp 65,920.00

3 WF 200.100.5,5.8 2,817.99 Kg Rp 27,736.41

4 Pek. Meni besi Zinhromate 113.19 m2 Rp 11,467.20

5 Pek. Cemen Grouting 3.68 m2 Rp 100,000.00

Pekerjaan Kolom baja type K2 WF 250.125.6.9 mm

1 Pas.Base Plat 300x400x12 mm 90.44 Kg Rp 27,736.41

2 Pek. Angkur HEX M-19 mm, Grade 36, panjang total 60 cm 48.00 set Rp 65,920.00

3 WF 250.125.6.9 994.56 Kg Rp 27,736.41

4 Pek. Meni besi Zinhromate 35.52 m2 Rp 11,467.20

5 Pek. Cemen Grouting 0.96 m2 Rp 100,000.00

Pekerjaan Balok dan Plat lantai

Pekerjaan Balok B1 WF 200.100.5,5.8

1 WF 200.100.5,5.8 4,758.42 Kg Rp 27,736.41

2 Pek. Meni besi Zinhromate 181.72 m2 Rp 11,467.20

3 Pas. End Plate 100.220.10 mm 117.44 Kg Rp 27,736.41

4 Pas. Baud HTB A-325 4 M 16 448.00 set Rp 9,520.00

Pekerjaan Balok B2 WF 250.125.6.9

1 WF 250.125.6.9 704.48 Kg Rp 27,736.41

2 Pek. Meni besi Zinhromate 23.80 m2 Rp 11,467.20

3 Pas. Voute WF 250.125.6.9 (include End Plate, Stiffener + meni besi) 8.00 set Rp 27,736.41

4 Pas. Baud HTB A-325 M 16 64.00 set Rp 9,520.00

Pekerjaan Balok B6 WF 150.75.5.7 (Sambungan system las)

1 WF 150.75.5.7 436.80 Kg Rp 27,736.41

2 Pek. Meni besi Zinhromate 18.72 m2 Rp 11,467.20

C PEKERJAAN ZONA B (RAMP 2 LANTAI)

C.2 PEKERJAAN STRUKTUR

Pekerjaan Kolom Baja

Pekerjaan Kolom baja type K2 WF 250.125.6.9 mm

1 Pas.Base Plat 300x400x12 mm 158.26 Kg Rp 27,736.41

2 Pek. Angkur HEX M-19 mm, Grade 36, panjang total 60 cm 84.00 set Rp 92,960.00

3 WF 250.125.6.9 3,178.72 Kg Rp 27,736.41

4 Pek. Meni besi Zinhromate 110.75 m2 Rp 11,467.20

5 Pek. Cemen Grouting 1.68 m2 Rp 100,000.00


Pekerjaan Kolom baja type K5 WF 400.200.8.13 mm

1 Pas.Base Plat 450x550x18 mm 139.89 Kg Rp 27,736.41

2 Pek. Angkur HEX M-22 mm, Grade 36, panjang total 90 cm 24.00 set Rp 186,960.00

3 WF 400.200.8.13 1,992.48 Kg Rp 27,736.41

4 Pek. Meni besi Zinhromate 50.29 m2 Rp 11,467.20

5 Pek. Cemen Grouting 0.99 m2 Rp 100,000.00

Pekerjaan Balok dan Plat lantai Ramp

Pekerjaan Balok B1 WF 200.100.5,5.8

1 WF 200.100.5,5.8 1,574.71 Kg Rp 27,736.41

2 Pek. Meni besi Zinhromate 59.15 m2 Rp 11,467.20

3 Pas. Join Voute WF 200.100.5,5.8 pada kolom, Join pada balok - system Las 5.00 set Rp 231,696.80

4 Pas. End Plate 100.220.10 mm 35.33 Kg Rp 27,736.41

5 Pas. Baud HTB A-325 4 M 16 180.00 set Rp 9,520.00

Pekerjaan Balok B3 WF 300.150.6,5.9

1 WF 300.150.6,5.9 2,238.70 Kg Rp 27,736.41

2 Pek. Meni besi Zinhromate 73.20 m2 Rp 11,467.20

3 Pas. Voute WF 300.150.6,5.9 (include End Plate, Stiffener + meni besi) 20.00 set Rp 711,982.40

4 Pas. Baud HTB A-325 8 M 22 112.00 set Rp 17,920.00


Pekerjaan Balok dan Plat lantai dak ramp

Pekerjaan Balok B1 WF 200.100.5,5.8

1 WF 200.100.5,5.8 1,642.87 Kg Rp 27,736.41

2 Pek. Meni besi Zinhromate 62.79 m2 Rp 11,467.20

3 Pas. Join Voute WF 200.100.5,5.8 pada kolom, Join pada balok - system Las 6.00 set Rp 231,696.80

4 Pas. End Plate 100.220.10 mm 42.39 Kg Rp 27,736.41

5 Pas. Baud HTB A-325 4 M 16 156.00 set Rp 9,520.00

Pekerjaan Balok B2 WF 250.125.6.9

1 WF 250.125.6.9 1,598.40 Kg Rp 27,736.41

2 Pek. Meni besi Zinhromate 54.00 m2 Rp 11,467.20

3 Pas. Voute WF 250.125.6.9 (include End Plate, Stiffener + meni besi) 18.00 set Rp 498,741.60

4 Pas. Baud HTB A-325 M 16 96.00 set Rp 9,520.00

Pekerjaan Balok B6 WF 150.75.5.7 (Sambungan system las)

1 WF 150.75.5.7 133.00 Kg Rp 27,736.41

2 Pek. Meni besi Zinhromate 5.70 m2 Rp 11,467.20

D PEKERJAAN
ZONA C
(SELASAR 4
LANTAI DAN
SELASAR 3
LANTAI)

D.2 PEKERJAAN
STRUKTUR

Pekerjaan Kolom
Baja
Pekerjaan Kolom
baja type K3 WF
300.150.6,5.9
mm

1 Pas. Base Plat 474.77 Kg Rp 27,736.41 Rp 13,168,415.38


350x450x16 mm

2 Pas. Top Plat 296.73 Kg Rp 27,736.41 Rp 8,230,224.94


350x450x10 mm

3 Pek. Angkur HEX 144.00 set Rp 154,480.00 Rp 22,245,120.00


M-20 mm, Grade
36, panjang total
90 cm

4 WF 300.150.6,5.9 6,165.60 Kg Rp 27,736.41 Rp 171,011,609.50

5 Pek. Meni besi 216.72 m2 Rp 11,467.20 Rp 2,485,171.58


Zinhromate
6 Pek. Cemen 3.78 m2 Rp 100,000.00 Rp 378,000.00
Grouting

Pekerjaan Kolom
baja type K4 WF
350.175.7.11 mm

1 Pas.Base Plat 79.13 Kg Rp 27,736.41 Rp 2,194,782.12


350x450x16 mm

2 Pek. Angkur HEX 24.00 set Rp 154,480.00 Rp 3,707,520.00


M-20 mm, Grade
36, panjang total
90 cm

3 WF 350.175.7.11 1,587.20 Kg Rp 27,736.41 Rp 44,023,229.95

4 Pek. Meni besi 46.06 m2 Rp 11,467.20 Rp 528,179.23


Zinhromate
5 Pek. Cemen 0.63 m2 Rp 100,000.00 Rp 63,000.00
Grouting

Pekerjaan Kolom
baja type K6 WF
150.75.5.7 mm,
(Kolom Tumbuh)

1 Pas. Base Plat 3.14 Kg Rp 27,736.41 Rp 87,092.33


200x100x10 mm

2 Pas. Baud Join 8.00 set Rp 7,280.00 Rp 58,240.00


HTB A-325 M 14

3 WF 150.75.5.7 120.40 Kg Rp 27,736.41 Rp 3,339,463.76

4 Pek. Meni besi 5.24 m2 Rp 11,467.20 Rp 60,088.13


Zinhromate

Pekerjaan Balok
dan Plat lantai 1

Pekerjaan Balok
B1 WF
200.100.5,5.8

1 WF 200.100.5,5.8 2,179.42 Kg Rp 27,736.41 Rp 60,449,286.68

2 Pek. Meni besi 83.26 m2 Rp 11,467.20 Rp 954,759.07


Zinhromate
3 Pas. End Plate 54.95 kg Rp 27,736.41 Rp 1,524,115.73
100.220.10 mm
4 Pas. Baud HTB 208.00 set Rp 9,520.00 Rp 1,980,160.00
A-325 4 M 16
Pekerjaan Balok
B4 WF
350.175.7.11

1 WF 350.175.7.11 595.20 Kg Rp 27,736.41 Rp 16,508,711.23

2 Pas. Stiffener 4.81 Kg Rp 27,736.41 Rp 133,412.13


87.5x350x10 mm,
(12 bh Perbalok )

3 Pek. Meni besi 16.93 m2 Rp 11,467.20 Rp 194,139.70


Zinhromate
4 Pas. Voute WF 4.00 set Rp 503,320.00 Rp 2,013,280.00
350.175.7.11

Pekerjaan Balok
dan Plat lantai 2

Pekerjaan Balok
B1 WF
200.100.5,5.8

1 WF 200.100.5,5.8 2,514.26 Kg Rp 27,736.41 Rp 69,736,546.21

2 Pek. Meni besi 96.04 m2 Rp 11,467.20 Rp 1,101,309.89


Zinhromate
3 Pas. End Plate 62.80 kg Rp 27,736.41 Rp 1,741,846.55
100.220.10 mm
4 Pas. Baud HTB 260.00 set Rp 9,520.00 Rp 2,475,200.00
A-325 4 M 16

Pekerjaan Balok
B4 WF
350.175.7.11

1 WF 350.175.7.11 595.20 Kg Rp 27,736.41 Rp 16,508,711.23

2 Pas. Stiffener 4.81 Kg Rp 27,736.41 Rp 133,412.13


87.5x350x10 mm,
(12 bh Perbalok )

3 Pek. Meni besi 16.93 m2 Rp 11,467.20 Rp 194,139.70


Zinhromate
4 Pas. Voute WF 4.00 set Rp 503,320.00 Rp 2,013,280.00
350.175.7.11

E PEKERJAAN
ZONA D (RAMP
4 LANTAI DAN
SELASAR 4
LANTAI)

E.2 PEKERJAAN
STRUKTUR

Pekerjaan Kolom
Baja
Pekerjaan Kolom
baja type K3 WF
300.150.6,5.9
mm

1 Pas. Base Plat 652.81 Kg Rp 27,736.41 Rp 18,106,605.81


350x450x16 mm

2 Pek. Angkur HEX 198.00 set Rp 103,040.00 Rp 20,401,920.00


M-20 mm, Grade
36, panjang total
60 cm

3 WF 300.150.6,5.9 4,815.04 Kg Rp 27,736.41 Rp 133,551,923.61

4 Pas. Join Kolom 9.00 set Rp 1,536,227.20 Rp 13,826,044.80


type K3 WF
300.150.6,5.9 mm

5 Pek. Meni besi 167.84 m2 Rp 11,467.20 Rp 1,924,654.85


Zinhromate
6 Pek. Cemen 5.20 m2 Rp 100,000.00 Rp 520,000.00
Grouting

Pekerjaan Kolom
baja type K5 WF
400.200.8.13 mm

1 Pas.Base Plat 139.89 Kg Rp 27,736.41 Rp 3,880,046.39


450x550x18 mm
2 Pek. Angkur HEX 24.00 set Rp 186,960.00 Rp 4,487,040.00
M-22 mm, Grade
36, panjang total
90 cm

3 WF 400.200.8.13 1,003.20 Kg Rp 27,736.41 Rp 27,825,166.51

4 Pek. Meni besi 26.30 m2 Rp 11,467.20 Rp 301,587.36


Zinhromate
5 Pek. Cemen 0.99 m2 Rp 100,000.00 Rp 99,000.00
Grouting

Pekerjaan Balok
dan Plat lantai
Selasar Lt. 2 dan
Ramp Ke Lt 2

Pekerjaan Balok
B1 WF
200.100.5,5.8

1 WF 200.100.5,5.8 3,234.41 Kg Rp 27,736.41 Rp 89,710,921.87

2 Pek. Meni besi 121.48 m2 Rp 11,467.20 Rp 1,393,035.46


Zinhromate
3 Pas. Join Voute 6.00 set Rp 231,696.80 Rp 1,390,180.80
WF 200.100.5,5.8
pada kolom, Join
pada balok -
system Las

4 Pas. End Plate 73.01 Kg Rp 27,736.41 Rp 2,025,035.29


100.220.10 mm
5 Pas. Baud HTB 304.00 set Rp 9,520.00 Rp 2,894,080.00
A-325 4 M 16

Pekerjaan Balok
B2 WF
250.125.6.9

1 WF 250.125.6.9 153.92 Kg Rp 27,736.41 Rp 4,269,188.23

2 Pek. Meni besi 5.20 m2 Rp 11,467.20 Rp 59,629.44


Zinhromate
3 Pas. Voute WF 2.00 set Rp 498,741.60 Rp 997,483.20
250.125.6.9
(include End
Plate, Stiffener +
meni besi)

4 Pas. Baud HTB 16.00 set Rp 13,360.00 Rp 213,760.00


A-325 8 M 20

Pekerjaan Balok
B3 WF
300.150.6,5.9

1 WF 300.150.6,5.9 2,238.70 Kg Rp 27,736.41 Rp 62,093,501.07

2 Pek. Meni besi 73.20 m2 Rp 11,467.20 Rp 839,399.04


Zinhromate
3 Pas. Voute WF 20.00 set Rp 711,982.40 Rp 14,239,648.00
300.150.6,5.9
(include End
Plate, Stiffener +
meni besi)
4 Pas. Baud HTB 112.00 set Rp 17,920.00 Rp 2,007,040.00
A-325 8 M 22
F PEKERJAAN
ZONA E
(SELASAR 1
LANTAI)

F.2 PEKERJAAN
STRUKTUR

Pekerjaan Kolom
Baja
Pekerjaan Kolom
baja type K1 WF
200.100.5,5.8
mm

1 Pas.Base Plat 673.14 Kg Rp 27,736.41 Rp 18,670,487.03


250x350x10 mm

2 Pek. Angkur HEX 392.00 set Rp 65,920.00 Rp 25,840,640.00


M-16 mm, Grade
36, panjang total
60 cm

3 WF 200.100.5,5.8 6,575.31 Kg Rp 27,736.41 Rp 182,375,494.04

4 Pek. Meni besi 264.11 m2 Rp 11,467.20 Rp 3,028,602.19


Zinhromate
5 Pek. Cemen 8.58 m2 Rp 100,000.00 Rp 858,000.00
Grouting

Pekerjaan Balok
dan Plat lantai

Pekerjaan Balok
B1 WF
200.100.5,5.8

1 WF 200.100.5,5.8 9,252.72 Kg Rp 27,736.41 Rp 256,637,235.54

2 Pek. Meni besi 352.10 m2 Rp 11,467.20 Rp 4,037,601.12


Zinhromate
3 Pas. End Plate 179.61 Kg Rp 27,736.41 Rp 4,981,736.60
100.220.10 mm
4 Pas. Baud HTB 844.00 set Rp 9,520.00 Rp 8,034,880.00
A-325 4 M 16

Pekerjaan Balok
B6 WF 150.75.5.7
(Sambungan
system las)

1 WF 150.75.5.7 512.40 Kg Rp 27,736.41 Rp 14,212,136.48

2 Pek. Meni besi 21.96 m2 Rp 11,467.20 Rp 251,819.71


Zinhromate
JUMLAH HARGA
(Rp)

Rp 8,001,676.92

Rp 11,074,560.00

Rp 78,160,926.02

Rp 1,297,972.37

Rp 368,000.00

Rp 2,508,480.92

Rp 3,164,160.00

Rp 27,585,523.93

Rp 407,314.94

Rp 96,000.00

Rp 131,981,488.07

Rp 2,083,819.58

Rp 3,257,363.99

Rp 4,264,960.00

Rp 19,539,746.12

Rp 272,919.36

Rp 221,891.28

Rp 609,280.00

Rp 12,115,263.89

Rp 214,665.98

Rp 4,389,564.25

Rp 7,808,640.00

Rp 88,166,281.20

Rp 1,269,992.40

Rp 168,000.00
Rp 3,880,046.39

Rp 4,487,040.00

Rp 55,264,242.20

Rp 576,685.49

Rp 99,000.00

Rp 43,676,802.19

Rp 678,284.88

Rp 1,158,484.00

Rp 979,927.37

Rp 1,713,600.00

Rp 62,093,501.07

Rp 839,399.04

Rp 14,239,648.00

Rp 2,007,040.00

Rp 45,567,315.90

Rp 720,025.49

Rp 1,390,180.80

Rp 1,175,746.42

Rp 1,485,120.00

Rp 44,333,877.74

Rp 619,228.80

Rp 8,977,348.80

Rp 913,920.00

Rp 3,688,942.53

Rp 65,363.04

Anda mungkin juga menyukai