Rincian Pendanaa :
HARGA
NO. U R A I A N VOLUME SATUAN JUMLAH (Rp)
(Rp)
1 2 3 4 5
I. BAHAN
1. Semen (1 zak=50 kg) 199.00 Zak 90,000.00 17,910,000.00
2. Pasir beton 22.00 M3 160,000.00 3,520,000.00
3. Pasir urug 44.00 M 3
140,000.00 6,160,000.00
4. Batu pecah 2/3 cm 27.00 M 3
425,000.00 11,475,000.00
5. Papan mal uk. 2/18 cm- 4m 20.00 Kpg 25,000.00 500,000.00
6. Kayu uk. 4/6 cm - 4 m 20.00 Btg 20,000.00 400,000.00
7. Wiremesh M5 (uk. 2,1 m x 5,4 m) 36.00 Lbr 250,000.00 9,000,000.00
8. Paku Campur 2.00 Kg 22,000.00 44,000.00
9. Cat khusus lapangan 180.00 Kg 60,000.00 10,800,000.00
10.Tiang net (knockdown) 1.00 set 2,500,000.00 2,500,000.00
11.Net 1.00 unit 100,000.00 100,000.00
12.Kursi wasit 1.00 unit 3,000,000.00 3,000,000.00
13,Bola voli 2.00 bh 200,000.00 400,000.00
III. UPAH
1. Pekerja 157.00 HOK 85,000.00 13,345,000.00
2. Tukang 12.00 HOK 120,000.00 1,440,000.00
3. Kepala Tukang 2.00 HOK 140,000.00 280,000.00
4. Mandor 23.00 HOK 120,000.00 2,760,000.00
J U M L A H (Rp.) 89,134,000.00
I Pekerjaan Persiapan
1. Pembersihan Lapangan dan Perataan M2 24.00 x 15.00 x x = 360.00 SNI - 8.11
- Pekerja HOK 0.100 36.00
- Mandor HOK 0.050 18.00
2. Pengukuran dan Pematokan M 1
0.00
A. BAHAN
1. Semen ( 50 Kg ) Zak 198.72 199.00
2. Pasir Beton M 3
21.28 22.00
3. Pasir Urug M 3
43.20 44.00
4. Batu pecah 2/3 (maks. 30 mm) M 3
27.00 27.00
5 Papan Mal tepi uk. 2/18 cm-4m Kpg 19.50 20.00
6 Kayu uk. 4/6 cm - 4 m Lbr 19.50 20.00
7 Wiremesh M5 (2,1 m x 5,4 m) M 2
36.00 36.00
8 Paku Campur Kg 1.56 2.00
9 Cat lapangan Kg 180.00 180.00
10 Tiang Set 1.00 1.00
11 Net Unit 1.00 1.00
12 Kursi wasit Unit 1.00 1.00
13 Bola voli Bh 2.00 2.00
B. ALAT
1. Gerobak Dorong Bh 4.00 2.00
2 Sewa Molen (Concrete Mixer) Hari 7.20 8.00
C. UPAH
1. Pekerja HOK 156.43 157.00
2. Tukang HOK 11.44 12.00
3. Kepala Tukang HOK 1.13 2.00
4. Mandor HOK 22.73 23.00
DESA PASIR BEDENGUNG KEC. SEJAHTERA BIAYA ALAT UNTUK PERHITUNGAN KODE
TAHUN ANGGARAN 2017 ANALISA BIAYA PEKERJAAN E. 080
PROPINSI : KABUPATEN : DISIAPKAN TGL :
KALIMANTAN BARAT SAMBAS