Anda di halaman 1dari 131

PEMERINTAH KOTA AMBON

DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


Jl. Yan Paays No. 30 Telp. 0911-311190- Ambon

BILL OF QUANTITY (BOQ)

PEKERJAAN :
PENGADAAN DAN PEMASANGAN LAMPU HIAS
WAIHAONG

TAHUN ANGGARAN
2020
BILL OF QUANTITY (BOQ)
REKAPITULASI
PEKERJAAN : PENGADAAN DAN PEMASANGAN LAMPU HIAS WAIHAONG
LOKASI : KOTA AMBON
TAHUN ANGGARAN: 2020

No. URAIAN PEKERJAAN JUMLAH


HARGA
(Rp)

A. PEKERJAAN PERSIAPAN Rp -
B. PEKERJAAN PENGADAAN MATERIAL UTAMA Rp -
C. PEKERJAAN KONSTRUKSI Rp -
D. PEKERJAAN PEMASANGAN Rp -

JUMLAH TOTAL PEKERJAAN Rp -


PPN 10% Rp -
JUMLAH Rp -
DIBULATKAN Rp -
Terbilang : .........................................................................................................................
.........................................................................................................................

Ambon, …........................... 2020

Penawar
PT./CV. …...................................

Nama Jelas
Jabatan
RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PENGADAAN DAN PEMASANGAN LAMPU HIAS WAIHAONG


LOKASI : KOTA AMBON
TAHUN ANGGARA: 2020

HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
A. PEKERJAAN PERSIAPAN
1 Pengukuran Kembali (Steak Out) Ls 1.00 -
2 Dokumentasi dan Pelaporan Ls 1.00 -
3 Pembersihan Awal dan Akhir Ls 1.00 -
4 Penyelenggaraan K3 Ls 1.00 -
5 Papan Nama Proyek Ls 1.00 -
Jumlah -
B. PEKERJAAN PENGADAAN MATERIAL UTAMA
1 Tiang Decorative, h = 6 M, 2 Lengan (AB 106) Bh 6.00 -
2 Kabel NFGBY 4 x 4 mm M' 330.00 -
3 Kabel NYM 4 x 2.5 mm (Eterna) M' 30.00 -
4 Lampu LED 30 Watt Philips Bh 48.00 -
5 Bola Politin Bh 48.00 -
6 Mobilisasi (Mantage) Ls 1.00 -
Jumlah -
C. PEKERJAAN KONSTRUKSI
1 Pek. Pembongkaran Aspal M2 5.00 -
2 Pek. Pembongkaran Trotoar M3 9.59 -
3 Pek. Galian Tanah (Pondasi Tiang & Kabel) M3 40.78 -
4 Pek. Urugan Tanah Kembali Untuk Pondasi M3 48.36 -
5 Pek. Pondasi Tiang 50 x 50 cm (64 Kg/M³, f’c = 19,3 Mp M3 0.90 -
6 Perbaikan Bekas Bongkaran Trotoar (Rabat Beton) M3 18.60 -
7 Crossing Kabel Pada Jalan (Pipa GIP 2") M' 10.00 -
8 Crossing Kabel Pada Jembatan (Pipa GIP 2") M' 20.00 -
9 Material Bantu Ls 1.00 -
Jumlah -
D. PEKERJAAN PEMASANGAN
1 Pemasangan Tiang Lampu Decorative Unit 6.00 -
2 Pemasangan Lampu M' 48.00 -
3 Gelar Kabel Tanah, Perapihan dan Instalasi M' 330.00 -
Jumlah -
ANALISA HARGA SATUAN PEKERJAAN

A.2.2.1.14. Pembongkaran 1 m3 trotoar

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.6670 -
Mandor L.04 OH 0.3330 -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.21 Pembongkaran 10 M2 Aspal Jalan

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 -
Tukang Batu L.03 OH 0.2600 -
Kepala Tukang L.03 OH 0.0260 -
Mandor L.04 OH 0.0260 -
JUMLAH TENAGA KERJA -
B BAHAN
Aspal M3 0.0450 -
Batu Pecah Mesin (Kg) Kg 0.3000 -
Minyak Tanah Liter 0.1000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Bantu Ls 1.0000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
G Untuk 1 M2 Pembongkaran Aspal F / 10 -
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 -
Mandor L.04 OH 0.0250 -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 -
Mandor L.04 OH 0.0500 -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7800 -
Tukang Batu L.02 OH 0.3900 -
Kepala Tukang L.03 OH 0.0390 -
Mandor L.04 OH 0.0390 -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Kali m3 1.2000 -
Pasir Urug m3 0.4320 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.3. Pemasangan 1 m3 pondasi batu kali campuran 1SP : 5PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 -
Tukang Batu L.02 OH 0.7500 -
Kepala Tukang L.03 OH 0.0750 -
Mandor L.04 OH 0.0750 -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Kali m3 1.2000 -
Porland Cemend Tonasa (Kg) Kg 136.0000 -
Pasir Pasang/Beton (M3) m3 0.5440 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 -
Tukang Batu L.02 OH 0.7500 -
Kepala Tukang L.03 OH 0.0750 -
Mandor L.04 OH 0.0750 -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Kali m3 1.2000 -
Porland Cemend Tonasa (Kg) Kg 163.0000 -
Pasir Pasang/Beton (M3) m3 0.5200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 -
Tukang Batu L.02 OH 0.2000 -
Kepala Tukang L.03 OH 0.0200 -
Mandor L.04 OH 0.0600 -
JUMLAH TENAGA KERJA -
B BAHAN
Porland Cemend Tonasa (Kg) kg 230.0000 -
Pasir Pasang/Beton (Kg) kg 893.0000 -
Batu Pecah Mesin (Kg) kg 1,027.0000 -
Air Liter 200.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 -
Tukang Batu L.02 OH 0.2750 -
Kepala Tukang L.03 OH 0.0280 -
Mandor L.04 OH 0.0830 -
JUMLAH TENAGA KERJA -
B BAHAN
Porland Cemend Tonasa (Kg) kg 371.0000 -
Pasir Pasang/Beton (Kg) kg 698.0000 -
Batu Pecah Mesin (Kg) kg 1,047.0000 -
Air Liter 215.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 -
Tukang Besi L.02 OH 0.0700 -
Kepala Tukang L.03 OH 0.0070 -
Mandor L.04 OH 0.0040 -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Beton Polos kg 10.5000 -
Ikat Beton (bendrat) kg 0.1500 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -
G Untuk 1 Kg Pembesian -
A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 -
Tukang Kayu L.02 OH 0.2600 -
Kepala Tukang L.03 OH 0.0260 -
Mandor L.04 OH 0.0260 -
JUMLAH TENAGA KERJA -
B BAHAN
Kayu Klas II kg 0.0400 -
Paku Campur kg 0.3000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -

1 M3 BETON Pondasi Tiang 50 x 50 cm Fc' = 19,3 Mpa


Besi beton kg 63.0778 - -
Spesi beton K.225 m3 1.0000 - -
Cetakan papan begesting m2 8.0000 - -
Jumlah -

Pemasangan 1 buah Tiang Lampu Decorative

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3750 -
Tukang Batu L.03 OH 0.2500 -
Mandor L.04 OH 0.0667 -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Dump Truck Hr 0.1250 -
Scaffolding Hr 0.1250 -
Alat Bantu Ls 0.1250 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -
Pemasangan Kabel Twisted

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0089 -
Tukang Listrik L.03 OH 0.0267 -
Supir L.03 OH 0.0030 -
Mandor L.04 OH 0.0010 -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Tangga 7 Meter Hr 0.0030 -
Scaffolding Hr 0.0030 -
Mobil Pick Up Hr 0.0030 -
Alat Bantu Ls 0.0030 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -

Pemasangan Kawat Baja

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0089 -
Tukang Listrik L.03 OH 0.0267 -
Supir L.03 OH 0.0030 -
Mandor L.04 OH 0.0010 -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Tangga 7 Meter Hr 0.0030 -
Scaffolding Hr 0.0030 -
Mobil Pick Up Hr 0.0030 -
Alat Bantu Ls 0.0030 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -
Pemasangan Kabel Seling Baja

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0089 -
Tukang Listrik L.03 OH 0.0267 -
Supir L.03 OH 0.0030 -
Mandor L.04 OH 0.0010 -
JUMLAH TENAGA KERJA -
B BAHAN
Klem Kabbel Seling baja Bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Tangga 7 Meter Hr 0.0030 -
Scaffolding Hr 0.0030 -
Mobil Pick Up Hr 0.0030 -
Alat Bantu Ls 0.0030 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -

Panel kontrol distribusi type APP-1P

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7326 -
Tukang Batu L.03 OH 0.7326 -
Mandor L.04 OH 0.1832 -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Tangga 7 Meter Hr 0.3663 -
Scaffolding Hr 0.0300 -
Alat Bantu Ls 0.3663 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.00% x D -
F Harga Satuan Pekerjaan (D+E) -
DAFTAR HARGA UPAH DAN BAHAN

HARGA UPAH
1 Mandor Org./Hr. Rp -
2 Kepala Tukang Org./Hr. Rp -
3 Tukang Kayu Org./Hr. Rp -
4 Tukang Batu Org./Hr. Rp -
5 Tukang Besi Org./Hr. Rp -
6 Tukang Cat Org./Hr. Rp -
7 Tukang Listrik Org./Hr. Rp -
8 Supir Org./Hr. Rp -
9 Pekerja Org./Hr. Rp -
HARGA SEWA PERALATAN
1 Sewa Dump Truck /Hr. Rp -
2 Tripod /Hr. Rp -
3 Tangga 7 Meter /Hr. Rp -
4 Scaffolding /Hr. Rp -
4 Katrol Pengangkat Tiang /Hr. Rp -
5 Mobil Pick Up /Hr. Rp -
HARGA BAHAN
BATU
1 Batu Karang M³ Rp -
2 Batu Kali M³ Rp -
KERIKIL
1 Batu Kerikil Sungai / Pantai (Kerikil Cor) M³ Rp -
2 Batu Pecah Mesin (M3) M³ Rp -
3 Batu Pecah Mesin (Kg) Kg Rp -
PASIR & TANAH
1 Pasir Pasang/Beton (M3) M³ Rp -
2 Pasir Pasang/Beton (Kg) Kg Rp -
3 Pasir Urug M³ Rp -
4 Sirtu M³ Rp -
5 Tanah Timbunan M³ Rp -
BATU BATA
1 Bata Merah 6x11x22 cm Bh Rp -
BAHAN KAYU
1 Kayu Klas I M³ Rp -
2 Kayu Klas II M³ Rp -
3 Papan Kayu Kls I M³ Rp -
4 Papan Kayu Kls II M³ Rp -
5 Dolken Kayu Btg Rp -
SEMEN
1 Porland Cemend Tonasa (Zak) Zak Rp -
2 Porland Cemend Tonasa (Kg) Kg Rp -
3 Sement Warna Kg Rp -
BAHAN AIR
1 Air Ltr Rp -
HARGA BAHAN
BAHAN BESI
1 Besi Beton Polos Kg Rp -
2 Angkur Ø 22 mm Kg Rp -
3 Angkur Ø 16 mm Kg Rp -
4 Besi Polos Standard Ø 6 mm Staf Rp -
5 Besi Polos Standard Ø 16 mm Staf Rp -
KAWAT
1 Ikat Beton (bendrat) Kg Rp -
2 Kawat Baja Kg Rp -
3 Kawat Baja M' Rp -
BAHAN PAKU
1 Paku Campur Kg Rp -
BAHAN PIPA
1 Pipa GIP Mediun A dia. 3" Staf Rp -
2 Pipa GIP Mediun A dia. 2." Staf Rp -
3 Pipa GIP Mediun A dia. 1.5." Staf Rp -
4 Pipa GIP Mediun A dia. 1." Staf Rp -
5 Pipa PVC dia 2" Staf Rp -
6 Pipa PVC dia 1.5" Staf Rp -
7 Pipa PVC dia 1" Staf Rp -
LAMPU JALAN DAN ARMATURE
1 Kap Lampu Jalan Zetalux Bh Rp -
2 Kap Lampu Jalan Osiwa Bh Rp -
3 Stang Lampu Uk. P= 3 M' Dia. 1,5" Bh Rp -
4 Kap Lampu Jalan Zetalux Bh Rp -
5 Stang Lampu Uk. P= 1,5 M' Dia. 1,5" Bh Rp -
6 Balon Mercury Scn-T 250 Watt Bh Rp -
7 Balon Mercury Scn-T 220 Watt (Non Ignitor) Bh Rp -
8 Balon MercuryHPL -N 250 Watt Bh Rp -
9 Balon Mercury ML 250 Watt Bh Rp -
10 LED SETA 100 W lengkap Bh Rp -
11 LED SETA 80 W lengkap Bh Rp -
12 Fatro Lengkap Bh Rp -
13 Lampu Philips (19 W) untuk Fatro Bh Rp -
14 Himawari 80 W ( 1 LED) Lengkap Bh Rp -
15 LED SETA LUX 95 W Bh Rp -
16 Balon Visicon 95 Watt Bh Rp -
17 Balon Visicon 75 Watt Bh Rp -
18 Lampu LED Flexibel 12 V-DC IP65 Bh Rp -
19 Lampu Shade Mika Bh Rp -
20 LAMPU KESSIL A. 160 TUNA BLUE 40 WATT Bh Rp -
21 LAMPU LED 33 WATT PHILIPS Bh Rp -
22 BOLA POLITIN Bh Rp -
23 LAMPU LED 50 WATT PHILIPS Bh Rp -
24 LED SETA 170 W Bh Rp -
25 Adaptor LED/Flasher IC Bh Rp -
26 Lampu Selang Bh Rp -
27 Lampu Meteor Bh Rp -
HARGA BAHAN
MATERIAL PANNEL
1 Box Pannel Outdoor Uk. 40 x 60 cm Bh Rp -
2 Box Pannel Uk. 40 x 60 cm Bh Rp -
3 Box Pannel Uk.30 x 40 cm Bh Rp -
4 Magnetic Contactor SN 65-220 V Bh Rp -
5 Magnetic Contactor 80 A Bh Rp -
6 Magnetic Contactor 50 A Bh Rp -
7 Magnetic Contactor 35 A Bh Rp -
8 Timer Switch Panasonic Bh Rp -
9 Timer Switch Theben Bh Rp -
10 MCB 2 A Bh Rp -
11 MCB 4 A Bh Rp -
12 MCB 10 A Bh Rp -
13 MCB 16 A Bh Rp -
14 MCB 25 A Bh Rp -
15 MCB 32 A Bh Rp -
16 MCB 35 A Bh Rp -
17 MCB 35 A (3 Phase) Bh Rp -
18 MCB 50 A Bh Rp -
19 MCB 50 A (3 Phase) Bh Rp -
20 MCB 63 A Bh Rp -
21 MCB 63 A (3 Phase) Bh Rp -
22 MCB 80 A Bh Rp -
23 MCB 80 A (3 Phase) Bh Rp -
24 KWH Meter 60/80 Bh Rp -
25 KWH Meter 3 Phase Bh Rp -
BAHAN KABEL JARINGAN
1 NYM 2 x 1.5 mm (Eterna) Meter Rp -
2 NYM 2 x 2.5 mm (Eterna) Meter Rp -
3 NYM 2 x 4 mm (Eterna) Meter Rp -
4 NYM 2 x 6 mm (Eterna) Meter Rp -
5 NYM 2 x 10 mm (Eterna) Meter Rp -
6 NYM 3 x 2,5 mm (Eterna) Meter Rp -
7 NYM 3 x 4 mm (Eterna) Meter Rp -
8 NYM 3 x 6 mm (Eterna) Meter Rp -
9 NYM 2 x 10 mm (Eterna) Meter Rp -
10 NYM 4 x 2.5 mm (Eterna) Meter Rp -
11 NYM 4 x 4 mm (Eterna) Meter Rp -
12 NYM 4 x 6 mm (Eterna) Meter Rp -
13 NYM 4 x 10 mm (Eterna) Meter Rp -
14 NGA 1,5 mm Meter Rp -
15 NGA 2,5 mm Meter Rp -
16 Tuistek 2 x 10 mm Meter Rp -
17 Tuistek 2 x 16 mm Meter Rp -
18 Tuistek 4 x 16 mm Meter Rp -
19 NYFGBY 2 x 6 mm Meter Rp -
20 NYFGBY 4 x 6 mm Meter Rp -
21 NYFGBY 2 x 4 mm Meter Rp -
HARGA BAHAN
22 NYFGBY 4 x 4 mm Meter Rp -
HARGA BAHAN
TIANG LAMPU / LISTRIK
1 Tiang PJU Type ISP Lengan Tunggal Oct. 9 M Buah Rp -
2 Tiang PJU Type ISP Lengan Ganda Oct. 9 M Buah Rp -
3 Tiang Galvanis 12 Meter Buah Rp -
4 Tiang PJU Type ISP Lengan Tunggal Oct. 7 M Buah Rp -
5 Tiang PJU Type ISP Lengan Ganda Oct. 7 M Buah Rp -
6 Tiang PJU Solar Cell Type ISP 9 M Oct Single Buah Rp -
7 Tiang Decorative, h = 7 M (ORLANDO) Buah Rp -
8 Tiang Lampu Decorative DG-Alfino-H7000 Bh Rp -
9 Tiang Decorative H 06 Doubel Arm Bh Rp -
10 Tiang Decorative H 06 Single Arm Bh Rp -
11 Tiang PJU Antik 6 M, 2 lengan AB 106 Buah Rp -
12 Tiang Telepon (Telkom) H07 Buah Rp -
13 Tiang Telepon (Telkom) H09 Buah Rp -
14 Tiang Listrik Standard H09 Buah Rp -
15 Tiang Listrik Standard H07 Buah Rp -
16 Tiang Listrik Besi 9 meter da N Buah Rp -
17 Tiang Listrik Besi 11 meter Buah Rp -
18 Tiang Listrik Besi 13 meter Buah Rp -
KLEM BEUGEL
1 Klem Beugel 2 x 1,5 " Buah Rp -
2 Klem Beugel 3 x 1,5 " Buah Rp -
3 Klem Beugel 4 x 1,5 " Buah Rp -
4 Klem Beugel 5 x 1,5 " Buah Rp -
5 Klem Beugel 6 x 1,5 " Buah Rp -
6 Klem Beugel 10 x 1,5 " Buah Rp -
7 Beugel 1.5" Buah Rp -
8 Beugel 2" Buah Rp -
9 Beugel 3" Buah Rp -
10 Beugel 5" Buah Rp -
11 Beugel 6" Buah Rp -
12 Beugel 10" Buah Rp -
13 Klem Kabbel Seling baja Buah Rp -
HARGA BAHAN
LAIN-LAIN
1 Fotocell Buah Rp -
2 Isolasi Listrik 3 M Roll Rp -
3 Service Wedge Clam 16 mm Buah Rp -
4 Tension Bracket Buah Rp -
5 Suspension Bracket Buah Rp -
6 Isolasi Listrik Schot 23 Roll Rp -
7 Cocector Aluminium Buah Rp -
8 Schoon 6 mm Buah Rp -
9 Kabel BC 6 mm2 Meter Rp -
10 Strain Klem LV TC Buah Rp -
11 Klem Kabel N0 10 Dos Rp -
12 Klem Kabel N0 12 Dos Rp -
13 Klem Kabel N0 14 Dos Rp -
14 Afta Klem 10 mm Buah Rp -
15 Afta Klem 16 mm Buah Rp -
16 Socket Automat Lampu Selang Buah Rp -
17 CCS/CCO 1P1 Buah Rp -
18 Veteng Porselin E-40 Buah Rp -
19 T Dos Buah Rp -
20 Dora Dos 3/4 Buah Rp -
21 Dora Dos 5/8 Buah Rp -
22 Automatic Timer Solenoid 1 " Buah Rp -
23 Automatic Timer Solenoid 11/2 " Buah Rp -
24 Automatic Timer Solenoid 2 " Buah Rp -
25 Automatic Timer Hunter 9 Sim Buah Rp -
26 Yokes /Stoping Buckle Buah Rp -
27 Stainless Steel Strip M Rp -
28 Knee PVC dia 2" Buah Rp -
29 Knee PVC dia 1,5" Buah Rp -
30 Knee PVC dia. 1" Buah Rp -
31 Gembok Buah Rp -
32 Skun Kabel (Ties) `15 cm Bh Rp -
33 Kabel Power M' Rp -
34 Kabel NYAF 2x2,5 mm M' Rp -
35 Kabel Seling M10 Baja M' Rp -
36 Klem Sekling Stanlees Steel Bh Rp -
37 Jarum Keras / Spand Skrup Stanlees Steel Bh Rp -
38 Kaussen Stainlees Steel Bh Rp -
39 Cat Primer Nebel 1000 Kg Rp -
40 Cat Finish Clear Coating Kg Rp -
41 Box Panel Out Door 25x30x20 cm Bh Rp -
42 Asessoris Ls Rp -
43 Grounding Rod 12 mm2 staff Rp -
44 Kabel schoon 6 mm2 Buah Rp -
45 Biaya Penyambungan VA Rp -
46 SLO ( sertifikat Layak Operasi ) VA Rp -
47 Uang jaminan Listrik (UJL) VA Rp -
HARGA BAHAN
BAHAN BAKAR MINYAK
1 Solar Ltr Rp -
2 Minyak Pelumas Ltr Rp -
3 BAHAN SANITAIR - Rp -
Kloset Jongkok American Standart
1 Kloset Duduk American standart Unit Rp -
2 Kran Air 3/4 Bh Rp -
3 Kran Air 1/2 Bh Rp -
Lembar 19 dari 131

RINCIAN HARGA SATUAN UPAH DAN BAHAN TAHUN 2014


LOKASI : DESA TAWIRI - AMBON

HARGA DI
LOKASI JASA +
HARGA BELI DI ONGKOS PROYEK (REAL OVERHEAD 10%
JUMLAH QUARRY ANGKUT COST)
NO. JENIS URAIAN STN (Rp.) (Rp.)
HARGA (Rp.) (Rp.)
(Rp.) (1) (2) (3) (4)
(1) + (2) 10% x (3)
I SATUAN UPAH
1. Pekerja OH 82,000.00 74,750.00 - 74,750.00 7,475.00
2. Tukang OH 95,000.00 86,250.00 - 86,250.00 8,625.00
3. Kepala Tukang OH 122,000.00 110,650.00 - 110,650.00 11,065.00
4. Mandor OH 134,000.00 122,100.00 - 122,100.00 12,210.00
II. SATUAN BAHAN
1 Tanah Urug M3 127,000.00 90,000.00 25,000.00 115,000.00 11,500.00
2 Pasir Beton / Pasang M3 193,000.00
### 150,000.00 25,000.00 175,000.00 17,500.00
3 Pasir Beton / Pasang Kg 227.00
### 107.14 100.00 207.14 20.71
4 Pasir Urug M3 154,000.00
### 115,000.00 25,000.00 140,000.00 14,000.00
5 Batu Kali M3 160,000.00
### 120,000.00 25,000.00 145,000.00 14,500.00
6 Kerikil M3 193,000.00
### 150,000.00 25,000.00 175,000.00 17,500.00
7 Kerikil Kg 232.00
### 111.11 100.00 211.11 21.11
8 Semen PC (50 Kg) Sak 74,000.00 66,000.00 1,000.00 67,000.00 6,700.00
9 Semen PC Kg 2,000.00 1,320.00 100.00 1,420.00 142.00
10 Air Ltr 246.00 24.00 200.00 224.00 22.40
11 Kayu Klas II M3 3,108,000.00 2,800,000.00 25,000.00 2,825,000.00 282,500.00
12 Papan Kayu Klas II M3 3,218,000.00 2,900,000.00 25,000.00 2,925,000.00 292,500.00
13 Plywood tebal 9 mm Lbr 112,000.00 100,000.00 2,000.00 102,000.00 10,200.00
14 Dolken Kayu Galam, Ø 8-10 cm, Panjang 4 M' Btg 45,000.00 40,000.00 1,000.00 41,000.00 4,100.00
15 Minyak Bekisting Liter 28,000.00
### 25,000.00 200.00 25,200.00 2,520.00
16 Besi Beton Kg 11,000.00
### 10,000.00 100.00 10,100.00 1,010.00
17 Kawat Las Kg 36,000.00
### 33,000.00 100.00 33,100.00 3,310.00
18 Kawat Ikat Kg 27,000.00
### 24,000.00 100.00 24,100.00 2,410.00
19 Paku Campur Kg 27,000.00
### 24,000.00 100.00 24,100.00 2,410.00
20 Soda Api Kg 12,000.00
### 11,000.00 100.00 11,100.00 1,110.00
21 Semen Putih Sak 157,000.00
### 140,000.00 3,000.00 143,000.00 14,300.00
22 Plamir Tembok Kg 25,000.00
### 23,000.00 100.00 23,100.00 2,310.00
23 Cat Tembok Metrolite Kg 24,000.00 22,000.00 100.00 22,100.00 2,210.00
24 Cat Tembok Anti Bocor Aquaproof Kg 94,000.00 85,000.00 100.00 85,100.00 8,510.00
25 Menie Besi Kg 50,000.00 45,000.00 100.00 45,100.00 4,510.00
26 Cat Besi Kg 77,000.00 70,000.00 100.00 70,100.00 7,010.00
27 Street box Bh 488,000.00 443,500.00 100.00 443,600.00 44,360.00
28 Minyak Cat (Thineer) Ltr 31,000.00 28,000.00 200.00 28,200.00 2,820.00
29 Kertas Amplas, semua ukuran Lbr 7,000.00 6,000.00 100.00 6,100.00 610.00
30 Kuas Bh 10,000.00 9,000.00 100.00 9,100.00 910.00
31 Pipa GIP Ø 100 mm Medium A Spindo M' 249,000.00 226,333.33 300.00 226,633.33 22,663.33
32 Pipa GIP Ø 75 mm Medium A Spindo M' 172,000.00 155,833.33 300.00 156,133.33 15,613.33
33 Pipa GIP Ø 50 mm Medium A spindo M' 106,000.00 96,250.00 300.00 96,550.00 9,655.00
34 Pipa GIP Ø 40 mm Medium A Spindo M' 78,000.00 70,583.33 300.00 70,883.33 7,088.33
35 Pipa GIP Ø 20 mm Medium A spindo M' 34,000.00 30,166.67 300.00 30,466.67 3,046.67
36 Elbow GIP Ø 100 mm Bh 363,000.00 330,000.00 150.00 330,150.00 33,015.00
Lembar 20 dari 131

HARGA DI
LOKASI JASA +
HARGA BELI DI ONGKOS PROYEK (REAL OVERHEAD 10%
JUMLAH QUARRY ANGKUT COST)
NO. JENIS URAIAN STN (Rp.) (Rp.)
HARGA (Rp.) (Rp.)
(Rp.) (1) (2) (3) (4)
(1) + (2) 10% x (3)
37 Elbow GIP Ø 75 mm Bh 176,000.00 160,000.00 150.00 160,150.00 16,015.00
38 Elbow GIP Ø 50 mm Bh 52,000.00 47,000.00 150.00 47,150.00 4,715.00
39 Socket GIP Ø 100 mm Bh 98,000.00 89,000.00 150.00 89,150.00 8,915.00
40 Socket GIP Ø 75 mm Bh 58,000.00 52,500.00 150.00 52,650.00 5,265.00
41 Socket GIP Ø 50 mm Bh 28,000.00 25,000.00 150.00 25,150.00 2,515.00
42 Socket GIP Ø 40 mm Bh 24,000.00 22,000.00 150.00 22,150.00 2,215.00
43 Socket GIP Ø 20 mm Bh 10,000.00 8,500.00 150.00 8,650.00 865.00
44 Knee GIP Ø 100 mm Bh 151,000.00 137,000.00 150.00 137,150.00 13,715.00
45 Knee GIP Ø 75 mm Bh 105,000.00 95,000.00 150.00 95,150.00 9,515.00
46 Knee GIP Ø 50 mm Bh 41,000.00 37,500.00 150.00 37,650.00 3,765.00
47 Knee GIP Ø 20 mm Bh 10,000.00 9,000.00 150.00 9,150.00 915.00
48 Nepel GIP Ø 100 mm Bh 94,000.00 85,000.00 150.00 85,150.00 8,515.00
49 Nepel GIP Ø 75 mm Bh 66,000.00 60,000.00 150.00 60,150.00 6,015.00
50 Nepel GIP Ø 50 mm Bh 50,000.00 45,000.00 150.00 45,150.00 4,515.00
51 Gilboult Joint GIP Ø 50 mm Bh 99,000.00 90,000.00 150.00 90,150.00 9,015.00
52 Water Mur GIP Ø 100 mm Bh 314,000.00 285,000.00 150.00 285,150.00 28,515.00
53 Water Mur GIP Ø 75 mm Bh 164,000.00 148,500.00 150.00 148,650.00 14,865.00
54 Water Mur GIP Ø 50 mm Bh 66,000.00 60,000.00 150.00 60,150.00 6,015.00
55 Gate Valve GIP Ø 100 mm Bh 1,980,000.00 1,800,000.00 150.00 1,800,150.00 180,015.00
56 Gate Valve GIP Ø 75 mm Bh 1,100,000.00 1,000,000.00 150.00 1,000,150.00 100,015.00
57 Gate Valve GIP Ø 50 mm Bh 935,000.00 850,000.00 150.00 850,150.00 85,015.00
58 Check Valve GIP Ø 50 mm Bh 220,000.00 200,000.00 150.00 200,150.00 20,015.00
59 Air Valve Ø 100 mm Bh 1,100,000.00 1,000,000.00 150.00 1,000,150.00 100,015.00
60 Air Valve Ø 75 mm Bh 825,000.00 750,000.00 150.00 750,150.00 75,015.00
61 Air Valve Ø 50 mm Bh 594,000.00 540,000.00 150.00 540,150.00 54,015.00
62 Flange GIP Ø 100 mm Bh 66,000.00 60,000.00 150.00 60,150.00 6,015.00
63 Flange GIP Ø 75 mm Bh 55,000.00 50,000.00 150.00 50,150.00 5,015.00
64 Flange GIP Ø 50 mm Bh 47,000.00 42,500.00 150.00 42,650.00 4,265.00
65 Over Sock GIP Ø 100 mm x 75 mm Bh 110,000.00 100,000.00 150.00 100,150.00 10,015.00
66 Over Sock GIP Ø 75 mm x 50 mm Bh 55,000.00 50,000.00 150.00 50,150.00 5,015.00
67 Over Sock GIP Ø 50 mm x 20 mm Bh 28,000.00 25,000.00 150.00 25,150.00 2,515.00
68 Tee GIP Ø 75 mm x 75 mm Bh 134,000.00 122,000.00 150.00 122,150.00 12,215.00
69 Tee GIP Ø 50 mm x 50 mm Bh 45,000.00 41,000.00 150.00 41,150.00 4,115.00
70 Tee GIP Ø 20 mm x 20 mm Bh 15,000.00 13,500.00 150.00 13,650.00 1,365.00
71 Doop GIP Ø 50 mm Bh 30,000.00 27,500.00 150.00 27,650.00 2,765.00
72 Atap Kran Ø 20 mm Bh 31,000.00 28,000.00 150.00 28,150.00 2,815.00
73 Pipa Hawa GIP Ø 50 mm Bh 44,000.00 40,000.00 150.00 40,150.00 4,015.00
74 Karet Packing 3 mm M' 30,000.00 27,150.00 200.00 27,350.00 2,735.00
75 Floor Drain Bh 42,000.00 38,000.00 200.00 38,200.00 3,820.00
76 Ijuk Kg 66,000.00 60,000.00 100.00 60,100.00 6,010.00
77 Sock Drat Luar Buah 9,000.00 8,100.00 100.00 8,200.00 820.00
78 Seal tape Rol 3,000.00 3,000.00 50.00 3,050.00 305.00
79 Pompa Submersible Unit 15,411,000.00 14,000,000.00 10,000.00 14,010,000.00 1,401,000.00
80 Panel Kontrol Pompa Submersible Unit 3,746,000.00 3,400,000.00 5,000.00 3,405,000.00 340,500.00
81 Kabel Power M' 16,000.00 14,000.00 200.00 14,200.00 1,420.00
82 Kabel Sensor M' 8,000.00 7,000.00 200.00 7,200.00 720.00
83 Probe Sensor Set 166,000.00 150,000.00 500.00 150,500.00 15,050.00
Lembar 21 dari 131

ONGKOS PIKUL TOTAL JUMLAH DIBULATKAN


(Rp.) (Rp.) (Rp.)

(5) (6) (7)


(3) + (4) + (5)

- 82,225.00 82,000.00
- 94,875.00 95,000.00
- 121,715.00 122,000.00
- 134,310.00 134,000.00

- 126,500.00 127,000.00
- 192,500.00 193,000.00
- 227.85 227.00
- 154,000.00 154,000.00
- 159,500.00 160,000.00
- 192,500.00 193,000.00
- 232.22 232.00
- 73,700.00 74,000.00
- 1,562.00 2,000.00
- 246.40 246.00
- 3,107,500.00 3,108,000.00
- 3,217,500.00 3,218,000.00
- 112,200.00 112,000.00
- 45,100.00 45,000.00
- 27,720.00 28,000.00
- 11,110.00 11,000.00
- 36,410.00 36,000.00
- 26,510.00 27,000.00
- 26,510.00 27,000.00
- 12,210.00 12,000.00
- 157,300.00 157,000.00
- 25,410.00 25,000.00
- 24,310.00 24,000.00
- 93,610.00 94,000.00
- 49,610.00 50,000.00
- 77,110.00 77,000.00
- 487,960.00 488,000.00
- 31,020.00 31,000.00
- 6,710.00 7,000.00
1.00 10,011.00 10,000.00
- 249,296.67 249,000.00
- 171,746.67 172,000.00
- 106,205.00 106,000.00
- 77,971.67 78,000.00
- 33,513.33 34,000.00
- 363,165.00 363,000.00
Lembar 22 dari 131

ONGKOS PIKUL TOTAL JUMLAH DIBULATKAN


(Rp.) (Rp.) (Rp.)

(5) (6) (7)


(3) + (4) + (5)
- 176,165.00 176,000.00
- 51,865.00 52,000.00
- 98,065.00 98,000.00
- 57,915.00 58,000.00
- 27,665.00 28,000.00
- 24,365.00 24,000.00
- 9,515.00 10,000.00
- 150,865.00 151,000.00
- 104,665.00 105,000.00
- 41,415.00 41,000.00
- 10,065.00 10,000.00
- 93,665.00 94,000.00
- 66,165.00 66,000.00
- 49,665.00 50,000.00
- 99,165.00 99,000.00
- 313,665.00 314,000.00
- 163,515.00 164,000.00
- 66,165.00 66,000.00
- 1,980,165.00 1,980,000.00
- 1,100,165.00 1,100,000.00
- 935,165.00 935,000.00
- 220,165.00 220,000.00
- 1,100,165.00 1,100,000.00
- 825,165.00 825,000.00
- 594,165.00 594,000.00
- 66,165.00 66,000.00
- 55,165.00 55,000.00
- 46,915.00 47,000.00
- 110,165.00 110,000.00
- 55,165.00 55,000.00
- 27,665.00 28,000.00
- 134,365.00 134,000.00
- 45,265.00 45,000.00
- 15,015.00 15,000.00
- 30,415.00 30,000.00
- 30,965.00 31,000.00
- 44,165.00 44,000.00
- 30,085.00 30,000.00
- 42,020.00 42,000.00
- 66,110.00 66,000.00
- 9,020.00 9,000.00
- 3,355.00 3,000.00
- 15,411,000.00 15,411,000.00
- 3,745,500.00 3,746,000.00
- 15,620.00 16,000.00
- 7,920.00 8,000.00
- 165,550.00 166,000.00
ANALISA HARGA SATUAN UPAH DAN BAHAN

ANALISA HARGA SATUAN UPAH


HARGA ONGKOS HARGA DI OVERHEAD & ONGKOS
NO TENAGA KERJA DASAR SAT ANGKUT LOKASI PROYEK LABA 15 % PIKUL JUMLAH
QUARRY ( Rp) ( Rp) ( Rp) ( Rp)
1 2 3 4 5 6 7 8 9
1 Mandor OH - -
2 Kepala Tukang OH - -
3 Tukang Kayu OH - -
4 Tukang Batu OH - -
5 Tukang Besi OH - -
6 Tukang Cat OH - -
7 Tukang Listrik OH - -
8 Supir OH - -
9 Pekerja OH - -
ANALISA HARGA SEWA PERALATAN
HARGA ONGKOS HARGA DI OVERHEAD & ONGKOS
NO TENAGA KERJA DASAR SAT ANGKUT LOKASI PROYEK LABA 15 % PIKUL JUMLAH
QUARRY ( Rp) ( Rp) ( Rp) ( Rp)
1 2 3 4 5 6 7 8 9
1 Sewa Dump Truck OH - -
2 Tripod OH - -
3 Tangga 7 Meter OH - -
4 Scaffolding OH - -
5 Katrol Pengangkat Tiang OH - -
6 Mobil Pick Up OH - -
ANALISA HARGA SATUAN BAHAN/MATERIAL
HARGA ONGKOS HARGA DI OVERHEAD & ONGKOS
NO BAHAN/MATERIAL DI QUARY SAT ANGKUT LOKASI PROYEK LABA 15 % PIKUL JUMLAH
( Rp) ( Rp) ( Rp) ( Rp) ( Rp)
1 2 3 4 5 6=(3+5) 7 = (6 x 15% ) 8 9 = ( 6+7+8)
BATU
1 Batu Karang M³ - - -
2 Batu Kali M³ - - -
KERIKIL
1 Batu Kerikil Sungai / Pantai (Kerikil Cor) M³ - - -
2 Batu Pecah Mesin (M3) M³ - - -
3 Batu Pecah Mesin (Kg) - Kg - - - -
PASIR & TANAH
1 Pasir Pasang/Beton (M3) M³ - - -
2 Pasir Pasang/Beton (Kg) Kg - - -
3 Pasir Urug M³ - - -
4 Sirtu M³ - - -
5 Tanah Timbunan M³ - - -
BATU BATA
1 Bata Merah 6x11x22 cm Bh - - -
BAHAN KAYU
1 Kayu Klas I M³ - - -
2 Kayu Klas II M³ - - -
3 Papan Kayu Kls I M³ - - -
4 Papan Kayu Kls II M³ - - -
5 Dolken Kayu Btg - - -
SEMEN
1 Porland Cemend Tonasa (Zak) Zak - - -
2 Porland Cemend Tonasa (Kg) Kg - - -
3 Sement Warna Kg - - -
BAHAN AIR
1 Air Ltr - -
BAHAN BESI
1 Besi Beton Polos Kg - - -
2 Angkur Ø 22 mm Kg - - -
3 Angkur Ø 16 mm Kg - - -
4 Besi Polos Standard Ø 6 mm Staf - - -
5 Besi Polos Standard Ø 16 mm Staf - - -
KAWAT
1 Ikat Beton (bendrat) Kg - - -
2 Kawat Baja Kg - - -
3 Kawat Baja M' - - -
BAHAN PAKU
1 Paku Campur Kg - - -
BAHAN PIPA
1 Pipa GIP Mediun A dia. 3" Staf - - -
2 Pipa GIP Mediun A dia. 2." Staf - - -
3 Pipa GIP Mediun A dia. 1.5." Staf - - -
4 Pipa GIP Mediun A dia. 1." Staf - - -
5 Pipa PVC dia 2" Staf - - -
6 Pipa PVC dia 1.5" Staf - - -
7 Pipa PVC dia 1" Staf - - -
LAMPU JALAN DAN ARMATURE
1 Kap Lampu Jalan Zetalux Bh - - -
2 Kap Lampu Jalan Osiwa Bh - - -
3 Stang Lampu Uk. P= 3 M' Dia. 1,5" Bh - - -
4 Kap Lampu Jalan Zetalux Bh - - -
5 Stang Lampu Uk. P= 1,5 M' Dia. 1,5" Bh - - -
6 Balon Mercury Scn-T 250 Watt Bh - - -
7 Balon Mercury Scn-T 220 Watt (Non Ignitor) Bh - - -
8 Balon MercuryHPL -N 250 Watt Bh - - -
9 Balon Mercury ML 250 Watt Bh - - -
10 LED SETA 100 W lengkap Bh - - -
11 LED SETA 80 W lengkap Bh - - -
12 Fatro Lengkap Bh - - -
13 Lampu Philips (19 W) untuk Fatro Bh - - -
14 Himawari 80 W ( 1 LED) Lengkap Bh - - -
15 LED SETA LUX 95 W Bh - - -
16 Balon Visicon 95 Watt Bh - - -
17 Balon Visicon 75 Watt Bh - - -
18 LED CL RL-2 100 Watt (bridgelux Chip) Bh - - -
19 LED CL RL-2 80 Watt (bridgelux Chip) Bh - - -
20 LED CL RL-2 60 Watt (bridgelux Chip) Bh - - -
21 LED MINI 20 W Bh - - -
22 LED MINI 30 W Bh - - -
23 LED MINI 40 W Bh - - -
24 LED MINI 50 W Bh - - -
25 LED JETA 20 W Bh - - -
26 LED JETA 30 W Bh - - -
27 LED JETA 40 W Bh - - -
28 LED JETA 50 W Bh - - -
29 LED SETA 60 W Bh - - -
30 LED SETA 80 W Bh - - -
31 LED SETA 100 W Bh - - -
32 LED META 130 W Bh - - -
33 LED META 150 W Bh - - -
34 Lampu LED Flexibel 12 V-DC IP65 Bh - - -
35 Lampu Shade Mika Bh - - -
36 LAMPU KESSIL A. 160 TUNA BLUE 40 WATT Bh - - -
37 LAMPU LED 33 WATT PHILIPS Bh - - -
38 BOLA POLITIN Bh - - -
39 LAMPU LED 50 WATT PHILIPS Bh - - -
40 LED SETA 170 W Bh - - -
41 Adaptor LED/Flasher IC Bh - - -
42 Ballast BSN 250 Watt Bh - - -
43 Ballast BHL 250 Watt Bh - - -
44 Ballast BHL 400 Watt Bh - - -
45 Lampu Selang Bh - - -
46 Lampu Meteor Bh - - -
47 Tiang Lampu Decorative DG-Alfino-H7000 Bh - - -
48 Tiang Decorative H 06 Doubel Arm Bh - - -
49 Tiang Decorative H 06 Single Arm Bh - - -
MATERIAL PANNEL
1 Box Pannel Outdoor Uk. 40 x 60 cm Bh - - -
2 Box Pannel Uk. 40 x 60 cm Bh - - -
3 Box Pannel Uk.30 x 40 cm Bh - - -
4 Box Out Door KWH Meter 3 Phase Bh - - -
5 Magnetic Contactor SN 65-220 V Bh - - -
6 Magnetic Contactor 80 A Bh - - -
7 Magnetic Contactor 50 A Bh - - -
8 Magnetic Contactor 35 A Bh - - -
9 Timer Switch Panasonic Bh - - -
10 Timer Switch Theben Bh - - -
11 MCB 2 A Bh - - -
12 MCB 4 A Bh - - -
13 MCB 10 A Bh - - -
14 MCB 16 A Bh - - -
15 MCB 25 A Bh - - -
16 MCB 32 A Bh - - -
17 MCB 35 A Bh - - -
18 MCB 35 A (3 Phase) Bh - - -
19 MCB 50 A Bh - - -
20 MCB 50 A (3 Phase) Bh - - -
21 MCB 63 A Bh - - -
22 MCB 63 A (3 Phase) Bh - - -
23 MCB 80 A Bh - - -
24 MCB 80 A (3 Phase) Bh - - -
25 KWH Meter 60/80 Bh - - -
26 KWH Meter 3 Phase Bh - - -
BAHAN KABEL JARINGAN
1 NYM 2 x 1.5 mm (Eterna) Meter - - -
2 NYM 2 x 2.5 mm (Eterna) Meter - - -
3 NYM 2 x 4 mm (Eterna) Meter - - -
4 NYM 2 x 6 mm (Eterna) Meter - - -
5 NYM 2 x 10 mm (Eterna) Meter - - -
6 NYM 3 x 2,5 mm (Eterna) Meter - - -
7 NYM 3 x 4 mm (Eterna) Meter - - -
8 NYM 3 x 6 mm (Eterna) Meter - - -
9 NYM 2 x 10 mm (Eterna) Meter - - -
10 NYM 4 x 2.5 mm (Eterna) Meter - - -
11 NYM 4 x 4 mm (Eterna) Meter - - -
12 NYM 4 x 6 mm (Eterna) Meter - - -
13 NYM 4 x 10 mm (Eterna) Meter - - -
14 NGA 1,5 mm Meter - - -
15 NGA 2,5 mm Meter - - -
16 Tuistek 2 x 10 mm Meter - - -
17 Tuistek 2 x 16 mm Meter - - -
18 Tuistek 4 x 16 mm Meter - - -
19 NYFGBY 2 x 6 mm Meter - - -
20 NYFGBY 4 x 6 mm Meter - - -
21 NYFGBY 2 x 4 mm Meter - - -
22 NYFGBY 4 x 4 mm Meter - - -
TIANG LAMPU / LISTRIK
1 Tiang PJU Type ISP Lengan Tunggal Oct. 9 M Buah - - -
2 Tiang PJU Type ISP Lengan Ganda Oct. 9 M Buah - - -
3 Tiang Galvanis 12 Meter Buah - - -
4 Tiang PJU Type ISP Lengan Tunggal Oct. 7 M Buah - - -
5 Tiang PJU Type ISP Lengan Ganda Oct. 7 M Buah - - -
6 Tiang PJU Solar Cell Type ISP 9 M Oct Single Buah - - -
7 Tiang Decorative, h = 7 M (ORLANDO) Buah - - -
8 Tiang Lampu Decorative DG-Alfino-H7000 Bh - - -
9 Tiang Decorative H 06 Doubel Arm Bh - - -
10 Tiang Decorative H 06 Single Arm Bh - - -
11 Tiang PJU Antik 6 M, 2 lengan AB 106 Buah - - -
12 Tiang Telepon (Telkom) H07 Buah - - -
13 Tiang Telepon (Telkom) H09 Buah - - -
14 Tiang Listrik Standard H09 Buah - - -
15 Tiang Listrik Standard H07 Buah - - -
16 Tiang Listrik Besi 9 meter da N Buah - - -
17 Tiang Listrik Besi 11 meter Buah - - -
18 Tiang Listrik Besi 13 meter Buah - - -
KLEM BEUGEL
1 Klem Beugel 2 x 1,5 " Buah - - -
2 Klem Beugel 3 x 1,5 " Buah - - -
3 Klem Beugel 4 x 1,5 " Buah - - -
4 Klem Beugel 5 x 1,5 " Buah - - -
5 Klem Beugel 6 x 1,5 " Buah - - -
6 Klem Beugel 10 x 1,5 " Buah - - -
7 Beugel 1.5" Buah - - -
8 Beugel 2" Buah - - -
9 Beugel 3" Buah - - -
10 Beugel 5" Buah - - -
11 Beugel 6" Buah - - -
12 Beugel 10" Buah - - -
13 Klem Kabbel Seling baja Buah - - -
LAIN-LAIN
1 Fotocell Buah - - -
2 Isolasi Listrik 3 M Roll - - -
3 Service Wedge Clam 16 mm Buah - - -
4 Tension Bracket Buah - - -
5 Suspension Bracket Buah - - -
6 Isolasi Listrik Schot 23 Roll - - -
7 Cocector Aluminium Buah - - -
8 Schoon 6 mm Buah - - -
9 Kabel BC 6 mm2 Meter - - -
10 Strain Klem LV TC Buah - - -
11 Klem Kabel N0 10 Dos - - -
12 Klem Kabel N0 12 Dos - - -
13 Klem Kabel N0 14 Dos - - -
14 Afta Klem 10 mm Buah - - -
15 Afta Klem 16 mm Buah - - -
16 Socket Automat Lampu Selang Buah - - -
17 CCS/CCO 1P1 Buah - - -
18 Veteng Porselin E-40 Buah - - -
19 T Dos Buah - - -
20 Dora Dos 3/4 Buah - - -
Dora Dos 5/8 Buah - - -
Automatic Timer Solenoid 1 " Buah - - -
Automatic Timer Solenoid 11/2 " Buah - - -
Automatic Timer Solenoid 2 " Buah - - -
Automatic Timer Hunter 9 Sim Buah - - -
Yokes /Stoping Buckle Buah - - -
Stainless Steel Strip M - - -
Knee PVC dia 2" Buah - - -
Knee PVC dia 1,5" Buah - - -
Knee PVC dia. 1" Buah - - -
Gembok Buah - - -
Skun Kabel (Ties) `15 cm Bh - - -
Kabel Power M' - - -
Kabel NYAF 2x2,5 mm M' - - -
Kabel Seling M10 Baja M' - - -
Klem Sekling Stanlees Steel Bh - - -
Jarum Keras / Spand Skrup Stanlees Steel Bh - - -
Kaussen Stainlees Steel Bh - - -
Cat Primer Nebel 1000 Kg - - -
Cat Finish Clear Coating Kg - - -
Box Panel Out Door 25x30x20 cm Bh - - -
Asessoris Ls - -
Grounding Rod 12 mm2 staff - - -
Kabel schoon 6 mm2 Buah - - -
Biaya Penyambungan VA - -
SLO ( sertifikat Layak Operasi ) VA - -
Uang jaminan Listrik (UJL) VA - -
BAHAN BAKAR MINYAK
1 Solar Ltr - - -
2 Minyak Pelumas Ltr - - -
BAHAN SANITAIR
1 Kloset Jongkok American Standart Unit - -
2 Kloset Duduk American standart Unit - -
3 Kran Air 3/4 Bh - -
4 Kran Air 1/2 Bh - -
5 Seal Tape Set - -
6 Dop Penguras Bak Bh - -
7 Floordrain Plastik Bh - -
8 Wastafel Warna/Keramik Unit - -
9 Bak Air Fiberglas 1 M3 Unit - -
No. URAIAN KODE KOEF. SATUAN

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP
2. Tenaga Pw 133.0 HP
3. Kapasitas Cp 0.93 M3
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 90,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B - C ) x D E 106,837.98 Rupiah
W

b. Asuransi, dll = 0.002 x B F 0.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 106,837.98 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 205,086.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 119,700.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 39,375 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 56,250.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 18,783.23 Rupiah


5. Pembantu Operator= ( 1 Orang / Jam ) x U2 M 12,354.66 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 451,548.90 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 558,386.88 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 18,783.23 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,354.66 Rp./Jam
4. Bahan Bakar Bensin Mb 128,950.00 Liter
5. Bahan Bakar Solar Ms 12,850.00 Liter
6. Minyak Pelumas Mp 36,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3
2. Tenaga Pw 20.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 25,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 2,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.57619 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B - C ) x D E 8,642.86 Rupiah
W

b. Asuransi, dll = 0.002 x B F 0.00 Rupiah


W
Biaya Pasti per Jam = (E+F) G 8,642.86 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 30,840.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 18,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,458 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 2,083.33 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 18,783.23 Rupiah


5. Pembantu Operator= ( 1 Orang / Jam ) x U2 M 12,354.66 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 83,519.56 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 92,162.42 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 18,783.23 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,354.66 Rp./Jam
4. Bahan Bakar Bensin Mb 128,950.00 Liter
5. Bahan Bakar Solar Ms 12,850.00 Liter
6. Minyak Pelumas Mp 36,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KET.

#REF!

0.12

0.025

0.125
% / Tahun

KET.
0.12

0.025

0.125

% / Tahun
PERHITUNGAN BACK UP VOLUME PEKERJAAN
PEKERJAAN : PENGADAAN DAN PEMASANGAN LAMPU HIAS WAIHAONG
LOKASI : KOTA AMBON
TAHUN ANGGARAN : 2020

VOLUME
No. JENIS PEKERJAAN ∑ P L T 1/3 SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
Rp. Rp.

A. PEKERJAAN PERSIAPAN
1 Pengukuran Kembali (Steak Out) 1.000 - -
2 Dokumentasi dan Pelaporan 1.000 - -
3 Pembersihan Awal dan Akhir 1.000 - -

B. PEKERJAAN PENGADAAN MATERIAL UTAMA


C. PEKERJAAN KONSTRUKSI
3 Pek. Galian Tanah (Pondasi Tiang & Kabel) 70.90 0.80 0.60 34.032 - -
### Err:509 0.12 70.90 8.508 Err:509 Err:509
### Err:509 62.37 15.592 Err:509 Err:509
KM/WC 2.60 0.25 0.651
R.Tamu 5.13 0.25 1.281
Dapur 7.29 0.25 1.823
R. tidur 6.25 0.25 1.563
R. periksa 12.56 0.25 3.141
R. Daftar 8.06 0.25 2.016
Km/WC 2.63 0.25 0.656
R. KIA 9.00 0.25 2.250
R. Obat 4.50 0.25 1.125
Teras 1 1.54 0.25 0.384
Teras 2 2.81 0.25 0.703
### Err:509 8.34 0.10 0.834 Err:509 Err:509
### Err:509 70.70 0.10 7.070 Err:509 Err:509
### Err:509 70.90 0.80 0.05 2.836 Err:509 Err:509
### Err:509 70.90 0.80 0.15 8.508 Err:509 Err:509
### Err:509 70.90 0.30 0.60 0.60 19.143 Err:509 Err:509
### Err:509 41.68 0.15 0.35 2.188 Err:509 Err:509
Err:509 Err:509
### Err:509 Err:509 Err:509
5 Pek. Pondasi Tiang 50 x 50 cm (64 Kg/M³, f’c = 19,3 Mpa) 70.90 0.15 0.20 2.127 - -
6 Perbaikan Bekas Bongkaran Trotoar (Rabat Beton) 27.00 0.15 0.15 4.00 2.430 - -
### Err:509 3.00 0.25 0.25 3.50 0.656 Err:509 Err:509
### Err:509 4.80 1.35 0.12 0.778 Err:509 Err:509
### Err:509 7.50 0.08 0.50 0.300 Err:509 Err:509
### Err:509 77.55 0.15 0.20 2.327 Err:509 Err:509
9 Material Bantu 3.00 0.15 0.30 0.135 - -
Jumlah #VALUE!
D. PEKERJAAN PEMASANGAN - -
1 Pemasangan Tiang Lampu Decorative 218.095 - -
Seluruh 63.85 3.80 246.650
Kusen P1 1.00 1.32 2.16 2.851
P2 6.00 0.92 2.16 11.923
P3 2.00 0.82 2.16 3.542
J1 1.00 0.57 1.62 0.923
J2 11.00 0.57 1.12 7.022
V KM/WC 2.00 0.52 0.46 0.478
V saja 21.00 0.32 0.27 1.814
28.555
2 Pemasangan Lampu 436.189 - -
### Err:509 436.189 Err:509 Err:509
Jumlah #VALUE!
### Err:509 Err:509 Err:509
### Err:509 0.492 Err:509 Err:509
P1 1.00 1.52 2.10 0.023
P2 6.00 1.12 2.10 0.102
P3 2.00 1.02 2.10 0.031
J1 1.00 1.54 3.00 0.033
J2 11.00 1.54 2.00 0.244
V KM/WC 2.00 1.44 0.60 0.012
V saja 21.00 1.04 0.30 0.047
### Err:509 12.600 Err:509 Err:509
P1 1.00 1.20 2.10 2.520
P2 6.00 0.80 2.10 10.080
### Err:509 2.940 Err:509 Err:509
P3 2.00 0.70 2.10 2.940
### Err:509 5.625 Err:509 Err:509
J1 1.00 0.45 1.50 0.675
J2 11.00 0.45 1.00 4.950
### Err:509 0.400 Err:509 Err:509
V KM/WC 2.00 0.40 0.50 0.400
Err:509 Err:509
### Err:509 Err:509 Err:509
### Err:509 90.05 0.07 6.303 Err:509 Err:509
Teras 1 1.54
R. Tamu 5.13
KM/WC 2.54
Dapur/R. Makan 6.70
R. Tidur 6.25
Teras 2 2.81
R. Adm 8.06
R. Periksa 12.56
R. KIA 9.00
R. Obat 4.50
KM/WC 2.63
Rabat Luar 28.34
### Err:509 52.20 52.200 Err:509 Err:509
R. Tamu 5.13
Dapur/R. Makan 6.70
R. Tidur 6.25
R. Adm 8.06
R. Periksa 12.56
R. KIA 9.00
R. Obat 4.50
### Err:509 4.35 4.350 Err:509 Err:509
Teras 1 1.54
Teras 2 2.81
### Err:509 5.16 5.160 Err:509 Err:509
KM/WC 2.54
KM/WC 2.63
### Err:509 18.495 Err:509 Err:509
KM/WC 4.17 2.00 8.334
KM/WC 5.08 2.00 10.161

### Err:509 Err:509 Err:509


### Err:509 2.000 Err:509 Err:509
### Err:509 3.000 Err:509 Err:509
### Err:509 2.000 Err:509 Err:509
### Err:509 1.000 Err:509 Err:509
### Err:509 1.000 Err:509 Err:509
### Err:509 2.000 Err:509 Err:509
### Err:509 1.000 Err:509 Err:509
### Err:509 1.000 Err:509 Err:509
### Err:509 1.000 Err:509 Err:509
Err:509 Err:509
### Err:509 Err:509 Err:509
### Err:509 80.92 80.915 Err:509 Err:509
Teras 1 -
R. Tamu 4.46
KM/WC 2.12
Dapur/R. Makan 7.55
R. Tidur 5.52
Teras 2 -
R. Adm 7.11
R. Periksa 11.42
R. KIA 8.12
R. Obat 3.85
KM/WC 2.16
Luar Bangunan 28.61
### Err:509 80.915 Err:509 Err:509
### Err:509 168.19 168.190 Err:509 Err:509
Teras 1 -
R. Tamu 7.65
KM/WC 5.97
Dapur/R. Makan 11.07
R. Tidur 9.40
Teras 2 -
R. Adm 12.39
R. Periksa 14.89
R. KIA 11.39
R. Obat 8.39
KM/WC 5.89
Luar Bangunan 81.15
### Err:509 Err:509 Err:509
### Err:509 104.950 Err:509 Err:509
R. Dinas 5.56 3.83 21.276
4.73 3.83 18.116
Puskesmas 2.00 6.78 3.55 48.138
2.00 3.25 2.68 17.420
### Err:509 104.950 Err:509 Err:509
### Err:509 15.41 15.410 Err:509 Err:509
5.38
6.78
3.25
### Err:509 48.18 0.20 9.636 Err:509 Err:509
7.50
4.20
5.20
19.94
11.34
### Err:509 Err:509 Err:509
### Err:509 9.00 9.000 Err:509 Err:509
### Err:509 27.00 27.000 Err:509 Err:509
### Err:509 24.00 24.000 Err:509 Err:509
### Err:509 9.00 9.000 Err:509 Err:509
### Err:509 12.00 12.000 Err:509 Err:509
### Err:509 24.00 24.000 Err:509 Err:509
Err:509 Err:509
### Err:509 Err:509 Err:509
### Err:509 436.189 Err:509 Err:509
### Err:509 80.915 Err:509 Err:509
### Err:509 9.636 Err:509 Err:509
### Err:509 26.011 Err:509 Err:509
P1 1.00 1.32 4.20 1.325
P2 6.00 0.92 4.20 7.373
P3 2.00 1.02 4.20 2.506
J1 1.00 1.14 3.00 0.994
J2 11.00 1.14 2.00 8.290
V KM/WC 2.00 1.04 0.60 0.787
V saja 21.00 0.64 0.30 4.738
### Err:509 14.070 Err:509 Err:509
Err:509 Err:509
### Err:509 Err:509 Err:509
### Err:509 34.00 34.000 Err:509 Err:509
### Err:509 13.00 13.000 Err:509 Err:509
### Err:509 7.00 7.000 Err:509 Err:509
### Err:509 6.00 6.000 Err:509 Err:509
### Err:509 4.00 4.000 Err:509 Err:509
### Err:509 14.00 14.000 Err:509 Err:509
### Err:509 1.00 1.000 Err:509 Err:509
### Err:509 1.00 1.000 Err:509 Err:509
Err:509 Err:509
### Err:509 Err:509 Err:509
### Err:509 1.000 Err:509 Err:509
### Err:509 1.000 Err:509 Err:509
### Err:509 1.000 Err:509 Err:509

TOTAL Err:509

Anda mungkin juga menyukai