40 60

Puncak Ø 63 mm
Pipa Ø 50 mm
Box Kontrol Box Kontrol
DINAS PEKERJAAN UMUM DAN

60

60
PENATAAN RUANG
Anchor Bolt Anchor Bolt
Lampu SETA KOTA AMBON
100 Watt
Segmen C KETERANGAN
plat 3,2 mm

40

40
4 Ø12 4 Ø12

Arde Arde

70

70
PEKERJAAN
Ø10 - 20 Ø10 - 20
30

PENGADAAN DAN PEMASANGAN

10

10
LAMPU JALAN RUAS GALALA -
HALONG
Segmen B
10 60 10 10 80 10
plat 3,2 mm LOKASI

GALALA - HALONG

DETAIL PONDASI BOX KONTROL PJU MENGETAHUI


Skala 1 : 30
30

KEPALA DINAS PEKERJAAN UMUM DAN


PENATAAN RUANG
900

KOTA AMBON

Ø10 - 20

...............................................
NIP. .......................................
Segmen A
plat 3,2 mm

60
4 Ø12
MENYETUJUI

PEJABAT PEMBUAT KOMITMEN


(PPK)
80

Pipa PVC 2" PENULANGAN PONDASI BOX J.S. TATIPIKALAWAN


Skala 1 : 30 NIP. 19720310 199703 1 008
30

DIPERIKSA PARAF
20

Anchor bolt 16 mm

........................................

Dasar Ø 150 mm Ø10 - 20


4 Ø16 DIGAMBAR PARAF
Rib Plat, t = 6 mm
100

........................................
20

Base Plat, 300 x 300 x 16 mm

40
4 Ø16
Ø12 - 15

NO NAMA GAMBAR SKALA


120

40
40

40
DET. PONDASI TIANG PJU PENULANGAN PONDASI TIANG
Skala 1 : 30 Skala 1 : 30
KODE LBR NO. LBR JLH LBR
TIANG PJU 9 M
Skala 1 : 50
KONSULTAN PERENCANA

CVP
.ESONACONSULTAN