Anda di halaman 1dari 75

PEMERINTAH PROVINSI KALIMANTAN

UTARA
DINAS PEKERJAAN UMUM, PENATAAN RUANG,
PERUMAHAN DAN KAWASAN PERMUKIMAN

HARGA SATUAN POKOK KEGIATAN BIDANG KE PU AN


PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

HARGA SATUAN POKOK KEGIATAN


DAFTAR ISI
HARGA SATUAN POKOK KEGIATAN

NO URAIAN HALAMAN NO URAIAN HALAMAN

BIDANG UMUM M PEKERJAAN KUNCI DAN KACA CK - 10


A PEKERJAAN TANAH U-1 N PEKERJAAN PENGECATAN CK - 10
B PEKERJAAN PASANGAN U-1 O PEKERJAAN SANITASI DALAM GEDUNG CK - 11
C PEKERJAAN BETON BERTULANG U-2 P PEKERJAAN PEMASANGAN PIPA LUAR GEDUNG CK - 12
D BETON PRACETAK U-2 Q PEKERJAAN PEMOTONGAN PIPA CK - 13
E PEKERJAAN BAJA U-3 R PEKERJAAN AKSESORIS PIPA CK - 13
F PEKERJAAN PEMANCANGAN U-3 S PEKERJAAN PENYAMBUNGAN PIPA CK - 13
G PEKERJAAN PENGERINGAN AIR (DEWATERING) U-3 T PEKERJAAN PENGETESAN PIPA CK - 14
H PENGGUNAAN PERALATAN KERJA U-3 U PEKERJAAN MEKANIKAL DAN ELEKTRIKAL CK - 14
I ALAT LAINNYA U-6 V PEKERJAAN LANSEKAP CK - 16
W PEKERJAAN SALURAN U-DITCH CK - 17
BIDANG BINA MARGA
A DIVISI 1. UMUM BM - 1 BIDANG SUMBER DAYA AIR
B DIVISI 2. DRAINASE BM - 1 A PEKERJAAN TANAH (MANUAL & SEMI MEKANIS) (NORMATIF) SDA - 1
C DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK BM - 3 B PEKERJAAN PASANGAN SDA - 3
D DIVISI 4. PEKERJAAN PREVENTIF BM - 3 C PEKERJAAN PENGAMAN PANTAI SDA - 6
E DIVISI 5. PERKERASAN BERBUTIR BM - 5 D PEKERJAAN BETON (NORMATIF) SDA - 7
F DIVISI 6. PERKERASAN ASPAL BM - 5 E PEKERJAAN PEMBESIAN SDA - 8
G DIVISI 7. STRUKTUR BM - 6 F PEKERJAAN BEKISTING SDA - 8
H DIVISI 8. REHABILITASI JEMBATAN BM - 9 G PEKERJAAN CURING SDA - 9
I DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN BM - 11 H PEKERJAAN PEMBONGKARAN KONTRUKSI BETON SDA - 9
J DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA BM - 12 I PEKERJAAN PEMASANGAN WATERSTOP SDA - 9
J PEKERJAAN PEMANCANGAN SDA - 9
BIDANG CIPTA KARYA K PEKERJAAN DEWATERING (Normatif) SDA - 10
A PEKERJAAN PERSIAPAN CK - 1 L PEKERJAAN PINTU AIR SDA - 10
B PEKERJAAN TANAH CK - 1 M PEKERJAAN AIR TANAH (Normatif) SDA - 11
C PEKERJAAN PONDASI CK - 2 N PEKERJAAN LAIN LAIN SDA - 12
D PEKERJAAN BETON CK - 2 O PEKERJAAN KAYU SDA - 12
E BETON PRACETAK CK - 3 P PEKERJAAN SALURAN U-DITCH SDA - 13
F PEKERJAAN BESI DAN ALUMUNIUM CK - 4
G PEKERJAAN DINDING CK - 5 BIDANG TATA RUANG
H PEKERJAAN PLESTERAN CK - 5 A PENGADAAN PETA TR - 1
I PEKERJAAN PELAPIS LANTAI DAN DINDING CK - 6 B PRODUK PENGINDERAAN JAUH TR - 1
JASA PENGUMPULAN DAN PENGOLAHAN DATA INFORMASI
J PEKERJAAN LANGIT-LANGIT DAN LIS CK - 8 C GEOSPASIAL TR - 1
K PEKERJAAN PENUTUP ATAP CK - 8
L PEKERJAAN KAYU CK - 9
harga satuan pokok kegiatan
PROVINSI KALIMANTAN UTARA 2021
bidang umum
HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

A PEKERJAAN TANAH
1 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 1 KP : 2 PP m3 1,133,325.00 1,186,589.55 1,170,228.50 1,277,007.15 1,269,363.10 1,110,017.95 1,206,560.45 1,225,932.20 1,252,744.45 2,142,295.90 1,224,003.65 2,000,519.07 2,190,982.30 1,207,819.70 1,241,873.50

2 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 3 KP : 10 PP m3 1,300,259.00 1,361,870.25 1,338,243.50 1,468,981.25 1,453,531.00 1,269,145.75 1,375,305.13 1,402,183.16 1,429,796.61 2,479,785.25 1,400,527.50 2,318,262.00 2,544,030.00 1,384,070.66 1,418,652.77

3 Pemasangan 1 m3 Pondasi Batu Belah Camp 1/4 SP : 1 KP : 4 PP 0.00 1,255,869.00 1,315,260.75 1,293,917.90 1,417,932.75 1,404,734.20 1,227,007.45 1,331,023.00 1,355,629.78 1,383,293.49 2,391,220.99 1,353,992.06 2,234,498.21 2,450,959.12 1,337,517.28 1,372,131.70

4 Pemasangan 1 m3 Pondasi Siklop, 60% Beton Camp 1 SP : 2 PB : 3 0.00 4,033,192.60 4,225,679.14 4,149,400.56 4,580,513.94 4,498,916.38 3,872,808.08 4,051,982.22 4,088,645.14 4,382,891.04 7,605,439.44 4,298,903.32 7,351,522.48 8,121,764.14 4,257,964.70 4,345,453.94

5 Pemasangan batu kosong ( aanstamping ) m3 888,444.00 931,037.70 919,558.86 1,007,979.60 995,071.08 867,324.48 946,482.66 962,387.16 985,009.50 1,752,136.32 964,259.82 1,630,270.18 1,794,866.64 952,968.66 976,497.66

6 Pemasangan pondasi sumuran , diameter 100 cm m3 1,416,006.50 1,482,407.04 1,441,638.16 1,592,388.44 1,578,104.98 1,330,207.53 1,422,015.02 1,457,044.94 1,473,782.04 2,465,174.04 1,450,545.37 2,321,117.27 2,540,094.24 1,430,416.00 1,466,120.74

7 Pengadaan Tiang Pancang spun pile d=50 cm m 1,766,484.29 1,851,266.29 1,833,201.88 2,017,562.80 1,971,928.11 1,715,420.40 1,885,313.98 1,918,719.17 1,962,607.42 3,650,958.22 1,928,557.57 3,384,335.36 3,756,162.14 1,910,721.46 2,161,999.85

8 Pengadaan Tiang Pancang spun pile d=45 cm m 1,480,984.29 1,551,466.29 1,536,301.88 1,689,262.80 1,652,128.11 1,438,520.40 1,580,713.98 1,608,619.17 1,644,207.42 3,041,758.22 1,615,757.57 2,821,295.36 3,130,562.14 1,600,621.46 1,808,499.85

9 Pengadaan Tiang Pancang spun pile d=40 cm m 1,202,484.29 1,259,066.29 1,246,601.88 1,368,962.80 1,340,228.11 1,168,320.40 1,283,513.98 1,306,019.17 1,333,407.42 2,447,358.22 1,310,357.57 2,271,575.36 2,519,762.14 1,298,021.46 1,463,499.85

10 Pengadaan Tiang Pancang spun pile d=30 cm m 768,484.29 803,366.29 795,301.88 869,862.80 854,128.11 747,420.40 820,513.98 834,619.17 849,407.42 1,521,358.22 834,757.57 1,415,495.36 1,568,562.14 826,621.46 926,099.85

11 Tiang Pancang square pile 35 x 35 cm m 967,300.00 1,013,965.00 1,003,665.00 1,103,944.00 1,081,388.00 940,900.00 1,032,960.00 1,049,960.00 1,074,830.00 1,988,450.00 1,056,230.00 1,843,850.00 2,049,100.00 1,045,930.00 1,183,460.00

12 Pengadaan Tiang Pancang square pile 30 x 30 cm m 761,800.00 798,265.00 789,965.00 867,644.00 851,188.00 741,500.00 813,560.00 826,660.00 845,530.00 1,549,650.00 830,830.00 1,438,130.00 1,598,300.00 822,630.00 928,860.00

13 Pengadaan Tiang Pancang square pile 25 x 25 cm m 595,300.00 623,365.00 616,865.00 676,144.00 664,788.00 580,000.00 635,960.00 645,760.00 659,830.00 1,194,450.00 648,330.00 1,109,630.00 1,233,300.00 641,730.00 722,660.00

14 Pengadaan Tiang Pancang square pile 20 x 20 cm m 447,800.00 468,565.00 463,465.00 506,544.00 499,588.00 437,000.00 478,660.00 485,660.00 495,330.00 879,850.00 486,730.00 818,750.00 910,100.00 481,630.00 540,160.00

15 Upah Potong dan buang tiang pancang bh 192,000.00 199,625.00 197,125.00 204,625.00 212,375.00 192,000.00 204,875.00 207,375.00 209,875.00 257,750.00 202,250.00 252,750.00 265,875.00 199,750.00 209,875.00

B PEKERJAAN PASANGAN

1 Pemasangan pondasi batu belah campuran 1 Semen : 3 PP m3 1,565,334.00 1,640,199.00 1,600,949.50 1,773,817.50 1,743,929.00 1,519,782.50 1,636,412.05 1,678,362.90 1,704,254.58 3,001,999.10 1,676,131.90 2,814,349.92 3,095,238.80 1,660,250.40 1,693,686.08

2 Pemasangan pondasi batu belah campuran 1 Semen : 4 PP m3 1,490,584.00 1,561,711.50 1,526,797.50 1,687,855.00 1,662,003.00 1,449,069.00 1,562,663.70 1,600,413.60 1,626,746.30 2,854,502.40 1,598,332.10 2,674,310.28 2,939,639.20 1,582,301.10 1,616,028.30

3 Pemasangan pondasi batu belah campuran 1 Semen : 5 PP m3 1,434,096.00 1,502,399.10 1,470,533.98 1,622,893.80 1,599,978.44 1,395,517.64 1,506,551.70 1,541,303.23 1,567,801.49 2,742,278.41 1,539,277.85 2,568,012.63 2,821,530.70 1,523,190.73 1,557,027.37

4 Pemasangan batu kosong ( aanstamping ) m3 888,444.00 931,037.70 919,558.86 1,007,979.60 995,071.08 867,324.48 946,482.66 962,387.16 985,009.50 1,752,136.32 964,259.82 1,630,270.18 1,794,866.64 952,968.66 976,497.66
Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 2
5 m2 171,960.00 176,488.00 173,014.00 189,044.00 189,318.00 163,834.00 175,619.20 178,161.60 178,885.80 310,038.40 177,087.60 287,237.68 314,925.20 175,511.60 178,409.80
PP
Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 3
6 m2 163,140.00 167,227.00 164,210.00 178,901.00 179,624.00 155,463.00 166,826.00 168,915.00 169,651.00 292,452.00 167,845.00 270,601.00 296,440.00 166,265.00 169,171.00
PP
Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 4
7 m2 158,000.00 161,830.00 159,094.00 172,990.00 173,982.00 150,592.00 161,726.20 163,539.60 164,293.30 282,252.40 162,475.60 260,936.08 285,701.20 160,889.60 163,807.30
PP
8 Plesteran 1 PC : 2 PP, tebal 20 mm m2 133,878.40 139,647.72 135,683.90 146,804.86 149,327.04 132,249.08 140,021.70 142,725.12 144,078.67 206,006.40 140,344.62 196,820.02 209,768.74 137,803.12 143,089.67

9 Plesteran 1 PC : 3 PP, tebal 20 mm m2 106,048.40 110,621.72 107,863.10 116,364.36 118,132.14 104,642.18 111,229.61 113,707.40 115,067.74 166,017.22 111,329.20 159,254.76 169,332.90 109,762.90 114,076.44

10 Plesteran 1 PC : 4 PP, tebal 20 mm m2 122,544.00 127,801.80 124,471.40 133,901.40 136,909.80 121,366.40 128,856.12 131,102.76 132,469.88 185,124.24 128,623.36 177,232.85 188,499.72 126,249.76 131,476.28

11 Plesteran Ciprat ,1 PC : 2 PP m2 73,830.00 76,981.00 74,747.70 80,408.00 82,632.10 73,294.10 77,544.96 78,640.68 79,256.39 107,709.92 77,331.98 102,949.56 109,526.46 75,593.18 78,782.59

12 Siar pasangan dinding Bata merah m2 43,206.65 45,041.82 43,821.90 47,050.41 48,262.74 42,849.23 45,391.65 46,180.32 46,611.57 63,534.05 45,225.82 61,022.73 64,645.64 44,363.32 46,272.32

BIDANG UMUM U - 5 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

13 Siar pasangan dinding conblock ekspose m2 17,915.00 18,680.00 18,170.00 19,525.00 20,010.00 17,755.00 18,815.00 19,150.00 19,325.00 26,495.00 18,760.00 25,443.00 27,000.00 18,410.00 19,190.00

14 Siar pasangan batu kali adukan 1 PC : 2 PP m2 77,480.00 80,784.00 78,626.00 84,542.00 86,536.00 76,774.00 81,390.80 82,820.40 83,641.20 115,681.60 81,194.40 110,899.92 117,688.80 79,670.40 83,017.20

15 Benangan sudut m 19,080.00 19,880.00 19,684.00 20,680.00 21,312.00 18,982.00 20,484.20 20,903.60 21,330.30 28,728.40 20,149.60 27,965.28 29,249.20 19,973.60 21,024.30

BIDANG UMUM U - 6 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

C PEKERJAAN BETON BERTULANG

1 Bekisting untuk kolom (pemakaian 1 x) m2 536,019.60 560,835.45 553,007.40 602,470.05 600,355.20 534,339.45 580,988.28 589,153.74 601,809.03 1,025,218.56 587,695.08 956,371.46 1,045,835.76 552,807.30 604,612.50

2 Bekisting untuk kolom (pemakaian 2 x) m2 268,009.80 280,417.73 276,503.70 301,235.03 300,177.60 267,169.73 290,494.14 294,576.87 300,904.52 512,609.28 293,847.54 478,185.73 522,917.88 276,403.65 302,306.25

3 Bekisting untuk balok/dinding (pemakaian 1x) m2 548,232.60 573,659.10 565,708.92 616,515.00 614,033.76 546,186.06 594,019.34 602,421.61 615,432.53 1,051,280.69 601,081.36 980,466.76 1,072,608.31 563,157.30 615,169.50

4 Bekisting untuk balok/dinding (pemakaian 2x) m2 274,116.30 286,829.55 282,854.46 308,257.50 307,016.88 273,093.03 297,009.67 301,210.81 307,716.26 525,640.34 300,540.68 490,233.38 536,304.16 281,578.65 307,584.75

5 Bekisting untuk plat lantai (pemakaian 1x) m2 743,019.60 777,771.45 768,287.40 840,382.05 832,195.20 734,715.45 801,236.28 813,265.74 831,993.03 1,465,714.56 814,015.08 1,363,747.46 1,498,475.76 776,919.30 859,636.50

6 Bekisting untuk plat lantai (pemakaian 2x) m2 371,509.80 388,885.73 384,143.70 420,191.03 416,097.60 367,357.73 400,618.14 406,632.87 415,996.52 732,857.28 407,007.54 681,873.73 749,237.88 388,459.65 429,818.25

7 Bekisting untuk tangga (pemakaian 1x) m2 567,642.30 593,941.65 585,899.70 638,805.45 635,772.90 564,913.35 614,580.24 623,323.92 636,913.47 1,090,843.08 622,222.68 1,017,136.31 1,113,352.26 590,025.90 647,033.70

8 Bekisting untuk tangga (pemakaian 2x) m2 283,821.15 296,970.83 292,949.85 319,402.73 317,886.45 282,456.68 307,290.12 311,661.96 318,456.74 545,421.54 311,111.34 508,568.16 556,676.13 295,012.95 323,516.85

9 Kolom praktis beton bertulang (11 x 11) cm m 112,912.75 118,147.32 115,867.33 126,892.50 126,084.97 109,499.09 114,676.85 115,622.84 122,759.86 200,925.70 120,081.74 194,398.32 213,080.97 118,072.80 121,565.12

10 Pemasangan 1 m2 Jembatan Untuk Pengecoran Beton m 157,676.50 165,248.10 163,110.48 179,057.30 176,646.44 153,816.64 168,954.14 170,552.73 174,494.65 314,126.27 171,122.02 289,835.84 319,623.55 147,625.50 154,226.50

11 Membuat 1 m' Kolom Praktis Beton Bertulang (11x11) cm m 131,278.25 137,411.55 134,933.18 148,000.17 146,644.09 127,293.04 134,233.87 135,527.96 143,163.73 245,237.73 140,137.51 235,114.81 258,321.51 136,864.95 140,332.55

12 Membuat 1 m' Ring Balok Beton Bertulang (10x15) cm m 164,933.00 172,521.28 169,133.72 184,893.55 184,278.76 159,974.66 168,272.49 169,824.64 178,838.34 294,794.22 174,914.54 283,547.77 310,246.08 170,103.40 174,909.48

13 Beton Ready-mix K175 m3 1,901,865.58 1,993,340.95 1,969,467.95 2,168,308.35 2,109,110.79 1,774,156.39 1,942,657.19 1,974,675.56 2,021,823.27 3,713,319.97 1,986,920.90 3,442,821.34 3,830,533.63 2,129,315.56 2,182,451.48

14 Beton Ready-mix K225 m3 1,998,465.58 2,094,770.95 2,069,931.95 2,279,398.35 2,217,302.79 1,864,718.89 2,042,275.94 2,076,105.56 2,126,030.52 3,912,557.47 2,089,316.90 3,627,134.14 4,035,325.63 2,189,690.56 2,230,751.48

15 Beton Ready-mix K300 m3 2,179,590.58 2,284,952.20 2,258,301.95 2,487,692.10 2,420,162.79 2,124,331.39 2,327,849.69 2,366,871.56 2,424,524.52 4,483,704.97 2,382,618.65 4,155,077.29 4,621,929.13 2,431,190.56 2,484,326.48

16 Beton Ready-mix K400 m3 2,493,540.58 2,614,599.70 2,584,809.95 2,848,734.60 2,771,786.79 2,347,718.89 2,573,575.94 2,617,065.56 2,681,480.52 4,975,157.47 2,635,106.90 4,609,556.14 5,126,905.63 2,793,440.56 3,088,076.48

17 Lantai Kerja Plastic Sheet m2 32,715.20 34,241.25 33,783.55 36,641.30 36,459.60 32,025.20 34,751.85 35,199.20 35,991.55 59,961.00 35,207.25 56,147.60 61,669.90 34,749.55 38,447.95

D BETON PRACETAK

1 Pembuatan lahan produksi beton K175 tebal 8 cm m2 115,642.85 121,230.81 117,146.64 131,318.95 128,426.39 111,676.05 119,082.24 122,825.80 123,892.91 220,258.98 122,810.32 206,971.07 228,497.13 121,332.41 123,466.66

2 Pembuatan lahan produksi beton K175 tebal 10 cm m2 157,886.38 165,536.41 160,342.32 179,479.58 175,478.27 152,550.95 163,141.07 168,048.01 169,803.02 303,903.14 168,170.02 285,093.79 314,904.04 165,482.59 169,134.64

3 Pembuatan lahan produksi beton K175 tebal 12 cm m2 175,354.30 183,829.57 178,327.51 199,159.99 195,072.20 169,666.63 181,706.21 186,867.76 188,993.53 336,646.17 187,024.16 315,572.03 348,414.81 183,774.37 188,180.25

4 Pembuatan lahan produksi beton K175 tebal 15 cm m2 239,053.61 250,642.70 242,760.25 271,776.99 265,689.60 230,950.60 246,987.98 254,436.44 257,079.80 460,367.21 254,624.95 431,873.77 477,107.41 250,575.89 256,071.66

5 Pembuatan bekisting untuk plat beton pra cetak (5x pemakaian) m2 491,817.97 515,760.17 508,744.23 562,257.46 549,876.48 477,142.51 520,750.59 531,546.18 543,785.72 1,015,231.05 534,506.99 943,494.95 1,044,390.86 488,608.36 500,536.02

6 Pembuatan bekisting untuk balok beton pra cetak (10x pemakaian) m2 227,993.25 239,224.27 237,062.84 261,495.74 255,271.02 221,315.09 243,142.09 247,648.94 254,248.21 485,697.67 249,402.11 449,793.20 498,631.72 206,651.44 212,057.01

7 Pembuatan bekisting untuk kolom beton pra cetak (10x pemakaian) m2 194,959.50 204,538.54 202,707.74 223,506.64 218,273.22 189,272.06 207,895.16 211,761.46 217,398.76 415,203.82 213,194.36 384,619.25 426,216.22 178,869.16 183,834.86

8 Pemasangan dan membuka bekisting plat beton pra cetak bh 11,235.50 11,701.25 11,396.50 12,109.50 12,632.75 11,235.50 11,919.75 12,023.25 12,126.75 15,260.50 11,758.75 14,651.00 15,444.50 11,454.00 12,023.25

9 Pemasangan dan membuka bekisting balok beton pra cetak bh 18,204.50 18,946.25 18,434.50 19,630.50 20,429.75 18,204.50 19,233.75 19,406.25 19,578.75 24,713.50 19,003.75 23,690.00 24,828.50 18,492.00 19,406.25

10 Pemasangan dan membuka bekisting kolom beton pra cetak bh 14,720.00 15,323.75 14,915.50 15,870.00 16,531.25 14,720.00 15,576.75 15,714.75 15,852.75 19,987.00 15,381.25 19,170.50 20,136.50 14,973.00 15,714.75

BIDANG UMUM U - 7 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

11 Menuang beton plat pra cetak bh 90,160.00 93,897.50 93,529.50 96,404.50 100,981.50 90,160.00 98,106.50 100,245.50 102,384.50 126,155.00 95,128.00 125,419.00 129,777.50 94,760.00 100,636.50

12 Menuang beton balok pra cetak bh 92,701.50 96,548.25 96,151.50 99,130.00 103,816.25 92,701.50 100,837.75 103,022.75 105,207.75 129,685.50 97,813.25 128,892.00 133,400.00 97,416.50 103,448.25

13 Menuang beton kolom pra cetak bh 83,403.75 86,899.75 86,549.00 89,176.75 93,512.25 83,403.75 90,884.50 92,810.75 94,737.00 116,638.75 88,118.75 115,937.25 120,428.00 87,768.00 93,190.25

14 Mendirikan komponen plat pracetak bh 150,085.49 154,860.50 153,932.43 160,699.38 163,289.13 147,678.40 164,555.49 167,579.92 168,102.65 244,895.64 159,727.36 237,777.86 255,354.48 157,973.55 165,677.42

15 Mendirikan komponen balok pracetak bh 175,358.78 181,578.61 180,409.42 190,765.99 192,025.49 171,942.41 192,402.22 195,929.91 197,504.16 300,492.52 189,104.79 293,993.50 310,016.44 187,183.81 194,972.31

16 Mendirikan komponen kolom pracetak bh 372,695.40 388,073.33 384,975.85 414,507.84 411,596.84 363,870.28 409,545.82 416,911.93 423,126.70 681,624.35 409,683.91 672,803.65 694,857.11 405,563.50 418,450.59

17 Melangsir komponen plat pracetak (sejauh + 20 m) bh 30,882.02 31,602.98 31,357.11 32,975.76 32,997.51 30,251.51 33,500.24 34,213.88 34,200.77 52,117.85 32,406.72 50,095.62 53,226.88 31,926.68 33,421.16

18 Melangsir komponen balok pracetak (sejauh + 20 m) bh 30,882.02 31,602.98 31,357.11 32,975.76 32,997.51 30,251.51 33,500.24 34,213.88 34,200.77 52,117.85 32,406.72 50,095.62 53,226.88 31,926.68 33,421.16

19 Melangsir komponen kolom pracetak (sejauh + 20 m) bh 30,882.02 31,602.98 31,357.11 32,975.76 32,997.51 30,251.51 33,500.24 34,213.88 34,200.77 52,117.85 32,406.72 50,095.62 53,226.88 31,926.68 33,421.16

20 Bahan grouting campuran m3 8,242,912.50 8,594,870.00 8,456,467.50 9,298,785.00 9,159,980.00 7,891,357.50 8,595,272.50 8,733,675.00 8,947,230.00 17,190,545.00 8,808,827.50 15,855,889.50 17,617,655.00 8,733,675.00 8,946,827.50

E PEKERJAAN BAJA

1 Pemasangan besi profil kg 55,579.50 58,092.25 57,350.50 62,353.00 62,123.00 54,389.25 55,533.50 60,110.50 61,513.50 96,163.00 59,650.50 96,689.70 105,259.50 59,041.00 60,840.75

2 Pemasangan rangka baja WF kg 54,257.00 56,769.75 56,028.00 60,898.25 60,668.25 53,199.00 57,781.75 58,788.00 60,058.75 100,659.50 58,328.00 94,309.20 102,614.50 57,718.50 59,518.25

3 Pekerjaan perakitan (erection) 100 kg 23,057.50 24,081.00 23,425.50 25,357.50 25,921.00 22,850.50 24,357.00 24,529.50 24,782.50 37,225.50 24,437.50 34,755.30 37,697.00 23,782.00 24,679.00

4 Pengelasan dengan las listrik 10 cm 114,205.45 114,587.78 113,929.91 121,187.40 120,092.77 109,832.37 124,878.24 128,058.85 127,791.39 175,090.21 120,269.84 177,655.23 185,278.93 118,032.14 124,178.31

F PEKERJAAN PEMANCANGAN

1 Pemancangan Dolken Kayu Galam 3 m bh 89,400.00 93,200.00 90,900.00 98,800.00 100,000.00 88,300.00 93,900.00 94,800.00 95,900.00 145,600.00 94,700.00 136,260.00 147,400.00 92,400.00 99,800.00

2 Pemancangan tiang pancang dengan pile driver dan hammer m 171,372.64 174,972.64 172,472.64 177,832.64 182,292.64 171,372.64 177,772.64 177,772.64 176,572.64 200,372.64 176,072.64 195,372.64 208,872.64 173,572.64 177,772.64

3 Pemancangan tiang pancang dengan jack-in hydraulic (kap 380 ton) m 352,000.00 367,600.00 362,700.00 394,460.00 391,720.00 344,800.00 382,400.00 387,200.00 393,200.00 621,000.00 387,900.00 616,000.00 629,500.00 383,000.00 392,000.00

4 Upah Potong dan buang tiang pancang bh 192,000.00 199,625.00 197,125.00 204,625.00 212,375.00 192,000.00 204,875.00 207,375.00 209,875.00 257,750.00 202,250.00 252,750.00 265,875.00 199,750.00 209,875.00

G PEKERJAAN PENGERINGAN AIR (DEWATERING)


1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x
1 bh 14,490.00 15,090.30 15,072.36 16,201.20 16,237.08 14,201.58 15,327.66 15,479.46 15,651.50 25,779.32 15,452.32 23,885.78 26,350.64 15,203.46 16,312.06
65 cm
1 buah kistdam pasir/tanah dibungkus karung plastik/bagor/goni
2 bh 31,883.75 33,207.98 33,170.60 35,208.98 35,744.30 31,468.03 33,794.48 33,730.65 34,569.00 52,380.20 33,796.20 49,143.41 53,332.40 33,184.40 35,307.88
atau terpal ukuran 45 cm x 120 cm
3 1 buah geobag pasir/tanah ukuran 145 x 240 cm bh 507,506.50 531,681.11 527,618.16 575,491.51 568,703.98 495,310.29 539,848.41 546,780.84 560,367.40 994,481.82 550,685.32 924,832.58 1,021,560.64 543,215.84 600,377.05
Kerangka kayu untuk 1 m3 kistdam pasir/tanah ukuran 43 cm x 65
4 m3 173,699.40 182,045.49 180,547.63 197,650.69 194,327.22 169,288.95 185,934.50 186,819.53 193,625.00 351,663.96 188,809.40 326,084.24 358,500.74 154,268.04 158,424.14
cm

BIDANG UMUM U - 8 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Kerangka baja profil L.50.50.5 atau L.60.60.6 atau profil besi


5 berlubang untuk 1 m³ kistdam pasir / tanah dengan karung ukuran m3 565,827.60 593,354.23 588,047.10 648,349.99 632,486.09 548,066.20 601,120.41 609,735.64 628,028.00 1,184,070.82 616,480.27 1,097,278.99 1,215,768.04 609,965.64 621,225.86
43 cm x 65 cm.
Pengoperasian per-jam pompa air diesel daya 5 kW dengan suction
6 head maks. 3 m dan discharge head maks. 20 m (kapasitas 0,5 m³/s jam 106,662.50 110,802.50 109,825.00 118,076.25 116,955.00 104,535.00 118,105.00 119,255.00 121,382.50 282,842.50 117,213.75 263,654.75 290,921.25 114,080.00 119,370.00
pada suction head
Pengoperasian 1 m dan
per-jam discharge
pompa head
air diesel 10 10
daya m) kW dengan
suction head maks. 3 m dan discharge head maksimal 20 m
7 jam 338,010.88 353,501.38 350,014.00 383,479.00 375,426.13 328,951.75 371,763.38 377,332.25 386,391.38 813,507.13 377,225.88 780,919.29 823,972.13 371,294.75 381,880.50
(kapasitas 1,0 m³/s pada suction head 1 m dan discharge head 10
Pengoperasian
m) per-jam pompa air diesel daya 20 kW dengan
suction head maks. 3 m dan discharge head maksimal 20 m
8 jam 796,541.75 819,001.25 813,659.50 862,919.75 850,453.75 783,069.50 926,411.25 934,536.00 948,008.25 1,675,061.25 893,734.00 1,616,901.73 1,772,966.50 864,673.50 920,943.00
(kapasitas 2,0 m³/s pada suction head 1 m dan discharge head 10
m)

H PENGGUNAAN PERALATAN KERJA

1 AGGREGAT (CHIP) SPREADER Rp/jam 419,333.54 429,707.90 426,424.26 453,009.44 450,832.17 410,827.61 445,681.14 449,121.02 459,689.29 664,237.53 444,780.60 640,407.88 680,761.25 440,390.78 445,266.78

2 Asphalt Tanker Rp/jam 420,476.76 435,995.50 430,992.64 467,599.60 457,048.23 406,806.17 449,373.50 458,346.99 461,953.93 766,520.11 451,006.80 726,125.37 790,904.80 444,740.73 452,281.46

3 ASPHALT DISTRIBUTOR Rp/jam 378,212.65 388,299.16 385,097.76 411,477.34 404,425.75 366,631.02 399,318.93 402,670.41 413,194.49 616,505.22 398,374.18 593,073.34 633,249.93 393,984.36 398,767.55

4 ASPHALT FINISHER Rp/jam #N/A #N/A #N/A #N/A 826,804.18 776,624.34 857,041.07 #N/A #N/A 973,742.45 825,322.27 #N/A 983,635.60 822,029.40 #N/A

5 ASPHALT LIQUID MIXER (kap 20000 ) Rp/jam 70,125.64 70,630.25 70,474.11 72,794.90 72,383.40 68,773.12 78,905.65 80,207.36 79,521.38 95,216.97 73,646.98 99,713.84 101,229.71 72,112.15 72,324.65

6 ASPHALT LIQUID MIXER Rp/jam 122,640.14 125,498.39 124,586.03 132,310.49 130,319.57 119,472.92 134,461.93 136,840.00 137,101.95 198,166.70 130,428.14 195,588.13 207,072.18 128,149.57 129,512.07

7 ASPHALT MIXING PLANT Rp/jam 8,029,301.03 8,380,861.99 8,264,341.96 9,076,550.10 8,838,989.59 7,751,192.54 8,494,828.12 8,660,905.86 8,793,907.62 15,764,466.57 8,665,542.22 14,717,191.99 16,221,915.90 8,549,743.15 8,723,710.56

8 ASPHALT MIXING PLANT (MODIFIKASI, ASBUTON) Rp/jam 7,931,595.05 8,275,632.65 8,161,262.15 8,968,096.46 8,738,840.96 7,702,339.55 8,343,383.85 8,458,165.95 8,691,707.16 15,633,540.56 8,565,393.59 14,595,499.20 16,096,119.45 8,449,594.52 8,621,407.52

9 ASPHALT MIXING PLANT (WARM MIX) Rp/jam 8,029,301.03 8,380,861.99 8,264,341.96 9,076,550.10 8,838,989.59 7,751,192.54 8,442,506.56 8,559,340.49 8,793,907.62 15,764,466.57 8,665,542.22 14,717,191.99 16,221,915.90 8,549,743.15 8,723,710.56

10 BABY VIBRATORY ROLLER 1-2 T. Rp/jam 80,782.52 80,782.52 80,782.52 82,211.09 82,211.09 80,782.52 87,925.38 87,925.38 89,353.95 97,925.38 83,639.66 103,639.66 103,639.66 82,211.09 82,211.09

11 BAR BENDER Rp/jam 77,523.99 78,004.02 77,858.54 80,018.40 80,875.60 77,032.99 87,999.98 89,770.82 88,047.93 102,263.72 82,183.57 106,940.49 108,111.77 80,677.75 80,867.21

12 BAR CUTTER Rp/jam 58,178.79 58,523.40 58,416.60 60,479.75 60,586.32 57,709.87 66,744.55 67,549.23 67,720.01 81,394.75 61,894.30 86,245.43 87,339.41 60,388.47 60,537.35

13 BLENDING EQUIPMENT Rp/jam 216,834.91 221,538.85 220,055.94 231,318.04 227,900.54 209,731.23 233,623.07 239,643.81 234,594.93 324,082.77 227,319.11 316,733.92 334,375.73 224,603.04 226,773.90

14 BORE PILE MACHINE Rp/jam 608,959.15 621,463.50 617,531.90 643,845.72 634,408.29 585,485.27 646,404.52 667,498.96 640,686.42 852,926.74 630,886.86 825,351.03 869,390.33 626,270.79 631,891.58

15 BORE PILE MACHINE Rp/jam 608,959.15 621,463.50 617,531.90 643,845.72 634,408.29 585,485.27 646,404.52 667,498.96 640,686.42 852,926.74 630,886.86 825,351.03 869,390.33 626,270.79 631,891.58

16 BREAKER Rp/jam 564,115.52 577,440.85 573,226.83 602,254.21 592,492.64 543,007.04 599,556.46 617,693.49 598,424.68 834,589.65 588,311.21 803,613.87 853,063.48 583,270.14 589,398.03

17 BULLDOZER 100-150 HP Rp/jam 699,219.56 712,639.46 708,434.31 735,933.88 725,631.31 671,724.70 741,237.39 766,435.43 732,016.64 952,950.17 721,944.88 923,652.71 969,432.03 717,222.56 723,173.53

18 CEMENT TANKER Rp/jam 372,476.76 385,595.50 381,392.64 412,399.60 403,448.23 360,406.17 398,573.50 406,746.99 408,753.93 664,920.11 398,606.80 631,805.37 686,104.80 393,140.73 399,481.46

19 COLD MILLING Rp/jam 1,356,279.83 1,378,882.41 1,371,850.25 1,417,806.37 1,399,841.19 1,301,866.98 1,433,303.97 1,484,752.46 1,409,165.53 1,764,946.29 1,390,492.62 1,714,211.04 1,786,089.72 1,383,964.05 1,393,700.60

20 COLD PAINT SRAY MACHINE Rp/jam 57,915.80 57,915.80 57,915.80 59,344.37 59,344.37 57,915.80 65,058.65 65,058.65 66,487.22 75,058.65 60,772.94 80,772.94 80,772.94 59,344.37 59,344.37

21 COLD RECYCLER Rp/jam 4,742,768.34 4,826,527.54 4,800,442.77 4,960,277.91 5,014,424.85 4,659,894.76 5,123,108.52 5,314,952.90 5,021,847.63 6,300,416.48 4,983,296.28 6,094,640.78 6,364,098.83 4,962,742.71 4,999,209.13

22 COMPRESSOR 4000-6500 L\M Rp/jam 182,456.72 187,719.73 186,036.55 199,201.20 197,343.23 178,827.48 199,538.44 203,425.62 203,787.32 310,463.57 196,296.80 300,731.66 322,218.51 193,274.48 195,805.15

BIDANG UMUM U - 9 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

23 CONCRETE BREAKER Rp/jam 635,523.78 655,918.28 649,397.35 699,094.14 691,748.26 621,096.34 684,151.26 699,477.47 699,058.21 1,098,562.49 680,749.69 1,044,498.26 1,127,604.40 673,158.62 682,956.32

24 CONCRETE CUTTER 130 feet/mnt Rp/jam 51,848.14 51,848.14 51,848.14 53,276.71 53,276.71 51,848.14 58,991.00 58,991.00 60,419.57 68,991.00 54,705.29 74,705.29 74,705.29 53,276.71 53,276.71

25 CONCRETE MIXER 0.3-0.6 M3 Rp/jam 87,184.43 88,907.16 88,359.38 93,607.90 92,416.25 85,374.43 97,050.79 98,376.04 99,336.40 139,667.89 93,040.82 140,351.87 147,321.95 91,097.25 91,920.10

26 CONCRETE PAN MIXER Rp/jam 284,198.45 286,742.32 285,972.71 294,069.33 300,710.47 283,378.40 314,317.49 324,062.08 310,887.95 360,228.71 298,662.81 360,499.32 366,564.21 296,837.69 297,837.71

27 CONCRETE PUMP Rp/jam 609,410.12 621,917.63 617,985.12 643,928.70 635,478.44 601,344.39 631,201.72 636,394.21 642,901.29 879,329.53 634,183.00 847,522.68 895,713.82 629,566.93 635,194.31

28 CONCRETE VIBRATOR Rp/jam 57,878.25 58,393.57 58,231.05 60,739.80 60,864.75 57,585.38 66,589.26 67,260.86 67,958.65 85,436.10 62,072.22 89,711.76 91,653.11 60,502.02 60,741.21

29 Concrete Mixer (350) Rp/jam 76,808.43 78,210.97 77,762.39 82,319.92 81,353.80 75,397.43 86,100.89 87,108.69 88,309.17 123,025.77 82,122.37 124,626.25 130,353.77 80,268.80 80,942.44

30 CRANE 10-15 TON Rp/jam 576,842.89 588,441.50 584,797.40 609,187.97 600,401.10 554,632.62 612,539.80 632,591.71 606,774.22 803,082.23 597,275.67 778,053.62 818,621.38 592,914.60 598,112.82

31 CRANE ON TRACK 35 TON Rp/jam 1,191,025.93 1,206,186.14 1,201,555.54 1,227,107.48 1,214,010.58 1,140,685.67 1,257,277.45 1,307,173.79 1,221,725.54 1,418,118.91 1,211,314.15 1,390,274.36 1,429,559.19 1,207,229.33 1,213,270.66

32 CRANE ON TRACK 75-100 TON Rp/jam 2,224,250.03 2,250,898.63 2,242,806.17 2,284,540.88 2,260,945.03 2,128,171.45 2,343,054.31 2,439,199.31 2,269,655.68 2,587,876.31 2,255,773.60 2,536,960.50 2,601,121.10 2,250,095.03 2,260,446.22

33 DRUM MIXER Rp/jam 344,957.14 344,957.14 344,957.14 346,385.71 346,385.71 344,957.14 352,100.00 352,100.00 353,528.57 362,100.00 347,814.29 367,814.29 367,814.29 346,385.71 346,385.71

34 DUMP TRUCK 3 - 4 M3 Rp/jam 249,508.14 256,659.12 254,376.70 271,548.83 269,495.82 244,346.02 265,474.25 267,777.96 275,744.53 415,647.85 267,624.40 400,598.31 429,322.51 264,070.82 267,484.47

35 DUMP TRUCK 6-8 M3 Rp/jam 375,138.99 388,276.38 384,068.20 415,088.47 409,293.50 365,973.09 398,211.27 402,524.11 414,610.33 670,932.38 404,452.07 637,767.54 692,089.24 398,986.00 405,338.42

36 EXCAVATOR 80-140 HP Rp/jam 494,478.66 505,217.00 501,830.65 525,074.96 526,978.25 485,345.74 536,354.72 553,150.66 533,278.07 721,367.55 524,017.82 697,908.10 736,803.66 519,763.00 524,666.64

37 EXCAVATOR Long Arm 155 HP Rp/jam 557,173.92 569,599.50 565,678.44 592,467.78 594,335.21 546,680.79 603,689.09 622,634.93 600,470.45 817,902.75 590,648.78 789,730.68 835,009.82 585,926.46 591,614.83

38 FLAT BED TRUCK 3-4 TON Rp/jam 286,792.64 293,392.64 291,267.64 308,046.21 315,560.82 282,417.64 301,735.49 303,960.49 309,764.06 447,485.49 301,799.78 433,137.28 461,549.78 298,246.21 301,496.21

39 FULVI MIXER Rp/jam 988,362.66 1,018,858.28 1,009,186.64 1,077,065.43 1,055,650.06 952,084.85 1,048,046.75 1,076,215.39 1,059,163.50 1,618,568.49 1,043,209.64 1,536,554.56 1,657,213.08 1,032,897.31 1,047,314.49

40 GENERATOR SET Rp/jam 314,308.34 326,452.46 322,552.00 351,799.23 343,632.66 304,718.25 337,377.79 343,183.63 348,957.55 591,007.45 339,121.23 560,285.09 611,571.66 333,867.66 339,793.30

41 GROUTING PUMP Rp/jam 175,171.14 181,801.77 179,668.02 196,468.46 192,059.66 170,597.29 190,332.74 192,766.53 198,160.87 335,999.22 190,188.23 321,613.42 350,042.62 186,634.66 189,893.43

42 HOT RECYCLER Rp/jam 3,518,233.19 3,565,048.52 3,550,715.57 3,630,983.67 3,590,947.26 3,368,166.10 3,705,256.99 3,853,352.44 3,602,315.08 4,216,864.53 3,576,318.69 4,117,273.63 4,242,059.27 3,566,390.12 3,585,236.33

43 HYDROLIC PUMP Rp/jam 42,993.00 42,993.00 42,993.00 44,421.57 44,421.57 42,993.00 50,135.86 50,135.86 51,564.43 60,135.86 45,850.14 65,850.14 65,850.14 44,421.57 44,421.57

44 JACK HAMMER Rp/jam 46,194.04 46,194.04 46,194.04 47,622.61 66,621.13 46,194.04 53,336.89 53,336.89 54,765.46 63,336.89 49,051.18 69,051.18 69,051.18 47,622.61 47,622.61

45 JACK HIDROLIC Rp/jam 123,131.60 124,290.96 123,935.78 127,256.04 125,757.18 118,965.65 134,086.92 137,689.89 132,930.25 156,309.74 126,855.75 159,409.29 162,520.98 125,214.68 125,681.66

46 JACK HIDROLIK JEMBATAN Rp/jam 59,297.54 59,297.54 59,297.54 60,726.11 60,726.11 59,297.54 66,440.39 66,440.39 67,868.97 76,440.39 62,154.68 82,154.68 82,154.68 60,726.11 60,726.11

47 KUNCI TORSI 200-1000N.M Rp/jam 46,231.07 46,231.07 46,231.07 47,659.64 47,659.64 46,231.07 53,373.93 53,373.93 54,802.50 63,373.93 49,088.21 69,088.21 69,088.21 47,659.64 47,659.64

48 MANIFOLD Rp/jam 41,124.64 41,124.64 41,124.64 42,553.21 42,553.21 41,124.64 48,267.50 48,267.50 49,696.07 58,267.50 43,981.79 63,981.79 63,981.79 42,553.21 42,553.21

49 Mesin Amplas kayu Rp/jam 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

50 MESIN LAS Rp/jam 70,809.09 71,242.12 71,110.06 73,236.35 72,536.50 69,090.98 79,263.78 80,637.52 79,692.95 93,686.36 73,844.47 98,434.61 99,574.12 72,338.65 72,511.42

51 MESIN POTONG RUMPUT Rp/jam 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33

52 MINI EXCAVATOR 40-60 HP Rp/jam 277,732.70 278,990.08 278,630.83 280,957.53 285,240.93 274,969.22 299,798.36 308,641.50 292,737.51 306,261.10 286,669.50 310,383.62 311,091.07 285,240.93 285,612.34

BIDANG UMUM U - 10 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

53 MOBILE CRANE 1 TON Rp/jam 187,709.41 187,709.41 187,709.41 189,137.98 189,137.98 187,709.41 194,852.27 194,852.27 196,280.84 204,852.27 190,566.55 210,566.55 210,566.55 189,137.98 189,137.98

54 MOTOR GRADER >100 HP Rp/jam 669,460.38 681,537.08 677,763.56 702,176.56 688,266.57 638,697.80 705,029.80 729,409.99 694,846.98 889,741.72 685,240.14 864,523.87 904,590.86 680,942.82 686,228.13

55 PEDESTRIAN ROLLER Rp/jam 217,550.79 219,302.99 218,781.30 222,397.39 220,719.28 209,559.26 233,747.22 241,929.87 228,089.22 252,498.48 221,857.46 255,009.63 258,148.88 220,241.88 220,863.33

56 PILE DRIVER + HAMMER Rp/jam 144,539.58 146,699.96 146,022.89 151,653.52 149,996.36 140,131.65 157,278.03 161,314.17 157,015.91 199,823.58 150,599.93 199,895.86 207,277.37 148,640.11 149,598.77

57 PILE DRIVER LEADER, 75 kw Rp/jam 144,592.77 149,307.02 147,792.59 160,033.48 165,638.33 149,271.99 167,057.90 169,675.68 172,088.60 271,658.79 164,756.91 263,138.47 283,112.04 161,840.83 164,160.37

58 PILE HAMMER Rp/jam 305,539.76 308,099.75 307,340.54 311,892.40 425,706.42 404,352.26 447,999.80 465,781.39 433,422.69 467,460.77 426,733.00 467,578.48 472,433.04 425,046.92 426,177.35

59 PILE HAMMER, 2,5 Ton Rp/jam 58,121.65 58,315.25 58,257.54 59,930.76 59,746.15 57,249.36 66,253.91 67,146.13 66,913.31 77,263.42 61,141.72 82,620.49 82,974.21 59,691.90 59,760.94

60 POMPA + MIXER EPOXY, 810 Watt Rp/jam 42,145.93 42,145.93 42,145.93 43,574.50 43,574.50 42,145.93 49,288.79 49,288.79 50,717.36 59,288.79 45,003.07 65,003.07 65,003.07 43,574.50 43,574.50

61 POWER BROOM Rp/jam 69,003.35 70,045.84 69,714.64 73,441.50 72,716.75 67,859.89 77,843.52 78,699.00 79,728.39 107,389.64 73,662.92 110,074.88 114,261.76 71,925.35 72,421.59

62 ROCK DRILL BREAKER Rp/jam 543,926.53 555,738.70 552,013.72 577,582.46 579,676.07 533,880.31 589,990.20 608,465.73 586,605.88 793,504.30 576,419.60 767,698.91 810,484.03 571,739.30 577,133.30

63 SAND BLASTING Rp/jam 42,401.25 42,401.25 42,401.25 43,829.82 43,829.82 42,401.25 49,544.11 49,544.11 50,972.68 59,544.11 45,258.39 65,258.39 65,258.39 43,829.82 43,829.82

64 SLIP FORM PAVER Rp/jam 2,579,728.11 2,607,149.71 2,598,898.61 2,641,277.32 2,616,071.37 2,468,624.73 2,717,140.08 2,829,677.01 2,628,590.99 2,934,164.63 2,608,900.80 2,885,410.39 2,943,541.37 2,603,774.73 2,613,993.67

65 STAMPER Rp/jam 53,890.71 53,890.71 53,890.71 55,319.29 55,319.29 53,890.71 61,033.57 61,033.57 62,462.14 71,033.57 56,747.86 76,747.86 76,747.86 55,319.29 55,319.29

66 STONE CRUSHER Rp/jam 984,588.42 1,003,574.28 997,623.32 1,037,440.36 1,022,885.52 945,964.37 1,042,218.81 1,077,562.81 1,030,364.91 1,345,832.06 1,015,625.52 1,301,928.03 1,366,871.45 1,009,521.95 1,017,950.80

67 STRESSING JACK Rp/jam 217,011.60 223,310.92 221,298.15 236,692.02 232,328.76 210,356.03 234,134.45 239,014.60 238,653.11 363,791.99 230,820.33 351,128.66 376,647.78 227,500.51 230,514.80

68 TAMPER Rp/jam 86,029.14 86,465.03 86,336.32 88,270.45 87,842.53 83,901.95 95,566.85 97,757.25 95,052.32 107,176.72 89,210.80 112,137.35 112,827.39 87,743.60 87,893.14

69 TANDEM ROLLER 6-8 T. Rp/jam 446,449.11 453,519.79 451,321.83 465,702.15 460,059.23 429,124.03 474,868.98 491,300.57 467,013.19 579,806.19 459,036.23 567,955.89 590,245.83 456,029.00 459,064.13

70 TANDEM ROLLER 8-10 T. Rp/jam 427,645.17 434,245.17 432,120.17 448,898.74 444,523.74 423,270.17 442,588.03 444,813.03 450,616.60 588,338.03 442,652.31 573,989.81 602,402.31 439,098.74 442,348.74

71 THERMOPLASTIC ROAD MARKING MACHINE Rp/jam 71,733.20 71,733.20 71,733.20 73,161.77 73,161.77 71,733.20 78,876.06 78,876.06 80,304.63 88,876.06 74,590.34 94,590.34 94,590.34 73,161.77 73,161.77

72 THREE WHEEL ROLLER 6-8 T Rp/jam 238,891.01 243,414.18 241,990.23 252,499.29 249,107.07 230,684.95 256,703.65 264,017.21 255,916.02 338,930.23 248,720.64 332,513.98 348,628.04 246,123.32 248,166.59

73 TIRE ROLLER 8-10 T. Rp/jam 476,823.83 487,552.07 484,163.82 507,613.63 499,700.24 459,110.82 507,484.12 522,884.96 505,921.48 695,787.78 496,673.81 672,186.21 711,534.85 492,376.49 497,284.66

74 TRACK LOADER 75-100 HP Rp/jam 331,636.66 337,660.21 335,771.70 348,947.81 344,335.93 319,460.17 354,264.90 365,392.09 351,126.57 455,462.03 343,454.50 445,410.02 466,064.34 340,538.43 343,215.35

75 TRAILER 20 TON Rp/jam 410,517.48 423,051.35 419,051.50 448,045.33 439,302.99 396,472.49 438,337.96 448,939.88 444,876.68 683,217.18 434,956.56 652,614.62 702,873.15 429,809.24 435,778.49

76 TRONTON 15 TON Rp/jam 470,859.21 484,013.52 479,838.36 512,940.72 503,745.22 455,765.82 502,955.69 514,489.37 512,138.67 771,231.93 496,286.65 738,931.95 791,335.10 490,995.58 497,233.95

77 Truk Mixer Rp/jam 589,215.08 605,553.32 600,358.82 636,856.13 625,223.99 567,783.32 626,505.37 643,797.46 630,552.73 930,196.53 619,392.56 889,541.84 953,041.10 613,288.99 620,959.66

78 VIBRATING RAMMER Rp/jam 48,744.78 49,106.30 48,991.34 51,221.92 50,971.95 48,366.28 56,457.80 56,734.41 58,067.97 73,308.06 52,231.68 77,966.29 79,429.87 50,694.96 50,867.69

79 VIBRATORY ROLLER 5-8 T. Rp/jam 264,438.77 270,672.87 268,695.49 283,298.27 278,803.26 255,512.96 283,849.77 291,279.50 285,309.33 402,922.68 277,525.83 391,176.78 414,923.45 274,354.76 277,255.18

80 WATER JET BLASTING Rp/jam 52,392.36 52,392.36 52,392.36 53,820.93 53,820.93 52,392.36 59,535.21 59,535.21 60,963.78 69,535.21 55,249.50 75,249.50 75,249.50 53,820.93 53,820.93

81 WATER PUMP 70-100 mm Rp/jam 48,377.26 48,786.36 48,655.12 51,014.05 50,737.08 48,029.65 56,081.73 56,304.59 57,820.51 74,190.98 51,967.65 78,685.43 80,397.33 50,411.58 50,610.34

82 WATER TANKER 3000-4500 L. Rp/jam 337,379.82 347,131.95 344,022.59 366,775.18 359,939.31 326,005.17 361,067.90 369,813.47 365,894.34 552,033.68 356,912.88 529,630.06 568,446.28 352,615.56 357,244.21

BIDANG UMUM U - 11 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

83 WELDING MACHINE, 300 A Rp/jam 46,992.22 47,334.89 47,225.02 49,430.14 49,193.29 46,687.30 54,611.25 54,808.66 56,287.09 71,364.28 50,456.86 76,059.93 77,487.45 48,922.04 49,088.16

84 WELDING SET Rp/jam 61,815.89 62,602.79 62,351.64 65,512.21 64,943.97 60,920.37 70,231.02 70,890.05 71,987.89 94,997.81 66,009.54 98,430.66 101,589.17 64,347.22 64,722.11

85 WHEEL LOADER 1.0-1.6 M3 Rp/jam 522,195.76 531,028.58 528,275.21 546,223.22 538,456.33 501,010.60 553,811.78 572,932.94 545,270.60 687,337.72 536,716.91 670,734.67 699,369.49 533,248.33 537,081.71

I ALAT LAINNYA

1 Alat pancang hammer 2 ton Rp/hari 500,000.00 525,000.00 520,000.00 575,000.00 560,000.00 485,000.00 550,000.00 560,000.00 575,000.00 1,000,000.00 565,000.00 1,000,000.00 1,000,000.00 560,000.00 570,000.00

2 Alat pancang hammer 0,5 ton Rp/hari 350,000.00 367,500.00 364,000.00 402,500.00 392,000.00 339,500.00 385,000.00 392,000.00 402,500.00 700,000.00 395,500.00 700,000.00 700,000.00 392,000.00 399,000.00

3 Alat pancang dengan tripod tinggi 5 - 7m beban tumbuk 1-2 ton Rp/hari 500,000.00 525,000.00 520,000.00 575,000.00 560,000.00 485,000.00 550,000.00 560,000.00 575,000.00 1,000,000.00 565,000.00 1,000,000.00 1,000,000.00 560,000.00 570,000.00

4 Bor Listrik Rp/hari 100,000.00 105,000.00 104,000.00 115,000.00 112,000.00 97,000.00 110,000.00 112,000.00 115,000.00 200,000.00 113,000.00 200,000.00 200,000.00 112,000.00 114,000.00

5 Bore Pile Machine portable Rp/jam 250,000.00 262,500.00 260,000.00 287,500.00 280,000.00 242,500.00 275,000.00 280,000.00 287,500.00 500,000.00 282,500.00 500,000.00 500,000.00 280,000.00 285,000.00

6 Chain Saw Rp/jam 20,000.00 21,000.00 20,800.00 23,000.00 22,400.00 19,400.00 22,000.00 22,400.00 23,000.00 40,000.00 22,600.00 40,000.00 40,000.00 22,400.00 22,800.00

7 Drone Rp/hari 163,622.40 171,800.00 170,100.00 188,100.00 183,200.00 158,700.00 179,900.00 183,200.00 188,100.00 327,200.00 184,800.00 327,200.00 327,200.00 183,200.00 186,500.00

8 Generator Set 1500 watt Rp/jam 50,000.00 52,500.00 52,000.00 57,500.00 56,000.00 48,500.00 55,000.00 56,000.00 57,500.00 100,000.00 56,500.00 100,000.00 100,000.00 56,000.00 57,000.00

9 Jack Tension Rp/hari 2,500,000.00 2,625,000.00 2,600,000.00 2,875,000.00 2,800,000.00 2,425,000.00 2,750,000.00 2,800,000.00 2,875,000.00 5,000,000.00 2,825,000.00 5,000,000.00 5,000,000.00 2,800,000.00 2,850,000.00

10 Jack-in hydraulics kap 380 ton Rp/jam 2,000,000.00 2,100,000.00 2,080,000.00 2,300,000.00 2,240,000.00 1,940,000.00 2,200,000.00 2,240,000.00 2,300,000.00 4,000,000.00 2,260,000.00 4,000,000.00 4,000,000.00 2,240,000.00 2,280,000.00

11 Kendaraan roda 4 pick up L300 Rp/hari 300,000.00 315,000.00 312,000.00 345,000.00 336,000.00 291,000.00 330,000.00 336,000.00 345,000.00 600,000.00 339,000.00 600,000.00 600,000.00 336,000.00 342,000.00

12 Kertas HVS atau Kalkir rim 50,000.00 52,500.00 52,000.00 57,500.00 56,000.00 48,500.00 55,000.00 56,000.00 57,500.00 100,000.00 56,500.00 100,000.00 100,000.00 56,000.00 57,000.00

13 Lift Kerja Rp/hari 550,000.00 577,500.00 572,000.00 632,500.00 616,000.00 533,500.00 605,000.00 616,000.00 632,500.00 1,100,000.00 621,500.00 1,100,000.00 1,100,000.00 616,000.00 627,000.00

14 Mesin Las listrik 250 A diesel Rp/hari 250,000.00 262,500.00 260,000.00 287,500.00 280,000.00 242,500.00 275,000.00 280,000.00 287,500.00 500,000.00 282,500.00 500,000.00 500,000.00 280,000.00 285,000.00

15 Mesin potong besi Rp/hari 100,000.00 105,000.00 104,000.00 115,000.00 112,000.00 97,000.00 110,000.00 112,000.00 115,000.00 200,000.00 113,000.00 200,000.00 200,000.00 112,000.00 114,000.00

16 Molen/Beton Mixer Rp/hari 110,000.00 115,500.00 114,400.00 126,500.00 123,200.00 106,700.00 121,000.00 123,200.00 126,500.00 220,000.00 124,300.00 220,000.00 220,000.00 123,200.00 125,400.00

17 Motor 2 Kw 1350 rpm + pengkabelan Rp/hari 200,000.00 210,000.00 208,000.00 230,000.00 224,000.00 194,000.00 220,000.00 224,000.00 230,000.00 400,000.00 226,000.00 400,000.00 400,000.00 224,000.00 228,000.00

18 Perahu Rp/hari 100,000.00 105,000.00 104,000.00 115,000.00 112,000.00 97,000.00 110,000.00 112,000.00 115,000.00 200,000.00 113,000.00 200,000.00 200,000.00 112,000.00 114,000.00

19 Peralatan potong pipa T1/manual (gergaji) / saw Rp/hari 75,000.00 78,700.00 78,000.00 86,200.00 84,000.00 72,700.00 82,500.00 84,000.00 86,200.00 150,000.00 84,700.00 150,000.00 150,000.00 84,000.00 85,500.00

20 Peralatan potong pipa T2/mekanik / cilinder saw Rp/hari 150,000.00 157,500.00 156,000.00 172,500.00 168,000.00 145,500.00 165,000.00 168,000.00 172,500.00 300,000.00 169,500.00 300,000.00 300,000.00 168,000.00 171,000.00

21 Pompa air diesel 10 KW Rp/hari 150,000.00 157,500.00 156,000.00 172,500.00 168,000.00 145,500.00 165,000.00 168,000.00 172,500.00 300,000.00 169,500.00 300,000.00 300,000.00 168,000.00 171,000.00

22 Pompa air diesel 20 KW Rp/hari 200,000.00 210,000.00 208,000.00 230,000.00 224,000.00 194,000.00 220,000.00 224,000.00 230,000.00 400,000.00 226,000.00 400,000.00 400,000.00 224,000.00 228,000.00

23 Pompa air diesel 5 KW Rp/hari 100,000.00 105,000.00 104,000.00 115,000.00 112,000.00 97,000.00 110,000.00 112,000.00 115,000.00 200,000.00 113,000.00 200,000.00 200,000.00 112,000.00 114,000.00

24 Pompa Submersible 3m³/h Rp/hari 120,000.00 126,000.00 124,800.00 138,000.00 134,400.00 116,400.00 132,000.00 134,400.00 138,000.00 240,000.00 135,600.00 240,000.00 240,000.00 134,400.00 136,800.00

25 Ponton Rp/hari 600,000.00 630,000.00 624,000.00 690,000.00 672,000.00 582,000.00 660,000.00 672,000.00 690,000.00 1,200,000.00 678,000.00 1,200,000.00 1,200,000.00 672,000.00 684,000.00

BIDANG UMUM U - 12 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

26 Scaffolding Rp/hari 35,000.00 36,700.00 36,400.00 40,200.00 39,200.00 33,900.00 38,500.00 39,200.00 40,200.00 70,000.00 39,500.00 70,000.00 70,000.00 39,200.00 39,900.00

27 Sewa Komputer Rp/hari 50,000.00 52,500.00 52,000.00 57,500.00 56,000.00 48,500.00 55,000.00 56,000.00 57,500.00 100,000.00 56,500.00 100,000.00 100,000.00 56,000.00 57,000.00

28 Sewa scanner ukuran A4 Rp/hari 15,000.00 15,700.00 15,600.00 17,200.00 16,800.00 14,500.00 16,500.00 16,800.00 17,200.00 30,000.00 16,900.00 30,000.00 30,000.00 16,800.00 17,100.00

29 Stamper Rp/hari 200,000.00 210,000.00 208,000.00 230,000.00 224,000.00 194,000.00 220,000.00 224,000.00 230,000.00 400,000.00 226,000.00 400,000.00 400,000.00 224,000.00 228,000.00

30 Stamper Kodok Rp/hari 150,000.00 157,500.00 156,000.00 172,500.00 168,000.00 145,500.00 165,000.00 168,000.00 172,500.00 300,000.00 169,500.00 300,000.00 300,000.00 168,000.00 171,000.00

31 Support pipa Rp/hari 80,000.00 84,000.00 83,200.00 92,000.00 89,600.00 77,600.00 88,000.00 89,600.00 92,000.00 160,000.00 90,400.00 160,000.00 160,000.00 89,600.00 91,200.00

32 Tamper Rp/jam 35,000.00 36,700.00 36,400.00 40,200.00 39,200.00 33,900.00 38,500.00 39,200.00 40,200.00 70,000.00 39,500.00 70,000.00 70,000.00 39,200.00 39,900.00

33 Theodolith Rp/hari 350,000.00 367,500.00 364,000.00 402,500.00 392,000.00 339,500.00 385,000.00 392,000.00 402,500.00 700,000.00 395,500.00 700,000.00 700,000.00 392,000.00 399,000.00

34 Tinta hitam Rp/hari 150,000.00 157,500.00 156,000.00 172,500.00 168,000.00 145,500.00 165,000.00 168,000.00 172,500.00 300,000.00 169,500.00 300,000.00 300,000.00 168,000.00 171,000.00

35 Tongkang Rp/hari 500,000.00 525,000.00 520,000.00 575,000.00 560,000.00 485,000.00 550,000.00 560,000.00 575,000.00 1,000,000.00 565,000.00 1,000,000.00 1,000,000.00 560,000.00 570,000.00

36 Total Station Rp/hari 481,225.60 505,200.00 500,400.00 553,400.00 538,900.00 466,700.00 529,300.00 538,900.00 553,400.00 962,400.00 543,700.00 962,400.00 962,400.00 538,900.00 548,500.00

37 Tripod tinggi 5 m Rp/jam 125,000.00 131,200.00 130,000.00 143,700.00 140,000.00 121,200.00 137,500.00 140,000.00 143,700.00 250,000.00 141,200.00 250,000.00 250,000.00 140,000.00 142,500.00

38 Tripod tinggi 7 m Rp/hari 150,000.00 157,500.00 156,000.00 172,500.00 168,000.00 145,500.00 165,000.00 168,000.00 172,500.00 300,000.00 169,500.00 300,000.00 300,000.00 168,000.00 171,000.00

39 Tripot/tackel dan handle crane 2 T Rp/hari 250,000.00 262,500.00 260,000.00 287,500.00 280,000.00 242,500.00 275,000.00 280,000.00 287,500.00 500,000.00 282,500.00 500,000.00 500,000.00 280,000.00 285,000.00

40 Waterpass Rp/hari 300,000.00 315,000.00 312,000.00 345,000.00 336,000.00 291,000.00 330,000.00 336,000.00 345,000.00 600,000.00 339,000.00 600,000.00 600,000.00 336,000.00 342,000.00

BIDANG UMUM U - 13 dari 75


harga satuan pokok kegiatan
PROVINSI KALIMANTAN UTARA 2021
bidang bina marga
HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

A DIVISI 1. UMUM
1 1.2 Mobilisasi 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00 1,364,590,000.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.8 Manajemen dan Keselamatan Lalu Lintas 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 1.8.(1) Manajemen dan Keselamatan Lalu Lintas Jalan LS 265,500,000.00 273,000,000.00 273,000,000.00 277,500,000.00 279,000,000.00 256,500,000.00 279,000,000.00 270,000,000.00 279,000,000.00 319,500,000.00 276,000,000.00 301,500,000.00 325,500,000.00 262,500,000.00 270,000,000.00
3 1.8.(2) Jembatan Sementara LS 569,833,169.67 617,661,636.27 608,522,734.62 678,100,941.97 635,695,276.24 599,838,881.11 699,966,415.16 619,573,594.77 666,927,456.93 858,129,695.04 624,505,287.52 688,428,981.54 719,145,423.94 576,887,927.93 596,525,666.54
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.17 Pengamanan Lingkungan Hidup 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 1.17.(1a) Pengujian pH Buah 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00
5 1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00 2,160,000.00
6 1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00
7 1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00 2,070,000.00
8 1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00 2,205,000.00
9 1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00 2,745,000.00
10 1.17.(1g) Pengujian Coliform Buah 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00
11 1.17.(1h) Pengujian E. Coli Buah 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00 2,952,000.00
12 1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00 4,230,000.00
13 1.17.(1j) Pengujian Temperatur (Suhu) Buah 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00 1,935,000.00
14 1.17.(1k) Pengujian Parameter Kualitas Air Lainnya Buah 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00 1,890,000.00
15 1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00 6,525,000.00
16 1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00 8,100,000.00
17 1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00 1,170,000.00
18 1.17.(3a) Pengujian NoX Buah 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00 3,723,000.00
19 1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00
20 1.17.(3c) Pengujian Karbondioksida (CO2) Buah 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00 4,800,000.00
21 1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00 4,620,000.00
22 1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00 4,467,000.00
23 1.17.(3g) Pengujian Timah Hitam (Pb) Buah 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00 4,278,000.00
24 1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. Buah 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.19 Keselamatan dan Kesehatan Kerja 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25 1.19 Keselamatan dan Kesehatan Kerja ( K3 ) LS 589,300,000.00 595,857,500.00 594,546,000.00 608,972,500.00 605,038,000.00 585,365,500.00 598,078,300.00 600,608,200.00 604,426,200.00 738,006,600.00 601,889,000.00 716,880,200.00 745,628,000.00 600,608,200.00 603,153,100.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.20 Pengujian Tanah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
26 1.20.(1) Pengeboran, termasuk SPT dan Laporan M1 603,383.55 604,971.68 604,517.93 605,652.30 603,899.18 593,071.05 614,727.30 625,555.43 604,332.30 610,396.05 603,899.18 608,446.99 609,313.24 603,899.18 604,353.96
27 1.20.(2) Sondir termasuk Laporan M1 467,178.07 468,448.57 468,085.57 468,993.07 467,590.57 458,928.07 476,253.07 484,915.57 467,937.07 472,788.07 467,590.57 471,228.82 471,921.82 467,590.57 467,954.39
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.21 Manajemen Mutu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
28 1.21 Manajemen Mut u LS 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00 952,704,000.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B DIVISI 2. DRAINASE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29 2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 44,364.24 45,311.35 45,064.01 47,040.07 47,163.62 43,747.37 46,922.75 47,422.16 47,780.17 63,700.82 46,717.06 62,471.46 65,471.94 46,180.14 46,671.41
30 2.2.(1) Pasangan Batu dengan Mortar M3 1,460,794.18 1,530,268.12 1,497,561.19 1,661,067.19 1,622,889.32 1,413,375.79 1,525,250.98 1,568,715.98 1,593,259.81 2,868,681.00 1,564,914.85 2,699,219.85 2,963,137.23 1,553,509.63 1,571,232.68
31 2.3.(1) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1 137,038.53 153,142.82 141,076.78 186,166.83 136,896.39 122,230.59 157,685.98 135,859.80 162,344.81 225,156.57 146,466.57 212,587.11 229,754.73 132,490.77 141,164.82
32 2.3.(2) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1 195,320.41 225,635.94 201,497.57 286,987.39 187,743.37 167,265.64 231,891.66 185,433.60 238,705.97 303,589.81 208,274.75 286,649.80 308,116.79 180,407.48 197,130.75
33 2.3.(3) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1 222,884.79 248,143.18 229,825.08 299,868.55 225,304.54 200,040.43 255,200.31 222,858.40 263,272.39 379,880.35 239,111.69 357,387.27 387,986.97 217,952.98 231,393.44

BIDANG BINA MARGA BM - 15 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

34 2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 40 cm M1 606,983.88 648,720.25 625,009.29 734,346.23 641,970.14 571,865.09 666,771.73 636,523.55 688,474.07 1,098,282.44 652,012.77 1,031,777.39 1,125,106.13 625,231.55 645,411.11
35 2.3.(5) Gorong-gorong Pipa Beton Bertulang, diameter dalam 60 cm M1 942,956.50 1,002,039.53 972,258.01 1,122,919.40 1,009,625.42 895,331.10 1,028,690.17 998,424.90 1,064,265.14 1,763,425.87 1,016,208.66 1,651,621.62 1,807,506.74 983,195.65 1,010,650.25
36 2.3.(6) Gorong-gorong Pipa Beton Bertulang, diameter dalam 80 cm M1 1,473,745.06 1,554,442.81 1,518,514.20 1,719,447.72 1,586,440.09 1,410,713.42 1,594,939.01 1,569,893.00 1,649,247.78 2,752,947.45 1,586,410.07 2,580,522.82 2,822,572.37 1,546,913.33 1,583,029.85
37 2.3.(7) Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 cm M1 1,998,157.05 2,101,331.00 2,060,367.36 2,311,811.25 2,164,975.26 1,920,391.56 2,154,264.75 2,138,837.80 2,230,227.14 3,800,330.60 2,154,693.60 3,555,773.35 3,897,045.71 2,110,854.99 2,155,538.91
38 2.3.(8) Gorong-gorong Pipa Beton Bertulang, diameter dalam 120 cm M1 2,600,214.65 2,736,714.47 2,684,719.26 3,014,716.29 2,830,743.30 2,499,057.47 2,805,056.03 2,791,454.52 2,908,676.99 5,055,355.56 2,812,239.03 4,719,507.98 5,185,360.61 2,757,542.43 2,816,007.99
39 2.3.(9) Gorong-gorong Pipa Beton Bertulang, diameter dalam 150 cm M1 3,831,283.05 4,034,427.06 3,958,282.77 4,447,415.04 4,179,656.48 3,682,619.73 4,131,059.46 4,113,791.58 4,287,567.93 7,521,869.52 4,148,536.67 7,011,518.80 7,713,845.62 4,069,804.82 4,156,436.55
40 2.3.(10) Gorong-gorong Pipa Baja Bergelombang Ton 42,609,355.80 44,674,510.86 44,268,996.34 48,924,982.76 47,539,055.27 41,253,533.66 45,298,782.35 46,028,719.18 47,311,269.34 89,257,557.88 46,528,217.79 82,797,832.39 91,861,079.16 45,999,295.54 46,856,994.42
41 2.3.(11) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 40 cm x 40 cm M1 618,304.08 643,683.89 638,094.83 694,341.40 679,780.16 602,503.44 655,199.00 665,384.78 679,860.55 1,200,043.49 666,897.17 1,118,235.82 1,228,892.92 662,191.17 671,969.14
42 2.3.(12) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 50 cm x 50 cm M1 830,201.16 865,728.90 857,853.77 936,853.96 915,825.65 807,995.80 881,413.56 895,624.05 916,020.07 1,647,546.97 898,289.49 1,531,753.31 1,687,818.86 891,903.58 905,532.23
43 2.3.(13) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 60 cm x 60 cm M1 1,057,080.53 1,102,901.11 1,092,735.97 1,194,823.10 1,167,474.03 1,028,188.91 1,124,028.13 1,142,591.70 1,168,568.17 2,113,387.98 1,145,209.83 1,964,471.67 2,165,970.99 1,136,853.76 1,154,410.04
44 2.3.(14) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 80 cm x 80 cm M1 1,659,042.76 1,730,066.12 1,714,352.20 1,873,476.69 1,830,695.69 1,612,677.26 1,769,796.17 1,800,284.06 1,838,039.73 3,305,716.39 1,797,699.05 3,080,176.26 3,391,878.01 1,783,541.79 1,810,722.17
45 2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm M1 2,866,321.95 2,986,480.49 2,959,983.38 3,230,771.59 3,157,854.83 2,784,954.52 3,066,841.03 3,121,630.05 3,180,793.68 5,668,812.84 3,104,706.73 5,297,443.82 5,823,281.38 3,078,457.18 3,124,395.91
46 2.3.(16) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 120 cm x 120 cm M1 4,367,292.04 4,541,791.87 4,503,551.68 4,899,874.34 4,793,347.85 4,243,115.83 4,686,122.14 4,772,390.76 4,848,413.36 8,469,359.57 4,721,352.80 7,952,253.72 8,711,886.80 4,678,284.22 4,744,955.31
47 2.3.(17) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 140 cm x 140 cm M1 7,182,363.74 7,462,412.00 7,401,239.12 8,040,318.27 7,868,532.52 6,977,296.49 7,720,333.95 7,865,179.91 7,977,767.89 13,797,492.02 7,758,120.34 12,988,384.98 14,204,055.25 7,684,353.04 7,791,284.12
48 2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm M1 8,624,934.34 8,952,931.18 8,881,522.42 9,632,879.67 9,431,194.18 8,379,087.58 9,281,213.51 9,457,204.80 9,579,686.03 16,402,556.61 9,306,699.23 15,476,150.67 16,895,965.51 9,215,585.86 9,340,795.16
49 2.3.(19) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 160 cm x 160 cm M1 10,965,330.50 11,380,170.24 11,289,913.79 12,241,373.05 11,985,884.38 10,652,237.36 11,805,041.98 12,029,991.53 12,181,438.00 20,814,505.03 11,830,400.30 19,650,297.76 21,444,940.61 11,713,479.95 11,871,804.64
50 2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 180 cm x 180 cm M1 15,859,169.77 16,439,354.43 16,313,701.10 17,651,483.20 17,292,918.22 15,407,246.64 17,098,404.99 17,428,719.67 17,617,312.33 29,708,181.36 17,087,424.56 28,132,409.75 30,632,532.31 16,912,250.35 17,133,598.39
51 2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm M1 22,351,406.86 23,145,001.47 22,973,853.05 24,812,465.20 24,320,566.15 21,715,865.12 24,126,900.82 24,598,189.94 24,827,355.26 41,386,011.88 24,054,235.79 39,295,846.35 42,703,237.90 23,800,151.96 24,102,827.79
52 2.3.(22) Saluran berbentuk U Tipe DS 1 M1 493,173.00 516,099.00 508,314.00 560,386.00 547,975.00 478,466.00 504,262.00 510,324.00 544,632.00 956,660.00 532,746.00 927,229.00 1,020,685.00 528,691.00 536,456.00
53 2.3.(23) Saluran berbentuk U Tipe DS 1a (dengan tutup) M1 625,430.00 654,955.00 643,003.00 712,457.00 694,663.00 605,323.00 640,589.00 651,382.00 687,481.00 1,229,315.00 674,405.00 1,182,215.00 1,304,003.00 669,750.00 678,695.00
54 2.3.(24) Saluran berbentuk U Tipe DS 2 M1 512,067.00 535,935.00 527,555.00 582,110.00 568,930.00 496,588.00 523,738.00 530,475.00 565,039.00 995,611.00 552,983.00 963,656.00 1,061,159.00 548,843.00 556,776.00
55 2.3.(25) Saluran berbentuk U Tipe DS 2a (dengan tutup) M1 663,218.00 694,628.00 681,485.00 755,906.00 736,573.00 641,568.00 679,540.00 691,684.00 728,295.00 1,307,216.00 714,879.00 1,255,068.00 1,384,951.00 710,052.00 719,335.00
56 2.3.(26) Saluran berbentuk U Tipe DS 3 M1 530,961.00 555,772.00 546,797.00 603,835.00 589,886.00 514,711.00 543,213.00 550,626.00 585,446.00 1,034,562.00 573,220.00 1,000,082.00 1,101,633.00 568,994.00 577,096.00
57 2.3.(27) Saluran berbentuk U Tipe DS 3a (dengan tutup) M1 701,006.00 734,302.00 719,968.00 799,355.00 778,484.00 677,813.00 718,491.00 731,987.00 769,109.00 1,385,117.00 755,353.00 1,327,921.00 1,465,899.00 750,354.00 759,975.00
58 2.3.(28) Saluran berbentuk U Tipe DS 4 M1 568,749.00 595,445.00 585,279.00 647,284.00 631,796.00 550,956.00 582,164.00 590,929.00 626,260.00 1,112,463.00 613,694.00 1,072,936.00 1,182,581.00 609,296.00 617,735.00
59 2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 776,581.00 813,648.00 796,932.00 886,253.00 862,306.00 750,303.00 796,392.00 812,591.00 850,738.00 1,540,919.00 836,301.00 1,473,628.00 1,627,795.00 830,959.00 841,254.00
60 2.3.(30) Saluran berbentuk U Tipe DS 5 M1 606,536.00 635,119.00 623,762.00 690,733.00 673,707.00 587,201.00 621,114.00 631,231.00 667,074.00 1,190,364.00 654,168.00 1,145,789.00 1,263,529.00 649,598.00 658,375.00
61 2.3.(31) Saluran berbentuk U Tipe DS 5a (dengan tutup) M1 852,157.00 892,995.00 873,897.00 973,151.00 946,127.00 822,792.00 874,293.00 893,196.00 932,366.00 1,696,722.00 917,249.00 1,619,334.00 1,789,690.00 911,564.00 922,534.00
62 2.3.(32) Saluran berbentuk U Tipe DS 6 M1 606,536.00 635,119.00 623,762.00 690,733.00 673,707.00 587,201.00 621,114.00 631,231.00 667,074.00 1,190,364.00 654,168.00 1,145,789.00 1,263,529.00 649,598.00 658,375.00
63 2.3.(33) Saluran berbentuk U Tipe DS 6a (dengan tutup) M1 852,157.00 892,995.00 873,897.00 973,151.00 946,127.00 822,792.00 874,293.00 893,196.00 932,366.00 1,696,722.00 917,249.00 1,619,334.00 1,789,690.00 911,564.00 922,534.00
64 2.3.(34) Pasangan Batu tanpa Adukan (Aanstamping) M3 755,811.43 759,897.74 759,080.48 768,070.36 765,618.58 753,359.65 761,274.18 762,865.69 765,231.45 848,463.14 763,639.94 835,283.72 853,194.66 762,865.69 764,457.20
65 2.4.(1) Bahan Drainase Porous atau Penyaring (Filter) M3 270,350.56 278,473.10 276,882.08 294,801.91 289,945.13 265,410.05 281,236.43 284,334.72 289,107.76 455,410.43 285,925.73 429,016.37 464,789.03 284,334.72 287,516.75

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah


66 2.4.(2) M1 133,349.92 138,675.02 137,655.32 149,438.52 146,266.12 130,064.22 140,487.82 142,527.22 145,699.62 255,260.72 143,546.92 237,812.52 261,378.92 142,527.22 144,566.62
Permukaan, diameter 4 inch

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah


67 2.4.(3) M1 101,476.05 105,781.45 104,875.05 114,505.55 111,899.65 98,756.85 107,141.05 108,840.55 111,333.15 200,047.05 109,633.65 185,952.53 205,032.25 108,840.55 110,540.05
Permukaan, diameter 5 inch

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah


68 2.4.(4) M1 138,865.05 145,096.55 143,850.25 157,559.55 153,820.65 135,126.15 147,135.95 149,628.55 153,254.15 280,036.85 150,761.55 259,982.75 287,288.05 149,628.55 152,007.85
Permukaan, diameter 6 inch

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah


69 2.4.(5) M1 175,121.05 183,165.35 181,465.85 199,253.95 194,382.05 170,249.15 185,771.25 188,943.65 193,588.95 357,307.45 190,529.85 331,565.69 366,824.65 188,943.65 192,002.75
Permukaan, diameter 8 inch

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

C DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70 3.1.(1) Galian Biasa M3 11,481.43 11,801.14 11,703.12 12,437.19 12,388.02 11,253.51 12,268.03 12,423.45 12,631.77 18,618.10 12,288.78 17,997.17 19,215.04 12,134.43 12,286.38

71 3.1.(2) Galian Batu Lunak M3 30,545.89 31,282.46 31,052.29 32,695.92 32,710.35 29,963.85 32,934.54 33,724.72 33,206.55 46,553.16 32,498.87 45,013.45 47,754.98 32,177.91 32,520.48
72 3.1.(3) Galian Batu M3 72,734.06 74,553.36 73,983.99 78,109.46 78,022.83 71,328.56 78,205.02 79,848.36 79,304.08 112,804.18 77,496.05 108,984.70 115,852.98 76,670.75 77,529.56
73 3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter M3 16,235.87 16,781.20 16,612.54 17,860.61 17,680.21 15,861.09 17,289.16 17,518.28 17,877.71 28,176.65 17,459.96 26,891.23 29,048.05 17,229.43 17,495.21
74 3.1.(5) Galian Struktur dengan kedalaman 2 - 4 meter M3 676,671.54 710,234.97 703,466.31 777,332.48 757,370.18 656,496.76 721,962.94 734,996.06 754,539.48 1,437,197.10 741,317.73 1,329,598.87 1,476,436.49 734,689.11 747,776.99

BIDANG BINA MARGA BM - 16 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

75 3.1.(6) Galian Struktur dengan kedalaman 4 - 6 meter M3 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21 836,114.21
76 3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 134,931.60 138,207.73 137,224.03 144,212.05 142,562.82 130,401.76 143,057.76 146,775.89 143,714.20 200,161.28 141,121.82 193,148.23 204,714.43 139,906.31 141,421.66

77 3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 528,228.22 544,776.57 541,484.13 573,144.01 597,926.01 521,097.70 573,635.06 579,397.29 585,772.11 839,615.26 565,041.02 832,828.30 875,063.26 553,287.46 562,941.74
78 3.1.(9) Galian Perkerasan berbutir M3 21,400.37 22,107.19 21,896.02 23,473.38 23,293.54 20,926.21 22,816.13 23,140.39 23,507.33 36,499.81 22,977.24 34,919.55 37,606.40 22,669.44 23,021.20

79 3.1.(10). Galian Perkerasan Beton M3 418,602.60 428,546.13 425,363.96 451,515.57 468,623.70 411,712.26 454,014.01 459,663.22 465,721.34 675,284.51 446,821.58 661,540.87 702,352.40 439,906.68 444,699.07
80 3.2.(1a) Timbunan Biasa dari sumber galian M3 183,819.97 191,448.62 189,691.66 206,571.66 202,396.38 178,325.96 195,743.24 199,282.95 202,499.07 353,405.94 198,714.34 331,060.54 363,108.80 196,659.92 199,878.00
81 3.2.(1b) Timbunan Biasa dari hasil galian M3 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64 39,755.64
82 3.2.(2a) Timbunan Pilihan dari sumber galian M3 276,416.37 288,644.25 285,842.08 313,248.47 306,168.03 268,216.84 294,364.02 299,569.85 306,284.42 553,320.21 300,491.49 515,913.59 568,841.74 297,552.52 302,493.16
83 3.2.(2b) Timbunan Pilihan dari galian M3 78,039.47 80,456.52 79,690.77 85,282.44 84,049.65 75,804.42 82,938.76 84,348.31 85,158.67 131,133.58 83,195.75 125,343.31 135,001.48 82,180.70 83,338.38
84 3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) M3 246,255.63 257,580.78 255,072.59 280,259.95 273,809.24 239,155.26 262,407.10 266,791.28 273,723.09 502,111.95 268,522.93 467,136.09 516,098.66 265,922.61 270,508.31
85 3.2.(3b) Timbunan Pilihan (diukur dengan rod & plate) M3 293,818.10 307,085.72 304,066.49 333,691.49 326,237.13 285,452.75 312,994.09 318,070.67 326,470.76 593,557.37 320,125.04 553,023.59 610,246.84 316,927.71 322,363.93
86 3.2.(4) Penimbunan Kembali Berbutir (Granular Backfill) M3 194,039.93 202,485.70 200,602.56 218,697.05 215,255.01 188,916.08 206,809.46 209,795.80 214,791.44 375,620.66 210,582.58 353,264.49 386,852.08 208,008.95 211,750.27
87 3.3.(1) Penyiapan Badan Jalan M2 13,369.17 13,587.40 13,521.20 13,956.45 13,786.63 12,845.51 14,210.81 14,698.39 13,980.49 17,406.63 13,745.31 17,054.06 17,728.72 13,653.68 13,747.93
88 3.4.(1) Pembersihan dan Pengupasan Lahan M2 16,746.28 17,254.65 17,106.96 18,210.98 18,026.00 16,286.13 17,780.07 18,089.21 18,166.22 27,206.95 17,786.23 26,126.16 27,968.47 17,558.24 17,815.78
89 3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm buah 1,886,524.15 1,900,001.00 1,896,165.91 1,906,226.39 1,891,696.92 1,801,011.44 1,980,994.05 2,070,683.43 1,895,286.17 1,950,965.15 1,891,457.87 1,934,308.34 1,942,518.07 1,891,273.60 1,895,228.82
90 3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm buah 42,469.19 43,828.46 43,485.47 46,225.98 46,018.59 41,454.72 45,135.77 45,792.12 46,124.25 68,461.65 45,145.67 66,155.62 70,459.68 44,447.92 45,196.79
91 3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm buah 124,015.35 128,087.15 126,978.38 135,600.50 134,634.15 121,034.59 131,757.48 133,538.74 135,341.74 205,935.92 132,346.57 198,037.81 212,089.21 130,372.72 132,535.42
92 3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm buah 323,409.71 335,013.60 331,730.07 357,061.98 354,118.99 316,257.80 343,216.59 346,581.78 356,012.33 564,583.51 347,860.59 539,833.48 582,219.25 342,467.94 348,552.19

93 3.5.(1) Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2) M2 121,319.43 150,522.54 123,893.87 210,822.08 101,391.56 92,708.37 153,640.53 97,727.31 155,875.62 131,369.59 126,544.29 126,464.34 130,985.20 95,681.55 113,127.42
94 3.5.(2a) Geotekstil Separator Kelas 1 M2 113,808.68 134,401.40 114,800.32 178,405.84 97,755.27 92,481.70 136,723.99 95,909.49 138,959.08 121,534.72 117,134.17 116,463.46 120,984.31 95,000.26 107,271.67
95 3.5.(2b) Geotekstil Separator Kelas 2 M2 151,936.71 181,139.82 154,511.15 241,439.37 132,008.84 123,325.66 184,257.81 128,344.60 186,492.91 161,986.88 157,161.57 157,081.63 161,602.48 126,298.83 143,744.70
96 3.5.(2c) Geotekstil Separator Kelas 3 M2 161,000.71 190,203.82 163,575.15 250,503.37 141,072.84 132,389.66 193,321.81 137,408.60 195,556.91 171,050.88 166,225.57 166,145.63 170,666.48 135,362.83 152,808.70

97 3.5.(3) Geotekstil Stabilisator (Kelas 1) M2 179,436.35 208,639.46 182,010.79 268,939.01 159,508.48 150,825.30 211,757.45 155,844.24 213,992.54 189,486.52 184,661.21 184,581.27 189,102.12 153,798.47 171,244.34
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
D DIVISI 4. PEKERJAAN PREVENTIF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4.1 Pengabutan Aspal Emulsi (Fog Seal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Pengabutan (Fog Seal) dengan Aspal Emulsi yang Mengikat Lambat (CSS-1h
98 4.1.(1) Liter 22,495.27 23,525.81 23,296.06 25,815.39 25,132.24 21,807.21 23,891.35 24,351.04 25,034.63 47,566.80 24,562.43 44,086.58 48,953.26 24,328.71 24,787.28
atau SS-1h)

Pengabutan (Fog Seal) dengan Aspal Emulsi yang Mengikat Lebih Cepat (CQS-
99 4.1.(2) Liter 22,495.27 23,525.81 23,296.06 25,815.39 25,132.24 21,807.21 23,891.35 24,351.04 25,034.63 47,566.80 24,562.43 44,086.58 48,953.26 24,328.71 24,787.28
1h atau QS-1h)

Pengabutan (Fog Seal) dengan Aspal Emulsi Modifikasi Polymer yang Mengikat
100 4.1.(3) Liter 22,495.27 23,525.81 23,296.06 25,815.39 25,132.24 21,807.21 23,891.35 24,351.04 25,034.63 47,566.80 24,562.43 44,086.58 48,953.26 24,328.71 24,787.28
Lebih Cepat (PMCQS-1h atau PMQS-1h)

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.2 Laburan Aspal (Buras) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
101 4.2.(1) Aspal di Labur M2 24,861.38 26,041.00 25,782.69 28,504.79 27,737.49 24,211.97 26,587.70 27,104.52 27,763.84 52,907.91 26,044.73 46,698.24 51,850.89 27,066.43 27,496.03
102 4.3 Pemeliharaan Dengan Laburan Aspal Satu Lapis (Single Chip Seal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
103 4.4 Lapis Penutup Bubur Aspal Emulsi (Emulsified Asphalt Slurry Seal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
104 4.4.(1) Penghamparan lapis penutup bubur aspal emulsi, tipe 1, CSS-1h SS-1h M2 37,804.86 39,585.44 39,138.96 43,516.31 42,181.94 36,592.50 40,147.41 40,848.39 42,062.20 79,804.30 41,253.41 73,951.61 82,124.81 40,823.66 41,608.15
105 4.4.(2) Penghamparan lapis penutup bubur aspal emulsi, tipe 1, CQS-1h QS-1h M2 30,067.53 31,388.14 31,041.14 34,235.53 33,203.10 29,170.46 32,069.95 32,673.19 33,326.23 60,539.70 31,629.10 54,446.28 60,111.69 32,337.06 32,928.68
106 4.4.(3) Penghamparan lapis penutup bubur aspal emulsi, tipe 2, CSS-1h SS-1h M2 33,228.09 35,203.31 34,829.65 38,410.46 37,102.87 33,223.40 37,225.65 36,548.86 37,588.17 65,549.09 36,505.47 58,570.90 64,238.51 35,708.35 36,155.72
107 4.4.(4) Penghamparan lapis penutup bubur aspal emulsi, tipe 2, CQS-1h QS-1h M2 33,228.09 35,203.31 34,829.65 38,410.46 37,102.87 33,223.40 37,225.65 36,548.86 37,588.17 65,549.09 36,505.47 58,570.90 64,238.51 35,708.35 36,155.72
108 4.4.(5) Penghamparan lapis penutup bubur aspal emulsi, tipe 3, CSS-1h SS-1h M2 34,451.38 38,106.29 36,041.76 45,014.71 36,420.95 32,695.43 40,228.50 35,915.96 40,709.20 63,864.32 37,788.60 56,879.97 62,257.81 35,055.74 36,546.65
109 4.4.(6) Penghamparan lapis penutup bubur aspal emulsi, tipe 3, CQS-1h QS-1h M2 34,881.36 38,548.00 36,477.99 45,498.91 36,892.12 33,089.92 40,649.94 36,371.20 41,169.28 64,808.46 38,246.08 57,792.58 63,280.78 35,521.16 37,020.29
110 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
111 4.5 Lapis Permukaan Mikro Aspal Emulsi Modifikasi Polimer (Micro Surfacing) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BIDANG BINA MARGA BM - 17 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Lapis Permukaan Mikro dengan aspal emulsi modifikasi polymer PMCQS-1h


112 4.5.(1) M2 11,541.77 12,378.05 12,232.52 13,410.58 12,800.33 11,945.84 13,730.21 12,906.45 13,299.47 19,858.01 12,749.34 16,954.28 18,112.73 12,196.53 12,324.54
atau PMCQS-1h untuk Tipe 1

Lapis Permukaan Mikro Perata dengan aspal emulsi modifikasi polymer


113 4.5.(2) Ton 65,752.10 80,837.79 66,903.30 113,687.62 54,242.88 49,781.74 83,599.68 56,147.37 85,056.67 78,603.73 69,267.74 73,732.76 78,122.60 53,414.57 62,355.27
PMCQS-1h atau PMCQS-1h untuk Tipe 1

Lapis Permukaan Mikro dengan aspal emulsi modifikasi polymer PMCQS-1h


114 4.5.(3) M2 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83 4,111.83
atau PMCQS-1h untuk Tipe 2

Lapis Permukaan Mikro Perata dengan aspal emulsi modifikasi polymer


115 4.5.(4) Ton 37,634.57 52,274.95 38,478.89 84,357.52 25,268.18 22,755.35 53,692.25 25,205.08 55,644.01 42,087.32 40,357.46 37,962.69 40,948.70 24,693.69 33,443.24
PMCQS-1h atau PMCQS-1h untuk Tipe 2

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.6 Lapis Tipis Aspal Pasir 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

116 4.6.(1) Latasir Kelas A (SS-A) Ton 2,486,111.11 2,620,929.37 2,574,973.20 2,904,957.50 2,748,044.85 2,388,413.36 2,660,157.34 2,672,410.48 2,776,178.34 5,191,585.63 2,705,411.61 4,794,385.61 5,320,719.02 2,668,639.52 2,720,418.89
117 4.6.(2) Latasir Kelas B (SS-B) Ton 2,964,420.57 3,120,718.41 3,069,173.09 3,449,724.70 3,278,501.03 2,851,327.48 3,167,807.48 3,191,522.23 3,303,751.45 6,174,202.92 3,223,655.54 5,704,067.85 6,328,011.02 3,184,556.25 3,243,159.73
118 4.6.(3) Latasir Kelas A Modifikasi (SS-A Mod) Ton 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
119 4.6.(4) Latasir Kelas B Modifikasi (SS-B Mod) Ton 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.7 Lapis Tipis Beton Aspal (LTBA) dan Stone Matrix Asphalt Tipis (SMA TIPIS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
120 4.7.(1) Lapis Tipis Beton Aspal - A (LTBA-A) Ton 2,376,041.97 2,504,820.03 2,460,495.32 2,773,814.55 2,622,616.81 2,296,725.02 2,560,643.44 2,571,411.32 2,668,685.28 4,946,317.91 2,466,717.56 4,331,929.28 4,801,962.55 2,561,006.32 2,614,173.14
121 4.7.(2) Lapis Tipis Beton Aspal - B Halus (LTBA-B Halus) Ton 2,159,907.25 2,279,080.66 2,236,915.29 2,527,900.98 2,382,915.34 2,087,566.30 2,330,908.84 2,336,778.53 2,430,059.10 4,503,388.04 2,230,431.86 3,918,354.49 4,344,213.66 2,327,879.69 2,377,872.27
122 4.7.(3) Lapis Tipis Beton Aspal - B Halus (LTBA-B Kasar) Ton 1,927,888.39 2,036,095.33 1,996,367.81 2,261,713.76 2,124,064.75 1,863,149.64 2,084,547.71 2,085,530.15 2,172,731.50 4,010,665.78 1,975,490.30 3,459,459.67 3,834,330.53 2,076,590.46 2,122,994.07
123 4.7.(4) Lapis Tipis Beton Aspal - B Halus Modifikasi Kasar (LTBA-B Mod Kasar) Ton 1,993,998.87 2,105,035.34 2,064,664.50 2,336,577.07 2,197,017.31 1,927,059.54 2,154,786.21 2,157,311.33 2,245,483.03 4,143,308.18 2,047,278.66 3,583,207.44 3,970,963.71 2,147,631.19 2,194,980.66
124 4.7.(5) Stone Matrix Asphalt Tipis (SMA Tipis) Ton 3,090,274.32 3,249,557.45 3,165,342.59 3,577,311.35 3,413,345.44 2,975,549.31 3,249,226.29 3,317,922.09 3,394,677.90 6,372,155.31 3,217,137.66 5,711,501.38 6,337,283.20 3,309,330.97 3,353,904.48
125 4.7.(6) Stone Matrix Asphalt Modifikasi Tipis (SMA Mod Tipis) Ton 3,131,679.66 3,292,917.57 3,208,327.15 3,624,812.00 3,459,565.43 3,015,645.66 3,293,309.17 3,362,833.08 3,440,715.55 6,460,321.07 3,262,538.34 5,793,222.61 6,428,084.56 3,354,246.32 3,399,489.58
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.8 Penambalan Dangkal Perkerasan Beton Semen Bersambung Tanpa Tulangan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tambalan Dangkal dengan Beton Semen Cepat Mengeras untuk Pembukaan


126 4.8.(1) M3 463,471.04 479,673.37 474,545.10 513,127.59 525,924.00 453,415.78 503,929.13 510,034.75 518,470.26 818,925.98 499,040.50 792,460.16 851,259.46 489,593.81 497,657.11
Lalu Lintas Umur Beton < 24 jam

Tambalan Dangkal dengan Beton Semen Cepat Mengeras untuk Pembukaan


127 4.8.(2) M3 348,308.82 358,557.11 355,434.26 380,053.32 397,452.89 342,255.40 381,679.93 386,151.06 390,523.09 576,254.80 373,389.88 567,229.44 601,126.05 365,803.26 371,158.34
Lalu Lintas Umur Beton lebih dari 1 hari dan kurang dari 3 hari

Tambahan Dangkal dengan Beton Semen Cepat Mengeras untuk Pembukaan


128 4.8.(3) M3 348,716.14 358,964.43 355,841.58 380,473.24 398,040.34 342,662.73 382,150.24 386,621.37 391,006.00 576,813.28 373,822.39 567,838.31 601,734.92 366,223.18 371,578.26
Lalu Lintas Umur Beton lebih dari 3 hari dan kurang dari 7 hari

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

4.9 Penambalan Penuh Perkerasan Beton Semen Bersambung Tanpa Tulangan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu
129 4.9.(1) M3 15,423,428.46 16,255,626.69 15,950,904.82 17,933,034.60 17,122,296.32 14,836,180.97 16,432,464.41 16,575,581.93 17,152,289.52 32,212,749.24 16,775,228.18 29,842,511.49 33,111,346.77 16,541,416.02 16,880,583.83
Lintas Umur Beton < 24 jam

Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu
130 4.9.(2) M3 15,039,253.22 15,858,311.96 15,556,967.46 17,506,739.82 16,689,197.02 14,460,576.09 16,014,977.55 16,150,767.67 16,721,408.28 31,503,926.02 16,359,714.14 29,165,706.13 32,377,482.95 16,131,841.36 16,465,173.35
Lintas Umur Beton lebih dari 1 hari dan kurang dari 3 hari

Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu
131 4.9.(3) M3 15,034,765.42 15,853,543.68 15,552,199.18 17,501,971.54 16,683,867.77 14,456,088.30 16,009,648.30 16,145,438.41 16,716,079.03 31,497,755.31 16,354,665.37 29,158,132.98 32,369,909.80 16,126,792.59 16,460,124.58
Lintas Umur Beton lebih dari 3 hari dan kurang dari 7 hari

132 4.9.(4) Pemasangan Ruji (Dowel) Buah 106,404.71 111,076.11 110,522.88 119,837.70 120,869.74 103,886.50 108,243.07 110,127.92 116,775.38 190,737.07 114,493.42 189,564.21 205,651.72 112,733.22 115,137.41
133 4.9.(5) Pemasangan Sealant M1 961.26 992.62 990.56 1,035.17 1,195.56 954.49 1,067.82 1,072.23 1,088.94 1,476.97 1,033.34 1,533.74 1,582.06 1,010.80 1,025.16
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.10 Penambahan Penyalurab Beban Pada Perkerasan Beton Semen (Dowel Retrofit) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Penambahan dan/atau Penggantian Ruji (Dowel) pada Perkerasan Beton Semen


134 4.10.(1) Buah 342,221.06 352,185.74 349,977.96 373,415.18 392,631.83 336,227.49 370,099.86 376,027.35 384,054.19 569,008.21 367,659.35 567,065.61 603,474.95 361,416.50 366,199.34
dengan Epoksi

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

4.11 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
135 4.11.(1) Penjahitan Melintang Tipe 1 (tabel pelat beton = 150 - 175 mm) Buah 26,485.06 27,663.25 27,499.88 29,531.59 29,558.44 26,021.16 27,826.26 28,055.28 28,852.26 46,606.80 28,435.65 45,003.24 48,374.03 27,965.68 28,593.67

136 4.11.(2) Penjahitan Melintang Tipe 2 (tabel pelat beton = > 175 mm - 200 mm) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
137 4.11.(3) Penjahitan Melintang Tipe 3 (tabel pelat beton = > 200 mm - 225 mm) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BIDANG BINA MARGA BM - 18 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

138 4.11.(4) Penjahitan Melintang Tipe 4 (tabel pelat beton = > 225 mm - 250 mm) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
139 4.11.(5) Penjahitan Melintang Tipe 5 (tabel pelat beton = > 250 mm - 275 mm) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

140 4.11.(6) Penjahitan Melintang Tipe 6 (tabel pelat beton = > 275 mm -300 mm) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
141 4.11.(7) Penjahitan Melintang Tipe 7 (tabel pelat beton = > 300 mm - 325 mm) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

142 4.11.(8) Penjahitan Melintang Tipe 8 (tabel pelat beton = > 325 mm - 350 mm) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
143 4.12.(1) Penutupan Sambungan Melintang (Termoplastik) M1 100,246.99 104,867.19 103,917.91 114,044.78 111,672.73 97,351.64 106,746.67 108,242.92 111,036.29 202,924.80 108,824.98 189,056.70 208,286.21 107,591.81 109,545.88
144 4.12.(2) Penutupan Sambungan Melintang (Termoseting) M1 175,612.30 184,250.00 182,491.66 201,558.95 196,532.78 170,340.35 187,196.08 190,598.32 195,571.95 371,317.01 192,168.65 344,309.20 382,018.30 190,323.17 193,764.52
145 4.12.(3) Penutupan Sambungan Melintang (Preformed) M1 785,006.52 824,114.22 816,261.92 902,363.09 879,054.94 761,452.75 837,506.91 852,661.88 875,482.07 1,671,944.77 860,108.78 1,546,605.59 1,717,904.03 852,387.02 867,581.06
146 4.12.(4) Penutupan Sambungan Memanjang (Termoplastik) M1 100,246.99 104,867.19 103,917.91 114,044.78 111,672.73 97,351.64 106,746.67 108,242.92 111,036.29 202,924.80 108,824.98 189,056.70 208,286.21 107,591.81 109,545.88
147 4.12.(5) Penutupan Sambungan Memanjang (Termoseting) M1 175,612.30 184,250.00 182,491.66 201,558.95 196,532.78 170,340.35 187,196.08 190,598.32 195,571.95 371,317.01 192,168.65 344,309.20 382,018.30 190,323.17 193,764.52
148 4.12.(6) Penutupan Sambungan Memanjang (Preformed) M1 785,006.52 824,114.22 816,261.92 902,363.09 879,054.94 761,452.75 837,506.91 852,661.88 875,482.07 1,671,944.77 860,108.78 1,546,605.59 1,717,904.03 852,387.02 867,581.06
149 4.12.(7) Penutupan Retak (Termoplastik) M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
150 4.12.(8) Penutupan Retak (Termoseting) M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.13 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
151 4.13.(1) Pengeboran Lubang Buah 5,385.27 5,401.71 5,399.48 5,423.24 5,433.40 5,380.46 5,423.68 5,428.84 5,429.32 5,624.34 5,416.23 5,627.22 5,655.69 5,405.92 5,415.58
152 4.13.(2) Material Injeksi Berbahan Dasar Semen Kg 451,185.20 473,739.83 469,230.73 518,839.96 505,324.40 437,657.90 481,359.14 490,119.68 503,263.09 962,487.48 494,489.51 889,953.08 988,792.56 490,100.12 498,867.18
153 4.13.(3) Material Injeksi Berbahan Dasar Cellular Kg 538,283.36 565,188.43 559,809.31 618,991.69 602,866.95 522,145.99 574,367.93 584,722.74 600,462.41 1,148,413.99 589,947.02 1,061,741.28 1,179,651.62 584,690.33 595,185.92
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
E DIVISI 5. PERKERASAN BERBUTIR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
154 5.1.(1) Lapis Pondasi Agregat Kelas A M3 967,774.53 1,089,130.09 1,058,692.24 1,257,876.28 1,073,161.71 1,067,921.56 1,344,324.54 1,068,118.23 1,217,939.77 1,601,466.26 1,106,432.99 1,084,623.07 1,119,006.34 972,183.16 991,502.78
155 5.1.(2) Lapis Pondasi Agregat Kelas B M3 910,159.23 1,060,957.88 1,030,934.90 1,218,519.77 1,058,531.29 1,053,366.48 1,326,007.03 1,053,558.93 1,201,337.57 1,579,605.70 1,091,349.06 1,069,801.99 1,103,707.36 958,925.82 977,982.27
156 5.1.(3) Lapis Pondasi Agregat Kelas S M3 796,402.24 838,079.24 807,641.39 970,395.49 826,011.55 820,771.41 1,034,624.16 767,562.74 891,067.58 1,142,221.56 859,282.84 833,661.49 856,701.86 745,325.22 764,644.85
157 5.1.(4) Lapis Drainase M3 984,878.52 1,062,079.54 1,022,974.32 1,222,576.33 1,066,620.78 952,641.62 1,110,426.98 1,066,382.54 1,160,009.42 2,081,804.09 850,608.48 1,457,896.00 1,617,571.06 1,061,284.47 1,102,653.62
158 5.2,(1) Lapis Permukaan Agregat Tanpa Penutup Aspal M3 973,025.57 1,094,537.12 1,064,074.12 1,263,501.47 1,078,815.92 1,073,044.60 1,349,928.05 1,073,826.98 1,223,548.19 1,609,013.98 1,111,932.63 1,092,094.94 1,126,774.75 977,583.09 997,000.56
159 5.2,(2) Lapis Pondasi Agregat Tanpa Penutup Aspal M3 967,592.00 1,088,939.41 1,058,501.56 1,257,679.08 1,072,954.73 1,067,739.03 1,344,130.60 1,067,924.29 1,217,745.83 1,601,221.80 1,106,240.68 1,084,370.46 1,118,753.73 971,997.36 991,310.47
160 5.3.(1.a) Perkerasan Beton Semen (PPC) M3 2,063,181.57 2,220,589.94 2,110,284.31 2,543,945.66 2,213,120.77 1,923,672.18 2,213,498.84 2,145,131.06 2,305,042.72 4,072,552.10 2,215,030.62 3,794,862.42 4,204,303.45 2,135,776.32 2,195,848.21
161 5.3.(1.a) Perkerasan Beton Semen (OPC Tipe I + Fly ash) M3 2,099,719.40 2,258,562.53 2,147,986.98 2,585,373.53 2,253,880.99 1,959,702.61 2,254,163.01 2,186,108.57 2,347,912.55 4,148,580.91 2,255,468.67 3,867,973.51 4,283,982.87 2,175,464.89 2,236,137.34
162 5.3.(1.b) Perkerasan Beton Semen Fast Track 8 Jam M3 4,060,086.45 4,255,330.72 4,180,729.22 4,651,063.25 4,516,045.85 3,918,112.48 4,267,479.62 4,376,645.33 4,458,796.54 8,406,819.25 4,392,422.09 7,821,942.12 8,675,015.71 4,364,045.71 4,422,437.19
163 5.3.(1.c) Perkerasan Beton Semen Fast Track 24 Jam M3 3,629,611.23 3,864,887.89 3,732,473.05 4,344,733.11 3,963,984.07 3,440,260.85 3,874,842.69 3,841,677.69 4,043,235.77 7,389,940.28 3,924,129.69 6,871,563.34 7,621,304.90 3,831,034.01 3,918,130.45
164 5.3.(2.a) Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal M3 2,502,220.84 2,681,842.27 2,566,092.00 3,049,837.51 2,705,231.81 2,349,266.25 2,682,563.32 2,621,748.68 2,795,923.02 5,017,521.01 2,696,297.43 4,669,793.02 5,176,253.28 2,612,450.59 2,680,912.58
165 5.3.(2.b) Perkerasan Beton Semen Fast Track 8 Jam dengan Anyaman Tulangan Tunggal M3 5,005,505.07 5,449,851.37 5,145,072.11 6,347,779.68 5,266,588.19 4,593,577.69 5,499,324.55 5,141,417.05 5,680,022.92 9,599,456.68 5,379,263.85 8,920,119.61 9,862,733.98 5,100,723.82 5,302,028.92
166 5.3.(2.c) Perkerasan Beton Semen Fast Track 24 Jam dengan Anyaman Tulangan Tunggal M3 5,077,852.11 5,527,159.20 5,221,298.09 6,431,016.14 5,348,109.40 4,665,590.29 5,580,027.39 5,222,753.30 5,764,305.75 9,760,862.37 5,462,913.27 9,070,688.57 10,030,032.82 5,182,060.07 5,385,379.38
167 5.3.(3) Lapis Pondasi bawah Beton Kurus (Concrete Vibrator) M3 1,412,332.86 1,538,013.92 1,443,628.53 1,798,262.29 1,490,893.39 1,297,076.19 1,535,457.68 1,447,377.65 1,596,439.60 2,727,411.86 1,514,812.51 2,545,597.22 2,816,833.36 1,438,316.22 1,490,538.21
168 5.4.(1) Stabilisasi Tanah Dasar dengan Semen Ton 815,266.72 878,521.43 841,258.40 1,010,105.79 879,228.44 763,769.33 885,787.04 852,373.31 925,394.77 1,643,340.70 885,534.06 1,524,003.62 1,689,736.99 850,980.83 878,802.22
169 5.4.(2) Lapis Fondasi Tanah Semen M3 892,359.49 963,717.24 914,894.64 1,112,528.22 956,698.09 830,470.09 961,898.63 925,552.84 1,005,124.02 1,774,673.97 962,213.84 1,651,309.01 1,831,009.85 923,563.81 952,362.80
170 5.5.(1) Lapis Fondasi Agregat Semen Kelas A (Cement Treated Base = CTB) M3 1,048,724.81 1,165,670.75 1,123,109.53 1,340,527.83 1,153,657.22 1,112,090.69 1,362,032.74 1,137,474.17 1,272,026.99 1,809,386.49 1,174,916.57 1,359,870.19 1,440,121.71 1,059,163.67 1,078,465.79
171 5.5.(2) Lapis Fondasi Agregat Semen Kelas B (Cement Treated Sub-Base = CTSB) M3 960,514.27 1,100,178.88 1,060,553.47 1,261,691.59 1,097,461.00 1,063,532.59 1,310,026.73 1,083,805.40 1,217,438.76 1,707,299.04 1,120,787.76 1,263,454.50 1,333,026.04 1,005,505.82 1,024,544.76
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
F DIVISI 6. PERKERASAN ASPAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
172 6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 37,099.08 38,807.35 38,427.62 42,599.53 41,466.93 35,960.59 39,388.10 40,147.31 41,282.92 78,625.45 40,517.13 72,839.89 80,910.38 40,134.91 40,894.49
173 6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 37,227.98 38,939.23 38,558.63 42,738.49 41,604.98 36,087.24 39,531.23 40,292.53 41,429.19 78,834.10 40,655.30 73,048.23 81,129.80 40,270.37 41,031.38
174 6.1 (2b) Lapis Perekat - Aspal Emulsi Modifikasi Polimer Liter 39,166.01 40,966.70 40,566.22 44,964.74 43,771.60 37,965.63 41,588.52 42,389.57 43,585.86 82,948.68 42,772.22 76,858.69 85,363.64 42,367.41 43,168.18
175 6.2 (1) Agregat Penutup BURTU M2 11,957.15 12,703.54 12,419.98 14,215.90 13,160.18 11,758.50 13,282.67 13,154.76 13,849.48 25,303.87 10,349.21 17,892.26 19,796.87 13,064.37 13,455.07

BIDANG BINA MARGA BM - 19 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

176 6.2 (2) Agregat Penutup BURDA M2 16,164.57 17,189.55 16,783.08 19,261.32 17,742.85 15,857.63 17,961.56 17,731.50 18,706.43 33,776.97 14,105.34 24,111.99 26,628.27 17,587.83 18,129.34
177 6.2 (3a) Bahan Aspal Keras untuk Pekerjaan Pelaburan Liter 21,631.33 22,653.80 22,426.32 24,812.86 24,131.29 20,948.58 22,997.71 23,452.05 24,020.97 45,944.07 23,563.43 42,380.60 47,082.27 23,448.77 23,789.98
178 6.2 (3b) Bahan Aspal Emulsi Modifikasi untuk Pekerjaan Pelaburan Liter 34,094.33 35,665.87 35,316.37 39,158.38 38,110.77 33,045.53 36,192.80 36,891.17 37,939.44 72,334.26 37,237.86 66,994.59 74,431.15 36,887.89 37,586.44
179 6.2 (4a) Aspal Cair untuk Precoated Liter 19,781.78 20,725.95 20,499.11 22,699.58 22,073.89 19,153.29 21,018.59 21,420.26 21,961.13 41,980.32 21,556.63 38,770.14 43,067.74 21,415.15 21,756.68
180 6.2 (4b) Aspal Emulsi untuk Precoated Liter 21,605.91 22,628.26 22,401.42 24,784.30 24,106.50 20,925.31 22,973.02 23,426.80 23,993.73 45,889.17 23,537.12 42,335.01 47,028.71 23,421.70 23,763.22
181 6.2 (4c) Aspal Emulsi Modifikasi Polimer untuk Precoated Liter 22,172.41 23,194.76 22,967.92 25,464.10 24,786.30 21,491.81 23,539.52 23,993.30 24,673.53 47,022.17 24,216.92 43,558.65 48,388.31 23,988.20 24,443.02
182 6.3 (1a) Stone Matrix Asphalt Halus (SMA Halus) Ton 2,154,383.62 2,261,804.74 2,233,147.54 2,484,404.52 2,393,928.98 2,096,131.74 2,313,428.28 2,345,307.20 2,413,577.66 4,541,053.12 2,223,122.56 3,945,392.69 4,376,576.71 2,338,626.35 2,381,706.23
183 6.3 (1b) Stone Matrix Asphalt Modifikasi Halus (SMA Mod Halus) Ton 2,221,083.11 2,329,856.51 2,300,905.37 2,562,679.98 2,471,372.96 2,162,871.51 2,380,967.73 2,412,386.99 2,490,811.21 4,678,542.00 2,299,927.23 4,083,892.88 4,530,508.44 2,407,949.16 2,458,567.36
184 6.3 (2a) Stone Matrix Asphalt Kasar (SMA Kasar) Ton 2,129,622.03 2,235,998.13 2,207,578.57 2,456,404.50 2,366,588.93 2,072,114.03 2,287,132.54 2,318,469.49 2,386,322.65 4,491,612.62 2,196,218.80 3,899,258.63 4,325,665.94 2,311,995.73 2,354,725.44
185 6.3 (2b) Stone Matrix Asphalt Modifikasi Kasar (SMA Mod Kasar) Ton 2,186,105.45 2,291,454.83 2,264,852.14 2,516,670.80 2,435,079.62 2,130,918.34 2,341,952.83 2,376,931.76 2,450,220.66 4,613,520.45 2,261,942.14 4,023,341.67 4,463,777.45 2,372,720.26 2,421,483.00
186 6.3(3) Lataston Lapis Aus (HRS-WC) Ton 2,340,113.94 2,456,045.10 2,423,444.62 2,697,552.05 2,599,288.12 2,269,317.26 2,502,405.69 2,539,336.19 2,610,477.18 4,915,802.91 2,467,258.44 4,382,958.11 4,862,536.56 2,532,846.93 2,576,697.18
187 6.3.(4) Lataston Lapis Fondasi (HRS-Base) Ton 2,015,569.73 2,116,198.02 2,087,121.50 2,325,268.63 2,237,808.71 1,956,086.29 2,158,262.42 2,188,670.12 2,251,311.17 4,232,237.10 2,106,310.58 3,736,507.63 4,144,709.82 2,182,336.87 2,221,244.04
188 6.3(5a) Laston Lapis Aus (AC-WC) Ton 2,088,549.32 2,193,016.45 2,164,063.55 2,409,604.68 2,320,346.16 2,032,780.64 2,243,698.38 2,274,890.88 2,340,746.67 4,405,583.11 2,142,272.56 3,803,021.09 4,218,886.23 2,267,905.05 2,309,739.68
189 6.3(5b) Laston Lapis Aus Modifikasi (AC-WC Mod) Ton 2,145,302.16 2,248,741.88 2,221,605.98 2,470,194.99 2,389,161.20 2,091,853.02 2,298,785.13 2,333,619.38 2,404,967.10 4,528,023.87 2,208,334.70 3,927,713.96 4,357,675.32 2,328,896.06 2,376,819.77
190 6.3(6a) Laston Lapis Antara (AC-BC) Ton 1,976,638.87 2,076,038.45 2,048,224.94 2,281,948.22 2,196,015.78 1,924,426.04 2,124,822.30 2,153,595.16 2,216,986.10 4,173,603.87 2,020,020.82 3,587,125.72 3,979,638.46 2,147,030.43 2,187,186.06
191 6.3(6b) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton 2,037,788.56 2,138,499.41 2,110,404.99 2,353,922.12 2,267,185.99 1,985,650.71 2,186,712.08 2,215,001.08 2,287,909.96 4,301,462.95 2,090,577.57 3,715,617.09 4,122,645.80 2,210,733.22 2,257,783.90
192 6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 1,806,439.08 1,897,874.78 1,871,831.02 2,086,960.11 2,006,323.43 1,759,714.58 1,944,019.25 1,969,184.25 2,028,292.87 3,814,206.87 1,833,628.05 3,253,206.73 3,608,859.84 1,962,770.54 2,000,298.87
193 6.3(7b) Laston Lapis Fondasi Modifikasi (AC-Base Mod) Ton 1,855,974.48 1,946,386.45 1,922,159.11 2,138,844.44 2,066,422.57 1,811,468.24 1,991,993.97 2,020,911.81 2,083,804.13 3,921,851.90 1,890,980.93 3,361,945.09 3,729,879.06 2,016,529.46 2,058,672.29
194 6.3.(8) Bahan anti pengelupasan Kg 45,320.00 47,586.00 47,132.80 52,118.00 50,758.40 43,960.40 48,265.80 49,172.20 50,531.80 96,531.60 49,625.40 89,325.72 99,250.80 49,172.20 50,078.60
195 6.4.(1a) Laston Hangat Pen.60-70, WMAC Lapis Aus (WMAC-WC) dengan Zeolit Ton 2,164,546.17 2,272,813.14 2,242,547.37 2,497,001.06 2,405,186.18 2,106,012.97 2,321,992.44 2,353,340.71 2,423,996.27 4,564,482.62 2,226,248.21 3,954,177.26 4,386,837.53 2,348,630.31 2,393,058.67
196 6.4.(1b) Laston Hangat Pen.60-70, WMAC Lapis Aus (WMAC-WC) dengan Wax Ton 2,125,615.84 2,231,883.34 2,202,612.73 2,452,178.23 2,361,860.66 2,068,682.21 2,281,939.10 2,312,785.21 2,381,943.46 4,484,375.94 2,182,833.93 3,876,031.54 4,300,008.96 2,308,042.79 2,350,618.76
197 6.4.(2a) Laston Hangat Pen.60-70, WMAC Lapis Antara (WMAC-BC) dengan Zeolit Ton 1,267,466.50 1,314,115.05 1,297,542.87 1,408,234.60 1,357,442.42 1,250,184.06 1,342,517.63 1,346,315.19 1,383,086.10 2,202,576.18 1,212,005.43 1,805,714.21 1,954,877.92 1,342,026.15 1,365,932.32
198 6.4.(2b) Laston Hangat Pen.60-70, WMAC Lapis Antara (WMAC-BC) dengan Wax Ton 2,010,585.17 2,111,633.49 2,083,529.09 2,320,937.88 2,234,035.63 1,957,303.67 2,159,744.55 2,188,108.63 2,254,712.79 4,245,759.77 2,057,181.88 3,654,015.62 4,053,960.58 2,183,787.56 2,224,621.87
199 6.4.(3a) Laston Hangat Pen.60-70, WMAC Lapis Fondasi (WMAC-Base) dengan Zeolit Ton 1,883,537.62 1,978,833.23 1,951,455.79 2,175,637.90 2,092,404.42 1,834,004.76 2,023,466.57 2,048,806.97 2,112,755.31 3,975,512.97 1,918,831.13 3,406,647.38 3,779,361.37 2,044,671.15 2,084,834.63
200 6.4.(3b) Laston Hangat Pen.60-70, WMAC Lapis Fondasi (WMAC-Base) dengan Wax Ton 1,845,097.34 1,938,415.50 1,912,039.86 2,131,376.14 2,049,632.29 1,797,154.81 1,983,955.78 2,008,808.37 2,071,267.08 3,896,491.40 1,875,939.76 3,329,442.91 3,693,578.63 2,004,639.99 2,042,943.28
201 6.5.(1) Laston Lapis Aus Asbuton (AC-WC Asb) Ton 2,056,509.38 2,158,664.76 2,131,686.29 2,370,494.11 2,285,069.80 2,002,431.60 2,207,857.16 2,237,960.27 2,303,847.61 4,337,699.05 2,109,096.05 3,744,597.18 4,154,178.80 2,233,272.27 2,273,700.27
202 6.5.(2) Laston Lapis Antara Asbuton (AC-BC Asb) Ton 1,944,598.93 2,041,686.77 2,015,847.68 2,242,837.64 2,160,739.42 1,894,077.00 2,088,981.08 2,116,664.55 2,180,087.03 4,105,719.80 1,986,844.31 3,528,701.81 3,914,931.04 2,112,397.65 2,151,146.65
203 6.5.(3) Laston Lapis Fondasi Asbuton (AC-Base Asb) Ton 1,774,085.25 1,863,198.50 1,839,140.63 2,047,503.03 1,970,711.67 1,729,064.46 1,907,864.80 1,931,929.46 1,991,069.38 3,745,796.41 1,800,112.51 3,194,247.68 3,543,569.73 1,927,815.25 1,963,937.25
204 6.6.(1) CPHMA Kemasa Kantong Ton 1,089,697.84 1,151,279.32 1,132,094.37 1,276,064.39 1,208,403.27 1,048,961.67 1,170,616.72 1,173,093.32 1,222,918.52 2,280,725.73 1,192,490.53 2,110,563.12 2,341,542.79 1,172,202.22 1,198,250.26
205 6.7.(1) Lapis Penetrasi Macadam M3 3,109,036.84 3,297,454.35 3,225,478.69 3,690,731.11 3,422,823.63 3,009,244.53 3,391,724.88 3,367,764.42 3,540,798.79 6,556,674.79 3,083,576.71 5,425,405.82 6,019,699.54 3,358,370.50 3,443,066.69
206 6.7.(2) Lapis Penetrasi Macadam Asbuton M3 2,637,264.18 2,791,801.54 2,736,318.11 3,150,356.60 2,891,099.62 2,543,083.62 2,857,616.34 2,841,505.08 2,972,753.38 5,491,183.80 2,578,034.52 4,517,285.85 5,011,062.33 2,832,719.10 2,891,681.53
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
G DIVISI 7. STRUKTUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
207 7.1 (1) Beton struktur, fc’50 MPa M3 3,197,518.56 3,402,908.03 3,268,864.32 3,815,551.79 3,461,552.28 3,023,754.79 3,404,296.54 3,371,946.73 3,545,123.80 6,155,419.50 3,421,243.15 5,781,853.52 6,359,152.13 3,332,334.52 3,403,004.55
208 7.1 (2) Beton struktur, fc’45 MPa M3 3,116,876.28 3,318,232.35 3,188,412.57 3,722,811.88 3,372,941.04 2,947,238.59 3,323,980.89 3,287,449.26 3,460,762.10 5,994,788.21 3,336,790.40 5,629,838.57 6,190,246.63 3,247,837.06 3,318,596.51
209 7.1 (3) Beton struktur, fc’40 MPa M3 3,017,068.81 3,213,357.29 3,088,300.59 3,608,561.93 3,262,659.78 2,852,154.16 3,223,170.71 3,181,889.72 3,355,252.98 5,799,226.36 3,231,626.20 5,442,587.76 5,983,326.15 3,142,656.17 3,213,449.00
210 7.1 (4) Beton struktur, fc’35 MPa M3 2,921,263.98 3,112,760.73 2,992,563.81 3,498,384.88 3,157,308.49 2,761,172.10 3,127,489.15 3,081,360.59 3,254,769.74 5,607,863.25 3,131,112.26 5,261,662.66 5,782,298.26 3,042,127.04 3,112,950.24
211 7.1 (5a) Beton struktur, fc’30 MPa M3 2,430,308.40 2,605,907.23 2,491,893.29 2,965,166.38 2,624,770.32 2,280,634.41 2,604,797.91 2,544,301.38 2,715,726.09 4,834,540.66 2,615,983.72 4,506,656.10 4,989,484.64 2,532,303.18 2,599,115.27
212 7.1 (5b) Beton strukutr bervolome besar, fc'30 MPa M3 2,553,170.13 2,727,822.32 2,613,808.38 3,102,713.71 2,761,292.12 2,403,496.14 2,729,145.24 2,671,238.73 2,838,653.45 4,980,147.09 2,744,419.92 4,642,678.07 5,135,406.61 2,654,297.15 2,727,551.47
213 7.1 (5c) Beton strukutr memadat sendiri, fc'30 MPa M3 2,360,765.83 2,533,221.00 2,420,488.14 2,887,203.27 2,547,458.97 2,212,784.23 2,531,813.25 2,469,145.80 2,639,212.66 4,707,583.10 2,542,045.94 4,385,984.91 4,859,358.66 2,458,804.22 2,524,982.56
214 7.1 (6a) Beton struktur, fc’25 Mpa M3 2,316,359.22 2,486,594.48 2,376,890.31 2,836,154.78 2,499,096.54 2,171,045.82 2,488,863.81 2,423,318.09 2,593,951.32 4,621,684.22 2,496,472.62 4,303,952.93 4,768,212.01 2,412,976.52 2,479,577.50
215 7.1 (6b) Beton struktur bervolume besar, fc’25 Mpa M3 2,464,859.22 2,635,094.48 2,525,390.31 3,001,154.78 2,664,096.54 2,319,545.82 2,640,663.81 2,578,418.09 2,745,751.32 4,803,184.22 2,651,572.62 4,475,552.93 4,949,712.01 2,561,476.52 2,634,677.50
216 7.1 (6c) Beton struktur memadat sendiri, fc’25 Mpa M3 2,314,683.69 2,484,833.92 2,374,286.46 2,834,207.97 2,496,712.81 2,168,949.55 2,485,543.95 2,420,657.20 2,590,634.84 4,615,044.51 2,493,533.05 4,298,661.70 4,762,332.87 2,410,315.62 2,476,437.44
217 7.1 (7a) Beton strukur, fc’20 MPa M3 2,476,126.44 2,585,698.22 2,540,915.75 2,802,435.74 2,740,917.03 2,402,283.60 2,618,917.69 2,686,044.56 2,726,794.59 4,850,522.83 2,665,874.90 4,568,007.58 5,010,733.88 2,644,652.34 2,675,908.30
218 7.1 (7b) Beton strukut bervolume besar, fc’20 MPa M3 2,624,626.44 2,734,198.22 2,689,415.75 2,967,435.74 2,905,917.03 2,550,783.60 2,770,717.69 2,841,144.56 2,878,594.59 5,032,022.83 2,820,974.90 4,739,607.58 5,192,233.88 2,793,152.34 2,831,008.30
219 7.1 (7c) Beton strukut memadat sendiri, fc’20 MPa M3 2,515,686.91 2,627,361.83 2,580,247.66 2,847,026.95 2,784,814.40 2,439,904.53 2,658,846.33 2,728,135.05 2,768,280.59 4,920,282.58 2,707,077.04 4,638,763.51 5,087,458.29 2,686,111.74 2,716,924.09

BIDANG BINA MARGA BM - 20 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

220 7.1 (7d) Beton strukut, fc’20 MPa yang dilaksanakan di air M3 3,257,543.57 3,409,166.91 3,363,352.94 3,644,177.37 3,646,408.95 3,181,072.59 3,498,355.47 3,565,272.17 3,605,969.49 5,958,107.17 3,520,469.67 5,805,614.10 6,263,394.33 3,485,125.13 3,530,816.70
221 7.1 (8) Beton , fc’15 Mpa M3 2,470,120.08 2,579,391.50 2,534,759.78 2,795,528.39 2,734,235.23 2,396,502.71 2,612,661.70 2,679,601.81 2,720,242.54 4,838,010.84 2,659,396.23 4,556,345.97 4,997,776.53 2,638,209.60 2,669,393.69
222 7.1 (9) Beton Siklop, fc’15 Mpa M3 1,106,479.40 1,154,316.67 1,128,574.83 1,246,369.12 1,215,589.80 1,070,957.39 1,146,557.46 1,177,951.57 1,192,263.81 2,091,217.79 1,177,221.04 1,974,285.49 2,164,085.93 1,169,816.98 1,181,017.31
223 7.1 (10) Beton, fc’10 Mpa M3 2,447,588.63 2,555,735.38 2,514,333.83 2,769,632.15 2,710,516.42 2,376,139.45 2,593,634.54 2,657,854.97 2,700,017.82 4,799,956.52 2,638,143.05 4,518,090.25 4,955,270.18 2,616,462.75 2,648,660.24
224 7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 16 meter Buah 84,030,744.26 88,098,178.64 87,245,900.35 96,234,226.96 93,782,405.97 81,725,808.88 88,713,379.43 90,091,625.96 93,772,592.45 175,026,262.79 92,054,772.95 163,973,857.68 181,915,212.22 88,937,070.43 91,836,603.21
225 7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 25 meter Buah 144,084,504.10 151,114,664.65 149,625,801.77 165,197,909.31 160,940,477.90 140,255,669.64 151,819,426.80 154,017,058.78 161,078,246.51 301,238,357.54 158,085,132.58 282,828,505.00 313,975,931.47 151,815,654.87 157,339,074.38
226 7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe I Bentang … meter Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
227 7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 16 meter Buah 7,766,953.53 7,869,499.86 7,842,039.54 7,986,082.72 7,927,828.57 7,440,927.87 8,202,816.22 8,530,279.19 7,956,174.74 9,083,264.36 7,895,737.42 8,957,754.69 9,175,472.35 7,875,256.29 7,911,593.13
228 7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 25 meter Buah 9,789,268.53 9,918,515.28 9,883,905.00 10,065,453.32 9,992,031.29 9,378,354.17 10,338,618.65 10,751,344.56 10,027,758.08 11,448,312.85 9,951,584.43 11,290,123.69 11,564,529.43 9,925,770.54 9,971,568.56
229 7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe I Bentang … meter Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
230 7.2 (3a) Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah 342,545,103.66 359,334,473.01 355,636,600.04 392,940,256.56 382,698,715.70 334,450,736.64 358,316,536.99 362,327,535.46 384,402,573.56 714,232,577.92 377,007,924.58 676,889,530.60 751,821,515.47 354,183,234.98 371,950,999.65
231 7.2 (3b) Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
232 7.2 (4a) Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah 9,789,268.53 9,918,515.28 9,883,905.00 10,065,453.32 9,992,031.29 9,378,354.17 10,338,618.65 10,751,344.56 10,027,758.08 11,448,312.85 9,951,584.43 11,290,123.69 11,564,529.43 9,925,770.54 9,971,568.56
233 7.2 (4b) Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
234 7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
235 7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
236 7.2.(7) Baja Prategang Kg 391,114.82 417,412.41 400,848.13 468,355.45 405,032.40 365,507.47 430,260.28 408,083.75 435,171.29 587,820.26 412,347.52 564,919.85 599,072.15 391,030.80 406,001.71
237 7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
238 7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Beton Pratekan untuk Diafragma fc' 45 MPa termasuk Pekerjaan pasca-tarik
239 7.2.(10) M3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(post-tension)
240 7.2.(11a) Penyediaan Balok T Beton Pratekan bentang 40m Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
241 7.2.(11b) Pemasangan Balok T Beton Pratekan bentang 60 m Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
242 7.2.(12a) Penyediaan Panel Full Depth slab Buah 1,592,432.53 1,639,567.42 1,628,515.05 1,728,213.71 1,697,332.49 1,549,242.29 1,666,315.32 1,702,896.58 1,707,583.46 2,576,746.44 1,686,221.55 2,475,043.65 2,670,487.20 1,603,769.54 1,664,028.61
243 7.2.(12b) Penmasangan Panel Full Depth slab Buah 713,663.66 723,229.70 720,727.21 734,074.89 728,987.02 683,952.62 753,715.59 783,668.06 731,459.79 835,829.22 725,620.75 824,280.96 844,121.79 723,643.84 727,065.70
244 7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 22,924.00 24,024.00 23,790.80 26,004.00 25,639.90 22,339.90 23,263.90 23,302.40 25,498.00 43,585.30 24,896.30 43,058.84 47,262.60 24,696.10 25,129.50
245 7.3 (2) Baja Tulangan Sirip BjTS 280 Kg 22,924.00 24,024.00 23,790.80 26,004.00 25,639.90 22,339.90 23,263.90 23,302.40 25,498.00 43,585.30 24,896.30 43,058.84 47,262.60 24,696.10 25,129.50
246 7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 22,924.00 24,024.00 23,790.80 26,004.00 25,639.90 22,339.90 23,263.90 23,302.40 25,498.00 43,585.30 24,896.30 43,058.84 47,262.60 24,696.10 25,129.50
247 7.3 (4) Baja Tulangan Sirip BjTS 420B Kg 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38 15,746.38
248 7.3 (5) Baja Tulangan Sirip BjTS 520 Kg 22,924.00 24,024.00 23,790.80 26,004.00 25,639.90 22,339.90 23,263.90 23,302.40 25,498.00 43,585.30 24,896.30 43,058.84 47,262.60 24,696.10 25,129.50
249 7.3 (6) Baja Tulangan Sirip BjTS 550 Kg 22,924.00 24,024.00 23,790.80 26,004.00 25,639.90 22,339.90 23,263.90 23,302.40 25,498.00 43,585.30 24,896.30 43,058.84 47,262.60 24,696.10 25,129.50
250 7.3 (7) Baja Tulangan Sirip BjTS 700 Kg 22,924.00 24,024.00 23,790.80 26,004.00 25,639.90 22,339.90 23,263.90 23,302.40 25,498.00 43,585.30 24,896.30 43,058.84 47,262.60 24,696.10 25,129.50
251 7.3 (8) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 25,701.50 26,911.50 26,678.30 29,001.50 28,747.40 25,117.40 26,178.90 26,244.90 28,468.00 47,352.80 27,783.80 46,798.84 51,002.60 27,501.10 28,017.00
252 7.4 (1a) Penyediaan Baja Struktur Grade 250 (Kuat Leleh 250 MPa) Kg 27,957.40 29,281.37 29,060.48 32,035.95 31,264.53 27,066.79 29,731.94 30,292.64 31,043.99 59,025.76 30,492.07 54,554.85 60,567.94 30,270.65 30,712.58
253 7.4 (1b) Penyediaan Baja Struktur Grade 345 (Kuat Leleh 345 MPa) Kg 19,167.44 19,170.38 19,169.48 19,174.09 19,171.49 19,156.82 19,180.56 19,191.17 19,172.45 19,207.59 19,170.92 19,201.97 19,209.06 19,170.29 19,171.43
254 7.4 (1c) Penyediaan Baja Struktur Grade 485 (Kuat Leleh 485 MPa) Kg 20,267.44 20,270.38 20,269.48 20,274.09 20,271.49 20,256.82 20,280.56 20,291.17 20,272.45 20,307.59 20,270.92 20,301.97 20,309.06 20,270.29 20,271.43
255 7.4 (1d) Penyediaan Baja Struktur Grade 690 (Kuat Leleh 690 Mpa Untuk Tebal Pelat < 2,5) Kg 24,667.44 24,670.38 24,669.48 24,674.09 24,671.49 24,656.82 24,680.56 24,691.17 24,672.45 24,707.59 24,670.92 24,701.97 24,709.06 24,670.29 24,671.43
Penyediaan Baja Struktur Grade 690 (Kuat Leleh 620 Mpa Untuk Tebal Pelat <
256 7.4 (1e) Kg 21,367.44 21,370.38 21,369.48 21,374.09 21,371.49 21,356.82 21,380.56 21,391.17 21,372.45 21,407.59 21,370.92 21,401.97 21,409.06 21,370.29 21,371.43
2,5-4,0 inch)
257 7.4 (2) Pemasangan Baja Struktur Kg 3,290.84 3,320.27 3,311.33 3,357.43 3,331.37 3,184.73 3,422.05 3,528.23 3,340.99 3,692.44 3,325.66 3,636.20 3,707.06 3,319.38 3,330.82
258 7.4 (3) Penyediaan Struktur Jembatan Rangka Baja Standar …… m Kg 27,967.44 29,290.38 29,069.48 32,044.09 31,271.49 27,076.82 29,740.56 30,301.17 31,052.45 59,027.59 30,500.92 54,555.97 60,569.06 30,280.29 30,721.43
259 7.4 (4) Pemasangan Jembatan Rangka Baja Standar Panjang ….. M Kg 3,290.84 3,320.27 3,311.33 3,357.43 3,331.37 3,184.73 3,422.05 3,528.23 3,340.99 3,692.44 3,325.66 3,636.20 3,707.06 3,319.38 3,330.82
260 7.4 (5a) Pemasangan Jembatan Rangka Baja yang disediakan Pengguna Jasa Kg 3,290.84 3,320.27 3,311.33 3,357.43 3,331.37 3,184.73 3,422.05 3,528.23 3,340.99 3,692.44 3,325.66 3,636.20 3,707.06 3,319.38 3,330.82
261 7.4 (5b) Pengangkutan Bahan Jembatan yang disediakan Pengguna Jasa Kg 27,967.44 29,290.38 29,069.48 32,044.09 31,271.49 27,076.82 29,740.56 30,301.17 31,052.45 59,027.59 30,500.92 54,555.97 60,569.06 30,280.29 30,721.43
262 7.5.(1) Tiang bor sekan primer diameter 80 cm (fc' > 15 MPa) M1 2,077,851.86 2,140,082.80 2,114,664.68 2,263,174.47 2,228,267.53 2,035,926.18 2,159,030.44 2,197,153.36 2,220,298.58 3,426,384.39 2,185,646.12 3,265,974.02 3,517,372.22 2,173,580.17 2,191,339.76
263 7.5.(2) Tiang bor sekan sekunder diameter 80 cm (fc' > 30 MPa) M1 3,040,456.40 3,140,461.32 3,075,529.48 3,345,062.25 3,151,204.00 2,955,215.87 3,139,829.55 3,105,376.30 3,203,004.03 4,409,685.70 3,146,199.96 4,222,952.85 4,497,927.52 3,098,543.23 3,136,593.25
264 7.5.(3) Tiang bor sekan primer diameter 100 cm (fc' > 15MPa) M1 2,869,150.39 2,966,386.23 2,926,670.42 3,158,716.96 3,104,174.87 2,803,641.52 2,995,991.92 3,055,558.99 3,091,723.39 4,976,232.47 3,037,578.93 4,725,591.26 5,118,400.95 3,018,725.87 3,046,475.23
265 7.5.(4) Tiang bor sekan sekunder diameter 100 cm (fc' > 30 MPa) M1 3,693,584.97 3,849,842.66 3,748,386.66 4,169,531.61 3,866,628.09 3,560,396.65 3,848,855.52 3,795,022.32 3,947,565.64 5,833,005.76 3,858,809.28 5,541,235.67 5,970,883.60 3,784,345.64 3,843,798.80

BIDANG BINA MARGA BM - 21 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

266 7.5.(5) Tiang bor sekan primer diameter 120 cm (fc' > 15 MPa) M1 3,836,293.03 3,976,312.65 3,919,121.87 4,253,268.90 4,174,728.29 3,741,960.27 4,018,944.84 4,104,721.42 4,156,798.16 6,870,491.24 4,078,830.13 6,509,567.89 7,075,213.84 4,051,681.74 4,091,640.81
267 7.5.(6) Tiang bor sekan sekunder diameter 120 cm (fc' > 30 MPa) M1 4,735,786.24 4,960,797.33 4,814,700.68 5,421,149.41 4,984,968.34 4,543,995.07 4,959,375.85 4,881,856.02 5,101,518.41 7,816,552.18 4,973,709.26 7,396,403.25 8,015,096.28 4,866,481.62 4,952,094.16
268 7.5.(7) Tiang bor sekan primer diameter 150 cm (fc' > 15 MPa) M1 5,616,714.72 5,835,495.37 5,746,134.79 6,268,239.51 6,145,519.81 5,469,319.77 5,902,108.16 6,036,134.07 6,117,503.98 10,357,649.42 5,995,678.93 9,793,706.69 10,677,528.49 5,953,259.57 6,015,695.62
269 7.5.(8) Tiang bor sekan sekunder diameter 150 cm (fc' > 15 MPa) M1 6,853,965.61 7,205,545.43 6,977,269.41 7,924,845.56 7,243,312.64 6,554,291.90 7,203,324.36 7,082,199.64 7,425,422.13 11,667,662.39 7,225,720.32 11,011,179.69 11,977,887.54 7,058,177.13 7,191,946.72
270 7.5.(9) Tiang bor sekan primer diameter …… cm (fc' > 15 MPa) M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
271 7.5.(10) Tiang bor sekan sekunder diameter ….. cm (fc' > 15 MPa) M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
272 7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan M1 54,626.79 56,937.57 56,937.57 59,433.00 61,559.14 54,280.29 58,231.64 58,740.00 59,363.86 80,713.29 57,676.93 80,875.61 82,746.71 56,382.86 57,792.43
273 7.6 (2) Dinding Turap Kayu Tanpa Pengawetan, Penyediaan dan Pemancangan M2 156,974.71 163,664.52 163,505.13 170,365.56 176,565.97 156,496.54 166,685.48 168,173.13 169,815.32 225,335.25 165,184.82 225,518.38 229,012.49 161,101.71 165,339.35
274 7.6.(3) Dinding Turap Kayu Dengan Pengawetan, Penyediaan dan Pemancangan M2 205,173.57 213,880.46 213,710.51 222,651.39 230,784.40 204,663.72 216,919.38 218,427.65 220,100.44 290,445.90 215,449.31 290,458.75 294,184.33 209,391.94 215,614.50
275 7.6.(4) Dinding Turap Baja, Penyediaan dan Pemancangan M2 4,630,174.03 4,850,512.79 4,811,877.04 5,308,201.67 5,171,708.16 4,476,434.85 4,923,460.52 5,007,225.73 5,146,953.15 9,734,117.20 5,054,744.25 9,023,798.83 10,014,882.61 4,998,155.66 5,087,285.53
276 7.6.(5) Dinding Turap Beton, Penyediaan dan Pemancangan M2 736,385.73 748,091.23 741,546.51 774,655.39 751,458.62 724,068.53 778,926.78 774,359.04 785,193.98 906,680.80 757,017.98 912,346.09 932,387.99 744,177.22 750,468.98
277 7.6.(6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran…… mm M1 146,934.50 154,281.23 153,011.88 167,474.68 165,166.64 143,126.47 157,439.11 159,901.64 163,593.62 297,878.22 160,631.09 279,935.97 307,762.18 158,901.64 161,864.17
278 7.6.(7) Penyediaan Tiang Pancang Kayu Dengan Pengawetan Ukuran…… mm M1 150,128.18 157,634.59 156,327.89 171,075.98 168,764.66 146,245.44 160,858.77 163,358.66 167,125.35 303,908.02 164,101.65 285,744.88 314,060.45 162,311.04 165,353.41
279 7.6 (8a) Penyediaan Tiang Pancang Baja Diameter 500 mm tebal 10 mm M1 4,679,909.68 4,904,904.84 4,865,575.35 5,372,163.50 5,232,097.05 4,524,218.18 4,977,745.21 5,059,390.51 5,205,525.68 9,888,591.80 5,112,456.46 9,158,511.45 10,170,084.56 5,054,901.02 5,145,734.44
280 7.6 (8b) Penyediaan Tiang Pancang Baja Diameter …. mm tebal …... mm M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
281 7.6.(8c) Penyediaan Tiang Pancang Baja Diameter …... mm tebal …… mm M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
282 7.6.(9a) Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 M1 2,260,078.75 2,382,521.28 2,345,685.58 2,626,054.53 2,511,053.64 2,179,325.83 2,418,954.60 2,437,787.38 2,518,860.01 4,713,669.25 2,462,452.03 4,355,954.59 4,828,782.97 2,431,589.19 2,481,502.99

Penyediaan Tiang Pancang Baja H Beam Ukuran …..mm x …….. mm x …….mm


283 7.6.(9b) M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x ……... mm

284 7.6.(10a) Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1 783,333.31 842,337.28 813,126.85 964,507.41 844,347.88 703,615.02 789,370.46 756,442.64 854,938.63 1,407,961.01 813,278.67 1,366,453.67 1,508,075.82 801,009.52 858,902.47
285 7.6.(10b) Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ……..mm x ……... m M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
286 7.6.(11a) Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1 1,165,418.13 1,222,686.77 1,212,022.32 1,316,859.50 1,300,554.39 1,095,262.35 1,194,437.45 1,212,082.58 1,266,042.73 2,038,098.58 1,215,048.00 1,995,366.68 2,153,952.27 1,230,645.12 1,287,044.21
287 7.6.(11b) Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ……. mm x ………. m M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
288 7.6.(12a) Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 817,613.94 860,915.38 848,746.72 950,626.99 904,570.74 745,538.94 809,070.61 815,694.11 864,994.92 1,549,764.23 843,698.01 1,475,066.96 1,633,913.28 857,774.19 915,479.15
289 7.6.(12b) Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……...mm M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
290 7.6.(13) Pemancangan Tiang Pancang Kayu Ukuran ….. Mm M1 270,629.61 281,643.05 281,306.56 289,074.79 303,160.84 268,438.92 296,839.99 298,845.90 296,709.72 367,683.40 288,551.17 392,568.72 396,237.25 282,607.28 288,053.60
291 7.6.(14a) Pemancangan Tiang Pancang Baja Diameter 500 mm M1 433,784.14 443,999.49 442,814.13 454,185.65 459,370.52 421,725.49 462,505.92 474,362.51 454,857.07 545,464.03 448,441.34 550,343.31 560,859.72 442,714.54 448,515.78
292 7.6.(14b) Pemancangan Tiang Pancang Baja Diameter …….. mm M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pemancangan Tiang Pancang Baja H beam Ukuran 300 mm x 300 mm x 10 mm x
293 7.6.(15a) M1 233,733.80 240,903.83 240,654.08 246,938.28 255,930.19 232,096.50 252,776.98 255,641.16 251,368.90 301,919.54 245,904.55 313,800.98 315,867.29 240,759.58 245,318.87
15 mm
Pemancangan Tiang Pancang Baja H beam Ukuran…….. mm x …….. mm x
294 7.6.(15b) M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
…….. mm x ……... mm

295 7.6.(16a) Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1 233,733.80 240,903.83 240,654.08 246,938.28 255,930.19 232,096.50 252,776.98 255,641.16 251,368.90 301,919.54 245,904.55 313,800.98 315,867.29 240,759.58 245,318.87

Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran………. mm x


296 7.6.(16b) M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
………... mm

297 7.6.(17a) Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1 233,733.80 240,903.83 240,654.08 246,938.28 255,930.19 232,096.50 252,776.98 255,641.16 251,368.90 301,919.54 245,904.55 313,800.98 315,867.29 240,759.58 245,318.87
298 7.6.(17b) Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ………. mm x ….. M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
299 7.6.(18a) Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 458,114.65 473,751.89 473,502.14 488,253.54 505,712.65 456,477.36 489,858.64 496,956.42 496,917.76 610,972.42 478,752.61 618,620.26 620,686.57 469,374.04 478,166.93
300 7.6.(18b) Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter ….. mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
301 7.6.(19a) Tiang Bor Beton, diameter 800 mm M1 2,285,371.48 2,388,217.53 2,365,217.70 2,592,260.33 2,532,020.69 2,223,092.20 2,350,322.49 2,368,930.75 2,526,490.65 4,485,296.61 2,479,325.89 4,295,327.37 4,745,896.16 2,462,472.88 2,502,040.96
302 7.6.(19b) Tiang Bor Beton, diameter ….. mm M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13)s/d 7.6.(18) bila Tiang
303 7.6.(20) M1 84,965.03 85,069.79 85,069.79 85,153.60 85,279.32 84,965.03 85,132.65 85,153.60 85,174.56 85,845.03 85,090.75 85,928.84 85,928.84 85,027.89 85,090.75
Pancang dikerjakan di tempat Yang Berair

Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) Bila Tiang Bor Beton
304 7.6.(21) M1 135,248.60 135,507.11 135,507.11 135,713.91 136,024.11 135,248.60 135,662.21 135,713.91 135,765.61 137,420.04 135,558.81 137,626.84 137,626.84 135,403.70 135,558.81
dikerjakan ditempat Yang Berair

305 7.6.(22) Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
306 7.6.(23) Pengujian Pembebanan Pada Tiang Dengan Diameter di atas 600 mm Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
307 7.6.(24) Tiang Uji jenis …. Ukuran …… M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BIDANG BINA MARGA BM - 22 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... Dengan beban
308 7.6.(25a) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
hidrolik Cara Beban Siklik

Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... Dengan beban
309 7.6 (25b) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
hidrolik Cara Beban Bertahap

Pengujian Pembebanan Statis pada Tiang ukuran / diameter ……. meja beban
310 7.6 (26a) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
statis Cara beban Siklik

Pengujian Pembebanan Statis pada Tiang ukuran / diameter ……. meja beban
311 7.6 (26b) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
statis Cara beban Bertahap

312 7.6 (27a) Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada
313 7.6 (27b) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tiangukuran / diameter ....

314 7.6 (28) Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
315 7.7.(1) Dinding Sumuran Silinder terpasang, Diameter ……………. M1 8,333,323.63 8,723,377.29 8,661,804.99 9,556,418.91 9,319,592.34 8,062,631.97 8,430,252.90 8,638,689.65 9,250,405.80 16,697,905.47 9,072,020.26 16,217,420.49 17,999,592.51 9,010,368.44 9,159,303.30
316 7.9.(1) Pasangan Batu M3 1,133,919.45 1,188,695.66 1,163,247.28 1,294,547.95 1,260,721.07 1,095,231.93 1,185,756.19 1,218,084.01 1,237,310.22 2,278,412.91 1,219,872.83 2,138,554.99 2,358,657.44 1,210,424.23 1,225,437.22
317 7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3 707,298.31 739,545.33 727,918.12 796,974.03 786,507.06 688,529.01 744,178.67 761,274.29 773,431.92 1,326,376.13 756,969.25 1,257,519.86 1,365,788.99 748,396.89 759,525.89
318 7.10.(2) Pasangan Batu Kosong M3 834,338.49 874,151.61 867,758.69 945,382.06 934,769.55 814,932.42 889,215.62 903,866.94 924,911.19 1,633,139.57 904,617.80 1,531,695.37 1,672,652.26 893,783.61 910,868.66
319 7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 1,077,862.50 1,129,392.00 1,120,647.00 1,225,284.50 1,207,866.00 1,049,735.50 1,148,471.50 1,167,782.00 1,195,716.50 2,157,380.50 1,170,906.00 2,017,705.80 2,213,937.00 1,158,157.00 1,179,530.00
320 7.10.(3b) Bronjong dengan kawat yang dilapisi PVC M3 1,070,746.49 1,081,746.49 1,081,746.49 1,091,829.82 1,103,746.49 1,070,746.49 1,087,246.49 1,090,913.16 1,094,579.82 1,171,579.82 1,082,663.16 1,172,496.49 1,172,496.49 1,076,246.49 1,082,663.16
321 7.10.(4) Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi M2 254,793.00 265,092.67 264,866.07 275,721.97 285,125.50 253,999.90 270,932.57 275,052.43 279,398.90 367,698.47 267,029.03 364,785.59 369,974.73 262,219.10 267,255.63
322 7.11.(1a) Sambungan Siar Muai Tipe Asphaltic Plug, Fixed M1 2,332,466.02 2,444,258.67 2,422,493.51 2,671,220.89 2,608,233.09 2,260,338.59 2,482,804.02 2,528,089.10 2,593,159.11 4,890,393.24 2,544,568.03 4,535,236.38 5,026,180.30 2,521,117.27 2,565,576.81
323 7.11.(1b) Sabungan siar Muai Tipe Asphaltic Plug, Movable M1 4,678,298.52 4,907,807.67 4,861,738.01 5,367,868.14 5,236,691.34 4,535,498.84 4,987,905.52 5,079,459.35 5,207,292.61 9,889,046.24 5,110,906.53 9,156,460.68 10,158,857.30 5,071,662.52 5,161,318.31
324 7.11.(2) Sambungan Siar Muai Tipe Silicone Seal M1 738,792.97 767,543.26 763,264.53 815,814.07 812,434.24 726,183.37 779,432.57 788,970.50 803,568.66 1,281,480.74 787,520.43 1,218,064.71 1,309,726.17 779,030.74 791,642.36
325 7.11.(3) Sambungan Siar Muai Tipe Strip seal M1 1,379,279.42 1,448,197.70 1,434,488.40 1,585,504.70 1,544,929.01 1,338,151.52 1,471,886.61 1,498,455.04 1,538,528.82 2,932,877.42 1,511,508.89 2,712,935.65 3,012,988.04 1,497,981.72 1,524,764.99
326 7.11.(4) Sambungan Siar Muai Tipe Compression Seal M1 1,387,145.27 1,456,332.93 1,442,668.95 1,593,682.71 1,553,716.31 1,346,153.33 1,480,111.64 1,506,747.20 1,546,842.80 2,944,209.22 1,519,440.19 2,724,673.92 3,024,207.39 1,505,642.78 1,532,650.97
327 7.11.(5) Sambungan Siar Muai Expansion Joint Tipe Modular, lebar …….. M1 1,193,278.86 1,193,490.92 1,193,449.57 1,193,845.19 1,194,058.49 1,193,177.18 1,193,746.65 1,193,830.92 1,193,932.24 1,197,148.07 1,193,675.14 1,196,944.86 1,197,488.62 1,193,556.62 1,193,664.89
328 7.11.(6) Sambungan Siar Muai Expansion Joint Tipe Finger Plate, lebar …….. M1 4,129,108.46 4,335,481.20 4,294,207.71 4,748,156.83 4,624,673.72 4,005,310.37 4,405,831.56 4,485,902.92 4,605,933.64 8,808,701.90 4,525,684.02 8,144,468.05 9,048,890.38 4,485,628.62 4,565,729.40
329 7.11.(7) Sambungan Siar Muai Expansion Tipe Karet dengan Lebar Celah …….. Cm M3 2,306,198.59 2,413,682.68 2,393,393.18 2,621,272.80 2,567,782.35 2,245,330.09 2,450,170.27 2,492,090.73 2,550,242.79 4,653,945.60 2,508,355.84 4,336,302.62 4,781,048.46 2,484,712.68 2,524,587.44
330 7.11.(8) Joint Filler untuk Sambungan Konstruksi M3 2,576,022.10 2,690,830.84 2,668,696.63 2,919,019.33 2,860,807.44 2,503,764.13 2,735,594.57 2,782,167.71 2,846,157.14 5,145,946.10 2,792,130.95 4,801,602.01 5,286,994.50 2,765,386.14 2,812,116.92

331 7.11.(9) Sambungan Siar Muai Tipe Modular, Lebar …….. M3 321,248.59 329,485.18 329,045.18 338,580.30 344,638.35 319,928.59 334,169.57 336,391.03 339,052.49 421,944.20 332,806.64 420,314.06 429,950.06 329,012.98 333,246.64
332 7.12.(1a) Landasan Logam Tipe Fixed Buah 2,151,478.29 2,253,945.81 2,237,249.68 2,434,388.38 2,408,910.09 2,099,677.82 2,301,210.45 2,337,971.08 2,386,063.81 4,195,518.03 2,336,894.20 3,956,297.03 4,319,717.33 2,308,993.81 2,352,305.86

333 7.12.(1b) Landasan Logam Tipe Moveable Buah 2,271,958.33 2,385,166.67 2,363,166.67 2,607,458.33 2,545,583.33 2,205,958.33 2,424,858.33 2,467,996.67 2,532,475.00 4,792,425.00 2,487,503.33 4,442,306.00 4,924,590.00 2,464,330.00 2,508,843.33
334 7.12.(1c) Landasan Logam Tipe ……. Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
335 7.12.(2) Landasan Elastomerik Karet Alam Berlapis Baja Ukuran ….. Mm x ….. Mm x…….. Buah 1,254,458.33 1,316,736.67 1,304,966.67 1,437,278.33 1,405,983.33 1,218,928.33 1,339,048.33 1,362,496.67 1,397,385.00 2,620,805.00 1,372,103.33 2,434,586.00 2,693,790.00 1,358,830.00 1,383,543.33
336 7.12.(3) Landasan Elastomerik Karet Sintetis Berlapis Baja Ukuran ….. Mm x ….. Mm x……. Buah 1,045,458.33 1,097,286.67 1,087,606.67 1,196,928.33 1,171,903.33 1,016,198.33 1,116,078.33 1,135,456.67 1,164,185.00 2,174,865.00 1,142,973.33 2,022,152.00 2,235,530.00 1,131,790.00 1,152,433.33
337 7.12.(4) Landasan karet Strip M1 375,718.75 394,185.00 390,995.00 428,023.75 421,547.50 366,038.75 401,293.75 407,907.50 417,601.25 759,618.75 409,612.50 710,902.50 781,412.50 405,157.50 412,802.50
338 7.12.(5) Landasan Tipe Logam Berongga (Pot Bearing) Buah 14,137,090.98 14,580,625.58 14,485,951.14 15,471,342.02 15,313,115.49 13,840,011.30 15,268,453.82 15,467,340.00 15,649,280.07 23,951,085.11 15,081,710.06 23,324,723.70 24,886,766.65 14,821,410.77 15,046,483.29
339 7.12.(6) Landasan Tipe Logam Jenis Spherical Buah 15,327,414.81 15,569,020.84 15,512,846.40 16,065,308.71 16,003,725.03 15,145,835.13 16,125,399.07 16,249,595.26 16,319,555.33 20,624,651.80 15,883,246.74 20,486,316.38 21,204,373.34 15,669,666.03 15,820,048.54
340 7.13.(1) Sandaran (Railing) M1 190,272.50 199,355.48 198,024.20 214,994.73 213,527.60 186,052.08 202,941.48 206,044.03 210,506.18 365,842.95 206,168.60 345,407.48 375,817.20 203,404.03 207,414.90
341 7.14.(1) Papan Nama Jembatan M1 612,336.74 642,128.58 638,003.41 688,878.92 689,337.08 599,961.57 658,307.58 668,143.58 681,939.42 1,153,448.49 664,770.25 1,103,453.11 1,193,873.83 657,143.58 668,812.75
342 7.15.(1) Pembongkaran Pasangan Batu M3 363,762.03 375,753.67 374,948.41 390,442.43 426,197.65 361,774.12 392,252.09 393,246.96 397,535.54 516,648.21 385,218.11 528,395.53 538,462.54 374,507.08 383,281.41
343 7.15.(2) Pembongkaran Beton M3 535,317.95 553,043.66 551,918.96 574,549.62 628,286.75 532,607.55 577,402.36 578,719.67 585,069.89 758,789.34 566,882.75 776,950.11 791,037.37 550,941.13 563,979.81
344 7.15.(3) Pembongkaran Beton Pratekan M3 485,003.14 498,784.40 494,407.65 527,299.35 523,638.06 475,043.82 516,447.49 521,414.15 535,389.98 803,274.64 519,924.25 774,414.64 829,343.10 513,097.44 519,691.08
345 7.15.(4) Pembongkaran Bangunan Gedung M2 294,412.02 301,550.48 299,379.15 318,135.47 337,099.08 289,696.52 323,742.59 328,341.30 331,426.92 480,034.74 315,714.21 473,754.47 501,414.99 310,022.76 313,582.36
346 7.15.(5) Pembongkaran Rangka Baja M2 1,180,107.59 1,211,983.05 1,202,059.94 1,277,372.58 1,269,494.52 1,157,664.67 1,251,486.43 1,261,502.10 1,296,268.66 1,909,753.08 1,260,179.69 1,846,156.76 1,971,038.64 1,244,075.35 1,259,440.37

347 7.15.(6) Pembongkaran Balok Baja (Steel Stingers) M1 434,970.83 447,413.50 443,692.88 472,471.23 470,041.25 426,555.95 462,699.89 466,455.22 479,572.64 713,393.80 465,681.08 690,039.82 736,863.72 459,102.61 465,322.02
348 7.15.(7) Pembongkaran Lantai Jembatan Kayu M2 163,726.75 170,882.33 170,794.40 176,960.07 185,137.05 163,527.86 173,973.99 174,062.75 174,369.69 222,416.39 172,680.82 228,716.62 229,823.32 167,039.85 172,675.43

BIDANG BINA MARGA BM - 23 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

349 7.15.(8) Pembongkaran Jembatan Kayu M2 46,184.92 46,380.31 46,353.92 46,642.65 46,754.15 46,125.23 46,527.33 46,553.97 46,646.09 48,962.63 46,529.65 48,901.29 49,233.45 46,398.40 46,528.04
350 7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3/ km 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

351 7.16.(1) Dreck drain Buah 152,900.00 160,600.00 159,225.00 174,625.00 171,875.00 148,775.00 164,010.00 166,650.00 170,610.00 314,270.00 167,475.00 294,910.00 325,050.00 165,825.00 168,685.00
352 7.16.(2a) Pipa Drainase Baja diameter 150 mm M1 107,923.97 112,030.64 111,517.31 118,593.97 118,813.97 106,292.31 112,158.97 114,707.31 116,540.64 177,168.97 114,523.97 172,090.64 183,457.31 112,873.97 115,037.31

353 7.16.(2b) Pipa Drainase Baja diameter ……. Mm M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
354 7.16.(3a) Pipa Drainase PVC diameter 150 mm M1 249,608.33 262,111.67 259,955.67 284,405.00 280,650.33 243,067.00 195,818.33 272,701.00 279,334.00 363,311.67 273,170.33 478,341.60 525,990.67 89,349.33 91,149.67
355 7.16.(3b) Pipa Drainase PVC diameter …… mm M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
356 7.16.(4) Pipa Penyalur PVC M1 249,608.33 262,111.67 259,955.67 284,405.00 280,650.33 243,067.00 195,818.33 272,701.00 279,334.00 363,311.67 273,170.33 478,341.60 525,990.67 89,349.33 91,149.67
357 7.17.(1) Pengujian Pembebanan Jembatan Buah Jembatan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
H DIVISI 8. REHABILITASI JEMBATAN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
358 8.1 (1) Cairan Perekat (Epoksi resin) Kg 146,376.16 152,241.23 150,867.47 162,926.63 161,067.60 142,814.51 156,460.91 158,566.31 161,116.45 265,055.93 157,450.77 253,186.26 274,212.77 155,150.37 157,968.81
359 8.1 (2) Bahan Penutup (Sealant) Kg 142,969.40 149,517.42 148,162.13 162,247.02 159,071.69 138,925.10 152,283.97 154,735.63 158,186.24 285,516.67 155,140.79 266,922.91 293,606.45 153,417.04 156,349.03
360 8.1 (3a) Tabung Penyuntik, penyediaan Buah 96,673.15 101,410.70 100,552.70 110,636.25 108,311.79 93,967.15 102,862.70 104,644.70 107,218.70 200,045.53 105,502.70 185,802.73 205,325.53 104,329.15 106,360.70
361 8.1 (3b) Tabung Penyuntik, penggunan Buah 121,653.12 126,809.95 126,237.95 134,643.24 135,407.62 119,849.12 129,197.92 131,174.79 133,679.66 209,080.18 129,853.50 200,373.85 213,389.05 128,177.08 130,425.50
362 8.2.(1) Penambahan (Patching) M3 3,348,941.13 3,515,598.81 3,482,224.10 3,848,866.01 3,749,512.79 3,006,153.94 3,305,528.24 3,366,054.67 3,455,923.68 6,590,044.07 3,394,347.00 6,097,645.44 6,771,917.74 3,522,580.31 3,826,392.04
363 8.2.(2) Perbaikan Dengan Cara Graut M3 4,713,705.21 4,913,196.70 4,865,263.98 5,294,919.21 5,215,743.20 4,590,765.03 5,066,302.86 5,139,987.76 5,243,003.98 8,938,504.88 5,104,896.24 8,506,498.39 9,259,650.50 5,023,343.51 5,119,416.97
364 8.3.(1a) Pengecetan protektif pada elemen struktur beton, tebal 200µm M2 43,807.06 45,549.12 45,215.73 48,812.56 48,402.51 42,900.98 47,345.83 48,010.95 48,795.17 80,748.60 47,381.77 77,313.79 83,602.61 46,675.64 47,476.38
365 8.3.(1b) Pengecetan protektif pada elemen struktur beton, tebal : ……µm M2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

366 8.3.(2a) Pengecetan dekoratif pada elemen struktur beton, tebal : 100 µm M2 43,807.06 45,549.12 45,215.73 48,812.56 48,402.51 42,900.98 47,345.83 48,010.95 48,795.17 80,748.60 47,381.77 77,313.79 83,602.61 46,675.64 47,476.38
367 8.3.(2b) Pengecetan dekoratif pada elemen struktur beton, tebal : ….. µm M2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
368 8.4.(1) Perkuatan struktur dengan bahan FRP jenis e- glass per lapis pada daerah kering M2 700,942.58 734,593.72 728,224.32 802,404.14 783,366.98 680,088.40 746,761.18 760,307.69 779,731.16 1,466,356.34 765,186.84 1,359,428.64 1,506,352.49 758,355.05 772,074.90
369 8.4.(2) Perkuatan Struktur dengan bahan FRP jenis e- glass-per lapis pada daerah basah M2 757,592.58 794,076.22 787,140.32 867,551.64 846,814.98 735,038.90 807,263.38 821,829.59 842,952.56 1,587,360.74 827,275.24 1,471,187.76 1,630,529.29 819,876.95 834,729.80
370 8.4.(3) Perkuatan Struktur dengan bahan FRP Laminasi jenis glass pada daerah kering M2 700,942.58 734,593.72 728,224.32 802,404.14 783,366.98 680,088.40 746,761.18 760,307.69 779,731.16 1,466,356.34 765,186.84 1,359,428.64 1,506,352.49 758,355.05 772,074.90
371 8.4.(4) Perkuatan Struktur dengan bahan FRP Jenis carbon per lapis pada daerah kering M2 700,942.58 734,593.72 728,224.32 802,404.14 783,366.98 680,088.40 746,761.18 760,307.69 779,731.16 1,466,356.34 765,186.84 1,359,428.64 1,506,352.49 758,355.05 772,074.90
372 8.4.(5) Perkuatan struktur dengan bahan FRP jenis carbon per lapis pada daerah basah M2 278,102.58 291,106.72 288,470.72 316,633.14 309,786.18 270,428.60 296,797.38 301,887.09 309,120.36 566,428.74 303,032.84 527,551.44 582,044.49 299,934.45 305,197.50
373 8.4.(6) Perkuatan struktur dengan bahan FRP lainasi jenis carbon pada daerah kering;ll M2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
374 8.4.(7) Pemasangan Perkuatan Pelat Lantai dengan Steel Plate Bonding Kg 1,167,754.05 1,220,772.29 1,212,941.72 1,313,204.33 1,303,442.88 1,142,986.85 1,241,406.65 1,261,665.57 1,289,046.88 2,202,198.87 1,259,705.83 2,076,464.70 2,254,480.13 1,244,689.23 1,267,374.73
375 8.4.(8) Perkuatan external stressing jembatan beton bentang …… m Buah 71,670,597.55 75,176,920.81 74,449,571.56 82,187,601.52 80,063,782.88 69,386,692.22 76,256,408.80 77,636,201.49 79,681,361.82 151,566,171.00 78,276,545.53 140,249,040.05 155,705,910.75 77,574,921.13 78,917,594.37
376 8.5.(1a) Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter M25 Buah 128,858.85 134,143.71 133,373.71 143,719.01 142,624.31 126,328.85 136,789.01 138,439.01 141,079.90 234,287.45 138,435.92 222,501.19 240,563.19 136,340.62 138,985.04
377 8.5.(1b) Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter M20 Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
378 8.5.(1c) Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter …… mm Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
379 8.5.(2a) Penggantian Baut Mutu Tinggi A490 Tipe 1 diameter M25 Buah 183,858.85 191,893.71 190,573.71 206,969.01 204,224.31 179,678.85 195,529.01 198,169.01 202,349.90 351,767.45 198,715.92 331,005.19 361,123.19 196,070.62 199,815.04
380 8.5.(2b) Penggantian Baut Mutu Tinggi A490 Tipe 1 diameter M20 Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
381 8.5.(2c) Penggantian Baut Mutu Tinggi A490 Tipe 1 diameter …… mm Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
382 8.5.(3a) Penggantian Baut Biasa Grade A diameter M25 Buah 128,858.85 134,143.71 133,373.71 143,719.01 142,624.31 126,328.85 136,789.01 138,439.01 141,079.90 234,287.45 138,435.92 222,501.19 240,563.19 136,340.62 138,985.04
383 8.5.(3b) Penggantian Baut Biasa Grade A diameter ……. mm Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
384 8.5.(4a) Penggantian Baut Biasa Grade B diameter M25 Buah 112,358.85 116,873.71 116,213.71 124,799.01 124,144.31 110,378.85 119,299.01 120,509.01 122,709.90 199,307.45 120,395.92 190,029.19 204,483.19 118,410.62 120,835.04
385 8.5.(4b) Penggantian Baut Biasa Grade B diameter …….. Mm Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
386 8.5.(5a) Penggantian Baut Biasa Grade C untuk anchor bolts diameter M25 Buah 101,358.85 105,323.71 104,773.71 112,149.01 111,824.31 99,708.85 107,529.01 108,629.01 110,389.90 175,767.45 108,405.92 168,447.19 180,503.19 106,530.62 108,625.04
387 8.5.(5b) Penggantian Baut Biasa Grade C untuk anchor bolts diameter ……. Mm Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
388 8.5.(6a) Pengencangan Baut Biasa Grade A diameter M25 Buah 33,113.47 33,981.22 33,981.22 34,927.87 35,874.51 33,113.47 34,927.87 34,927.87 35,085.64 41,791.03 34,375.66 42,816.56 42,816.56 33,429.01 34,217.88
389 8.5.(6b) Pengencangan Baut Biasa Grade A diameter …… mm Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
390 8.5.(7a) Pengencangan Baut Biasa Grade B diameter M25 Buah 33,113.47 33,981.22 33,981.22 34,927.87 35,874.51 33,113.47 34,927.87 34,927.87 35,085.64 41,791.03 34,375.66 42,816.56 42,816.56 33,429.01 34,217.88
391 8.5.(7b) Pengencangan Baut Biasa Grade B diameter ……. mm Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BIDANG BINA MARGA BM - 24 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

392 8.6.(1a) Pengelasan SMAW pada baja Grade 30 M1 88,480.84 90,226.49 89,685.52 93,866.07 92,703.65 87,121.75 91,714.47 92,540.00 93,385.33 128,308.05 92,033.65 123,799.02 131,209.66 91,305.35 92,146.75
393 8.6.(1b) Pengelasan SMAW pada baja Grade ….. M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

394 8.6.(2a) Pengelasan SAW pada baja Grade 30 M1 78,446.54 81,193.44 80,660.49 85,604.90 85,697.14 77,111.48 83,336.07 84,429.56 85,534.85 126,464.32 83,149.88 122,730.09 129,964.50 81,869.61 83,254.97
395 8.6.(2b) Pengelasan SAW pada baja Grade …… M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

396 8.6.(3a) Pengelasan GMAW pada baja Grade 30 M1 79,648.15 82,459.14 81,910.17 86,990.76 87,042.95 78,281.05 84,617.79 85,735.32 86,880.66 129,027.76 84,471.65 125,109.29 132,608.05 83,175.37 84,592.77
397 8.6.(3b) Pengelasan GMAW pada baja Grade ….. M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
398 8.6.(4a) Pengelasan FCAW pada baja Grade 30 M1 78,847.08 81,618.01 81,077.05 86,069.52 86,145.74 77,504.00 83,768.65 84,862.14 85,983.45 127,329.48 83,590.47 123,523.16 130,845.68 82,302.20 83,703.57
399 8.6.(4b) Pengelasan FCAW pada baja Grade …… M1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
400 8.7.(1a) Pengecatan struktur baja pada daerah kering tebal 80 mikron M2 109,586.14 114,041.38 113,182.49 121,956.17 121,173.27 107,289.28 117,847.29 119,741.20 122,163.23 197,999.75 117,840.81 189,607.74 203,906.24 116,139.94 118,050.79
401 8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 184,976.22 192,176.89 190,801.08 204,586.87 204,046.95 181,408.39 199,229.37 202,366.04 206,215.94 322,935.15 198,223.31 311,702.15 332,797.66 195,163.53 198,333.02
402 8.7.(1c) Pengecatan struktur baja pada daerah kering tebal …… mikron M2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
403 8.7.(2a) Pengecatan struktur baja pada daerah basah/pasang surut 360 mikron M2 184,976.22 192,176.89 190,801.08 204,586.87 204,046.95 181,408.39 199,229.37 202,366.04 206,215.94 322,935.15 198,223.31 311,702.15 332,797.66 195,163.53 198,333.02
404 8.7.(2b) Pengecatan struktur baja pada daerah basah/pasang surut 500 mikron M2 184,976.22 192,176.89 190,801.08 204,586.87 204,046.95 181,408.39 199,229.37 202,366.04 206,215.94 322,935.15 198,223.31 311,702.15 332,797.66 195,163.53 198,333.02
405 8.7.(2c) Pengecatan struktur baja pada daerah basah/pasang surut ….. mikron M2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

406 Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) 184,976.22 192,176.89 190,801.08 204,586.87 204,046.95 181,408.39 199,229.37 202,366.04 206,215.94 322,935.15 198,223.31 311,702.15 332,797.66 195,163.53 198,333.02
8.7.(3a) 80 mikron M2

407 Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) 184,172.79 191,306.51 189,944.08 203,582.57 203,082.83 180,645.13 198,336.67 201,451.02 205,260.75 320,480.22 197,294.90 309,514.13 330,307.01 194,248.51 197,391.22
8.7.(3b) 160 mikron M2

408 Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.7.(3c) ….. mikron M2
409 8.8.(1) Perbaikan Elemen Struktur Baja dengan Cara Pelurusan LS 6,512,877.62 6,696,750.51 6,668,333.31 6,950,852.64 6,984,956.82 6,358,993.19 6,932,190.33 7,108,738.85 7,000,042.07 9,260,625.45 6,782,396.59 9,066,235.04 9,395,935.07 6,703,103.08 6,786,730.84
410 8.8.(2) Penggantian Elemen Struktur Baja Grade 250 (Kuat Leleh 250 Mpa) Kg 1,189,185.92 1,241,151.84 1,231,496.92 1,347,077.31 1,316,100.58 1,153,967.00 1,260,695.79 1,284,144.23 1,310,200.49 2,383,808.53 1,288,194.43 2,214,635.00 2,445,532.81 1,278,421.51 1,299,628.53
411 8.8.(3) Penggantian Elemen Struktur Baja Grade 345 (Kuat Leleh 345 Mpa) Kg 1,201,890.92 1,254,548.74 1,244,710.12 1,361,744.71 1,330,330.18 1,166,347.50 1,274,332.71 1,297,907.87 1,324,387.85 2,411,082.37 1,302,141.77 2,239,740.21 2,473,427.49 1,292,185.15 1,313,759.57
412 8.8.(4) Penggantian Elemen Struktur Baja Grade 485 (Kuat Leleh 485 Mpa) Kg 1,193,737.38 1,249,198.58 1,239,246.66 1,359,561.08 1,330,246.88 1,157,854.06 1,270,519.32 1,295,451.14 1,323,287.79 2,437,173.82 1,297,561.46 2,264,245.45 2,500,425.34 1,286,474.78 1,309,292.57
413 8.8.(5) Penggantian Elemen Struktur Baja Grade …….. Kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

414 Pekuatan dengan external stressing untuk jembatan baja dengan bentang 56,963,464.11 59,726,928.50 59,168,410.81 65,257,571.33 63,606,481.06 55,152,287.16 60,632,217.93 61,708,113.81 63,319,991.94 120,145,338.70 62,196,353.02 111,228,075.59 123,429,873.78 61,624,114.00 62,696,656.74
8.9.(1) ……….m Buah
415 8.10.(1) Penggantian Lantai Kayu M3 6,991,529.00 7,325,932.93 7,263,150.43 7,988,517.93 7,806,393.29 6,795,261.50 7,443,624.29 7,579,375.29 7,768,256.29 14,488,569.57 7,627,853.86 13,445,922.32 14,873,528.72 7,561,303.86 7,689,019.36

416 8.10.(2) Perbaikan Lantai Kayu M3 8,642,412.54 9,042,816.46 8,969,033.96 9,848,401.46 9,622,276.82 8,402,145.04 9,182,507.82 9,351,258.82 9,573,139.82 17,745,453.11 9,410,737.39 16,478,405.85 18,218,412.25 9,333,187.39 9,482,902.89

417 8.10.(3) Penggantian Gelegar Kayu M3 5,992,771.71 6,287,603.35 6,229,602.37 6,872,162.05 6,704,887.05 5,817,754.94 6,392,907.29 6,508,301.59 6,676,814.60 12,617,293.73 6,557,041.59 11,693,381.34 12,964,169.12 6,497,770.53 6,612,284.61

418 8.10.(4) Perbaikan Gelegar Kayu M3 5,938,295.78 6,230,955.38 6,173,346.72 6,811,218.80 6,644,869.02 5,764,582.67 6,335,336.68 6,449,814.49 6,617,412.43 12,515,949.77 6,498,513.97 11,597,882.59 12,860,156.69 6,440,010.53 6,553,507.29

419 8.10.(5) Penggantian Balok Kepala Tiang M3 5,693,154.10 5,976,039.55 5,920,196.28 6,536,974.19 6,374,787.92 5,525,307.46 6,076,268.95 6,186,622.58 6,350,102.70 12,059,901.92 6,235,139.64 11,168,138.20 12,392,100.78 6,180,090.56 6,289,009.36

420 8.10.(6) Perbaikan Papan Lajur Kendaraan M3 6,183,437.45 6,485,871.22 6,426,497.16 7,085,463.42 6,914,950.13 6,003,857.88 6,594,404.42 6,713,006.40 6,884,722.17 12,971,997.62 6,761,888.29 12,027,626.98 13,328,212.61 6,699,930.51 6,818,005.22

421 8.10.(7) Pengantian Papan Lajur Kendaraan M3 9,831,021.05 10,298,763.65 10,211,575.76 11,237,591.24 10,978,021.94 9,544,129.57 10,468,883.04 10,659,462.24 10,926,198.01 20,435,405.96 10,723,107.39 18,954,028.76 20,980,195.89 10,630,567.08 10,804,927.37

422 8.10.(8) Perbaikan dan/atau Penggantian kerb kayu M3 10,975,195.46 11,467,506.30 11,368,901.27 12,469,300.51 12,178,938.37 10,665,250.04 11,668,304.01 11,878,554.29 12,141,777.34 22,231,947.93 11,931,489.84 20,703,056.00 22,855,008.79 11,820,095.17 12,012,575.73

423 8.10.(9) Perbaikan dan/atau Penggantian sandaran Kayu M3 6,847,751.00 7,176,690.95 7,112,609.17 7,828,268.33 7,647,094.12 6,652,527.52 7,296,295.89 7,425,895.67 7,608,592.31 14,202,261.76 7,475,264.00 13,187,748.57 14,590,498.26 7,403,652.85 7,534,377.20

424 8.10.(10) Pengecatan/Perlindungan Gelegar M2 76,396.55 79,765.11 79,138.42 85,875.10 84,926.53 74,596.34 81,426.81 82,619.99 84,261.99 144,636.17 82,435.03 136,459.73 148,360.27 81,245.35 82,847.79

425 8.10.(11) Pengecatan/Perlindungan Lantai Kayu M2 76,396.55 79,765.11 79,138.42 85,875.10 84,926.53 74,596.34 81,426.81 82,619.99 84,261.99 144,636.17 82,435.03 136,459.73 148,360.27 81,245.35 82,847.79

426 8.10.(12) Pengecatan/Perlindungan Tiang Pancang Kayu M2 76,396.55 79,765.11 79,138.42 85,875.10 84,926.53 74,596.34 81,426.81 82,619.99 84,261.99 144,636.17 82,435.03 136,459.73 148,360.27 81,245.35 82,847.79

427 8.10.(13) Pengecatan/Perlindungan Balok Kepala Kayu M2 76,396.55 79,765.11 79,138.42 85,875.10 84,926.53 74,596.34 81,426.81 82,619.99 84,261.99 144,636.17 82,435.03 136,459.73 148,360.27 81,245.35 82,847.79

428 8.10.(14) Pengecatan/Perlindungan Sandaran M1 76,396.55 79,765.11 79,138.42 85,875.10 84,926.53 74,596.34 81,426.81 82,619.99 84,261.99 144,636.17 82,435.03 136,459.73 148,360.27 81,245.35 82,847.79

429 8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 4,671,359.67 4,878,202.68 4,860,422.37 5,156,957.87 5,243,296.17 4,614,746.87 4,982,024.63 5,049,765.76 5,135,370.94 7,757,041.47 4,971,162.76 7,523,216.82 7,919,331.43 4,898,735.52 4,998,803.71

430 8.11.(2) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Silicone Seal M1 746,963.15 775,995.84 771,699.26 824,972.25 821,660.85 734,088.46 788,210.64 797,903.08 812,635.75 1,297,561.41 796,325.30 1,233,114.66 1,326,227.57 787,786.19 800,424.64

431 8.11.(3) Penggantian Karet Pengisi Sambungan Siar Muai Tipe Strip Seal M1 1,368,198.68 1,436,573.12 1,422,977.12 1,572,769.78 1,532,533.99 1,327,410.68 1,460,080.75 1,486,445.24 1,526,179.12 2,913,140.56 1,499,385.79 2,694,886.96 2,992,933.94 1,485,971.92 1,512,528.59

432 8.11.(4) Penggantian Karet Pengisi Sambungan Siar Muai Tipe Compression Seal M1 1,387,145.27 1,456,332.93 1,442,668.95 1,593,682.71 1,553,716.31 1,346,153.33 1,480,111.64 1,506,747.20 1,546,842.80 2,944,209.22 1,519,440.19 2,724,673.92 3,024,207.39 1,505,642.78 1,532,650.97

433 8.11.(5) Penggantian Sambungan Siar Muai Tipe Modular, lebar …….. M1 210,862.94 221,282.48 219,192.95 242,061.85 236,164.43 204,631.78 225,024.45 229,112.72 235,167.48 446,148.16 230,862.74 413,232.03 458,501.68 228,730.79 232,834.11

434 8.11.(6) Penggantian Sambungan Siar Muai Tipe Finger Plate, lebar …….. M1 4,131,042.94 4,337,471.48 4,296,180.15 4,750,268.85 4,626,766.03 4,007,206.38 4,407,947.15 4,488,059.72 4,608,094.28 8,811,993.56 4,527,765.24 8,147,656.53 9,052,306.68 4,487,677.79 4,567,805.41

BIDANG BINA MARGA BM - 25 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Penggantian Sambungan Siar Muai Tipe Dobel Siku dengan Penutup Karet
435 8.11.(7) Neoprene M1 423,136.59 443,691.58 439,552.45 484,494.04 473,932.61 410,906.40 451,972.19 460,074.71 471,752.95 884,746.55 462,738.83 821,473.72 909,575.31 458,200.76 466,243.46

436 8.12.(1) Penggantian Landasan Logam Tipe …… Buah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Penggantian Landasan Elastomer Karet Alam Berlapis Baja Ukuruan ….
437 8.12.(2) mm x …… mm x ……. mm Buah #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Penggantian Landasan Elastomer Sintetis Berlapis Baja Ukuran ….. mm x
438 8.12.(3) ….. mm x …….. mm Buah 8,613,678.65 8,879,738.22 8,824,072.09 9,378,686.97 9,371,491.17 8,474,549.50 9,417,563.99 9,502,341.09 9,647,228.30 14,135,415.55 9,207,644.60 14,115,241.75 14,883,854.44 9,011,656.03 9,154,585.85

439 8.12.(4) Penggantian Landasan Karet Strip tebal …. mm M1 4,368,558.59 4,469,475.73 4,466,285.73 4,624,167.16 4,727,740.02 4,358,878.59 4,861,437.16 4,867,707.16 4,933,628.59 6,128,637.16 4,625,644.31 6,529,398.59 6,599,908.59 4,499,992.88 4,562,834.31

440 8.12.(5) Penggantian Landasan Logam Berongga (Pot Bearing) Buah 12,045,678.65 12,483,338.22 12,393,352.09 13,325,486.97 13,215,331.17 11,803,589.50 13,079,573.99 13,230,901.09 13,475,668.30 21,459,435.55 12,969,424.60 20,886,445.75 22,407,414.44 12,740,216.03 12,949,695.85

441 8.12.(6) Penggantian Landasan Logam Jenis Spherical Buah 8,996,808.59 9,329,165.73 9,279,665.73 9,946,737.16 9,911,380.02 8,848,308.59 9,799,887.16 9,895,917.16 10,096,478.59 16,005,537.16 9,698,734.31 15,660,960.59 16,746,088.59 9,528,202.88 9,680,804.31

442 8.12.(7) Penggantian Stopper Lateral dan Horisontal Buah 8,745,678.65 9,018,338.22 8,961,352.09 9,530,486.97 9,519,331.17 8,602,589.50 9,558,473.99 9,645,781.09 9,794,518.30 14,417,235.55 9,352,294.60 14,375,611.75 15,173,154.44 9,155,096.03 9,300,555.85

443 8.13.(1) Perbaikan Sandaran Baja M1 297,454.10 303,996.29 302,915.05 315,566.04 313,836.94 294,210.37 306,923.76 309,304.65 312,895.32 430,207.76 309,249.92 414,076.05 437,785.66 307,790.02 310,299.44

444 8.13.(2) Penggantian Sandaran Baja M1 408,375.00 428,363.10 424,850.80 465,699.30 457,802.40 397,611.50 435,688.00 442,756.05 453,732.95 831,336.00 444,948.35 775,211.03 853,376.70 440,116.05 448,460.65

445 8.13.(3) Perbaikan Tembok Sandaran Beton M1 552,711.72 579,769.91 575,084.19 629,651.09 619,829.13 538,324.98 591,131.25 601,439.55 616,368.32 1,121,762.51 602,743.70 1,049,298.67 1,153,787.41 597,039.55 607,347.85

446 8.13.(4) Perbaikan Sandaran Beton-Baja M1 2,790,273.16 2,928,925.92 2,901,738.63 3,203,816.40 3,124,730.45 2,708,125.44 2,976,761.22 3,030,547.46 3,111,056.06 5,907,677.01 3,055,407.36 5,471,787.09 6,071,062.28 3,027,490.66 3,080,883.81

447 8.13.(5) Penggantian Sandaran Beton-Baja M1 3,144,852.12 3,300,505.96 3,270,238.60 3,608,042.52 3,525,457.63 3,053,247.89 3,355,908.66 3,415,648.70 3,505,686.61 6,630,694.41 3,442,324.35 6,147,349.64 6,814,881.04 3,409,854.17 3,470,474.81

448 8.14.(1) Penggantian Deck Drain Buah 142,744.78 149,808.26 148,398.01 163,899.15 159,970.56 138,529.43 152,425.35 155,130.30 159,207.84 302,571.24 156,344.23 280,140.55 310,884.91 154,896.64 157,598.27

449 8.14.(2) Penggantian Pipa Penyalur, Pipa Cucuran PVC diamter …… mm M1 797,242.37 836,819.99 829,033.55 916,253.35 893,042.98 773,259.96 626,902.75 866,011.57 889,036.73 1,250,317.94 873,339.98 1,570,055.00 1,743,920.53 305,045.67 311,890.39

450 8.14.(3) Penggantian Pipa Penyalur, Pipa Cucuran Baja diamter …… mm M1 365,478.62 383,453.89 379,999.25 419,682.55 409,467.58 354,434.96 389,893.45 396,804.37 407,400.63 776,299.34 400,027.58 718,092.68 797,295.73 396,446.87 403,572.09

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

I DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

451 9.1.(1) Mandor Jam 27,897.22 29,599.60 29,599.60 29,599.60 33,004.37 27,897.22 33,004.37 33,004.37 33,004.37 38,111.51 31,301.98 38,111.51 46,623.41 31,301.98 33,004.37

452 9.1.(2) Pekerja Biasa Jam 20,956.75 21,807.94 21,807.94 22,659.13 23,510.32 20,956.75 21,807.94 21,807.94 21,807.94 27,766.27 21,807.94 26,063.89 27,766.27 20,956.75 21,807.94

453 9.1.(3) Tukang Kayu, Tukang Batu, dsb Jam 25,212.70 26,063.89 26,063.89 26,915.08 27,766.27 25,212.70 26,915.08 27,766.27 28,617.46 35,426.98 26,063.89 35,426.98 34,575.79 26,063.89 27,766.27

454 9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 556,941.38 569,392.05 566,682.21 590,148.68 595,415.94 549,404.86 594,901.83 603,756.10 600,834.17 785,801.72 587,221.87 775,194.76 806,546.14 579,025.57 586,308.83

455 9.1.(4) b Dump Truck, kapasitas 6 - 8 m³ Jam 412,652.89 427,104.01 422,475.01 456,597.31 450,222.85 402,570.40 438,032.40 442,776.52 456,071.36 738,025.62 444,897.28 701,544.29 761,298.16 438,884.60 445,872.26

456 9.1.(5) a Truk Bak Datar 3 - 4 ton Jam 325,481.90 332,741.90 330,404.40 348,860.83 358,152.92 320,669.40 341,919.04 344,366.54 350,750.47 502,244.04 341,989.76 486,461.01 517,714.76 338,080.83 341,655.83

457 9.1.(5) b Truk Bak Datar 6 - 8 ton Jam 335,777.48 343,830.24 341,266.24 360,288.92 358,152.92 325,817.19 357,877.19 365,729.88 361,519.65 516,040.12 352,542.73 499,284.15 530,970.32 348,633.80 352,435.82

458 9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 321,691.03 329,887.74 327,282.61 346,408.11 340,561.58 310,796.03 344,818.92 353,653.05 347,519.19 502,589.27 338,503.01 485,656.65 517,421.33 334,594.08 338,437.32

459 9.1.(7) Bulldozer 100 - 150 PK Jam 726,712.95 741,474.83 736,849.17 765,527.26 754,194.44 696,468.60 765,075.41 792,793.25 753,361.16 986,959.47 748,567.94 948,446.55 998,803.80 744,944.82 751,490.89

460 9.1.(8) Motor Grader min 100 PK Jam 364,800.32 371,426.23 369,348.87 383,842.59 378,769.52 351,406.19 389,691.39 401,931.30 386,239.23 501,008.23 377,799.95 489,951.02 512,670.78 374,592.27 377,536.89

461 9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 262,780.11 267,755.59 266,189.26 277,749.21 274,017.77 253,753.44 282,374.02 290,418.93 281,507.62 372,823.26 273,592.70 365,765.38 383,490.84 270,735.65 272,983.25

462 9.1.(10) Loader Roda Berantai 75 - 100 PK Jam 364,800.32 371,426.23 369,348.87 383,842.59 378,769.52 351,406.19 389,691.39 401,931.30 386,239.23 501,008.23 377,799.95 489,951.02 512,670.78 374,592.27 377,536.89

463 9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 543,926.53 555,738.70 552,013.72 577,582.46 579,676.07 533,880.31 589,990.20 608,465.73 586,605.88 793,504.30 576,419.60 767,698.91 810,484.03 571,739.30 577,133.30

464 9.1.(12) Crane 10 - 15 Ton Jam 693,144.24 705,373.65 701,516.30 727,968.03 718,886.50 672,148.37 728,631.86 747,081.76 725,752.64 939,671.42 715,448.53 912,789.24 957,125.20 710,651.35 716,217.89

465 9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 491,094.02 498,871.76 496,454.01 512,272.37 506,065.16 472,036.43 522,355.87 540,430.63 513,714.51 637,786.81 504,939.86 624,751.48 649,270.41 501,631.90 504,970.54

466 9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam 290,882.65 297,740.16 295,565.04 311,628.10 306,683.59 281,064.26 312,234.75 320,407.45 313,840.26 443,214.95 305,278.42 430,294.45 456,415.79 301,790.24 304,980.70

467 9.1.(15) Pemadat Bervibrasi 1.5 - 3.0 PK Jam 94,632.05 95,111.53 94,969.95 97,097.49 96,626.78 92,292.14 105,123.53 107,532.98 104,557.55 117,894.40 98,131.88 123,351.09 124,110.13 96,517.96 96,682.45

468 9.1.(16) Penggilas Roda Karet 8 - 10 Ton Jam 524,506.21 536,307.27 532,580.20 558,375.00 549,670.26 505,021.90 558,232.53 575,173.46 556,513.62 765,366.56 546,341.19 739,404.83 782,688.34 541,614.13 547,013.13

469 9.1.(17) Kompresor 4000 - 6500 Ltr/mnt Jam 200,702.39 206,491.71 204,640.20 219,121.32 217,077.55 196,710.23 219,492.28 223,768.18 224,166.05 341,509.93 215,926.48 330,804.83 354,440.36 212,601.92 215,385.67

470 9.1.(18) Mesin Pengaduk beton (Molen) 0.3 - 0.6 M3 Jam 95,902.87 97,797.87 97,195.32 102,968.69 101,657.88 93,911.87 106,755.86 108,213.64 109,270.04 153,634.67 102,344.90 154,387.05 162,054.14 100,206.98 101,112.11

471 9.1.(19) Pompa Air 70 - 100 mm Jam 53,214.98 53,665.00 53,520.63 56,115.45 55,810.79 52,832.61 61,689.90 61,935.05 63,602.56 81,610.08 57,164.42 86,553.98 88,437.07 55,452.74 55,671.37

472 9.1.(20) Jack Hammer Jam 50,813.44 50,813.44 50,813.44 52,384.87 73,283.24 50,813.44 58,670.58 58,670.58 60,242.01 69,670.58 53,956.30 75,956.30 75,956.30 52,384.87 52,384.87

473 9.2.(1) Marka Jalan Termoplastik M2 369,925.44 387,995.57 384,364.81 424,175.42 413,377.27 359,066.25 394,180.66 401,346.80 411,872.72 779,721.52 404,429.21 721,581.89 800,683.15 401,161.82 407,984.36

474 9.2.(2) Marka Jalan Bukan Termoplastik M2 98,321.74 98,346.12 98,338.34 98,401.74 98,394.74 98,304.15 98,400.51 98,408.37 98,440.39 98,946.50 98,393.23 98,914.68 99,012.59 98,376.25 98,387.89

475 9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 475,658.61 503,671.15 493,881.72 560,509.05 525,325.72 456,305.59 511,895.86 509,974.15 534,669.08 990,272.31 519,919.81 916,212.04 1,016,435.65 509,744.43 521,759.87

476 9.2.(3b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade Buah 823,859.27 871,468.95 855,670.19 967,848.96 911,709.01 791,534.93 885,672.13 884,982.09 925,264.65 1,721,992.67 900,974.88 1,592,980.44 1,767,728.36 884,654.50 904,810.09

BIDANG BINA MARGA BM - 26 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

477 9.2.(4a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah 473,888.74 501,568.91 492,111.85 557,742.07 523,921.46 454,901.33 509,793.62 508,569.89 532,566.84 988,834.81 518,149.94 914,807.78 1,015,031.39 508,340.17 520,156.18

478 9.2.(4b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah 821,308.33 868,419.46 853,119.25 963,802.36 909,706.48 789,532.40 882,622.64 882,979.56 922,215.16 1,719,940.29 898,423.94 1,590,977.91 1,765,725.83 882,651.97 902,508.43

479 9.2.(5) Patok Pengarah Buah 105,956.89 112,924.90 109,601.05 126,864.74 114,544.32 100,575.70 112,355.14 108,676.58 119,125.31 205,925.46 114,826.37 194,668.26 215,265.19 111,487.13 114,659.58

480 9.2.(6a) Patok Kilometer Buah 417,088.10 441,690.95 432,391.75 490,912.98 458,233.91 399,613.40 439,586.29 433,973.21 467,697.38 841,691.64 454,319.38 794,385.76 880,797.59 445,393.85 455,926.66

481 9.2.(6b) Patok Hektometer Buah 117,309.54 127,053.05 120,916.60 146,542.69 122,874.66 108,859.60 125,158.57 115,307.10 133,339.43 212,836.19 126,163.48 203,705.14 224,485.78 119,854.91 124,676.59

482 9.2.(7) Rel Pengaman M1 531,151.66 560,983.57 550,639.26 620,647.38 583,594.82 510,516.32 569,254.47 567,166.32 592,820.87 1,078,130.06 577,944.56 999,111.24 1,105,907.82 567,166.32 579,853.66

483 9.2.(8) Paku Jalan Tidak Memantul Buah 214,572.33 224,493.89 222,490.35 244,343.94 238,326.39 208,547.85 227,693.68 231,631.46 237,325.06 439,315.53 233,490.35 407,425.16 450,908.87 231,631.46 235,459.24

484 9.2.(9a) Paku Jalan Memantul Bujur Sangkar Buah 221,172.33 231,423.89 229,310.35 251,933.94 245,696.39 214,927.85 234,733.68 238,781.46 244,695.06 453,395.53 240,750.35 420,493.16 465,428.87 238,781.46 242,719.24

485 9.2.(9b) Paku Jalan Memantul Persegi panjang Buah 234,372.33 245,283.89 243,060.35 267,113.94 260,546.39 227,797.85 248,923.68 253,191.46 259,545.06 481,775.53 255,270.35 446,629.16 494,468.87 253,191.46 257,349.24

486 9.2.(9c) Paku Jalan Memantul Bulat Buah 222,272.33 232,523.89 230,520.35 253,143.94 247,016.39 216,027.85 235,943.68 239,991.46 246,015.06 455,815.53 241,960.35 422,671.16 467,848.87 239,991.46 243,929.24

487 9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 168,365.90 178,326.57 174,464.30 198,247.91 184,089.66 161,220.66 180,918.39 178,963.20 188,312.70 338,917.87 183,014.19 314,129.38 347,551.04 178,963.20 183,325.77

488 9.2.(10b) Kereb Pracetak Jenis 2 (Penghalang/Barrier) M1 145,142.47 154,163.99 150,284.53 172,213.96 157,711.49 138,425.30 156,346.94 153,385.44 162,577.01 288,310.68 157,484.80 267,342.71 295,521.47 153,385.44 157,436.96

489 9.2.(10c) Kereb Pracetak Jenis 3 (Kereb Berparit/Gutter) M1 149,044.92 158,261.38 154,343.08 176,701.60 162,082.25 142,210.50 160,510.54 157,624.78 166,929.63 296,637.88 161,761.96 275,041.61 304,075.81 157,624.78 161,752.04

490 9.2.(10d) Kereb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cm M1 171,963.20 182,606.70 178,143.84 203,902.46 187,290.81 164,109.04 185,230.39 182,090.77 192,718.49 344,247.22 186,798.48 319,065.13 352,935.37 182,090.77 186,840.79

491 9.2.(10e) Kereb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cm M1 209,079.13 221,577.44 216,744.40 246,584.79 228,860.65 200,110.50 224,831.42 222,411.59 234,118.31 423,449.27 227,477.93 392,288.14 434,294.26 222,411.59 227,881.40

492 9.2.(10f) Kereb Pracetak Jenis 6 (Kereb dengan Bukaan) Buah 87,562.55 97,805.20 90,272.01 119,214.92 88,998.44 78,213.36 99,616.60 86,333.75 103,251.82 157,435.06 94,401.64 146,141.69 160,723.38 85,998.07 91,487.22

493 9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 658,262.26 697,023.54 683,799.70 775,503.23 728,182.10 631,775.73 708,525.39 706,311.63 739,817.48 1,375,252.65 719,896.13 1,272,031.79 1,411,712.37 705,975.95 722,534.19

494 9.2.(10h) Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) Buah 654,762.37 692,068.70 679,946.69 766,717.86 723,886.74 629,427.29 702,759.27 702,697.70 733,270.64 1,362,831.71 715,212.03 1,260,829.62 1,398,841.17 702,697.70 718,415.40

495 9.2.(10i) Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) Buah 654,762.37 692,068.70 679,946.69 766,717.86 723,886.74 629,427.29 702,759.27 702,697.70 733,270.64 1,362,831.71 715,212.03 1,260,829.62 1,398,841.17 702,697.70 718,415.40

496 9.2.(11) Kereb yang digunakan kembali M1 28,058.46 28,949.93 28,771.93 30,733.58 30,198.85 27,523.00 29,252.89 29,598.36 30,117.47 48,283.89 29,770.19 45,408.83 49,318.48 29,598.36 29,943.83

497 9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 49,376.62 50,055.00 49,941.99 51,525.07 51,072.72 48,924.27 50,245.35 50,578.73 51,019.19 65,588.15 50,685.80 63,312.41 66,469.06 50,578.73 50,798.82
Pembengkokan Ubin Eksisting atau Perkerasan Blok Beton Eksisting pada
498 9.2.(12b) Trotoar atau Median M3 9,178.72 9,377.21 9,313.86 9,790.52 9,733.53 9,035.43 9,621.90 9,685.84 9,906.98 13,790.37 9,681.58 13,372.63 14,169.95 9,582.94 9,677.70

499 9.2.(13) Beton Pemisah Jalur (Concrete Barrier) M1 631,770.21 638,535.64 631,770.21 652,066.50 624,328.24 624,328.24 638,535.64 624,328.24 638,535.64 625,004.78 631,770.21 624,328.24 624,328.24 624,328.24 628,387.49

500 9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah 9,974,701.45 10,479,089.28 10,372,831.05 11,487,944.15 11,161,648.28 9,668,622.68 10,648,282.48 10,827,067.88 11,130,364.08 21,254,807.22 10,930,495.85 19,650,281.40 21,832,088.28 10,827,067.88 11,024,229.94

501 9.2.(15) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED Buah 12,614,701.45 13,251,089.28 13,118,431.05 14,523,944.15 14,118,448.28 12,229,422.68 13,465,162.48 13,695,097.88 14,075,284.08 26,888,567.22 13,824,155.85 24,858,869.40 27,619,408.28 13,695,097.88 13,943,519.94

502 9.2.(16) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah 8,104,701.45 8,515,589.28 8,428,031.05 9,337,444.15 9,067,248.28 7,854,722.68 8,652,992.48 8,795,477.88 9,044,324.08 17,264,227.22 8,880,755.85 15,960,749.40 17,732,608.28 8,795,477.88 8,956,339.94

503 9.2.(17) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah 8,874,701.45 9,324,089.28 9,228,831.05 10,222,944.15 9,929,648.28 8,601,622.68 9,474,582.48 9,631,917.88 9,903,204.08 18,907,407.22 9,724,675.85 17,479,805.40 19,420,448.28 9,631,917.88 9,807,739.94

504 9.2.(18) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah 8,379,701.45 8,804,339.28 8,714,031.05 9,653,694.15 9,375,248.28 8,121,472.68 8,946,362.48 9,094,237.88 9,351,114.08 17,850,967.22 9,182,155.85 16,503,269.40 18,335,408.28 9,094,237.88 9,260,489.94

505 9.2.(19) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah 9,424,701.45 9,901,589.28 9,800,831.05 10,855,444.15 10,545,648.28 9,135,122.68 10,061,322.48 10,229,437.88 10,516,784.08 20,080,887.22 10,327,475.85 18,564,845.40 20,626,048.28 10,229,437.88 10,416,039.94

506 9.2.(20) Pagar Pemisah Pedestrian Carbon Steel M' 631,950.33 642,141.01 631,950.33 662,522.38 620,740.58 620,740.58 642,141.01 620,740.58 642,141.01 621,759.65 631,950.33 620,740.58 620,740.58 620,740.58 626,854.99

507 9.2.(21) Pagar Pemisah Pedestrian Galvanised M' 758,170.09 801,074.13 786,546.13 888,275.86 838,587.00 727,383.88 812,370.27 812,039.93 847,773.90 1,582,982.80 827,103.13 1,464,174.50 1,625,302.83 812,039.93 829,976.26

508 9.2.(22a) Stabilisasi dengan Tanaman M2 72,165.38 75,630.38 74,937.38 82,560.38 80,481.38 70,086.38 76,785.38 78,055.88 80,134.88 150,705.38 78,748.88 139,455.68 154,632.38 78,055.88 79,441.88

509 9.2.(22b) Stabilisasi dengan Tanaman VS M2 234,371.55 245,825.01 243,540.40 268,465.12 261,967.34 227,441.36 250,041.91 254,336.59 260,741.13 490,464.52 256,023.20 454,573.52 503,650.61 253,533.29 258,213.59

510 9.2.(23) Semak / Perdu…………………. M2 117,374.96 123,111.46 121,964.16 134,584.46 131,142.56 113,933.06 125,015.56 127,137.46 130,555.16 247,386.16 128,284.76 228,796.60 253,924.56 127,137.46 129,432.06

511 9.2.(24) Pohon Jenis ……………………. Buah 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96 6,494.96

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

J DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

512 10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 556,941.38 569,392.05 566,682.21 590,148.68 595,415.94 549,404.86 594,901.83 603,756.10 600,834.17 785,801.72 587,221.87 775,194.76 806,546.14 579,025.57 586,308.83

513 10.1.(2) Timbunan Pilihan pada Lereng Tepi Saluran untuk Pemeliharaan M3 381,610.35 397,675.62 394,801.84 426,383.97 423,305.66 373,325.58 405,938.98 411,055.88 419,095.46 698,262.74 411,346.87 663,111.11 717,678.30 404,999.05 413,088.60

514 10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 1,757,462.22 1,837,105.18 1,802,764.00 1,983,614.37 1,949,015.26 1,706,347.65 1,837,768.77 1,882,252.17 1,911,869.15 3,322,174.35 1,879,603.28 3,142,568.51 3,427,053.02 1,859,973.77 1,885,820.92

515 10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 1,312,738.32 1,452,074.97 1,409,684.25 1,659,872.53 1,454,131.11 1,397,191.39 1,732,106.31 1,439,563.74 1,615,558.27 2,149,672.58 1,476,090.12 1,623,217.63 1,689,453.84 1,324,481.01 1,353,971.51

516 10.1.(5) Perbaikan Lapis Fondasi Agregat Kelas B M3 1,146,948.06 1,273,344.92 1,271,038.21 1,378,671.07 1,366,034.13 1,317,268.34 1,558,843.50 1,353,488.71 1,438,242.79 2,004,930.68 1,344,824.19 1,496,885.84 1,554,166.12 1,240,628.52 1,244,281.11

517 10.1.(6) Perbaikan Lapis Fondasi Agregat Kelas S M3 1,200,006.31 1,296,462.64 1,294,149.33 1,411,938.36 1,376,259.03 1,327,695.34 1,571,864.23 1,363,618.18 1,449,471.42 2,021,450.63 1,355,148.63 1,506,238.07 1,563,986.38 1,249,699.16 1,253,292.01

518 10.1.(7) Perbaikan dan Perataan Permukaan JalanTanah M2 11,435.00 11,654.57 11,591.35 12,018.55 11,811.54 10,934.27 12,055.71 12,453.28 11,898.94 15,305.94 11,729.50 14,900.98 15,577.81 11,641.11 11,744.45

BIDANG BINA MARGA BM - 27 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Perbaikan dan Perataan Permukan Perkerasan Berbutir Tanpa Penutup


519 10.1.(8) Aspal M3 12,024.83 12,265.68 12,200.95 12,654.74 12,461.92 11,517.28 12,679.06 13,082.30 12,523.40 16,131.51 12,346.93 15,723.03 16,418.00 12,240.68 12,361.67

520 10.1.(9) Perbaikan Campuran Aspal Panas M3 4,823,430.16 5,074,711.31 4,993,987.28 5,600,967.14 5,354,081.58 4,683,163.98 5,210,806.72 5,246,160.54 5,434,719.97 10,069,401.91 4,949,481.78 8,712,943.86 9,648,145.45 5,217,140.09 5,320,522.88

521 10.1.(10) Perbaikan Campuran Aspal Panas dengan Asbuton M3 4,505,978.16 4,746,651.51 4,669,921.06 5,242,306.56 5,007,243.25 4,376,821.69 4,867,370.52 4,894,785.75 5,080,446.50 9,395,829.37 4,611,905.63 8,113,778.32 8,984,299.58 4,866,730.58 4,971,248.70

522 10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin M3 2,548,184.83 2,680,397.59 2,642,529.47 2,948,391.56 2,844,213.85 2,463,017.76 2,743,029.99 2,760,648.58 2,858,692.30 5,226,320.31 2,783,658.40 4,866,130.13 5,375,360.04 2,739,790.27 2,795,594.98

523 10.1.(12) Perbaikan Lapis Penetrasi Macadam tanpa atau dengan Asbuton Liter 3,150,041.84 3,309,603.38 3,261,252.47 3,678,407.35 3,482,756.33 3,056,610.30 3,401,839.26 3,416,625.91 3,533,720.57 6,417,712.32 3,128,526.48 5,410,852.79 5,971,410.25 3,387,518.69 3,447,174.12

524 10.1.(13) Residu Bitumen untuk Pemeliharaan M3 419,976.07 432,877.75 429,333.94 459,174.79 455,092.17 409,842.96 448,689.96 453,660.80 463,122.15 705,379.99 448,292.32 681,458.11 729,432.69 442,439.27 448,564.76

525 10.1.(14) Perbaikan Perkerasan Beton Semen M3 1,934,335.14 2,027,980.21 1,979,001.03 2,214,775.44 2,144,760.44 1,861,592.26 2,014,224.84 2,074,739.95 2,104,481.37 3,961,600.94 2,079,585.14 3,697,602.27 4,100,100.46 2,068,720.92 2,090,920.99

526 10.1.(15) Perbaikan Lapis Fondasi Bawah Beton Kurus M3 1,708,884.14 1,848,160.56 1,745,091.04 2,138,909.72 1,822,193.90 1,582,179.82 1,869,296.43 1,771,234.91 1,937,063.19 3,192,735.44 1,832,073.01 3,006,522.56 3,302,393.82 1,742,046.09 1,801,918.49

527 10.1.(16) Perbaikan Pasangan Batu M2 1,610,307.83 1,682,910.44 1,654,954.54 1,815,300.80 1,787,256.55 1,565,935.78 1,689,055.84 1,727,066.28 1,755,944.76 3,031,585.56 1,724,336.77 2,867,899.35 3,122,801.19 1,705,007.69 1,730,476.06

528 10.1.(17) Pengecatan Kereb pada Trotoar atau Median M1 32,852.53 34,293.17 34,071.31 36,843.12 36,603.52 32,186.94 35,306.71 35,714.25 36,474.50 61,690.34 35,557.45 58,900.42 63,765.41 35,004.26 35,684.65

529 10.1.(18) Perbaikan Rel Pengaman Buah 513,660.14 541,220.53 533,949.65 596,125.33 572,122.44 496,451.37 550,703.23 555,084.85 574,793.26 1,073,807.45 562,012.98 995,743.75 1,103,090.40 553,830.05 565,307.82

530 10.1.(19) Pembersihan Patok Buah 18,558.53 19,386.61 19,367.90 20,053.40 21,003.15 18,497.39 19,895.14 19,939.79 19,930.55 25,587.52 19,664.82 26,539.54 26,780.64 19,090.65 19,666.35

531 10.1.(20) Pembersihan Rambu M1 18,558.53 19,386.61 19,367.90 20,053.40 21,003.15 18,497.39 19,895.14 19,939.79 19,930.55 25,587.52 19,664.82 26,539.54 26,780.64 19,090.65 19,666.35

532 10.1.(21) Pembersihan Drainase Buah 298,825.64 306,717.90 304,966.73 320,118.12 322,258.05 294,432.30 318,422.59 322,071.12 324,377.74 445,200.99 316,768.32 436,678.42 457,871.02 311,789.45 316,431.37

533 10.1.(22) Pengendalian Tanaman M2 2,862.44 2,935.78 2,935.78 2,990.78 3,082.44 2,862.44 2,972.44 2,972.44 2,972.44 3,412.44 2,954.11 3,504.11 3,504.11 2,899.11 2,954.11

534 10.2.(1) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

535 10.2.(2) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

536 10.2.(3) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

537 10.2.(4) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

538 10.2. (…..) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BIDANG BINA MARGA BM - 28 dari 75


harga satuan pokok kegiatan
PROVINSI KALIMANTAN UTARA 2021
bidang cipta karya
HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

A PEKERJAAN PERSIAPAN
1 A.1 Pagar sementara dari Seng Gelombang BJLS 20 KI tinggi 2 meter m 492,079.25 515,713.82 509,079.70 558,803.75 550,914.40 478,910.03 522,522.63 531,507.00 543,833.05 971,686.75 532,687.82 903,251.10 995,127.89 461,797.45 473,741.35
2 A.2 Pagar sementara dari kawat duri tinggi 1,8 meter m 583,648.00 611,840.88 605,139.20 664,892.68 653,540.40 567,320.59 579,632.78 631,755.95 647,086.66 1,097,395.55 633,952.80 1,095,690.03 1,209,715.59 625,436.70 639,393.10
3 A.3 Pengukuran dan pemasangan bouwplank m 98,083.50 102,654.18 101,427.70 110,300.53 109,730.70 96,133.68 104,597.56 106,394.78 108,860.50 184,355.12 105,816.79 172,668.22 188,231.08 89,212.40 92,211.60
4 A.4 Pembuatan gudang semen dan peralatan m2 1,257,841.25 1,315,009.19 1,300,928.30 1,406,523.31 1,404,536.40 1,229,703.34 1,335,673.48 1,361,539.74 1,393,798.45 2,287,246.96 1,344,820.70 2,156,867.25 2,330,266.39 1,194,608.50 1,238,939.85
5 A.5 Pembuatan rumah jaga (konstruksi kayu) m2 1,201,002.50 1,256,481.38 1,242,975.20 1,348,636.63 1,342,606.60 1,177,549.98 1,282,412.84 1,304,705.82 1,335,959.26 2,248,575.68 1,294,358.81 2,108,930.86 2,292,017.62 1,126,321.50 1,165,168.50
6 A.6 Pembuatan kantor lapangan , dengan lantai plesteran m2 1,745,470.00 1,821,565.50 1,798,121.60 1,940,452.50 1,946,170.30 1,698,523.55 1,836,836.12 1,871,415.01 1,911,054.59 3,050,372.24 1,843,794.08 2,882,979.34 3,099,363.16 1,671,737.75 1,735,856.00
7 A.7 Pembuatan bedeng pekerja m2 1,709,820.00 1,786,921.75 1,767,812.20 1,912,708.75 1,906,865.60 1,671,920.60 1,814,384.44 1,853,183.37 1,897,911.93 3,123,918.88 1,827,158.41 2,950,325.14 3,179,941.82 1,660,992.15 1,741,011.45
8 A.8 Membersihkan lapangan dan perataan m2 23,000.00 24,150.00 23,575.00 24,725.00 26,450.00 23,000.00 25,300.00 25,300.00 25,300.00 31,050.00 24,725.00 29,900.00 33,925.00 24,150.00 25,300.00
9 A.9 Pembongkaran beton bertulang m3 1,968,386.00 2,052,715.50 1,976,045.00 2,129,386.00 2,221,374.50 1,968,386.00 2,068,033.50 2,068,033.50 2,068,033.50 2,627,704.00 2,060,374.50 2,474,363.00 2,665,999.00 1,983,704.00 2,068,033.50
10 A.10 Bongkaran dinding tembok Bata merah m3 931,868.00 970,582.75 932,247.50 1,008,918.00 1,048,012.25 931,868.00 971,341.75 971,341.75 971,341.75 1,240,827.00 970,962.25 1,164,156.50 1,242,724.50 932,627.00 971,341.75
11 A.11 Membongkar dinding bata/ pas. batu kali (bongkaran dipakai kembali) m2 430,560.00 448,845.00 431,595.00 466,095.00 485,415.00 430,560.00 450,915.00 450,915.00 450,915.00 574,770.00 449,880.00 540,270.00 579,945.00 432,630.00 450,915.00
12 A.12 Mengupas plesteran m2 19,550.00 20,412.50 19,693.75 21,131.25 22,137.50 19,550.00 20,700.00 20,700.00 20,700.00 26,162.50 20,556.25 24,725.00 26,881.25 19,837.50 20,700.00
13 A.13 Membongkar jembatan kayu (bongkaran dipakai kembali) m3 1,692,800.00 1,759,500.00 1,736,500.00 1,817,000.00 1,886,000.00 1,692,800.00 1,805,500.00 1,840,000.00 1,874,500.00 2,346,000.00 1,768,700.00 2,300,000.00 2,350,600.00 1,745,700.00 1,846,900.00
14 A.14 Membongkar genteng/ sirap ( bongkaran dipakai kembali) m2 78,200.00 81,650.00 78,775.00 84,525.00 88,550.00 78,200.00 82,800.00 82,800.00 82,800.00 104,650.00 82,225.00 98,900.00 107,525.00 79,350.00 82,800.00
15 A.15 Membongkar genteng/ sirap (bongkaran tidak dipakai kembali) m2 15,640.00 16,330.00 15,755.00 16,905.00 17,710.00 15,640.00 16,560.00 16,560.00 16,560.00 20,930.00 16,445.00 19,780.00 21,505.00 15,870.00 16,560.00
16 A.16 Membongkar rangka atap/ reng/ kaso (bongkaran dipakai kembali) m2 49,680.00 51,750.00 50,600.00 53,475.00 55,775.00 49,680.00 52,900.00 53,475.00 54,050.00 67,850.00 52,095.00 65,550.00 68,885.00 50,945.00 53,590.00
17 A.17 Membongkar rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali) m2 37,260.00 38,812.50 37,950.00 40,106.25 41,831.25 37,260.00 39,675.00 40,106.25 40,537.50 50,887.50 39,071.25 49,162.50 51,663.75 38,208.75 40,192.50
18 A.18 Membongkar kuda-kuda/ gording/ balok (bongkaran dipakai kembali) m3 1,729,600.00 1,798,600.00 1,775,600.00 1,856,100.00 1,929,700.00 1,729,600.00 1,849,200.00 1,883,700.00 1,918,200.00 2,396,600.00 1,810,100.00 2,350,600.00 2,412,700.00 1,787,100.00 1,890,600.00
19 A.19 Membongkar kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali) m3 1,089,050.00 1,131,600.00 1,108,600.00 1,171,850.00 1,216,700.00 1,089,050.00 1,153,450.00 1,170,700.00 1,187,950.00 1,493,850.00 1,133,900.00 1,447,850.00 1,488,100.00 1,110,900.00 1,170,700.00
20 A.20 Membongkar plafond (bongkaran dipakai kembali) m2 70,840.00 73,600.00 73,025.00 75,900.00 78,775.00 70,840.00 75,900.00 77,625.00 79,350.00 98,900.00 74,060.00 97,750.00 99,130.00 73,485.00 77,970.00
21 A.21 Membongkar plafond (bongkaran tidak dipakai kembali) m2 23,460.00 24,495.00 23,632.50 25,357.50 26,565.00 23,460.00 24,840.00 24,840.00 24,840.00 31,395.00 24,667.50 29,670.00 32,257.50 23,805.00 24,840.00
22 A.22 Pengukuran kembali (site) m2 12,477.50 12,707.50 12,592.50 12,914.50 13,179.00 12,477.50 12,937.50 12,995.00 12,937.50 14,662.50 12,765.00 14,432.50 15,180.00 12,650.00 12,995.00
23 A.23 Pembuatan 1 m2 Pagar Sementara dari Kayu Tinggi 2 m m 417,151.00 436,996.32 431,139.60 472,651.50 466,950.60 406,216.23 442,521.96 450,106.09 460,267.61 822,437.91 450,609.79 765,534.62 842,109.58 386,880.70 404,396.35
24 A.24 Pembuatan 1 m2 Steger / Perancah dari Bambu m2 555,668.50 577,802.55 571,535.74 599,070.65 618,507.72 554,405.57 593,312.14 605,558.26 618,321.19 802,524.28 582,356.32 784,431.38 805,337.64 574,650.40 612,773.13
25 A.25 Pembuatan 1 Buah Kotak Adukan Uk. 40 x 50 x 25 cm bh 226,849.00 237,501.45 235,777.60 256,391.35 253,308.20 221,695.85 242,627.00 247,530.60 254,250.05 444,544.00 245,743.50 416,601.30 453,882.00 203,554.60 210,261.40
26 A.26 Pembuatan 1 m2 Jalan Sementara m2 270,043.00 282,385.95 275,333.00 301,251.70 303,197.50 266,096.20 284,713.55 287,261.95 291,079.95 465,007.10 288,479.80 432,415.64 472,942.10 281,454.45 289,811.50
27 A.27 Pemasangan 1 m2 Pagar Kawat Jaring Galvanis m2 42,941.00 45,057.00 44,516.50 48,162.00 48,518.50 42,044.00 46,218.50 47,138.50 47,909.00 79,580.00 46,759.00 75,000.70 84,157.00 46,368.00 47,610.00
28 A.28 Pemasangan 1 m2 Panel Beton Pracetak 5x50x240 cm Untuk Pagar m2 3,094,927.84 3,244,743.77 3,144,715.19 3,517,286.85 3,440,587.62 2,991,499.24 3,200,860.52 3,295,778.37 3,331,443.60 5,954,265.57 3,297,866.28 5,585,244.99 6,167,673.21 3,262,709.42 3,317,724.87
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B PEKERJAAN TANAH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 B.1 Galian tanah biasa sedalam 1 meter m3 108,100.00 112,700.00 108,387.50 117,012.50 121,900.00 108,100.00 113,275.00 113,275.00 113,275.00 144,325.00 112,987.50 135,700.00 145,762.50 108,675.00 113,275.00
2 B.2 Galian tanah biasa sedalam 2 meter m3 132,480.00 138,172.50 132,997.50 143,347.50 149,557.50 132,480.00 139,207.50 139,207.50 139,207.50 176,985.00 138,690.00 166,635.00 179,572.50 133,515.00 139,207.50
3 B.3 Galian tanah biasa sedalam 3 meter m3 157,228.00 164,036.00 157,998.50 170,073.50 177,652.00 157,228.00 165,577.00 165,577.00 165,577.00 210,151.00 164,806.50 198,076.00 214,003.50 158,769.00 165,577.00
4 B.4 Galian tanah keras sedalam 1 M m3 143,888.00 150,006.00 144,256.00 155,756.00 162,242.00 143,888.00 150,742.00 150,742.00 150,742.00 192,096.00 150,374.00 180,596.00 193,936.00 144,624.00 150,742.00
5 B.5 Galian tanah cadas sedalam 1 Meter m3 218,040.00 227,355.00 218,730.00 235,980.00 245,985.00 218,040.00 228,735.00 228,735.00 228,735.00 291,180.00 228,045.00 273,930.00 294,630.00 219,420.00 228,735.00
6 B.6 Galian tanah lumpur sedalam 1 Meter m3 173,880.00 181,297.50 174,397.50 188,197.50 196,132.50 173,880.00 182,332.50 182,332.50 182,332.50 232,185.00 181,815.00 218,385.00 234,772.50 174,915.00 182,332.50

BIDANG CIPTA KARYA CK - 30 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

7 B.7 Stripping tebing setinggi 1 m m2 7,820.00 8,165.00 7,877.50 8,452.50 8,855.00 7,820.00 8,280.00 8,280.00 8,280.00 10,465.00 8,222.50 9,890.00 10,752.50 7,935.00 8,280.00
8 B.8 Pembuangan tanah sejauh 30 meter m3 47,380.00 49,392.50 47,495.00 51,290.00 53,417.50 47,380.00 49,622.50 49,622.50 49,622.50 63,250.00 49,507.50 59,455.00 63,825.00 47,610.00 49,622.50
9 B.9 Urugan kembali m3 36,033.33 37,566.67 36,129.17 39,004.17 40,633.33 36,033.33 37,758.33 37,758.33 37,758.33 48,108.33 37,662.50 45,233.33 48,587.50 36,225.00 37,758.33
10 B.10 Pemadatan tanah m3 78,200.00 81,650.00 78,775.00 84,525.00 88,550.00 78,200.00 82,800.00 82,800.00 82,800.00 104,650.00 82,225.00 98,900.00 107,525.00 79,350.00 82,800.00
11 B.11 Urugan pasir m3 222,640.00 233,450.00 229,931.00 253,115.00 249,688.00 217,258.00 236,716.00 240,166.00 245,410.00 440,542.00 241,707.00 408,001.60 451,329.00 238,326.00 243,616.00
12 B.12 Lapisan pudel m3 517,960.00 542,020.99 534,181.90 581,856.99 579,965.70 508,024.69 550,873.35 559,528.48 571,453.17 960,066.69 557,864.54 897,850.17 980,201.58 550,040.98 566,389.61
13 B.13 Urugan tanah tanah dari luar lokasi pekerjaan (manual) m3 135,700.00 142,255.00 139,851.50 153,352.50 152,467.00 132,802.00 144,348.00 146,280.00 149,040.00 258,221.00 146,958.50 239,972.80 265,454.50 144,555.00 148,212.00
14 B.14 Urugan S i r t u m3 259,900.00 272,665.00 269,019.50 296,182.50 291,571.00 253,276.00 276,966.00 281,244.00 287,592.00 523,457.00 283,026.50 484,895.20 537,590.50 279,519.00 285,522.00
15 B.15 Lapisan ijuk 10 cm m2 299,460.00 314,295.00 310,672.50 342,757.50 335,685.00 291,180.00 318,780.00 324,300.00 332,580.00 619,275.00 326,887.50 573,666.00 636,697.50 272,205.00 329,820.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
C PEKERJAAN PONDASI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 C.1 Pemasangan pondasi batu belah campuran 1 Semen : 3 PP m3 1,565,334.00 1,640,199.00 1,600,949.50 1,773,817.50 1,743,929.00 1,519,782.50 1,636,412.05 1,678,362.90 1,704,254.58 3,001,999.10 1,676,131.90 2,814,349.92 3,095,238.80 1,660,250.40 1,693,686.08
2 C.2 Pemasangan pondasi batu belah campuran 1 Semen : 4 PP m3 1,490,584.00 1,561,711.50 1,526,797.50 1,687,855.00 1,662,003.00 1,449,069.00 1,562,663.70 1,600,413.60 1,626,746.30 2,854,502.40 1,598,332.10 2,674,310.28 2,939,639.20 1,582,301.10 1,616,028.30
3 C.3 Pemasangan pondasi batu belah campuran 1 Semen : 5 PP m3 1,434,096.00 1,502,399.10 1,470,533.98 1,622,893.80 1,599,978.44 1,395,517.64 1,506,551.70 1,541,303.23 1,567,801.49 2,742,278.41 1,539,277.85 2,568,012.63 2,821,530.70 1,523,190.73 1,557,027.37
4 C.4 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 6 PP m3 1,394,214.00 1,460,523.00 1,430,804.70 1,577,029.50 1,556,184.60 1,357,706.10 1,466,925.51 1,499,564.58 1,526,175.47 2,663,026.02 1,497,577.38 2,492,951.78 2,738,129.76 1,481,452.08 1,515,363.17
5 C.5 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 8 PP m3 1,339,704.00 1,403,287.50 1,376,506.30 1,514,343.00 1,496,329.40 1,306,027.40 1,412,769.94 1,442,519.52 1,469,286.46 2,554,714.88 1,440,585.22 2,390,365.90 2,624,145.44 1,424,407.02 1,458,421.26
6 C.6 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 1 KP : 2 PP m3 1,133,325.00 1,186,589.55 1,170,228.50 1,277,007.15 1,269,363.10 1,110,017.95 1,206,560.45 1,225,932.20 1,252,744.45 2,142,295.90 1,224,003.65 2,000,519.07 2,190,982.30 1,207,819.70 1,241,873.50
7 C.7 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 3 KP : 10 PP m3 1,300,259.00 1,361,870.25 1,338,243.50 1,468,981.25 1,453,531.00 1,269,145.75 1,375,305.13 1,402,183.16 1,429,796.61 2,479,785.25 1,400,527.50 2,318,262.00 2,544,030.00 1,384,070.66 1,418,652.77
8 C.8 Pemasangan 1 m3 Pondasi Batu Belah Camp 1/4 SP : 1 KP : 4 PP 0 1,255,869.00 1,315,260.75 1,293,917.90 1,417,932.75 1,404,734.20 1,227,007.45 1,331,023.00 1,355,629.78 1,383,293.49 2,391,220.99 1,353,992.06 2,234,498.21 2,450,959.12 1,337,517.28 1,372,131.70
9 C.9 Pemasangan 1 m3 Pondasi Siklop, 60% Beton Camp 1 SP : 2 PB : 3 Kr dan 40% Batu Belah 0 4,033,192.60 4,225,679.14 4,149,400.56 4,580,513.94 4,498,916.38 3,872,808.08 4,051,982.22 4,088,645.14 4,382,891.04 7,605,439.44 4,298,903.32 7,351,522.48 8,121,764.14 4,257,964.70 4,345,453.94
10 C.10 Pemasangan batu kosong ( aanstamping ) m3 888,444.00 931,037.70 919,558.86 1,007,979.60 995,071.08 867,324.48 946,482.66 962,387.16 985,009.50 1,752,136.32 964,259.82 1,630,270.18 1,794,866.64 952,968.66 976,497.66
11 C.11 Pemasangan pondasi sumuran , diameter 100 cm m3 1,416,006.50 1,482,407.04 1,441,638.16 1,592,388.44 1,578,104.98 1,330,207.53 1,422,015.02 1,457,044.94 1,473,782.04 2,465,174.04 1,450,545.37 2,321,117.27 2,540,094.24 1,430,416.00 1,466,120.74
12 C.12 Pengadaan Tiang Pancang spun pile d=50 cm m 1,766,484.29 1,851,266.29 1,833,201.88 2,017,562.80 1,971,928.11 1,715,420.40 1,885,313.98 1,918,719.17 1,962,607.42 3,650,958.22 1,928,557.57 3,384,335.36 3,756,162.14 1,910,721.46 2,161,999.85
13 C.13 Pengadaan Tiang Pancang spun pile d=45 cm m 1,480,984.29 1,551,466.29 1,536,301.88 1,689,262.80 1,652,128.11 1,438,520.40 1,580,713.98 1,608,619.17 1,644,207.42 3,041,758.22 1,615,757.57 2,821,295.36 3,130,562.14 1,600,621.46 1,808,499.85
14 C.14 Pengadaan Tiang Pancang spun pile d=40 cm m 1,202,484.29 1,259,066.29 1,246,601.88 1,368,962.80 1,340,228.11 1,168,320.40 1,283,513.98 1,306,019.17 1,333,407.42 2,447,358.22 1,310,357.57 2,271,575.36 2,519,762.14 1,298,021.46 1,463,499.85
15 C.15 Pengadaan Tiang Pancang spun pile d=30 cm m 768,484.29 803,366.29 795,301.88 869,862.80 854,128.11 747,420.40 820,513.98 834,619.17 849,407.42 1,521,358.22 834,757.57 1,415,495.36 1,568,562.14 826,621.46 926,099.85
16 C.16 Tiang Pancang square pile 35 x 35 cm m 967,300.00 1,013,965.00 1,003,665.00 1,103,944.00 1,081,388.00 940,900.00 1,032,960.00 1,049,960.00 1,074,830.00 1,988,450.00 1,056,230.00 1,843,850.00 2,049,100.00 1,045,930.00 1,183,460.00
17 C.17 Pengadaan Tiang Pancang square pile 30 x 30 cm m 761,800.00 798,265.00 789,965.00 867,644.00 851,188.00 741,500.00 813,560.00 826,660.00 845,530.00 1,549,650.00 830,830.00 1,438,130.00 1,598,300.00 822,630.00 928,860.00
18 C.18 Pengadaan Tiang Pancang square pile 25 x 25 cm m 595,300.00 623,365.00 616,865.00 676,144.00 664,788.00 580,000.00 635,960.00 645,760.00 659,830.00 1,194,450.00 648,330.00 1,109,630.00 1,233,300.00 641,730.00 722,660.00
19 C.19 Pengadaan Tiang Pancang square pile 20 x 20 cm m 447,800.00 468,565.00 463,465.00 506,544.00 499,588.00 437,000.00 478,660.00 485,660.00 495,330.00 879,850.00 486,730.00 818,750.00 910,100.00 481,630.00 540,160.00
20 C.20 Upah Potong dan buang tiang pancang bh 192,000.00 199,625.00 197,125.00 204,625.00 212,375.00 192,000.00 204,875.00 207,375.00 209,875.00 257,750.00 202,250.00 252,750.00 265,875.00 199,750.00 209,875.00
21 C.21 Pemancangan Dolken Kayu Galam 3 m bh 89,400.00 93,200.00 90,900.00 98,800.00 100,000.00 88,300.00 93,900.00 94,800.00 95,900.00 145,600.00 94,700.00 136,260.00 147,400.00 92,400.00 99,800.00
22 C.22 Pemancangan tiang pancang dengan pile driver dan hammer m 171,372.64 174,972.64 172,472.64 177,832.64 182,292.64 171,372.64 177,772.64 177,772.64 176,572.64 200,372.64 176,072.64 195,372.64 208,872.64 173,572.64 177,772.64
23 C.23 Pemancangan tiang pancang dengan jack-in hydraulic (kap 380 ton) m 352,000.00 367,600.00 362,700.00 394,460.00 391,720.00 344,800.00 382,400.00 387,200.00 393,200.00 621,000.00 387,900.00 616,000.00 629,500.00 383,000.00 392,000.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
D PEKERJAAN BETON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 D.1 Membuat 1 m3 Beton Mutu f'c = 7,4 Mpa (K-100) m3 1,446,309.00 1,516,182.43 1,472,400.43 1,642,392.63 1,609,781.04 1,400,312.57 1,501,430.11 1,542,635.07 1,561,324.53 2,779,420.97 1,544,322.47 2,603,893.69 2,874,756.43 1,525,602.65 1,554,247.20

BIDANG CIPTA KARYA CK - 31 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

2 D.2 Membuat 1 m3 Beton Mutu f'c = 9,8 Mpa (K-125) m3 1,509,990.25 1,583,047.22 1,535,960.93 1,715,625.55 1,679,770.04 1,460,748.86 1,564,908.16 1,609,391.54 1,627,993.71 2,906,377.06 1,611,047.19 2,723,998.19 3,008,205.88 1,592,524.72 1,620,943.63
3 D.3 Membuat 1 m3 Beton Mutu f'c = 12,2 Mpa (K-150) m3 1,559,785.25 1,635,331.74 1,585,631.73 1,772,889.57 1,734,482.44 1,507,991.78 1,614,494.78 1,661,564.28 1,680,076.29 3,005,550.30 1,663,188.19 2,817,851.99 3,112,487.88 1,644,807.86 1,673,055.19
4 D.4 Membuat 1 m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K-100), Slump (3-6) cm, w/c = 0,87 m3 1,341,837.25 1,407,125.86 1,367,745.14 1,527,900.58 1,493,160.92 1,297,350.08 1,393,528.49 1,432,638.15 1,451,328.52 2,624,676.97 1,435,591.35 2,456,230.42 2,715,702.69 1,419,226.39 1,444,451.18
5 D.5 Membuat 1 m3 Beton Mutu f'c = 14,5 Mpa (K-175), Slump (120 ± 20) mm m3 1,619,395.50 1,697,921.99 1,645,142.39 1,841,440.84 1,800,003.92 1,564,571.21 1,673,937.24 1,724,065.28 1,742,505.42 3,124,435.23 1,725,662.75 2,930,306.19 3,237,436.99 1,707,463.42 1,735,506.52
6 D.6 Membuat 1 m3 Beton Mutu f'c = 16,9 Mpa (K-200) m3 1,674,733.50 1,756,026.77 1,700,301.91 1,905,079.42 1,860,786.48 1,617,052.95 1,728,976.24 1,782,009.18 1,800,319.48 3,234,513.23 1,783,561.68 3,034,524.27 3,353,234.86 1,765,523.24 1,793,362.90
7 D.7 Membuat 1 m3 Beton Mutu f'c = 19,3 Mpa (K-225) m3 1,718,094.25 1,801,554.93 1,743,649.09 1,954,943.65 1,908,476.52 1,658,238.25 1,772,312.96 1,827,525.84 1,845,827.05 3,321,186.66 1,829,073.05 3,116,444.73 3,444,257.59 1,811,172.38 1,838,871.74
8 D.8 Membuat 1 m3 Beton Mutu f'c = 21,7 Mpa (K-250) m3 1,743,658.75 1,828,398.00 1,769,040.17 1,984,343.17 1,936,510.76 1,682,438.16 1,797,587.89 1,854,212.05 1,872,386.53 3,371,736.52 1,855,716.94 3,164,403.73 3,497,545.37 1,837,880.67 1,865,473.77
9 D.9 Membuat 1 m3 Beton Mutu f'c = 24,0 Mpa (K-275) m3 1,787,755.50 1,874,700.10 1,812,876.79 2,035,054.95 1,984,887.12 1,724,200.52 1,841,250.28 1,900,278.86 1,918,263.25 3,459,061.31 1,901,720.27 3,247,209.74 3,589,552.04 1,883,980.60 1,911,414.31
10 D.10 Membuat 1 m3 Beton Mutu f'c = 26,4 Mpa (K-300) m3 1,801,141.50 1,888,755.63 1,826,154.23 2,050,449.08 1,999,557.44 1,736,863.17 1,854,455.04 1,914,236.18 1,932,141.22 3,485,470.83 1,915,651.14 3,272,285.30 3,617,413.78 1,897,948.96 1,925,318.96
11 D.11 Membuat 1 m3 Beton Mutu f'c = 28,8 Mpa (K-325) m3 1,932,678.50 2,026,229.28 1,958,130.99 2,196,109.00 2,146,075.72 1,865,654.55 1,989,819.36 2,052,864.89 2,070,963.70 3,695,473.71 2,053,085.00 3,471,843.49 3,834,079.99 2,032,918.83 2,063,870.39
12 D.12 Membuat 1 m3 Beton Mutu f'c = 31,2 Mpa (K-350), Slump (120 ± 20) mm m3 1,950,664.50 2,045,114.81 1,976,008.43 2,216,793.13 2,165,806.04 1,882,687.20 2,007,624.12 2,071,652.21 2,089,671.67 3,731,083.23 2,071,845.87 3,505,613.06 3,871,601.73 2,051,717.19 2,082,605.04
13 D.13 Beton kedap air dengan storox-100 m3 1,857,480.00 1,947,329.50 1,883,660.90 2,109,813.00 2,063,845.20 1,794,515.20 1,915,672.30 1,974,577.60 1,993,076.50 3,547,179.60 1,974,846.70 3,331,014.56 3,677,603.40 1,954,620.50 1,985,928.10
14 D.14 Beton tumbuk/rabat 1 Pc : 3 Ps : 5 Kr utk bawah lantai/pondasi m3 1,402,597.50 1,470,388.85 1,429,753.60 1,592,731.60 1,562,380.80 1,359,094.15 1,459,220.05 1,497,563.35 1,516,914.40 2,699,020.10 1,499,746.05 2,526,214.89 2,789,099.60 1,481,410.45 1,509,746.45
15 D.15 Pemasangan PVC Waterstop lebar 150 mm per M m 215,883.75 226,492.50 224,094.75 247,175.25 241,758.75 209,725.50 230,028.75 234,186.00 240,154.50 449,224.50 235,738.50 416,221.80 461,196.00 233,461.50 264,770.25
16 D.16 Pemasangan PVC Waterstop lebar 200 mm m 285,711.75 299,810.75 296,751.75 327,221.00 319,993.25 277,621.50 304,617.75 310,132.00 318,061.25 596,430.25 312,219.25 552,420.90 612,340.50 309,281.00 350,991.50
17 D.17 Pemasangan PVC Waterstop lebar 230 mm-320 mm m 357,477.50 375,164.50 371,323.50 409,664.50 400,349.50 347,213.75 381,087.00 387,958.25 397,969.00 747,730.00 390,712.50 692,472.50 767,717.00 386,992.25 439,443.75
18 D.18 Pembesian dengan besi polos kg 22,738.95 23,798.10 23,512.90 25,829.00 25,297.70 22,126.00 22,878.10 22,912.60 25,243.65 43,723.00 24,665.20 42,868.78 47,373.10 24,501.90 24,976.85
19 D.19 Pembesian dengan besi ulir kg 24,521.45 25,580.60 25,416.15 27,853.00 27,321.70 23,787.75 24,056.85 24,695.10 27,026.15 45,505.50 26,447.70 45,617.28 50,363.10 26,284.40 26,759.35
20 D.20 Pemasangan 1 m2 jaring kawat baja/wire mesh m2 103,482.75 108,571.50 107,472.10 118,392.50 115,864.80 100,621.55 110,309.15 112,358.45 115,240.35 214,529.05 112,892.05 198,840.29 220,011.10 111,915.70 114,169.70
21 D.21 Bekisting untuk pondasi m2 197,719.50 206,459.50 202,710.50 218,281.50 221,455.50 195,500.00 210,624.80 212,975.40 216,588.70 329,962.60 210,392.50 310,749.55 334,247.50 196,535.00 211,646.00
22 D.22 Bekisting batako untuk pondasi m2 148,235.00 153,985.00 150,914.50 165,600.00 165,358.50 143,738.50 153,891.85 155,884.80 158,192.28 260,403.70 156,137.80 244,800.04 267,138.10 152,837.30 163,631.78
23 D.23 Bekisting untuk sloof m2 197,719.50 206,459.50 202,710.50 218,281.50 221,455.50 195,500.00 210,624.80 212,975.40 216,588.70 329,962.60 210,392.50 310,749.55 334,247.50 196,535.00 211,646.00
24 D.24 Bekisting untuk kolom (pemakaian 1 x) m2 536,019.60 560,835.45 553,007.40 602,470.05 600,355.20 534,339.45 580,988.28 589,153.74 601,809.03 1,025,218.56 587,695.08 956,371.46 1,045,835.76 552,807.30 604,612.50
25 D.25 Bekisting untuk kolom (pemakaian 2 x) m2 268,009.80 280,417.73 276,503.70 301,235.03 300,177.60 267,169.73 290,494.14 294,576.87 300,904.52 512,609.28 293,847.54 478,185.73 522,917.88 276,403.65 302,306.25
26 D.26 Bekisting untuk balok/dinding (pemakaian 1x) m2 548,232.60 573,659.10 565,708.92 616,515.00 614,033.76 546,186.06 594,019.34 602,421.61 615,432.53 1,051,280.69 601,081.36 980,466.76 1,072,608.31 563,157.30 615,169.50
27 D.27 Bekisting untuk balok/dinding (pemakaian 2x) m2 274,116.30 286,829.55 282,854.46 308,257.50 307,016.88 273,093.03 297,009.67 301,210.81 307,716.26 525,640.34 300,540.68 490,233.38 536,304.16 281,578.65 307,584.75
28 D.28 Bekisting untuk plat lantai (pemakaian 1x) m2 743,019.60 777,771.45 768,287.40 840,382.05 832,195.20 734,715.45 801,236.28 813,265.74 831,993.03 1,465,714.56 814,015.08 1,363,747.46 1,498,475.76 776,919.30 859,636.50
29 D.29 Bekisting untuk plat lantai (pemakaian 2x) m2 371,509.80 388,885.73 384,143.70 420,191.03 416,097.60 367,357.73 400,618.14 406,632.87 415,996.52 732,857.28 407,007.54 681,873.73 749,237.88 388,459.65 429,818.25
30 D.30 Bekisting untuk tangga (pemakaian 1x) m2 567,642.30 593,941.65 585,899.70 638,805.45 635,772.90 564,913.35 614,580.24 623,323.92 636,913.47 1,090,843.08 622,222.68 1,017,136.31 1,113,352.26 590,025.90 647,033.70
31 D.31 Bekisting untuk tangga (pemakaian 2x) m2 283,821.15 296,970.83 292,949.85 319,402.73 317,886.45 282,456.68 307,290.12 311,661.96 318,456.74 545,421.54 311,111.34 508,568.16 556,676.13 295,012.95 323,516.85
32 D.32 Kolom praktis beton bertulang (11 x 11) cm m 112,912.75 118,147.32 115,867.33 126,892.50 126,084.97 109,499.09 114,676.85 115,622.84 122,759.86 200,925.70 120,081.74 194,398.32 213,080.97 118,072.80 121,565.12
33 D.33 Pemasangan 1 m2 Jembatan Untuk Pengecoran Beton m 157,676.50 165,248.10 163,110.48 179,057.30 176,646.44 153,816.64 168,954.14 170,552.73 174,494.65 314,126.27 171,122.02 289,835.84 319,623.55 147,625.50 154,226.50
34 D.34 Membuat 1 m' Kolom Praktis Beton Bertulang (11x11) cm m 131,278.25 137,411.55 134,933.18 148,000.17 146,644.09 127,293.04 134,233.87 135,527.96 143,163.73 245,237.73 140,137.51 235,114.81 258,321.51 136,864.95 140,332.55
35 D.35 Membuat 1 m' Ring Balok Beton Bertulang (10x15) cm m 164,933.00 172,521.28 169,133.72 184,893.55 184,278.76 159,974.66 168,272.49 169,824.64 178,838.34 294,794.22 174,914.54 283,547.77 310,246.08 170,103.40 174,909.48
36 D.36 Beton Ready-mix K175 m3 1,901,865.58 1,993,340.95 1,969,467.95 2,168,308.35 2,109,110.79 1,774,156.39 1,942,657.19 1,974,675.56 2,021,823.27 3,713,319.97 1,986,920.90 3,442,821.34 3,830,533.63 2,129,315.56 2,182,451.48
37 D.37 Beton Ready-mix K225 m3 1,998,465.58 2,094,770.95 2,069,931.95 2,279,398.35 2,217,302.79 1,864,718.89 2,042,275.94 2,076,105.56 2,126,030.52 3,912,557.47 2,089,316.90 3,627,134.14 4,035,325.63 2,189,690.56 2,230,751.48
38 D.38 Beton Ready-mix K250 m3 2,046,765.58 2,145,485.95 2,120,163.95 2,334,943.35 2,271,398.79 1,906,981.39 2,088,764.69 2,123,439.56 2,174,572.02 4,005,534.97 2,137,013.15 3,712,987.39 4,130,718.13 2,250,065.56 2,303,201.48

BIDANG CIPTA KARYA CK - 32 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

39 D.39 Beton Ready-mix K300 m3 2,179,590.58 2,284,952.20 2,258,301.95 2,487,692.10 2,420,162.79 2,124,331.39 2,327,849.69 2,366,871.56 2,424,524.52 4,483,704.97 2,382,618.65 4,155,077.29 4,621,929.13 2,431,190.56 2,484,326.48
40 D.40 Beton Ready-mix K400 m3 2,493,540.58 2,614,599.70 2,584,809.95 2,848,734.60 2,771,786.79 2,347,718.89 2,573,575.94 2,617,065.56 2,681,480.52 4,975,157.47 2,635,106.90 4,609,556.14 5,126,905.63 2,793,440.56 3,088,076.48
41 D.41 Lantai Kerja Plastic Sheet m2 32,715.20 34,241.25 33,783.55 36,641.30 36,459.60 32,025.20 34,751.85 35,199.20 35,991.55 59,961.00 35,207.25 56,147.60 61,669.90 34,749.55 38,447.95
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
E BETON PRACETAK 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 E.1 Pembuatan lahan produksi beton K175 tebal 8 cm m2 115,642.85 121,230.81 117,146.64 131,318.95 128,426.39 111,676.05 119,082.24 122,825.80 123,892.91 220,258.98 122,810.32 206,971.07 228,497.13 121,332.41 123,466.66
2 E.2 Pembuatan lahan produksi beton K175 tebal 10 cm m2 157,886.38 165,536.41 160,342.32 179,479.58 175,478.27 152,550.95 163,141.07 168,048.01 169,803.02 303,903.14 168,170.02 285,093.79 314,904.04 165,482.59 169,134.64
3 E.3 Pembuatan lahan produksi beton K175 tebal 12 cm m2 175,354.30 183,829.57 178,327.51 199,159.99 195,072.20 169,666.63 181,706.21 186,867.76 188,993.53 336,646.17 187,024.16 315,572.03 348,414.81 183,774.37 188,180.25
4 E.4 Pembuatan lahan produksi beton K175 tebal 15 cm m2 239,053.61 250,642.70 242,760.25 271,776.99 265,689.60 230,950.60 246,987.98 254,436.44 257,079.80 460,367.21 254,624.95 431,873.77 477,107.41 250,575.89 256,071.66
5 E.5 Pembuatan bekisting untuk plat beton pra cetak (5x pemakaian) m2 491,817.97 515,760.17 508,744.23 562,257.46 549,876.48 477,142.51 520,750.59 531,546.18 543,785.72 1,015,231.05 534,506.99 943,494.95 1,044,390.86 488,608.36 500,536.02
6 E.6 Pembuatan bekisting untuk balok beton pra cetak (10x pemakaian) m2 227,993.25 239,224.27 237,062.84 261,495.74 255,271.02 221,315.09 243,142.09 247,648.94 254,248.21 485,697.67 249,402.11 449,793.20 498,631.72 206,651.44 212,057.01
7 E.7 Pembuatan bekisting untuk kolom beton pra cetak (10x pemakaian) m2 194,959.50 204,538.54 202,707.74 223,506.64 218,273.22 189,272.06 207,895.16 211,761.46 217,398.76 415,203.82 213,194.36 384,619.25 426,216.22 178,869.16 183,834.86
8 E.8 Pemasangan dan membuka bekisting plat beton pra cetak bh 11,235.50 11,701.25 11,396.50 12,109.50 12,632.75 11,235.50 11,919.75 12,023.25 12,126.75 15,260.50 11,758.75 14,651.00 15,444.50 11,454.00 12,023.25
9 E.9 Pemasangan dan membuka bekisting balok beton pra cetak bh 18,204.50 18,946.25 18,434.50 19,630.50 20,429.75 18,204.50 19,233.75 19,406.25 19,578.75 24,713.50 19,003.75 23,690.00 24,828.50 18,492.00 19,406.25
10 E.10 Pemasangan dan membuka bekisting kolom beton pra cetak bh 14,720.00 15,323.75 14,915.50 15,870.00 16,531.25 14,720.00 15,576.75 15,714.75 15,852.75 19,987.00 15,381.25 19,170.50 20,136.50 14,973.00 15,714.75
11 E.11 Menuang beton plat pra cetak bh 90,160.00 93,897.50 93,529.50 96,404.50 100,981.50 90,160.00 98,106.50 100,245.50 102,384.50 126,155.00 95,128.00 125,419.00 129,777.50 94,760.00 100,636.50
12 E.12 Menuang beton balok pra cetak bh 92,701.50 96,548.25 96,151.50 99,130.00 103,816.25 92,701.50 100,837.75 103,022.75 105,207.75 129,685.50 97,813.25 128,892.00 133,400.00 97,416.50 103,448.25
13 E.13 Menuang beton kolom pra cetak bh 83,403.75 86,899.75 86,549.00 89,176.75 93,512.25 83,403.75 90,884.50 92,810.75 94,737.00 116,638.75 88,118.75 115,937.25 120,428.00 87,768.00 93,190.25
14 E.14 Mendirikan komponen plat pracetak bh 150,085.49 154,860.50 153,932.43 160,699.38 163,289.13 147,678.40 164,555.49 167,579.92 168,102.65 244,895.64 159,727.36 237,777.86 255,354.48 157,973.55 165,677.42
15 E.15 Mendirikan komponen balok pracetak bh 175,358.78 181,578.61 180,409.42 190,765.99 192,025.49 171,942.41 192,402.22 195,929.91 197,504.16 300,492.52 189,104.79 293,993.50 310,016.44 187,183.81 194,972.31
16 E.16 Mendirikan komponen kolom pracetak bh 372,695.40 388,073.33 384,975.85 414,507.84 411,596.84 363,870.28 409,545.82 416,911.93 423,126.70 681,624.35 409,683.91 672,803.65 694,857.11 405,563.50 418,450.59
17 E.17 Melangsir komponen plat pracetak (sejauh + 20 m) bh 30,882.02 31,602.98 31,357.11 32,975.76 32,997.51 30,251.51 33,500.24 34,213.88 34,200.77 52,117.85 32,406.72 50,095.62 53,226.88 31,926.68 33,421.16
18 E.18 Melangsir komponen balok pracetak (sejauh + 20 m) bh 30,882.02 31,602.98 31,357.11 32,975.76 32,997.51 30,251.51 33,500.24 34,213.88 34,200.77 52,117.85 32,406.72 50,095.62 53,226.88 31,926.68 33,421.16
19 E.19 Melangsir komponen kolom pracetak (sejauh + 20 m) bh 30,882.02 31,602.98 31,357.11 32,975.76 32,997.51 30,251.51 33,500.24 34,213.88 34,200.77 52,117.85 32,406.72 50,095.62 53,226.88 31,926.68 33,421.16
20 E.20 Bahan grouting campuran m3 8,242,912.50 8,594,870.00 8,456,467.50 9,298,785.00 9,159,980.00 7,891,357.50 8,595,272.50 8,733,675.00 8,947,230.00 17,190,545.00 8,808,827.50 15,855,889.50 17,617,655.00 8,733,675.00 8,946,827.50
21 E.21 Bahan grouting tidak campuran m3 9,816,400.00 10,243,280.00 10,030,070.00 11,097,040.00 10,883,370.00 9,389,980.00 10,243,740.00 10,456,950.00 10,670,620.00 20,487,480.00 10,457,410.00 18,823,338.00 20,914,820.00 10,456,950.00 10,670,160.00
22 E.22 Upah grouting pada join pracetak titik 80,770.25 84,157.00 84,157.00 86,267.25 90,079.50 80,770.25 87,969.25 90,079.50 92,189.75 113,752.25 85,433.50 113,752.25 117,173.50 85,433.50 90,930.50
23 E.23 Pemasangan bekisting join pra cetak titik 102,134.95 106,746.91 105,339.08 113,820.33 114,171.31 100,507.93 109,257.36 110,652.31 113,052.82 182,387.47 109,422.27 171,039.09 184,655.04 97,316.68 101,731.07
24 E.24 Upah join dengan sling titik 105,754.00 109,675.50 108,410.50 113,470.50 117,518.50 105,754.00 112,458.50 114,988.50 117,518.50 146,993.00 109,802.00 144,463.00 145,095.50 108,537.00 114,988.50
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
F PEKERJAAN BESI DAN ALUMUNIUM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 F.1 Pemasangan besi profil kg 55,579.50 58,092.25 57,350.50 62,353.00 62,123.00 54,389.25 55,533.50 60,110.50 61,513.50 96,163.00 59,650.50 96,689.70 105,259.50 59,041.00 60,840.75
2 F.2 Pemasangan rangka baja WF kg 54,257.00 56,769.75 56,028.00 60,898.25 60,668.25 53,199.00 57,781.75 58,788.00 60,058.75 100,659.50 58,328.00 94,309.20 102,614.50 57,718.50 59,518.25
3 F.3 Pekerjaan perakitan (erection) kg 23,057.50 24,081.00 23,425.50 25,357.50 25,921.00 22,850.50 24,357.00 24,529.50 24,782.50 37,225.50 24,437.50 34,755.30 37,697.00 23,782.00 24,679.00
4 F.4 Pembuatan pintu besi plat baja 2 mm rangkap rangka baja siku m2 856,744.25 892,066.50 880,831.00 950,929.25 950,457.75 841,150.25 859,642.25 921,052.25 940,953.00 1,415,184.25 911,852.25 1,418,905.65 1,530,310.75 902,341.75 929,844.00
5 F.5 Pengelasan dengan las listrik 10 cm 114,205.45 114,587.78 113,929.91 121,187.40 120,092.77 109,832.37 124,878.24 128,058.85 127,791.39 175,090.21 120,269.84 177,655.23 185,278.93 118,032.14 124,178.31
6 F.6 Pemasangan pintu rolling door besi m2 704,214.00 735,218.00 725,213.00 780,758.00 786,531.00 694,669.00 749,041.00 762,036.00 778,136.00 1,209,938.00 751,272.00 1,145,124.00 1,227,303.00 741,267.00 769,511.00

BIDANG CIPTA KARYA CK - 33 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

7 F.7 Pemasangan pintu lipat (folding door) plastik/PVC m2 399,073.00 417,542.00 412,482.00 447,902.00 446,384.00 391,368.00 425,224.00 432,699.00 442,589.00 741,152.00 429,801.00 695,313.00 756,631.00 424,856.00 438,150.00
8 F.8 Pemasangan sunscreen alumunium m2 421,590.00 440,795.00 437,805.00 471,385.00 470,695.00 413,885.00 451,490.00 461,150.00 473,110.00 778,780.00 453,905.00 736,713.00 795,110.00 451,030.00 467,015.00
9 F.9 Pemasangan pintu rolling door alumunium m2 2,020,665.00 2,118,300.00 2,095,645.00 2,298,735.00 2,261,820.00 1,969,950.00 2,155,100.00 2,193,625.00 2,248,480.00 4,061,800.00 2,197,880.00 3,778,164.00 4,161,735.00 2,175,800.00 2,227,550.00
10 F.10 Pemasangan kusen pintu alumunium m 112,702.30 118,061.30 116,900.95 128,264.10 126,004.35 109,493.80 119,728.80 121,914.95 125,007.30 228,785.60 122,302.50 212,495.62 234,547.10 121,149.05 123,776.80
11 F.11 Pemasangan pintu alumunium strip lebar 8 cm m 558,752.80 585,314.35 579,604.60 639,352.85 624,355.70 542,077.80 593,748.45 605,185.20 621,842.95 1,166,392.10 609,380.40 1,081,759.00 1,198,873.85 603,670.65 615,724.95
12 F.12 Pemasangan pintu kaca rangka alumunium m2 493,164.85 517,129.70 511,939.75 564,295.80 551,955.15 478,628.85 525,075.05 534,375.10 548,862.80 1,029,045.30 538,019.45 953,309.29 1,056,151.95 532,860.55 543,295.65
13 F.13 Pemasangan venetioins blinds dan vertical blinds m2 307,947.00 322,126.50 318,159.00 345,356.50 344,448.00 302,082.00 328,060.50 333,868.00 341,400.50 569,089.00 331,476.00 534,290.00 580,991.50 327,623.50 337,950.50
14 F.14 Pemasangan terali besi strip (2x3) mm m2 1,104,113.11 1,136,622.85 1,123,550.22 1,196,280.01 1,210,220.01 1,084,098.18 1,169,308.82 1,208,005.26 1,222,460.44 1,691,355.94 1,165,721.33 1,680,138.91 1,768,579.65 1,147,018.11 1,202,105.19
15 F.15 Pemasangan jendela nako dan teralis m2 467,227.75 489,463.00 484,495.00 531,553.00 522,249.50 419,359.00 453,583.00 466,112.25 477,727.25 859,142.00 467,440.50 806,865.30 889,007.50 462,650.75 473,621.75
16 F.16 Pemasangan talang datar/jurai seng BJLS 20 lebar 90 cm m 154,899.25 161,890.10 159,848.85 173,209.55 173,092.25 152,108.20 164,782.81 167,644.93 171,406.70 281,541.62 166,203.29 264,638.32 286,533.08 148,783.55 154,057.45
17 F.17 Pemasangan talang 1/2 lingkaran seng BJLS 30 lebar 45 cm m 147,171.25 153,612.40 152,027.70 163,148.20 164,226.90 144,955.20 150,385.50 159,928.20 163,689.85 243,064.00 157,164.75 243,265.25 260,371.50 155,523.70 161,709.55
18 F.18 Pemasangan rangka besi hollow 1 x 40.40.2, modul 60 x 120 cm dinding partisi m2 475,329.50 498,001.75 492,901.50 540,120.50 532,070.50 463,294.75 506,304.75 515,591.00 528,540.00 950,417.50 516,229.25 884,647.85 973,900.50 511,129.00 523,204.00
19 F.19 Pemasangan rangka besi hollow 1 x 40.40.2, modul 60 x 60 cm plafond m2 564,512.00 591,272.50 585,074.00 640,147.50 631,833.00 550,758.00 601,277.50 612,260.00 627,428.50 1,115,523.00 612,214.00 1,039,618.40 1,142,467.50 606,015.50 621,034.50
20 F.20 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Canal Dingin Profil C75 m2 708,354.00 741,323.35 732,168.20 796,291.05 792,323.55 694,255.00 754,988.80 768,021.18 785,988.20 1,327,656.60 763,736.85 1,244,067.93 1,355,709.70 754,934.18 778,025.03
21 F.21 Pemasangan 1 m2 Atap Jurai Rangka Atap Baja Canal Dingin Profil C75 m2 866,623.90 907,419.00 896,526.20 977,642.60 969,505.20 847,993.90 923,785.80 939,801.85 962,338.40 1,658,697.90 936,675.00 1,550,655.40 1,695,403.60 926,247.95 952,785.35
22 F.22 Dinding Alumunium Composite Panel + Rangka m2 1,291,780.75 1,353,600.25 1,340,210.25 1,471,770.25 1,445,176.75 1,256,093.25 1,373,873.00 1,398,800.50 1,434,109.25 2,627,594.00 1,403,792.25 2,440,447.25 2,692,849.00 1,390,141.00 1,421,228.00
23 F.23 Langit - langit Spandrel Aluminium m2 888,467.00 931,109.00 921,966.50 1,012,471.50 992,933.00 863,167.00 944,633.00 961,653.00 986,263.00 1,814,539.00 965,643.50 1,684,704.00 1,860,711.50 956,616.00 977,178.00
24 F.24 Pagar BRC 1,20 x 2,40 m bh 838,398.50 879,641.42 869,723.30 958,540.30 939,103.65 815,510.82 893,540.40 908,979.67 931,880.81 1,727,884.54 914,784.50 1,601,327.40 1,773,173.00 905,139.82 923,838.76
25 F.25 Pagar BRC 0,90 x 2,40 m bh 688,398.50 722,041.42 713,723.30 785,940.30 771,103.65 669,910.82 733,240.40 745,979.67 764,280.81 1,407,284.54 750,184.50 1,305,047.40 1,443,973.00 742,139.82 757,838.76
26 F.26 Pemasangan atap spandek zincalume m2 142,669.00 149,028.50 147,775.00 162,311.00 158,907.00 138,425.50 151,535.50 154,272.50 158,274.50 288,742.00 154,422.00 268,433.00 295,918.00 153,168.50 156,664.50
27 F.27 Pemasangan nok zincalume m 60,329.00 62,985.50 62,491.00 67,355.50 67,045.00 58,500.50 63,641.00 64,733.50 66,332.00 112,953.00 64,124.00 105,896.60 115,322.00 63,629.50 65,607.50
28 F.28 Pemasangan kuda-kuda baja ringan dan reng utk atap spandek m2 454,485.75 475,153.67 471,749.78 512,822.49 506,507.84 440,568.11 481,267.64 490,167.61 503,037.26 895,432.78 488,121.99 836,173.07 916,213.97 484,302.61 497,275.87
29 F.29 Pemasangan kuda-kuda baja ringan dan reng utk atap genteng m2 516,585.75 540,358.67 536,333.78 584,237.49 576,059.84 500,805.11 547,507.64 557,442.61 572,175.26 1,027,912.78 556,017.99 958,385.87 1,052,005.97 551,577.61 565,792.87
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
G PEKERJAAN DINDING 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 G.1 Ps.dinding Bata merah (8x8x16), tebal 1 bata, camp. spesi 1 Semen : 2 PP m2 416,070.00 427,455.00 418,531.00 457,987.50 458,240.50 396,715.50 424,835.30 431,337.40 433,030.20 749,735.60 428,876.40 695,169.02 762,302.80 424,954.90 431,926.20
2 G.2 Ps.dinding Bata merah (8x8x16), tebal 1 bata, camp. spesi 1 Semen : 3 PP m2 387,435.00 397,445.75 389,997.20 425,517.25 426,620.10 369,217.85 396,082.31 401,419.23 403,186.67 697,404.62 398,983.53 645,674.35 707,692.06 395,324.23 402,057.37
3 G.3 Ps.dinding Bata merah (8x8x16), tebal 1 bata, camp. spesi 1 Semen : 4 PP m2 373,175.00 382,472.75 375,755.60 409,118.25 410,943.30 355,680.05 381,853.13 386,462.79 388,243.80 668,946.26 384,031.69 618,761.04 677,788.38 380,367.79 387,109.90
4 G.4 Ps.dinding Bata merah (8x8x16), tebal 1 bata, camp. spesi 1 Semen : 5 PP m2 364,780.00 373,658.00 367,443.40 399,464.00 401,750.20 347,746.20 373,596.82 377,722.56 379,564.63 652,433.64 375,312.16 603,065.89 660,349.32 371,627.56 378,410.03
5 G.5 Ps.dinding Bata merah (8x8x16), tebal 1 bata, camp. spesi 1 Semen : 6 PP m2 361,330.00 370,035.50 364,177.40 395,496.50 398,047.20 344,560.70 370,455.02 374,265.66 376,243.43 646,150.04 371,901.26 596,926.27 653,527.52 368,170.66 375,042.83
6 G.6 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 2 PP m2 171,960.00 176,488.00 173,014.00 189,044.00 189,318.00 163,834.00 175,619.20 178,161.60 178,885.80 310,038.40 177,087.60 287,237.68 314,925.20 175,511.60 178,409.80
7 G.7 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 3 PP m2 163,140.00 167,227.00 164,210.00 178,901.00 179,624.00 155,463.00 166,826.00 168,915.00 169,651.00 292,452.00 167,845.00 270,601.00 296,440.00 166,265.00 169,171.00
8 G.8 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 4 PP m2 158,000.00 161,830.00 159,094.00 172,990.00 173,982.00 150,592.00 161,726.20 163,539.60 164,293.30 282,252.40 162,475.60 260,936.08 285,701.20 160,889.60 163,807.30
9 G.9 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 5 PP m2 154,760.00 158,428.00 155,870.00 169,264.00 170,426.00 147,522.00 158,513.00 160,152.00 160,917.50 275,826.00 159,092.00 254,845.60 278,934.00 157,502.00 160,427.50
10 G.10 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 6 PP m2 152,840.00 156,412.00 153,982.00 167,056.00 168,330.00 145,714.00 156,646.60 158,164.80 158,953.90 272,093.20 157,112.80 251,283.04 274,975.60 155,514.80 158,455.90
11 G.11 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 8 PP m2 149,400.00 152,800.00 150,550.00 163,100.00 164,550.00 142,450.00 153,220.00 154,560.00 155,355.00 265,240.00 153,510.00 244,798.00 267,770.00 151,910.00 154,855.00
12 G.12 Ps. dinding Hollow/Concrete Block HB20, spesi 1 Semen : 3 PP m2 354,740.00 371,856.00 364,312.00 402,928.00 395,898.00 344,700.00 372,335.20 380,133.60 388,210.80 692,590.40 381,579.60 647,531.28 713,689.20 377,095.60 393,598.80

BIDANG CIPTA KARYA CK - 34 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

13 G.13 Ps. dinding Hollow/Concrete Block HB20, spesi 1 Semen : 4 PP m2 351,420.00 368,370.00 361,344.00 399,110.00 392,422.00 341,722.00 369,604.80 376,964.40 385,301.20 687,129.60 378,498.40 641,985.12 707,526.80 373,926.40 390,601.20
14 G.14 Ps.dinding terawang ( roster), spesi 1 Semen : 3 PP m2 253,800.00 263,770.00 260,806.00 287,210.00 282,018.00 246,208.00 266,378.80 271,400.40 275,089.20 491,557.60 270,314.40 455,045.92 501,378.80 268,750.40 295,625.20
15 G.15 Ps. dinding terawang ( roster), spesi 1 Semen : 4 PP m2 248,400.00 258,100.00 255,430.00 281,000.00 276,090.00 241,090.00 261,019.00 265,752.00 269,458.50 480,838.00 264,672.00 444,889.60 490,094.00 263,102.00 289,988.50
16 G.16 Ps dinding bata berongga, spesi 1 Semen : 3 PP m2 341,800.00 353,070.00 350,106.00 386,760.00 380,868.00 326,208.00 352,978.80 355,250.40 363,189.20 658,857.60 360,664.40 613,945.92 676,628.80 352,100.40 390,525.20
17 G.17 Pemasangan Grass block m2 348,593.00 365,307.50 361,874.00 398,427.00 390,341.50 338,498.00 370,358.50 377,084.50 386,575.50 720,243.00 380,122.50 668,712.00 740,612.00 375,794.00 425,009.50
18 G.18 Paving block m2 263,993.00 275,007.50 269,474.00 300,627.00 291,941.50 254,198.00 275,558.50 280,784.50 286,075.50 530,643.00 280,222.50 488,892.00 540,812.00 279,494.00 314,609.50
19 G.19 Kanstein m 142,770.00 149,580.00 147,844.00 162,410.00 159,812.00 139,082.00 152,004.00 154,514.00 158,440.00 287,638.00 155,218.00 267,074.40 294,856.00 153,494.00 172,464.00
20 G.20 Ps dinding bataco, spesi camp 1 semen : 4 PP m2 128,900.00 133,900.00 131,230.00 144,000.00 143,790.00 124,990.00 133,819.00 135,552.00 137,558.50 226,438.00 135,772.00 212,869.60 232,294.00 132,902.00 142,288.50
21 G.21 Pemasangan 1 m2 Dinding Conblock HB20 Camp 1 SP : 3 PP m2 407,951.00 427,634.40 418,958.80 463,367.20 455,282.70 396,405.00 428,185.48 437,153.64 446,442.42 796,478.96 438,816.54 744,660.97 820,742.58 433,659.94 452,638.62
22 G.22 Pemasangan 1 m2 Dinding Conblock HB20 Camp 1 SP : 4 PP m2 404,133.00 423,625.50 415,545.60 458,976.50 451,285.30 392,980.30 425,045.52 433,509.06 443,096.38 790,199.04 435,273.16 738,282.89 813,655.82 430,015.36 449,191.38
23 G.23 Pemasangan 1 m2 Dinding Conblock HB15 Camp 1 SP : 3 PP m2 339,549.00 355,911.20 348,689.20 385,461.60 379,051.50 330,102.90 356,385.00 363,531.10 371,439.65 660,422.00 365,152.60 617,466.28 680,487.20 360,577.90 378,183.25
24 G.24 Pemasangan 1 m2 Dinding Conblock HB15 Camp 1 SP : 4 PP m2 336,467.00 352,675.10 345,901.60 381,917.30 375,808.50 327,322.20 353,796.12 360,559.96 368,685.63 655,244.24 362,255.06 612,250.71 674,692.12 357,606.76 375,355.63
25 G.25 Pemasangan 1 m2 Dinding Conblock HB10 Camp 1 SP : 3 PP m2 272,711.00 285,798.00 279,990.50 309,097.00 304,566.00 265,420.00 286,255.24 291,601.82 298,133.36 525,130.48 293,037.02 491,218.64 540,936.54 289,005.12 305,396.76
26 G.26 Pemasangan 1 m2 Dinding Conblock HB10 Camp 1 SP : 4 PP m2 271,262.00 284,276.55 278,762.30 307,430.65 303,082.50 264,153.85 285,176.08 290,279.09 296,973.47 522,972.16 291,769.49 488,937.08 538,401.48 287,682.39 304,181.67
27 G.27 Pemasangan 1 m2 Dinding Bata Ringan Tebal 7,5 cm (instant mortar) m2 498,272.00 518,857.00 513,072.50 545,640.50 553,702.00 493,442.00 529,828.00 540,201.00 552,506.00 801,849.00 527,148.50 769,994.00 810,186.50 521,364.00 564,880.00
28 G.28 Pemasangan 1 m2 Dinding Bata Ringan Tebal 10 cm (instant mortar) m2 498,410.00 519,000.75 513,210.50 545,790.00 553,857.25 493,580.00 529,971.75 540,344.75 552,649.75 802,033.00 527,292.25 770,166.50 810,370.50 521,502.00 565,023.75
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
H PEKERJAAN PLESTERAN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 H.1 Plesteran 1 PC : 2 PP, tebal 20 mm m2 133,878.40 139,647.72 135,683.90 146,804.86 149,327.04 132,249.08 140,021.70 142,725.12 144,078.67 206,006.40 140,344.62 196,820.02 209,768.74 137,803.12 143,089.67
2 H.2 Plesteran 1 PC : 3 PP, tebal 20 mm m2 106,048.40 110,621.72 107,863.10 116,364.36 118,132.14 104,642.18 111,229.61 113,707.40 115,067.74 166,017.22 111,329.20 159,254.76 169,332.90 109,762.90 114,076.44
3 H.3 Plesteran 1 PC : 4 PP, tebal 20 mm m2 122,544.00 127,801.80 124,471.40 133,901.40 136,909.80 121,366.40 128,856.12 131,102.76 132,469.88 185,124.24 128,623.36 177,232.85 188,499.72 126,249.76 131,476.28
4 H.4 Plesteran 1 PC : 5 PP, tebal 20 mm m2 119,995.60 125,125.98 121,950.60 130,970.74 134,120.36 118,959.22 126,353.95 128,451.78 129,839.26 180,119.90 125,979.28 172,473.50 183,211.56 123,598.78 128,838.76
5 H.5 Plesteran 1 PC : 6 PP, tebal 20 mm m2 117,870.40 122,894.52 119,834.60 128,526.76 131,787.24 116,944.88 124,244.16 126,228.60 127,622.86 175,900.32 123,758.40 168,475.92 178,769.80 121,375.60 126,620.06
6 H.6 Plesteran 1 PC : 2PP, tebal 15 mm m2 99,875.20 104,213.46 101,266.70 109,612.48 111,403.72 98,561.44 104,495.90 106,621.56 107,619.76 154,826.80 104,770.06 148,048.61 158,135.12 102,999.06 106,883.76
7 H.7 Plesteran 1 PC : 3PP, tebal 15 mm m2 94,934.80 99,026.04 96,353.90 103,931.02 105,983.08 93,881.86 99,601.73 101,458.98 102,477.54 145,038.46 99,614.38 138,768.38 147,823.76 97,836.48 101,734.64
8 H.8 Plesteran 1 PC : 4 PP, tebal 15 mm m2 91,632.00 95,558.10 93,060.30 100,132.80 102,354.60 90,748.80 96,314.34 97,999.32 99,024.66 138,463.68 96,157.02 132,545.14 140,909.04 94,376.82 98,279.46
9 H.9 Plesteran 1 PC : 5 PP, tebal 15 mm m2 89,663.20 93,490.86 91,109.90 97,868.68 100,198.12 88,887.64 94,376.36 95,948.64 96,987.55 134,587.72 94,110.94 128,862.19 136,816.88 92,326.14 96,237.75
10 H.10 Plesteran 1 PC :6 PP, tebal 15 mm m2 88,126.80 91,877.64 89,582.70 96,101.82 98,512.68 87,432.66 92,855.37 94,343.70 95,389.40 131,545.74 92,508.30 125,977.44 133,611.60 90,721.20 94,637.30
11 H.11 Plesteran 1 PC : 2 PP, tebal 10 mm m2 89,516.00 92,989.00 92,441.60 96,163.00 99,327.80 89,368.80 95,834.33 98,248.64 100,636.85 128,372.66 93,632.54 126,844.17 128,431.08 93,142.64 98,766.95
12 H.12 Berapen 1 PC : 5 PP tebal 15 mm m2 53,961.45 56,334.36 54,815.90 59,418.43 60,212.62 53,185.89 56,547.11 57,688.14 58,295.80 85,844.97 56,793.44 81,844.44 87,780.88 55,871.14 57,896.75
13 H.13 Plesteran skoning 1 PC : 3 PP, lebar 10 cm m 89,516.00 92,989.00 92,441.60 96,163.00 99,327.80 89,368.80 95,834.33 98,248.64 100,636.85 128,372.66 93,632.54 126,844.17 128,431.08 93,142.64 98,766.95
14 H.14 Plesteran granit 1 PC : 2 granit, tebal 10 mm m2 605,193.25 633,178.50 625,991.00 687,659.75 677,384.50 588,518.25 641,015.75 652,084.50 667,178.25 1,200,617.25 654,407.50 1,117,012.25 1,231,604.00 646,645.00 723,074.00
15 H.15 Plesteran Teraso ,1 PC : 2 Batu Teraso, tebal 10 mm m2 391,255.00 409,590.00 403,340.00 441,965.00 437,530.00 381,255.00 413,405.00 421,530.00 430,155.00 756,015.00 422,050.00 706,715.00 776,960.00 416,800.00 463,760.00
16 H.16 Plesteran Ciprat ,1 PC : 2 PP m2 73,830.00 76,981.00 74,747.70 80,408.00 82,632.10 73,294.10 77,544.96 78,640.68 79,256.39 107,709.92 77,331.98 102,949.56 109,526.46 75,593.18 78,782.59
17 H.17 Siar pasangan dinding Bata merah m2 43,206.65 45,041.82 43,821.90 47,050.41 48,262.74 42,849.23 45,391.65 46,180.32 46,611.57 63,534.05 45,225.82 61,022.73 64,645.64 44,363.32 46,272.32
18 H.18 Siar pasangan dinding conblock ekspose m2 17,915.00 18,680.00 18,170.00 19,525.00 20,010.00 17,755.00 18,815.00 19,150.00 19,325.00 26,495.00 18,760.00 25,443.00 27,000.00 18,410.00 19,190.00
19 H.19 Siar pasangan batu kali adukan 1 PC : 2 PP m2 77,480.00 80,784.00 78,626.00 84,542.00 86,536.00 76,774.00 81,390.80 82,820.40 83,641.20 115,681.60 81,194.40 110,899.92 117,688.80 79,670.40 83,017.20

BIDANG CIPTA KARYA CK - 35 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

20 H.20 Plesteran Acian m2 48,100.00 50,125.00 48,800.00 52,275.00 53,750.00 47,775.00 50,600.00 51,425.00 51,925.00 69,800.00 50,325.00 67,085.00 70,850.00 49,325.00 51,525.00
21 H.21 Benangan sudut m 19,080.00 19,880.00 19,684.00 20,680.00 21,312.00 18,982.00 20,484.20 20,903.60 21,330.30 28,728.40 20,149.60 27,965.28 29,249.20 19,973.60 21,024.30
22 H.22 Pemasangan 1 m2 Plesteran 1 SP : 1 PP Tebal 15 mm m2 371,689.20 386,518.91 380,840.90 401,786.08 412,789.97 369,795.84 393,837.51 403,165.39 410,748.95 541,264.52 388,217.69 529,032.29 543,721.38 384,322.64 404,732.15
23 H.23 Pemasangan 1 m2 Plesteran 1 SP : 7 PP tebal 15 mm m2 87,252.80 90,959.94 88,717.90 95,096.72 97,555.88 86,606.96 91,996.78 93,434.28 94,486.76 129,828.56 91,601.18 124,344.62 131,797.36 89,811.78 93,732.36
24 H.24 Pemasangan 1 m2 Plesteran 1 SP : 8 PP Tebal 15 mm m2 86,378.80 90,042.24 87,853.10 94,091.62 96,599.08 85,781.26 91,138.19 92,524.86 93,584.13 128,111.38 90,694.06 122,711.81 129,983.12 88,902.36 92,827.43
25 H.25 Pemasangan 1 m2 Plesteran 1 SP : 1/2 KP : 3 PP Tebal 15 mm m2 90,516.62 94,385.41 91,607.01 98,628.16 101,280.75 89,814.15 94,990.37 96,380.62 97,110.00 132,385.62 94,783.13 126,546.56 134,697.11 92,676.08 96,540.69
26 H.26 Pemasangan 1 m2 Plesteran 1 SP : 2 KP : 8 PP Tebal 15 mm m2 85,370.94 88,977.92 86,497.02 92,672.87 95,646.42 84,966.26 89,922.77 91,012.48 91,767.31 121,852.41 89,410.75 116,571.80 123,573.20 87,282.34 91,187.26
27 H.27 Pemasangan 1 m2 Plesteran 1 SM : 1 KP : 1 PP Tebal 15 mm m2 80,447.07 83,814.98 81,679.36 87,069.76 90,270.59 80,306.08 85,147.53 85,934.59 86,767.61 112,927.35 84,379.26 107,993.59 114,106.03 82,244.68 86,164.69
28 H.28 Pemasangan 1 m2 Plesteran 1 SM : 1 KP : 2 PP Tebal 15 mm m2 79,874.92 83,210.33 81,072.52 86,379.42 89,630.79 79,764.61 84,533.06 85,304.50 86,111.88 111,357.28 83,729.64 106,563.30 112,481.81 81,592.64 85,515.65
29 H.29 Pemasangan 1 m2 Plesteran 1 SM : 1 KP : 2 PP Tebal 20 mm m2 111,883.80 116,499.28 113,876.33 120,836.73 125,330.46 111,741.56 118,639.79 120,019.23 121,445.02 156,407.63 117,232.49 150,493.30 157,713.89 114,610.59 120,368.45
30 H.30 Pemasangan 1 m2 Plesteran Dengan Mortar Siap Pakai (MSP) m2 105,248.00 109,549.00 107,019.00 113,344.00 117,898.00 105,248.00 111,573.00 112,838.00 114,103.00 143,704.00 110,055.00 138,644.00 144,716.00 107,525.00 113,091.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
I PEKERJAAN PELAPIS LANTAI DAN DINDING (SNI 7395-2008) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 I.1 Pemasangan 1 m2 Lantai ubin PC abu - abu ukuran ( 40 x 40 ) cm m2 209,523.10 218,960.00 215,529.55 235,842.00 233,959.45 204,273.35 220,701.10 225,030.85 229,867.18 396,097.95 225,072.25 371,233.80 407,203.50 222,006.35 227,669.53
2 I.2 Pemasangan 1 m2 Lantai ubin PC abu - abu ukuran ( 30 x30 ) cm m2 227,951.85 237,621.05 233,507.50 256,849.05 253,984.40 222,396.20 240,573.10 245,397.35 250,545.33 434,203.20 245,221.40 406,266.02 445,891.80 242,257.85 248,478.78
3 I.3 Pemasangan 1 m2 Lantai ubin PC abu - abu ukuran ( 20 x20 ) cm m2 266,644.75 277,104.00 274,252.00 301,144.75 296,355.00 259,043.25 280,390.70 285,607.10 289,736.18 511,866.15 283,997.10 474,596.03 521,626.20 282,341.10 289,017.43
4 I.4 Pemasangan 1 m2 Lantai ubin warna ukuran ( 40 x40 ) cm m2 225,220.60 235,405.00 231,825.05 253,782.00 251,450.95 219,372.85 237,295.60 241,924.35 247,209.18 429,286.95 242,115.25 401,911.20 441,289.50 238,899.85 244,862.03
5 I.5 Pemasangan 1 m2 Lantai ubin warna ukuran ( 30 x30 ) cm m2 246,064.35 256,596.05 252,310.00 277,549.05 274,166.90 239,818.70 259,720.60 264,889.85 270,555.33 472,498.20 264,886.40 441,663.02 485,221.80 261,750.35 268,316.28
6 I.6 Pemasangan 1 m2 Lantai ubin warna ukuran (20 x20 ) cm m2 284,998.75 296,332.00 293,305.20 322,120.75 316,806.60 276,698.05 299,793.50 305,359.50 310,012.98 550,671.75 303,924.30 510,464.99 561,480.60 302,093.50 309,119.43
7 I.7 Pemasangan 1 m2 Lantai ubin teraso ukuran (40 x40 ) cm m2 250,854.10 262,678.40 258,221.00 283,457.75 279,716.80 244,243.90 264,569.00 269,960.20 275,245.03 481,763.75 270,151.10 450,650.73 495,291.20 266,820.70 272,897.88
8 I.8 Pemasangan 1 m2 Lantai ubin teraso ukuran (30 x30 ) cm m2 322,507.15 337,134.00 332,847.95 364,912.25 360,165.05 313,531.40 340,258.55 346,792.85 355,188.43 633,574.10 348,154.45 591,545.51 651,757.90 343,653.35 351,584.33
9 I.9 Pemasangan 1 m2 Lantai ubin granit ukuran (40 x40 ) cm m2 262,580.65 275,052.40 270,710.00 297,241.65 293,385.70 255,208.00 276,943.00 282,334.20 288,381.48 508,581.75 282,525.10 474,648.93 522,109.20 279,309.70 286,034.33
10 I.10 Pemasangan 1 m2 Lantai ubin granit ukuran (30 x30 ) cm m2 355,268.35 371,260.25 366,974.20 403,133.65 397,021.40 344,927.55 375,749.85 382,284.15 390,679.73 704,556.70 383,645.75 655,429.85 722,740.50 379,144.65 387,075.63
11 I.11 Pemasangan 1 m2 Lantai ubin teralux marmer ukuran (40 x40 ) cm m2 257,243.50 268,952.80 264,610.40 291,142.05 287,286.10 250,633.30 271,605.85 276,997.05 283,044.33 497,907.45 277,187.95 465,042.06 511,434.90 273,972.55 280,697.18
12 I.12 Pemasangan 1 m2 Lantai ubin teralux marmer ukuran (30 x30 ) cm m2 347,078.05 363,069.95 357,418.85 393,578.30 387,466.05 336,737.25 366,194.50 372,728.80 381,124.38 685,446.00 374,090.40 638,230.22 703,629.80 369,589.30 378,885.33
13 I.13 Pemasangan 1 m2 Lantai ubin teralux marmer ukuran (60 x60 ) cm m2 238,786.00 250,033.00 245,847.00 270,261.50 266,892.00 232,403.50 252,163.95 256,995.10 262,429.43 460,995.90 257,179.10 430,492.38 473,234.20 254,097.10 260,175.43
14 I.14 Pemasangan 1 m2 Lantai ubin teralux marmer ukuran (40 x40 ) cm m2 257,243.50 268,952.80 264,610.40 291,142.05 287,286.10 250,633.30 271,605.85 276,997.05 283,044.33 497,907.45 277,187.95 465,042.06 511,434.90 273,972.55 280,697.18
15 I.15 Pemasangan 1 m2 Lantai ubin teralux marmer ukuran (30 x30 ) cm m2 347,078.05 363,069.95 357,418.85 393,578.30 387,466.05 336,737.25 366,194.50 372,728.80 381,124.38 685,446.00 374,090.40 638,230.22 703,629.80 369,589.30 378,885.33
16 I.16 Pemasangan 1 m plin ubin Pc abu - abu ukuran (15 x20 ) cm m 56,557.00 58,598.25 57,881.80 62,542.75 62,969.40 55,120.65 59,160.14 60,494.37 61,648.51 95,872.28 59,411.07 90,858.33 97,708.14 58,884.37 60,615.81
17 I.17 Pemasangan 1 m plin ubin Pc abu - abu ukuran (10 x30 ) cm m 47,932.00 49,707.60 49,040.60 52,706.80 53,394.50 46,963.70 50,312.73 51,388.44 52,328.80 78,177.46 50,302.84 74,463.51 79,491.68 49,778.44 51,505.40
18 I.18 Pemasangan 1 m plin ubin PC abu - abu ukuran (10 x40 ) cm m 44,413.00 46,090.85 45,423.85 48,699.05 49,484.50 43,640.20 46,695.98 47,673.94 48,516.55 70,943.96 46,588.34 67,777.41 72,062.68 46,063.94 47,790.90
19 I.19 Pemasangan 1 m plin ubin Pc warna ukuran (10 x20 ) cm m 58,972.00 61,610.10 60,287.60 65,471.80 65,412.00 57,601.20 61,617.23 62,888.44 64,035.80 99,751.46 61,802.84 94,301.01 101,456.68 61,220.94 63,614.90
20 I.20 Pemasangan 1 m plin ubin Pc warna ukuran (10 x30 ) cm m 52,687.25 54,918.25 53,845.30 58,023.25 58,684.50 51,677.55 55,546.38 56,637.04 57,615.35 88,644.76 55,562.94 83,931.69 90,011.88 55,027.04 57,182.95
21 I.21 Pemasangan 1 m plin ubin PC warna ukuran (10 x40 ) cm m 48,742.75 50,771.35 49,799.60 53,776.30 54,234.00 47,935.45 51,399.48 52,388.94 53,266.05 80,350.96 51,314.84 76,285.11 81,515.68 50,778.94 52,833.65
22 I.22 Pemasangan 1 m plin ubin teraso ukuran (10 x30 ) cm m2 52,687.25 54,918.25 53,845.30 58,023.25 58,684.50 51,677.55 55,546.38 56,637.04 57,615.35 88,644.76 55,562.94 83,931.69 90,011.88 55,027.04 57,182.95
23 I.23 Pemasangan 1 m plin ubin teraso ukuran (10 x40 ) cm m2 51,180.75 53,209.35 52,542.35 56,519.05 56,976.75 50,373.45 54,142.23 55,131.69 56,008.80 85,836.46 54,057.59 81,222.06 87,001.18 53,521.69 55,576.40
24 I.24 Pemasangan 1 m plin ubin granit ukuran (10 x40 ) cm m2 74,951.25 78,198.85 77,227.10 83,641.80 83,490.00 73,534.45 79,436.48 81,035.44 82,826.80 136,424.96 80,266.09 128,397.36 139,418.18 79,425.44 82,089.65

BIDANG CIPTA KARYA CK - 36 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

25 I.25 Pemasangan 1 m plin ubin granit ukuran (10 x30 ) cm m2 79,479.95 82,928.80 81,855.85 88,875.45 88,724.80 77,658.35 83,962.88 85,459.49 87,655.65 145,477.76 84,791.34 136,542.81 148,468.68 83,849.49 86,411.35
26 I.26 Pemasangan 1 m plin ubin teralux kerang ukuran (10 x40 ) cm m2 102,074.00 106,845.35 105,264.10 115,031.05 113,965.00 99,742.95 108,387.73 110,291.44 112,997.05 194,327.46 109,826.84 181,606.71 198,539.68 108,681.44 111,955.15
27 I.27 Pemasangan 1 m plin ubin teralux kerang ukuran (10 x30 ) cm m2 101,807.20 106,473.90 104,995.00 114,450.30 113,487.75 99,579.65 108,319.88 110,222.44 112,824.55 194,191.76 109,554.29 181,116.12 197,994.58 108,612.44 111,580.25
28 I.28 Pemasangan 1 m plin ubin teralux marmer ukuran (10 x60 ) cm m2 62,962.50 65,750.10 64,692.10 69,968.30 70,253.50 61,787.20 66,769.23 67,844.94 69,394.80 111,090.46 67,161.84 104,809.71 113,209.68 66,234.94 68,571.40
29 I.29 Pemasangan 1 m plin ubin teralux marmer ukuran (10 x40 ) cm m2 74,646.50 77,894.10 76,922.35 83,337.05 83,185.25 73,229.70 79,131.73 80,730.69 82,522.05 135,815.46 79,961.34 127,848.81 138,808.68 79,120.69 81,480.15
30 I.30 Pemasangan 1 m plin ubin teralux marmer ukuran (10 x30 ) cm m2 79,479.95 82,928.80 81,855.85 88,875.45 88,724.80 77,658.35 83,962.88 85,459.49 87,655.65 145,477.76 84,791.34 136,542.81 148,468.68 83,849.49 86,411.35
31 I.31 Keramik 50 x 50 cm m2 374,212.30 391,301.30 384,426.60 417,952.55 418,728.80 368,067.85 397,008.75 403,851.25 411,385.48 1,054,032.50 401,172.90 975,283.72 1,068,800.80 395,398.75 407,905.58
32 I.32 Keramik 40 x 40 cm m2 350,062.30 365,943.80 359,310.60 390,180.05 391,680.80 341,502.85 369,236.25 374,146.75 380,835.73 998,487.50 371,226.90 921,380.92 1,008,908.80 365,694.25 377,718.08
33 I.33 Keramik 30 x 30 cm m2 339,480.00 354,890.00 348,128.00 378,062.50 379,741.50 334,224.50 345,578.45 365,859.85 372,283.18 951,171.90 362,846.85 906,296.83 992,148.70 357,407.35 369,258.68
34 I.34 Keramik 20 x 20 cm m2 343,767.20 359,388.80 352,539.40 382,984.50 384,520.90 334,732.80 345,242.65 366,484.30 372,762.73 950,500.30 363,378.15 907,253.17 993,211.30 358,031.80 369,831.38
35 I.35 Plin Keramik 10 x 40 cm m 68,856.25 71,799.10 70,827.35 76,632.55 76,785.50 67,439.45 72,731.98 74,330.94 75,817.55 123,015.96 73,561.59 116,329.26 126,009.18 72,720.94 75,080.40
36 I.36 Plin Keramik 10 x 30 cm m 65,199.25 68,142.10 67,170.35 72,670.80 72,823.75 63,782.45 68,770.23 70,064.44 71,551.05 115,092.46 69,295.09 108,649.56 117,476.18 68,454.44 70,813.90
37 I.37 Plin Keramik 10 x 20 cm m 91,712.50 95,569.60 94,293.10 103,145.80 102,384.50 89,686.20 97,416.73 98,710.94 101,111.80 172,385.46 98,246.34 160,761.81 175,378.68 97,100.94 100,069.90
38 I.38 Plin Keramik 10 x 10 cm m 108,778.50 113,854.60 111,968.60 122,649.80 121,279.00 106,142.70 114,482.73 117,605.44 119,396.80 206,517.46 116,531.34 193,674.81 211,948.68 115,995.44 118,964.40
39 I.39 Plin Keramik 5 x 20 cm m 180,430.98 189,031.25 186,614.76 204,874.80 201,781.42 175,473.10 191,537.56 195,177.66 199,976.32 360,627.12 195,309.10 335,474.78 369,504.20 193,567.66 198,338.37
40 I.40 Plin internal cove 5 x 5 x 20 cm m 439,518.50 458,808.60 452,518.10 486,164.80 490,854.50 433,225.70 467,187.73 475,324.44 485,177.30 747,983.46 468,109.34 709,022.01 760,648.18 461,949.94 479,880.40
41 I.41 Lantai Marmer 1 x 1 m m2 3,189,319.15 3,347,200.35 3,312,189.75 3,655,315.25 3,571,609.05 3,098,171.30 3,400,439.60 3,461,642.60 3,550,977.48 6,674,494.20 3,486,283.65 6,180,723.07 6,852,622.30 3,453,190.10 3,520,298.93
42 I.42 Homogenous tile 30 x 60 cm m2 350,620.63 367,458.93 361,457.65 398,481.33 392,074.68 341,472.38 371,095.57 377,795.59 385,628.58 873,788.52 379,442.39 763,340.01 843,435.07 374,893.56 382,985.31
43 I.43 Homogenous tile 60 x 60 cm m2 450,825.88 472,701.18 465,682.15 513,676.83 504,372.18 438,641.63 477,959.32 486,556.84 497,408.58 1,159,241.52 489,324.89 1,008,510.81 1,115,847.07 483,654.81 493,764.81
44 I.44 Homogenous tile 50 x 50 cm m2 421,633.13 442,076.68 435,264.65 480,068.08 471,648.93 410,322.88 446,765.57 454,937.59 464,903.83 1,072,945.52 457,245.64 934,901.61 1,034,059.07 452,035.56 461,478.56
45 I.45 Homogenous tile 40 x 40 cm m2 364,035.38 381,580.93 375,372.65 413,897.08 407,168.43 354,415.63 385,303.82 392,268.34 400,544.08 906,914.27 394,093.39 792,863.38 876,238.82 389,366.31 397,722.56
46 I.46 Granit Alam m2 2,489,802.90 2,612,665.45 2,584,750.93 2,850,984.55 2,788,218.13 2,419,663.25 2,654,023.48 2,701,647.85 2,770,672.00 5,181,661.95 2,719,556.80 4,800,614.74 5,319,168.60 2,693,195.35 2,746,725.55
47 I.47 Steptread tangga 10 x 30 cm m 56,010.75 58,493.60 57,587.98 62,102.30 62,459.38 55,111.45 59,360.36 60,519.44 61,681.17 96,272.71 59,681.09 91,344.36 98,248.18 58,909.44 61,013.02
48 I.48 Lantai Karpet m2 521,525.00 546,963.00 541,276.25 595,406.75 583,797.50 507,437.50 556,151.50 566,104.75 580,646.50 1,069,983.00 568,473.75 992,929.55 1,097,111.50 563,068.75 575,316.25
49 I.49 Under-layer m2 115,132.25 120,491.25 119,030.75 126,793.25 129,605.00 113,723.50 124,297.75 126,160.75 128,386.00 191,371.50 123,613.50 182,493.50 199,007.50 122,193.25 127,161.25
50 I.50 Lantai parquet kayu m2 567,553.75 594,371.75 586,310.25 640,360.25 635,564.75 555,392.50 604,181.25 613,887.25 627,629.75 1,081,977.50 613,306.50 1,009,364.20 1,106,668.00 605,434.75 622,052.25
51 I.51 Lantai kayu gymfloor m2 567,553.75 594,371.75 586,310.25 640,360.25 635,564.75 555,392.50 604,181.25 613,887.25 627,629.75 1,081,977.50 613,306.50 1,009,364.20 1,106,668.00 605,434.75 622,052.25
52 I.52 Dinding poselen 11 x 11 cm m2 886,132.50 927,716.50 910,793.10 999,959.50 988,818.30 864,468.80 931,489.88 955,638.04 969,042.67 1,682,429.76 949,526.94 1,574,023.49 1,727,703.88 943,563.04 966,528.77
53 I.53 Dinding poselen 10 x 20 cm m2 810,376.25 846,411.50 833,714.35 914,744.50 903,632.05 789,632.55 855,963.63 872,521.79 888,370.17 1,549,432.26 873,281.94 1,450,294.99 1,592,348.88 861,654.29 879,847.52
54 I.54 Dinding poselen 20 x 20 cm m2 861,545.50 900,162.50 887,558.50 973,659.00 962,826.00 841,174.40 915,716.48 929,040.84 950,704.77 1,668,937.96 929,707.84 1,551,861.61 1,705,200.68 918,173.34 942,275.27
55 I.55 Dinding keramik 10 x 20 cm m2 700,666.25 733,654.00 722,785.35 789,797.00 784,170.05 685,408.05 743,815.63 756,716.79 772,565.17 3,275,536.26 755,648.44 2,993,914.69 3,307,481.88 745,849.29 766,480.52
56 I.56 Dinding Keramik 30 x 30 cm m2 286,478.00 299,337.00 293,680.00 318,510.00 320,358.00 282,074.00 303,149.20 308,462.60 313,762.80 831,398.40 305,707.60 769,623.68 842,115.20 301,112.60 311,267.80
57 I.57 Dinding marmer 1 x 1 m m2 3,338,215.40 3,502,230.13 3,463,325.05 3,816,057.65 3,738,204.95 3,246,710.48 3,557,577.90 3,620,998.68 3,711,928.60 6,880,440.80 3,641,801.03 6,379,579.35 7,060,847.05 3,605,301.18 3,679,914.33
58 I.58 Dinding batu paras m2 417,059.00 436,281.25 428,674.00 467,331.25 466,532.00 409,014.75 441,955.35 449,646.55 458,095.03 757,525.70 447,323.55 710,594.89 774,702.10 441,194.05 482,716.53
59 I.59 Dinding batu tempel hitam m2 423,763.50 443,365.25 435,631.50 475,047.75 473,995.50 415,466.25 449,039.35 456,857.05 465,558.53 771,693.70 454,660.55 723,801.49 789,376.10 448,404.55 490,939.03
60 I.60 Dinding Keramik 20 x 25 cm m2 323,412.20 337,958.55 331,453.00 359,403.75 361,649.70 318,347.60 341,376.58 347,969.99 353,944.47 941,618.16 344,801.74 872,895.63 954,908.48 339,517.49 351,075.22
61 I.61 Dinding Keramik 20 x 20 cm m2 335,487.20 350,637.30 344,011.00 373,290.00 375,173.70 329,215.10 341,376.58 360,165.74 366,381.72 941,618.16 357,118.24 895,065.33 979,541.48 351,713.24 363,391.72

BIDANG CIPTA KARYA CK - 37 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

62 I.62 Border Dinding Keramik 5 x 20 m 188,933.50 196,827.10 191,045.48 207,519.80 211,878.88 187,378.70 198,372.36 199,508.44 201,446.42 290,461.71 198,888.59 272,055.36 292,828.18 193,240.94 200,559.77
63 I.63 Lantai vynil 30 x 30 cm m2 270,804.30 283,435.90 279,601.80 306,445.10 302,382.15 263,294.80 287,707.00 291,702.10 300,033.85 538,062.00 292,816.45 500,306.81 550,477.40 289,022.60 296,412.50
64 I.64 Plint vynil 15 x 30 cm m2 61,014.40 63,737.60 62,817.60 67,988.00 68,126.00 59,846.00 64,860.00 65,816.80 67,436.00 109,848.00 65,301.60 103,301.28 111,881.20 64,390.80 66,617.20
65 I.65 Plint kayu tebal 2 cm lebar 10 cm m2 51,186.50 53,345.63 52,536.60 55,869.88 57,180.30 50,840.93 54,593.72 55,412.06 56,432.92 79,379.44 54,073.23 75,969.41 80,063.46 50,841.50 53,314.00
66 I.66 Wallpaper lebar 50 cm m2 150,497.63 157,400.50 154,456.50 169,162.13 168,751.00 147,478.88 159,237.63 161,143.75 164,234.38 277,227.63 162,075.25 258,123.83 283,946.50 158,907.00 163,426.50
67 I.67 Floor hardener m2 180,044.00 188,531.00 186,116.00 203,711.00 201,342.00 175,444.00 191,222.00 194,787.00 199,502.00 352,636.00 194,488.00 328,716.00 360,893.00 192,648.00 197,800.00
68 I.68 Pemasangan 1 m2 Lantai Teraso Cor di tempat, Tebal 3 cm m2 88,085.40 91,699.16 89,609.38 94,993.68 98,664.48 88,014.56 93,374.94 94,449.50 95,539.70 121,751.88 92,192.28 117,301.10 122,698.56 90,102.50 94,795.42
69 I.69 Pemasangan 1 m2 Lantai Keramik Artistik Uk. 10 x 20 cm m2 4,801,083.25 5,036,481.35 4,988,429.75 5,505,725.05 5,376,678.95 4,493,815.90 5,118,486.70 5,024,750.20 5,156,011.78 29,614,588.40 5,063,407.45 26,573,145.91 29,510,869.90 5,016,297.70 5,111,317.03
70 I.70 Pemasangan 1 m2 Lantai Keramik Artistik Uk. 10 x 10 cm / Uk. 5 x 20 cm m2 9,377,767.00 9,838,938.85 9,748,170.50 10,765,825.05 10,502,533.70 8,765,542.65 10,000,230.95 9,809,077.95 10,068,489.78 58,882,076.90 9,890,451.95 52,815,426.01 58,668,958.90 9,800,625.45 9,981,078.28
71 I.71 Pemasangan 1 m2 Lantai Keramik Uk. 33 x 33 cm m2 214,377.25 223,449.60 218,201.00 234,188.30 239,646.20 212,532.65 226,202.70 229,710.20 232,562.78 326,020.40 225,564.45 311,428.51 331,183.90 221,257.70 230,671.03
72 I.72 Pemasangan 1 m2 Lantai Keramik Mozaik Uk. 30 x 30 cm m2 1,337,622.50 1,402,234.10 1,385,899.50 1,525,174.85 1,497,380.50 1,305,083.25 1,423,327.40 1,452,337.30 1,487,717.05 7,088,429.80 1,458,592.15 6,462,222.37 7,165,399.30 1,443,884.80 1,475,424.70
73 I.73 Pemasangan 1 m2 Dinding Bata Pelapis 3 x 7 x 24 cm m2 748,713.25 783,522.60 768,723.25 842,216.30 835,524.45 731,355.15 787,106.00 806,643.35 817,881.73 1,393,662.00 800,692.10 1,306,120.78 1,430,034.20 794,568.35 815,207.98
74 I.74 Pemasangan 1 m2 Paving Block Natural Tebal 6 cm m2 148,401.75 154,288.60 152,677.45 160,802.20 165,082.50 147,648.50 158,199.75 161,526.70 165,027.30 221,607.30 155,935.40 215,929.98 222,109.85 154,048.25 163,024.00
75 I.75 Pemasangan 1 m2 Paving Block Natural Tebal 8 cm m2 718,120.95 752,275.95 743,768.25 813,656.05 803,345.15 701,339.00 765,246.80 778,794.95 797,859.65 1,409,826.40 778,546.55 1,315,067.55 1,441,457.15 758,728.60 790,861.90
76 I.76 Pemasangan 1 m2 Paving Block Berwarna Tebal 6 cm m2 148,401.75 154,288.60 152,677.45 160,802.20 165,082.50 147,648.50 158,199.75 161,526.70 165,027.30 221,607.30 155,935.40 215,929.98 222,109.85 154,048.25 163,024.00
77 I.77 Pemasangan 1 m2 Paving Block Berwarna Tebal 8 cm m2 718,120.95 752,275.95 743,768.25 813,656.05 803,345.15 701,339.00 765,246.80 778,794.95 797,859.65 1,409,826.40 778,546.55 1,315,067.55 1,441,457.15 758,728.60 790,861.90
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
j J PEKERJAAN LANGIT-LANGIT DAN LIS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 J.1 Plafond Gypsumboard 120x240 cm, tebal 9 mm m2 58,016.35 60,652.61 59,742.73 65,031.35 64,904.85 56,915.34 61,529.14 62,528.26 63,820.40 105,923.28 62,288.14 99,204.15 107,958.78 61,378.26 63,255.52
2 J.2 Plafond Kalsiboard 120x240 cm, tebal 4,5 cm m2 54,457.33 56,941.79 56,073.77 60,860.07 60,974.15 53,523.76 57,891.46 58,765.00 59,931.56 97,727.92 58,425.52 91,653.44 99,716.04 57,557.50 59,408.54
3 J.3 Lis profil gypsum m 58,712.10 61,441.05 60,611.90 66,003.10 65,621.30 57,501.15 62,527.80 63,598.45 65,032.50 110,151.60 63,237.35 103,146.03 112,433.20 62,528.95 64,394.25
4 J.4 Langit-langit asbes semen, tebal 4 mm m 47,869.90 49,981.30 49,552.35 53,631.40 53,481.90 46,845.25 50,941.55 51,984.60 53,282.95 88,543.10 51,390.05 83,430.89 90,486.60 50,961.10 52,578.00
5 J.5 Langit-langit akustik 30 x 30 cm m2 365,976.00 382,835.00 379,367.75 417,530.50 409,469.00 354,872.75 387,969.75 395,600.00 406,001.75 746,131.50 396,928.25 693,108.45 765,773.50 393,461.00 401,292.50
6 J.6 Langit-langit akustik 30 x 60 cm m2 316,480.00 331,499.00 328,123.75 360,421.50 354,016.00 307,745.75 336,495.75 342,562.00 351,307.75 643,183.50 343,798.25 597,474.45 659,513.50 340,423.00 348,070.50
7 J.7 Langit-langit akustik 60 x 120 cm m2 238,257.00 249,676.50 247,186.75 271,377.00 266,662.00 231,983.75 253,960.25 258,543.00 265,034.75 483,080.50 259,250.25 448,848.45 495,098.00 256,760.50 262,487.50
8 J.8 Langit-langit tripleks 120 x 240, 3 mm m2 68,779.20 71,881.90 70,951.55 76,599.20 76,909.70 64,428.75 69,685.40 70,888.30 72,399.98 114,530.80 69,993.03 108,185.45 116,583.55 69,105.80 75,724.63
9 J.9 Langit-langit tripleks 120 x 240, 4 mm m2 75,247.95 78,652.53 77,679.05 84,016.70 84,154.70 73,959.38 80,164.78 81,540.18 83,353.73 135,489.55 80,731.15 127,514.07 138,059.80 79,757.68 87,885.88
10 J.10 Langit-langit tripleks 120 x 240, 5 mm m2 79,470.75 83,084.63 82,061.13 88,872.00 88,857.63 78,070.63 84,651.50 86,129.25 88,049.75 144,463.00 85,370.25 135,864.45 147,338.00 84,346.75 93,006.25
11 J.11 Langit-langit lambrisering tebal 9 mm m2 309,476.50 322,199.53 317,087.20 336,513.58 345,190.90 307,941.83 328,697.60 334,270.50 340,359.18 465,299.20 325,520.15 447,825.87 467,546.30 308,266.70 323,899.80
12 J.12 Langit-langit akustik 60 x 120 cm, rangka alumunium m2 639,216.00 669,254.00 661,756.00 722,838.25 714,920.50 624,743.25 679,920.25 692,886.50 709,440.75 1,239,780.50 691,696.25 1,158,734.25 1,268,708.75 684,232.75 702,362.50
13 J.13 Lis profil kayu m 44,073.75 46,111.84 45,549.20 49,429.01 49,307.40 43,250.64 47,000.50 47,787.39 48,866.66 81,489.00 47,451.88 76,452.58 83,150.75 46,890.39 51,954.99
14 J.14 Pemasangan 1 m2 Langit - Langit Besi Hollow 40x40 m2 422,372.00 440,185.50 436,620.50 475,375.50 466,083.50 411,792.00 446,188.50 453,433.50 463,898.50 819,973.00 455,929.00 763,991.00 840,316.50 452,364.00 459,942.50
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
K K PEKERJAAN PENUTUP ATAP 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 K.1 Atap genteng palentong kecil m2 104,972.00 109,319.00 105,581.50 116,362.75 115,051.75 102,097.00 110,020.50 110,451.75 113,758.00 192,866.50 109,497.25 176,766.50 193,240.25 108,634.75 113,413.00
2 K.2 Atap genteng palentong besar m2 120,152.00 125,764.00 123,521.50 135,337.75 134,141.75 117,392.00 126,465.50 129,656.75 131,468.00 225,756.50 128,702.25 211,335.50 231,650.25 127,839.75 131,123.00
3 K.3 Atap genteng kodok glazuur m2 274,597.00 287,569.00 283,831.50 311,862.75 304,801.75 265,972.00 291,145.50 294,451.75 303,508.00 555,116.50 296,372.25 513,141.50 566,990.25 292,634.75 300,288.00

BIDANG CIPTA KARYA CK - 38 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

4 K.4 Atap asbes gelombang 92 x 250 x 5 mm m2 63,428.25 66,279.10 65,159.00 70,390.35 71,001.00 62,512.85 67,165.75 68,404.30 69,622.15 108,117.25 67,707.40 102,352.07 110,643.80 66,644.80 69,011.50
5 K.5 Atap asbes gelombang 92 x 225 x 5 mm m2 67,936.25 70,971.10 69,862.50 75,519.35 76,038.00 66,928.85 71,995.75 73,337.80 74,693.65 117,777.25 72,686.90 111,315.17 120,602.80 71,578.30 74,037.00
6 K.6 Atap asbes gelombang 92 x 180 x 5 mm m2 73,059.50 76,370.35 75,192.75 81,401.60 81,782.25 71,827.85 77,429.50 78,840.55 80,317.15 128,644.75 78,172.40 121,189.07 131,573.80 77,081.05 79,591.50
7 K.7 Atap asbes gelombang 105 x 300 x 4 mm m2 57,649.50 60,201.35 59,167.50 63,714.60 64,566.75 56,935.35 61,065.00 62,148.30 63,239.65 95,915.75 61,422.65 91,039.52 98,074.30 60,388.80 62,657.75
8 K.8 Atap asbes gelombang 105 x 270 x 4 mm m2 59,959.85 62,608.30 61,582.50 66,363.05 67,150.80 59,173.25 63,488.05 64,643.80 65,799.55 100,761.85 63,910.10 95,516.93 103,049.20 62,884.30 65,225.70
9 K.9 Atap asbes gelombang 105 x 240 x 4 mm m2 60,493.45 63,192.50 62,106.90 67,000.15 67,758.00 59,674.65 64,037.75 65,214.20 66,399.85 101,861.25 64,489.70 96,560.21 104,208.40 63,454.70 65,766.20
10 K.10 Atap asbes gelombang 105 x 210 x 4 mm m2 63,347.75 66,165.25 65,098.05 70,268.45 70,921.65 62,474.90 67,117.45 68,366.35 69,598.00 108,020.65 67,674.05 102,292.04 110,577.10 66,606.85 68,982.75
11 K.11 Atap asbes gelombang 105 x 150 x 4 mm m2 75,319.25 78,722.10 77,521.50 83,983.35 84,295.00 74,081.85 79,907.75 81,364.80 82,904.65 133,601.25 80,713.90 125,763.77 136,656.80 79,605.30 82,156.00
12 K.12 Atap asbes gelombang 105 x 300 x 6 mm m2 67,828.15 70,860.70 69,730.25 75,420.45 75,942.55 66,824.20 71,912.95 73,229.70 74,608.55 117,611.65 72,600.65 111,159.92 120,430.30 71,470.20 73,930.05
13 K.13 Atap asbes gelombang 105 x 270 x 6 mm m2 63,780.15 66,633.30 65,538.50 70,792.85 71,421.90 62,883.15 67,568.25 68,813.70 70,084.45 108,922.25 68,105.30 103,068.29 111,439.60 67,054.20 69,441.60
14 K.14 Atap asbes gelombang 105 x 240 x 6 mm m2 68,016.75 71,083.80 69,933.80 75,627.45 76,143.80 67,007.05 72,101.55 73,404.50 74,831.65 117,988.85 72,795.00 111,509.75 120,819.00 71,645.00 74,133.60
15 K.15 Atap asbes gelombang 105 x 210 x 6 mm m2 68,726.30 71,833.60 70,662.90 76,457.75 76,971.80 67,657.95 72,826.05 74,166.95 75,540.05 119,437.85 73,521.80 112,817.99 122,272.60 72,407.45 74,877.65
16 K.16 Atap asbes gelombang 105 x 180 x 6 mm m2 72,804.20 76,094.35 74,934.00 81,149.75 81,516.60 71,645.00 77,225.95 78,602.50 80,113.60 128,237.65 78,003.35 120,884.78 131,235.70 76,843.00 79,405.20
17 K.17 Atap asbes gelombang 105 x 300 x 6 mm m2 67,828.15 70,860.70 69,730.25 75,420.45 75,942.55 66,824.20 71,912.95 73,229.70 74,608.55 117,611.65 72,600.65 111,159.92 120,430.30 71,470.20 73,930.05
18 K.18 Atap genteng beton m2 170,269.00 177,896.95 175,471.60 190,392.85 189,218.70 166,449.85 180,722.50 183,096.10 188,061.80 313,260.00 181,953.00 293,015.40 318,136.00 179,531.10 185,754.90
19 K.19 Atap genteng aspal m2 207,494.50 216,496.70 213,985.10 232,367.85 231,182.20 210,782.35 228,286.50 232,833.60 238,081.05 399,015.50 230,810.75 375,333.55 406,007.50 228,222.10 244,364.65
20 K.20 Atap genteng metal m2 79,865.20 83,377.30 81,806.40 88,423.50 89,304.40 78,765.80 84,879.20 85,764.70 87,298.80 135,304.40 84,883.80 126,842.24 136,429.10 83,453.20 86,558.20
21 K.21 Atap sirap kayu m2 203,090.00 209,564.50 208,541.00 226,262.50 225,515.00 196,029.00 211,910.50 216,522.00 221,547.50 371,243.00 213,601.00 347,760.00 377,855.50 212,600.50 216,901.50
22 K.22 Atap genteng metal m2 79,865.20 83,377.30 81,806.40 88,423.50 89,304.40 78,765.80 84,879.20 85,764.70 87,298.80 135,304.40 84,883.80 126,842.24 136,429.10 83,453.20 86,558.20
23 K.23 Atap seng gelombang 90 x 180 cm m2 81,675.30 85,456.50 84,276.60 91,788.40 91,480.20 80,044.60 86,903.20 88,225.70 90,118.60 152,140.40 87,956.60 142,106.88 155,351.20 86,776.70 89,355.00
24 K.24 Atap alumunium m2 207,126.50 215,612.35 214,262.25 225,433.35 230,201.25 205,659.10 221,559.00 226,885.80 232,542.65 323,966.50 218,558.65 314,855.97 326,441.30 217,329.30 228,660.25
25 K.25 Atap roof light fiberglass 90 x 180 cm m2 50,582.75 52,799.95 51,777.60 55,722.10 56,646.70 50,006.60 53,699.25 54,388.10 55,277.05 82,483.75 53,682.00 77,934.35 83,720.00 52,732.10 54,827.40
26 K.26 Bubung genteng palentong besar m 149,753.00 155,894.00 152,600.40 165,370.00 166,805.20 147,462.20 157,100.12 159,884.96 161,827.08 245,292.24 157,635.56 231,846.81 248,594.12 155,261.96 160,833.48
27 K.27 Bubung genteng kodok glazur m 165,853.00 173,144.00 169,275.40 183,770.00 184,630.20 162,987.20 174,350.12 177,134.96 180,227.08 279,792.24 175,460.56 263,931.81 284,244.12 172,511.96 178,658.48
28 K.28 Bubung stel gelombang 92 cm m 106,208.25 110,917.50 109,606.50 118,743.25 118,254.50 103,310.25 112,015.75 114,114.50 116,765.25 197,564.25 113,183.00 185,227.05 201,537.50 112,148.00 115,644.00
29 K.29 Bubung stel gelombang 105 cm m 97,790.25 102,085.50 100,878.00 109,083.25 108,836.00 95,168.25 103,080.25 105,006.50 107,415.75 179,693.25 104,006.00 168,708.45 183,183.50 103,040.00 106,363.50
30 K.30 Bubung stel gelombang 108 cm m 96,387.25 100,613.50 99,423.25 107,473.25 107,266.25 93,811.25 101,591.00 103,488.50 105,857.50 176,714.75 102,476.50 165,955.35 180,124.50 101,522.00 104,816.75
31 K.31 Nok paten 92 cm m 53,078.25 55,165.50 54,544.50 57,747.25 58,776.50 51,836.25 55,435.75 56,430.50 57,563.25 84,404.25 55,085.00 80,650.65 85,341.50 54,464.00 56,856.00
32 K.32 Nok paten 105 cm m 55,148.25 57,235.50 56,614.50 60,093.25 61,122.50 53,906.25 57,781.75 58,776.50 60,047.25 89,096.25 57,431.00 84,873.45 90,033.50 56,810.00 59,202.00
33 K.33 Nok paten 108 cm m 55,562.25 57,787.50 57,028.50 60,645.25 61,536.50 54,320.25 58,195.75 59,328.50 60,461.25 89,924.25 57,983.00 85,867.05 91,137.50 57,362.00 59,754.00
34 K.34 Nok stel rata 92 cm m 58,270.50 60,536.00 59,834.50 63,238.50 64,538.00 57,074.50 60,950.00 62,065.50 63,307.50 90,758.00 60,421.00 87,006.70 91,482.50 59,719.50 62,468.00
35 K.35 Nok stel rata 105 cm m 53,791.25 55,821.00 55,211.50 58,540.75 59,604.50 52,595.25 56,344.25 57,316.00 58,540.75 86,221.25 55,959.00 82,223.85 87,089.50 55,349.50 57,718.50
36 K.36 Nok genteng beton m 228,562.50 238,745.75 234,192.90 255,547.25 255,424.20 223,781.95 241,303.12 245,605.96 249,767.58 410,386.24 244,081.06 385,295.91 419,622.12 240,775.96 247,842.48
37 K.37 Nok genteng aspal m 97,962.75 102,052.44 100,967.70 107,592.56 109,087.85 96,876.29 104,456.34 106,515.07 108,792.82 160,946.18 103,927.69 154,123.48 162,959.37 100,015.50 104,650.00
38 K.38 Nok genteng metal m 79,798.50 83,116.25 81,535.00 86,934.25 89,286.00 79,252.25 84,686.00 85,732.50 87,135.50 120,750.00 83,996.00 115,207.00 121,969.00 82,420.50 86,181.00
39 K.39 Nok sirap m 82,202.00 85,577.25 84,686.00 89,504.50 91,545.75 81,661.50 85,864.75 89,510.25 91,476.75 123,763.00 86,727.25 123,162.70 128,558.50 85,847.50 90,165.75
40 K.40 Nok atap seng m 47,184.50 49,201.60 48,221.80 51,706.30 52,812.60 46,807.30 48,564.50 50,671.30 51,446.40 71,001.00 49,910.00 70,177.60 74,899.50 48,934.80 51,011.70

BIDANG CIPTA KARYA CK - 39 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

41 K.41 Nok atap alumunium m 223,330.00 232,120.60 231,393.80 240,064.80 248,243.60 222,745.80 240,396.00 246,366.80 252,696.40 325,542.00 234,439.00 321,595.20 328,003.00 233,716.80 247,811.20
42 K.42 Alumunium foil/sisalation m 965,718.25 1,013,851.50 1,003,570.50 1,108,927.75 1,081,805.00 937,462.75 1,030,060.75 1,048,322.75 1,075,761.75 2,041,773.25 1,057,350.25 1,888,410.40 2,097,255.00 1,047,310.75 1,066,734.25
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
L L PEKERJAAN KAYU 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 L.1 Membuat dan Pemasangan 1 m³ kusen pintu dan kusen jendela, kayu bengkirai m3 9,710,025.00 10,139,923.75 10,051,460.00 10,782,486.25 10,831,217.50 9,565,441.25 10,376,760.50 10,588,682.50 10,849,456.50 17,114,921.00 10,389,824.50 16,254,484.10 17,386,574.00 8,944,297.50 9,260,892.50
2 L.2 Miembuat dan Pemasangan 1 m2 Pintu klamp standar, kayu bengkirai m2 412,252.00 429,829.75 425,983.00 456,176.25 459,321.50 406,760.75 439,649.60 449,141.70 460,503.70 710,732.20 438,633.00 677,055.60 716,875.50 375,452.00 389,942.00
3 L.3 Membuat dan Pemasangan 1 m2 Pintu klamp sederhana, kayu meranti untuk gudang sementa m2 366,252.00 381,529.75 378,143.00 403,276.25 407,801.50 362,140.75 390,567.60 399,167.30 409,190.70 612,568.20 388,212.40 586,298.52 616,034.30 352,452.00 369,242.00
4 L.4 Membuat dan Pemasangan 1 m2 daun pintu panel , kayu meranti m2 1,313,300.00 1,378,792.50 1,371,513.00 1,416,627.50 1,470,804.00 1,308,826.50 1,435,089.60 1,454,280.80 1,475,827.20 1,946,729.20 1,420,636.40 1,909,465.52 2,077,097.80 1,381,035.00 1,458,890.00
5 L.5 Membuat dan Pemasangan 1 m2 Pintu dan jendela kaca , kayu meranti m2 652,855.00 679,132.50 673,614.80 706,882.00 726,174.40 650,032.90 698,167.76 713,787.98 730,303.82 980,495.52 686,655.34 956,299.61 985,530.68 661,675.50 700,304.00
6 L.6 Membuat dan Pemasangan 1 m2 Pintu dan jendela jalusi kayu , kayu meranti m2 936,445.00 975,303.50 967,209.80 1,022,028.00 1,042,539.40 929,298.90 1,001,128.36 1,022,990.78 1,047,138.02 1,482,456.72 990,250.74 1,432,851.33 1,495,776.48 930,292.50 981,295.00
7 L.7 Membuat 1 m2 daun Pintu kayu plywood rangkap , rangka tertutup meranti ( lebar sampai 90 m2 1,427,235.96 1,488,682.65 1,477,047.18 1,574,344.19 1,590,235.87 1,409,634.47 1,525,568.27 1,558,492.48 1,597,184.86 2,422,982.38 1,520,148.37 2,317,061.34 2,454,624.46 1,488,244.73 1,614,925.91
8 L.8 Pemasangan 1 m2 Jalusi kusen , kayu meranti m2 729,445.00 761,317.25 755,377.50 797,404.25 816,534.50 723,217.75 786,606.90 801,846.70 819,377.30 1,170,828.80 777,002.10 1,129,170.28 1,199,286.70 722,510.50 759,034.50
9 L.9 Pemasangan 1 m2 plywood rangkap , rangka ekspose kayu meranti m2 1,082,506.50 1,130,151.58 1,120,449.60 1,200,866.23 1,207,382.70 1,066,678.48 1,156,440.00 1,180,364.60 1,209,419.93 1,897,040.00 1,157,411.75 1,803,661.15 1,927,043.50 1,127,441.60 1,230,771.40
10 L.10 Pemasangan 1 m³ Taekwood rangkap lapis formika , rangka ekspose kayu kelas II m2 1,137,683.50 1,187,663.08 1,177,501.10 1,261,540.23 1,268,873.20 1,121,222.98 1,215,343.00 1,240,532.60 1,271,025.43 1,988,764.00 1,216,050.25 1,891,670.65 2,020,032.50 1,185,562.60 1,294,159.40
11 L.11 Pemasangan 1 m3 Kuda-kuda konvensional, bentang 6 m kayu bengkirai m2 7,682,230.00 8,034,601.50 7,962,232.00 8,615,144.50 8,578,724.00 7,535,409.50 8,214,818.00 8,368,182.00 8,579,057.50 14,350,436.00 8,275,089.50 13,496,761.10 14,611,279.00 6,846,272.00 7,025,948.00
12 L.12 Pemasangan 1 m2 rangka atap genteng keramik, kayu meranti m2 209,070.00 219,190.00 216,832.50 237,935.00 234,025.00 203,780.00 223,422.00 226,941.00 232,627.75 422,004.00 227,435.50 391,581.90 431,468.50 184,632.50 189,520.00
13 L.13 Pemasangan 1 m2 rangka atap genteng beton, kayu meranti m2 280,312.50 293,994.63 290,924.70 319,863.88 313,816.60 272,885.23 299,436.54 304,336.92 312,098.16 574,033.08 305,522.11 532,137.80 587,641.72 245,007.50 251,102.50
14 L.14 Pemasangan 1 m2 rangka atap sirap, kayu meranti m2 88,681.10 92,714.96 91,530.34 98,988.67 99,173.93 87,210.37 94,612.11 96,144.37 98,256.69 159,416.22 95,168.94 149,941.69 162,254.88 82,658.09 85,766.31
15 L.15 Pemasangan 1 m2 rangka plafon 50 x 100 cm, kayu meranti m2 147,004.50 153,664.73 152,210.78 161,982.68 164,911.84 145,276.17 158,784.00 161,246.01 164,630.30 247,532.99 157,486.01 235,830.33 254,079.53 143,589.00 150,086.50
16 L.16 Pemasangan 1 m2 rangka plafon 60 x 60 cm, kayu meranti m2 146,262.75 152,678.89 150,889.66 161,716.16 163,305.98 144,402.57 156,464.26 158,916.48 162,424.17 249,678.52 155,945.08 236,518.15 252,550.17 140,990.00 147,102.25
17 L.17 Pemasangan 1 m lisplank ukuran ( 3 x 20 ) cm , kayu bengkirai m 103,109.00 107,700.95 106,600.86 114,584.85 115,102.58 101,556.73 110,247.83 112,211.20 114,858.50 182,085.66 110,352.39 172,253.30 184,767.28 93,242.00 96,450.50
18 L.18 Pemasangan 1 m lisplank ukuran ( 3 x 30 ) cm , kayu bengkirai m 102,752.50 107,326.63 106,234.70 114,174.88 114,705.60 101,213.23 109,779.69 111,829.68 114,468.93 181,149.38 109,968.18 171,561.72 183,998.85 92,563.50 95,749.00
19 L.19 Pemasangan 1 m2 rangka dinding pemisah ( 60 x 120 ) cm , kayu meranti m2 203,757.00 212,755.75 210,891.60 226,084.25 227,265.30 200,786.55 217,985.72 222,208.06 227,665.04 357,909.44 217,896.48 339,713.86 363,032.46 193,384.00 201,710.00
20 L.20 Pemasangan 1 m2 dinding pemisah Taekwood rangkap, rangka kayu meranti m2 326,662.00 341,724.35 338,712.80 367,343.35 364,918.90 319,922.75 348,939.42 355,571.36 364,607.74 619,816.84 352,496.78 581,994.40 632,233.06 346,481.70 384,611.80
21 L.21 Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu meranti m2 444,130.00 464,667.85 460,542.80 499,696.85 496,162.90 434,912.75 474,366.72 483,462.76 495,766.84 844,773.44 479,440.98 793,073.76 861,936.96 452,603.20 494,341.30
22 L.22 Pemasangan 1 m2 dinding bilik , rangka kayu meranti m2 109,979.10 115,259.56 113,684.86 124,727.97 123,111.64 107,327.78 117,075.06 118,962.79 121,685.53 216,095.12 119,141.61 200,942.40 221,148.22 106,408.01 114,222.95
23 L.23 Pemasangan 1 m2 dinding lambrisering dari plywood 120 x 240 cm m2 62,485.25 65,389.00 64,814.00 70,460.50 69,822.25 61,111.00 66,780.50 67,970.75 69,724.50 120,537.25 67,522.25 112,774.75 122,900.50 66,953.00 74,709.75
24 L.24 Kusen Pintu/Jendela Alumunium m 287,272.30 301,359.80 298,428.45 329,019.60 321,446.85 278,877.30 305,810.30 311,538.45 319,690.80 600,948.60 313,697.00 557,005.72 617,336.10 310,772.55 316,942.30
25 L.25 Pintu/jendela kaca rangka alumunium m2 1,191,678.30 1,250,572.10 1,238,298.15 1,367,566.20 1,333,997.70 1,156,396.30 1,269,673.60 1,293,141.65 1,327,869.35 2,518,020.45 1,303,860.80 2,331,672.84 2,587,700.10 1,291,617.90 1,316,235.95
26 L.26 Pemancangan Tiang Pancang Ulin 10/10 4 m (dg sunduk dan kalang) bh 714,408.75 746,564.19 734,440.60 794,487.56 799,516.80 703,912.99 761,068.85 772,195.10 786,737.71 1,235,500.20 766,115.63 1,170,010.00 1,256,375.00 731,285.00 757,317.55
27 L.27 Pemancangan Tiang Pancang Ulin 10/10 4 m bh 522,962.50 546,638.13 538,108.00 583,064.38 585,074.00 514,622.13 557,622.35 565,919.60 576,932.58 918,882.20 562,305.73 870,714.68 934,430.20 536,475.00 554,731.25
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
M M PEKERJAAN KUNCI DAN KACA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 M.1 Pemasangan 1 Buah Kunci Tanam Antik bh 180,757.00 188,266.50 187,346.50 198,271.50 200,985.50 178,802.00 193,395.50 198,110.50 203,285.50 298,609.00 191,751.00 288,144.00 301,771.50 190,831.00 199,950.50
2 M.2 Pemasangan kunci tanam biasa bh 155,825.00 162,380.00 161,747.50 171,522.50 173,305.00 153,870.00 166,865.00 171,005.00 175,605.00 263,925.00 165,772.50 254,035.00 267,317.50 165,140.00 172,730.00
3 M.3 Pemasangan kunci kamar mandi bh 185,587.00 193,700.25 192,751.50 205,804.00 206,591.75 182,712.00 198,599.25 203,314.25 208,834.25 328,279.00 198,449.75 313,524.50 333,396.50 197,501.00 205,614.25
4 M.4 Pemasangan kunci silinder bh 160,977.00 167,825.25 167,106.50 177,514.00 178,991.75 158,907.00 172,494.25 176,634.25 181,464.25 276,069.00 171,539.75 265,086.50 279,576.50 170,821.00 178,474.25

BIDANG CIPTA KARYA CK - 40 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

5 M.5 Pemasangan engsel pintu bh 70,104.00 73,191.75 72,760.50 78,165.50 78,159.75 68,839.00 74,824.75 76,492.25 78,504.75 127,558.00 75,215.75 121,106.50 129,973.00 74,669.50 77,469.75
6 M.6 Pemasangan engsel jendela kupu-kupu bh 48,024.00 50,163.00 49,760.50 53,555.50 53,521.00 47,104.00 51,221.00 52,371.00 53,751.00 87,653.00 51,439.50 83,030.00 89,205.50 51,152.00 53,061.00
7 M.7 Pemasangan engsel angin bh 97,014.00 101,280.50 100,245.50 107,605.50 108,203.50 95,519.00 103,258.50 105,328.50 107,858.50 168,843.00 103,477.00 160,356.00 171,430.50 102,442.00 106,478.50
8 M.8 Pemasangan spring knip bh 97,589.00 102,056.75 101,280.50 109,790.50 108,864.75 95,519.00 104,264.75 106,392.25 109,209.75 186,438.00 105,345.75 175,340.50 190,233.00 104,569.50 107,829.75
9 M.9 Pemasangan kait angin bh 43,309.00 45,016.75 44,815.50 47,345.50 48,144.75 42,849.00 46,304.75 47,397.25 48,604.75 70,518.00 45,775.75 68,114.50 71,093.00 45,574.50 47,799.75
10 M.10 Pemasangan door closer bh 212,037.00 221,329.00 220,006.50 235,761.50 236,233.00 208,587.00 226,688.00 231,748.00 237,958.00 379,799.00 227,113.50 361,238.00 386,066.50 225,676.00 234,508.00
11 M.11 Pemasangan kunci slot bh 59,984.00 62,410.50 62,180.50 65,745.50 66,688.50 59,294.00 64,158.50 65,653.50 67,378.50 98,923.00 63,572.00 95,427.00 99,900.50 63,227.00 66,228.50
12 M.12 Pemasangan door holder bh 162,702.00 169,579.00 168,716.50 179,066.50 181,033.00 160,747.00 174,133.00 178,158.00 182,873.00 274,689.00 173,063.50 263,948.00 277,966.50 172,086.00 179,998.00
13 M.13 Pemasangan door stop bh 62,905.00 65,780.00 65,262.50 70,667.50 70,265.00 61,525.00 67,160.00 68,540.00 70,380.00 118,795.00 67,792.50 111,987.00 121,497.50 67,275.00 69,460.00
14 M.14 Pemasangan rel pintu sorong bh 288,512.00 301,426.50 299,356.50 322,126.50 321,620.50 283,337.00 308,395.50 315,180.50 323,575.50 528,609.00 309,856.00 500,733.00 537,981.50 307,901.00 319,090.50
15 M.15 Pemasangan kunci lemari bh 90,284.20 94,122.90 93,634.15 99,729.15 100,477.80 89,019.20 96,567.80 98,810.30 101,397.80 156,383.90 96,265.35 149,518.40 158,471.15 95,776.60 99,787.80
16 M.16 Pemasangan kaca tebal 3 mm m2 208,762.95 218,840.40 216,960.15 237,683.15 233,452.30 186,441.45 204,236.55 208,169.55 213,764.30 386,418.40 208,097.10 360,316.85 395,756.40 206,349.10 211,539.05
17 M.17 Pemasangan kaca tebal 5 mm m2 284,662.95 298,535.40 295,896.15 324,968.15 318,460.30 242,354.45 265,715.55 270,787.05 278,026.30 509,376.40 271,220.60 473,939.15 522,003.40 268,966.60 275,295.05
18 M.18 Pemasangan kaca tebal 8 mm m2 310,862.25 325,933.00 323,020.05 354,716.35 347,702.50 302,432.75 331,718.65 338,057.45 347,076.90 638,461.60 338,773.90 593,646.79 654,396.00 335,995.50 343,614.25
19 M.19 Pemasangan kaca buram 12 mm m2 340,604.47 357,024.52 353,939.07 387,705.37 380,768.11 331,795.47 363,599.76 370,651.56 380,510.51 690,663.09 370,582.21 643,428.68 707,225.97 367,631.31 376,553.36
20 M.20 Pemasangan cermin tebal 5 mm m2 282,817.20 296,597.65 293,981.40 322,846.40 316,396.05 240,566.20 263,749.05 268,786.05 275,973.55 505,443.40 269,202.35 470,306.30 517,966.90 266,965.60 273,259.55
21 M.21 Pemasangan cermin tebal 8 mm m2 308,278.20 323,220.15 320,339.40 351,745.90 344,812.55 299,929.20 328,965.55 335,256.05 344,203.05 632,955.40 335,948.35 588,560.80 648,744.90 333,194.10 340,764.55
22 M.22 Pemasangan kaca wireglassed tebal 5 mm m2 332,658.20 348,842.15 345,719.90 380,150.90 372,182.55 323,550.20 355,082.05 361,763.55 371,481.05 688,109.40 362,938.85 639,032.00 705,439.90 359,943.10 367,881.55
23 M.23 Pemasangan kaca patri tebal 5 mm m2 1,518,810.75 1,594,291.00 1,579,036.25 1,743,520.75 1,700,746.50 1,474,351.75 1,620,493.75 1,650,106.25 1,694,030.50 3,212,134.00 1,662,647.00 2,972,948.95 3,298,315.00 1,647,904.00 1,678,902.25
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
N N PEKERJAAN PENGECATAN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 N.1 Pengikisan / Pengerokan 1 m2 Permukaan Cat Lama m2 22,206.50 23,149.50 22,275.50 24,104.00 25,006.75 22,177.75 23,235.75 23,253.00 23,281.75 31,389.25 23,224.25 29,381.93 31,584.75 22,356.00 23,270.25
2 N.2 Pencucian 1 m2 Bidang Permukaan Tembok yang Pernah di Cat m2 22,528.50 23,488.75 22,609.00 24,477.75 25,369.00 22,488.25 23,575.00 23,598.00 23,638.25 31,728.50 23,575.00 29,697.60 31,935.50 22,701.00 23,626.75
3 N.3 Pengerokan 1 m2 Karat Pada Permukaan Baja Cara Manual m2 23,448.50 24,466.25 23,586.50 25,455.25 26,461.50 23,408.25 24,667.50 24,690.50 24,730.75 32,993.50 24,610.00 30,962.60 33,488.00 23,736.00 24,719.25
4 N.4 Pengecatan 1 m2 Bidang Kayu Baru (1 Lps Plamir, 1 Lps Cat Dasr, 2 Lps Cat Penutup) m2 54,193.75 56,798.50 55,969.35 61,397.35 60,728.05 52,931.05 53,171.40 58,472.90 59,763.20 91,243.30 58,738.55 88,171.65 97,347.50 57,932.40 59,349.20
5 N.5 Pengecatan 1 m2 Bidang Kayu Baru (1 Lps Plamuur, 1 Lps Cat Dasar, 3 Lps Cat Penutup) m2 75,342.25 78,745.10 77,864.20 84,444.50 84,138.60 73,913.95 75,740.15 81,697.15 83,705.05 122,862.55 80,910.55 118,983.60 128,478.00 80,052.65 82,653.95
6 N.6 Pelaburan 1 m2 Bidang Kayu Dengan teak Oil m2 43,093.95 45,190.40 44,836.20 47,355.85 48,286.20 42,597.15 46,594.55 47,246.60 48,064.25 69,318.55 46,653.20 66,155.13 72,482.20 46,257.60 48,302.30
7 N.7 Pelaburan 1 m2 Bidang Kayu Dengan Politur m2 65,486.52 68,582.55 67,805.15 73,848.17 73,221.19 63,988.76 69,678.04 70,913.37 72,653.32 111,078.04 70,736.27 103,830.99 113,539.27 69,958.87 72,174.92
8 N.8 Pelaburan 1 m2 Bidang Kayu Dengan Cat Residu dan TER m2 20,257.25 21,142.75 20,527.50 22,241.00 22,793.00 20,096.25 21,361.25 21,482.00 21,643.00 39,680.75 21,453.25 36,699.38 40,186.75 20,838.00 21,602.75
9 N.9 Pelaburan 1 m2 Bidang Kayu Dengan Vernis m2 62,485.25 65,055.50 64,020.50 67,942.00 69,718.75 62,151.75 66,378.00 67,493.50 68,712.50 91,632.00 65,716.75 88,091.73 91,936.75 64,699.00 67,890.25
10 N.10 Pengecatan 1 m2 Tembok Baru (1 Lps Plamir, 1 Lps Cat Dasar, 2 Cat Lapis Cat Penutup) m2 56,994.00 59,662.00 59,146.80 64,348.25 63,724.95 55,710.60 54,880.30 61,999.95 63,604.20 105,259.50 61,682.55 103,995.42 113,593.55 61,125.95 62,914.20
11 N.11 Pengecatan 1 m2 Tembok Lama (1 Lps Plamuur, 2 Lps Cat Penutup) m2 48,369.00 50,648.30 50,142.30 54,673.30 54,123.60 47,265.00 45,625.10 52,513.60 53,824.60 88,770.80 52,375.60 88,354.50 96,784.00 51,835.10 53,286.40
12 N.12 Pelaburan 1 m2 Tembok Dengan Kalkarium m2 16,767.00 17,482.30 17,275.30 18,344.80 18,726.60 16,617.50 17,898.60 18,232.10 18,611.60 25,762.30 17,760.60 24,670.95 26,024.50 17,553.60 18,372.40
13 N.13 Pelaburan 1 m2 Tembok Dengan Kapur Sirih m2 74,675.25 78,224.15 76,832.65 84,422.65 83,745.30 73,071.00 79,197.05 80,214.80 81,773.05 142,273.40 80,686.30 131,913.05 145,463.50 79,312.05 81,268.20
14 N.14 Pelaburan 1 m2 Tembok Lama Dengan Kapur Sirih (Pemeliharaan) m2 162,351.25 169,987.25 166,629.25 182,890.25 182,102.50 159,171.50 171,867.50 173,920.25 177,025.25 301,196.50 174,857.50 279,515.55 307,429.50 171,534.00 176,001.75
15 N.15 Pemasangan 1 m2 Wallpaper m2 96,324.00 100,538.75 99,871.75 107,461.75 107,381.25 94,553.00 102,850.25 105,058.25 107,956.25 176,030.50 103,396.50 166,931.70 179,394.25 102,614.50 106,507.25
16 N.16 Pengecatan 1 m2 Permukaan Baja Dengan Menie Besi m2 44,332.50 46,065.55 45,913.75 47,761.80 49,191.25 44,196.80 47,565.15 48,801.40 50,074.45 65,207.30 46,520.95 64,214.16 65,263.65 46,357.65 49,116.50

BIDANG CIPTA KARYA CK - 41 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

17 N.17 Pengecatan 1 m2 Permukaan Baja Dengan Menie Besi Dengan Perancah m2 82,018.00 85,324.71 83,846.27 88,529.76 91,556.56 81,869.42 87,121.70 88,509.06 89,938.51 116,221.30 85,887.75 112,514.39 116,545.60 84,397.81 88,861.42
18 N.18 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Manual 4 Lapis m2 91,319.20 95,018.75 93,482.35 98,951.75 101,833.65 90,994.90 96,939.25 98,578.00 100,326.00 130,927.50 95,799.60 126,378.91 131,035.60 94,250.55 99,075.95
19 N.19 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Manual Sistem 1 Lapis Cat Mutakhir m2 42,239.50 44,168.05 43,610.30 46,991.30 47,248.90 41,598.95 45,075.40 45,811.40 46,795.80 64,379.30 45,299.65 60,686.19 65,370.60 44,741.90 46,374.90
20 N.20 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Manual Sistem 3 Lapis m2 223,502.50 232,406.95 229,949.40 241,049.20 248,823.20 222,963.15 238,650.30 243,588.40 248,694.40 320,318.70 234,348.15 312,827.14 321,084.60 231,858.40 244,855.70
21 N.21 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis Cat Mutakhir m2 200,100.00 208,063.75 205,656.80 215,630.75 222,865.40 199,710.15 213,532.00 217,804.25 222,184.60 286,269.50 209,665.70 279,451.38 287,003.20 207,224.25 218,857.65
22 N.22 Plituran 1 m2 Dengan Plitur Melamic m2 299,764.75 311,766.15 310,084.85 324,763.45 332,915.80 298,222.60 320,981.10 328,806.85 337,186.90 457,341.20 315,423.15 446,434.95 458,766.05 313,741.85 334,047.40
23 N.23 Pengecatan 1 m2 Dinding Dalam m2 409,262.00 428,815.45 424,905.45 467,587.70 456,809.90 397,532.00 435,517.65 443,124.90 454,699.65 813,266.20 446,339.15 752,781.95 833,175.00 442,256.65 450,787.35
24 N.24 Pengecatan 1 m2 Dinding Luar m2 115,092.00 120,109.45 119,097.45 129,464.70 127,403.90 112,424.00 122,073.65 124,137.90 127,087.65 219,222.20 124,270.15 204,790.85 224,296.00 123,269.65 125,912.35
25 N.25 Pengecatan 1 m2 Plafond m2 90,942.00 94,717.45 93,981.45 101,657.70 100,355.90 88,964.00 96,267.65 97,848.90 100,108.65 167,610.20 97,774.15 157,098.05 171,304.00 96,980.65 99,209.35
26 N.26 Pengecatan 1 m2 Kayu m2 84,392.75 87,672.55 86,810.05 93,136.20 92,886.65 83,033.45 89,119.25 90,562.50 92,485.30 133,262.00 89,746.00 125,337.35 134,245.25 88,923.75 91,448.00
27 N.27 Pengecatan 1 m2 Lapisan Waterproofing Membrane Sheet + Screed m2 207,310.50 216,532.35 213,573.40 233,159.05 229,811.40 202,013.60 218,681.47 223,693.86 228,389.08 393,639.94 222,427.71 370,214.58 404,248.92 221,094.86 226,285.73
28 N.28 Pekerjaan 1 m2 TER Rangka Atap m2 31,757.25 32,642.75 32,027.50 33,741.00 34,293.00 31,596.25 32,861.25 32,982.00 33,143.00 51,180.75 32,953.25 48,199.38 51,686.75 32,338.00 33,102.75
29 N.29 Pengecatan 1 m2 Cat Meni m2 56,925.00 58,730.50 58,581.00 60,398.00 62,008.00 56,798.50 60,398.00 61,628.50 62,893.50 77,993.00 59,259.50 77,046.55 78,464.50 59,098.50 61,939.00
30 N.30 Pengecatan 1 m2 Cat Besi m2 157,320.00 163,271.25 160,843.60 169,205.25 174,330.80 156,914.05 166,704.00 169,251.25 171,945.70 219,201.50 164,560.40 212,441.11 220,277.90 162,121.25 169,978.05
31 N.31 Pengecatan 1 m2 Plafond Tekstur m2 102,557.00 106,884.45 106,056.45 114,859.70 113,339.40 100,280.00 108,664.65 110,487.40 113,092.15 191,047.20 110,401.15 178,968.75 195,304.50 109,504.15 112,054.85
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
O O. PEKERJAAN SANITASI DALAM GEDUNG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 O.1 Pemasangan 1 Buah Closet Duduk / Monoblock bh 3,833,525.00 4,018,905.00 3,968,305.00 4,360,455.00 4,294,675.00 3,738,650.00 4,082,730.00 4,150,465.00 4,248,790.00 7,659,115.00 4,166,565.00 7,111,899.00 7,846,450.00 4,117,000.00 4,211,875.00
2 O.2 Pemasangan 1 Buah Closet Jongkok Porselen bh 766,705.00 800,745.00 791,177.00 847,435.00 857,256.00 756,631.00 819,299.10 834,522.80 852,185.65 1,302,108.20 818,445.80 1,239,131.44 1,328,806.60 809,682.80 842,272.65
3 O.3 Pemasangan 1 Buah Closet Jongkok teraso bh 631,810.00 658,375.00 650,072.00 693,450.00 704,421.00 624,726.00 672,329.10 685,252.80 699,235.65 1,028,408.20 669,175.80 983,601.44 1,041,651.60 661,677.80 690,472.65
4 O.4 Pemasangan 1 Buah Urinoir bh 3,575,925.00 3,749,920.00 3,711,487.00 4,082,960.00 4,000,091.00 3,479,141.00 3,811,714.10 3,880,182.80 3,979,150.65 7,346,278.20 3,899,180.80 6,817,505.44 7,535,586.60 3,862,357.80 3,943,477.65
5 O.5 Pemasangan 1 Buah Wastafel bh 2,600,966.50 2,724,994.00 2,696,267.00 2,952,981.50 2,907,223.00 2,536,727.50 2,771,527.60 2,821,584.80 2,891,400.15 5,181,552.70 2,824,666.80 4,825,776.74 5,307,898.60 2,797,319.80 2,864,340.65
6 O.6 Pemasangan 1 Buah Bathcuip Porselen bh 4,196,902.00 4,403,792.75 4,363,111.50 4,811,036.50 4,695,961.75 4,076,152.00 4,477,461.75 4,559,859.25 4,681,241.75 8,821,834.00 4,590,184.75 8,172,762.50 9,055,284.00 4,550,768.50 4,638,806.75
7 O.7 Pemasangan 1 Buah Bak Fiberglass Volume 1 m3 bh 3,461,960.00 3,621,580.00 3,583,170.00 3,875,845.00 3,876,880.00 3,398,595.00 3,704,610.00 3,771,425.00 3,858,710.00 6,370,770.00 3,729,795.00 5,996,146.00 6,521,765.00 3,692,075.00 3,812,940.00
8 O.8 Pemasangan 1 Buah Bak Mandi Batu Bata Volume 0,30 m3 bh 4,535,370.00 4,735,815.00 4,644,735.00 5,094,615.00 5,049,765.00 4,416,690.00 4,745,268.00 4,861,809.00 4,924,564.50 8,456,916.00 4,828,344.00 7,912,561.20 8,656,533.00 4,792,464.00 4,909,384.50
9 O.9 Pemasangan 1 Buah Bak Mandi Teraso Volume 0,30 m3 bh 3,467,710.00 3,627,330.00 3,588,920.00 3,881,595.00 3,882,630.00 3,404,345.00 3,710,360.00 3,777,175.00 3,864,460.00 6,376,520.00 3,735,545.00 6,001,896.00 6,527,515.00 3,697,825.00 3,818,690.00
10 O.10 Pemasangan 1 Buah Bak Air Fiberglass Volume 1 m3 bh 3,467,710.00 3,627,330.00 3,588,920.00 3,881,595.00 3,882,630.00 3,404,345.00 3,710,360.00 3,777,175.00 3,864,460.00 6,376,520.00 3,735,545.00 6,001,896.00 6,527,515.00 3,697,825.00 3,818,690.00
11 O.11 Pemasangan 1 Buah Bak Beton Volume 1 m3 bh 13,674,968.95 14,311,731.81 14,083,872.71 15,468,807.26 15,236,516.25 13,366,931.07 14,216,988.73 14,455,538.18 15,100,376.28 26,219,096.63 14,761,857.58 24,946,355.47 27,397,191.22 14,514,642.52 15,011,394.89
12 O.12 Pemasangan 1 Buah Bak Cuci Piring Stainlessteel bh 1,281,100.00 1,344,465.00 1,332,102.50 1,468,262.50 1,434,280.00 1,244,530.00 1,367,580.00 1,392,880.00 1,430,140.00 2,688,585.00 1,401,102.50 2,491,866.00 2,759,942.50 1,389,085.00 1,416,915.00
13 O.13 Pemasangan 1 Buah Bak Cuci Piring Teraso bh 511,520.00 535,900.00 529,632.50 579,887.50 570,975.00 498,295.00 543,685.50 555,749.00 569,313.25 1,009,746.00 553,276.50 945,700.20 1,036,115.50 549,424.00 563,448.25
14 O.14 Pemasangan 1 Buah Floor Drain bh 91,080.00 95,335.00 94,587.50 102,982.50 101,775.00 88,895.00 97,290.00 99,245.00 101,775.00 179,055.00 98,727.50 167,670.00 183,367.50 97,980.00 100,740.00
15 O.15 Pemasangan 1 Buah Bak Kontrol Pasangan Bata 30x30x35 cm bh 673,451.50 700,199.35 681,814.30 739,834.10 749,875.90 653,862.40 691,687.05 701,778.30 710,770.15 1,060,086.10 696,588.35 1,004,474.63 1,078,226.20 683,116.10 706,640.50
16 O.16 Pemasangan 1 Buah Bak Kontrol Pasangan Bata 45x45x50 cm bh 1,021,269.00 1,060,839.35 1,032,387.20 1,122,398.85 1,135,756.10 998,957.85 1,055,398.70 1,071,970.20 1,085,958.80 1,636,146.40 1,063,622.35 1,549,429.73 1,661,000.20 1,043,827.40 1,078,309.00
17 O.17 Pemasangan 1 Buah Bak Kontrol Pasangan Bata 60x60x65 cm bh 1,249,429.00 1,296,546.92 1,263,078.35 1,379,528.04 1,386,603.30 1,213,138.45 1,283,688.77 1,304,955.37 1,324,535.50 2,092,726.53 1,300,717.74 1,976,201.42 2,135,190.97 1,280,254.52 1,316,142.69
18 O.18 Pemasangan 1 m' Pipa Galvanis Ø 1/2" m 298,425.00 312,777.00 309,844.50 339,825.00 333,511.50 290,559.00 318,435.00 324,058.50 332,166.00 606,855.00 325,197.00 563,950.80 623,484.00 322,402.50 329,268.00
19 O.19 Pemasangan 1 Buah Kran Ø 1/2" bh 139,437.50 145,431.88 144,796.50 154,143.13 155,227.00 137,473.88 149,344.75 152,800.50 156,949.13 242,454.50 148,835.88 232,128.08 245,979.25 148,085.50 154,531.25
20 O.20 Pemasangan 1 m' Pipa Galvanis Ø 3/4" m 391,230.00 409,722.00 405,961.50 445,050.00 436,252.50 380,880.00 416,760.00 424,039.50 434,493.00 793,500.00 426,006.00 737,403.00 815,097.00 422,383.50 430,767.00

BIDANG CIPTA KARYA CK - 42 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

21 O.21 Pemasangan 1 m' Pipa Galvanis Ø 1" m 487,830.00 511,152.00 506,425.50 556,140.00 544,444.50 474,582.00 519,846.00 528,919.50 542,271.00 999,672.00 531,852.00 927,925.80 1,026,789.00 527,263.50 537,579.00
22 O.22 Pemasangan 1 m' Pipa Galvanis Ø 1 1/2" m 790,694.00 828,770.50 820,973.50 902,876.50 883,188.50 768,890.00 842,409.50 857,520.50 879,531.50 1,631,045.00 862,293.00 1,512,972.20 1,673,077.50 854,772.00 871,665.50
23 O.23 Pemasangan 1 m' Pipa Galvanis Ø 3" m 1,953,154.25 2,048,719.25 2,029,313.00 2,237,089.25 2,183,694.75 1,897,264.25 2,082,040.50 2,119,490.25 2,175,018.00 4,089,463.25 2,134,900.25 3,787,981.55 4,198,098.00 2,116,046.00 2,155,910.75
24 O.24 Pemasangan 1 m' Pipa Galvanis Ø 4" m 2,809,904.25 2,946,869.25 2,919,183.00 3,218,039.25 3,139,804.75 2,729,174.25 2,994,266.50 3,047,724.25 3,127,402.00 5,885,165.25 3,071,138.25 5,450,209.95 6,041,824.00 3,044,280.00 3,100,290.75
25 O.25 Pemasangan 1 m' Pipa PVC type AW Ø 1/2" m 53,866.00 56,028.00 55,545.00 59,754.00 59,455.00 52,900.00 54,970.00 57,937.00 59,248.00 91,954.00 57,500.00 90,408.40 97,796.00 64,055.00 67,804.00
26 O.26 Pemasangan 1 m' Pipa PVC type AW Ø 3/4" m 60,766.00 63,342.00 62,721.00 67,758.00 67,183.00 59,524.00 61,870.00 65,389.00 66,838.00 105,754.00 65,090.00 104,070.40 112,976.00 68,195.00 70,564.00
27 O.27 Pemasangan 1 m' Pipa PVC type AW Ø 1" m 82,961.00 86,503.00 85,606.00 92,851.00 91,724.00 81,167.00 88,205.00 89,240.00 91,379.00 155,549.00 89,079.00 144,950.60 158,079.00 84,870.00 87,239.00
28 O.28 Pemasangan 1 m' Pipa PVC type AW Ø 1 1/2" m 135,424.00 141,358.00 139,943.50 152,122.00 150,086.50 132,388.00 134,320.00 146,015.50 149,431.00 238,786.00 145,912.00 240,704.20 263,143.00 119,657.50 129,421.00
29 O.29 Pemasangan 1 m' Pipa PVC type AW Ø 2" m 172,914.00 180,366.00 178,813.50 194,304.00 191,440.50 168,912.00 174,570.00 186,265.50 190,647.00 313,536.00 186,438.00 309,051.00 338,445.00 169,567.50 173,811.00
30 O.30 Pemasangan 1 m' Pipa PVC type AW Ø 2 1/2" m 219,604.00 229,327.25 227,205.50 247,129.25 243,650.50 214,636.00 228,970.75 237,061.00 242,667.25 413,252.50 237,118.50 393,967.00 431,267.25 234,582.75 240,942.25
31 O.31 Pemasangan 1 m' Pipa PVC type AW Ø 3" m 300,104.00 313,277.25 310,465.50 337,979.25 332,430.50 293,066.00 316,370.75 323,495.00 331,171.25 576,552.50 324,242.50 541,590.20 594,015.25 320,602.75 326,962.25
32 O.32 Pemasangan 1 m' Pipa PVC type AW Ø 4" m 427,754.00 446,447.25 442,531.50 482,189.25 473,328.50 417,404.00 471,620.75 460,805.00 471,517.25 869,802.50 462,518.50 776,687.00 853,317.25 457,912.75 467,032.25
33 O.33 Pemasangan 1 m' Pipa Air Limbah Jenis Pipa PVC AW diameter 200 mm Ø 20 cm m 2,070,575.00 2,173,644.90 2,149,597.02 2,378,324.20 2,317,117.06 2,007,878.61 2,203,669.56 2,246,476.24 2,304,080.66 4,379,900.12 2,263,697.26 4,055,608.77 4,501,674.77 2,244,411.99 2,284,454.53
34 O.34 Pemasangan 1 m' Pipa Air Limbah Jenis Pipa PVC AW diameter 200 mm Ø 15 cm m 1,968,558.50 2,066,790.93 2,046,817.38 2,262,784.28 2,204,676.04 1,909,829.27 2,100,003.39 2,138,246.52 2,195,227.30 4,189,173.77 2,156,680.10 3,873,916.68 4,303,079.20 2,137,522.02 2,176,090.95
35 O.35 Pemasangan 1 m' Pipa Beton Ø 15 - 20 cm m 1,398,264.76 1,467,825.96 1,452,996.48 1,605,548.47 1,565,825.63 1,357,089.82 1,490,942.34 1,518,168.36 1,558,017.70 2,956,607.68 1,530,347.78 2,735,708.50 3,036,706.56 1,516,477.86 1,544,501.52
36 O.36 Pemasangan 1 m' Pipa Beton Ø 30 - 100 cm m 1,478,946.00 1,551,980.78 1,534,958.82 1,694,088.58 1,655,879.71 1,436,740.89 1,575,600.86 1,604,401.80 1,645,171.72 3,082,592.71 1,615,136.82 2,855,898.78 3,165,160.64 1,599,813.30 1,631,024.76
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
P P PEKERJAAN PEMASANGAN PIPA LUAR GEDUNG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 P.1 Pengadaan dan Pemasangan 1 m' PIPA PVC AW diameter 2 1/2" m 159,211.75 166,991.50 165,128.50 181,665.50 178,359.25 155,020.00 166,347.50 172,712.75 177,025.25 317,543.75 173,546.50 301,317.25 332,718.00 171,338.50 175,852.25
2 P.2 Pengadaan dan Pemasangan 1 m' PIPA PVC AW diameter 3" m 220,265.25 231,069.50 228,551.00 251,660.25 246,744.00 214,331.25 233,386.75 238,993.00 245,082.25 449,253.25 240,327.00 419,813.25 463,990.50 237,118.50 241,799.00
3 P.3 Pengadaan dan Pemasangan 1 m' PIPA PVC AW diameter 4" m 315,726.75 331,280.50 327,773.00 361,226.50 353,676.75 307,015.50 352,107.00 342,809.25 351,480.25 684,347.75 344,862.00 606,320.25 670,875.50 340,779.50 347,926.75
4 P.4 Pengadaan dan Pemasangan 1 m' PIPA PVC AW diameter 6" m 715,570.25 751,053.50 743,440.50 820,726.25 801,446.50 694,881.75 763,341.25 777,089.50 797,427.25 1,504,447.25 782,862.50 1,393,012.25 1,544,588.00 653,809.50 661,123.50
5 P.5 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 63 mm m 74,629.25 78,225.88 77,395.00 85,166.13 83,530.25 72,625.38 79,700.75 81,057.75 83,159.38 152,081.75 81,457.38 141,789.25 155,606.50 80,626.50 82,317.00
6 P.6 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 100 mm m 138,448.50 145,207.63 143,658.00 158,403.88 154,997.00 134,489.63 147,757.75 150,282.00 154,240.88 287,132.00 151,325.63 266,777.00 294,377.00 149,776.00 152,806.25
7 P.7 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 125 mm m 253,902.75 266,469.38 263,741.00 291,096.63 284,308.75 246,608.88 271,014.75 275,856.25 283,052.38 532,582.25 277,888.88 493,815.75 546,537.50 275,275.50 280,565.50
8 P.8 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 150 mm m 316,186.75 331,783.63 328,382.50 362,419.63 354,073.50 307,052.88 337,318.00 343,355.50 352,322.63 662,279.25 345,859.63 613,979.25 679,696.00 342,573.50 349,214.75
9 P.9 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 200 mm m 635,357.75 666,870.63 660,134.50 728,786.63 711,562.50 617,023.88 677,902.00 690,034.50 708,201.63 1,336,156.25 695,252.63 1,237,463.25 1,371,628.00 688,746.50 701,873.75
10 P.10 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 250 mm m 987,568.25 1,036,621.50 1,026,306.00 1,133,279.00 1,106,075.75 958,801.00 1,053,779.50 1,072,691.25 1,100,923.75 2,080,896.25 1,081,092.00 1,927,520.75 2,136,228.50 1,071,006.50 1,091,332.75
11 P.11 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 300 mm m 1,557,094.25 1,634,555.38 1,618,326.00 1,787,620.38 1,743,952.00 1,511,568.63 1,661,784.50 1,691,627.00 1,736,261.38 3,288,844.75 1,705,245.88 3,045,757.75 3,376,503.50 1,689,476.50 1,721,095.75
12 P.12 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 400 mm m 2,524,094.75 2,649,634.50 2,623,380.00 2,897,545.75 2,827,068.00 2,450,448.75 2,694,260.25 2,742,773.00 2,815,067.75 5,326,920.75 2,764,554.00 4,935,391.75 5,468,054.50 2,739,104.50 2,790,337.00
13 P.13 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 450 mm m 3,197,276.00 3,356,269.25 3,323,155.00 3,670,443.50 3,581,105.75 3,103,896.00 3,412,872.25 3,474,282.25 3,565,937.25 6,748,729.00 3,502,043.25 6,252,998.50 6,927,554.00 3,469,734.00 3,534,657.25
14 P.14 Pengadaan dan Pemasangan 1 m' Pipa GIP diameter 63 mm m 1,248,244.50 1,309,841.38 1,296,188.00 1,429,395.38 1,398,141.25 1,213,235.63 1,331,550.50 1,355,188.75 1,390,036.63 2,599,276.00 1,364,144.38 2,408,594.50 2,667,862.00 1,350,836.00 1,377,838.00
15 P.15 Pengadaan dan Pemasangan 1 m' Pipa GIP diameter 100 mm m 2,228,872.50 2,339,430.63 2,315,801.00 2,556,176.88 2,496,558.00 2,164,883.63 2,377,883.75 2,420,428.00 2,483,611.88 4,681,765.00 2,438,307.63 4,334,534.00 4,806,655.00 2,415,368.00 2,461,822.25
16 P.16 Pengadaan dan Pemasangan 1 m' Pipa GIP diameter 125 mm m 2,844,168.50 2,985,328.13 2,955,442.50 3,262,863.38 3,185,718.50 2,762,009.63 3,034,269.25 3,088,681.50 3,169,598.38 5,985,750.00 3,112,092.63 5,540,815.00 6,145,979.50 3,083,012.00 3,141,805.75
17 P.17 Pengadaan dan Pemasangan 1 m' Pipa GIP diameter 150 mm m 3,603,197.25 3,782,186.13 3,744,492.00 4,134,741.63 4,035,810.00 3,498,728.38 3,844,197.00 3,913,151.00 4,015,969.63 7,594,996.75 3,943,404.63 7,029,288.75 7,798,644.50 3,906,745.50 3,980,765.25
18 P.18 Pengadaan dan Pemasangan 1 m' Pipa GIP diameter 200 mm m 5,189,122.00 5,446,730.63 5,392,189.00 5,953,472.38 5,812,169.00 5,039,113.13 5,536,002.25 5,635,230.00 5,782,927.38 10,925,747.50 5,678,202.63 10,112,605.50 11,218,549.00 5,625,156.00 5,732,169.25
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

BIDANG CIPTA KARYA CK - 43 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Q Q PEKERJAAN PEMOTONGAN PIPA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Q.1 Pemotongan 1 Buah PIPA PVC AW diameter 2 1/2" bh 29,865.50 29,911.50 29,882.75 29,951.75 30,003.50 29,865.50 29,934.50 29,946.00 29,957.50 30,268.00 29,917.25 30,210.50 30,285.25 29,888.50 29,946.00
2 Q.2 Pemotongan 1 Buah PIPA PVC AW diameter 3/4" bh 9,033.25 9,165.50 9,085.00 9,286.25 9,430.00 9,033.25 9,228.75 9,269.00 9,309.25 10,229.25 9,177.00 10,068.25 10,246.50 9,096.50 9,269.00
3 Q.3 Pemotongan 1 Buah PIPA PVC AW diameter 4" bh 39,738.25 39,951.00 39,824.50 40,140.75 40,376.50 39,738.25 40,060.25 40,123.50 40,186.75 41,647.25 39,974.00 41,394.25 41,699.00 39,847.50 40,123.50
4 Q.4 Pemotongan 1 Buah PIPA PVC AW diameter 6" bh 99,331.25 99,630.25 99,452.00 99,894.75 100,228.25 99,331.25 99,785.50 99,871.75 99,958.00 101,999.25 99,664.75 101,642.75 102,085.50 99,486.50 99,871.75
5 Q.5 Pemotongan 1 Buah Pipa HDPE diameter 63 mm bh 35,094.55 35,114.10 35,102.60 35,131.35 35,153.20 35,094.55 36,688.45 36,694.20 36,699.95 37,615.35 35,898.40 37,592.35 39,185.10 35,495.90 36,303.20
6 Q.6 Pemotongan 1 Buah Pipa HDPE diameter 100 mm bh 59,759.75 59,823.00 59,788.50 59,874.75 59,949.50 59,759.75 63,129.25 63,146.50 63,163.75 65,210.75 61,467.50 65,141.75 68,517.00 60,616.50 62,330.00
7 Q.7 Pemotongan 1 Buah Pipa HDPE diameter 125 mm bh 76,319.75 76,411.75 76,360.00 76,492.25 76,595.75 76,319.75 80,879.50 80,908.25 80,937.00 83,771.75 78,631.25 83,668.25 88,216.50 77,475.50 79,804.25
8 Q.8 Pemotongan 1 Buah Pipa HDPE diameter 150 mm bh 139,782.50 139,943.50 139,851.50 140,081.50 140,265.50 139,782.50 145,601.50 145,647.50 145,693.50 149,557.50 142,749.50 149,373.50 155,192.50 141,266.00 144,256.00
9 Q.9 Pemotongan 1 Buah Pipa HDPE diameter 200 mm bh 154,974.00 155,399.50 155,146.50 155,779.00 156,250.50 154,974.00 163,484.00 163,610.50 163,737.00 170,591.00 159,378.50 170,085.00 178,560.50 157,159.00 161,644.00
10 Q.10 Pemotongan 1 Buah Pipa HDPE diameter 250 mm bh 197,909.25 198,564.75 198,179.50 199,139.75 199,875.75 197,909.25 209,081.50 209,271.25 209,461.00 219,000.25 203,728.25 218,229.75 229,379.00 200,801.50 206,729.75
11 Q.11 Pemotongan 1 Buah Pipa GIP diameter 63 mm bh 4,657.50 4,847.25 4,738.00 5,014.00 5,226.75 4,657.50 4,950.75 5,008.25 5,065.75 6,359.50 4,870.25 6,141.00 6,417.00 4,761.00 5,008.25
12 Q.12 Pemotongan 1 Buah Pipa GIP diameter 100 mm bh 13,943.75 14,513.00 14,179.50 15,013.25 15,651.50 13,943.75 14,817.75 14,984.50 15,151.25 19,026.75 14,582.00 18,359.75 19,205.00 14,248.50 14,984.50
13 Q.13 Pemotongan 1 Buah Pipa GIP diameter 125 mm bh 22,022.50 22,919.50 22,390.50 23,713.00 24,713.50 22,022.50 23,391.00 23,655.50 23,920.00 30,049.50 23,023.00 28,991.50 30,302.50 22,494.00 23,655.50
14 Q.14 Pemotongan 1 Buah Pipa GIP diameter 150 mm bh 31,475.50 32,757.75 32,004.50 33,890.50 35,322.25 31,475.50 33,436.25 33,815.75 34,195.25 42,952.50 32,907.25 41,446.00 43,320.50 32,154.00 33,815.75
15 Q.15 Pemotongan 1 Buah Pipa GIP diameter 200 mm bh 81,523.50 84,847.00 82,892.00 87,779.50 91,494.00 81,523.50 86,606.50 87,584.00 88,561.50 111,239.50 85,238.00 107,329.50 112,217.00 83,283.00 87,584.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
R R PEKERJAAN AKSESORIS PIPA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 R.1 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 50 mm bh 2,706,335.25 2,838,470.25 2,806,621.00 3,087,123.25 3,031,842.75 2,635,322.75 2,886,868.00 2,936,864.25 3,009,688.00 5,507,436.25 2,949,939.75 5,115,113.75 5,647,477.50 2,918,780.50 2,982,749.25
2 R.2 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 75 mm bh 3,909,660.75 4,101,268.00 4,056,395.00 4,465,996.25 4,379,660.00 3,804,608.25 4,172,401.25 4,245,179.00 4,352,054.25 8,015,206.75 4,267,339.50 7,445,933.75 8,218,601.50 4,223,501.50 4,313,144.00
3 R.3 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 100 mm bh 6,812,260.75 7,149,055.50 7,075,145.00 7,803,928.75 7,630,595.00 6,620,210.75 7,270,501.25 7,399,629.00 7,590,971.75 14,205,656.75 7,450,022.00 13,173,784.75 14,576,491.50 7,377,951.50 7,523,944.00
4 R.4 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 150 mm bh 8,885,360.00 9,325,177.50 9,229,555.00 10,182,962.50 9,952,675.00 8,633,107.50 9,483,015.00 9,651,950.00 9,902,477.50 18,572,730.00 9,719,742.50 17,219,479.00 19,059,410.00 9,626,650.00 9,815,135.00
5 R.5 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 200 mm bh 11,527,180.25 12,095,912.75 11,969,131.00 13,195,910.75 12,912,297.75 11,205,985.25 12,305,023.00 12,522,804.25 12,844,430.50 23,927,446.25 12,602,982.25 22,210,622.75 24,543,587.50 12,479,420.50 12,730,609.25
6 R.6 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 250 mm bh 13,502,995.25 14,170,512.75 14,023,951.00 15,468,195.75 15,125,242.75 13,122,460.25 14,413,203.00 14,669,164.25 15,048,290.50 28,143,806.25 14,768,662.25 26,108,846.75 28,874,947.50 14,625,780.50 14,915,379.25
7 R.7 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 300 mm bh 15,795,135.00 16,575,985.00 16,404,635.00 18,094,100.00 17,692,750.00 15,349,970.00 16,858,310.00 17,157,770.00 17,601,210.00 32,930,020.00 17,274,150.00 30,541,355.00 33,788,150.00 17,107,170.00 17,445,730.00
8 R.8 Pengadaan dan Pemasangan 1 Buah Tee HDPE Ø 63 mm bh 289,529.75 303,738.00 300,518.00 330,987.25 324,323.00 281,583.25 308,953.25 314,479.00 322,385.25 596,901.75 316,238.50 554,535.75 612,179.50 313,133.50 319,585.00
9 R.9 Pengadaan dan Pemasangan 1 Buah Tee HDPE Ø 90 mm bh 572,182.50 600,245.38 593,860.00 654,117.13 640,941.00 556,522.38 610,414.25 621,207.00 636,913.13 1,179,716.00 624,740.38 1,094,915.00 1,210,260.00 618,470.00 631,263.75
10 R.10 Pengadaan dan Pemasangan 1 Buah Tee HDPE Ø 110 mm bh 1,247,502.75 1,309,099.63 1,295,498.00 1,428,837.63 1,397,342.00 1,212,321.38 1,330,906.50 1,354,608.00 1,389,576.63 2,600,075.25 1,363,621.13 2,409,888.25 2,668,425.50 1,350,479.50 1,377,257.25
11 R.11 Pengadaan dan Pemasangan 1 Buah Tee HDPE Ø 160 mm bh 2,080,315.50 2,183,309.50 2,161,080.00 2,384,640.00 2,330,130.00 2,021,033.00 2,223,927.50 2,263,591.00 2,322,402.00 4,339,559.50 2,279,725.50 4,039,455.50 4,447,326.00 2,258,071.00 2,302,001.00
12 R.12 Pengadaan dan Pemasangan 1 Buah Tee HDPE Ø 200 mm bh 2,276,816.00 2,389,205.50 2,364,216.00 2,606,808.50 2,550,332.00 2,213,163.50 2,433,262.00 2,476,318.00 2,540,016.50 4,718,128.00 2,492,429.50 4,392,494.00 4,835,037.00 2,468,015.00 2,517,488.00
13 R.13 Pengadaan dan Pemasangan 1 Buah Tee HDPE Ø 250 mm bh 3,560,486.25 3,736,741.00 3,698,584.00 4,080,987.75 3,988,108.00 3,459,113.75 3,802,756.75 3,870,624.00 3,971,208.75 7,437,067.25 3,898,051.50 6,907,699.25 7,627,432.50 3,860,929.50 3,936,174.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
S S PEKERJAAN PENYAMBUNGAN PIPA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 S.1 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 63 mm bh 459,954.00 479,649.76 470,171.06 503,131.04 515,893.68 456,691.39 490,651.53 496,964.68 504,442.04 704,530.25 487,893.88 677,781.25 712,218.00 478,415.18 499,063.09
2 S.2 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 100 mm bh 594,130.25 620,119.10 608,629.68 654,220.05 666,252.04 588,055.49 634,515.95 643,068.04 653,760.05 953,735.25 633,730.96 914,911.25 965,620.50 622,241.54 647,002.88
3 S.3 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 150 mm bh 888,823.50 928,550.83 912,605.96 985,212.48 996,556.88 877,144.91 948,866.15 962,447.88 979,807.48 1,497,553.00 951,758.75 1,425,862.00 1,520,852.00 935,928.88 970,003.61
4 S.4 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 200 mm bh 1,321,194.75 1,381,590.45 1,359,804.16 1,474,557.60 1,481,056.48 1,299,869.38 1,410,269.15 1,431,422.48 1,459,607.60 2,335,356.75 1,420,767.27 2,208,557.75 2,377,889.50 1,399,210.98 1,445,256.06

BIDANG CIPTA KARYA CK - 44 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

5 S.5 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 250 mm bh 1,781,660.50 1,864,083.30 1,836,229.84 1,996,188.40 1,997,049.52 1,749,666.12 1,901,449.10 1,930,740.52 1,970,428.40 3,232,799.50 1,920,459.98 3,046,499.50 3,296,406.00 1,892,836.52 1,951,533.44
6 S.6 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 300 mm bh 2,458,211.25 2,573,476.90 2,537,255.12 2,766,351.45 2,755,016.36 2,409,219.41 2,623,445.55 2,665,017.36 2,722,536.45 4,591,852.25 2,657,182.64 4,311,091.25 4,688,952.50 2,621,420.86 2,696,796.92
7 S.7 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 400 mm bh 3,616,583.25 3,787,769.38 3,736,994.00 4,082,652.38 4,052,899.00 3,539,340.63 3,859,388.50 3,921,960.00 4,009,512.38 6,893,818.75 3,916,948.88 6,455,645.75 7,046,636.50 3,866,978.50 3,971,921.75
8 S.8 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 450 mm bh 4,381,684.00 4,590,077.23 4,530,244.68 4,954,573.18 4,910,097.04 4,284,687.37 4,675,673.45 4,752,248.04 4,860,273.18 8,441,471.50 4,750,601.59 7,894,715.50 8,633,073.00 4,691,574.04 4,815,034.13
9 S.9 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 500 mm bh 6,267,310.25 6,569,051.85 6,488,772.88 7,115,213.30 7,022,191.64 6,116,966.84 6,687,621.45 6,800,057.64 6,960,998.30 12,380,365.25 6,812,475.11 11,544,568.25 12,675,840.50 6,733,691.14 6,897,296.58
10 S.10 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 600 mm bh 7,729,374.25 8,102,186.43 8,004,254.84 8,780,771.53 8,660,264.52 7,541,598.00 8,247,551.60 8,386,725.52 8,586,651.53 15,330,425.75 8,405,065.61 14,288,226.75 15,699,328.50 8,308,974.02 8,508,229.69
11 S.11 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 700 mm bh 7,974,220.75 8,357,282.88 8,253,885.80 9,046,535.38 8,934,989.40 7,785,573.03 8,508,758.00 8,651,100.40 8,854,485.38 15,682,981.25 8,663,520.98 14,630,432.25 16,054,471.50 8,561,963.90 8,773,185.55
12 S.12 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 800 mm bh 8,219,377.75 8,612,705.35 8,503,839.68 9,312,656.30 9,210,062.04 8,029,849.24 8,770,305.95 8,915,823.04 9,122,676.30 16,036,157.75 8,922,327.21 14,973,258.75 16,410,235.50 8,815,301.54 9,038,495.38
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
T T PEKERJAAN PENGETESAN PIPA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 T.1 Penngetesan 1 Meter Pipa Ø 50 mm m 2,240.12 2,342.25 2,288.19 2,489.23 2,522.58 2,209.06 2,376.29 2,392.16 2,423.22 3,738.05 2,391.01 3,479.85 3,828.68 2,336.96 2,415.16
2 T.2 Penngetesan 1 Meter Pipa Ø 75 mm m 2,240.27 2,342.40 2,288.35 2,489.40 2,522.74 2,209.21 2,376.45 2,392.32 2,423.38 3,738.36 2,391.18 3,480.14 3,829.00 2,337.12 2,415.33
3 T.3 Penngetesan 1 Meter Pipa Ø 100 mm m 2,240.57 2,342.72 2,288.66 2,489.74 2,523.07 2,209.50 2,376.76 2,392.64 2,423.71 3,739.00 2,391.50 3,480.73 3,829.66 2,337.44 2,415.65
4 T.4 Penngetesan 1 Meter Pipa Ø 150 mm m 2,241.32 2,343.50 2,289.43 2,490.59 2,523.90 2,210.22 2,377.56 2,393.45 2,424.54 3,740.59 2,392.32 3,482.20 3,831.29 2,338.25 2,416.47
5 T.5 Penngetesan 1 Meter Pipa Ø 200 mm m 2,242.29 2,344.51 2,290.43 2,491.70 2,524.98 2,211.17 2,378.59 2,394.50 2,425.62 3,742.65 2,393.38 3,484.11 3,833.41 2,339.30 2,417.53
6 T.6 Penngetesan 1 Meter Pipa Ø 250 mm m 2,243.63 2,345.92 2,291.82 2,493.23 2,526.47 2,212.47 2,380.02 2,395.94 2,427.11 3,745.51 2,394.85 3,486.76 3,836.35 2,340.74 2,419.00
7 T.7 Penngetesan 1 Meter Pipa Ø 300 mm m 2,245.28 2,347.64 2,293.51 2,495.10 2,528.29 2,214.06 2,381.76 2,397.72 2,428.93 3,749.00 2,396.65 3,489.99 3,839.94 2,342.52 2,420.80
8 T.8 Penngetesan 1 Meter Pipa Ø 400 mm m 2,249.39 2,351.94 2,297.75 2,499.78 2,532.84 2,218.05 2,386.13 2,402.14 2,433.48 3,757.73 2,401.14 3,498.07 3,848.93 2,346.94 2,425.29
9 T.9 Penngetesan 1 Meter Pipa Ø 500 mm m 2,251.78 2,354.45 2,300.21 2,502.51 2,535.49 2,220.37 2,388.67 2,404.72 2,436.13 3,762.80 2,403.75 3,502.78 3,854.15 2,349.52 2,427.90
10 T.10 Penngetesan 1 Meter Pipa Ø 600 mm m 2,261.12 2,364.22 2,309.85 2,513.14 2,545.84 2,229.42 2,398.59 2,414.78 2,446.48 3,782.64 2,413.96 3,521.15 3,874.56 2,359.58 2,438.11
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
U U PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 U.1 Pemasangan 1 buah instalasi titik Lampu bh 563,212.50 590,950.50 586,224.00 638,560.50 632,764.50 548,722.50 603,853.50 613,893.00 627,796.50 1,119,559.50 614,307.00 1,043,790.60 1,161,684.00 609,580.50 625,140.00
2 U.2 Pemasangan 1 buah instalasi titik Lampu Luar bh 658,495.75 690,645.15 683,198.90 753,837.65 735,433.05 639,175.75 701,019.30 713,295.55 732,816.80 1,389,132.15 719,977.05 1,286,816.65 1,429,139.50 712,530.80 727,976.45
3 U.3 Pemasangan 1 buah instalasi titik Lampu Sorot bh 737,467.40 772,790.80 766,040.30 842,319.80 825,670.10 716,215.40 784,166.60 798,645.10 818,919.60 1,523,119.80 802,341.20 1,411,859.60 1,563,277.80 795,590.70 812,548.60
4 U.4 Pemasangan 1 buah Instalasi titik Stop Kontak bh 665,850.00 698,538.75 692,967.00 756,412.50 747,718.50 648,099.75 712,890.75 724,983.00 741,784.50 1,337,634.00 726,242.25 1,245,274.05 1,385,554.50 720,670.50 738,282.75
5 U.5 Pemasangan 1 buah Instalasi titik Detector bh 502,837.50 528,281.25 522,709.50 569,853.75 564,782.25 490,521.00 539,010.75 547,480.50 560,659.50 989,874.00 548,739.75 925,769.55 1,030,549.50 543,168.00 558,969.00
6 U.6 Pemasangan 1 buah Instalasi titik TV bh 669,472.50 702,161.25 695,865.00 760,035.00 750,978.75 651,360.00 715,788.75 727,518.75 746,493.75 1,343,430.00 731,313.75 1,254,402.75 1,395,697.50 723,206.25 742,267.50
7 U.7 Pemasangan 1 buah Insalasi titik Telepon bh 450,673.50 472,132.50 468,372.00 508,633.50 505,735.50 439,081.50 482,862.00 490,969.50 501,975.00 877,576.50 490,417.50 820,789.50 913,905.00 486,657.00 500,284.50
8 U.8 Pemasangan 1 M Kabel Power ( NYM 3x2,5 mm ) m 55,441.50 58,133.65 57,627.65 62,647.40 62,240.30 54,113.25 59,394.05 60,383.05 61,734.30 108,124.15 60,296.80 101,002.20 111,964.00 59,790.80 61,419.20
9 U.9 Pemasangan 1 M Kabel Power ( NYY 4x2,5 mm + NYA 2,5 mm ) m 50,807.00 53,194.40 52,780.40 57,161.90 57,053.80 49,599.50 54,362.80 55,259.80 56,519.05 96,940.40 55,116.05 90,871.85 100,510.00 54,581.30 56,054.45
10 U.10 Pemasangan 1 M Kabel Power ( NYY 4x4 mm + NYA 4 mm ) m 68,315.75 71,548.40 70,892.90 77,327.15 76,615.30 66,504.50 72,958.30 74,096.80 75,839.05 134,131.40 74,194.55 125,213.15 138,667.00 73,418.30 75,495.20
11 U.11 Pemasangan 1 M Kabel Power ( NYY 4x6 mm + NYA 6 mm ) m 90,812.63 95,160.78 94,249.40 103,021.03 101,734.18 88,397.63 96,947.30 98,703.93 101,064.30 181,548.78 98,893.68 169,269.08 187,519.00 97,982.30 100,343.83
12 U.12 Pemasangan 1 M Kabel Power ( NYY 4x16 mm + NYA 16 mm ) m 188,257.88 197,556.78 195,558.65 215,197.78 210,892.18 182,944.88 201,033.80 204,480.93 209,739.30 389,721.78 205,636.68 361,406.48 401,005.00 203,759.30 208,052.83
13 U.13 Pemasangan 1 M Kabel Power ( NYY 4x185 mm + NYA 95 mm ) m 1,106,199.38 1,161,383.28 1,150,208.15 1,270,794.28 1,238,957.68 1,073,355.38 1,180,557.80 1,201,755.18 1,233,699.30 2,348,769.78 1,211,846.43 2,172,584.03 2,413,424.50 1,201,033.55 1,223,077.33
14 U.14 Pemasangan 1 M Kabel Power ( NYM 3x4 mm ) m 61,841.25 64,895.65 64,268.90 70,013.15 69,364.55 60,271.50 66,156.05 67,265.80 68,858.55 121,648.15 67,300.30 113,608.50 125,971.00 66,673.55 68,422.70
15 U.15 Pemasangan 1 M Kabel Power ( NYFGBY 4x240 mm + NYA 95 mm ) m 1,862,057.00 1,955,103.50 1,936,398.75 2,139,586.50 2,085,605.50 1,806,632.75 1,987,228.75 2,023,080.00 2,076,923.00 3,957,150.00 2,040,203.50 3,660,176.30 4,066,492.00 2,022,102.50 2,059,109.50

BIDANG CIPTA KARYA CK - 45 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

16 U.16 Pemasangan 1 M Kabel Power ( NYY 4x240 mm + NYA 95 mm ) m 1,479,113.90 1,552,473.55 1,537,270.55 1,696,384.55 1,656,430.10 1,436,368.40 1,578,218.60 1,606,583.35 1,648,834.35 3,111,223.80 1,618,248.95 2,880,493.55 3,195,093.30 1,603,528.95 1,634,493.85
17 U.17 Pemasangan 1 M Kabel Power ( NYY 3x2,5 mm ) m 106,427.90 111,201.55 109,764.05 117,819.80 119,041.10 104,978.90 113,641.85 115,562.35 117,845.10 182,070.30 113,824.70 172,529.90 186,244.80 112,507.95 116,787.10
18 U.18 Pemasangan 1 M Kabel Power ( FRC 4x4 mm + NYA 4 mm ) m 261,229.40 273,610.30 270,723.80 295,805.30 292,438.10 255,071.15 278,707.10 283,525.60 290,396.85 512,200.80 283,478.45 477,906.65 525,552.30 280,471.20 287,889.85
19 U.19 Pemasangan 1 M Kabel Power ( FRC 3x2.5 mm ) m 167,889.65 175,682.05 173,640.80 188,458.55 187,868.60 164,629.40 179,329.85 182,337.10 186,431.10 313,446.30 181,323.95 294,028.55 321,243.30 179,282.70 184,890.10
20 U.20 Pemasangan 1 M Kabel Power ( FRC 4x6 mm + NYA 6 mm ) m 329,453.15 345,335.80 341,604.05 374,172.05 368,752.10 321,242.15 351,519.35 357,786.85 366,590.10 657,825.30 358,222.70 612,446.30 675,040.80 354,732.45 363,358.60
21 U.21 Pemasangan Kabel Tray ( W=200 mm ) m 170,395.50 178,883.65 177,170.15 194,868.65 190,959.80 165,565.50 182,076.05 185,238.55 189,970.80 353,488.15 186,359.80 327,915.60 364,090.00 184,646.30 188,448.20
22 U.22 Pemasangan Tee Kabel Tray ( W=200 mm ) bh 216,642.75 227,425.15 225,228.65 247,998.65 242,761.55 210,484.50 231,462.80 235,591.30 241,651.80 452,261.65 237,074.80 419,202.60 465,520.00 234,999.05 239,646.20
23 U.23 Pemasangan Kabel Tray ( W=900 mm ) m 579,888.65 608,329.30 602,182.55 662,281.55 649,375.10 564,191.15 618,859.85 629,836.60 646,005.60 1,192,506.30 632,808.20 1,106,700.20 1,224,211.80 626,782.20 640,359.10
24 U.24 Pemasangan Kabel Tray ( W=600 mm ) m 376,183.40 394,481.05 390,266.30 428,026.55 421,157.60 366,644.15 401,509.85 408,622.60 418,754.10 757,806.30 409,541.45 704,820.05 777,678.30 405,568.20 415,160.35
25 U.25 Pemasangan Reduser Kabel Tray ( W=400 mm ) m 276,323.15 289,549.30 286,421.30 313,193.30 309,343.10 269,802.65 295,008.35 300,189.10 307,422.60 544,803.30 300,141.95 507,900.95 558,879.30 297,134.70 304,794.85
26 U.26 Pemasangan Kabel Tray ( W=400 mm ) m 300,956.15 315,510.55 312,141.05 341,569.55 336,994.85 293,590.40 321,211.10 326,754.10 334,832.85 597,208.80 327,069.20 556,370.00 612,733.80 323,699.70 331,842.85
27 U.27 Pemasangan Tee Kabel Tray ( W=400 mm ) bh 396,107.15 415,370.80 411,035.30 450,969.05 443,496.35 385,964.15 422,761.85 430,236.85 440,972.10 800,310.30 431,397.20 744,160.40 821,389.80 427,182.45 437,136.85
28 U.28 Pemasangan Elbow Kabel Tray ( W=400 mm ) m 368,213.90 386,028.55 382,055.30 418,849.55 412,222.10 358,916.15 393,057.35 399,928.60 409,939.35 740,901.30 400,847.45 689,170.85 760,290.30 396,874.20 406,345.60
29 U.29 Pemasangan Kabel Ladder ( W=200 mm ) m 216,672.65 227,000.80 224,476.55 244,607.30 242,568.35 211,842.65 231,252.35 235,225.60 240,768.60 417,291.30 234,695.45 390,097.25 427,986.30 232,171.20 238,623.85
30 U.30 Pemasangan Tee Kabel Ladder ( W=200 mm ) bh 262,919.90 275,542.30 272,535.05 297,737.30 294,370.10 256,761.65 280,639.10 285,578.35 292,449.60 516,064.80 285,410.45 481,384.25 529,416.30 282,523.95 289,821.85
31 U.31 Pemasangan Lampu sorot bh 1,467,280.40 1,540,157.05 1,525,074.80 1,682,860.55 1,643,268.35 1,425,017.90 1,565,781.35 1,594,025.35 1,635,914.10 3,086,349.30 1,605,570.20 2,857,671.80 3,169,735.80 1,590,970.95 1,621,694.35
32 U.32 Pemasangan Lampu T-Bulk-18 watt + batt bh 252,535.40 264,674.80 261,788.30 285,903.80 282,778.10 246,739.40 269,650.85 274,348.60 280,857.60 494,088.30 274,059.95 460,953.35 506,715.30 271,294.20 278,471.35
33 U.33 Pemasangan Lampu Baret-32 watt bh 296,056.00 310,741.50 307,757.25 340,014.75 331,527.75 287,241.25 315,692.25 321,453.75 329,992.50 627,687.25 324,047.00 580,639.60 644,609.50 321,183.50 327,140.50
34 U.34 Pemasangan Splitter TV bh 172,810.50 181,419.40 179,585.15 197,645.90 193,616.30 167,980.50 184,732.55 187,895.05 192,748.05 358,801.15 189,016.30 332,697.30 369,403.00 187,302.80 191,225.45
35 U.35 Pemasangan Penangkal Petir bh 15,418,735.40 16,189,184.80 16,034,636.30 17,727,033.80 17,268,922.10 14,957,953.40 16,451,962.10 16,750,927.60 17,198,777.85 32,858,710.80 16,897,712.45 30,383,527.85 33,754,020.30 16,747,873.20 17,049,197.35
36 U.36 Pemasangan Stop Kontak daya bh 55,320.75 58,012.90 57,506.90 62,526.65 62,119.55 53,992.50 59,273.30 60,262.30 61,613.55 107,882.65 60,296.80 101,002.20 111,964.00 59,670.05 61,298.45
37 U.37 Pemasangan Stop Kontak-TV bh 80,919.75 84,940.15 84,071.90 91,989.65 90,737.30 78,867.00 86,683.55 88,155.55 90,231.30 162,703.15 88,310.80 151,427.40 167,992.00 87,563.30 89,674.70
38 U.38 Pemasangan Stop Kontak-TELEPON bh 79,470.75 83,370.40 82,622.90 90,299.15 89,167.55 77,418.00 85,113.80 86,465.05 88,540.80 159,563.65 86,741.05 148,601.85 164,852.50 85,872.80 87,984.20
39 U.39 Pemasangan Saklar tunggal bh 45,057.00 47,266.15 46,760.15 50,693.15 50,527.55 44,091.00 48,405.80 49,153.30 50,263.05 86,147.65 49,067.05 80,788.65 89,504.50 48,561.05 49,947.95
40 U.40 Pemasangan Sakalr Ganda bh 77,176.50 80,955.40 80,207.90 87,642.65 86,511.05 75,244.50 82,698.80 84,050.05 86,125.80 154,733.65 84,205.30 144,037.50 159,781.00 83,457.80 85,569.20
41 U.41 Pemasangan Manual push button bh 211,450.50 221,991.40 219,794.90 242,081.90 236,965.55 205,413.00 225,908.30 229,916.05 235,735.05 441,152.65 231,399.55 408,987.15 454,169.50 229,323.80 233,970.95
42 U.42 Pemasangan 1 buah instalasi titik Manual PUSH BUTTON bh 665,108.25 697,142.65 689,753.90 762,635.15 744,115.55 643,373.25 705,044.30 719,678.05 739,141.80 1,399,424.65 724,059.55 1,295,775.15 1,439,489.50 719,085.80 731,943.95
43 U.43 Pemasangan Bell Alarm bh 206,258.25 216,557.65 214,481.90 236,165.15 231,169.55 200,462.25 220,474.55 224,361.55 230,059.80 430,285.15 225,724.30 398,771.70 442,819.00 223,769.30 228,295.70
44 U.44 Pemasangan 1 buah instalasi titik Bell Alarm bh 665,108.25 697,142.65 689,753.90 762,635.15 744,115.55 643,373.25 705,044.30 719,678.05 739,141.80 1,399,424.65 724,059.55 1,295,775.15 1,439,489.50 719,085.80 731,943.95
45 U.45 Pemasangan Lampu indikator bh 102,413.25 107,520.40 106,410.65 116,743.40 114,766.55 99,636.00 109,505.30 111,460.30 114,139.80 208,346.65 111,857.05 193,810.65 215,084.50 110,868.05 113,341.70
46 U.46 Pemasangan 1 buah instalasi titik Lampu indikator bh 665,108.25 697,142.65 689,753.90 762,635.15 744,115.55 643,373.25 705,044.30 719,678.05 739,141.80 1,399,424.65 724,059.55 1,295,775.15 1,439,489.50 719,085.80 731,943.95
47 U.47 Pemasangan MCFA bh 7,316,651.90 7,681,985.05 7,608,459.80 8,409,601.55 8,194,559.60 7,098,818.90 7,806,865.85 7,948,614.85 8,160,761.10 15,568,518.30 8,016,912.20 14,398,087.40 15,992,419.80 7,945,560.45 8,089,788.85
48 U.48 Pemasangan Lampu Taman (t=1,5 m) bh 681,922.40 715,434.55 708,201.05 779,650.55 763,604.60 663,206.15 727,655.60 740,685.10 759,752.10 1,410,097.80 744,622.70 1,307,966.30 1,447,840.80 737,630.70 753,139.60
49 U.49 Pemasangan Lampu Taman (t=2,5 m) bh 809,917.40 849,829.30 841,388.30 926,844.80 906,934.85 787,337.15 864,223.85 879,668.35 902,478.60 1,683,234.30 884,934.20 1,560,527.00 1,728,463.80 876,613.95 894,658.60
50 U.50 Pemasangan Lampu SL-13 watt bh 25,742.75 26,967.50 26,668.50 29,256.00 28,801.75 25,018.25 27,301.00 27,841.50 28,502.75 52,026.00 27,956.50 48,481.70 53,521.00 27,657.50 28,336.00
51 U.51 Pemasangan Lampu Pijar-40 watt bh 68,874.65 71,716.30 70,761.80 74,591.30 77,020.10 68,512.40 73,552.85 74,748.85 75,944.85 101,892.30 72,648.95 98,413.55 103,893.30 71,694.45 75,249.10
52 U.52 Pemasangan Lampu T-Bulk-18 watt bh 198,127.75 207,983.25 205,965.00 227,475.75 221,886.75 192,331.75 211,364.25 215,193.75 220,834.50 419,031.25 216,821.00 387,632.80 430,157.50 214,923.50 218,948.50

BIDANG CIPTA KARYA CK - 46 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

53 U.53 Pemasangan Lampu T-Bulk-36 watt bh 198,127.75 207,983.25 205,965.00 227,475.75 221,886.75 192,331.75 211,364.25 215,193.75 220,834.50 419,031.25 216,821.00 387,632.80 430,157.50 214,923.50 218,948.50
54 U.54 Pemasangan Lampu Baret-32 watt C/W BATTERY CHARGER bh 296,056.00 310,741.50 307,757.25 340,014.75 331,527.75 287,241.25 315,692.25 321,453.75 329,992.50 627,687.25 324,047.00 580,639.60 644,609.50 321,183.50 327,140.50
55 U.55 Pemasangan Lampu V-Shafe 2x36 W bh 296,056.00 310,741.50 307,757.25 340,014.75 331,527.75 287,241.25 315,692.25 321,453.75 329,992.50 627,687.25 324,047.00 580,639.60 644,609.50 321,183.50 327,140.50
56 U.56 Pemasangan Lampu PL 7 Watt Fitting E27 bh 75,371.00 79,010.75 78,228.75 86,370.75 84,346.75 73,197.50 80,310.25 81,696.00 83,927.00 158,044.50 82,294.00 146,289.20 162,196.00 81,512.00 83,156.50
57 U.57 Pemasangan Panel Unit bh 258,060.00 270,774.40 268,215.65 295,694.90 289,129.55 250,452.75 275,295.05 280,268.80 287,416.05 539,926.15 282,235.30 500,491.50 555,841.00 279,676.55 285,168.95
58 U.58 Pemasangan GENSET 25 kVA bh 138,139,133.90 145,045,494.55 143,663,763.80 158,855,407.55 154,715,749.10 133,996,684.40 147,394,590.35 150,074,262.85 154,093,294.35 294,743,967.30 151,411,521.95 272,508,384.95 302,781,639.30 150,071,208.45 152,753,360.35
59 U.59 Pemasangan 1 buah Grounding box bh 635,312.90 666,530.80 659,780.30 726,037.55 711,440.60 617,924.90 677,906.60 690,090.85 707,708.85 1,310,599.80 693,545.45 1,216,027.25 1,345,686.30 687,036.45 701,579.35
60 U.60 Pemasangan 1 buah Grounding Rod Gip 1" bh 488,963.90 512,816.05 507,635.30 557,712.05 547,462.10 476,043.65 521,897.60 531,183.85 544,575.60 998,581.80 533,189.45 927,386.45 1,024,974.30 528,129.45 539,895.10
61 U.61 Pemasangan 1 M Kabel pentanahan ( BC 50 mm ) m 148,048.13 155,294.28 153,779.15 168,950.53 165,852.43 144,063.38 158,288.30 161,010.93 165,061.80 304,230.78 161,804.43 282,508.43 313,340.50 160,289.30 163,858.33
62 U.62 Pemasangan 1 M Kabel pentanahan ( NYY 70 mm ) m 188,658.65 197,537.80 195,255.05 212,367.05 211,173.35 184,673.90 201,306.35 204,796.60 209,494.35 357,399.30 203,904.20 334,673.00 366,403.80 201,742.20 207,711.85
63 U.63 Pemasangan 1 buah Terminal Box Telepon m 89,522.90 93,451.30 92,255.30 98,379.05 100,204.10 88,556.90 95,650.10 97,208.35 99,008.10 146,086.80 95,349.95 139,275.35 149,295.30 94,153.95 98,070.85
64 U.64 Pemasangan 1 buah Terminal Box TV bh 335,693.63 352,358.28 349,031.90 384,730.78 376,078.18 326,033.63 358,491.80 364,836.93 374,321.55 704,637.78 367,441.68 652,655.48 724,615.00 364,115.30 371,306.83
65 U.65 Pemasangan 1 buah Terminal Fire Alarm bh 320,720.63 336,660.78 333,455.15 367,584.28 359,293.93 311,543.63 342,552.80 348,656.43 357,658.05 672,759.78 351,019.68 623,095.88 691,771.00 347,934.80 354,764.08
66 U.66 Pemasangan 1 buah Antena UHF bh 884,019.38 928,094.28 919,213.40 1,015,408.03 990,212.68 857,937.38 943,525.55 960,617.43 986,041.05 1,874,705.28 968,535.18 1,734,623.78 1,926,802.00 959,895.80 977,592.58
67 U.67 Pemasangan 1 buah Antena VHF bh 884,019.38 928,094.28 919,213.40 1,015,408.03 990,212.68 857,937.38 943,525.55 960,617.43 986,041.05 1,874,705.28 968,535.18 1,734,623.78 1,926,802.00 959,895.80 977,592.58
68 U.68 Pemasangan Master Amplifier ( MIXER ) bh 659,221.40 691,646.80 684,654.80 753,568.55 738,247.10 641,108.90 703,384.85 716,052.10 734,394.60 1,361,556.30 719,748.20 1,263,192.20 1,398,091.80 712,997.70 728,023.60
69 U.69 Pemasangan 1 M Kabel Coaxial ( 7c-2v mm ) m 33,344.25 34,949.65 34,564.40 37,289.90 37,486.55 32,619.75 35,847.80 36,353.80 37,101.30 61,031.65 36,146.80 57,532.20 63,664.00 35,761.55 36,906.95
70 U.70 Pemasangan MDF-FA ( 5 zone ) bh 534,365.90 560,512.30 554,848.55 609,996.80 598,418.60 519,996.65 570,197.60 580,329.10 595,169.85 1,095,181.80 582,817.70 1,016,717.30 1,124,230.80 577,274.70 590,006.35
71 U.71 Pemasangan 1 M Kabel Power fire alarm ( NYA 5x2x2,5 mm ) m 85,508.25 89,770.15 88,901.90 97,302.65 95,929.55 83,334.75 91,634.30 92,985.55 95,302.80 172,604.65 93,261.55 160,338.75 177,893.50 92,393.30 94,625.45
72 U.72 Pemasangan 1 M Kabel Power fire alarm ( NYA 3x2x2,5 mm ) m 71,018.25 74,555.65 73,808.15 80,639.15 79,628.30 69,207.00 76,057.55 77,167.30 79,122.30 141,451.15 77,322.55 131,648.55 146,015.50 76,575.05 78,565.70
73 U.73 Pemasangan 1 M Kabel Power fire alarm ( NYA 20x1,5 mm ) m 107,243.25 112,471.15 111,482.15 122,177.15 120,200.30 104,224.50 114,576.80 116,411.05 119,332.05 218,489.65 116,928.55 202,939.35 225,227.50 115,818.80 118,533.95
74 U.74 Pemasangan 1 M jelly armoured ( kabel telepo ) m 84,330.65 88,017.55 86,821.55 92,462.30 94,287.35 83,485.40 90,095.60 91,533.10 93,212.10 134,977.80 89,674.70 129,059.90 137,944.80 88,478.70 92,395.60
75 U.75 Pemasangan Heat Detector bh 99,394.50 104,260.15 103,271.15 113,241.65 111,385.55 96,738.00 106,365.80 108,200.05 110,758.80 202,067.65 108,596.80 187,942.20 208,564.00 107,607.80 110,081.45
76 U.76 Pemasangan Smoke Detector bh 454,641.00 477,256.90 472,766.15 521,738.90 509,256.80 441,358.50 485,400.05 494,117.05 507,181.05 960,136.15 498,015.55 888,895.95 987,401.50 493,524.80 502,881.20
77 U.77 Pemasangan Panel MDP bh 75,864,700.75 79,657,360.50 78,898,308.75 87,240,615.75 84,968,238.75 73,590,133.00 80,947,332.75 82,419,051.00 84,626,136.75 161,857,693.00 83,152,578.50 149,648,191.30 166,270,312.00 82,416,348.50 83,889,901.00
78 U.78 Pemasangan Panel DB bh 12,909,635.50 13,554,584.25 13,425,123.00 14,842,296.75 14,458,570.50 12,523,718.50 13,774,228.50 14,024,560.50 14,399,748.00 27,511,484.50 14,147,576.00 25,439,186.80 28,260,307.00 14,021,858.00 14,274,265.75
79 U.79 Pemasangan Panel Kebakaran bh 7,417,080.25 7,787,322.75 7,712,802.75 8,525,864.25 8,306,961.75 7,195,987.00 7,913,748.00 8,057,578.50 8,272,772.25 15,790,523.50 8,127,222.50 14,602,550.50 16,219,600.00 8,054,876.00 8,200,661.50
80 U.80 Pemasangan Panel Pompa Air Bersih bh 13,313,544.25 13,978,658.25 13,845,091.50 15,306,822.00 14,910,900.00 12,915,552.25 14,205,306.00 14,463,486.75 14,850,266.25 28,373,639.50 14,590,245.50 26,235,991.90 29,145,646.00 14,460,784.25 14,720,920.00
81 U.81 Pemasangan Panel Unit bh 258,060.00 270,774.40 268,215.65 295,694.90 289,129.55 250,452.75 275,295.05 280,268.80 287,416.05 539,926.15 282,235.30 500,491.50 555,841.00 279,676.55 285,168.95
82 U.82 Pemasangan P-PLN bh 7,088,072.15 7,441,813.30 7,370,582.30 8,146,487.30 7,938,448.85 6,877,001.15 7,562,709.35 7,700,111.35 7,905,616.35 15,080,205.30 7,766,114.45 13,946,651.45 15,490,824.30 7,697,056.95 7,836,817.60
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
V V PEKERJAAN LANSEKAP 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 V.1 Pengadaan dan penanaman Ara Rea Polyback 53,889.00 56,488.00 55,855.50 61,605.50 60,191.00 52,279.00 57,316.00 58,236.00 59,731.00 112,263.00 58,799.50 103,937.00 115,310.50 58,167.00 59,271.00
2 V.2 Pengadaan dan penanaman Asoka Polyback 32,860.00 34,420.00 34,070.00 37,470.00 36,640.00 31,860.00 34,840.00 35,440.00 36,340.00 67,620.00 35,730.00 62,660.00 69,470.00 35,380.00 36,040.00
3 V.3 Pengadaan dan penanaman Bakung Polyback 14,329.00 14,973.00 14,800.50 16,180.50 15,916.00 13,869.00 14,996.00 15,226.00 15,571.00 27,623.00 15,329.50 25,691.00 28,370.50 15,157.00 15,456.00
4 V.4 Pengadaan dan penanaman Brokoli Polyback 58,259.00 61,088.00 60,455.50 66,665.50 65,021.00 56,534.00 61,916.00 63,066.00 64,676.00 121,463.00 63,514.50 112,424.00 124,740.50 62,997.00 64,101.00
5 V.5 Pengadaan dan penanaman Brokoli Kuning Polyback 58,259.00 61,088.00 60,455.50 66,665.50 65,021.00 56,534.00 61,916.00 63,066.00 64,676.00 121,463.00 63,514.50 112,424.00 124,740.50 62,997.00 64,101.00

BIDANG CIPTA KARYA CK - 47 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

6 V.6 Pengadaan dan penanaman Bugenvil Parigata t = 0,75 m pohon 441,554.00 463,473.00 459,045.50 507,460.50 494,316.00 428,329.00 470,971.00 479,481.00 492,246.00 939,573.00 483,724.50 868,802.00 965,160.50 479,412.00 487,991.00
7 V.7 Pengadaan dan penanaman Bunga Krisan Polyback 119,669.00 125,488.00 124,280.50 137,275.50 133,906.00 116,104.00 127,466.00 129,766.00 133,101.00 252,563.00 130,904.50 233,726.00 259,520.50 129,697.00 132,066.00
8 V.8 Pengadaan dan penanaman Dolar t= 1 m pohon 3,659,714.00 3,842,633.00 3,806,005.50 4,208,390.50 4,098,761.00 3,550,004.00 3,904,756.00 3,975,711.00 4,082,086.00 7,807,143.00 4,011,119.50 7,218,113.00 8,019,950.50 3,975,642.00 4,046,666.00
9 V.9 Pengadaan dan penanaman Kalatea kodok Polyback 119,669.00 125,488.00 124,280.50 137,275.50 133,906.00 116,104.00 127,466.00 129,766.00 133,101.00 252,563.00 130,904.50 233,726.00 259,520.50 129,697.00 132,066.00
10 V.10 Pengadaan dan penanaman Kalatea Merah Polyback 105,064.00 110,193.00 109,100.50 120,485.50 117,461.00 101,959.00 111,941.00 113,896.00 116,886.00 221,513.00 114,919.50 204,953.00 227,550.50 113,827.00 115,851.00
11 V.11 Pengadaan dan penanaman Bunga Krisan Polyback 119,669.00 125,488.00 124,280.50 137,275.50 133,906.00 116,104.00 127,466.00 129,766.00 133,101.00 252,563.00 130,904.50 233,726.00 259,520.50 129,697.00 132,066.00
12 V.12 Pengadaan dan penanaman Kucai Polyback 31,924.00 33,373.00 33,085.50 36,420.50 35,581.00 31,004.00 33,856.00 34,431.00 35,236.00 65,343.00 34,649.50 60,467.00 67,010.50 34,362.00 35,006.00
13 V.13 Pengadaan dan penanaman Lili Brasil Polyback 24,564.00 25,668.00 25,380.50 27,910.50 27,301.00 23,874.00 26,036.00 26,496.00 27,071.00 49,703.00 26,599.50 45,977.00 50,910.50 26,427.00 26,841.00
14 V.14 Pengadaan dan penanaman Lili Paris Polyback 24,564.00 25,668.00 25,380.50 27,910.50 27,301.00 23,874.00 26,036.00 26,496.00 27,071.00 49,703.00 26,599.50 45,977.00 50,910.50 26,427.00 26,841.00
15 V.15 Pengadaan dan penanaman Nanas nanasan Polyback 112,424.00 117,898.00 116,805.50 128,995.50 125,741.00 109,089.00 119,761.00 121,946.00 125,051.00 237,153.00 122,969.50 219,443.00 243,650.50 121,877.00 124,016.00
16 V.16 Pengadaan dan penanaman Palem Putri t = 2 m pohon 660,974.00 693,933.00 687,205.50 759,770.50 740,071.00 641,194.00 705,111.00 717,876.00 736,966.00 1,407,853.00 724,189.50 1,301,639.00 1,446,090.50 717,807.00 730,641.00
17 V.17 Pengadaan dan penanaman Palem Kuning pohon 368,414.00 386,768.00 383,030.50 423,395.50 412,436.00 357,374.00 392,886.00 400,016.00 410,596.00 783,403.00 403,454.50 724,316.00 804,620.50 399,947.00 407,031.00
18 V.18 Pengadaan dan penanaman Palem Phonik t= 1 m pohon 514,694.00 540,293.00 535,175.50 591,525.50 576,311.00 499,284.00 548,941.00 558,946.00 573,781.00 1,095,513.00 563,879.50 1,013,081.00 1,125,470.50 558,877.00 568,836.00
19 V.19 Pengadaan dan penanaman Palem Regu pohon 295,274.00 309,948.00 306,900.50 339,215.50 330,556.00 286,419.00 314,801.00 320,551.00 329,061.00 627,233.00 323,299.50 580,037.00 644,310.50 320,482.00 326,186.00
20 V.20 Pengadaan dan penanaman Pucuk Merah t = 0,75 m pohon 222,134.00 233,128.00 230,885.50 255,150.50 248,561.00 215,464.00 236,831.00 241,086.00 247,411.00 471,293.00 243,144.50 435,758.00 484,000.50 241,017.00 245,341.00
21 V.21 Pengadaan dan penanaman Rembusa Hijau Polyback 55,269.00 57,868.00 57,350.50 63,215.50 61,686.00 53,659.00 58,811.00 59,846.00 61,341.00 115,253.00 60,294.50 106,628.00 118,300.50 59,777.00 60,881.00
22 V.22 Pengadaan dan penanaman Rembusa Putih Polyback 55,269.00 57,868.00 57,350.50 63,215.50 61,686.00 53,659.00 58,811.00 59,846.00 61,341.00 115,253.00 60,294.50 106,628.00 118,300.50 59,777.00 60,881.00
23 V.23 Pengadaan dan penanaman Rumput Jepang m2 119,669.00 125,488.00 124,280.50 137,275.50 133,906.00 116,104.00 127,466.00 129,766.00 133,101.00 252,563.00 130,904.50 233,726.00 259,520.50 129,697.00 132,066.00
24 V.24 Pengadaan dan penanaman Sambang dara Polyback 55,269.00 57,868.00 57,350.50 63,215.50 61,686.00 53,659.00 58,811.00 59,846.00 61,341.00 115,253.00 60,294.50 106,628.00 118,300.50 59,777.00 60,881.00
25 V.25 Pengadaan dan penanaman Tabib Buya t = 3-4 m pohon 734,114.00 770,753.00 763,335.50 843,950.50 822,066.00 712,149.00 783,081.00 797,341.00 818,616.00 1,563,793.00 804,344.50 1,445,918.00 1,606,400.50 797,272.00 811,486.00
26 V.26 Pengadaan dan penanaman Taiwan Beuty Polyback 24,564.00 25,668.00 25,380.50 27,910.50 27,301.00 23,874.00 26,036.00 26,496.00 27,071.00 49,703.00 26,599.50 45,977.00 50,910.50 26,427.00 26,841.00
27 V.27 Pengadaan dan penanaman Terang Bulan Polyback 24,564.00 25,668.00 25,380.50 27,910.50 27,301.00 23,874.00 26,036.00 26,496.00 27,071.00 49,703.00 26,599.50 45,977.00 50,910.50 26,427.00 26,841.00
28 V.28 Urugan dengan top soil m3 450,662.00 472,328.00 465,290.00 510,830.00 505,172.00 440,036.00 479,504.00 486,404.00 496,616.00 880,118.00 489,026.00 816,720.80 903,992.00 482,264.00 493,166.00
29 V.29 Pemupukan dengan kompos kg 6,164.00 6,348.00 6,175.50 6,635.50 6,601.00 6,049.00 6,256.00 6,371.00 6,371.00 8,993.00 6,359.50 8,625.00 9,280.50 6,302.00 6,371.00
30 V.30 Pengadaan dan penanaman Rumput Gajah Mini m2 102,304.00 107,088.00 106,110.50 116,575.50 113,896.00 99,429.00 108,721.00 110,561.00 113,321.00 210,473.00 111,469.50 195,063.00 216,050.50 110,492.00 112,401.00
31 V.31 Pengadaan dan penanaman Melati putih Polyback 34,799.00 36,363.00 36,075.50 39,640.50 38,801.00 33,764.00 36,961.00 37,536.00 38,456.00 71,553.00 37,869.50 66,263.00 73,450.50 37,467.00 38,111.00
32 V.32 Pengadaan dan penanaman Bulu domba Polyback 40,664.00 42,573.00 42,170.50 46,425.50 45,356.00 39,514.00 43,286.00 43,976.00 45,126.00 84,203.00 44,309.50 77,855.00 86,330.50 43,907.00 44,666.00
33 V.33 Pengadaan dan penanaman Adam hawa Polyback 37,789.00 39,583.00 39,180.50 43,090.50 42,136.00 36,639.00 40,066.00 40,756.00 41,791.00 77,763.00 41,089.50 72,059.00 79,890.50 40,687.00 41,446.00
34 V.34 Perawatan Tanaman hari 424,350.00 445,050.00 433,550.00 456,550.00 486,450.00 424,350.00 463,450.00 463,450.00 463,450.00 571,550.00 454,250.00 548,550.00 617,550.00 442,750.00 463,450.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
W W PEKERJAAN SALURAN U-DITCH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 W.1 Saluran U-ditch : 30 x 50 x 8 cm ; L = 60 cm bh 911,751.35 950,498.79 939,125.47 1,010,637.90 1,010,152.47 892,715.11 961,186.38 977,334.23 1,015,100.24 1,609,272.66 977,576.32 1,562,439.55 1,687,208.96 964,509.44 997,730.64
2 W.2 Saluran U-ditch : 40 x 60 x 8 cm ; L = 60 cm bh 1,009,090.19 1,052,433.99 1,039,149.82 1,121,297.25 1,118,407.43 987,098.72 1,060,384.54 1,077,829.17 1,121,961.06 1,798,522.56 1,082,485.62 1,744,300.34 1,888,255.13 1,067,525.71 1,102,646.31
3 W.3 Saluran U-ditch : 50 x 80 x 10 cm ; L = 60 cm bh 1,351,202.54 1,410,717.86 1,390,639.50 1,510,226.86 1,498,831.65 1,318,902.44 1,408,307.73 1,430,174.73 1,497,475.43 2,461,014.61 1,451,177.24 2,382,448.47 2,593,629.93 1,431,112.36 1,472,821.91
4 W.4 Saluran U-ditch : 80 x 120 x 10 cm ; L = 80 cm bh 2,225,384.43 2,326,257.00 2,288,999.70 2,504,151.45 2,471,072.07 2,166,831.16 2,298,243.96 2,331,512.57 2,457,318.88 4,156,225.31 2,393,549.64 4,014,107.00 4,397,162.09 2,357,230.10 2,415,897.46
5 W.5 Saluran U-ditch : 100 x 150 x 10 cm ; L = 100 cm bh 3,186,041.00 3,332,385.62 3,276,270.89 3,596,438.79 3,539,515.20 3,098,718.98 3,276,111.49 3,321,864.70 3,512,189.13 6,018,395.27 3,429,228.73 5,806,928.00 6,378,768.64 3,374,781.30 3,452,076.61
6 W.6 Saluran U-ditch : 120 x 160 x 12 cm ; L = 100 cm bh 4,024,092.35 4,210,065.53 4,137,114.34 4,549,133.96 4,471,269.10 3,911,610.58 4,126,898.12 4,183,229.61 4,431,844.49 7,636,112.00 4,332,242.70 7,368,123.06 8,104,283.70 4,268,967.47 4,362,218.88

BIDANG CIPTA KARYA CK - 48 dari 75


harga satuan pokok kegiatan
PROVINSI KALIMANTAN UTARA 2021
bidang sumber daya air
HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

A. PEKERJAAN TANAH (MANUAL & SEMI MEKANIS) (NORMATIF)


1 A.1 1 m2 pembersihan dan striping/kosrekan m2 9,384.00 9,798.00 9,798.00 10,143.00 10,626.00 9,384.00 9,936.00 9,936.00 9,936.00 12,558.00 9,867.00 11,868.00 12,903.00 9,522.00 9,936.00

1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/


2 A.2 m2 11,870.30 12,394.70 12,392.40 12,839.75 13,438.90 11,865.70 12,568.35 12,571.80 12,575.25 16,248.35 12,486.70 15,334.91 16,684.20 12,054.30 12,574.10
tumbuhan ø < 15 cm

Cabut 1 tunggul pohon tanaman keras ø > 15 cm dan membuang sisa tunggul
3 A.3 bh 33,580.00 35,075.00 35,052.00 36,455.00 37,996.00 33,511.00 35,650.00 35,696.00 35,765.00 46,460.00 35,489.00 44,160.00 47,610.00 34,316.00 35,742.00
kayu dan akarnya

4 A.4 1 m' uitset trase saluran m 6,118.00 6,382.50 6,352.60 6,741.30 6,757.40 6,028.30 6,578.00 6,660.80 6,681.50 10,028.00 6,621.70 9,890.00 10,028.00 6,522.80 6,743.60
5 A.5 Pasang 1 m' profil melintang galian tanah m 49,248.75 51,466.24 51,156.14 54,797.21 54,694.92 48,364.46 52,841.26 52,918.58 53,874.84 89,237.52 52,899.75 83,323.02 90,329.69 46,844.10 48,452.95
6 A.6 Pasang 1 m' bouwplank m 88,768.50 93,117.80 92,418.60 100,723.90 99,608.40 86,675.50 94,785.30 95,985.90 98,246.80 174,402.10 96,604.60 162,168.86 179,280.40 79,143.00 81,249.80
7 A.7 Patok Kayu (Ukuran 5/7) bh 14,483.10 15,178.51 15,086.16 16,215.58 16,161.41 14,208.83 15,428.35 15,604.81 15,774.30 26,455.66 15,597.84 24,698.10 26,985.53 13,142.43 13,407.39
8 A.8 Patok Tetap Bantu (PTB) bh 303,428.75 313,706.80 311,860.60 328,290.20 330,128.87 298,060.08 314,939.24 316,297.73 325,167.17 467,600.42 319,824.42 451,049.29 492,598.77 317,360.04 323,718.43
9 A.9 Patok Tetap Utama (PTU) bh 497,454.51 517,176.43 512,341.61 549,037.39 546,933.64 483,087.51 513,598.67 517,817.20 534,832.24 841,440.41 525,833.00 804,470.48 883,699.48 521,377.16 531,864.42
10 A.10 1 m³ galian tanah biasa sedalam ≤ 1 m (Cara Manual) m3 181,286.00 190,997.75 190,997.75 194,235.00 210,421.25 181,286.00 203,946.75 203,946.75 203,946.75 246,031.00 197,472.25 239,556.50 278,403.50 194,235.00 203,946.75
11 A.11 1 m³ galian tanah biasa sedalam > 1 m s.d. 2 m (Cara Manual) m3 105,570.00 110,227.50 110,227.50 114,108.75 119,542.50 105,570.00 111,780.00 111,780.00 111,780.00 141,277.50 111,003.75 133,515.00 145,158.75 107,122.50 111,780.00
12 A.12 1 m³ galian tanah biasa sedalam > 2 m s.d. 3 m (Cara Manual) m3 118,864.00 124,108.00 124,108.00 128,478.00 134,596.00 118,864.00 125,856.00 125,856.00 125,856.00 159,068.00 124,982.00 150,328.00 163,438.00 120,612.00 125,856.00
13 A.13 1 m3 galian tanah biasa > 3 m, untuk setiap penambahan kedalaman 1 m m3 11,730.00 12,247.50 12,247.50 12,678.75 13,282.50 11,730.00 12,420.00 12,420.00 12,420.00 15,697.50 12,333.75 14,835.00 16,128.75 11,902.50 12,420.00
14 A.14 1 m³ galian tanah biasa sedalam ≤ 1 m (Cara Semi Mekanis) m3 43,964.16 45,745.01 45,630.01 47,864.30 49,405.30 43,652.01 46,801.37 46,916.37 47,228.51 77,115.37 46,531.94 72,378.19 78,938.94 45,069.80 47,006.73
15 A.15 1 m³ galian tanah biasa sedalam > 1 m s.d. 2 m (Cara Semi Mekanis) m3 50,220.16 52,277.01 52,162.01 54,626.30 56,489.30 49,908.01 53,425.37 53,540.37 53,852.51 85,487.37 53,109.94 80,290.19 87,540.94 51,417.80 53,630.73
16 A.16 1 m³ galian tanah biasa sedalam > 2 m s.d. 3 m (Cara Semi Mekanis) m3 56,476.16 58,809.01 58,694.01 61,388.30 63,573.30 56,164.01 60,049.37 60,164.37 60,476.51 93,859.37 59,687.94 88,202.19 96,142.94 57,765.80 60,254.73

Kedalaman yang > 3 m menggunakan AHSP A.16) + {AHSP A.13) untuk setiap
17 A.17 m3 58,650.00 61,237.50 61,237.50 63,393.75 66,412.50 58,650.00 62,100.00 62,100.00 62,100.00 78,487.50 61,668.75 74,175.00 80,643.75 59,512.50 62,100.00
kedalaman 1 m

18 A.18 1 m³ galian tanah berbatu sedalam ≤ 1 m (Cara Manual) m3 211,296.40 220,618.30 220,618.30 228,386.55 239,262.10 211,296.40 223,725.60 223,725.60 223,725.60 282,764.30 222,171.95 267,227.80 290,532.55 214,403.70 223,725.60
19 A.19 1 m³ galian tanah berbatu sedalam > 1 m s.d. 2 m (Cara Manual) m3 234,600.00 244,950.00 244,950.00 253,575.00 265,650.00 234,600.00 248,400.00 248,400.00 248,400.00 313,950.00 246,675.00 296,700.00 322,575.00 238,050.00 248,400.00
20 A.20 1 m³ galian tanah berbatu sedalam > 2 m s.d. 3 m (Cara Manual) m3 258,060.00 269,445.00 269,445.00 278,932.50 292,215.00 258,060.00 273,240.00 273,240.00 273,240.00 345,345.00 271,342.50 326,370.00 354,832.50 261,855.00 273,240.00

1 m³ galian tanah berbatu > 3 m, untuk setiap penambahan kedalaman 1 m (Cara


21 A.21 m3 21,896.00 22,862.00 22,862.00 23,667.00 24,794.00 21,896.00 23,184.00 23,184.00 23,184.00 29,302.00 23,023.00 27,692.00 30,107.00 22,218.00 23,184.00
Manual)

22 A.22 1 m³ galian tanah berbatu sedalam ≤ 1 m (Cara Semi Mekanis) m3 91,142.39 94,766.54 94,479.04 99,374.75 102,261.25 90,362.04 97,131.43 97,418.93 98,199.29 167,672.43 96,595.86 157,209.48 171,541.36 93,630.50 97,644.82
23 A.23 1 m³ galian tanah berbatu sedalam > 1 m s.d. 2 m (Cara Semi Mekanis) m3 102,090.39 106,197.54 105,910.04 111,208.25 114,658.25 101,310.04 108,723.43 109,010.93 109,791.29 182,323.43 108,107.36 171,055.48 186,594.86 104,739.50 109,236.82
24 A.24 1 m³ galian tanah berbatu sedalam > 2 m s.d. 3 m (Cara Semi Mekanis) m3 102,090.39 106,197.54 105,910.04 111,208.25 114,658.25 101,310.04 108,723.43 109,010.93 109,791.29 182,323.43 108,107.36 171,055.48 186,594.86 104,739.50 109,236.82

Kedalaman yang > 3 m menggunakan AHSP A.24) + {AHSP A.21) untuk setiap
25 A.25 m3 100,096.00 104,512.00 104,512.00 108,192.00 113,344.00 100,096.00 105,984.00 105,984.00 105,984.00 133,952.00 105,248.00 126,592.00 137,632.00 101,568.00 105,984.00
kedalaman 1 m

26 A.26 1 m³ Galian batu sedalam ≤ 1 m (Cara Manual) m3 528,319.20 551,627.40 551,627.40 571,050.90 598,243.80 528,319.20 559,396.80 559,396.80 559,396.80 707,015.40 555,512.10 668,168.40 726,438.90 536,088.60 559,396.80
27 A.27 1 m³ Galian batu sedalam > 1 m s.d. 2 m (Cara Manual) m3 586,500.00 612,375.00 612,375.00 633,937.50 664,125.00 586,500.00 621,000.00 621,000.00 621,000.00 784,875.00 616,687.50 741,750.00 806,437.50 595,125.00 621,000.00
28 A.28 1 m³ Galian batu sedalam > 2 m s.d. 3 m (Cara Manual) m3 645,150.00 673,612.50 673,612.50 697,331.25 730,537.50 645,150.00 683,100.00 683,100.00 683,100.00 863,362.50 678,356.25 815,925.00 887,081.25 654,637.50 683,100.00

1 m³ Galian batu sedalam > 3 m untuk setiap penambahan kedalaman 1 m (Cara


29 A.29 m3 58,650.00 61,237.50 61,237.50 63,393.75 66,412.50 58,650.00 62,100.00 62,100.00 62,100.00 78,487.50 61,668.75 74,175.00 80,643.75 59,512.50 62,100.00
Manual)

30 A.30 1 m³ Galian batu sedalam ≤ 1 m (Cara Semi Mekanis) m3 204,180.79 212,395.07 211,820.07 222,416.50 229,316.50 202,620.07 217,446.86 218,021.86 219,582.57 364,646.86 216,214.71 342,110.96 373,189.71 209,479.00 218,473.64
31 A.31 1 m³ Galian batu sedalam > 1 m s.d. 2 m (Cara Semi Mekanis) m3 235,460.79 245,055.07 244,480.07 256,226.50 264,736.50 233,900.07 250,566.86 251,141.86 252,702.57 406,506.86 249,104.71 381,670.96 416,199.71 241,219.00 251,593.64
32 A.32 1 m³ Galian batu sedalam > 2 m s.d. 3 m (Cara Semi Mekanis) m3 254,228.79 264,651.07 264,076.07 276,512.50 285,988.50 252,668.07 270,438.86 271,013.86 272,574.57 431,622.86 268,838.71 405,406.96 442,005.71 260,263.00 271,465.64

BIDANG SUMBER DAYA AIR SDA - 50 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Kedalaman yang > 3 m menggunakan AHSP A.32) + {AHSP A.29) untuk setiap
33 A.33 m3 265,098.00 276,793.50 276,793.50 286,539.75 300,184.50 265,098.00 280,692.00 280,692.00 280,692.00 354,763.50 278,742.75 335,271.00 364,509.75 268,996.50 280,692.00
kedalaman 1 m

34 A.34 1 m³ Galian tanah cadas atau tanah keras sedalam ≤ 1 m (Cara Manual) m3 195,500.00 204,125.00 204,125.00 211,312.50 221,375.00 195,500.00 207,000.00 207,000.00 207,000.00 261,625.00 205,562.50 247,250.00 268,812.50 198,375.00 207,000.00
35 A.35 1 m³ Galian tanah cadas atau tanah keras sedalam > 1 m s.d. 2 m (Cara Manual) m3 217,708.80 227,313.60 227,313.60 235,317.60 246,523.20 217,708.80 230,515.20 230,515.20 230,515.20 291,345.60 228,914.40 275,337.60 299,349.60 220,910.40 230,515.20
36 A.36 1 m³ Galian tanah cadas / tanah keras sedalam > 2 m s.d. 3 m (Cara Manual) m3 234,600.00 244,950.00 244,950.00 253,575.00 265,650.00 234,600.00 248,400.00 248,400.00 248,400.00 313,950.00 246,675.00 296,700.00 322,575.00 238,050.00 248,400.00

1 m³ Galian tanah cadas / tanah keras sedalam > 3 m untuk setiap penambahan
37 A.37 m3 15,640.00 16,330.00 16,330.00 16,905.00 17,710.00 15,640.00 16,560.00 16,560.00 16,560.00 20,930.00 16,445.00 19,780.00 21,505.00 15,870.00 16,560.00
kedalaman 1 m (Cara Manual)

38 A.38 1 m³ Galian tanah cadas / tanah keras sedalam ≤ 1 m (Cara Semi Mekanis) m3 73,938.39 76,803.54 76,516.04 80,779.25 82,780.25 73,158.04 78,915.43 79,202.93 79,983.29 144,649.43 78,506.36 135,451.48 147,885.86 76,173.50 79,428.82

BIDANG SUMBER DAYA AIR SDA - 51 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

39 A.39 1 m³ Galian tanah cadas / tanah keras sedalam > 1 m s.d. 2 m (Cara Semi Mekanis) m3 89,578.39 93,133.54 92,846.04 97,684.25 100,490.25 88,798.04 95,475.43 95,762.93 96,543.29 165,579.43 94,951.36 155,231.48 169,390.86 92,043.50 95,988.82
40 A.40 1 m³ Galian tanah cadas / tanah keras sedalam > 2 m s.d. 3 m (Cara Semi Mekanis) m3 102,090.39 106,197.54 105,910.04 111,208.25 114,658.25 101,310.04 108,723.43 109,010.93 109,791.29 182,323.43 108,107.36 171,055.48 186,594.86 104,739.50 109,236.82

Kedalaman yang > 3 m menggunakan AHSP A.40) + {AHSP A.37) untuk setiap
41 A.41 m3 93,840.00 97,980.00 97,980.00 101,430.00 106,260.00 93,840.00 99,360.00 99,360.00 99,360.00 125,580.00 98,670.00 118,680.00 129,030.00 95,220.00 99,360.00
kedalaman 1 m

42 A.42 1 m³ Galian lumpur sedalam ≤ 1 m (Cara Manual) m3 129,812.00 135,539.00 135,539.00 140,311.50 146,993.00 129,812.00 137,448.00 137,448.00 137,448.00 173,719.00 136,493.50 164,174.00 178,491.50 131,721.00 137,448.00
43 A.43 1 m³ Galian lumpur sedalam > 1 m s.d. 2 m (Cara Manual) m3 156,400.00 163,300.00 163,300.00 169,050.00 177,100.00 156,400.00 165,600.00 165,600.00 165,600.00 209,300.00 164,450.00 197,800.00 215,050.00 158,700.00 165,600.00
44 A.44 1 m³ Galian lumpur sedalam > 2 m s.d. 3 m (Cara Manual) m3 179,860.00 187,795.00 187,795.00 194,407.50 203,665.00 179,860.00 190,440.00 190,440.00 190,440.00 240,695.00 189,117.50 227,470.00 247,307.50 182,505.00 190,440.00

1 m³ Galian lumpur sedalam > 3 m s.d. 3 m untuk setiap penambahan kedalaman 1


45 A.45 m3 23,460.00 24,495.00 24,495.00 25,357.50 26,565.00 23,460.00 24,840.00 24,840.00 24,840.00 31,395.00 24,667.50 29,670.00 32,257.50 23,805.00 24,840.00
m (Cara Manual)

46 A.46 1 m³ Galian lumpur sedalam ≤ 1 m (Cara Semi Mekanis) m3 70,656.00 73,968.00 73,554.00 78,660.00 79,557.00 69,621.00 75,658.50 76,279.50 77,314.50 141,001.50 76,417.50 133,677.15 142,795.50 74,623.50 77,004.00
47 A.47 1 m³ Galian lumpur sedalam > 1 m s.d. 2 m (Cara Semi Mekanis) m3 81,972.00 85,822.20 85,325.40 91,349.10 92,280.60 80,730.00 87,809.40 88,554.60 89,796.60 165,434.40 88,740.90 156,852.18 167,483.70 86,691.60 89,424.00
48 A.48 1 m³ Galian lumpur sedalam > 2 m s.d. 3 m (Cara Semi Mekanis) m3 94,714.00 99,178.30 98,571.10 105,732.15 106,588.90 93,196.00 101,526.60 102,437.40 103,955.40 194,872.10 102,705.35 184,785.22 197,175.55 100,401.90 103,500.00

1 m³ Galian lumpur > 3 m untuk setiap penambahan kedalaman 1 m (Cara Semi


49 A.49 m3 11,960.00 12,539.60 12,429.20 13,537.80 13,422.80 11,684.00 12,889.20 13,054.80 13,330.80 28,391.20 13,142.20 26,944.04 28,616.60 12,916.80 13,248.00
Mekanis)

50 A.50 1 m³ Galian pasir sedalam ≤ 1 m' (Cara Manual) m3 103,224.00 107,778.00 107,778.00 111,573.00 116,886.00 103,224.00 109,296.00 109,296.00 109,296.00 138,138.00 108,537.00 130,548.00 141,933.00 104,742.00 109,296.00
51 A.51 1 m³ Galian pasir sedalam > 1 m s.d. 2 m' (Cara Manual) m3 125,120.00 130,640.00 130,640.00 135,240.00 141,680.00 125,120.00 132,480.00 132,480.00 132,480.00 167,440.00 131,560.00 158,240.00 172,040.00 126,960.00 132,480.00
52 A.52 1 m³ Galian pasir untuk pondasi sedalam > 2 m s.d. 3 m' (Cara Manual) m3 143,888.00 150,236.00 150,236.00 155,526.00 162,932.00 143,888.00 152,352.00 152,352.00 152,352.00 192,556.00 151,294.00 181,976.00 197,846.00 146,004.00 152,352.00

1 m³ Galian pasir kedalaman > 3 m untuk setiap penambahan kedalaman 1 m


53 A.53 m3 15,640.00 16,330.00 16,330.00 16,905.00 17,710.00 15,640.00 16,560.00 16,560.00 16,560.00 20,930.00 16,445.00 19,780.00 21,505.00 15,870.00 16,560.00
(Cara Manual)

54 A.54 1 m³ Galian pasir sedalam ≤ 1 m' (Cara Semi Menaknis) m3 69,460.00 72,703.00 72,298.20 77,176.50 78,227.60 68,498.60 74,163.50 74,720.10 75,681.50 143,025.50 74,837.40 134,571.85 144,969.00 72,995.10 75,403.20
55 A.55 1 m³ Galian pasir sedalam > 1 m s.d. 2 m' (Cara Semi Menaknis) m3 82,846.00 86,744.50 86,192.50 92,408.25 93,230.50 81,535.00 88,561.50 89,320.50 90,631.50 179,147.00 89,567.75 168,492.25 181,360.75 87,492.00 90,252.00

1 m³ Galian pasir sedalam > 3 m' untuk setiap penambahan kedalaman 1 m (Cara
56 A.56 m3 8,970.00 9,404.70 9,316.38 10,153.35 10,064.34 8,760.24 9,632.40 9,753.84 9,963.60 22,928.70 9,824.91 21,539.04 23,125.35 9,650.34 9,902.88
Semi Menaknis)

57 A.57 (K3) 1 m² Pasangan papan 3/20, JAT ≥ 1,5 m' m2 463,404.00 486,357.14 481,873.46 531,630.91 518,846.88 449,987.47 494,892.13 502,420.69 517,157.37 976,530.50 507,156.73 904,625.11 1,001,347.21 359,685.50 360,904.50
58 A.58 Kayu Bengkirai Ukuran 10 cm x 10 cm x 4 m, tebal 8 cm, JAT 4,0 m' m2 132,997.50 138,793.50 138,197.34 150,378.60 148,631.52 129,325.32 140,960.33 141,322.90 147,831.81 261,209.16 143,570.74 245,190.83 266,809.48 128,928.80 131,762.40
59 A.59 Kayu Bengkirai Ukuran 10 cm x 10 cm x 4 m, tebal 12 cm, JAT ≤ 6,0 m' m2 195,168.80 203,670.18 202,830.56 220,541.83 218,188.58 189,809.46 206,738.15 207,361.35 216,915.42 382,308.99 210,597.41 358,887.31 391,251.11 188,687.40 192,875.70
60 A.60 1 m³ Timbunan tanah atau urugan tanah kembali m3 51,612.00 53,889.00 53,889.00 55,786.50 58,443.00 51,612.00 54,648.00 54,648.00 54,648.00 69,069.00 54,268.50 65,274.00 70,966.50 52,371.00 54,648.00
61 A.61 1 m³ Pemadatan Tanah m3 89,700.00 93,725.00 93,610.00 97,750.00 101,430.00 89,355.00 95,450.00 95,680.00 96,025.00 127,650.00 95,220.00 121,900.00 130,525.00 92,230.00 95,910.00
62 A.62 1 m³ Timbunan pasir sebagai bahan pengisi m3 350,060.00 367,195.00 364,320.00 398,245.00 392,840.00 341,435.00 373,382.00 378,856.00 387,343.00 695,704.00 381,271.00 646,612.80 714,012.00 376,096.00 384,468.00
63 A.63 1 m³ Pemadatan pasir sebagai bahan pengisi m3 38,640.00 40,480.00 40,250.00 43,355.00 43,470.00 37,950.00 41,860.00 42,320.00 43,010.00 66,930.00 42,435.00 65,780.00 67,505.00 41,630.00 42,780.00
64 A.64 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 5 m m3 59,505.60 62,224.20 61,994.20 65,950.20 66,971.40 58,815.60 63,659.40 64,119.40 64,809.40 94,769.20 64,206.80 91,917.20 95,482.20 62,550.80 64,579.40
65 A.65 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 10 m m3 40,038.40 41,758.80 41,758.80 43,322.80 45,199.60 40,038.40 42,071.60 42,071.60 42,071.60 53,488.80 41,915.20 50,360.80 54,270.80 40,351.20 42,071.60
66 A.66 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 20 m m3 46,368.00 48,360.38 48,360.38 50,171.63 52,345.13 46,368.00 48,722.63 48,722.63 48,722.63 61,944.75 48,541.50 58,322.25 62,850.38 46,730.25 48,722.63
67 A.67 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 30 m m3 52,403.20 54,654.90 54,654.90 56,701.90 59,158.30 52,403.20 55,064.30 55,064.30 55,064.30 70,007.40 54,859.60 65,913.40 71,030.90 52,812.60 55,064.30
68 A.68 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 50 m m3 62,118.40 64,787.55 64,787.55 67,214.05 70,125.85 62,118.40 65,272.85 65,272.85 65,272.85 82,986.30 65,030.20 78,133.30 84,199.55 62,603.70 65,272.85
69 A.69 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 100 m m3 88,320.00 92,115.00 92,115.00 95,565.00 99,705.00 88,320.00 92,805.00 92,805.00 92,805.00 117,990.00 92,460.00 111,090.00 119,715.00 89,010.00 92,805.00
70 A.70 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 200 m m3 139,840.00 145,848.75 145,848.75 151,311.25 157,866.25 139,840.00 146,941.25 146,941.25 146,941.25 186,817.50 146,395.00 175,892.50 189,548.75 140,932.50 146,941.25
71 A.71 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 300 m m3 191,360.00 199,582.50 199,582.50 207,057.50 216,027.50 191,360.00 201,077.50 201,077.50 201,077.50 255,645.00 200,330.00 240,695.00 259,382.50 192,855.00 201,077.50
72 A.72 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 400 m m3 242,880.00 253,316.25 253,316.25 262,803.75 274,188.75 242,880.00 255,213.75 255,213.75 255,213.75 324,472.50 254,265.00 305,497.50 329,216.25 244,777.50 255,213.75
73 A.73 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 500 m m3 287,040.00 299,373.75 299,373.75 310,586.25 324,041.25 287,040.00 301,616.25 301,616.25 301,616.25 383,467.50 300,495.00 361,042.50 389,073.75 289,282.50 301,616.25

BIDANG SUMBER DAYA AIR SDA - 52 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Mengangkut 1 m³ material atau hasil galian dengan jarak angkut > 500 m untuk
74 A.74 m3 51,814.40 54,040.80 54,040.80 56,064.80 58,493.60 51,814.40 54,445.60 54,445.60 54,445.60 69,220.80 54,243.20 65,172.80 70,232.80 52,219.20 54,445.60
setiap penambahan jarak angkut 100 m

75 A.75 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi 1 m m3 220,800.00 230,287.50 230,287.50 238,912.50 249,262.50 220,800.00 232,012.50 232,012.50 232,012.50 294,975.00 231,150.00 277,725.00 299,287.50 222,525.00 232,012.50
Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 1 m s.d. 2
76 A.76 m3 30,912.00 32,240.25 32,240.25 33,447.75 34,896.75 30,912.00 32,481.75 32,481.75 32,481.75 41,296.50 32,361.00 38,881.50 41,900.25 31,153.50 32,481.75
m
Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 2 m s.d. 3
77 A.77 m3 40,803.84 42,557.13 42,557.13 44,151.03 46,063.71 40,803.84 42,875.91 42,875.91 42,875.91 54,511.38 42,716.52 51,323.58 55,308.33 41,122.62 42,875.91
m
Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 3 m s.d. 4
78 A.78 m3 51,004.80 53,196.41 53,196.41 55,188.79 57,579.64 51,004.80 53,594.89 53,594.89 53,594.89 68,139.23 53,395.65 64,154.48 69,135.41 51,403.28 53,594.89
m
Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 4 m s.d. 5
79 A.79 m3 60,690.56 63,298.36 63,298.36 65,669.08 68,513.95 60,690.56 63,772.50 63,772.50 63,772.50 81,078.80 63,535.43 76,337.35 82,264.16 61,164.71 63,772.50
m
Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 5 m s.d. 6
80 A.80 m3 69,198.72 72,172.10 72,172.10 74,875.18 78,118.87 69,198.72 72,712.72 72,712.72 72,712.72 92,445.17 72,442.41 87,039.02 93,796.70 69,739.34 72,712.72
m
Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 6 m s.d. 7
81 A.81 m3 76,117.12 79,387.78 79,387.78 82,361.10 85,929.09 76,117.12 79,982.44 79,982.44 79,982.44 101,687.72 79,685.11 95,741.07 103,174.38 76,711.79 79,982.44
m
Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 7 m s.d. 8
82 A.82 m3 81,445.76 84,945.38 84,945.38 88,126.86 91,944.63 81,445.76 85,581.68 85,581.68 85,581.68 108,806.45 85,263.53 102,443.50 110,397.18 82,082.06 85,581.68
m
Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 8 m s.d. 9
83 A.83 m3 85,508.48 89,182.67 89,182.67 92,522.85 96,531.06 85,508.48 89,850.71 89,850.71 89,850.71 114,233.99 89,516.69 107,553.64 115,904.07 86,176.52 89,850.71
m
Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 9 m s.d. 10
84 A.84 m3 88,938.24 92,759.81 92,759.81 96,233.96 100,402.94 88,938.24 93,454.64 93,454.64 93,454.64 118,815.93 93,107.22 111,867.63 120,553.01 89,633.07 93,454.64
m
Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 10 m untuk
85 A.85 m3 2,208.00 2,302.88 2,302.88 2,389.13 2,492.63 2,208.00 2,320.13 2,320.13 2,320.13 2,949.75 2,311.50 2,777.25 2,992.88 2,225.25 2,320.13
setiap penambahan 1 m

86 A.86 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi 1 m m3 44,160.00 46,057.50 46,057.50 47,782.50 49,852.50 44,160.00 46,402.50 46,402.50 46,402.50 58,995.00 46,230.00 55,545.00 59,857.50 44,505.00 46,402.50
87 A.87 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 1 m s.d. 2 m m3 64,606.08 67,382.12 67,382.12 69,905.80 72,934.21 64,606.08 67,886.86 67,886.86 67,886.86 86,309.69 67,634.49 81,262.34 87,571.52 65,110.82 67,886.86
88 A.88 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 2 m s.d. 3 m m3 88,908.80 92,729.10 92,729.10 96,202.10 100,369.70 88,908.80 93,423.70 93,423.70 93,423.70 118,776.60 93,076.40 111,830.60 120,513.10 89,603.40 93,423.70
89 A.89 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 3 m s.d. 4 m m3 116,288.00 121,284.75 121,284.75 125,827.25 131,278.25 116,288.00 122,193.25 122,193.25 122,193.25 155,353.50 121,739.00 146,268.50 157,624.75 117,196.50 122,193.25
90 A.90 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 4 m s.d. 5 m m3 144,403.20 150,608.03 150,608.03 156,248.78 163,017.68 144,403.20 151,736.18 151,736.18 151,736.18 192,913.65 151,172.10 181,632.15 195,734.03 145,531.35 151,736.18
91 A.91 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 5 m s.d. 6 m m3 172,224.00 179,624.25 179,624.25 186,351.75 194,424.75 172,224.00 180,969.75 180,969.75 180,969.75 230,080.50 180,297.00 216,625.50 233,444.25 173,569.50 180,969.75
92 A.92 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 6 m s.d. 7 m m3 197,836.80 206,337.60 206,337.60 214,065.60 223,339.20 197,836.80 207,883.20 207,883.20 207,883.20 264,297.60 207,110.40 248,841.60 268,161.60 199,382.40 207,883.20
93 A.93 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 7 m s.d. 8 m m3 221,536.00 231,055.13 231,055.13 239,708.88 250,093.38 221,536.00 232,785.88 232,785.88 232,785.88 295,958.25 231,920.50 278,650.75 300,285.13 223,266.75 232,785.88
94 A.94 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 8 m s.d. 9 m m3 242,880.00 253,316.25 253,316.25 262,803.75 274,188.75 242,880.00 255,213.75 255,213.75 255,213.75 324,472.50 254,265.00 305,497.50 329,216.25 244,777.50 255,213.75
Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 9 m s.d. 10
95 A.95 m3 264,076.80 275,423.85 275,423.85 285,739.35 298,117.95 264,076.80 277,486.95 277,486.95 277,486.95 352,790.10 276,455.40 332,159.10 357,947.85 266,139.90 277,486.95
m
Menaikkan 1 m³ material atau hasil galian tanah dengan beda tinggi > 10 m untuk
96 A.96 m3 7,360.00 7,676.25 7,676.25 7,963.75 8,308.75 7,360.00 7,733.75 7,733.75 7,733.75 9,832.50 7,705.00 9,257.50 9,976.25 7,417.50 7,733.75
setiap penambahan 1 m

97 A.97 Pekerjaan 1 m3 Galian Tanah di Situ / Waduk m3 201,995.96 210,039.12 208,650.81 224,103.34 223,285.56 197,457.59 219,154.30 223,138.36 223,753.43 342,679.63 220,405.50 336,824.31 345,962.85 217,313.54 222,277.34
98 A.98 Pekerjaan 1 m3 Galian Tanah Sungai Menggunakan Excavator 80-140 Hp m3 43,821.10 45,287.79 45,161.45 47,014.80 48,391.70 43,427.04 46,875.99 47,502.67 46,761.20 60,868.14 46,229.13 58,127.28 62,376.85 45,137.60 46,599.80

Pekerjaan 1 m3 Pengangkutan Galian Tanah Sungai Dari Excavator 80-140 Hp


99 A.99 m3 42,657.58 43,635.92 43,245.70 46,425.80 46,074.80 41,530.79 45,387.25 45,781.11 47,143.12 71,061.93 45,754.85 68,488.96 73,399.84 45,147.31 46,463.64
Sejauh 3 Km

Pekerjaan 1 m3 Perataan dan Perapihan Lokasi Buangan Tanah Sungai


100 A.100 m3 37,147.43 38,394.35 38,306.95 39,739.62 40,689.45 36,546.26 39,351.02 39,874.76 39,159.36 50,070.13 38,783.74 47,798.38 51,244.11 37,854.19 39,064.64
Menggunakan Bulldozer 100-150 Hp

Pekerjaan Pengangkutan 1 m3 Hasil Galian dari Borrow Area (A) Menggunakan


101 A.101 m3 36,671.56 37,939.48 37,844.72 39,374.65 40,603.21 36,376.02 39,186.59 39,656.60 39,100.50 50,744.07 38,673.47 48,408.60 52,015.52 37,714.90 38,979.45
Dump Truck

Pekerjaan Pengangkutan 1 m3 Hasil Galian Menuju Stockpile (B) Menggunakan


102 A.102 m3 7,757.85 7,935.78 7,864.81 8,443.16 8,379.32 7,552.93 8,254.28 8,325.91 8,573.61 12,923.57 8,321.14 12,455.64 13,348.75 8,210.65 8,450.04
Dump Truck Sejauh 3 Km

103 A.103 Pekerjaan Muat 1 m3 Hasil Galian Di Stockpile (B) Ke Dalam Tongkang m3 40,746.18 42,154.98 42,049.69 43,749.61 45,114.68 40,417.79 43,540.66 44,062.89 43,445.00 56,382.30 42,970.52 53,787.33 57,795.03 41,905.45 43,310.50

Pekerjaan Pengangkutan Dengan Tongkang 1 m3 Hasil Galian Dari Stockpile (B)


104 A.104 m3 11,448.10 12,020.51 11,906.03 13,165.32 12,821.88 11,104.66 12,592.92 12,821.88 13,165.32 22,896.21 12,936.36 22,896.21 22,896.21 12,821.88 13,050.84
Ke Stock Pile (C), Jarak angkut 20 Km

105 A.105 Pekerjaan Muat 1 m3 Hasil Galian Di Stockpile (C) Ke Dalam Perahu m3 65,460.56 68,601.97 68,171.11 73,733.21 73,592.21 64,167.96 71,085.33 71,947.07 73,239.67 116,114.86 72,213.42 114,469.72 116,937.43 70,959.98 72,808.80

BIDANG SUMBER DAYA AIR SDA - 53 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Pekerjaan Pengangkutan Dengan Tongkang 1 m3 Hasil Galian Dari Stockpile (C)


106 A.106 m3 336,076.00 351,156.33 350,725.47 366,236.67 380,024.40 334,783.40 357,619.33 358,481.07 359,773.67 478,262.00 356,757.60 456,718.67 489,033.67 345,555.07 359,342.80
Ke Stock Pile (D) Lokasi Pekerjaan, Jarak angkut 2 Km

107 A.107 Galian Tanah Kedalaman 0 - 2 meter m3 41,001.89 42,419.53 42,313.60 44,024.34 45,397.75 40,671.53 43,813.10 44,338.48 43,716.86 56,735.48 43,239.75 54,123.72 58,155.57 42,167.69 43,581.55
108 A.108 Galian Tanah Kedalaman 2 - 4 meter m3 41,627.41 43,056.82 42,946.61 44,688.56 46,064.38 41,283.68 44,491.59 45,038.21 44,391.46 57,648.01 43,902.63 55,006.57 59,087.63 42,825.19 44,250.68
109 A.109 Galian Tanah Kedalaman > 4 meter m3 47,882.56 49,429.74 49,276.70 51,330.76 52,730.66 47,405.24 51,276.48 52,035.57 51,137.43 66,773.31 50,531.46 63,835.11 68,408.19 49,400.19 50,941.93
110 A.110 Pemadatan Tanah di Lokasi Pekerjaan m3 50,056.01 51,631.27 51,466.18 53,615.57 54,539.15 49,063.97 53,133.57 53,943.66 52,994.66 69,288.52 52,335.67 66,295.33 70,997.73 51,184.62 52,773.55
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B. PEKERJAAN PASANGAN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 B.1 Mortar tipe M (setara campuran 1 PC : 2 PP) Secara Manual m3 1,890,439.00 1,980,024.00 1,943,684.00 2,132,560.00 2,108,410.00 1,839,241.00 1,974,913.40 2,007,886.20 2,050,063.60 3,512,021.80 2,017,178.20 3,298,478.76 3,623,461.40 1,994,431.20 2,037,804.60
2 B.2 Mortar tipe M (setara campuran 1 PC : 2 PP) Menggunakan Molen/Beton Mixer m3 1,759,293.00 1,843,148.70 1,806,712.56 1,991,471.10 1,959,787.68 1,707,806.58 1,836,448.80 1,869,613.88 1,912,079.70 3,342,879.80 1,880,037.02 3,139,686.76 3,449,144.40 1,862,368.88 1,899,724.56
3 B.3 Mortar tipe S (setara campuran 1 PC : 3 PP) Secara Manual m3 1,785,789.00 1,870,141.50 1,839,448.00 2,012,212.50 1,993,502.00 1,740,030.50 1,870,956.85 1,898,376.30 1,940,859.03 3,304,108.70 1,907,771.80 3,101,547.24 3,404,648.60 1,884,921.30 1,928,496.53
4 B.4 Mortar tipe S (setara campuran 1 PC : 3 PP) Menggunakan Molen/Beton Mixer m3 1,654,643.00 1,733,266.20 1,702,476.56 1,871,123.60 1,844,879.68 1,608,596.08 1,732,492.25 1,760,103.98 1,802,875.13 3,134,966.70 1,770,630.62 2,942,755.24 3,230,331.60 1,752,858.98 1,790,416.49
5 B.5 Mortar Tipe N (setara campuran 1 PC : 4 PP) Secara Manual m3 1,704,139.00 1,784,409.00 1,758,120.00 1,918,315.00 1,903,848.00 1,662,624.00 1,789,846.20 1,812,933.60 1,855,653.80 3,141,887.40 1,822,409.60 2,947,895.28 3,233,924.20 1,799,478.60 1,843,210.80
6 B.6 Mortar Tipe N (setara campuran 1 PC : 4 PP) Menggunakan Molen/Beton Mixer m3 1,572,993.00 1,647,533.70 1,621,148.56 1,777,226.10 1,755,225.68 1,531,189.58 1,651,381.60 1,674,661.28 1,717,669.90 2,972,745.40 1,685,268.42 2,789,103.28 3,059,607.20 1,667,416.28 1,705,130.76
7 B.7 Mortar Tipe O (setara campuran 1 PC:5 PP) Secara Manual m3 1,645,259.00 1,722,585.00 1,699,460.80 1,850,603.00 1,839,190.40 1,606,798.40 1,731,336.04 1,751,308.32 1,794,191.36 3,024,867.08 1,760,839.52 2,837,069.14 3,110,784.04 1,737,853.32 1,781,693.16
8 B.8 Mortar Tipe O (setara campuran 1 PC:5 PP) Menggunakan Molen/Beton Mixer m3 1,514,113.00 1,585,709.70 1,562,489.36 1,709,514.10 1,690,568.08 1,475,363.98 1,592,871.44 1,613,036.00 1,656,207.46 2,855,725.08 1,623,698.34 2,678,277.14 2,936,467.04 1,605,791.00 1,643,613.12
9 B.9 Bongkar 1 m³ pasangan batu dan pembersihan batu (manual) m3 222,548.00 232,385.10 232,351.52 240,793.90 251,958.56 222,438.06 235,663.98 235,732.52 235,837.86 300,667.96 234,158.40 283,991.12 308,926.80 226,072.52 235,802.90
10 B.10 Bongkar 1 m³ pasangan batu (manual) m3 190,859.75 199,296.73 199,266.94 206,514.70 216,081.32 190,762.35 202,108.94 202,169.54 202,262.92 257,937.87 200,821.63 243,626.93 265,023.25 193,889.54 202,232.10
11 B.11 Bongkar 1 m³ pasangan batu dengan jack hammer m3 96,496.16 100,554.01 100,554.01 104,168.30 108,998.30 96,414.01 102,426.87 102,426.87 102,509.01 129,221.87 101,490.44 122,650.44 133,000.44 97,958.30 102,344.73
12 B.12 Pembersihan 1 m³ bongkaran pasangan batu untuk pemanfaatan kembali material b m3 31,688.25 33,088.38 33,084.58 34,279.20 35,877.24 31,675.72 33,555.05 33,562.98 33,574.94 42,730.09 33,336.78 40,364.20 43,903.55 32,182.98 33,570.80
13 B.13 Mortar tipe M (setara campuran 1 PC: 2 PP) Secara Manual m3 1,743,860.00 1,791,240.00 1,770,356.00 1,917,280.00 1,921,098.00 1,663,958.00 1,784,825.30 1,792,592.40 1,822,431.45 3,132,190.60 1,797,491.40 2,910,080.52 3,183,742.80 1,782,932.40 1,814,772.45
14 B.14 Mortar tipe M (setara campuran 1 PC: 2 PP) Menggunakan Molen/Beton Mixer m3 1,615,750.00 1,657,552.50 1,636,542.00 1,779,682.50 1,775,876.00 1,535,468.50 1,649,700.30 1,657,720.40 1,687,938.95 2,969,120.60 1,663,780.90 2,757,360.52 3,015,497.80 1,654,270.40 1,680,153.45
15 B.15 Mortar tipe S (setara campuran 1 PC : 3 PP) Secara Manual m3 1,648,410.00 1,691,017.50 1,675,044.00 1,807,512.50 1,816,172.00 1,573,349.50 1,689,606.45 1,692,494.10 1,722,434.93 2,941,752.90 1,697,427.60 2,729,965.68 2,983,615.20 1,682,834.10 1,714,741.43
16 B.16 Mortar tipe S (setara campuran 1 PC : 3 PP) Menggunakan Molen/Beton Mixer m3 1,521,450.00 1,558,537.50 1,542,426.00 1,671,237.50 1,672,238.00 1,445,975.50 1,555,708.50 1,558,871.00 1,589,225.25 2,781,137.00 1,564,977.50 2,579,514.40 2,817,891.00 1,555,421.00 1,581,393.75
17 B.17 Mortar tipe N (setara campuran 1 PC : 4 PP) Secara Manual m3 1,595,510.00 1,635,472.50 1,622,374.00 1,746,677.50 1,758,097.00 1,523,209.50 1,637,091.70 1,637,156.10 1,667,266.55 2,836,723.40 1,642,147.10 2,630,460.78 2,873,054.20 1,627,496.10 1,659,515.55
18 B.18 Mortar tipe N (setara campuran 1 PC : 4 PP) Menggunakan Molen/Beton Mixer m3 1,467,400.00 1,501,785.00 1,488,560.00 1,609,080.00 1,612,875.00 1,394,720.00 1,501,966.70 1,502,284.10 1,532,774.05 2,673,653.40 1,508,436.60 2,477,740.78 2,704,809.20 1,498,834.10 1,524,896.55
19 B.19 Mortar tipe O (setara campuran 1 PC : 5 PP) Secara Manual m3 1,564,460.00 1,602,870.00 1,591,692.00 1,710,970.00 1,724,126.00 1,493,896.00 1,606,658.10 1,604,884.80 1,635,266.65 2,775,856.20 1,609,967.80 2,572,538.04 2,808,695.60 1,595,224.80 1,627,423.65
20 B.20 Mortar tipe O (setara campuran 1 PC : 5 PP) Menggunakan Molen/Beton Mixer m3 1,436,350.00 1,469,182.50 1,457,878.00 1,573,372.50 1,578,904.00 1,365,406.50 1,471,533.10 1,470,012.80 1,500,774.15 2,612,786.20 1,476,257.30 2,419,818.04 2,640,450.60 1,466,562.80 1,492,804.65
21 B.21 Mortar Campuran (setara campuran 1 PC : 6 PP) Secara Manual m3 1,550,660.00 1,588,380.00 1,578,628.00 1,695,100.00 1,709,314.00 1,481,154.00 1,594,090.90 1,591,057.20 1,621,981.85 2,750,721.80 1,596,324.20 2,547,979.56 2,781,408.40 1,581,397.20 1,613,954.85
22 B.22 Mortar Campuran (setara campuran 1 PC : 6 PP) Menggunakan Molen/Beton Mixer m3 1,422,550.00 1,454,692.50 1,444,814.00 1,557,502.50 1,564,092.00 1,352,664.50 1,458,965.90 1,456,185.20 1,487,489.35 2,587,651.80 1,462,613.70 2,395,259.56 2,613,163.40 1,452,735.20 1,479,335.85
23 B.23 Bongkar 1 m³ pasangan Batu Bata 8 x 8 x 16 Sacara Manual m3 94,932.50 99,126.44 99,116.20 102,685.69 107,483.60 94,899.04 100,524.38 100,545.19 100,577.28 127,908.75 99,866.23 120,833.21 131,422.46 96,405.19 100,566.70
24 B.24 Bongkar 1 m³ pasangan Batu Bata 8 x 8 x 16 dengan jack hammer m3 32,342.46 33,689.61 33,689.61 34,905.32 36,515.32 32,309.61 34,346.75 34,346.75 34,379.61 43,316.75 34,018.18 41,148.18 44,598.18 32,835.32 34,313.89
25 B.25 Siaran dengan Mortar tipe M (setara campuran 1 PC : 2 PP) m2 91,862.00 95,834.10 95,077.40 100,155.80 102,793.90 91,050.10 96,876.92 95,933.46 99,464.88 136,828.84 96,478.56 131,329.91 139,999.62 94,725.96 98,747.28
26 B.26 Siaran dengan Mortar tipe S (setara campuran 1 PC : 3 PP) m2 89,792.00 93,660.60 93,062.60 97,775.30 100,544.50 89,111.20 94,899.38 93,809.64 97,381.77 132,873.76 94,368.54 127,531.87 135,779.58 92,602.14 96,650.37
27 B.27 Trasraam Tebal 1 cm, dengan Mortar tipe M (setara campuran 1 PC : 2 PP) m2 94,392.00 98,490.60 97,625.80 103,065.30 105,586.10 93,462.80 99,437.74 98,606.52 102,151.51 141,950.48 99,156.22 136,149.70 145,354.94 97,399.02 101,429.31
28 B.28 Plesteran tebal 1 cm, dengan Mortar tipe N (setara campuran 1 PC : 4 PP) m2 88,895.00 92,718.75 92,165.60 96,743.75 99,557.80 88,259.05 94,002.38 92,867.79 96,439.92 131,079.76 93,426.69 125,836.54 133,895.88 91,660.29 95,708.52
29 B.29 Trasraam tebal 1,5 cm, dengan Mortar tipe M (setara campuran 1 PC : 2 PP) m2 119,896.70 125,051.46 123,829.70 131,174.98 133,828.72 118,582.94 125,713.40 124,768.56 129,320.26 182,162.30 125,700.06 174,418.11 185,643.12 123,446.06 128,388.76
30 B.30 Plesteran tebal 1,5 cm, dengan Mortar tipe S (setara campuran 1 PC : 3 PP) m2 116,566.30 121,554.54 120,591.30 127,345.02 130,211.28 115,465.06 122,537.10 121,354.44 125,973.99 175,809.70 122,308.94 168,314.09 178,860.88 120,031.94 125,019.49
31 B.31 Plesteran tebal 1,5 cm, dengan Mortar tipe N (setara campuran 1 PC : 4 PP) m2 111,745.50 116,492.70 115,715.30 121,801.10 124,880.80 110,857.70 117,623.84 116,242.92 120,821.76 165,983.18 117,183.62 159,088.52 168,610.24 114,920.42 119,881.06
32 B.32 1 m² Pekerjaan Acian m2 55,602.50 57,942.75 57,569.00 60,415.25 62,238.00 55,228.75 58,615.50 57,839.25 60,139.25 80,626.50 58,184.25 77,504.25 81,995.00 57,034.25 59,575.75

BIDANG SUMBER DAYA AIR SDA - 54 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

33 B.33 1 m³ Pasangan Batu Kosong m3 950,268.00 995,587.20 988,593.36 1,074,426.60 1,064,945.08 929,148.48 1,013,194.16 1,021,106.16 1,052,986.00 1,836,638.32 1,029,637.32 1,712,242.18 1,882,749.64 1,017,081.16 1,043,968.16
Bentuk I, Tipe A bronjong kawat ukuran L=2,0 m x B=1,0 m x T=1,0 m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm
34 B.34 bh 2,353,423.25 2,466,065.75 2,447,318.45 2,672,905.90 2,638,203.50 2,294,385.70 2,505,278.45 2,535,907.55 2,603,488.45 4,666,114.65 2,554,856.10 4,333,532.58 4,786,838.20 2,523,269.05 2,582,205.40
dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm
35 B.35 bh 2,378,447.25 2,492,222.50 2,473,326.85 2,700,965.33 2,666,254.88 2,318,890.48 2,531,835.98 2,562,589.28 2,630,960.23 4,712,024.95 2,581,726.43 4,376,418.27 4,833,782.35 2,549,732.28 2,609,442.58
dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, dan kawat pengikat ø 2,0 mm, lubang kotak
36 B.36 bh 3,098,997.00 3,245,507.00 3,222,978.50 3,505,867.00 3,475,926.75 3,026,725.25 3,303,812.00 3,337,288.50 3,430,030.25 5,997,865.25 3,361,231.50 5,590,745.70 6,175,350.50 3,314,403.50 3,402,608.50
100 x 100 mm;

Bentuk I, Tipe B bronjong kawat ukuran L=3,0 m x B=1,0 m x T=1,0 m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm
37 B.37 bh 4,321,030.70 4,524,463.40 4,495,033.06 4,871,753.97 4,847,609.95 4,228,650.51 4,597,772.91 4,637,497.59 4,760,196.61 8,170,964.82 4,667,663.93 7,611,933.67 8,374,893.86 4,599,386.59 4,722,647.27
dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm
38 B.38 bh 3,518,822.90 3,687,276.05 3,659,216.97 3,996,714.14 3,944,616.15 3,430,483.12 3,745,901.67 3,791,807.83 3,892,821.07 6,978,834.34 3,820,154.41 6,481,265.59 7,159,447.82 3,772,965.08 3,861,001.49
dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100
39 B.39 bh 4,460,441.75 4,670,058.00 4,636,754.00 5,053,899.25 4,996,612.00 4,353,744.75 4,743,686.75 4,793,585.25 4,929,664.75 8,699,652.25 4,834,818.50 8,099,021.05 8,930,877.00 4,766,301.50 4,889,351.50
x 100 mm;

Bentuk I, Tipe C bronjong kawat ukuran L = 4,0 m x B = 1,0 m x T = 1,0 m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm
40 B.40 bh 4,691,288.15 4,916,114.30 4,878,253.77 5,331,681.87 5,258,557.28 4,571,932.30 4,994,076.60 5,056,756.66 5,191,636.25 9,340,829.69 5,095,008.19 8,672,701.33 9,583,149.87 5,033,078.16 5,149,049.22
dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm
41 B.41 bh 4,643,374.55 4,865,804.10 4,828,581.59 5,275,362.46 5,205,048.93 4,526,251.77 4,943,188.87 5,004,247.89 5,137,903.42 9,224,460.73 5,041,930.40 8,566,079.91 9,463,297.79 4,980,120.89 5,095,781.91
dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100
42 B.42 bh 5,892,266.50 6,169,301.50 6,125,210.50 6,676,865.50 6,600,586.00 5,751,104.00 6,266,580.00 6,332,866.00 6,512,438.50 11,499,080.00 6,387,295.50 10,704,574.90 11,804,796.00 6,296,986.00 6,459,193.50
x 100 mm;

Bentuk I, Tipe D bronjong kawat ukuran L=2,0 m x B=1,0 m x T= 0,5 m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BIDANG SUMBER DAYA AIR SDA - 55 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm
43 B.43 bh 1,375,423.00 1,441,208.75 1,430,858.75 1,557,353.00 1,543,765.75 1,342,487.00 1,467,118.25 1,483,149.25 1,522,341.25 2,681,892.00 1,492,107.75 2,495,391.90 2,758,045.00 1,473,483.50 1,510,105.25
dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm
44 B.44 bh 1,393,226.15 1,459,829.55 1,449,375.82 1,577,292.97 1,563,762.53 1,359,927.10 1,486,090.15 1,502,213.61 1,541,946.80 2,714,419.29 1,511,264.34 2,525,821.15 2,791,482.17 1,492,363.86 1,529,549.57
dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100
45 B.45 bh 1,816,994.25 1,901,594.00 1,888,615.10 2,054,832.65 2,035,206.75 1,774,857.10 1,931,515.85 1,949,584.65 2,006,154.30 3,502,265.20 1,966,603.50 3,264,117.45 3,594,831.00 1,937,469.40 1,989,679.40
x 100 mm;

Bentuk I, Tipe E bronjong kawat ukuran L=3,0 m x B=1,0 m x T=0,5 m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm
46 B.46 bh 1,995,792.80 2,090,698.85 2,075,326.34 2,262,971.96 2,237,370.43 1,946,922.52 2,123,912.12 2,147,826.14 2,205,811.67 3,918,412.48 2,163,693.15 3,641,751.16 4,018,473.29 2,136,165.14 2,187,696.41
dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm
47 B.47 bh 2,464,546.60 2,579,252.20 2,563,728.58 2,769,568.46 2,765,145.10 2,415,147.43 2,621,173.38 2,638,777.12 2,710,440.98 4,565,399.26 2,655,513.99 4,259,883.68 4,675,997.98 2,614,684.62 2,688,868.36
dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100
48 B.48 bh 3,267,598.50 3,417,121.50 3,397,923.40 3,664,721.10 3,663,463.00 3,205,338.65 3,472,489.40 3,490,312.10 3,591,700.70 5,965,696.30 3,516,544.75 5,580,245.05 6,114,584.50 3,456,904.60 3,562,888.60
x 100 mm;

Bentuk I, Tipe F Bronjong kawat ukuran L = 4,0 m x B = 1,0 m x T = 0,5 m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm
49 B.49 bh 2,640,886.45 2,766,533.15 2,746,141.81 2,994,775.72 2,960,569.20 2,576,094.76 2,810,534.91 2,842,382.09 2,919,035.11 5,188,698.57 2,863,365.68 4,822,122.22 5,321,471.36 2,827,029.59 2,895,073.02
dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm
50 B.50 bh 2,673,388.90 2,800,505.30 2,779,915.47 3,031,263.27 2,996,984.53 2,607,902.50 2,845,011.80 2,877,025.96 2,954,734.45 5,248,808.84 2,898,277.04 4,878,245.51 5,382,887.57 2,861,426.21 2,930,458.87
dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100
51 B.51 bh 3,459,125.25 3,620,780.75 3,595,361.15 3,917,082.85 3,874,263.75 3,376,734.65 3,677,557.40 3,714,746.10 3,821,746.70 6,722,931.05 3,747,510.75 6,261,898.35 6,902,369.00 3,693,241.10 3,790,398.85
x 100 mm;

52 B.52 Pasangan Bronjong Pabrikasi (tenaga kerja untuk 1 m³ batu bronjong) m3 754,791.00 792,166.00 784,944.00 865,202.50 845,779.00 733,205.50 806,587.00 818,662.00 839,385.00 1,582,699.00 825,332.00 1,461,045.10 1,622,201.50 816,937.00 832,577.00
53 Bentuk II, Tipe G bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,17 m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, kawat sisi ø 3,40 mm
53 B.53 bh 4,263,207.32 4,458,976.42 4,435,283.20 4,767,718.99 4,784,384.33 4,187,506.73 4,533,018.71 4,550,423.27 4,678,839.17 7,651,479.92 4,578,008.55 7,158,228.59 7,829,216.10 4,502,445.27 4,641,140.33
dan kawat pengikat ø 2,0 mm, lubang heksagonal 60 x 80 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, kawat sisi ø 4,0 mm
54 B.54 bh 3,404,091.54 3,564,881.09 3,539,191.93 3,856,174.94 3,815,832.71 3,320,889.04 3,620,960.15 3,659,653.51 3,759,651.07 6,650,383.30 3,686,693.69 6,183,122.29 6,818,558.38 3,639,384.76 3,728,534.37
dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Bentuk II, Tipe H bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,23 m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, kawat sisi ø 3,40 mm
55 B.55 bh 3,846,247.91 4,027,941.01 3,999,929.54 4,349,374.18 4,312,633.52 3,757,285.41 4,092,692.80 4,132,480.50 4,245,684.43 7,424,143.09 4,162,126.35 6,908,727.97 7,610,321.19 4,106,254.75 4,210,793.20
dan kawat pengikat ø 2,0 mm, lubang heksagonal 60 x 80 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, kawat sisi ø 4,0 mm
56 B.56 bh 4,096,860.51 4,291,024.21 4,259,778.02 4,643,201.94 4,592,571.12 3,996,576.49 4,358,857.08 4,406,724.22 4,526,412.31 8,024,574.65 4,439,282.79 7,459,322.76 8,228,551.07 4,382,591.47 4,489,091.36
dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Bentuk II, Tipe I bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,30 m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, kawat sisi ø 3,40 mm
57 B.57 bh 4,574,152.60 4,791,318.60 4,757,011.80 5,179,625.30 5,128,581.40 4,465,919.20 4,868,276.60 4,919,483.80 5,052,911.40 8,903,171.20 4,955,172.90 8,279,885.92 9,128,840.30 4,890,181.80 5,011,516.00
dan kawat pengikat ø 2,0 mm, lubang heksagonal 60 x 80 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, kawat sisi ø 4,0 mm
58 B.58 bh 5,365,757.40 5,618,012.20 5,580,284.84 6,057,874.78 6,016,901.20 5,245,552.04 5,708,703.04 5,758,931.36 5,918,260.64 10,253,238.08 5,799,605.02 9,548,685.34 10,507,250.54 5,719,463.36 5,869,534.68
dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

59 B.59 Pasangan Bronjong Pabrikasi (tenaga kerja untuk 1 m³ batu bronjong) m3 762,611.00 800,331.00 793,109.00 873,655.00 854,634.00 741,025.50 814,867.00 826,942.00 847,665.00 1,593,164.00 833,554.50 1,470,935.10 1,632,954.00 824,872.00 840,857.00
60 B.60 1 m panjang Tiang pancang spun pile d = 30 cm m 1,017,106.00 1,066,087.95 1,058,387.55 1,152,101.05 1,140,950.65 993,874.85 1,086,193.40 1,101,244.60 1,123,759.30 1,972,574.30 1,105,833.10 1,836,447.88 2,026,378.20 1,089,169.60 1,213,560.50
61 B.61 1 m³ Pemasangan modul bronjong kawat menjadi struktur krib sungai m3 276,393.47 287,328.24 287,118.71 297,228.31 308,798.06 275,034.23 294,546.04 295,699.02 294,214.52 372,202.23 290,793.35 353,513.08 384,020.73 281,342.59 293,387.92
62 B.62 1 m² Pasangan batu muka m2 95,553.50 99,762.50 98,986.25 105,426.25 106,863.75 94,231.00 100,952.75 100,688.25 104,049.13 156,365.50 101,303.50 148,481.10 160,241.00 99,722.25 105,739.63
63 B.63 1 m² Pasangan batu candi m2 94,116.00 98,290.50 97,520.00 103,741.50 105,340.00 92,816.50 99,469.25 99,049.50 102,531.13 153,398.50 99,659.00 145,521.00 156,952.00 98,083.50 103,853.63
64 B.64 1 m² Pemasangan Geotextile, Tipe-A, Tipis m2 163,875.00 171,925.00 170,476.00 187,105.00 183,678.00 159,528.00 174,685.00 177,232.25 181,918.50 334,765.00 178,681.25 310,310.25 343,677.50 176,657.25 180,354.50

BIDANG SUMBER DAYA AIR SDA - 56 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

65 B.65 1 m² Pemasangan Geotextile, Tipe-B, Tebal Sedang m2 179,400.00 188,140.00 186,649.60 204,148.00 201,148.80 174,928.80 191,176.00 193,664.60 198,747.60 358,984.00 195,155.00 333,173.40 368,414.00 192,744.60 197,073.20
66 B.66 1 m² Pemasangan Geotextile, Tipe-C, Tebal m2 197,340.00 206,862.00 205,344.00 223,698.00 221,352.00 192,786.00 210,220.00 212,577.50 218,109.00 385,388.00 214,095.50 358,213.50 395,347.00 211,197.50 216,315.00

Pasangan bar screen (saringan kasar) bangunan intake, pengukur dan pengatur 1
67 B.67 m2 871,264.57 911,687.84 903,362.06 985,878.27 972,521.05 849,262.77 878,703.00 890,830.97 965,717.03 1,620,410.90 942,927.17 1,596,136.97 1,760,231.53 933,961.92 955,764.51
buah pasangan bar screen/saringan kasar.

68 B.68 Pasangan ambang ukur pada bangunan pengukur dan/atau pengatur bh 1,042,607.77 1,092,523.78 1,083,822.19 1,192,511.84 1,167,315.35 1,011,514.84 1,096,350.42 1,126,754.91 1,157,612.59 2,140,080.22 1,137,444.56 2,009,851.24 2,226,145.51 1,125,271.47 1,148,182.84
69 B.69 1 m² pasangan lempengan rumput m2 28,560.00 29,820.00 29,820.00 30,870.00 32,340.00 28,560.00 30,240.00 30,240.00 30,240.00 38,220.00 30,030.00 36,120.00 39,270.00 28,980.00 30,240.00

BIDANG SUMBER DAYA AIR SDA - 57 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Penebasan Secara Manual 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


70 B.70 m2 2,284.80 2,385.60 2,385.60 2,469.60 2,587.20 2,284.80 2,419.20 2,419.20 2,419.20 3,057.60 2,402.40 2,889.60 3,141.60 2,318.40 2,419.20
Dengan Kemiringan 1v : 10h

Penebasan Secara Manual 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


71 B.71 m2 1,945.80 2,031.48 2,031.48 2,103.35 2,202.83 1,945.80 2,059.08 2,059.08 2,059.08 2,603.60 2,045.28 2,459.85 2,672.60 1,973.40 2,059.08
Dengan Kemiringan 1v : 10h s/d 1v : 2,5h

Penebasan Secara Manual 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


72 B.72 m2 2,617.40 2,732.98 2,732.98 2,829.00 2,964.13 2,617.40 2,772.08 2,772.08 2,772.08 3,502.90 2,752.53 3,310.85 3,600.65 2,656.50 2,772.08
Dengan Kemiringan 1v : 2,5h s/d 1v : 1h

Penebasan Secara Manual 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


73 B.73 m2 3,910.00 4,082.50 4,082.50 4,226.25 4,427.50 3,910.00 4,140.00 4,140.00 4,140.00 5,232.50 4,111.25 4,945.00 5,376.25 3,967.50 4,140.00
Dengan Kemiringan 1v : 1h s/d 1h : 2,5v

Penebasan Secara Manual 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


74 B.74 m2 7,820.00 8,165.00 8,165.00 8,452.50 8,855.00 7,820.00 8,280.00 8,280.00 8,280.00 10,465.00 8,222.50 9,890.00 10,752.50 7,935.00 8,280.00
Dengan Kemiringan 2,5v : 1h sampai dengan tegak

Penebasan Semi Mekanis 1 m2 Rumput. Perhitungan secara umum (jika tidak


75 B.75 m2 667.07 693.15 692.25 722.06 742.62 663.48 701.85 703.64 707.23 954.04 701.09 900.16 976.67 682.94 706.33
diketahui kondisi medan secara detail)

Penebasan Semi Meknis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


76 B.76 m2 552.24 573.80 573.08 597.52 614.77 549.36 580.99 582.43 585.30 787.27 580.27 743.00 805.96 565.18 584.58
Dengan Kemiringan 1v : 10h

Penebasan Semi Mekanis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


77 B.77 m2 684.78 711.51 710.62 740.93 762.32 681.21 720.43 722.21 725.77 976.22 719.54 921.31 999.39 700.82 724.88
Dengan Kemiringan 1v : 10h s/d 1v : 2,5h

Penebasan Semi Mekanis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


78 B.78 m2 2,017.52 2,052.71 2,051.45 2,092.16 2,119.30 2,012.46 2,064.44 2,066.97 2,072.03 2,410.02 2,063.64 2,336.69 2,440.61 2,039.37 2,070.77
Dengan Kemiringan 1v : 2,5h s/d 1v : 1h

Penebasan Semi Mekanis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


79 B.79 m2 2,080.08 2,118.03 2,116.77 2,159.78 2,190.14 2,075.02 2,130.68 2,133.21 2,138.27 2,493.74 2,129.42 2,415.81 2,526.63 2,102.85 2,137.01
Dengan Kemiringan 1v : 2,5h s/d 1v : 1h

Penebasan Semi Mekanis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


80 B.80 m2 1,483.65 1,541.61 1,539.66 1,605.55 1,651.67 1,475.83 1,560.93 1,564.84 1,572.66 2,117.65 1,559.09 1,998.37 2,167.90 1,518.61 1,570.71
Dengan Kemiringan 1v : 1h s/d 2,5v : 1h

Penebasan Semi Mekanis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik


81 B.81 m2 2,650.75 2,754.25 2,750.80 2,868.10 2,950.90 2,636.95 2,788.75 2,795.65 2,809.45 3,778.90 2,785.30 3,566.38 3,868.60 2,712.85 2,806.00
Dengan Kemiringan 2,5v : 1h sampai dengan tegak

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
C. PEKERJAAN PENGAMAN PANTAI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 C.1 Penanaman 1 Pohon Bakau bh 45,066.20 47,254.65 46,782.00 51,682.15 50,443.60 43,648.25 47,911.30 48,741.60 50,044.55 94,594.40 49,205.05 87,740.40 97,170.40 48,686.40 49,571.90
2 C.2 Matras bambu m 183,195.00 191,848.75 190,440.00 205,131.25 205,850.00 179,888.75 194,424.75 196,322.25 199,622.75 327,899.50 196,696.00 304,947.80 336,467.00 192,872.25 211,830.00
3 C.3 Pembuatan 1 buah kubus beton ukuran 30 cm x 30 cm x 30 cm bh 206,175.43 215,644.62 214,404.83 229,999.89 231,254.48 201,206.54 213,527.16 213,319.17 224,058.34 353,381.07 219,324.83 337,844.97 369,611.95 218,340.42 225,403.13
4 C.4 Pembuatan 1 buah kubus beton ukuran 40 cm x 40 cm x 40 cm bh 281,394.67 294,941.32 292,023.95 321,203.71 314,273.90 269,631.93 286,279.39 288,280.70 308,553.45 554,517.08 302,322.83 530,802.27 587,856.05 306,235.89 312,989.12
5 C.5 Pembuatan 1 buah 3B (Blok Beton Bergigi) bh 430,860.11 451,637.90 447,098.92 492,228.70 481,125.59 412,539.05 437,945.58 441,118.37 472,571.38 852,995.33 463,040.42 816,670.41 904,807.91 469,381.78 479,562.56
6 C.6 Pembuatan 1 buah blok beton berat 0,5 ton quadripod, tetrapod, dolos, tribar bh 960,357.09 1,006,755.86 996,473.02 1,098,121.71 1,072,221.57 918,829.94 975,355.79 982,707.70 1,053,666.42 1,910,761.81 1,032,450.00 1,829,586.59 2,027,877.17 1,047,338.48 1,069,650.93
7 C.7 Pembuatan 1 buah blok beton berat 0,75 ton quadripod, tetrapod, dolos, tribar bh 1,434,656.39 1,503,971.46 1,488,598.74 1,640,498.98 1,601,750.22 1,372,544.17 1,456,874.32 1,467,840.17 1,574,017.87 2,854,597.19 1,542,317.44 2,733,527.86 3,029,823.69 1,564,671.78 1,597,992.82
8 C.8 Pembuatan blok beton berat 1,0 ton quadripod, tetrapod, dolos, tribar dan lain-lain bh 1,922,166.12 2,015,008.47 1,994,466.15 2,197,645.29 2,146,098.92 1,839,182.38 1,952,235.92 1,966,848.02 2,108,791.06 3,821,672.78 2,066,311.99 3,659,464.45 4,055,860.72 2,095,996.52 2,140,759.72
9 C.9 Pembuatan 1 buah blok beton berat 1,5 ton quadripod, tetrapod, dolos, tribar bh 1,006,523.84 1,054,928.21 1,044,580.97 1,148,373.26 1,124,215.37 964,806.94 1,024,322.79 1,031,303.25 1,103,460.96 1,978,025.31 1,081,153.19 1,893,488.73 2,096,545.05 1,094,774.83 1,119,141.18
10 C.10 Pembuatan 1 buah blok beton berat 2,0 ton quadripod, tetrapod, dolos, tribar bh 1,008,823.84 1,057,343.21 1,046,972.97 1,151,018.26 1,126,791.37 967,037.94 1,026,776.89 1,033,801.97 1,106,026.61 1,982,933.51 1,083,674.22 1,898,026.59 2,101,587.11 1,097,273.55 1,121,684.52
11 C.11 Pembuatan 1 buah blok beton berat 2,5 ton quadripod, tetrapod, dolos, tribar bh 1,008,823.84 1,057,343.21 1,046,972.97 1,151,018.26 1,126,791.37 967,037.94 1,026,776.89 1,033,801.97 1,106,026.61 1,982,933.51 1,083,674.22 1,898,026.59 2,101,587.11 1,097,273.55 1,121,684.52
12 C.12 Pemasangan 1 m³ berbagai jenis armor m3 1,011,770.00 1,061,611.00 1,052,480.00 1,156,509.00 1,133,900.00 984,377.00 1,078,927.70 1,095,439.40 1,124,379.15 2,081,909.40 1,104,271.40 1,928,845.32 2,137,380.80 1,092,449.40 1,114,949.15
13 C.13 1 m3 pasangan batu 1 kg - 3 kg, void maksimum 15% m3 797,442.05 834,507.67 828,299.24 901,148.62 891,960.50 778,643.97 850,419.79 863,736.33 878,401.98 1,538,535.27 864,928.55 1,430,449.13 1,580,215.42 852,996.74 872,338.52
14 C.14 1 m3 pasangan batu 3 kg - 5 kg, void maksimum 15% m3 857,345.55 896,883.67 890,410.74 967,331.12 958,499.50 837,748.22 914,394.29 925,928.33 945,964.48 1,642,334.27 928,529.30 1,529,980.48 1,684,416.92 916,338.74 938,498.02
15 C.15 1 m³ Pasangan batu 5 kg - 10 kg, void maksimum 20% m3 908,560.55 950,333.24 943,556.86 1,024,371.98 1,015,688.75 888,042.52 969,011.87 981,026.56 1,002,064.68 1,732,923.99 983,551.25 1,614,882.78 1,777,196.66 970,478.02 994,180.47
16 C.16 1 m3 pasangan batu 10 kg - 30 kg, void maksimum 20% m3 935,114.05 978,209.24 971,168.36 1,054,904.48 1,045,427.75 913,796.77 997,336.37 1,009,868.56 1,031,677.18 1,789,572.99 1,012,652.00 1,667,264.13 1,835,398.16 999,320.02 1,023,539.97

BIDANG SUMBER DAYA AIR SDA - 58 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

17 C.17 1 m3 pasangan batu 30 kg - 50 kg, void maksimum 25% m3 975,707.66 1,020,508.40 1,013,269.89 1,099,732.35 1,090,721.40 953,789.37 1,040,624.15 1,053,429.99 1,075,932.37 1,857,503.12 1,056,033.66 1,731,213.88 1,904,897.31 1,041,922.49 1,067,478.62
18 C.18 1 m³ Pasangan batu 50 kg - 100 kg, void maksimum 25% m3 975,707.66 1,020,508.40 1,013,269.89 1,099,732.35 1,090,721.40 953,789.37 1,040,624.15 1,053,429.99 1,075,932.37 1,857,503.12 1,056,033.66 1,731,213.88 1,904,897.31 1,041,922.49 1,067,478.62
19 C.19 1 m3 pasangan batu 100 kg - 200 kg, void maksimum 30% m3 996,950.46 1,042,809.20 1,035,359.09 1,124,158.35 1,114,512.60 974,392.77 1,063,283.75 1,076,503.59 1,099,622.37 1,902,822.32 1,079,314.26 1,773,118.96 1,951,458.51 1,064,996.09 1,090,966.22
20 C.20 1 m3 pasangan batu 200 kg - 300 kg, void maksimum 30% m3 996,950.46 1,042,809.20 1,035,359.09 1,124,158.35 1,114,512.60 974,392.77 1,063,283.75 1,076,503.59 1,099,622.37 1,902,822.32 1,079,314.26 1,773,118.96 1,951,458.51 1,064,996.09 1,090,966.22
21 C.21 1 m3 pasangan batu 300 kg - 400 kg, void maksimum 30% m3 1,053,476.16 1,101,833.97 1,094,027.51 1,187,305.71 1,177,649.65 1,029,837.92 1,123,566.23 1,137,370.22 1,161,645.07 2,004,741.85 1,140,156.36 1,868,497.52 2,055,878.55 1,124,903.77 1,152,520.58
22 C.22 1 m³ Pasangan batu 400 kg - 500 kg, void maksimum 35% m3 1,064,097.56 1,112,984.37 1,105,072.11 1,199,518.71 1,189,545.25 1,040,139.62 1,134,896.03 1,148,907.02 1,173,490.07 2,027,401.45 1,151,796.66 1,889,450.06 2,079,159.15 1,136,440.57 1,164,264.38
23 C.23 1 m3 pasangan batu 200 kg - 500 kg, void maksimum 32% m3 1,047,783.66 1,095,899.97 1,088,093.51 1,181,164.71 1,171,232.65 1,024,145.42 1,117,528.73 1,131,401.72 1,155,538.57 1,997,048.35 1,134,187.86 1,861,149.02 2,048,047.05 1,119,107.77 1,146,448.58

BIDANG SUMBER DAYA AIR SDA - 59 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

24 C.24 1 m3 pasangan batu 500 kg - 650 kg, void maksimum 35% m3 1,084,206.46 1,134,024.77 1,126,006.71 1,221,966.71 1,212,135.85 1,059,928.82 1,156,288.33 1,170,391.32 1,195,512.57 2,062,883.55 1,173,384.46 1,922,650.10 2,115,492.25 1,157,637.37 1,186,128.18
25 C.25 1 m3 pasangan batu 650 kg - 800 kg, void maksimum 35% m3 1,100,138.56 1,150,750.37 1,142,573.61 1,240,286.21 1,229,979.25 1,075,381.37 1,173,283.03 1,187,696.52 1,213,280.07 2,096,872.95 1,190,844.91 1,954,078.91 2,150,413.15 1,174,942.57 1,203,743.88
1 Buah buis beton diangkut < 30 m dan dipasang untuk konstruksi pengaman
26 C.26 bh 312,800.00 326,600.00 326,600.00 338,100.00 354,200.00 312,800.00 331,200.00 331,200.00 331,200.00 418,600.00 328,900.00 395,600.00 430,100.00 317,400.00 331,200.00
pantai
Pengecoran 1 buah buis beton diameter 1 m' dengan campuran beton fc = 7,4 MPa
27 C.27 bh 1,125,937.85 1,180,580.21 1,148,783.81 1,278,652.37 1,251,302.99 1,034,816.26 1,105,049.28 1,136,487.37 1,149,237.44 2,030,353.56 1,139,074.34 1,914,248.57 2,108,236.18 1,126,118.01 1,145,555.98
(K-100)

28 C.28 1 m' Pasangan Pipa Suling-suling m 141,277.50 148,187.85 146,993.00 161,326.60 158,424.00 135,337.75 140,599.00 150,552.25 154,190.85 269,008.00 151,609.10 263,075.38 291,833.20 135,585.00 139,736.50
29 C.29 1 m' Peilskaal / mistar duga muka air (diambil dari AHSP Hidrologi) m 600,973.61 626,660.93 621,952.78 677,431.24 665,947.63 584,902.89 634,876.80 643,506.82 657,618.23 1,171,970.94 647,694.78 1,087,794.77 1,200,083.60 641,508.07 652,670.87
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
D. PEKERJAAN BETON (NORMATIF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lantai Kerja Beton Tipe-1 : menggunakan campuran beton tumbuk fc' = 1,8 s.d 3,7
1 D.1 m3 1,117,604.50 1,171,714.76 1,144,657.56 1,267,637.41 1,244,510.68 991,332.43 1,060,246.87 1,086,827.74 1,101,064.51 1,929,731.74 1,089,640.64 1,812,842.15 2,001,422.28 1,075,112.00 1,097,046.64
(B0 : K-40 s.d. K-60) atau setara 1 PC : 3 PB : 5 Kr

Lantai Kerja Beton Tipe-2 : menggunakan campuran beton fc' = 5,6 s.d 7,4 MPa
2 D.2 m3 1,147,222.75 1,202,820.08 1,173,620.54 1,301,704.55 1,276,763.12 1,030,431.97 1,101,185.61 1,129,969.76 1,144,075.20 2,011,609.21 1,132,748.05 1,890,435.48 2,087,637.09 1,118,012.75 1,140,099.54
(K-80 s.d. K-100) atau setara 1 PC : 2 PB : 3 Kr

Lantai Kerja Beton Tipe-2 : menggunakan campuran beton fc' = 7,4 MPa atau
3 D.3 m3 1,167,250.00 1,223,849.32 1,193,804.88 1,324,736.52 1,298,871.64 1,050,697.04 1,122,752.36 1,152,438.92 1,166,694.32 2,054,742.72 1,155,269.76 1,930,974.57 2,132,680.52 1,140,340.00 1,162,669.32
setara 1 PC : 2 PB : 3 Kr

4 D.4 1 m³ beton mutu, f'c = 7,4 MPa (K100), slump (12_2) cm, w/c = 0,87 (Manual) m3 1,291,197.00 1,353,503.43 1,320,910.93 1,462,693.63 1,437,074.04 1,172,269.87 1,251,962.91 1,283,573.42 1,299,602.93 2,265,398.57 1,286,593.67 2,130,174.65 2,350,811.83 1,269,490.75 1,295,078.60

1 m³ beton mutu, f'c = 7,4 MPa (K100), slump (12_2) cm, w/c = 0,87
5 D.5 m3 1,255,786.20 1,316,819.58 1,283,910.83 1,426,797.53 1,396,998.84 1,135,910.32 1,215,510.21 1,248,742.22 1,263,742.48 2,237,759.47 1,251,960.27 2,106,296.05 2,321,372.98 1,236,421.35 1,259,292.90
(Menggunakan Molen/Beton Mixer)

6 D.6 1 m³ Beton mutu, f’c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78 m3 1,357,897.00 1,423,538.43 1,387,610.93 1,539,398.63 1,510,444.04 1,235,634.87 1,318,662.91 1,353,608.42 1,369,637.93 2,398,798.57 1,356,628.67 2,256,237.65 2,490,881.83 1,339,525.75 1,365,113.60

1 m³ beton mutu, f'c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78
7 D.7 m3 1,322,414.10 1,386,778.88 1,350,535.84 1,503,419.62 1,470,288.08 1,199,229.43 1,282,159.74 1,318,725.83 1,333,724.72 2,371,058.52 1,321,943.43 2,232,265.74 2,461,339.31 1,306,405.22 1,329,275.59
(Menggunakan Molen/Beton Mixer)

8 D.8 1 m³ Beton mutu, f'c = 12,2 Mpa (K150), slump (12±12) cm, w/c = 0,72 (Manual) m3 1,406,127.91 1,474,180.69 1,435,655.08 1,594,863.98 1,563,404.66 1,280,999.26 1,366,183.49 1,403,677.74 1,419,560.16 2,493,839.74 1,406,647.16 2,346,270.94 2,590,918.82 1,389,711.19 1,415,084.16

1 m³ Beton mutu, f'c = 12,2 Mpa (K150), slump (12±12) cm, w/c = 0,72
9 D.9 m3 1,370,717.11 1,437,496.84 1,398,654.98 1,558,967.88 1,523,329.46 1,244,639.71 1,329,730.79 1,368,846.54 1,383,699.71 2,466,200.64 1,372,013.76 2,322,392.34 2,561,479.97 1,356,641.79 1,379,298.46
(Menggunakan Molen/Beton Mixer)

10 D.10 1 m³ Beton mutu, f'c = 14,5 MPa (K175), slump (12±12) cm, w/c = 0,66 (Manual) m3 1,463,265.43 1,534,174.58 1,492,594.10 1,660,571.62 1,626,156.69 1,334,255.10 1,421,970.75 1,462,457.30 1,478,166.80 2,605,414.26 1,465,366.50 2,451,965.76 2,708,357.51 1,448,642.13 1,473,747.66

1 m³ Beton mutu, f'c = 14,5 MPa (K175), slump (12±12) cm, w/c = 0,66
11 D.11 m3 1,427,854.63 1,497,490.73 1,455,594.00 1,624,675.52 1,586,081.49 1,297,895.55 1,385,518.05 1,427,626.10 1,442,306.35 2,577,775.16 1,430,733.10 2,428,087.16 2,678,918.66 1,415,572.73 1,437,961.96
(Menggunakan Molen/Beton Mixer)

12 D.12 1 m³ Beton mutu, f'c = 16,9 MPa (K200), slump (12±12) cm, w/c = 0,61 (Manual) m3 1,517,774.92 1,591,409.45 1,546,891.96 1,723,257.44 1,686,011.31 1,385,779.04 1,475,956.34 1,519,328.72 1,534,879.38 2,713,385.42 1,522,183.25 2,554,235.89 2,821,990.99 1,505,631.92 1,530,512.40

1 m³ Beton mutu, f'c = 16,9 MPa (K200), slump (12±12) cm, w/c = 0,61
13 D.13 m3 1,482,364.12 1,554,725.60 1,509,891.86 1,687,361.34 1,645,936.11 1,349,419.49 1,439,503.64 1,484,497.52 1,499,018.93 2,685,746.32 1,487,549.85 2,530,357.29 2,792,552.14 1,472,562.52 1,494,726.70
(Menggunakan Molen/Beton Mixer)

14 D.14 1 m³ Beton mutu, f'c = 19,3 MPa (K225), slump (12±12) cm, w/c = 0,58 (Manual) m3 1,558,627.40 1,634,303.89 1,587,630.55 1,770,237.13 1,730,892.09 1,423,297.87 1,515,260.84 1,560,740.06 1,576,169.97 2,791,994.43 1,563,551.99 2,628,699.64 2,904,728.49 1,547,166.43 1,571,842.74

1 m³ Beton mutu, f'c = 19,3 MPa (K225), slump (12±12) cm, w/c = 0,58
15 D.15 m3 1,281,403.66 1,343,760.42 1,299,144.99 1,456,300.11 1,419,986.40 1,233,057.36 1,309,539.08 1,353,562.19 1,363,390.38 2,425,817.22 1,355,077.07 2,291,906.30 2,527,606.60 1,342,629.68 1,360,632.74
(Menggunakan Molen/Beton Mixer)

1 m³ Beton mutu, f'c = 21,7 MPa (K250) kedap air, slump (12±12) cm, w/c = 0,56
16 D.16 m3 1,585,487.72 1,662,507.56 1,614,369.28 1,801,126.83 1,760,377.65 1,449,371.42 1,542,596.29 1,589,524.21 1,604,884.47 2,846,665.34 1,592,312.80 2,680,469.10 2,962,250.11 1,575,982.14 1,600,580.06
(Manual)

1 m³ Beton mutu, f'c = 21,7 MPa (K250) kedap air, slump (12±12) cm, w/c = 0,56
17 D.17 m3 1,310,113.41 1,373,905.66 1,327,807.13 1,489,316.33 1,451,543.32 1,260,307.82 1,338,169.14 1,383,664.47 1,393,457.99 2,483,077.33 1,385,167.46 2,346,068.99 2,587,787.36 1,372,756.80 1,390,711.74
(Menggunakan Molen/Beton Mixer)

1 m³ Beton mutu, f'c = 24,0 MPa (K275) kedap air, slump (12±12) cm, w/c = 0,53
18 D.18 m3 1,631,495.40 1,710,816.17 1,660,193.26 1,854,036.21 1,810,894.25 1,493,989.55 1,589,399.31 1,638,788.61 1,654,045.81 2,940,271.37 1,641,542.76 2,769,083.02 3,060,710.02 1,625,290.60 1,649,775.16
(Manual)

1 m³ Beton mutu, f'c = 24,0 MPa (K275) kedap air, slump (12±12) cm, w/c = 0,53
19 D.19 m3 1,596,084.60 1,674,132.32 1,623,193.16 1,818,140.11 1,770,819.05 1,457,630.00 1,552,946.61 1,603,957.41 1,618,185.36 2,912,632.27 1,606,909.36 2,745,204.42 3,031,271.17 1,592,221.20 1,613,989.46
(Menggunakan Molen/Beton Mixer)

BIDANG SUMBER DAYA AIR SDA - 60 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

1 m³ Beton mutu, f'c = 26,4 MPa (K300) kedap air, slump (12±12) cm, w/c = 0,52
20 D.20 m3 1,645,844.38 1,725,882.81 1,674,472.20 1,870,537.75 1,826,643.10 1,507,971.71 1,604,055.21 1,654,223.42 1,669,441.43 2,969,583.17 1,656,964.47 2,796,842.09 3,091,553.44 1,640,742.02 1,665,183.61
(kedap air) (Manual)

1 m³ Beton mutu, f'c = 26,4 MPa (K300) kedap air, slump (12±12) cm, w/c = 0,52
21 D.21 m3 1,610,433.58 1,689,198.96 1,637,472.10 1,834,641.65 1,786,567.90 1,471,612.16 1,567,602.51 1,619,392.22 1,633,580.98 2,941,944.07 1,622,331.07 2,772,963.49 3,062,114.59 1,607,672.62 1,629,397.91
(kedap air) (Menggunakan Molen/Beton Mixer)

1 m³ Beton mutu, f'c = 28,8 MPa (K325) kedap air, slump (12±12) cm, w/c = 0,49
22 D.22 m3 1,784,088.32 1,870,451.64 1,816,106.91 2,023,540.35 1,980,958.82 1,644,552.10 1,748,356.85 1,800,566.68 1,817,380.55 3,193,228.70 1,803,178.22 3,009,453.30 3,323,398.94 1,784,469.69 1,812,814.30
(kedap air) (Manual)

1 m³ Beton mutu, f'c = 28,8 MPa (K325) kedap air, slump (12±12) cm, w/c = 0,49
23 D.23 m3 1,729,785.32 1,814,072.89 1,759,411.91 1,967,276.60 1,919,606.32 1,589,300.35 1,691,834.35 1,745,941.68 1,761,174.30 3,139,983.70 1,748,719.97 2,961,038.30 3,267,865.44 1,732,110.19 1,756,797.80
(kedap air) (Menggunakan Molen/Beton Mixer)

BIDANG SUMBER DAYA AIR SDA - 61 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

1 m³ Beton mutu, f'c = 31,2 MPa (K350) kedap air, slump (12±12) cm, w/c = 0,48
24 D.24 m3 1,802,806.13 1,890,105.59 1,834,745.42 2,045,066.07 2,001,508.76 1,662,757.14 1,767,450.93 1,820,666.72 1,837,437.02 3,231,416.86 1,823,263.73 3,045,607.22 3,363,569.97 1,804,587.19 1,832,885.04
(kedap air) (Manual)

1 m³ Beton mutu, f'c = 31,2 MPa (K350) kedap air, slump (12±12) cm, w/c = 0,48
25 D.25 m3 1,748,503.13 1,833,726.84 1,778,050.42 1,988,802.32 1,940,156.26 1,607,505.39 1,710,928.43 1,766,041.72 1,781,230.77 3,178,171.86 1,768,805.48 2,997,192.22 3,308,036.47 1,752,227.69 1,776,868.54
(kedap air) (Menggunakan Molen/Beton Mixer)

26 D.26 1 m³ Beton menggunakan Ready Mixed dan pompa beton m3 1,981,483.60 2,076,328.09 2,058,894.20 2,256,300.17 2,170,624.35 1,825,316.78 2,000,802.48 2,030,447.86 2,084,045.07 3,831,257.21 2,045,641.69 3,553,453.56 3,934,210.85 2,126,643.18 2,184,906.18
27 D.27 1 m³ beton menggunakan bahan aditif m3 22,908.00 24,012.00 23,736.00 26,220.00 25,530.00 22,218.00 24,426.00 24,840.00 25,530.00 48,852.00 24,978.00 44,960.40 49,956.00 24,840.00 25,254.00

Mengangkut / Menaikkan 1 m³ Beton dicorkan pada tapak berjarak < 25 m dengan


28 D.28 m3 64,124.00 66,953.00 66,953.00 69,310.50 72,611.00 64,124.00 67,896.00 67,896.00 67,896.00 85,813.00 67,424.50 81,098.00 88,170.50 65,067.00 67,896.00
beda tinggi < 1 m (Manual)

Mengangkut / Menaikkan 1 m³ Beton dicorkan pada tapak berjarak setiap


29 D.29 m3 78,200.00 81,650.00 81,650.00 84,525.00 88,550.00 78,200.00 82,800.00 82,800.00 82,800.00 104,650.00 82,225.00 98,900.00 107,525.00 79,350.00 82,800.00
tambahan jarak 25 m (Manual)

30 D.30 Mengangkut / Menaikkan 1 m3 Beton Menggunakan pompa beton m3 35,033.60 36,579.20 36,579.20 37,867.20 39,670.40 35,033.60 37,094.40 37,094.40 37,094.40 46,883.20 36,836.80 44,307.20 48,171.20 35,548.80 37,094.40
31 D.31 Pemadatan 1 m³ Beton Pada Saat Mengecor Menggunakan Concrete Vibrator m3 45,756.00 47,375.97 47,357.29 49,247.58 51,274.45 45,558.03 49,057.76 49,135.00 49,215.24 62,150.15 48,250.81 59,766.85 64,302.61 46,632.73 48,878.10
32 D.32 Pemadatan 1 m³ Beton Pada Saat Mengecor (Manual) m3 78,200.00 81,650.00 81,650.00 84,525.00 88,550.00 78,200.00 82,800.00 82,800.00 82,800.00 104,650.00 82,225.00 98,900.00 107,525.00 79,350.00 82,800.00

Mengangkut / Menaikkan 1 m³ beton dicorkan pada tapak setiap kenaikan 4 m


33 D.33 m3 39,100.00 40,825.00 40,825.00 42,262.50 44,275.00 39,100.00 41,400.00 41,400.00 41,400.00 52,325.00 41,112.50 49,450.00 53,762.50 39,675.00 41,400.00
(vertikal) (Manual)

Mengangkut / Menaikkan 1 m³ beton dicorkan pada tapak setiap kenaikan 4 m


34 D.34 m3 35,033.60 36,579.20 36,579.20 37,867.20 39,670.40 35,033.60 37,094.40 37,094.40 37,094.40 46,883.20 36,836.80 44,307.20 48,171.20 35,548.80 37,094.40
(vertikal) (Menggunakan Pompa)

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
E. PEKERJAAN PEMBESIAN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 E.1 Pembesian 100 Kg Dengan Besi Polos atau Ulir Untuk Plat 100 kg 2,275,505.00 2,384,007.50 2,359,340.00 2,589,742.50 2,538,452.50 2,213,750.00 2,294,537.50 2,287,350.00 2,534,082.50 4,408,755.00 2,472,040.00 4,320,872.00 4,776,640.00 2,455,595.00 2,506,367.50

Pembesian 100 Kg Dengan Besi Polos atau Ulir Untuk Kolom, Balok, Ring Balk,
2 E.2 100 kg 2,641,205.00 2,765,094.50 2,740,220.00 2,984,698.50 2,948,956.50 2,578,898.00 2,683,950.50 2,669,058.00 2,932,373.50 4,921,931.00 2,856,301.00 4,814,994.80 5,298,027.00 2,831,668.00 2,901,300.50
dan Sloof

Pembesian 100 kg jaring kawat (Kawat Wiremesh Ukuran 8 mm x 2,25 m 50 m)


3 E.3 100 kg 9,484,050.00 9,957,447.50 9,863,435.00 10,900,217.50 10,621,975.00 9,202,070.00 10,112,467.50 10,297,560.00 10,573,502.50 20,160,535.00 10,380,935.00 18,639,683.00 20,702,070.00 10,297,272.50 10,478,397.50
untuk pelat atau dinding

4 E.4 Pembesian 100 kg kabel prestressed / strand 100 kg 8,820,787.50 9,253,820.00 9,172,112.50 10,123,910.00 9,877,465.00 8,554,792.50 9,402,630.00 9,552,705.00 9,838,135.00 18,782,547.50 9,655,285.00 17,442,849.25 19,267,732.50 9,572,255.00 9,755,105.00

Mengangkut/menaikkan 100 kg tulangan setiap kenaikan vertikal 4 m atau jarak


5 E.5 100 kg 59,817.25 62,186.25 62,186.25 64,555.25 66,924.25 59,817.25 62,778.50 61,594.00 63,963.00 81,138.25 62,186.25 77,584.75 80,546.00 60,409.50 63,370.75
horizontal setiap 25 m ke tapak pemasangan (Manual)

Mengangkut/menaikkan 100 kg tulangan Secara Mekanis (penambahan jarak


6 E.6 100 kg 54,534.23 56,436.62 56,331.85 58,454.15 60,041.53 53,854.62 57,860.52 57,977.01 58,154.76 74,378.61 56,961.68 71,359.04 75,745.36 55,686.29 57,798.96
horizontal 10 m sd. 25 m)

Mengangkut/menaikkan 100 kg tulangan Secara Mekanis (setiap penambahan


7 E.7 100 kg 80,179.23 83,116.62 83,011.85 86,054.15 88,791.53 79,499.62 85,115.52 84,542.01 86,099.76 109,453.61 83,756.68 105,284.04 111,050.36 81,906.29 85,398.96
jarak horizontal 25 m)

8 E.8 Mengangkut/menaikkan 100 kg tulangan Secara Mekanis (setiap kenaikan 4 m) 100 kg 79,407.50 82,843.13 82,685.00 86,724.38 89,240.00 78,933.13 84,898.75 84,065.00 86,839.38 117,990.00 84,453.13 114,540.00 119,140.00 82,570.00 86,106.25
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
F. PEKERJAAN BEKISTING 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 F.1 1 m² bekisting lantai beton expose dengan Multipleks 18 mm m2 183,706.75 191,894.29 191,064.91 203,511.59 205,558.13 183,491.70 199,025.44 196,671.62 205,989.38 327,268.38 198,857.31 308,513.28 332,365.87 191,463.50 205,926.36
2 F.2 1 m² bekisting lantai beton biasa dengan Multipleks 18 mm (TP) m2 125,683.50 131,526.77 130,757.76 140,859.02 140,887.88 125,641.53 136,847.70 136,799.40 141,359.73 240,943.40 137,897.65 224,610.87 245,619.30 131,941.80 143,088.06
3 F.3 1 m² bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) m2 158,573.50 165,861.63 164,997.40 176,861.38 177,787.70 156,026.83 169,541.28 168,878.88 174,752.74 287,355.56 170,203.68 268,651.22 292,578.86 144,451.50 148,775.50

1 m² perancah bekisting lantai menggunakan Kayu Meranti Ukuran 5 cm x 7 cm x 4


4 F.4 m2 148,695.00 155,508.75 154,744.00 165,513.75 166,727.00 146,458.25 158,932.30 158,177.90 163,776.10 260,939.60 159,410.70 244,607.76 265,863.90 140,760.00 145,992.50
m, tinggi 4 m**, JAT ≤ 60 cm

1 m² perancah bekisting lantai menggunakan dolken Ø 8 - 10 cm, tinggi 4 m, JAT ≤


5 F.5 m2 155,137.88 162,064.79 161,456.55 172,149.60 173,967.40 152,877.44 165,684.76 164,493.47 170,461.17 266,854.51 165,821.95 250,503.81 271,625.40 163,124.97 177,181.19
80 cm
1 m2 perancah bekisting lantai menggunakan bambu ø 8-10 cm, tinggi 4 m, JAT <
6 F.6 m2 154,673.40 161,742.60 160,877.00 172,017.00 173,210.60 152,187.00 165,000.20 163,879.00 170,010.90 269,280.40 165,241.40 252,280.92 273,994.80 162,591.00 177,094.10
80 cm

BIDANG SUMBER DAYA AIR SDA - 62 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

7 F.7 1 m² Bekisting lantai Floordeck tipe pelat (JAP ≤ 0,6 m) m2 374,635.50 393,160.28 389,637.48 429,002.33 419,646.04 364,129.22 400,092.96 405,860.94 417,084.28 781,210.92 409,390.85 722,793.02 801,129.19 398,364.60 406,336.40
8 F.8 1 m² Bekisting lantai Floordeck tipe pelat (JAP ≤ 0,8 m) m2 370,110.25 388,450.16 384,926.62 424,163.99 414,566.26 359,592.52 395,205.15 401,171.64 412,179.52 775,230.30 404,671.87 717,120.96 795,221.73 393,612.80 401,330.45
9 F.9 1 m² Bekisting lantai Floordeck tipe balok T (JAP ≤ 1,2 m) m2 359,540.60 377,405.85 373,925.26 412,484.30 402,711.83 349,147.13 383,906.41 389,980.04 400,570.25 757,566.32 393,395.91 700,492.97 777,259.47 383,280.05 390,581.40
10 F.10 1 m² Bekisting lantai dengan Floordeck tipe balok T (JAP ≤ 2,0 m) m2 354,949.80 372,610.35 369,146.78 407,424.30 397,562.59 344,605.09 378,997.01 385,127.13 395,532.93 750,024.53 388,506.85 693,385.91 769,599.64 378,799.65 385,914.70
11 F.11 1 m² Bekisting balok beton expose menggunakan Multipleks 18 mm, JAT ≤ 1,0 m m2 228,890.25 239,143.77 238,063.11 253,927.02 256,125.93 227,930.58 247,317.62 244,679.06 256,095.92 408,396.74 247,380.18 384,814.45 415,059.61 233,728.30 249,785.06
1 m2 Bekisting balok beton biasa menggunakan multiflex 12 mm atau 18 mm, JAT
12 F.12 m2 156,733.50 164,046.47 163,063.56 175,835.12 175,689.18 156,056.73 170,008.64 170,083.62 175,717.36 299,675.28 171,455.11 279,370.10 305,673.22 160,201.90 172,235.96
< 1,0m
13 F.13 1 m² Bekisting balok beton biasa menggunakan kayu papan 3/20 cm (TP) m2 174,340.00 182,292.25 181,419.40 193,895.75 195,486.20 171,767.45 186,331.28 185,340.44 191,929.71 309,550.56 186,777.02 290,016.94 315,134.04 166,060.00 172,270.00

BIDANG SUMBER DAYA AIR SDA - 63 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

1 m² Perancah Bekisting balok menggunakan Kaso 5/7, tinggi 4 m dan JAT ≤ 1,0
14 F.14 m2 132,813.50 138,708.98 138,253.00 146,152.93 148,980.20 131,500.78 141,937.14 140,259.52 145,651.76 215,564.28 141,297.51 203,537.72 219,046.02 129,894.80 135,398.70
m
1 m² Perancah Bekisting balok menggunakan dolken Ø 8-10 cm, tinggi 4 m**, JAT
15 F.15 m2 141,504.63 147,681.74 147,304.65 155,392.95 158,739.10 140,157.29 151,154.51 149,122.57 154,944.22 226,409.01 150,250.95 214,009.71 229,891.90 147,512.57 158,167.09
≤ 1,2 m
16 F.16 1 m² Bekisting kolom beton expose menggunakan 18 mm (TP) m2 195,879.50 204,583.97 203,736.76 216,740.62 219,175.28 195,609.83 211,971.68 209,368.54 219,437.14 344,133.36 211,712.47 324,978.55 349,617.94 203,315.40 218,396.96
17 F.17 1 m2 Bekisting kolom beton biasa menggunakan multiflex 12mm atau 18 mm, (TP) m2 134,803.00 141,060.84 140,247.56 150,980.74 151,113.68 134,635.10 146,619.94 146,481.02 151,390.83 256,692.88 147,653.56 239,349.41 261,600.62 140,732.40 152,214.46
18 F.18 1 m² Bekisting kolom beton biasa menggunakan kayu papan 3/20, (TP) m2 162,587.00 169,993.00 169,188.00 180,745.50 182,309.50 160,218.00 173,801.80 172,794.40 178,956.10 288,286.60 174,130.70 270,075.66 293,371.90 155,215.50 161,046.00
19 F.19 1 m² Perancah bekisting kolom beton menggunakan kayu 5/7 cm, tinggi 4 m, JAT ≤ m2 127,845.50 133,533.98 133,078.00 140,805.43 143,402.70 126,532.78 136,647.14 135,084.52 140,246.76 208,779.28 136,088.01 196,982.72 212,157.52 124,800.30 130,039.70
1 m² Perancah bekisting kolom beton dengan kayu dolken Ø 8-10 cm, tinggi 4 m,
20 F.20 m2 127,845.50 133,533.98 133,078.00 140,805.43 143,402.70 126,532.78 136,647.14 135,084.52 140,246.76 208,779.28 136,088.01 196,982.72 212,157.52 124,800.30 130,039.70
JAT ≤ 1,2
21 F.21 1 m² Bekisting Dinding beton expose dengan Multipleks 18 mm m2 207,356.50 216,538.22 215,673.76 229,166.37 232,009.28 207,046.58 224,311.18 221,294.04 232,087.14 361,084.36 223,787.47 341,193.55 366,591.94 215,206.40 230,897.46
22 F.22 1 m2 Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm (TP) m2 136,125.50 142,408.07 141,632.16 152,135.92 152,608.68 136,067.43 148,002.70 147,696.80 152,730.93 255,663.40 148,868.65 238,714.47 260,500.30 142,678.20 154,362.66
23 F.23 1 m² Bekisting dinding beton biasa menggunakan kayu papan 3/20 cm m2 164,162.50 171,605.88 170,834.80 182,191.63 184,087.40 161,895.28 175,472.06 174,283.88 180,576.80 287,832.12 175,621.79 269,937.52 292,823.58 157,435.00 163,472.50

1 m² Perancah / penyokong bekisting dinding beton menggunakan kayu 5/7, tinggi


24 F.24 m2 129,421.00 135,146.85 134,724.80 142,251.55 145,180.60 128,210.05 138,317.40 136,574.00 141,867.45 208,324.80 137,579.10 196,844.58 211,609.20 127,019.80 132,466.20
maksimum 2,5 m

1 m² Perancah/penyokong bekisting dinding beton menggunakan Balok 8/12, tinggi


25 F.25 m2 170,982.00 178,703.10 177,964.80 189,315.30 191,755.60 168,822.30 182,640.70 181,281.40 187,953.70 289,381.40 182,661.40 272,348.52 294,712.80 165,958.80 172,509.20
maksimum 4,5 m

1 m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm atau


26 F.26 m2 140,012.50 146,572.22 145,657.16 157,337.37 156,934.98 139,539.28 152,189.16 152,362.58 157,338.75 271,626.32 153,599.29 252,873.82 277,022.58 144,262.90 155,652.96
18 mm (TP)

27 F.27 1 m² Bekisting fondasi dan sloof beton biasa menggunakan papan 3/20 cm m2 162,828.50 170,329.38 169,422.60 181,754.63 182,553.30 160,154.18 174,081.02 173,500.96 179,499.02 296,435.04 174,866.93 277,045.07 301,905.36 153,651.50 159,125.50

1 m² Perancah /penyokong bekisting sloof dan fondasi beton menggunakan Kaso


28 F.28 m2 103,500.00 108,261.00 107,699.80 115,368.00 116,041.90 101,873.90 110,763.86 110,189.78 114,045.27 183,577.72 111,052.74 171,673.93 186,800.48 98,037.50 101,602.50
5/7, tinggi maksimum 2,0 m

29 F.29 Bongkar 1 m² bekisting secara biasa (membersihkan dan membereskan puing-puing m2 6,256.00 6,532.00 6,532.00 6,762.00 7,084.00 6,256.00 6,624.00 6,624.00 6,624.00 8,372.00 6,578.00 7,912.00 8,602.00 6,348.00 6,624.00
30 F.30 Bongkar 1 m² bekisting secara hati-hati (dan membereskan puing-puing) *) m2 9,384.00 9,798.00 9,798.00 10,143.00 10,626.00 9,384.00 9,936.00 9,936.00 9,936.00 12,558.00 9,867.00 11,868.00 12,903.00 9,522.00 9,936.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
G. PEKERJAAN CURING 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 G.1 Menggenangi 100 m² permukaan beton dengan air 100 m2 118,133.75 123,211.00 123,205.25 127,845.50 133,354.00 118,122.25 124,136.75 124,142.50 124,154.00 158,113.50 123,688.25 148,854.85 160,436.50 119,082.50 124,148.25
2 G.2 Menyirami 100 m² permukaan beton menggunakan media terpal selama 4 hari 100 m2 4,688,090.00 4,916,480.00 4,869,560.00 5,378,550.00 5,244,230.00 4,547,330.00 4,988,700.00 5,082,540.00 5,211,570.00 9,879,880.00 5,128,540.00 9,152,804.00 10,166,000.00 5,077,020.00 5,774,610.00
3 G.3 Menyirami 100 m² permukaan beton menggunakan media karung goni selama 4 hari 100 m2 295,895.00 308,614.00 308,591.00 320,252.00 334,006.00 295,849.00 310,937.00 310,960.00 311,006.00 396,474.00 309,833.00 373,239.40 402,316.00 298,310.00 310,983.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
H. PEKERJAAN PEMBONGKARAN KONTRUKSI BETON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 H.1 Bongkar 1 m³ beton secara konvensional m3 590,456.00 616,543.75 616,298.80 640,026.75 668,260.40 589,560.15 625,281.45 625,774.80 626,521.15 842,910.90 621,885.50 793,534.50 864,685.00 600,934.80 626,272.75
2 H.2 Bongkar 1 m³ beton dengan jack hammer m3 235,460.79 245,055.07 244,480.07 256,226.50 264,736.50 233,900.07 250,566.86 251,141.86 252,702.57 406,506.86 249,104.71 381,670.96 416,199.71 241,219.00 251,593.64
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
I. PEKERJAAN PEMASANGAN WATERSTOP 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 I.1 1 m' Pasangan Water Stop PVC lebar 150 mm m 216,456.51 227,100.80 225,047.81 247,785.63 242,437.49 210,297.63 230,706.37 234,346.52 240,833.08 450,027.74 236,382.18 417,021.63 462,172.86 234,105.02 265,448.67
2 I.2 1 m' Pasangan Water Stop PVC lebar 200 mm m 219,218.75 229,980.45 227,924.25 250,779.35 245,537.65 213,051.30 233,647.80 237,235.80 243,844.85 454,013.10 239,290.85 420,846.18 466,224.95 236,954.05 268,435.30
3 I.3 1 m' Pasangan Water Stop PVC lebar 230 mm - 320 mm m 358,512.50 376,260.45 372,876.00 410,790.35 401,558.15 348,239.55 382,279.55 388,466.55 399,175.35 749,379.10 391,867.10 694,072.38 769,612.20 388,144.55 440,647.80
4 I.4 1 m' Pasangan Water Stop PVC lebar 150 mm - 200 mm m 290,398.00 304,676.40 302,013.00 332,629.45 325,205.05 282,168.60 309,676.60 314,598.60 323,389.20 606,070.70 317,380.45 561,407.46 622,404.15 314,316.85 356,671.35
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
J. PEKERJAAN PEMANCANGAN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 J.1 Per-m' Penetrasi tiang pancang kayu gelondong Ø 15 - 20 cm m 136,792.50 143,019.75 142,485.00 151,429.13 153,870.00 135,171.00 147,185.63 147,401.25 150,739.13 219,678.75 147,849.75 214,503.75 221,835.00 144,727.50 149,773.13
2 J.2 Per-m' Penetrasi tiang pancang kayu atau dolken Ø 8 - 10 cm 0 33,867.50 35,425.75 35,247.50 37,797.63 38,007.50 33,327.00 36,641.88 36,713.75 37,826.38 57,528.75 36,949.50 56,666.25 57,816.25 36,340.00 37,504.38

BIDANG SUMBER DAYA AIR SDA - 64 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

3 J.3 Per-m' Penetrasi tiang pancang baja pipa Ø 30 cm atau kotak 30 x 30 cm m 102,637.50 107,377.80 106,706.20 114,789.55 115,073.60 100,850.40 110,400.00 110,723.15 114,346.80 204,125.00 111,623.60 196,559.38 205,698.20 109,803.15 113,330.20
4 J.4 Per-m' penetrasi tiang pancang beton kotak 20 cm x 20 cm m 152,110.50 159,148.50 158,401.00 169,441.00 170,982.00 149,868.00 164,254.50 164,944.50 168,797.00 253,908.50 165,611.50 249,078.50 255,921.00 162,449.00 167,647.00
5 J.5 Per-m' penetrasi tiang pancang beton kotak 25 cm x 25 cm m 142,876.00 149,454.00 148,856.00 158,470.00 160,816.00 141,082.00 153,824.00 154,468.00 157,366.00 231,380.00 154,790.00 225,860.00 233,864.00 151,432.00 156,492.00
6 J.6 Per-m' penetrasi tiang pancang beton kotak 30 cm x 30 cm m 166,738.50 174,345.75 173,673.00 184,695.75 187,542.00 164,720.25 179,469.00 179,779.50 183,867.75 268,789.50 180,348.75 262,579.50 271,377.00 176,571.00 182,677.50
7 J.7 Per-m' penetrasi tiang pancang beton Ø 40 atau kotak 40 cm x 40 cm m 203,791.50 213,089.25 212,267.00 225,739.25 229,218.00 201,324.75 219,351.00 219,730.50 224,727.25 328,520.50 220,426.25 320,930.50 331,683.00 215,809.00 223,272.50
8 J.8 Per-m' penetrasi tiang pancang (hollow) beton Ø 40 cm m 185,265.00 193,717.50 192,970.00 205,217.50 208,380.00 183,022.50 199,410.00 199,755.00 204,297.50 298,655.00 200,387.50 291,755.00 301,530.00 196,190.00 202,975.00

BIDANG SUMBER DAYA AIR SDA - 65 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

9 J.9 Per m' penetrasi untuk 1 m' lebar turap (10 - 12,5 buah) dolken Ø 8 - 10 cm m 295,550.00 308,976.25 307,625.00 328,382.50 331,775.00 291,438.75 318,981.25 318,837.50 328,670.00 489,037.50 320,763.75 480,412.50 491,912.50 315,100.00 325,881.25
10 J.10 Per m' penetrasi untuk 1 m' lebar turap (10 buah) kayu papan (2 - 3) / 10 cm m 263,752.50 275,856.25 274,505.00 294,112.50 296,010.00 259,641.25 285,228.75 285,660.00 294,342.50 445,855.00 287,471.25 438,955.00 448,155.00 282,670.00 291,841.25
11 J.11 Per m' penetrasi untuk 1 m' lebar turap (5 buah) kayu papan (2 - 3) / 20 cm m 220,909.25 230,664.13 229,988.50 243,012.25 248,147.00 218,853.63 237,121.38 235,727.00 243,288.25 343,838.50 236,954.63 335,558.50 346,598.50 232,139.00 241,232.63
12 J.12 Per m' penetrasi untuk 1 m' lebar turap (4 buah) kayu papan (2 - 3) / 25 cm m 219,972.00 229,574.50 229,034.00 241,017.00 247,158.00 218,327.50 235,600.50 233,703.00 241,316.00 333,799.00 234,841.50 324,829.00 336,789.00 229,816.00 239,280.50
13 J.13 Per m' penetrasi untuk 1 m' lebar turap (3,33 buah) kayu papan (2 - 3) / 30 cm m 223,404.75 233,072.92 232,624.30 244,046.79 251,063.40 222,039.82 238,886.63 236,573.40 244,368.79 332,499.50 237,666.02 322,839.50 335,719.50 232,387.40 242,310.18
14 J.14 Per m' penetrasi untuk 1 m' lebar turap (14 buah) kayu kaso 5/7 tebal 5 cm m 221,300.25 231,638.75 230,287.50 248,359.75 248,262.00 217,189.00 240,166.00 241,367.75 248,509.25 388,199.75 243,023.75 383,599.75 389,735.00 239,372.50 246,393.25
15 J.15 Per m' penetrasi untuk 1 m' lebar turap (20 buah) kayu kaso 5/7 tebal 7 cm m 178,457.00 186,446.63 185,771.00 197,259.50 200,399.00 176,401.38 192,058.63 191,434.75 197,455.00 286,183.25 192,507.13 280,203.25 288,178.50 188,841.50 195,784.63
16 J.16 Per m' penetrasi untuk 1 m' lebar turap (8 buah) kayu balok 8/12 tebal 8 cm m 263,752.50 275,856.25 274,505.00 294,112.50 296,010.00 259,641.25 285,228.75 285,660.00 294,342.50 445,855.00 287,471.25 438,955.00 448,155.00 282,670.00 291,841.25
17 J.17 Per m' penetrasi untuk 1 m' lebar (12,5 buah) turap kayu balok 8/12 tebal 12 cm m 220,909.25 230,664.13 229,988.50 243,012.25 248,147.00 218,853.63 237,121.38 235,727.00 243,288.25 343,838.50 236,954.63 335,558.50 346,598.50 232,139.00 241,232.63
18 J.18 Per-m' penetrasi (1 buah) turap baja profil Larsen lebar 350 mm m 301,242.50 313,478.50 312,524.00 330,205.25 335,110.00 298,367.50 321,160.50 313,495.75 339,319.00 483,310.50 319,895.50 477,016.55 485,392.00 317,520.75 332,626.00
19 J.19 Per-m' penetrasi (1 buah) turap baja profil Larsen lebar 350 mm m 301,242.50 313,478.50 312,524.00 330,205.25 335,110.00 298,367.50 321,160.50 313,495.75 339,319.00 483,310.50 319,895.50 477,016.55 485,392.00 317,520.75 332,626.00
20 J.20 Per-m' penetrasi untuk 1 m' lebar turap (7 buah) baja profil INP-8 + UNP-8 m 228,792.50 239,430.00 237,935.00 257,157.25 256,266.00 224,319.00 245,226.00 247,819.25 256,841.00 414,161.00 250,102.00 406,784.90 421,176.00 246,899.25 254,219.00
21 J.21 Per-m' penetrasi untuk 1 m' lebar turap (5,56 buah) baja profil INP-10 + UNP-10 m 210,139.50 219,923.70 218,536.80 236,300.85 235,372.80 205,985.70 225,015.90 227,627.55 235,869.60 381,369.90 229,721.70 374,440.23 388,318.20 226,799.55 233,468.40
22 J.22 Per-m' penetrasi untuk 1 buah turap beton pre-cast 12 x 30 cm m' 91,195.00 95,346.50 94,990.00 100,952.75 102,580.00 90,114.00 98,123.75 98,267.50 100,492.75 146,452.50 98,566.50 143,002.50 147,890.00 96,485.00 99,848.75
23 J.23 Per-m' penetrasi 1 buah turap beton pre-cast 15 x 40 cm m' 145,912.00 152,554.40 151,984.00 161,524.40 164,128.00 144,182.40 156,998.00 157,228.00 160,788.40 234,324.00 157,706.40 228,804.00 236,624.00 154,376.00 159,758.00
24 J.24 Per-m' penetrasi 1 buah turap beton pre-cast 22 x 50 cm m' 182,390.00 190,693.00 189,980.00 201,905.50 205,160.00 180,228.00 196,247.50 196,535.00 200,985.50 292,905.00 197,133.00 286,005.00 295,780.00 192,970.00 199,697.50
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
K. PEKERJAAN DEWATERING (Normatif) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 K.1 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm bh 14,490.00 15,090.30 15,072.36 16,201.20 16,237.08 14,201.58 15,327.66 15,479.46 15,651.50 25,779.32 15,452.32 23,885.78 26,350.64 15,203.46 16,312.06

1 buah kistdam pasir/tanah dibungkus karung plastik/bagor/goni atau terpal ukuran


2 K.2 bh 31,883.75 33,207.98 33,170.60 35,208.98 35,744.30 31,468.03 33,794.48 33,730.65 34,569.00 52,380.20 33,796.20 49,143.41 53,332.40 33,184.40 35,307.88
45 cm x 120 cm

3 K.3 1 buah geobag pasir/tanah ukuran 145 x 240 cm bh 507,506.50 531,681.11 527,618.16 575,491.51 568,703.98 495,310.29 539,848.41 546,780.84 560,367.40 994,481.82 550,685.32 924,832.58 1,021,560.64 543,215.84 600,377.05
4 K.4 Kerangka kayu untuk 1 m3 kistdam pasir/tanah ukuran 43 cm x 65 cm m3 173,699.40 182,045.49 180,547.63 197,650.69 194,327.22 169,288.95 185,934.50 186,819.53 193,625.00 351,663.96 188,809.40 326,084.24 358,500.74 154,268.04 158,424.14

Kerangka baja profil L.50.50.5 atau L.60.60.6 atau profil besi berlubang untuk 1 m³
5 K.5 m3 565,827.60 593,354.23 588,047.10 648,349.99 632,486.09 548,066.20 601,120.41 609,735.64 628,028.00 1,184,070.82 616,480.27 1,097,278.99 1,215,768.04 609,965.64 621,225.86
kistdam pasir / tanah dengan karung ukuran 43 cm x 65 cm.
Pengoperasian per-jam pompa air diesel daya 5 kW dengan suction head maks. 3
6 K.6 m dan discharge head maks. 20 m (kapasitas 0,5 m³/s pada suction head 1 m dan jam 106,662.50 110,802.50 109,825.00 118,076.25 116,955.00 104,535.00 118,105.00 119,255.00 121,382.50 282,842.50 117,213.75 263,654.75 290,921.25 114,080.00 119,370.00
discharge head 10 m)
Pengoperasian per-jam pompa air diesel daya 10 kW dengan suction head maks. 3
7 K.7 m dan discharge head maksimal 20 m (kapasitas 1,0 m³/s pada suction head 1 m jam 338,010.88 353,501.38 350,014.00 383,479.00 375,426.13 328,951.75 371,763.38 377,332.25 386,391.38 813,507.13 377,225.88 780,919.29 823,972.13 371,294.75 381,880.50
dan discharge head 10 m)
Pengoperasian per-jam pompa air diesel daya 20 kW dengan suction head maks. 3
8 K.8 m dan discharge head maksimal 20 m (kapasitas 2,0 m³/s pada suction head 1 m jam 796,541.75 819,001.25 813,659.50 862,919.75 850,453.75 783,069.50 926,411.25 934,536.00 948,008.25 1,675,061.25 893,734.00 1,616,901.73 1,772,966.50 864,673.50 920,943.00
dan discharge head 10 m)
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1 L. PEKERJAAN PINTU AIR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 L.1 Pintu Angkat Lebar B = 200 mm; H = 250 mm; H1 = 500 mm dan TR = 1050 mm. bh 14,153,554.47 14,169,802.27 14,167,023.57 14,194,095.42 14,195,869.01 14,147,453.17 14,175,851.06 14,177,231.21 14,189,723.21 14,411,207.11 14,180,021.50 14,385,677.72 14,425,235.61 14,174,376.55 14,186,494.23

Pintu Sorong Kayu Lebar B = 1500 mm; H = 1500 mm; H1 = 3000 mm dan TR =
3 L.2 bh 61,434,593.66 61,882,814.48 61,805,835.35 62,576,317.48 62,596,821.28 61,258,407.60 61,944,165.46 62,105,636.12 62,442,293.77 68,646,330.71 62,181,384.48 68,081,583.35 69,262,167.92 62,034,587.99 62,354,689.14
3800 mm.
Pintu Sorong Baja Lebar B = 500 mm; H = 500 mm; H1 = 1000 mm dan TR = 1900
4 L.3 bh 25,267,581.83 25,373,757.38 25,352,919.44 25,545,677.03 25,538,186.30 25,220,829.88 25,388,456.39 25,427,139.24 25,502,356.59 27,082,094.17 25,445,268.03 26,913,669.34 27,224,366.58 25,412,732.98 25,481,795.10
mm.
5 L.4 Pintu Skot Balk Lebar B = 500 mm; H = 1000 mm. bh 264,442.50 276,327.75 274,744.20 295,095.75 296,267.60 259,691.85 281,100.94 280,920.62 290,943.33 471,064.38 282,900.46 441,428.33 480,125.92 274,045.00 283,015.00

Pelumasan pintu air (Pintu Angkat) (Pelumasan setiap 2 minggu sekali atau 26
6 L.5 m2 17,950.67 18,755.14 18,726.26 19,561.45 20,293.59 17,877.81 19,016.40 19,056.86 19,129.72 26,988.20 18,970.75 25,303.38 27,642.09 18,366.86 19,107.73
kali/tahun)

BIDANG SUMBER DAYA AIR SDA - 66 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Pelumasan Pintu Sorong Kayu dengan Roda Gigi (Stang Tunggal < 1 m)
7 L.6 m2 35,155.96 36,729.39 36,685.00 38,267.17 39,757.80 35,036.59 37,246.20 37,315.66 37,435.03 51,651.10 37,130.05 48,552.08 53,001.20 35,935.66 37,397.54
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Kayu dengan Roda Gigi (Stang Double < 1 m)
8 L.7 m2 53,524.68 55,924.27 55,849.75 58,310.06 60,522.20 53,321.82 56,712.25 56,830.93 57,033.79 79,162.55 56,560.45 74,385.80 81,232.55 54,760.93 56,969.62
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Kayu dengan Roda Gigi (Stang Tunggal 1 - 2 m)


9 L.8 m2 52,331.44 54,671.46 54,608.90 56,937.88 59,185.90 52,164.46 55,440.35 55,536.49 55,703.47 76,618.75 55,254.05 72,034.28 78,619.75 53,466.49 55,651.26
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Kayu dengan Roda Gigi (Stang Double 1 - 2 m)


10 L.9 m2 86,637.78 90,508.80 90,411.28 94,228.01 97,992.65 86,377.42 91,781.50 91,931.81 92,192.17 126,203.30 91,454.33 118,686.10 129,509.55 88,481.81 92,110.75
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

BIDANG SUMBER DAYA AIR SDA - 67 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Tunggal < 1 m)
11 L.10 m2 53,202.68 55,586.17 55,513.95 57,939.76 60,161.10 53,009.02 56,368.40 56,480.18 56,673.84 78,731.30 56,207.40 73,976.97 80,778.30 54,410.18 56,613.12
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Double < 1 m)
12 L.11 m2 88,199.02 92,148.01 92,033.93 96,023.39 99,740.65 87,891.28 93,445.55 93,624.15 93,931.89 129,787.85 93,163.23 121,988.78 133,179.20 90,174.15 93,835.06
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Tunggal < 1 m)
13 L.12 m2 53,202.68 55,586.17 55,513.95 57,939.76 60,161.10 53,009.02 56,368.40 56,480.18 56,673.84 78,731.30 56,207.40 73,976.97 80,778.30 54,410.18 56,613.12
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Double < 1 m)
14 L.13 m2 88,199.02 92,148.01 92,033.93 96,023.39 99,740.65 87,891.28 93,445.55 93,624.15 93,931.89 129,787.85 93,163.23 121,988.78 133,179.20 90,174.15 93,835.06
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Tunggal < 1 - 2 m)
15 L.14 m2 86,775.78 90,653.70 90,553.88 94,386.71 98,146.75 86,510.82 91,927.55 92,080.16 92,345.12 126,751.85 91,604.98 119,183.93 130,062.70 88,630.16 92,262.55
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Double < 1 - 2 m)
16 L.15 m2 138,257.60 144,433.10 144,280.15 150,347.55 156,381.60 137,851.65 146,462.85 146,696.30 147,102.25 201,304.05 145,929.25 189,317.95 206,571.05 141,176.30 146,975.75
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Tunggal > 2 m)
17 L.16 m2 136,398.74 142,481.44 142,349.88 148,209.93 154,301.25 136,050.06 144,483.70 144,683.92 145,032.60 196,576.40 143,895.48 184,977.16 201,747.95 139,163.92 144,924.04
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Double > 2 m)
18 L.17 m2 221,018.04 230,871.01 230,665.85 240,116.78 250,035.30 220,471.56 234,117.00 234,431.64 234,978.12 317,457.50 233,141.80 298,782.19 325,834.10 225,461.64 234,807.46
(Pelumasan setiap 2 minggu sekali atau 26 kali/tahun)

19 L.18 Pintu Besi uk. lebar 0,3 m dan tinggi 0,6 m, ulir tunggal bh 1,182,506.55 1,237,000.68 1,228,125.04 1,336,118.26 1,321,880.14 1,154,952.06 1,258,776.09 1,268,247.39 1,308,690.42 2,280,917.53 1,278,374.46 2,127,623.02 2,332,741.59 1,262,281.36 1,296,182.31
20 L.19 Pintu besi uk. lebar 0,4 m dan tinggi 0,6 m, ulir tunggal bh 1,384,497.60 1,447,563.87 1,437,646.66 1,560,508.58 1,547,302.21 1,353,547.61 1,473,365.75 1,482,282.86 1,530,593.95 2,631,360.45 1,493,906.94 2,457,854.20 2,689,248.63 1,474,328.16 1,515,798.94
21 L.20 Pintu besi uk. lebar 0,5 m dan tinggi 0,8 m, ulir tunggal bh 1,950,565.15 2,037,657.14 2,024,823.16 2,189,329.76 2,179,046.79 1,910,106.56 2,074,769.39 2,082,119.43 2,152,494.41 3,613,316.00 2,097,929.80 3,383,210.74 3,688,246.92 2,068,590.68 2,131,287.67
22 L.21 Pintu besi uk. lebar 0,8 m dan tinggi 1 m, ulir tunggal bh 3,325,122.21 3,470,549.40 3,450,630.52 3,716,289.30 3,713,062.49 3,261,567.04 3,535,092.40 3,538,639.31 3,662,602.15 5,997,923.24 3,564,637.60 5,630,341.48 6,114,153.34 3,511,593.33 3,625,822.75
23 L.22 Pintu kayu rangka besi uk. lebar 1,2 m dan tinggi 1,4 m, ulir double bh 3,459,297.10 3,624,210.86 3,596,241.86 3,930,826.51 3,871,515.67 3,372,531.64 3,681,989.10 3,721,960.42 3,833,066.75 6,878,259.01 3,755,727.22 6,395,832.79 7,046,118.52 3,411,237.95 3,480,042.70
24 L.23 Pintu kayu rangka besi uk. lebar 1 m dan tinggi 2 m, ulir double bh 3,878,789.18 4,060,934.27 4,032,200.30 4,388,654.36 4,340,803.09 3,788,930.67 4,121,849.33 4,159,636.04 4,279,088.89 7,493,340.11 4,195,672.78 6,976,780.21 7,666,130.31 3,958,589.44 4,053,178.26
25 L.24 Pintu kayu rangka besi uk. lebar 1,4 m dan tinggi 2,5 m ulir double bh 5,749,641.14 6,021,132.18 5,978,069.77 6,508,397.52 6,435,988.78 5,615,939.79 6,113,970.76 6,171,361.18 6,348,925.00 11,146,444.58 6,224,420.96 10,377,023.49 11,410,374.73 5,664,915.65 5,789,886.50
26 L.25 Pintukayu rangka besi uk. lebar 1,6 m dan tinggi 2,5 m ulir double bh 6,845,824.82 7,170,660.68 7,117,457.11 7,764,856.70 7,662,766.46 6,679,733.95 7,281,795.76 7,355,828.06 7,571,441.70 13,445,869.58 7,421,670.78 12,509,648.17 13,770,374.37 6,791,822.73 6,937,299.92
27 L.26 Pintu kayu rangka besi uk. lebar 1,8 m dan tinggi 2,5 m ulir double bh 7,705,334.24 8,070,648.75 8,009,929.64 8,743,774.29 8,622,634.28 7,516,299.37 8,200,108.05 8,281,817.04 8,533,138.56 15,198,541.71 8,357,095.16 14,143,404.25 15,564,524.36 7,512,109.57 7,666,010.90
28 L.27 Pintu kayu rangka besi uk. lebar 2 m dan tinggi 2,5 m ulir double bh 7,995,531.30 8,375,012.28 8,311,406.57 9,076,987.92 8,947,205.13 7,797,692.12 8,510,068.10 8,597,320.92 8,857,007.34 15,814,279.11 8,674,930.73 14,713,632.73 16,197,395.96 7,752,905.52 7,907,695.62
29 L.28 Pintu air elektromekanik uk. lebar 2 m dan tinggi 2,5 m ulir double pakai motor bh 17,224,254.37 18,065,049.78 17,907,199.73 19,690,793.49 19,278,173.70 16,749,144.21 18,360,706.09 18,623,941.34 19,162,968.51 31,880,605.09 18,793,409.47 29,361,524.46 32,701,308.44 17,787,075.94 18,119,067.45
30 L.29 Pintu air elektromekanik uk. lebar 2,5 m dan tinggi 3,5 m ulir double pakai motor bh 18,609,397.18 19,513,501.80 19,346,264.34 21,249,709.73 20,826,602.92 18,105,402.31 19,836,664.06 20,106,702.26 20,696,209.42 34,490,387.48 20,288,305.54 31,803,581.58 35,368,647.81 18,996,685.66 19,353,816.05
31 L.30 Pintu air elektromekanik uk. lebar 3 m dan tinggi 3,5 m ulir double pakai motor bh 21,652,349.92 22,702,873.78 22,508,855.30 24,718,275.82 24,230,559.84 21,067,470.11 23,079,039.02 23,389,629.33 24,077,342.87 40,671,642.23 23,600,946.70 37,544,699.33 41,706,546.82 22,057,157.95 22,472,535.01
32 L.31 Pintu air elektromekanik uk. lebar 3,5 m dan tinggi 4,5 m ulir double pakai motor bh 26,735,621.40 28,029,541.39 27,792,828.76 30,498,610.03 29,917,365.51 26,022,117.28 28,492,332.72 28,861,041.39 29,718,218.19 50,845,624.48 29,124,023.49 47,004,036.21 52,128,397.09 27,146,937.74 27,665,342.71
33 L.32 Pemasangan Pintu Klep Fiber ukuran 60 x 60 cm bh 17,815,800.00 18,703,312.50 18,528,742.50 20,461,950.00 19,953,765.00 17,292,090.00 19,006,981.50 19,336,916.50 19,862,271.00 37,743,138.00 19,509,778.75 34,914,914.25 38,762,532.50 19,331,741.50 19,689,408.75
34 L.33 Pemasangan Pintu Klep Fiber ukuran 80 x 80 cm bh 22,576,800.00 23,702,362.50 23,480,182.50 25,937,100.00 25,286,085.00 21,910,260.00 24,086,968.50 24,509,346.25 25,173,166.50 47,903,112.00 24,728,231.50 44,308,129.20 49,199,438.00 24,504,171.25 24,954,149.00
35 L.34 Pemasangan Pintu Klep Fiber ukuran 100 x 100 cm bh 25,750,800.00 27,035,062.50 26,781,142.50 29,587,200.00 28,840,965.00 24,989,040.00 27,473,626.50 27,957,500.50 28,713,763.50 54,676,428.00 28,207,332.25 50,570,510.55 56,157,639.50 27,952,325.50 28,463,931.75
36 L.35 Pemasangan Pintu Klep Fiber ukuran 120 x 120 cm bh 36,859,800.00 38,699,512.50 38,334,502.50 42,362,550.00 41,283,045.00 35,764,770.00 39,326,929.50 40,026,371.00 41,105,853.00 78,383,034.00 40,383,854.25 72,488,250.15 80,510,683.50 40,021,196.00 40,748,237.50
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1 M. AHSP Pekerjaan Air Tanah (Informatif) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 M.1 1 m' pengambilan dan deskripsi sampel batuan (dalam laporan) m' 472,650.00 489,900.00 489,900.00 504,275.00 524,400.00 472,650.00 495,650.00 495,650.00 495,650.00 604,900.00 492,775.00 576,150.00 619,275.00 478,400.00 495,650.00
3 M.2 1 m' pengeboran Ø 8 3/4" - 12" m' 216,563.17 219,137.79 219,137.79 221,357.29 224,287.03 216,563.17 220,291.93 219,404.13 221,179.73 238,225.49 219,492.91 234,674.29 239,557.19 217,717.31 220,735.83
4 M.3 1 m' reaming Ø 8 3/4" - 12" m' 286,293.65 288,663.80 288,663.80 290,705.05 293,404.10 286,293.65 289,729.85 288,913.35 290,546.35 306,230.05 288,992.70 302,964.05 307,466.30 287,359.70 290,138.10
5 M.4 1 m' reaming Ø 8 3/4" - 14 3/4" m' 405,586.60 407,988.95 407,988.95 410,058.95 412,793.65 405,586.60 409,067.65 408,239.65 409,895.65 425,796.70 408,321.30 422,484.70 427,044.45 406,665.30 409,481.65
6 M.5 Bongkar pasang temporary cassing (ID) 12" m 162,802.05 165,506.85 165,506.85 167,835.60 170,916.45 162,802.05 166,724.70 165,793.20 167,656.20 185,551.35 165,882.90 181,825.35 186,965.85 164,019.90 167,190.45

BIDANG SUMBER DAYA AIR SDA - 68 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

7 M.6 Bongkar pasang temporary cassing (ID) 17" m 196,394.70 199,129.40 199,129.40 201,486.90 204,598.80 196,394.70 200,355.30 199,412.30 201,298.30 219,403.90 199,506.60 215,631.90 220,818.40 197,620.60 200,826.80
8 M.7 1 m' Pengadaan dan pemasangan cassing pipa black steel 6" m' 597,868.90 598,468.05 598,468.05 598,985.55 599,666.35 597,868.90 598,734.85 598,527.85 598,941.85 602,912.80 598,549.70 602,084.80 603,217.55 598,135.70 598,838.35

BIDANG SUMBER DAYA AIR SDA - 69 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

9 M.8 1 m' pengadaan dan pemasangan LC Screen 6" m' 569,118.90 569,718.05 569,718.05 570,235.55 570,916.35 569,118.90 569,984.85 569,777.85 570,191.85 574,162.80 569,799.70 573,334.80 574,467.55 569,385.70 570,088.35
10 M.9 1 m' pengadaan dan pemasangan cassing pipa black steel 8" m' 1,092,801.30 1,093,470.60 1,093,470.60 1,094,045.60 1,094,809.20 1,092,801.30 1,093,774.20 1,093,544.20 1,094,004.20 1,098,427.10 1,093,564.90 1,097,507.10 1,098,783.60 1,093,104.90 1,093,889.20
11 M.10 1 m' pengadaan dan pemasangan LC screen 8" m' 1,064,072.00 1,064,739.00 1,064,739.00 1,065,314.00 1,066,073.00 1,064,072.00 1,065,038.00 1,064,808.00 1,065,268.00 1,069,684.00 1,064,831.00 1,068,764.00 1,070,029.00 1,064,371.00 1,065,153.00
12 M.11 1 m' pengadaan dan pemasangan pipa sounding PVC 1" m' 78,066.60 78,266.70 78,266.70 78,439.20 78,666.90 78,066.60 78,356.40 78,287.40 78,425.40 79,750.20 78,294.30 79,474.20 79,853.70 78,156.30 78,390.90
13 M.12 1 m³ pengadaan dan pemasangan gravel pack m' 1,763,111.00 1,797,312.00 1,784,432.00 1,855,962.00 1,846,624.00 1,638,336.00 1,680,794.00 1,691,604.00 1,703,564.00 2,158,067.00 1,693,858.00 2,091,091.00 2,194,062.00 1,684,773.00 1,700,114.00
14 M.13 1 jam pencucian sumur jam 688,306.05 693,075.10 693,075.10 697,186.35 702,613.20 688,306.05 695,212.95 693,568.45 696,857.45 728,431.85 693,732.90 721,853.85 730,898.60 690,443.90 696,035.20
15 M.14 1 jam uji pemompaan jam 688,306.05 693,075.10 693,075.10 697,186.35 702,613.20 688,306.05 695,212.95 693,568.45 696,857.45 728,431.85 693,732.90 721,853.85 730,898.60 690,443.90 696,035.20
16 M.15 1 lokasi pasang dan bongkar peralatan uji pemompaan lokasi 2,165,450.00 2,226,400.00 2,226,400.00 2,278,150.00 2,348,300.00 2,165,450.00 2,250,550.00 2,239,050.00 2,262,050.00 2,657,650.00 2,235,600.00 2,565,650.00 2,697,900.00 2,189,600.00 2,256,300.00
17 M.16 Sampling 1 sampel analisa kualitas air bh 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00 345,000.00
18 M.17 1 Buah Patok Sumur bh 397,900.00 408,250.00 407,560.00 420,900.00 426,880.00 395,830.00 411,700.00 413,022.50 415,035.00 529,000.00 412,562.50 506,402.50 538,775.00 406,122.50 414,345.00
19 M.18 1 Titik Electric Logging titik 880,325.00 889,525.00 888,835.00 902,175.00 905,855.00 878,255.00 890,675.00 891,997.50 894,010.00 1,004,525.00 892,687.50 981,927.50 1,008,550.00 886,247.50 893,320.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
N. PEKERJAAN LAIN LAIN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 N.1 Pemagaran Dengan Rangka Baja L.40.40.4 m 792,580.00 820,295.00 814,706.00 874,690.00 862,063.00 775,468.00 824,803.00 837,131.00 857,118.00 1,394,076.00 842,225.50 1,315,813.90 1,431,681.00 836,901.00 850,344.50
2 N.2 Pemagaran Dengan Rangka Kayu m 472,535.00 485,109.68 483,087.40 507,913.03 504,219.80 466,219.78 485,249.40 491,836.60 502,000.88 719,821.80 494,774.85 693,861.93 741,356.70 463,261.40 470,366.10
3 N.3 1 m² Pembuatan Direksi Keet atap abses gelombang, dinding triplek, kaca nako. m' 3,797,895.13 3,885,375.51 3,866,806.84 4,046,183.55 4,013,765.36 3,737,482.24 3,897,261.28 3,921,863.21 3,973,456.02 5,566,496.12 3,936,439.03 5,312,662.11 5,659,267.39 3,630,344.15 3,685,014.46

1 Buah papan nama pekerjaan menggunakan Multipleks 18 mm, frame besi siku
4 N.4 bh 1,416,685.00 1,479,920.63 1,471,450.30 1,582,661.63 1,581,452.40 1,397,392.03 1,520,399.48 1,505,221.32 1,587,150.08 2,540,261.45 1,526,048.74 2,391,250.22 2,574,272.47 1,427,219.00 1,492,861.00
dan tiang kayu 8/12

1 Buah papan nama pekerjaan menggunakan multiflex 10 mm, frame allumunium


5 N.5 bh 591,905.00 614,920.53 612,372.70 648,494.78 652,445.60 588,185.33 632,774.28 626,666.40 651,345.63 948,723.55 632,535.31 895,856.05 960,608.11 602,491.90 626,158.90
siku dan tiang kayu 5/7, printing banner plastik

6 N.6 Investigasi Lapangan ls 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00 2,250,000.00
7 N.7 Sewa Lahan ha 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00
8 N.8 Fasilitas ls 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00 340,800,000.00
9 N.9 Kebutuhan Lain-lain ls 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00 458,000,000.00

1 Set foto dokumentasi menggunakan kamera digital tanpa film (jika menggunakan
10 N.10 set 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00 5,307,250.00
kamera digital, untuk dokumentasinya dengan CD dan album foto)
Penggambaran dengan CAD untuk 1 buah gambar (file AutoCAD) layout, tampak
11 N.11 potongan dan detail untuk kondisi tidak rumit dan banyak bentuk duplikasi ukuran bh 382,317.50 393,956.65 393,930.20 402,288.40 402,205.60 382,231.25 405,599.25 405,655.60 399,988.40 413,885.00 399,932.05 413,885.00 465,635.00 399,905.60 399,961.95
A1
Pencetakan 1 lembar gambar layout, tampak, potongan dan detail untuk kondisi
12 N.12 lembar 40,020.00 40,893.43 40,719.20 42,641.43 42,117.60 39,495.03 41,768.00 42,117.60 42,641.43 58,420.00 42,291.83 58,420.00 59,340.00 42,117.60 42,467.20
tidak rumit ukuran A1 :

13 N.13 Foto copy dan jilid Exemplar 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00 161,000.00
14 N.14 1 Set as built drawing (reduce dan copy kalkir serta blue/black print) Set 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00 4,755,250.00
15 N.15 1 m2 Pengangkatan gulma dan/atau sampah apung Secara manual m2 4,692.00 4,899.00 4,899.00 5,071.50 5,313.00 4,692.00 4,968.00 4,968.00 4,968.00 6,279.00 4,933.50 5,934.00 6,451.50 4,761.00 4,968.00
16 N.16 1 m2 Pengangkatan gulma dan/atau sampah apung Secara Mekanis m2 4,962.25 5,010.55 5,007.10 5,078.40 5,096.80 4,948.45 5,054.25 5,061.15 5,074.95 5,708.60 5,046.20 5,588.08 5,779.90 5,012.85 5,064.60
17 N.17 1 m3 Pengangkutan gulma padat, ketebalan 25 cm (Secara Manual) m3 78,200.00 81,650.00 81,650.00 84,525.00 88,550.00 78,200.00 82,800.00 82,800.00 82,800.00 104,650.00 82,225.00 98,900.00 107,525.00 79,350.00 82,800.00
18 N.18 1 m3 Pengangkutan gulma padat, ketebalan 25 cm (Secara Mekanisl) m3 47,106.26 48,926.42 48,656.56 51,838.41 52,180.62 46,285.12 50,955.20 51,783.08 51,729.24 76,169.32 51,003.01 74,344.86 77,188.11 50,133.19 51,432.38
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
O. PEKERJAAN KAYU 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 O.1 1 m2 Pekerjaan serutan papan atau balok kayu (Manual) m2 37,490.00 38,973.50 38,939.00 40,330.50 41,699.00 37,421.00 40,123.50 38,433.00 41,952.00 53,797.00 39,272.50 52,911.50 54,050.00 38,950.50 41,262.00
2 O.2 1 m2 Membuat pasangan/konstruksi kayu dari bahan baku papan kayu m2 420,083.50 436,471.00 436,321.50 451,265.75 466,842.50 419,623.50 449,615.50 429,611.25 470,045.25 597,747.00 439,443.75 588,230.75 597,747.00 435,947.75 463,243.00

BIDANG SUMBER DAYA AIR SDA - 70 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

1 m' Pembuatan Profil pada sudut kayu dengan alat serutan profil,
3 O.3 m' 6,831.00 7,105.85 7,102.40 7,356.55 7,625.65 6,824.10 7,266.85 7,040.30 7,507.20 9,565.70 7,147.25 9,304.65 9,614.00 7,028.80 7,415.20
takikan/sambungan dengan pahat dan lain-lain

4 O.4 1 m3 Membuat pasangan/konstruksi kayu dari bahan baku balok kayu kelas I m3 2,365,374.63 2,477,197.75 2,459,878.75 2,717,507.50 2,649,140.00 2,288,178.00 2,328,755.75 2,554,239.13 2,623,319.63 4,652,543.50 2,580,076.75 4,640,577.75 5,155,473.00 2,554,227.63 2,607,254.13

1 m3 Membuat pasangan/konstruksi kayu dari bahan baku balok kayu kelas II


5 O.5 m3 2,049,875.00 2,130,093.25 2,129,041.00 2,203,704.75 2,278,184.50 2,046,959.75 2,196,327.50 2,097,703.50 2,293,468.00 2,937,215.00 2,145,325.00 2,882,705.00 2,933,420.00 2,128,293.50 2,259,301.50
dan/atau III

6 O.6 1 m2 Pekerjaan serutan papan atau balok kayu (Semi Mekanis) m2 36,501.00 37,208.25 37,173.75 37,932.75 38,484.75 36,432.00 37,656.75 37,001.25 38,450.25 44,815.50 37,363.50 44,160.00 44,970.75 37,156.50 38,174.25

7 1 m3 Membuat pasangan/konstruksi kayu dari bahan baku papan atau balok 853,817.50 887,374.50 886,351.00 921,742.25 949,359.50 850,931.00 910,857.50 883,504.75 936,726.75 1,236,135.00 895,821.25 1,192,452.25 1,236,307.50 882,239.75 927,026.50
O.7 kayu (semi mekanis) m3

BIDANG SUMBER DAYA AIR SDA - 71 dari 75


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO NOMOR URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Pekerjaan logam besi atau baja 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 P.1 Pemasangan 1 Kg Besi Profil Siku, IWF, INP, UNP kg 55,579.50 58,092.25 57,695.50 62,353.00 62,123.00 54,389.25 55,533.50 59,075.50 61,513.50 96,163.00 59,650.50 96,689.70 105,259.50 59,041.00 60,840.75
2 P.2 Pengerjaan 100 Kg pekerjaan perakitan konstruksi besi/baja /100 kg 427,145.46 434,369.25 432,977.69 447,936.41 445,571.26 423,072.31 441,206.45 442,587.12 448,357.12 567,606.36 443,580.44 562,416.14 570,189.74 441,458.28 446,404.59
3 P.3 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m2 1,829,092.73 1,903,883.87 1,891,159.10 2,037,328.46 2,014,594.88 1,790,037.66 1,932,884.22 1,942,866.56 2,001,572.56 3,327,812.93 1,959,963.47 3,126,360.39 3,400,065.37 1,941,123.39 1,983,501.54
4 P.4 Pengerjaan 10 cm pengelasan dengan las listrik 10 cm 87,538.00 91,826.35 91,024.80 99,929.25 98,053.60 85,188.55 93,904.40 96,238.90 99,016.15 177,566.90 97,100.25 173,707.27 181,357.30 96,077.90 98,161.70
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Q PEKERJAAN SALURAN U-DITCH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1 Q.1 Saluran U-ditch : 30 x 50 x 8 cm ; L = 60 cm bh 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35 911,751.35

2 Q.2 Saluran U-ditch : 40 x 60 x 8 cm ; L = 60 cm bh 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19 1,009,090.19

3 Q.3 Saluran U-ditch : 50 x 80 x 10 cm ; L = 60 cm bh 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54 1,351,202.54

4 Q.4 Saluran U-ditch : 80 x 120 x 10 cm ; L = 80 cm bh 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43 2,225,384.43

5 Q.5 Saluran U-ditch : 100 x 150 x 10 cm ; L = 100 cm bh 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00 3,186,041.00

6 Q.6 Saluran U-ditch : 120 x 160 x 12 cm ; L = 100 cm bh 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42 4,015,724.42

BIDANG SUMBER DAYA AIR SDA - 72 dari 75


harga satuan pokok kegiatan
PROVINSI KALIMANTAN UTARA 2021
bidang tata ruang
HARGA SATUAN POKOK KEGIATAN BIDANG TATA RUANG
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NOMOR KAB BULUNGAN KOTA TARAKAN KAB TANA TIDUNG KAB MALINAU KAB NUNUKAN
NO URAIAN SATUAN
ANALISA Tanjung Selor Tarakan Tideng pale Malinau Nunukan

A PENGADAAN PETA

1 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 1.000 NLP 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00
2 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 2.500 NLP 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00
3 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 5.000 NLP 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00
4 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 10.000 NLP 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00
5 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 1.000 m2 1.00 1.00 1.00 1.00 1.00
6 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 2.500 km2 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00
7 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 10.000 km2 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00
8 Cetakan Peta Rupa Bumi skala 1 :50.000 NLP 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
9 Peta Lingkungan Pantai Indonesia jenis vektor hipsografi skala 1 : 10.000 NLP 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
10 Cetakan Peta Lingkungan Pantai Indonesia NLP 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
11 Cetakan Peta Lingkungan Laut Indonesia NLP 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00

B PRODUK PENGINDERAAN JAUH

12 Mozaik Citra Radar hasil scan dan plot lembar 400,000.00 400,000.00 400,000.00 400,000.00 400,000.00
13 Foto Udara Hitam Putih lembar 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00
14 Diapositif Film lembar 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00

C JASA PENGUMPULAN DAN PENGOLAHAN DATA INFORMASI GEOSPASIAL

15 Pengumpulan data geospasial GPS Geodetic titik 4,000,000.00 4,000,000.00 4,000,000.00 4,000,000.00 4,000,000.00
16 Pengumpulan data geospasial Gaya Berat titik 1,500,000.00 1,500,000.00 1,500,000.00 1,500,000.00 1,500,000.00
17 Pengumpulan data geospasial Sipat datar teliti km 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00

BIDANG TATA RUANG TR -74 dari 75


NOMOR KAB BULUNGAN KOTA TARAKAN KAB TANA TIDUNG KAB MALINAU KAB NUNUKAN
NO URAIAN SATUAN
ANALISA Tanjung Selor Tarakan Tideng pale Malinau Nunukan

18 Pengumpulan data geospasial Sipat datar km 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00
19 Survey pasang surut per bulan titik 20,000,000.00 20,000,000.00 20,000,000.00 20,000,000.00 20,000,000.00
20 Survey Bathimetri single beam (minimum 10 hari) m3 12,000,000.00 12,000,000.00 12,000,000.00 12,000,000.00 12,000,000.00
21 Survey Bathimetri multi beam (minimum 10 hari) m3 20,000,000.00 20,000,000.00 20,000,000.00 20,000,000.00 20,000,000.00
22 Pengolahan Data Geospasial dari hasil survey GPS titik 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00
23 Pengolahan Data Geospasial dari hasil survey pasang surut m3 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00
24 Pengolahan citra resolusi tinggi ha 1,500,000.00 1,500,000.00 1,500,000.00 1,500,000.00 1,500,000.00
25 Pengolahan citra resolusi menengah scene 7,000,000.00 7,000,000.00 7,000,000.00 7,000,000.00 7,000,000.00
26 Pengolahan citra resolusi rendah scene 5,000,000.00 5,000,000.00 5,000,000.00 5,000,000.00 5,000,000.00

BIDANG TATA RUANG TR -75 dari 75