(BOQ)
NO URAIAN PEKERJAAN
Terbilang : .......................................................................................................................................................................................................................................
Nama Perusahaan
CV/ PT
Nama Terang
Direktur
BILL OF QUANTITY
(BOQ)
Paket : (PAKET - 01)
Kegiatan : REHABILITASI DAN PEMBANGUNAN PRASARANA INFRASTRUKTUR PERGURUAN TINGGI NEGERI (PTN) DAN
PASAR DI PROVINSI JAWA TIMUR
PEMBANGUNAN GEDUNG KULIAH PRODI TEKNIK MESIN ALAT BERAT DAN BENGKEL TEKNIK LISTRIK INDUSTRI
Pekerjaan
POLITEKNIK NEGERI MADURA
Lokasi : KABUPATEN SAMPANG
Tahun : 2019
B PEKERJAAN K3
1 Pekerjaan K3 ls 1,00 - -
JUMLAH. B -
C PEKERJAAN PASANGAN DINDING
1 LANTAI SATU
1 Pasangan dinding bata ringan m² 840,60 - -
2 Plesteran (semen instan) m² 1.681,20 - -
3 Acian (semen instan) m² 1.681,20 - -
4 Benangan sudut m 332,20 - -
5 Benangan Opening Kusen Pintu & Jendela m' 313,45 - -
6 Kolom praktis 10 x 10 m³ 1,75 - -
7 Balok latei 12 x 10 m³ 1,28 - -
8 Acian Beton Kolom m² 346,50 - -
9 Roster uk. 30 x 30 m² 21,12 - -
10 Meja beton T.8 cm m3 0,24 - -
JUMLAH. C1 -
2 LANTAI DUA
1 Pasangan dinding bata ringan m² 418,01 - -
2 Plesteran (semen instan) m² 836,02 - -
3 Acian (semen instan) m² 836,02 - -
4 Benangan sudut m 231,60 - -
5 Benangan Opening Kusen Pintu & Jendela m' 535,76 - -
6 Kolom praktis 10 x 10 m³ 2,10 - -
7 Balok latei 12 x 10 m³ 2,19 - -
8 Acian Beton Kolom m² 459,38 - -
9 Meja beton T.8 cm m3 0,24 - -
JUMLAH. C2 -
3 LANTAI ATAP
1 Pasangan dinding bata ringan m² 141,46 - -
2 Plesteran dry mix m² 282,92 - -
3 Acian (semen instan) m² 282,92 - -
4 Benangan Opening Kusen Pintu & Jendela m' 208,00 - -
JUMLAH. C3 -
TOTAL (C1+C2+C3) -
D PEKERJAAN PELAPIS LANTAI DAN DINDING
1 LANTAI SATU
1 Lantai Keramik. Uk. 30 x 30 Unpolish (CT-3-UP) Toilet m² 21,76 - -
Lantai Homogenous Tile. Uk. 30 x 60 Unpolish Trap Tangga
2 (stepnosing) m' 38,64 - -
3 Lantai Homogenous Tile. Uk. 20 x 60 Unpolish Plin trap Tangga m' 38,64 - -
Lantai Homogenous Bordes. Uk. 60 x 60 Unpolish
4 (HT-3-UP) m² 7,20 - -
5 Dinding Keramik. Uk. 30 x 40 m² 77,28 - -
6 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) m² 195,35 - -
7 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) (teras) m² 19,66 - -
8 Plin Homogenous tile uk.10 x60 (HT-3) m' 168,57 - -
9 Floor Hardener m² 925,27 - -
JUMLAH. D1 -
2 LANTAI DUA
1 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) m² 212,23 - -
2 Plin Homogenous tile uk.10 x60 (HT-3) m' 119,85 - -
JUMLAH. D2 -
3 LANTAI ATAP
1 Waterproofing Atap m² 1.604,40 - -
2 Screed Lantai m² 1.604,40 - -
JUMLAH. D3 -
TOTAL (D1+D2+D3) -
E PEKERJAAN PASANGAN PLAFOND
1 LANTAI SATU
1.1 Gypsum (GP-1) m² 113,14 - -
1.2 Calsiboard m² 21,76 - -
1.3 Akustik m² 101,87 - -
JUMLAH. E.1 -
2 LANTAI DUA
2.1 Gypsum (GP-1) m² 110,66 - -
2.2 Akustik m² 124,77 - -
JUMLAH. E.2 -
JUMLAH. (E1+E2) -
F PEKERJAAN PINTU DAN JENDELA
1 LANTAI SATU
A PINTU ALUMUNIUM
1 Pintu Type B-1 unit 2,00 - -
2 Pintu Type E2-A unit 1,00 - -
3 Pintu Type M-2 unit 4,00 - -
4 Pintu Type C unit 2,00 - -
5 Double Steel Door unit 1,00 - -
B JENDELA ALUMUNIUM
1 Type J-6 unit 16,00 - -
2 Type BV-3 unit 1,00 - -
3 Tralis besi nako t=10mm m² 141,12 - -
JUMLAH. F1 -
2 LANTAI DUA
A PINTU ALUMUNIUM
1 Pintu Type S unit 3,00 - -
B JENDELA ALUMUNIUM
1 Type J-6 unit 16,00 - -
2 Type BVB unit 3,00 - -
3 Tralis besi nako t = 10mm m² 141,12 - -
JUMLAH. F2 -
JUMLAH. (F1 + F2) -
G PEKERJAAN SANITAIR
LANTAI SATU
1 Closet Duduk Lengkap Asccories unit 4,00 - -
Wastafel Under Counter Lengkap Accessories '
2 (Meja,kran, tempat sabun) unit 4,00 - -
3 Closet Jongkok Lengkap Asccories unit 1,00 - -
4 Kaca Cermin Bevel bh 4,00 - -
5 Cove Lampu di atas Wastafel set 4,00 - -
6 Top Table Granit Alam m² 3,33 - -
7 Shower spray set 4,00 - -
8 Tissue holder bh 4,00 - -
9 Cubical toilet ( L ) unit 4,00 - -
10 Cubical toilet ( I ) bh 1,00 - -
11 Urinoir bh 2,00 - -
12 Partition urinoir set 2,00 - -
13 Kitcen sink m² 1,00 - -
14 Foor Drain bh 5,00 - -
15 Kran bh 1,00 - -
JUMLAH. G -
JUMLAH. G -
H PEKERJAAN PENGECATAN DINDING DAN PLAFOND
1 LANTAI SATU
a. Pengecatan dinding
1 Interior Emulsion (P-1) m² 741,98 - -
2 Exterior Weathershield (P-7) m² 352,57 - -
3 Waterbase Majestic (P-3) m² 586,65 - -
b. Pengecatan plafond
1 Gypsum(GP-1) m² 113,14 - -
2 Calsiboard (P-1) m² 21,76 - -
JUMLAH. H1 -
2 LANTAI DUA
a. Pengecatan dinding
1 Interior Emulsion (P-1) m² 276,31 - -
2 Exterior Weathershield (P-7) m² 595,41 - -
b. Pengecatan plafond
1 Gypsum(GP-1) m² 110,66 - -
JUMLAH. H2 -
3 LANTAI ATAP
a. Pengecatan dinding
1 Exterior Weathershield ( P-7 ) m² 282,92 - -
JUMLAH. H3 -
JUMLAH.
-
(H1+H2+H3)
GEDUNG BENGKEL TENAGA TEKNIK LISTRIK INDUSTRI
1.2 PEKERJAAN ARSITEKTUR (NON STANDART)
A PEKERJAAN PELAPIS DINDING
1 FAÇADE
1. Pekerjaan Finishing Dinding
a. Sun Louvre ( Kisi - kisi 1 )
Sisi Kanan unit 10,00 - -
Sisi Kiri unit 10,00 - -
b. Sun louvre Hunter Douglas Luxalon 84R
Sisi Kanan m² 33,39 - -
Sisi Kiri m² 29,68 - -
c. Railling hollow
Sisi Depan m' 2,14 - -
Sisi Belakang m' 2,14 - -
Sisi Kiri m' 31,20 - -
Sisi Kanan m' 35,10 - -
JUMLAH A -
B PEKERJAAN PELAPIS LANTAI
1 LANTAI DUA
a Waterprofing coating m² 65,98 - -
JUMLAH B1 -
LANTAI
2 ATAP
b Waterprofing coating m² 125,68 - -
JUMLAH B2 -
JUMLAH (B1+B2) -
C PEKERJAAN PINTU DAN JENDELA
1 JENDELA CW 1 Unit 1,00 - -
2 JENDELA CW 2 Unit 1,00 - -
3 JENDELA CW 3 Unit 1,00 - -
4 JENDELA CW 4 Unit 1,00 - -
5 Pintu besi bh 1,00 - -
JUMLAH C -
D PEKERJAAN ATAP
1 Listplang Steel roof 0.5 klip-lok colourbond m1 163,31 - -
2 Penutup atap Steel roof 0.5 klip-lok colourbond m² 1.391,11 - -
Alumunium foil + Wiremesh + glaswoll
3 Bumbungan m1 56,20 - -
JUMLAH D -
E PEKERJAAN RAILLING
1 LANTAI SATU
1 Railling tangga stainless m' 16,68 - -
2 Hand Railling tangga stainless m' 25,68 - -
JUMLAH E -
F PEKERJAAN LANDSCAPE
1 PENGERASAN
1 Pekerjaan Paving Stone tebal 8 cm, K-400 m² 1.057,90 - -
2 Pekerjaan Tanah Urug Bawah Paving m3 105,79 - -
3 Pekerjaan Kanstin m 186,02 - -
JUMLAH F1 -
2 TANAMAN
1 Pohon Palem dia min 12-15 cm tinggi 3 m bh 7,00 - -
2 Pohon Pule dia min.15 cm tinggi 3m bh 8,00 - -
3 Pohon Ketapang kencana dia min.15 cm tinggi 3m bh 8,00 - -
4 Pohon Tabepuya bunga warna Kuning dia min.15cm tinggi 3m bh 9,00 - -
5 Pohon Tabepuya bunga warna Pink dia min.15 cm tinggi 3m bh 9,00 - -
6 Pohon Tabepuya bunga warna Putih dia min.15 cm tinggi 3m bh 8,00 - -
7 Rumput gajah mini m² 345,00 - -
8 Tanah taman termasuk humus m3 147,60 - -
9 Galian tanah untuk pohon dan tanaman m3 44,10 - -
JUMLAH F2 -
3 SELASAR
1 Pekerjaan Tanah Urug Bawah Paving m3 5,25 - -
2 Lantai Kerja Bawah Pondasi m3 1,76 - -
3 Pasir Urug Bawah Pondasi m3 4,61 - -
4 Galian Tanah Pondasi m3 140,40 - -
5 Urugan Tanah Kembali Pondasi m3 133,37 - -
6 Pekerjaan Pondasi Plat Setempat uk 130x130x25 m3 7,03 - -
7 Pekerjaan Sloof Uk 25x40 m3 5,26 - -
8 Pekerjaan Kolom Uk. 30x30 m3 2,43 - -
9 Pekerjaan Kolom H Beam 125.125.6,5.9 Finish Cat kg 879,45 - -
10 Pekerjaan Balok IWF 150.75.5.7 Finish Cat kg 736,40 - -
11 Pekerjaan Balok IWF 100.50.5.7 Finish Cat kg 277,20 - -
12 Pemasangan Plat Besi t 10mm Finish Cat m² 1,13 - -
13 Pemasangan Plat Besi t 12mm Finish Cat m² 0,90 - -
14 Pemasangan Anchor dia. 16mm bh 216,00 - -
15 Pemasangan Anchor dia. 19mm bh 72,00 - -
16 Gording C 100.50.20.3,2 Finish Cat kg 723,25 - -
17 Atap UPVC m2 87,05 - -
18 Pekerjaan Kansteen m' 52,60 - -
19 Pekerjaan Paving Stone m2 52,54 - -
JUMLAH F3 -
4 Pekerjaan Sumur Bor dan Pipa Penyiraman
1 Pek. Bor Sumur m1 120,00 - -
2 Pas. Pipa PVC Ø 2 "AW Hisap sumur m1 100,00 - -
3 Pas. Pipa PVC Ø 4 " AW Chasing sumur m1 120,00 - -
4 Pas. Pipa PVC Ø 2 " AW m1 175,00 - -
Pengadaan dan pemasangan tandon air Fiber, kap. 2200 L +
5 unit 1,00 - -
rangka siku dan dudukan
Pompa Sub Sumersible daya 1,5 Kw 2 HP 1 phase, kapasitas
6 bh 1,00 - -
daya dorong max 131 m, outlet 1 1/2 ich
Ground Water Tank + Ruang Pompa beton bertulang
7 tebal = 12 cm, Fc = 26,4 Mpa, finish keramik dinding, unit 2,00 - -
ukuran 4x5x2,5 m
Pompa semi jet pump Type JPC 3, Output : 850 watt, Input start :
8 600 watt, daya hisap : 11 meter, Daya dorong : 45 meter (max), bh 2,00 - -
total head : 56 meter, debit air : 2 m3/jam,
9 Pasang Pipa AW diam. 1 1/2" untuk taman M' 400,00 - -
10 Pemasangan Kran 3/4 untuk penyiraman tanaman Bh 25,00 - -
JUMLAH F4 -
4 Pekerjaan Tempat Sampah dan Bangku taman
Pemasangan tempat sampah 50 Liter, isi 4 (kering, basah, plastik,
1 Unit 21,00 - -
logam) + Besi + Pengecatan (setiap 20 meter)
2 Pemasangan foot plat beton untuk tong sampah (30x30x15) m3 1,134 - -
3 Pengadaan bangku taman besi tempa ukuran 2 x 0,5 Unit 15,000 - -
JUMLAH F5 -
5 Pengadaan Gazebo
1 Pengadaan Gazebo Ukuran 2,5 x 2,5 m Unit 2,000 - -
2 Pemasangan pondasi beton ukuran 30x30 m3 0,144 - -
JUMLAH F6 -
JUMLAH F1 s/d F6 -
G PEKERJAAN SALURAN DAN RABATAN
1 SALURAN KELILING GEDUNG
1 Saluran U ditch U 40 m' 165,40 - -
2 Bak kontrol 60X60 cm bh 16,00 - -
3 Penutup Beton T.8 cm m3 2,02 - -
4 Rabatan Keliling Gedung m² 165,40 - -
5 Galian tanah saluran m3 49,62 - -
6 Lantai kerja tebal 5cm bawah U-ditch m3 3,31 - -
Rabatan Keliling Gedung K-175 tebal 8cm + tulangan wiremesh
7 m3 13,23 - -
M8
8 Kansteen sepatu pinggir rabatan m' 165,40 - -
JUMLAH G -
1.3 PEKERJAAN STRUKTUR (NON STANDAR)
A PEKERJAAN TIANG PANCANG
1 Tiang Pancang 40x40cm, L=30 m K 450 m' 2.010,00 - -
2 Mob. Demob Alat Berat (hammer) untuk pemancangan Ls 1,00 - -
JUMLAH A -
JUMLAH A II -
III Pekerjaan Instalasi Penerangan Lantai - 01
1 Armature lampu :
- Lampu Baret SCB 20 ACR Led Basic Plat 22 W + Battery Emergency Box bh 10,00 - -
- Lampu Down Light RD 125 E 27 Leb Bulb 4 w Cover Glass bh 10,00 - -
- Lampu Down Light Comport 150-75 Led DLS 13,6 - 1200lm bh 21,00 - -
- Lampu RM 300 2x36 M2 T- Led Esential - 2x14,5 W 3200lm bh 10,00 - -
- Lampu RMO T 2x36 T led Essential 2x14,5 Watt 3200lm bh 4,00 - -
- Highbay Helios 150 W Led bh 28,00 - -
- Emergency Kit c/w Battery & Charge Min. 2 Hours Backup bh 6,00 - -
2 Peralatan Instalasi :
- Saklar 1 Gang 1 Way bh 1,00 - -
- Saklar 2 Gang 1 Way bh 14,00 - -
- Saklar 1 Gang 2 Way bh 2,00 - -
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter bh 8,00 - -
- Stop Kontak Peralatan Outbow ( 2P+E ) Schuko - 250 V bh 10,00 - -
- Stop Kontak Peralatan Outbow ( 3P+E ) - 400 V / IP44 bh 44,00 - -
- Plugs 16 A / ( 3P+E ) - 400 V / IP44 bh 44,00 - -
3 Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 83,00 - -
4 Instalasi stop kontak umum, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 8,00 - -
5 Instalasi stop kontak peralatan 1Ø, NYM 3 x 2,5 mm² ttk 10,00 - -
6 Instalasi stop kontak peralatan 3Ø, NYY 4 x 6 mm² ttk 44,00 - -
7 Ceiling Mounted Exhaust Fan 10 " KM/WC, 36,8 W / 220 V / 564 CMH set 4,00 - -
Instalasi Ceilling Mounted Exhaust Fan, NYM 3 x 2,5 mm² dalam conduit
8 PVC HI 20 mm² ttk 4,00 - -
9 Instalasi Penangkal Petir Early Streamer V3 set 1,00 - -
JUMLAH A III -
IV Pekerjaan Instalasi Penerangan Lantai - 02
1 Armature lampu :
- Lampu Down Light Comport 150-75 Led DLS 13,6 - 1200lm bh 20,00 - -
- Lampu RMO T 2x36 T led Essential 2x14,5 Watt 3200lm bh 10,00 - -
- Emergency Kit c/w Battery & Charge Min. 2 Hours Backup bh 5,00 - -
2 Peralatan Instalasi :
- Saklar 2 Gang 1 Way bh 4,00 - -
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter bh 6,00 - -
3 Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 30,00 - -
Instalasi stop kontak umum, NYM 3 x 2,5 mm² dalam conduit PVC HI
4 20 mm² ttk 6,00 - -
Portable Projector XGA (1024 x 768), 4000 Lumens ANSI lengkap dengan ceilling
5 mount bracket set 3,00 - -
6 Instalasi Portable Projector, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 3,00 - -
7 Instalasi Portable Projector, VGA dalam conduit PVC HI 20 mm² lengkap assesories ttk 3,00 - -
JUMLAH A IV -
JUMLAH
-
(AI+AII+AIII+AIV)
B PEKERJAAN ELEKTRONIKA
I Pekerjaan Instalasi Telepon
Lantai-01
1 Main Distribution Frame Kapasitas 1 x 20 pair set 1,00 - -
2 Terminal BOX c/w LSA 1 x 10 pairs set 1,00 - -
3 Pesawat Telephone Analog KX-T505 set 2,00 - -
4 Telepon Outlets ( FCC Standard ) /w Surround 1 Gang - 6 Wire bh 2,00 - -
5 Instalasi Kabel Telepon ITC 2 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² ttk 2,00 - -
6 Instalasi kabel feeder telepon dari MDF ke TB-01
- Instalasi Kabel Telepon ITC 10 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² m' 20,00 - -
JUMLAH B I -
II Pekerjaan Instalasi Data / LAN
Lantai-01
1 Patch Panel / Wallmount 2 U unit 1,00 - -
2 8-port UTP, 10/100Mbps, Auto-sensing, Unmanaged unit 1,00 - -
3 Instalasi power wallmount, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 1,00 - -
4 Outlet Data Cat6 c/w Modular Jack bh 2,00 - -
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e) dalam conduit
5 PVC HI 20 mm² ttk 2,00 - -
6 Instalasi Kabel Fedeer Data / LAN dari Patch Utama ke Patch Lantai
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 6) dalam conduit
- PVC HI 20 mm² m' 25,00 - -
JUMLAH B II -
III Pekerjaan Instalasi Fire Alarm Semi Addressable
Lantai-01
1 Intelligent Addressable Master Control Fire Alarm bh 1,00 - -
2 Smoke Detector Conventional bh 1,00 - -
3 ROR Heat Detector bh 3,00 - -
4 Zone Module bh 1,00 - -
5 Control Module bh 4,00 - -
6 Terminal Box Fire Alarm for 6 module (550 x 475 x 150) bh 1,00 - -
7 Instalasi Fire Alarm Kabel NYM 2 x 1,5 mm² dalam conduit PVC HI 20 mm² ttk 4,00 - -
8 Instalasi for Control Device NYM 2 X 1,5 mm² dalam conduit PVC HI 20 mm² ttk 5,00 - -
Instalasi Looping Fire Alarm Kabel STP AWG18 1P + NYM 2 x 1,5 mm² dalam
m' 50,00 - -
9 conduit PVC HI 20 mm²
JUMLAH B III -
IV Lantai-02
1 ROR Heat Detector bh 4,00 - -
2 Zone Module bh 1,00 - -
3 Control Module bh 2,00 - -
4 Instalasi Fire Alarm Kabel NYM 2 x 1,5 mm² dalam conduit PVC HI 20 mm² ttk 4,00 - -
5 Instalasi for Control Device NYM 2 X 1,5 mm² dalam conduit PVC HI 20 mm² ttk 3,00 - -
JUMLAH B IV -
V Pekerjaan Instalasi CCTV
Lantai-01
Peralatan Utama
Pengadaan dan Pemasangan Peralatan Utama BGM , Berikut dengan Support, Material Bantu Sesuai Dengan Spesifikasi CCTV
1 DVR Standalone CADVR 2016FD 6 TB ( Incl. Harddisk) unit 1,00 - -
3 Video Distribution 2 in 16 out unit 2,00 - -
4 Monitor LCD 32" Ex LG dan Inst Central Utama unit 2,00 - -
5 Software dan Training Ls 1,00 - -
6 Rack Kabinet unit 1,00 - -
7 Instalasi Peralatan Utama ls 1,00 - -
8 Test Dan Commisioning Ls 1,00 - -
Pengadaan dan Pemasangan Fixtures lengkap dengan aksesoris lainnya yang
dibutuhkan
9 CCTV 2MP Indoor HEL2R1 White Housing ( Dome Camera) unit 4,00 - -
Pengadaan dan Pemasangan Instalasi Lengkap Dengan conduit PVC ,
T-does , Socket dan aksesoris lainnya yang dibutuhkan
10 Instalasi Power Listrik ( NYM 2x15mm ) ttk 4,00 - -
11 Instalasi Kabel Kamera Coaxial RG 11 ttk 4,00 - -
12 Instalasi Power Listrik ( NYM 2x15mm ) dari Lantai 2 ke lantai 3 m' 250,00 - -
13 Instalasi Kabel Kamera Coaxial RG 11 dari lantai 2 ke lantai 3 m' 250,00 - -
JUMLAH B V -
VI Lantai-02
Pengadaan dan Pemasangan Fixtures lengkap dengan aksesoris lainnya yang dibutuhkan
1 CCTV 2MP Indoor HEL2R1 White Housing ( Dome Camera) unit 2,00 - -
Pengadaan dan Pemasangan Instalasi Lengkap Dengan conduit PVC ,
T-does , Socket dan aksesoris lainnya yang dibutuhkan
2 Instalasi Power Listrik ( NYM 2x15mm ) ttk 2,00 - -
3 Instalasi Kabel Kamera Coaxial RG 11 ttk 2,00 - -
JUMLAH B VI -
VII Pekerjaan Instalasi Kabel Tray
Lantai-01
1 Kabel Tray GI perforated Type C 300x3000x100 m' 23,97 - -
2 Kabel Ladder GI perforated Type C 300x3000x100 m' 10,00 - -
JUMLAH B VII -
JUMLAH (B I sd B VII) -
C PEKERJAAN MEKANIKAL
I Pekerjaan Instalasi Air Bersih
Lantai-01
1 Pemipaan Polypropelyne ( PPR ) Class PN.10 :
- Ø 25 mm / ¾" m' 65,00 - -
- Ø 32 mm / 1" m' 26,00 - -
2 Gate Valve, Bronze Body, Screwed, Class 125
- Ø 32 mm / 1" bh 1,00 - -
3 Box Kontrol Valve set 1,00 - -
4 Pompa transfer otomatis - semi jet ( JP Basic 7 ) set 1,00 - -
5 Tandon Air bawah kapasitas 5.000 liter set 1,00 - -
6 Tempat Pompa uk 60 x 60 cm ls 1,00 - -
JUMLAH .... C I -
II Lantai-02
1 Pemipaan Medium Galvanis Standart / SNI 07 - 0039 -87 :
- Ø 25 mm / 1” m' 15,00 - -
- Ø 50 mm / 2” m' 6,00 - -
2 Pompa booster stainless steel otomatis ( CH4-60) set 2,00 - -
Kapasitas = 70 liter/menit, Head = 40 meter
3 Gate Valve, Bronze Body, Screwed, Class 125
- Ø 32 mm / 1" bh 6,00 - -
3 Check Valve, Bronze Body, Screwed, Class 125
- Ø 32 mm / 1" bh 3,00 - -
4 Strainer, Bronze Body, Screwed, Class 125
- Ø 32 mm / 1" bh 2,00 - -
5 Rubber Fleksible Joint 10 Bar Union Screwed Double
- Ø 32 mm / 1" bh 4,00 - -
6 Floating Valve, Bronze Body, Screwed, Class 125
- Ø 50 mm / 2” bh 2,00 - -
7 Tandon Atas Kap. 2.200 ltr set 2,00 - -
JUMLAH .... C II -
III Pekerjaan Instalasi Air Bekas, Kotor & Vent
Lantai-01
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Ø 40 mm / 1¼" m' 39,38 - -
- Ø 76 mm / 2 ½” m' 11,50 - -
- Ø 89 mm / 3” m' 25,38 - -
- Ø 114 mm / 4” m' 26,50 - -
2 Floor Clean Out Ø 89 mm / 3” set 2,00 - -
3 Septic Tank Bio Filter Kap.3.000 liter bh 1,00 - -
4 Peresapan bh 1,00 - -
JUMLAH .... C III -
IV Pekerjaan Instalasi Tata Udara ( AC )
Lantai-01
1 Peralatan Utama AC lengkap c/w Pemipaan HVAC ( Cu ) Type ASTM B280 :
- AC Cassete Standard Class 12.000 btu/H Wireless unit 1,00 - -
- AC Cassete Standard Class 18.000 btu/H Wireless unit 1,00 - -
2 Instalasi AC, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 2,00 - -
Pemipaan drainage AC Wall Mounted Single Split , PVC AW lengkap dengan isolasi
3 aeroflex ttk 2,00 - -
JUMLAH .... C IV -
V Lantai-02
1 Peralatan Utama AC lengkap c/w Pemipaan HVAC ( Cu ) Type ASTM B280 :
- AC Cassete Standard Class 24.000 btu/H Wireless unit 2,00 - -
- AC Cassete Standard Class 28.000 btu/H Wireless unit 1,00 - -
2 Instalasi AC, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 3,00 - -
Pemipaan drainage AC Wall Mounted Single Split , PVC AW lengkap dengan isolasi
3 aeroflex ttk 3,00 - -
JUMLAH .....C V -
VI Pekerjaan Hydrant
Lantai-01
1 Box Fire Extingusher ( tertanam tembok) bh 5,00 - -
2 Fire Extinguisher Dry Chemical kap. 3 kg + Aksesoris bh 5,00 - -
JUMLAH ..... C VI -
VII Lantai-02
1 Box Fire Extingusher ( tertanam tembok) bh 2,00 - -
2 Fire Extinguisher Dry Chemical kap. 3 kg + Aksesoris bh 2,00 - -
JUMLAH .....C VII -
JUMLAH
-
(C I s/d C VII)
PEKERJAAN PEMBANGUNAN GEDUNG KULIAH TEKNIK MESIN ALAT BERAT
2
(TMAB)
2.1 PEKERJAAN ARSITEK (STANDART)
A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Kerja ls 1,00 - -
2 Pembuatan Pagar seng Proyek keliling tinggi 2 meter ls 1,00 - -
3 Pembuatan spanduk banner proyek m2 120,00 - -
JUMLAH. A -
B PEKERJAAN PASANGAN DINDING
I LANTAI SATU
1 Pasangan dinding bata ringan m² 16,20 - -
2 Plesteran (semen instan) m² 32,40 - -
3 Acian (semen instan) m² 32,40 - -
4 Benangan sudut m 60,00 - -
5 Benangan Opening Kusen Pintu & Jendela m' 22,60 - -
6 Kolom praktis 10 x 10 m³ 0,02 - -
7 Balok latei 12 x 10 m³ 0,03 - -
8 Pekerjaan Plat Tangga Entrance m³ 16,84 - -
9 Pekerjaan Pasir Urug Tangga Entrance m³ 24,32 - -
10 Perbaikan Ruang Pantry & Ruang Panel m² 6,90 - -
JUMLAH. B I -
II LANTAI DUA
1 Perbaikan Ruang Pantry & Ruang Panel m² 6,90 - -
JUMLAH. B II -
III LANTAI TIGA
1 Pasangan dinding bata ringan m² 921,71 - -
2 Plesteran (semen instan) m² 1.843,42 - -
3 Acian (semen instan) m² 1.843,42 - -
4 Benangan sudut m 1.672,78 - -
5 Benangan Opening Kusen Pintu & Jendela m' 851,90 - -
6 Kolom praktis 10 x 10 m³ 4,09 - -
7 Balok latei 12 x 10 m³ 2,25 - -
8 Ring Balok 15 x 10 m³ 4,27 - -
9 Acian Beton Kolom m² 459,38 - -
10 Meja beton T.8 cm m3 0,22 - -
11 Pemasangan Tangga monyet + Tutup Manhole bh 2,00 - -
JUMLAH. B III -
IV LANTAI ATAP
1 Pasangan dinding bata ringan m² 312,06 - -
2 Plesteran (semen instan) m² 312,06 - -
3 Acian (semen instan) m² 312,06 - -
4 Kolom praktis 10 x 10 m³ 0,52 - -
5 Ring balok 12 x 15 m³ 1,87 - -
JUMLAH. B IV -
JUMLAH.
( BI+BII+BIII+BIV) -
C PEKERJAAN PELAPIS LANTAI DAN DINDING
I LANTAI SATU
1 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 ) (Lobby tengah) m² 584,91 - -
2 Lantai Ceramic Tile Uk 30 x 30 (CT-3 UP) Toilet m² 4,90 - -
3 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) (teras) m² 165,19 - -
4 Pola Motif lantai (Granit tile) unit 1,00 - -
5 Plin Homogenous tile uk.10 x60 (HT-3) m' 440,88 - -
JUMLAH. C I -
II LANTAI DUA
1 Lantai Keramik. Uk. 30 x 30 Unpolish (CT-3-UP) Toilet m² 47,57 - -
Lantai Keramik Tile. Uk. 30 x 30 Unpolish Trap Tangga
2
(stepnosing) m' 80,16 - -
3 Lantai Keramik Tile. Uk. 20 x 30 Unpolish Plin trap Tangga m' 80,16 - -
4 Lantai Keramik Bordes. Uk. 30 x 30 Unpolish (CT-3-UP) m² 15,00 - -
5 Dinding Keramik. Uk. 30 x 40 m² 140,22 - -
6 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) (Pantry) m² 5,50 - -
7 Waterprofing coating m² 47,57 - -
8 Plin Homogenous tile uk.10 x60 (HT-3) m' 566,28 - -
JUMLAH. C II -
III LANTAI TIGA
1 Lantai Keramik. Uk. 30 x 30 Unpolish (CT-3-UP) Toilet m² 47,57 - -
2 Dinding Keramik. Uk. 30 x 40 m² 140,22 - -
3 Lantai Homogenous Tile. Uk. 60 x 60 (HT-3 UP) m² 1.111,55 - -
4 Waterprofing coating m² 47,57 - -
5 Cordrile Plat beton plumbing ttk 12,00 - -
6 Plin Homogenous tile uk.10 x60 (HT-3) m' 523,28 - -
JUMLAH. C III -
IV LANTAI ATAP
1 Screed Lantai m² 1.604,40 - -
2 Water Proofing Membrane m² 1.604,40 - -
JUMLAH. C IV -
V FAÇADE
1. Pekerjaan Finishing Dinding
a. Sun Louvre
Sisi Depan
Sun louvre Hunter Douglas Luxalon 84R m² 30,05 - -
Sisi Kanan
Sun louvre Hunter Douglas Luxalon 84R m² 188,64 - -
Sisi Belakang
Sun louvre Hunter Douglas Luxalon 84R m² 15,20 - -
Sisi Kiri
Sun louvre Hunter Douglas Luxalon 84R m² 147,33 - -
b. Railling holoow
Sisi Depan m' 36,95 - -
Sisi Belakang m' 22,73 - -
Sisi Kiri m' 59,15 - -
Sisi Kanan m' 71,40 - -
Cover Kolom ( Plat stainless steel hair line T.2 mm R.
m' 146,30
d. 45 cm ) - -
e. Huruf Stainless Steel t. 2mm
Huruf Stainless Steel T. 30cm "POLTERA" unit 1,00 - -
Huruf Stainless Steel T. 50cm "GEDUNG" unit 1,00 - -
Huruf Stainless Steel T. 100cm "B" unit 1,00 - -
Huruf Timbul Arcrylic T. 75cm "POLITEKNIK NEGERI MADURA" unit 1,00 - -
JUMLAH H -
I PEKERJAAN RAILLING
I LANTAI SATU
1 Perbaikan Poles Railling Tangga ls 1,00 - -
JUMLAH I.I -
II LANTAI DUA
1 Railling tangga stainless m' 16,68 - -
2 Hand Railling tangga stainless ø 3" m' 25,68 - -
3 Hand Railling void stainless ø 2.5" m' 83,43 - -
JUMLAH I.II -
III LANTAI TIGA
1 Hand Railling void stainless ø 2.5" m' 83,43 - -
JUMLAH I.III -
JUMLAH I
-
(I.I+I.II+I.III)
J PEKERJAAN LANDSCAPE
I PENGERASAN
1 Pekerjaan Paving Stone tebal 8 cm, K-400 m² 2.669,14 - -
2 Pekerjaan Pasir urug Bawah Paving tebal 10cm m² 266,91 - -
3 Pekerjaan Kanstin K-250 m 647,68 - -
JUMLAH J I -
II TAMAN
1 Pohon Pule dia min.15 cm tinggi 3m bh 5,00 - -
2 Pohon Ketapang kencana dia min.15 cm tinggi 3m bh 10,00 - -
3 Pohon Tabepuya bunga warna Kuning dia min.15 cm tinggi 3m bh 10,00 - -
4 Pohon Tabepuya bunga warna Pink dia min.15 cm tinggi 3m bh 10,00 - -
5 Pohon Tabepuya bunga warna Putih dia min.15 cm tinggi 3m bh 10,00 - -
6 Rumput gajah mini m2 300,00 - -
7 Tanah taman termasuk humus m3 80,58 - -
8 Galian tanah untuk tanaman m3 80,58 - -
JUMLAH J II -
III SELASAR
1 Pekerjaan Tanah Urug Bawah Paving m3 13,73 - -
2 Lantai Kerja Bawah Pondasi m3 4,31 - -
3 Pasir Urug Bawah Pondasi m3 11,26 - -
4 Galian Tanah Pondasi m3 343,20 - -
5 Urugan Tanah Kembali Pondasi m3 326,01 - -
6 Pekerjaan Pondasi Plat Setempat uk 130x130x25 m3 17,19 - -
7 Pekerjaan Sloof Uk 25x40 m3 13,13 - -
8 Pekerjaan Kolom Uk. 30x30 m3 5,94 - -
9 Pekerjaan Kolom H Beam 125.125.6,5.9 Finish Cat kg 2.149,77 - -
10 Pekerjaan Balok IWF 150.75.5.7 Finish Cat kg 1.838,76 - -
11 Pekerjaan Balok IWF 100.50.5.7 Finish Cat kg 677,60 - -
12 Pemasangan Plat Besi t 10 mm Finish Cat m² 2,75 - -
13 Pemasangan Plat Besi t 12 mm Finish Cat m² 2,20 - -
14 Pemasangan Anchor dia. 16 mm bh 528,00 - -
15 Pemasangan Anchor dia. 19 mm bh 176,00 - -
16 Gording C 100.50.20.3,2 Finish Cat kg 1.805,93 - -
17 Atap UPVC m2 217,37 - -
18 Pekerjaan Kansteen m' 131,34 - -
19 Pekerjaan Paving Stone tebal 6 cm, K-300 m2 137,34 - -
20 Lampu outbow 8W bh 22,00 - -
JUMLAH J III -
IV PEKERJAAN SUMUR BOR DAN TANDON
1 Pek. Bor Sumur m1 120,00 - -
2 Pas. Pipa PVC Ø 2 "AW Hisap sumur m1 100,00 - -
3 Pas. Pipa PVC Ø 4 " AW Chasing sumur m1 120,00 - -
4 Pas. Pipa PVC Ø 2 " AW m1 175,00 - -
Pompa Sub Sumersible daya 1,5 Kw 2 HP 1 phase, kapasitas
5 bh 1,00 - -
daya dorong max 131 m, outlet 1 1/2 ich
Ground Water Tank + R. Pompa beton bertulang tebal = 12 cm,
6 unit 1,00 - -
Fc = 26,4 Mpa, finish keramik dinding, ukuran 4x5x2,5 m
Pompa semi jet pump Type JPC 3, Output : 850 watt, Input start :
7 600 watt, daya hisap : 11 meter, Daya dorong : 45 meter (max), bh 2,00 - -
total head : 56 meter, debit air : 2 m3/jam,
8 Pasang Pipa Air Bersih AW diam. 1 1/2" Sprinkler dan kran Taman M' 300,00 - -
9 Pemasangan Kran 3/4 untuk penyiraman tanaman Bh 30,00 - -
JUMLAH J IV -
JUMLAH J
-
(J.I+J.II+J.III+J.IV)
K PEKERJAAN SALURAN DAN RABATAN
I SALURAN KELILING GEDUNG
1 U-ditch 40X50 tebal 8CM, K-350 unit 208,33 - -
2 Galian tanah saluran m3 75,00 - -
3 Lantai kerja tebal 5cm bawah U-ditch m3 5,00 - -
4 Bak kontrol 60X60 cm bh 18,00 - -
5 Cover Penutup U-ditch, K-350 unit 416,67 - -
6 Rabatan Keliling Gedung K-175 tebal 8 cm m3 20,00 - -
7 Tulangan wiremesh M8 untuk Rabatan m2 250,00 - -
8 Kansteen sepatu pinggir rabatan m' 250,00 - -
JUMLAH K -
2.2 PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
A PEKERJAAN ELEKTRIKAL
I Pekerjaan Panel
1 PL-02, Panel Pembagi Penerangan & Tenaga Lantai - 02 Unit 1,00 - -
2 PL-03, Panel Pembagi Penerangan & Tenaga Lantai - 03 Unit 1,00 - -
3 P.PB, Panel Pembagi Pompa Booster Unit 1,00 - -
JUMLAH A I -
II Instalasi Kabel Feeder Instalasi Tegangan Rendah
1 Dari Panel MDP ke PL-02
Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm² m' 35,00 - -
2 Dari Panel MDP ke PL-03
Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm² m' 45,00 - -
3 Dari Panel MDP ke P.PB
Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm² m' 55,00 - -
4 Penambahan Daya PLN 11.000 watt ls 1,00 - -
JUMLAH A II -
III Pekerjaan Instalasi Penerangan
Lampu penerangan jalan umum (PJU)
1 Lampu PJU (DOUBLE ARM)
- Pekerjaan Lampu PJU Oktagonal 7m lengan (double) 1,5 meter bh 25,00 - -
- Pekerjaan pemasangan kabel NYFGBY ukuran 4 X 6 mm m' 635,00 - -
- Box Panel 50x50 tahan cuaca termasuk timer (komplit) bh 2,00 - -
Lampu LED lokal ISO 9001, 60 watt standart SNI, Life time 50.000 Hours,
bh 50,00 - -
- Outdoor IP 65
10 Instalasi Portable Projector, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 5,00 - -
11 Instalasi Portable Projector, VGA dalam conduit PVC HI 20 mm² lengkap assesories ttk 5,00 - -
JUMLAH A IV -
V Pekerjaan Elektrikal Lantai-03
1 Armature lampu :
- Lampu Down Light RD 125 E 27 Leb Bulb 4 w Cover Glass bh 8,00 - -
- Lampu Down Light RD 150 E 27 Leb Bulb 8 w Cover Glass bh 6,00 - -
- Lampu Down Light Comport 150-75 Led DLS 13,6 - 1200lm bh 87,00 - -
- Lampu RM 300 2x36 M2 T- Led Esential - 2x14,5 W 3200lm bh 16,00 - -
- Lampu RM 300 2x36 ACR T- Led Esential 2x14,5 W 3200lm bh 32,00 - -
- Emergency Kit c/w Battery & Charge Min. 2 Hours Backup bh 22,00 - -
2 Peralatan Instalasi :
- Saklar 1 Gang 1 Way bh 8,00 - -
- Saklar 2 Gang 1 Way bh 16,00 - -
- Saklar 1 Gang 2 Way bh 2,00 - -
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter bh 24,00 - -
- Stop Kontak Peralatan Outbow ( 2P+E ) Schuko - 250 V bh 120,00 - -
- Stop Kontak Peralatan Outbow ( 3P+E ) - 400 V / IP44 bh 10,00 - -
- Plugs 16 A / ( 3P+E ) - 400 V / IP44 bh 10,00 - -
3 Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 149,00 - -
4 Instalasi stop kontak umum, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 24,00 - -
5 Instalasi stop kontak peralatan 1Ø, NYM 3 x 2,5 mm² ttk 120,00 - -
6 Instalasi stop kontak peralatan 3Ø, NYY 4 x 6 mm² ttk 10,00 - -
7 Ceiling Mounted Exhaust Fan 10 " KM/WC, 36,8 W / 220 V / 564 CMH set 6,00 - -
Instalasi Ceilling Mounted Exhaust Fan, NYM 3 x 2,5 mm² dalam conduit
8 PVC HI 20 mm² ttk 6,00 - -
Portable Projector XGA (1024 x 768), 4000 Lumens ANSI lengkap dengan ceilling
9 mount bracket ttk 5,00 - -
10 Instalasi Portable Projector, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 5,00 - -
11 Instalasi Portable Projector, VGA dalam conduit PVC HI 20 mm² lengkap assesories ttk 5,00 - -
JUMLAH A V -
JUMLAH A
-
(AI+AII+AIII+AIV+AV)
B PEKERJAAN ELEKTRONIKA
I Lantai-02
1 Terminal BOX c/w LSA 1 x 10 pairs set 1,00 - -
2 Pesawat Telephone Analog KX-T505 set 6,00 - -
3 Telepon Outlets ( FCC Standard ) /w Surround 1 Gang - 6 Wire bh 6,00 - -
4 Instalasi Kabel Telepon ITC 2 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² ttk 6,00 - -
5 Instalasi kabel feeder telepon dari MDF ke TB-01
- Instalasi Kabel Telepon ITC 10 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² m' 110,00 - -
JUMLAH BI -
II Lantai-03
1 Terminal BOX c/w LSA 1 x 10 pairs set 1,00 - -
2 Pesawat Telephone Analog KX-T505 set 6,00 - -
3 Telepon Outlets ( FCC Standard ) /w Surround 1 Gang - 6 Wire bh 6,00 - -
4 Instalasi Kabel Telepon ITC 2 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² ttk 6,00 - -
5 Instalasi kabel feeder telepon dari MDF ke TB-01
Instalasi Kabel Telepon ITC 10 x 2 x 0.6 mm² dalam conduit
- PVC HI 20 mm² m' 120,00 - -
JUMLAH B II -
III Pekerjaan Instalasi Data / LAN Lantai -02
1 Patch Panel / Wallmount 2 U unit 2,00 - -
2 8-port UTP, 10/100Mbps, Auto-sensing, Unmanaged unit 4,00 - -
3 Instalasi power wallmount, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 2,00 - -
4 Outlet Data Cat6 c/w Modular Jack bh 26,00 - -
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e) dalam conduit
5 PVC HI 20 mm² ttk 26,00 - -
6 Instalasi Kabel Fedeer Data / LAN dari Patch Utama ke Patch Lantai
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 6) dalam conduit
- PVC HI 20 mm² m' 160,00 - -
JUMLAH B III -
IV Pekerjaan Instalasi Data / LAN Lantai -03
1 Patch Panel / Wallmount 2 U unit 1,00 - -
2 8-port UTP, 10/100Mbps, Auto-sensing, Unmanaged unit 1,00 - -
3 Instalasi power wallmount, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² ttk 1,00 - -
4 Outlet Data Cat6 c/w Modular Jack bh 6,00 - -
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e) dalam conduit
5 PVC HI 20 mm² ttk 6,00 - -
6 Instalasi Kabel Fedeer Data / LAN dari Patch Utama ke Patch Lantai
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 6) dalam conduit
- PVC HI 20 mm² m' 120,00 - -
JUMLAH B IV -
V Pekerjaan Instalasi MATV Lantai - 02
4 Instalasi Kabel Sound System NYMHy 2 x 1.5 mm² dalam conduit PVC 20 mm² ttk 14,00 - -
JUMLAH B X -
XI Pekerjaan Instalasi CCTV (Lantai -02)
Peralatan Utama
Pengadaan dan Pemasangan Peralatan Utama BGM , Berikut dengan Support,
Material Bantu Sesuai Dengan Spesifikasi CCTV
1 DVR Standalone CADVR 2016FD 6 TB ( Incl. Harddisk) unit 1,00 - -
2 DVR Standalone CADVR 10086FD 6 TB ( Incl. Harddisk) unit 1,00 - -
3 Video Distribution 2 in 16 out unit 2,00 - -
4 Monitor LCD 32" Ex LG dan Inst Central Utama unit 2,00 - -
5 Software dan Training Ls 1,00 - -
6 Rack Kabinet unit 1,00 - -
7 Instalasi Peralatan Utama ls 1,00 - -
8 Test Dan Commisioning Ls 1,00 - -
Pengadaan dan Pemasangan Fixtures lengkap dengan aksesoris lainnya yang
dibutuhkan
9 CCTV 2MP Indoor HEL2R1 White Housing ( Dome Camera) unit 2,00 - -
Pengadaan dan Pemasangan Instalasi Lengkap Dengan conduit PVC , T-
does , Socket dan aksesoris lainnya yang dibutuhkan
10 Instalasi Power Listrik ( NYM 2x15mm ) ttk 2,00 - -
11 Instalasi Kabel Kamera Coaxial RG 11 ttk 2,00 - -
12 Instalasi Power Listrik ( NYM 2x15mm ) dari Lantai 2 ke lantai 3 m' 160,00 - -
13 Instalasi Kabel Kamera Coaxial RG 11 dari lantai 2 ke lantai 3 m' 160,00 - -
JUMLAH B XI -
XII Pekerjaan Instalasi CCTV (Lantai -03)
Pengadaan dan Pemasangan Fixtures lengkap dengan aksesoris lainnya yang
dibutuhkan
1 CCTV 2MP Indoor HEL2R1 White Housing ( Dome Camera) unit 2,00 - -
Pengadaan dan Pemasangan Instalasi Lengkap Dengan conduit PVC , T-does ,
Socket dan aksesoris lainnya yang dibutuhkan
2 Instalasi Power Listrik ( NYM 2x15mm ) ttk 2,00 - -
3 Instalasi Kabel Kamera Coaxial RG 11 ttk 2,00 - -
JUMLAH B XII -
XIII Pekerjaan Instalasi Kabel Tray (Lantai - 02)
1 Kabel Tray GI perforated Type C 300x3000x100 m' 165,42 - -
2 Kabel Tray GI perforated Type C 200x3000x100 m' 109,66 - -
3 Kabel Ladder GI perforated Type C 300x3000x100 m' 50,00 - -
4 Kabel Trunking PVC 100x50 m' 71,61 - -
JUMLAH B XIII -
XIV Pekerjaan Instalasi Kabel Tray (Lantai - 03)
1 Kabel Tray GI perforated Type C 300x3000x100 m' 157,50 - -
2 Kabel Tray GI perforated Type C 200x3000x100 m' 109,66 - -
3 Kabel Ladder GI perforated Type C 300x3000x100 m' 50,00 - -
4 Kabel Trunking PVC 100x50 m' 71,61 - -
JUMLAH B IV -
JUMLAH B
-
(BI s/d BXIV)
C PEKERJAAN MEKANIKAL
I Pekerjaan Instalasi Air Bersih (lantai - 01)
1 Reservoir Kap. 250 M3
Tanki Reservoir domestik. kapasitas : 250 M3, FRP modular temasuk
- unit 1,00 - -
Pengiriman dan pemasangan
- Pondasi Plat beton bertulang 12cm K-300 m3 60,00 - -
- Floating valve dia. 50 mm bh 1,00 - -
- Water Level Control ( WLC ) set 1,00 - -
- Strainer / Saringan bh 1,00 - -
- Foot Valve dia. 65 mm bh 1,00 - -
- Gate valve dia. 50 mm bh 1,00 - -
2 Reservoir Kap. 30 M3
- Tanki Reservoir domestik. kapasitas : 30 M3, FRP modular unit 1,00 - -
- Pondasi Plat beton bertulang 12 cm K-300 m3 8,00 - -
- Floating valve dia. 50 mm bh 1,00 - -
- Water Level Control ( WLC ) set 1,00 - -
- Strainer / Saringan bh 1,00 - -
- Foot Valve dia. 65 mm bh 1,00 - -
- Gate valve dia. 50 mm bh 1,00 - -
4 Row Water
Pompa Row Water Type 30-36 T, inlet 2,5 inch, outlet 2 inch, head 37 m
- Ex Grounfos unit 2,00 - -
Pompa JD Basic 7 daya 750 watt, daya hisap 50 m, daya dorong 50 meter, total
- head 100 m debit 28 ltr/menit inlet 1 1/4 inch, outlet 1 inch unit 2,00 - -
Pompa transfer Sentrifugal 2 Inch Phase NS 30-18 M, 1800 watt, Debit
30 m3/jam, inlet 2 inch, outlet 2 inch (Ex Groundfos)
- unit 2,00 - -
- Tanki Row Water. kapasitas :12,5 M3, FRV modular bh 2,00 - -
lengkap dengan dudukan baja dan pondasi beton bertulang
- Floating valve dia. 50 mm set 1,00 - -
- Water Level Control ( WLC ) bh 2,00 - -
- Strainer / Saringan bh 2,00 - -
- Foot Valve dia. 65 mm bh 2,00 - -
JUMLAH C I -
II Pekerjaan Instalasi Air Bersih (lantai - 02)
1 Pemipaan Polypropelyne ( PPR ) Class PN.10 :
- Ø 25 mm / ¾" m' 105,75 - -
- Ø 32 mm / 1" m' 20,75 - -
2 pompa transfer otomatis - semi jet ( JP Basic 7 ) di lantai 1 set 1,00 - -
3 Tempat Pompa uk. 60 x 60 cm di lantai 1 ls 1,00 - -
JUMLAH C II -
III Pekerjaan Instalasi Air Bersih (lantai - 03)
1 Pompa booster stainless steel otomatis ( CH4-60) set 2,00 - -
Kapasitas = 70 liter/menit, Head = 40 meter
2 Pemipaan Medium Galvanis Standart / SNI 07 - 0039 -87 :
- Ø 25 mm / 1” m' 4,70 - -
- Ø 32 mm / 1 ¼” m' 15,00 - -
- Ø 50 mm / 2” m' 7,50 - -
3 Pemipaan Polypropelyne ( PPR ) Class PN.10 :
- Ø 25 mm / ¾" m' 134,75 - -
- Ø 32 mm / 1" m' 20,75 - -
4 Gate Valve, Bronze Body, Screwed, Class 125
- Ø 25 mm / ¾" bh 180,00 - -
- Ø 32 mm / 1" bh 5,00 - -
- Ø 40 mm / 1¼" bh 9,00 - -
5 Check Valve, Bronze Body, Screwed, Class 125
- Ø 40 mm / 1¼" bh 3,00 - -
6 Strainer, Bronze Body, Screwed, Class 125
- Ø 40 mm / 1¼" bh 2,00 - -
7 Rubber Fleksible Joint 10 Bar Union Screwed Double
- Ø 40 mm / 1¼" bh 4,00 - -
8 Floating Valve, Bronze Body, Screwed, Class 125
- Ø 50 mm / 2” bh 2,00 - -
9 Tandon Atas Kap. 2.200 ltr set 2,00 - -
JUMLAH C III -
IV Pekerjaan Instalasi Air Bekas, Kotor & Vent (Lantai -02)
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Ø 40 mm / 1¼" m' 74,63 - -
- Ø 76 mm / 2 ½” m' 24,63 - -
- Ø 89 mm / 3” m' 39,38 - -
- Ø 114 mm / 4” m' 41,88 - -
2 Floor Clean Out Ø 89 mm / 3” set 5,00 - -
3 Grease trap portable (stainlees steel) bh 1,00 - -
JUMLAH C IV -
V Pekerjaan Instalasi Air Bekas, Kotor & Vent (Lantai -03)
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Ø 40 mm / 1¼" m' 74,63 - -
- Ø 60 mm / 2” m' 12,50 - -
- Ø 76 mm / 2 ½” m' 24,63 - -
- Ø 89 mm / 3” m' 39,38 - -
- Ø 114 mm / 4” m' 29,38 - -
2 Floor Clean Out Ø 89 mm / 3” set 5,00 - -
3 Grease trap portable (stainlees steel) bh 1,00 - -
4 Pipa PVC 3" air hujan dari atap ke saluran m' 858,00 - -
JUMLAH C V -
VI Pekerjaan Hydrant (Lantai -01)
1 Box Fire Extingusher ( tertanam tembok) bh 10,00 - -
2 Fire Extinguisher Dry Chemical kap. 3 kg + Aksesoris bh 10,00 - -
JUMLAH C VI -
VII Pekerjaan Hydrant (Lantai -02)
1 Pemipaan BSP Schedule 40 / ASTM A 53:
- Ø 100 mm / 4” m' 12,50 - -
- Ø 80 mm / 3” m' 10,00 - -
- Ø 65 mm / 2 ½” m' 60,00 - -
- Ø 32 mm / 1 ¼” m' 1,25 - -
JUMLAH C XI -
JUMLAH C
-
(CI s/d C XI)
PERHITUNGAN BIAYA SMK3 KONSTRUKSI YANG MEMPEKERJAKAN 100 ORANG
PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG BENGKEL TENAGA LISTRIK (TLIA)
b Pelatihan K3;
Bekerja di Ketinggian Org 5 1 - -
K3 Peralatan Konstruksi 86 Penggunaan bahan kimia (MSDS) Org 5 1 - -
Analysis Keselamatan Pekerjaan Org 10 1 - -
Perilaku Berbasis Keselamatan (Budaya K3) Org 100 1 - -
P3K Org 2 1 - -
c Simulasi K3; Org 100 1 - -
d Spanduk (banner) ; Lb 2 1 - -
e Poster; Lb 2 1 - -
f Papan Informasi K3. Bh 1 1 - -
Total -
3 Alat Pelindung Kerja terdiri atas ;
b Tali Keselamatan (Life Line); Ls 1 1 - - Sesuai kebutuhan
d Pagar Pengaman (Guard Railling); Ls 1 1 - - Sesuai kebutuhan
e Pembatas Area (Restricted Area ). Ls 1 1 - - Sesuai kebutuhan
Total -
4 Alat Pelindung Diri terdiri atas:
a Topi Pelindung (Safety Helmet) ; Bh 105 1 - - Staf & tamu
b Pelindung Mata (Goggles, Spectacles); Psg 10 1 - -
c Pelindung Pernafasan Dan Mulut (Masker); Bh 10 1 - -
d Sarung Tangan (Safety Gloves); Psg 10 1 - -
e Sepatu Keselamatan (Safety Shoes); Psg 5 1 - -
f Rompi Keselamatan (Safety Vest); Bh 100 1 - -
Total -
Asuransi Dan Perijinan terdiri atas : Nilai Kontrak =
5 a BPJS Ketenagakerjaan Dan Kesehatan Ls 1 1 - -
>5M
Kerja;
b Surat Ijin Kelaikan Alat; Alat/Kend 1 1 - - Sesuai kebutuhan
c Surat Ijin Operator; Lb/Alat 1 1 - - Sesuai kebutuhan
Surat Ijin Pengesahan Panitia Pembina Keselamatan Dan
d Ls 1 1 - -
Kesehatan Kerja (P2K3);
Total -
6 a Personil K3 terdiri atas : Ahli K3 OB 1 5 - - Risiko K3 Tinggi
b Ahli K3 K3
Petugas OB 1 5 - - Risiko K3 Sdg/Kecil
c Petugas Pengatur Lalu Lintas OB 1 5 - -
(Flagman ); Total -
Fasilitas sarana kesehatan; Peralatan P3K (Kotak P3K, Tandu,
7 a Ls 1 1 - -
Tabung Oksigen, Obat Luka, Perban,
b Ruang P3K (Tempat Tidur Pasien, Ls 1 1 - -
c Stetoskop, Timbangan Berat
Peralatan Pengasapan Badan,
(Fogging) ; Bh 1 1 - -
d Obat Pengasapan. Kali 3 6 - -
Total -
Rambu- Rambu terdiri atas :
8 a Bh 5 1 - - Sesuai kebutuhan
Rambu Petunjuk;
b Rambu Larangan; Bh 5 1 - - Sesuai kebutuhan
c Rambu Peringatan; Bh 5 1 - - Sesuai kebutuhan
d Rambu Kewajiban; Bh 5 1 - - Sesuai kebutuhan
e Rambu Informasi; Bh 2 1 - - Sesuai kebutuhan
Total -
Lain- Lain Terkait Pengendalian
9 a Risiko K3 Bh 2 1 - -
Alat Pemadam Api Ringan (APAR); 10Kg
b Sirine; Bh 1 1 - -
c Bendera K3; Bh 2 1 - -
d Lampu Darurat (Emergency Lamp ); Bh 2 1 - -
e Program Inspeksi Dan Audit Internal; Org 1 1 - -
f Pelaporan dan Penyelidikan Insiden. Ls 1 1 - -
Total -
TOTAL TOTAL -
Rp 146.868.000
ANALISA HARGA SATUAN SNI 2008 DAN PENDEKATAN LAPANGAN
PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG BENGKEL TENAGA TEKNIK LISTRIK INDUSTRI
2 Paku kg 0,400 - -
3 Minyak begisting ltr 0,200 - -
4 Kayu kelas II (Balok) m³ 0,015 - -
5 Multiplex 9 mm lbr 0,350 - -
6 Dolken Ø 8 - 10 CM (kayu cerucuk) btg 2,000 - -
TENAGA KERJA
1 Pekerja oh 0,660 - -
2 Tukang Kayu oh 0,330 - -
3 Kepala Tukang oh 0,033 - -
4 Mandor oh 0,033 - -
TOTAL -
PROFIT 15% -
NO. URAIAN SATUAN INDEKS HARGA SATUAN JUMLAH
JUMLAH -
5 1 M² PEKERJAAN BEKISTING UNTUK BALOK Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Kayu kelas III 2 x 20 x 400 m³ 0,040 - -
SNI 7394:2008
2 Paku kg 0,400 - -
3 Minyak begisting ltr 0,200 - -
4 Kayu kelas II (Balok) m³ 0,018 - -
5 Multiplex 9 mm lbr 0,350 - -
6 Dolken Ø 8 - 10 CM (kayu cerucuk) btg 2,000 - -
TENAGA KERJA
1 Pekerja oh 0,660 - -
2 Tukang Kayu oh 0,330 - -
3 Kepala Tukang oh 0,033 - -
4 Mandor oh 0,033 - -
TOTAL -
PROFIT 15% -
JUMLAH -
SNI 7394:2008
TENAGA KERJA
1 Pekerja oh 0,070 - -
2 Tukang Besi oh 0,070 - -
3 Kepala Tukang oh 0,007 - -
4 Mandor oh 0,004 - -
TOTAL -
PROFIT 15% -
JUMLAH -
9 1 KG PEKERJAAN BESI IWF Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
NO. URAIAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Baja WF 200 KG 11,917 - -
2 PENGELASAN cm 0,500 - -
TENAGA KERJA
1 Pekerja oh 0,140 - -
2 Tukang Besi oh 0,140 - -
3 Kepala Tukang oh 0,014 - -
4 Mandor oh 0,008 - -
TOTAL -
PROFIT 15% -
JUMLAH -
10 1 KG PEKERJAAN BESI SIKU 50 X 50 Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Besi Siku 50 x 50 KG 1,050 - -
2 PENGELASAN kg 0,150 - -
TENAGA KERJA
1 Pekerja oh 0,140 - -
2 Tukang Besi oh 0,140 - -
3 Kepala Tukang oh 0,014 - -
4 Mandor oh 0,008 - -
TOTAL -
PROFIT 15% -
JUMLAH -
9 1 M³ PEKERJAAN MEMBUAT BETON MUTU SITE MIX (K 175) Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Semen (PC) kg 326,000 - -
2 Pasir beton m³ 0,543 - -
SNI 7394:2008
TENAGA KERJA
1 Pekerja oh 1,650 - -
2 Tukang Batu oh 0,275 - -
3 Kepala Tukang oh 0,028 - -
4 Mandor oh 0,083 - -
JUMLAH -
14 1 M³ PEKERJAAN BETON READ MIX K 350 Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Beton read mix K-350 M3 1,000 - -
2 ALAT LS 1,000 - -
SNI 7394:2008
TENAGA KERJA
1 Pekerja oh 1,650 - -
2 Tukang Batu oh 0,275 - -
3 Kepala Tukang oh 0,028 - -
4 Mandor oh 0,083 - -
JUMLAH -
15 1 M³ PEKERJAAN BETON READ MIX K 500 Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Beton read mix K-500 M3 1,000 - -
2 ALAT LS 1,000 - -
SNI 7394:2008
TENAGA KERJA
1 Pekerja oh 1,650 - -
2 Tukang Batu oh 0,275 - -
3 Kepala Tukang oh 0,028 - -
4 Mandor oh 0,083 - -
JUMLAH -
16 1 M³ BETON READY MIX K-300 Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Beton read mix K-300 M3 1,000 - -
2 ALAT LS 1,000 - -
SNI 7394:2008
TENAGA KERJA
1 Pekerja oh 1,650 - -
2 Tukang Batu oh 0,275 - -
3 Kepala Tukang oh 0,028 - -
4 Mandor oh 0,083 - -
NO. URAIAN SATUAN INDEKS HARGA SATUAN JUMLAH
JUMLAH -
1 M³ RIB 12/120,10/90,12/260,(150 kg/m3) K250 Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 #REF! M³ 1,000 - -
2 #REF! KG 150,000 - -
3 #REF! KG -
4 #REF! M² 4,000 -
JUMLAH -
17 1 M³ PLAT BETON (t=12 cm) Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 #REF! M³ 1,000 - -
2 #REF! KG 120,000 - -
3 #REF! KG -
4 #REF! M² 0,200 -
JUMLAH -
18 1 M³ PEKERJAAN MEMBUAT LANTAI KERJA BETON Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Semen (PC) kg 230,000 - -
2 Pasir beton m3 0,638 - -
SNI 7394:2008
1 #REF! M³ 1,050 - -
2 #REF! KG 189,444 - -
3 #REF! KG 88,889 - -
4 #REF! M² 4,861 - -
-
JUMLAH -
#### #REF! KG #REF! #REF!
-
12 1 m³ PEKERJAAN MEMBUAT KOLOM PRAKTIS 10 X 10 Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
SNI 7394:2008
1 #REF! M³ 1,050 - -
2 #REF! KG 227,333 - -
3 #REF! KG 64,000 - -
4 #REF! M² 12,000 - -
TOTAL -
PROFIT 15% -
JUMLAH -
13 1 M³ PEKERJAAN MEMBUAT RING BALOK UK. 15 X 10 CM Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
SNI 7394:2008
1 #REF! M³ 1,050 - -
2 #REF! KG 181,867 - -
3 #REF! KG 97,778 - -
4 #REF! M² 5,185 - -
TOTAL -
PROFIT 15% -
JUMLAH -
14 1 M³ PEKERJAAN MEMBUAT BALOK LATEI UK. 10 X 12 CM #REF!
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
7394:2008
NO. URAIAN SATUAN INDEKS HARGA SATUAN JUMLAH
SNI 7394:2008
1 #REF! M³ 1,050 #REF! #REF!
2 #REF! KG 227,333 #REF! #REF!
3 #REF! KG 108,889 #REF! #REF!
4 #REF! M² 6,667 #REF! #REF!
TOTAL #REF!
PROFIT 15% #REF!
JUMLAH #REF!
PEKERJAAN PLAFOND (SNI 2839:2008)
15 1 M² MEMASANG PLAFOND GYPSUM BOARD UK. 1.2 X 2.4 X 9 MM Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Gypsum board (UK. 120 X 240 X 0.09 CM) LBR 0,347 - -
2 Besi hollow untuk plafond M 4,000 - -
3 Paku ramset+misiu BH 4,000 - -
SNI 2839:2008
TOTAL -
PROFIT 15% -
JUMLAH -
16 1 M² MEMASANG PLAFOND GRC BOARD UK. 1.2 X 2.4 X 6 MM -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Grc (UK. 120 X 240 X 0.06 CM) LBR 0,347 - -
2 Besi hollow untuk plafond M 4,000 - -
3 Paku ramset+misiu BH 4,000 - -
4 Klem pengantung ke beton BH 4,000 - -
5 Klem pengantung ke plafond BH 4,000 - -
SNI 2839:2008
3 skrup BH 3,000 - -
TENAGA KERJA
1 Pekerja oh 0,060 - -
2 Tukang Kayu oh 0,060 - -
3 Kepala Tukang oh 0,006 - -
4 Mandor oh 0,003 - -
TOTAL -
PROFIT 15% -
JUMLAH -
PEKERJAAN PLESTERAN (SNI 2837:2008)
19 1 m² PEKERJAAN MEMASANG PLESTERAN 1:3 Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Semen (PC) kg 7,776 - -
SNI 2837:2008
TENAGA KERJA
1 Pekerja oh 0,300 - -
2 Tukang Batu oh 0,150 - -
3 Kepala Tukang oh 0,015 - -
4 Mandor oh 0,015 - -
TOTAL -
PROFIT 15% -
JUMLAH -
21 1 m² PEKERJAAN MEMASANG PLESTERAN T.10 MM Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Semen untuk plesteran - PM 210 kg 20,000 - -
TENAGA KERJA
1 Pekerja oh 0,300 - -
2 Tukang Batu oh 0,150 - -
3 Kepala Tukang oh 0,015 - -
4 Mandor oh 0,015 - -
TOTAL -
PROFIT 15% -
JUMLAH -
22 1 m² PEKERJAAN MEMASANG ACIAN T.2 MM Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Semen untuk plesteran - PM 210 kg 2,200 - -
SNI 2837:2008
TENAGA KERJA
1 Pekerja oh 0,150 - -
2 Tukang Batu oh 0,100 - -
3 Kepala Tukang oh 0,010 - -
SNI 2837:2008
NO. URAIAN SATUAN INDEKS HARGA SATUAN JUMLAH
4 Mandor oh 0,008 - -
TOTAL -
PROFIT 15% -
JUMLAH -
23 1 M² PEKERJAAN MEMASANG PLESTERAN SKONING 10 MM 1:2 Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Semen (PC) kg 0,500 - -
SNI 2837:2008
TOTAL -
PROFIT 15% -
JUMLAH -
36 1 M² PEKERJAAN MEMASANG LANTAI KERAMIK UK.30 X 30 CM (UP) Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Keramik uk. 30 X 30 cm M2 1,050 - -
I 7395:2008
SNI 7395:2008
3 Pasir pasang m³ 0,023 - -
4 Semen Warna KG 0,900 - -
TENAGA KERJA
1 Pekerja oh 0,250 - -
2 Tukang Batu oh 0,120 - -
3 Kepala Tukang oh 0,012 - -
4 Mandor oh 0,013 - -
TOTAL -
PROFIT 15% -
JUMLAH -
34 1 M' PEKERJAAN MEMASANG PLINT GRANIT TILE UK.16 X 60 CM Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Plint Granit Tile 16 x 60 bj 1,667 - -
SNI 7395:2008
TOTAL -
PROFIT 15% -
JUMLAH -
36 1 M' PEKERJAAN MEMASANG PLINT KERAMIK UK.20 X 30 CM Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Plint Keramik Tile uk. 20 x 30 bj 3,333 - -
2 Semen (PC) kg 1,140 - -
3 Pasir pasang m³ 0,003 - -
4 Semen Warna KG 0,100 - -
TENAGA KERJA
1 Pekerja oh 0,090 - -
2 Tukang Batu oh 0,090 - -
3 Kepala Tukang oh 0,009 - -
4 Mandor oh 0,005 - -
TOTAL -
PROFIT 15% -
JUMLAH -
NO. URAIAN SATUAN INDEKS HARGA SATUAN JUMLAH
37 1 M' PEKERJAAN MEMASANG PLINT KERAMIK UK.10 X 30 CM Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
SNI 7395:2008 1 Plint homogenius uk. 10 X 30 cm bh 3,333 - -
2 Semen (PC) kg 1,650 - -
3 Pasir pasang m³ 0,003 - -
4 Semen Warna kg 0,100 - -
TENAGA KERJA
1 Pekerja oh 0,060 - -
2 Tukang Batu oh 0,030 - -
3 Kepala Tukang oh 0,003 - -
4 Mandor oh 0,003 - -
TOTAL -
PROFIT 15% -
JUMLAH -
38 1 m' PEKERJAAN LIST UK. 15 X 30 HOMOGENOUS TILE (CUTTING) Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
1 Border Homogenous tile uk. 15 x 30 (cutting) m 3,333 - -
SNI 7395:2008
PEKERJAAN ATAP
48 1 M² Penutup atap Steel Roof 0.5 Klip-Lok Colourbond Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
Penutup atap M² 1,050 - -
aluminium foil + bubble M² 1,050 - -
aksesoris ls 1,000 - -
TENAGA KERJA
Pekerja OH 0,200 - -
Tukang Besi OH 0,200 - -
Kepala Tukang OH 0,025 - -
Mandor OH 0,010 - -
TOTAL -
PROFIT 15% -
JUMLAH -
49 1 M² PEKERJAAN GENTENG GLAZUR Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
Genteng glazur BH 18,000 - -
aluminium foil + bubble M² 1,050 - -
Wiremess M² 1,050 - -
TENAGA KERJA
Pekerja OH 0,150 - -
Tukang kayu OH 0,075 - -
Kepala Tukang OH 0,008 - -
Mandor OH 0,008 - -
TOTAL -
PROFIT 15% -
JUMLAH -
49 1M PEKERJAAN BUMBUNGAN Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
Bumbungan glazur m' 5,000 - -
PERLENGKAPAN LS 1,000 - -
Semen (PC) kg 8,000 - -
Pasir pasang m³ 0,032 - -
TENAGA KERJA
Pekerja OH 0,400 - -
Tukang Besi OH 0,200 - -
Kepala Tukang OH 0,020 - -
Mandor OH 0,020 - -
TOTAL -
NO. URAIAN SATUAN INDEKS HARGA SATUAN JUMLAH
PROFIT 15% -
JUMLAH -
50 1M PEKERJAAN PARAPET FLASHING Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
Plashing parapet m 1,000 - -
NON STANDAR
PERLENGKAPAN LS 1,000 - -
TENAGA KERJA
Pekerja OH 0,200 - -
Tukang Besi OH 0,200 - -
Kepala Tukang OH 0,025 - -
Mandor OH 0,010 - -
TOTAL -
PROFIT 15% -
JUMLAH -
51 1M PEKERJAAN NOK PINGGIR Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
Nok pinggir m' 1,064 - -
NON STANDAR
PERLENGKAPAN LS 1,000 - -
TENAGA KERJA
Pekerja OH 0,200 - -
Tukang Besi OH 0,200 - -
Kepala Tukang OH 0,025 - -
Mandor OH 0,010 - -
TOTAL -
PROFIT 15% -
JUMLAH -
50 1M PEKERJAAN LIST PLANK GRC 9mm Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN
GRC 9 mm LBR 2,100 - -
Besi hollow untuk plafond M 2,100 - -
NON STANDAR
TOTAL -
PROFIT 15% -
JUMLAH -
m' PEKERJAAN PEMASANGAN U DITCH UK 40X50 MUTU K-350 Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
TOTAL -
PROFIT 15% -
JUMLAH -
m' BAK KONTROL UK 60X60CM Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
TOTAL -
PROFIT 15% -
JUMLAH -
m3 PEKERJAAN GALIAN TANAH Rp -
NO KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH
Pekerja hr 0,750 - -
Mandor hr 0,025 - -
TOTAL -
PROFIT 15% -
JUMLAH -
ANALISA HARGA SATUAN PEKERJAAN
#REF! #REF!
#REF!
#REF!
Bahan Upah
1 Lt.1 - - -
1,09 Lt.2 - - -
1,12 Lt.3 - - -
1,135 Lt.4 - - -
1,162 Lt.5 - - -
-
9 1 KG PEMBESIAN DENGAN BESI POLOS U24
Bahan
Besi Beton polos 1,050 kg - -
Kawat Beton 0,015 kg - -
total -
Profit 15% -
-
Upah
Pekerja 0,007 org - -
Tukang besi 0,005 org - -
Kepala Tukang Besi 0,001 org - -
Mandor 0,004 org - -
total -
Profit 15% -
Jumlah -
Bahan Upah
1 Lt.1 - - -
1,09 Lt.2 - - -
1,12 Lt.3 - - -
1,135 Lt.4 - - -
1,162 Lt.5 - - -
Bahan Upah
2 x Pakai 0,5 Lt.1 - - -
Lt.2 - - -
Lt.3 - - -
Lt.4 - - -
Lt.5 - - -
14 1 M2 PASANG BEGISTING UNTUK PLAT LANTAI
Bahan
Kayu acuan (meranti) 0,040 m3 - -
Paku biasa 2" - 5" 0,400 kg - -
Minyak begisting 0,200 ltr - -
Balok kayu meranti 0,015 m3 - -
Multiplek t. 9 mm 0,350 lbr - -
Dolken kayu gelam 6,000 bt - -
total -
Profit 15% -
-
Upah
Pekerja 0,660 org - -
Tukang kayu 0,330 org - -
Kep. Tukang Kayu 0,033 org - -
Mandor 0,033 org - -
total -
Profit 15% -
Jumlah -
Bahan Upah
2 x Pakai 0,5 Lt.1 - - -
Lt.2 - - -
Lt.3 - - -
Lt.4 - - -
Lt.5 - - -
15 1 M2 PASANG BEGISTING UNTUK TANGGA
Bahan
Kayu acuan (meranti) 0,030 m3 - -
Paku biasa 2" - 5" 0,400 kg - -
Minyak begisting 0,200 ltr - -
Balok kayu meranti 0,020 m3 - -
Multiplek t. 9 mm 0,350 lbr - -
Dolken kayu gelam 3,000 bt - -
total -
Profit 15% -
-
Upah
Pekerja 0,660 org - -
Tukang kayu 0,330 org - -
Kep. Tukang Kayu 0,033 org - -
Mandor 0,033 org - -
total -
Profit 15% -
Jumlah -
Bahan Upah
2 x Pakai 0,5 Lt.1 - - -
Lt.2 - - -
Lt.3 - - -
Lt.4 - - -
Lt.5 - - -
16 1 M3 LANTAI KERJA 1 PC : 3 PS : 5 KRL
PC ( 50 kg ) 3,165 zak - -
Pasir Beton 0,638 m3 - -
Koral beton 0,810 m3 - -
Air 200,000 lt - -
Total -
Profit 15% -
Jumlah -
24 1 BH ANGKUR D22
KEBUTUHAN
Bahan
ANGKUR D 22 1,000 BH - -
MUR 1,000 BH - -
Upah
Pekerja 0,070 oh - -
Tukang Besi 0,070 oh - -
Kepala Tukang 0,007 oh - -
Mandor 0,004 oh - -
Total -
Profit 15% -
-
25 TIANG PANCANG 30 X 30
Pengadaan Bahan
Tiang Pancang 30 x 30 1,000 m1 - -
Angkutan tiang pancang 1,000 m1 - -
-
Penyambungan
Kawat las 3,768 kg - -
Solar 2,826 ltr - -
Minyak pelumas 0,377 ltr - -
Pekerja 0,377 OH - -
Tukang las 0,188 OH - -
Kepala tukang 0,019 OH - -
Mandor 0,002 OH - -
Sewa alat 0,560 OH - -
-
Pemancangan 0,150 lot - -
PERABOT TETAP
1 Kursi Mahasiswa Rp - per Unit
2 Kursi Dosen Rp - per Unit
3 Meja Dosen Rp - per Unit
4 Meja Laboratorium Rp - per Unit
5 Kursi Laboratorium Rp - per Unit
6 Loker Kunci isi 32 kunci Rp - per Unit
7 Papan Tulis Rp - per Unit
8 Kursi Tunggu isi 4 seater Rp - per Unit
DAFTAR HARGA SATUAN BAHAN
#### : #REF!
: #REF!
#### :
HARGA SAT.
NO. JENIS BAHAN BANGUNAN SAT.
( Rp. )
a b c d
1 Pasir Urug m3 -
2 Sirtu m3 -
3 Pasir Pasang m3 -
4 Pasir Beton m3 -
5 Batu Pecah mesin 2/3 m3 -
6 Batu Pecah mesin 3/5 m3 -
7 Batu Belah Pondasi m3 -
8 Bata merah bakar kelas 1 bh -
9 Batako 20x40x10 Cm bh -
10 Semen Gresik / 50 Kg zak -
11 Ready mix beton K-225 m3 -
12 Ready mix beton K-300 m3 -
13 Biaya Pompa ready mix m3 -
C. BAHAN KAYU
24 Kayu klas II m3 -
25 Kayu klas III 5 x 7 x 400 m3 -
26 Kayu klas III 2 x 30 x 400 m3 -
27 Kayu klas III 2 x 20 x 400 m3 -
28 Kayu klas III 5 x 7 x 400 m3 -
29 Dolken 5 s/d 7 btg -
F. BAHAN LOGAM
36 Besi Beton polos U 24 kg -
37 Besi Beton ulir U 40 kg -
38 Kawat Beton kg -
39 Besi Wire Mesh M-7 m1 -
40 Steeldeck pengganti begisting plat lantai m2 -
41 WIREMESTH M6 KG -
42 Besi plat strip 30 X 30 X 0.05 mm M -
43 BESI IWF 200 x 100 x 5,5 x 8 MM KG -
44 Besi siku KG -
45 Besi canal C KG -
46 Pipa Blac Steel dia. 2 " M -
47 Angkur dia. 16 bh -
48 Angkur dia. 19 bh -
49 Angkur dia. 22 bh -
50 Kawat las Kg -
F. LAIN-LAIN
50 Sewa Welding Set jam -
51 Sewa Alat Airless Spry jam -
52 Metal Roof / Terpasang (Agregat,t = 0,4 mm ) M² -
53 Alluminium Foil Smart Foam 4 mm M² -
54 Rabung PCS -
55 Screw (berkaret) 12X14X45 M² -
56 Tiang Pancang 30 x 30 m1 -
57 Noc wuwung metal roof ( terpasang ) m1 -
58 Waterproofing coating Elastomeric Acrylic/ Terpasang M2 -
K. BAHAN PERPIPAAN
62 Besi Pipa Hitam Medium B O 1'' t = 2 mm bt -
63 Besi Pipa Hitam Medium B O 1,1/2'' t = 2 mm bt -
64 Besi Pipa Hitam Medium B O 2'' t = 2 mm bt -
65 Besi Pipa Hitam Medium B O 3'' t = 2 mm bt -
HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
NO. URAIAN SAT HARGA SATUAN
1 Komponen Panel :
▪ Pilot Lamp RST+Fuse bh Rp -
▪ Ampere Meter bh Rp -
▪ CT bh Rp -
▪ Volt Meter bh Rp -
▪ SSV bh Rp -
▪ Hz Meter bh Rp -
▪ KW Meter bh Rp -
▪ Power Factor (Cos Q) bh Rp -
▪ KWH Meter Analog bh Rp -
▪ Arrester 3P+N bh Rp -
▪ Motorized bh Rp -
▪ UVT bh Rp -
▪ Shunt Trip bh Rp -
▪ MCCB 320-800A/3P (70 kA) bh Rp -
▪ MCCB 320-800A/3P (50 kA) bh Rp -
▪ MCCB 250-630A/3P (50 kA) bh Rp -
▪ MCCB 160-400A/3P (50 kA) bh Rp -
▪ MCCB 175-250A/3P (50 kA) bh Rp -
▪ MCCB 175-250A/3P (36 kA) bh Rp -
▪ MCCB 140-200A/3P (36 kA) bh Rp -
▪ MCCB 112-160A/3P (36 kA) bh Rp -
▪ MCCB 87-125A/3P (36 kA) bh Rp -
▪ MCCB 70-100A/3P (50 kA) bh Rp -
▪ MCCB 70-100A/3P (36 kA) bh Rp -
▪ MCCB 56-80A/3P (36 kA) bh Rp -
▪ MCCB 44-63A/3P (36 kA) bh Rp -
▪ MCCB 225A/3P (18 kA) bh Rp -
▪ MCCB 125A/3P (18 kA) bh Rp -
▪ MCCB 100A/3P (18 kA) bh Rp -
▪ MCCB 60A/3P (18 kA) bh Rp -
▪ MCCB 32A/3P (18 kA) bh Rp -
▪ MCCB 80A/3P, 10 kA bh Rp -
▪ MCCB 30A/3P, 10 kA bh Rp -
▪ MCB 6A/3P, 10 kA bh Rp -
▪ MCB 10A/3P, 10 Ka bh Rp -
▪ MCB 16A/3P, 10 kA bh Rp -
▪ MCB 20A/3P, 10 kA bh Rp -
▪ MCB 25A/3P, 10 kA bh Rp -
▪ MCB 32A/3P, 10 kA bh Rp -
▪ MCB 40A/3P, 10 kA bh Rp -
▪ MCB 50A/3P, 10 kA bh Rp -
▪ MCB 63A/3P, 10 kA bh Rp -
▪ MCB 80A/3P, 10 kA bh Rp -
▪ MCB 100A/3P, 10 kA bh Rp -
▪ MCB 6A/3P, 6kA bh Rp -
▪ MCB 10A/3P, 6kA bh Rp -
▪ MCB 16A/3P, 6kA bh Rp -
▪ MCB 20A/3P, 6kA bh Rp -
▪ MCB 25A/3P, 6kA bh Rp -
▪ MCB 32A/3P, 6kA bh Rp -
▪ MCB 40A/3P, 6kA bh Rp -
▪ MCB 50A/3P, 6kA bh Rp -
▪ MCB 63A/3P, 6kA bh Rp -
▪ MCB 6A/1P, 4,5kA bh Rp -
▪ MCB 10A/1P, 4,5kA bh Rp -
▪ MCB 16A/1P, 4,5kA bh Rp -
▪ MCB 20A/1P, 4,5kA bh Rp -
▪ MCB 32A/1P, 4,5kA bh Rp -
▪ MCB 6A/1P,6kA bh Rp -
▪ MCB 10A/1P,6kA bh Rp -
▪ MCB 16A/1P, 6kA bh Rp -
▪ MCB 20A/1P, 6kA bh Rp -
▪ MCB 63A/1P, 6kA bh Rp -
▪ Cos 4P lengkap Auxiliary set Rp -
2 Instalasi Kabel Feeder Instalasi Tegangan Rendah
▪ Kabel TR, NYA 1 x 2,5 mm² m' Rp -
▪ Kabel TR, NYA 1 x 4 mm² m' Rp -
▪ Kabel TR, NYM 2 x 1,5 mm² m' Rp -
▪ Kabel TR, NYM 3 x 2,5 mm² m' Rp -
▪ Kabel TR, NYY 4 x 2,5 mm² m' Rp -
▪ Kabel TR, NYY 4 x 4 mm² m' Rp -
▪ Kabel TR, NYY 4 x 6 mm² m' Rp -
▪ Kabel TR, NYY 4 x 10 mm² m' Rp -
▪ Kabel TR, NYY 4 x 16 mm² m' Rp -
▪ Kabel TR, NYY 4 x 25 mm² m' Rp -
▪ Kabel TR, NYY 4 x 35 mm² m' Rp -
▪ Kabel TR, NYY 4 x 50 mm² m' Rp -
▪ Kabel TR, NYY 4 x 70 mm² m' Rp -
▪ Kabel TR, NYY 4 x 95 mm² m' Rp -
▪ Kabel TR, NYY 4 x 120 mm² m' Rp -
▪ Kabel TR, NYY 4 x 150 mm² m' Rp -
▪ Kabel TR, NYY 4 x 185 mm² m' Rp -
▪ Kabel TR, NYMHy 3 x 2.5 mm² m' Rp -
▪ Kabel TR, NYMHy 2 x 1.5 mm² m' Rp -
▪ Kabel TR, NYFGbY 4 x 25 mm² m' Rp -
▪ Kabel TR, NYFGbY 4 x 35 mm² m' Rp -
▪ Kabel TR, NYFGbY 4 x 70 mm² m' Rp -
▪ Kabel TR, NYFGbY 4 x 95 mm² m' Rp -
▪ Kabel TR, NYFGbY 4 x 240 mm² m' Rp -
▪ Kabel BC 120 mm² m' Rp -
▪ Kabel BC 95 mm² m' Rp -
▪ Kabel BC 70 mm² m' Rp -
▪ Kabel BC 50 mm² m' Rp -
▪ Kabel BC 35 mm² m' Rp -
▪ Kabel BC 16 mm² m' Rp -
▪ Kabel BC 10 mm² m' Rp -
▪ Kabel BC 6 mm² m' Rp -
▪ ITC Cable 2 x 2 x 0,6 mm² m' Rp -
▪ ITC Cable 10 x 2 x 0,6 mm² m' Rp -
▪ ITC Cable 20 x 2 x 0,6 mm² m' Rp -
▪ UTP Cable 4 Pairs (Cat 5e) m' Rp -
▪ UTP Cable 4 Pairs (Cat 6) m' Rp -
▪ Coaxial RG 6 / AWG m' Rp -
▪ Coaxial RG 11 / AWG m' Rp -
▪ STP AWG18 1P m' Rp -
3 Armature lampu
Normal :
▪ Lampu Baret SCB 20 ACR TLC 22 W + Battery Emergency Box bh Rp -
▪ Lampu Down Light RD 125 E 27 Esential 8 w Cover Glass bh Rp -
▪ Lampu Down Light RD 150 E 27 Esential 14 w Cover Glass bh Rp -
▪ Lampu Down Light RD 150 PLC 18 W bh Rp -
▪ Lampu RM 300 2x36 M2 TL-D - 2x36w Electronic Ballast bh Rp -
▪ Lampu RM 300 2x36 ACR TL- D 2X36 w Electronic Ballast bh Rp -
▪ Lampu RMO 2x36 w Electronic Ballast bh Rp -
▪ Lampu Balk BLCG 1x18 w Electronic Ballast bh Rp -
▪ Highbay Industrial Light I B 40 - HPLN 250 w Magnetic Ballast bh Rp -
Led :
▪ Lampu Baret SCB 20 ACR Led Basic Plat 22 W + Battery Emergency Box bh Rp -
▪ Lampu Down Light RD 125 E 27 Leb Bulb 4 w Cover Glass bh Rp -
▪ Lampu Down Light RD 150 E 27 Leb Bulb 8 w Cover Glass bh Rp -
▪ Lampu Down Light Comport 150-75 Led DLS 13,6 - 1200lm bh Rp -
▪ Lampu RM 300 2x36 M2 T- Led Esential - 2x14,5 W 3200lm bh Rp -
▪ Lampu RM 300 2x36 ACR T- Led Esential 2x14,5 W 3200lm bh Rp -
▪ Lampu RMO T 2x36 T led Essential 2x14,5 Watt 3200lm bh Rp -
▪ Lampu Balk BLCG 1x18 T Led Esential 8 W bh Rp -
▪ Highbay Helios 150 W Led bh Rp -
▪ Emergency Kit c/w Battery & Charge Min. 2 Hours Backup bh Rp -
4 Peralatan Instalasi :
▪ Saklar 1 Gang 1 Way bh Rp -
▪ Saklar 2 Gang 1 Way bh Rp -
▪ Saklar 1 Gang 2 Way bh Rp -
▪ Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter bh Rp -
▪ Stop Kontak Komputer (UPS) 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter bh Rp -
▪ Stop Kontak Medis (UPS) 1 Gang ( 2P+E ) Schuko - 250 V w/ Safety Shutter bh Rp -
▪ Stop Kontak AC 1 Gang ( 2P+E ) 13 A - 3 Pin British Standard w/ Neon Sign bh Rp -
▪ Stop Kontak Peralatan Outbow ( 2P+E ) Schuko - 250 V bh Rp -
▪ Stop Kontak Peralatan Outbow ( 3P+E ) - 400 V / IP44 bh Rp -
▪ Plugs 16 A / ( 3P+E ) - 400 V / IP44 bh Rp -
▪ Telepon Outlets ( FCC Standard ) /w Surround 1 Gang - 6 Wire bh Rp -
▪ Outlet Data Cat6 c/w Modular Jack bh Rp -
▪ Outlet Televisi 1 Gang 75 Ohm bh Rp -
▪ Inbow doos plastic boks bh Rp -
▪ Pipa PVC High Impact 20 mm² m' Rp -
▪ Socket Pipa bh Rp -
▪ Tee Doos bh Rp -
▪ Klem Pipa bh Rp -
▪ Fhiser bh Rp -
▪ Las Doop bh Rp -
▪ Isolasi ban bh Rp -
▪ Ceiling Mounted Exhaust Fan 10 " KM/WC, 36,8 W / 220 V / 564 CMH bh Rp -
▪ Wall Mounted Industrial Fan 16", 73,9 W / 220 V / 2.010 CMH bh Rp -
▪ Auto Ceiling Mounted Fan 16 " 55 W / 220 V / 65,5 CMM bh Rp -
▪ HIGH PRESSURE INDUSTRIAL FAN, 350 W / 220 V / 8350 CMH bh Rp -
▪ Axial Flow Industrial Fan ( Ekshaust ) bh Rp -
600 CMH - 0,05~0,08 INCH/100FT - 50 HZ - 34 WATT - 1.451 RPM
▪ UPS Powerscale 3-3 ( 7,5kVA ) / Cabinet B / Battery ( 1 x 48 ) x 7 Ah bh Rp -
▪ UPS Powerscale 3-3 ( 10 kVA ) / Cabinet B / Battery ( 1 x 48 ) x 7 Ah bh Rp -
▪ UPS Powerscale 3-3 ( 20 kVA ) / Cabinet B / Battery ( 2 x 48 ) x 7 Ah bh Rp -
▪ UPS Powerscale 3-3 ( 30 kVA ) / Cabinet C / Battery ( 2 x 48 ) x 7 Ah bh Rp -
▪ UPS Powerscale 3-3 ( 40 kVA ) / Cabinet C / Battery ( 2 x 48 ) x 7 Ah bh Rp -
▪ Overhead Single Girder Crane Kapasitas 5 ton bh Rp -
5 Elektronika
▪ PABX KX-TES824ND kapasitas 8 line / 24 extention : set Rp -
▪ Pesawat Telephone Analog KX-T505 set Rp -
▪ Main Distribution Frame Kapasitas 1 x 20 pair set Rp -
▪ UPS Smart-1000VA 230V set Rp -
▪ UPS Smart-650VA 230V set Rp -
▪ Terminal BOX c/w LSA 1 x 10 pairs bh Rp -
▪ Server Intel Xeon Dual Core E5503 (1.6Ghz 1066Mhz, 4MB L2, (80W) set Rp -
1x 2GB | 250GB 7200rpm Simple Swap SATA | Integrated Management Module(IMM)
DVD-ROM | Either Eight 2.5-inch SFF SAS hot swap disk bays or Four 3.5-inch SAS
Ethernet | Expansion slots | USB
▪ Patch Panel / Wallmount 2 U bh Rp -
▪ Patch Panel / Wallmount 4 U bh Rp -
▪ Patch Panel / Wallmount 8 U bh Rp -
▪ Patch Panel / Wallmount 12 U bh Rp -
▪ Patch Panel / Wallmount 15 U bh Rp -
▪ Closed Rack 42 U bh Rp -
▪ 8-port UTP, 10/100Mbps, Auto-sensing, Unmanaged bh Rp -
▪ 16-port UTP, 10/100Mbps, Auto-sensing, Unmanaged bh Rp -
▪ 24-port UTP, 10/100Mbps, Auto-sensing, Unmanaged bh Rp -
▪ Antenna Yagi UHF / VHF 25 Element bh Rp -
▪ Booster TV : bh Rp -
Freq (MHz) 48,5 - 956
Impedence 300 / 75
Max Output Level 148
Noise Coeffecient < 1
Power Input 220 V
▪ Intelligent Addressable Master Control Fire Alarm set Rp -
▪ Smoke Detector Conventional bh Rp -
▪ ROR Heat Detector bh Rp -
▪ Fixed Heat Detector bh Rp -
▪ Break Glass bh Rp -
▪ Alarm Bell bh Rp -
▪ Indicator Lamp bh Rp -
▪ Zone Module bh Rp -
▪ Control Module bh Rp -
▪ Mini Monitor Module bh Rp -
▪ Terminal Box Fire Alarm for 6 module (550 x 475 x 150) set Rp -
▪ Addressable Photoelectric Smoke Detector bh Rp -
▪ Manual Release Station bh Rp -
▪ Manual Abort Station bh Rp -
▪ Alarm Bell bh Rp -
▪ Strobe Light with Horn bh Rp -
▪ Evacuate Sign Lamp bh Rp -
▪ Discharge Sign Lamp bh Rp -
▪ Ceiling Speaker 6 Watt bh Rp -
▪ Ceiling Speaker 6 Watt, metal grill c/w firedome (EVAC) bh Rp -
▪ Horn speaker, daya 15 watt, high impedance bh Rp -
▪ Volume Control 36W bh Rp -
▪ Power Amplifier 240 W bh Rp -
▪ Power Amplifier 120 W bh Rp -
▪ Mixer Pre Amplifier / Sistem Controller bh Rp -
▪ DVD /CD/MP3/MP4 Player + Radio Tuner bh Rp -
▪ Paging Microphone & Chime Tone + Key Pad bh Rp -
▪ Selector Switch 6 zone bh Rp -
▪ Main Distibution Frame (MDF) Sound System bh Rp -
▪ Kabinet Rack lengkap blower junction dan aksesories + bh Rp -
Rectifier, Battery charger
▪ Dome CCTV Camera CAD 560 set Rp -
Features:
• 1/3" SONY Super HAD CCD
• 560 TV lines (High Resolution)
• 0.05Lux/F1.2
• 2.5 mm / 3.8 mm / 6.0 mm Lens (selectable)
• 12 VDC Input Voltage
9 Tata Udara
▪ AC Standard Split Wall Mounted ½ PK 5.000 btu/H unit Rp -
▪ AC Standard Split Wall Mounted ¾ PK 7.000 btu/H unit Rp -
▪ AC Standard Split Wall Mounted 1 PK 9.000 btu/H unit Rp -
▪ AC Standard Split Wall Mounted 1½ PK 12.000 btu/H unit Rp -
▪ AC Standard Split Wall Mounted 2 PK 18.000 btu/H unit Rp -
▪ AC Standard Split Wall Mounted 2½ PK 24.000 btu/H unit Rp -
▪ AC Cassete Standard Class 12.000 btu/H Wireless unit Rp -
▪ AC Cassete Standard Class 18.000 btu/H Wireless unit Rp -
▪ AC Cassete Standard Class 21.000 btu/H Wireless unit Rp -
▪ AC Cassete Standard Class 24.000 btu/H Wireless unit Rp -
▪ AC Cassete Standard Class 28.000 btu/H Wireless unit Rp -
▪ AC Cassete Standard Class 30.000 btu/H Wireless unit Rp -
▪ AC Cassete Standard Class 36.000 btu/H Wireless unit Rp -
▪ AC Cassete Standard Class 42.000 btu/H Wireless unit Rp -
▪ AC Cassete Standard Class 48.000 btu/H Wireless unit Rp -
Seng :
- Seng BJLS 80 m² Rp -
- Seng BJLS 70 m² Rp -
- Seng BJLS 60 m² Rp -
- Seng BJLS 50 m² Rp -
BAHAN ISOLASI
- Glaswool, Density 24 Kg/M3 m² Rp -
- Alluminium Foil, Double Side Fire Resistance m² Rp -
- Alumunium Tipe, lebar 2" m' Rp -
- Flinkote m² Rp -
Fleksibel Duct Ø 12” Non Isolasi m' Rp -
Supply Air Difusher ( SAD ) 14 ' x 14 " bh Rp -
Return Air Grille ( RAG ) 16" x 12 " bh Rp -
Pemipaan HVAC ( Cu ) Type ASTM B280
▪ Ø ¼” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
▪ Ø ⅜” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
▪ Ø ½” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
▪ Ø ⅝” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
▪ Ø ¾” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
▪ Ø ⅞” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
▪ Ø 1” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
▪ Ø 1 ⅛” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
▪ Ø 1 ¼” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
▪ Ø 1 ⅜” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
▪ Ø 1 ⅝” + Aeroflex 1/2 inch ( 13mm ) m' Rp -
DAFTAR HARGA SATUAN UPAH KERJA
#REF! : #REF!
: #REF!
#REF! :
HARGA UPAH
NO SATUAN WAKTU
(Rp)
1 PEKERJA - 1 ORANG/HR/ 8 JAM
4 TUKANG GALI - 1 ORANG/HR/ 8 JAM
6 TUKANG BATU - 1 ORANG/HR/ 8 JAM
7 KEPALA TUKANG BATU - 1 ORANG/HR/ 8 JAM
9 TUKANG KAYU - 1 ORANG/HR/ 8 JAM
10 KEPALA TUKANG KAYU - 1 ORANG/HR/ 8 JAM
12 TUKANG CAT - 1 ORANG/HR/ 8 JAM
13 KEPALA TUKANG CAT - 1 ORANG/HR/ 8 JAM
12 TUKANG BESI BETON - 1 ORANG/HR/ 8 JAM
13 KEPALA TUKANG BESI BETON - 1 ORANG/HR/ 8 JAM
15 TUKANG BESI PROFIL - 1 ORANG/HR/ 8 JAM
16 KEPALA TUKANG BESI PROFIL - 1 ORANG/HR/ 8 JAM
17 MANDOR - 1 ORANG/HR/ 8 JAM