B PEKERJAAN LANTAI 1
B1 TERAS -
B2 AREA LOBBY -
B3 RUANG LOKER -
B4 AREA KOMERSIL -
B5 RUANG DIFABEL -
B6 RUANG PENJAGA -
B7 GUDANG -
B8 RUANG POMPA, PANEL & JANITOR -
B9 RUANG LAUNDRY -
B10 HALL/RUANG SERBAGUNA -
B11 AREA TANGGA UTAMA & BELAKANG -
B12 KORIDOR -
B13 RUANG GWT -
TOTAL B -
C PEKERJAAN LANTAI 2
C1 KAMAR TIDUR 1-6, 8-12 -
C2 KAMAR TIDUR 13 -
C3 KAMAR TIDUR 7 -
C4 TOILET & JANITOR -
C5 DAPUR -
C6 KORIDOR -
C7 AREA TANGGA UTAMA & BELAKANG -
TOTAL C -
D PEKERJAAN LANTAI 3
D1 KAMAR TIDUR 1-6, 8-12 -
D2 KAMAR TIDUR 13 -
D3 KAMAR TIDUR 7 -
D4 TOILET & JANITOR -
D5 DAPUR -
D6 KORIDOR -
D7 AREA TANGGA UTAMA & BELAKANG -
TOTAL D -
E PEKERJAAN LANTAI 4
E1 KAMAR TIDUR 1-6, 8-12 -
E2 KAMAR TIDUR 13 -
E3 KAMAR TIDUR 7 -
E4 TOILET & JANITOR -
E5 DAPUR -
E6 KORIDOR -
E7 AREA TANGGA UTAMA & BELAKANG -
TOTAL E -
F PEKERJAAN LANTAI 5
F1 KAMAR TIDUR 1-6, 8-12 -
F2 KAMAR TIDUR 13 -
F3 KAMAR TIDUR 7 -
F4 TOILET & JANITOR -
F5 DAPUR -
F6 KORIDOR -
F7 AREA TANGGA UTAMA & BELAKANG -
TOTAL F -
…...................., 2023
Dibuat Oleh,
CV/PT
….........................................................................
Direktur
KEMENTERIAN AGAMA REPLUBIK INDONESIA
UNIVERSITAS ISLAM NEGERI SUNAN AMPEL SURABAYA
Jl. A. Yani 117 Surabaya 60237 Telp. 031-8410298
Fax.: (031) 8413300, Website : www.uinsby.ac.id E-mail: dpu@gresikkab.go.id
B PEKERJAAN LANTAI 1
B1 TERAS -
B2 AREA LOBBY -
B3 RUANG LOKER -
B4 AREA KOMERSIL/KANTIN -
B5 RUANG DIFABEL -
B6 RUANG PENJAGA -
B7 GUDANG -
B8 RUANG POMPA, PANEL & JANITOR -
B9 RUANG LAUNDRY -
B10 HALL/RUANG SERBAGUNA -
B11 AREA TANGGA UTAMA & BELAKANG -
B12 KORIDOR -
B13 RUANG GWT -
TOTAL B -
C PEKERJAAN LANTAI 2
C1 KAMAR TIDUR 1-6, 8-12 -
C2 KAMAR TIDUR 13 -
C3 KAMAR TIDUR 7 -
C4 TOILET & JANITOR -
C5 DAPUR -
C6 KORIDOR -
C7 AREA TANGGA UTAMA & BELAKANG -
TOTAL C -
D PEKERJAAN LANTAI 3
D1 KAMAR TIDUR 1-6, 8-12 -
D2 KAMAR TIDUR 13 -
D3 KAMAR TIDUR 7 -
D4 TOILET & JANITOR -
D5 DAPUR -
D6 KORIDOR -
D7 AREA TANGGA UTAMA & BELAKANG -
TOTAL D -
E PEKERJAAN LANTAI 4
E1 KAMAR TIDUR 1-6, 8-12 -
E2 KAMAR TIDUR 13 -
E3 KAMAR TIDUR 7 -
E4 TOILET & JANITOR -
E5 DAPUR -
E6 KORIDOR -
E7 AREA TANGGA UTAMA & BELAKANG -
TOTAL E -
F PEKERJAAN LANTAI 5
F1 KAMAR TIDUR 1-6, 8-12 -
F2 KAMAR TIDUR 13 -
F3 KAMAR TIDUR 7 -
F4 TOILET & JANITOR -
F5 DAPUR -
F6 KORIDOR -
F7 AREA TANGGA UTAMA & BELAKANG -
TOTAL F -
…...................., 2023
Dibuat Oleh,
CV/PT
….........................................................................
Direktur
KEMENTERIAN AGAMA REPLUBIK INDONESIA
UNIVERSITAS ISLAM NEGERI SUNAN AMPEL SURABAYA
Jl. A. Yani 117 Surabaya 60237 Telp. 031-8410298
Fax.: (031) 8413300, Website : www.uinsby.ac.id E-mail: dpu@gresikkab.go.id
E Personel K3 Konstruksi :
i Petugas K3 Konstruksi ob 4,00 - -
II PEKERJAAN BETON
1 Lantai Kerja Tb. 5cm m³ 0,08 - -
2 Pek. Beton Sloof 15/20cm m³ 0,45 - -
3 Rabat Beton Tb. 5cm m³ 1,76 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
III PEKERJAAN PASANGAN
1 Pasang Rollag Bata Ringan - Sisi Ramp m³ 0,11 - -
2 Pasang Dinding Bata Ringan Tb. 10cm - Cover Kolom m² 7,08 - -
3 Pek. Plesteran 1ps : 3pp Tb. 15mm m² 14,16 - -
4 Pek. Acian m² 14,16 - -
5 Urugan Pasir Tb. 10cm - Bawah Granit m³ 3,51 - -
6 Pasang Granite Tile 60x60cm - Polished m² 31,30 - -
7 Pasang Granite Tile 60x60cm - Unpolished m² 3,80 - -
8 Pekerjaan Rangka Plafon Hollow 20x40cm m² 10,90 - -
9 Pemasangan Plafon Kalsiboard Tb. 3mm m² 10,90 - -
10 Pek. Plesteran 1ps : 3pp Tb. 3cm - Deck Beton Kanopi Teras m² 0,53 - -
11 Waterproofing/Acian Grouting Lantai Deck Beton Kanopi Teras m² 17,55 - -
12 Pasang Granit Tile 30/30cm Motif Batu Alam m² 9,11 - -
13 Pengerokan & Pembersihan Lumut Dipermukaan Beton m² 17,55 - -
IV PEKERJAAN PENGECATAN
1 Pengecatan Plafon Kalsiboard m² 10,90 - -
2 Pengecatan Dinding Baru - Cover Kolom m² 14,16 - -
V PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 2,00 - -
2 Instalasi Titik Lampu Titik 6,00 - -
3 Pasang Kap Downlight 5" Fittiing E27 - Putih Buah 6,00 - -
4 Pasang Lampu Bohlam LED Bulb 10Watt Buah 6,00 - -
Sub Total -
B2 AREA LOBBY
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pemindahan Perabot m² 28,08 - -
2 Pengurugan Menggunakan Bekas Bongkaran m³ 3,07 - -
3 Bongkar Pintu Jendela Aluminium m² 14,70 - -
4 Pasang Pintu Jendela Aluminium + Perbaikan m² 14,70 - -
II PEKERJAAN BETON
1 Pek. Beton Sloof 15/20cm m² 0,67 - -
2 Rabat Beton Tb. 5cm m³ 1,40 - -
IV PEKERJAAN PENGECATAN
1 Pengecatan Dinding Lama + Plat Deck Lama m² 45,42 - -
V PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Buah 3,00 - -
2 Pasang Lampu RMO 2x36 Watt + Kap Housing 59,5x59,5cm Buah 2,00 - -
VI PEKERJAAN SANITAIR
1 Pasang Roof Drain Stainless Buah 2,00 - -
Sub Total -
B3 RUANG LOKER
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pemindahan Perabot m² 18,72 - -
2 Pembongkaran Keramik Eksisting m² 18,72 - -
3 Pembuangan Bekas Bongkaran m³ 0,94 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,56 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 18,72 - -
II PEKERJAAN PASANGAN
1 Pemasangan Dinding Partisi Kalsi Board 3mm + Rangka C 75 m² 28,71 - -
2 Urugan Pasir Tb.3cm m³ 1,68 - -
3 Pemasangan Keramik Lantai 40x40cm - Polished m² 56,16 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
III PEKERJAAN PENGECATAN
1 Pengerokan Cat m² 31,68 - -
2 Pengecatan Dinding Partisi Baru m² 143,55 - -
3 Pengecatan Dinding & Plat Deck Lama m² 52,80 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,84 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 18,72 - -
3 Pemasangan Granite Tile 60x60cm - Unpolished m² 9,36 - -
V PEKERJAAN SANITAIR
1 Pembongkaran + Pemasangan Bak Mandi PVC Baru Buah 1,00 - -
Sub Total -
B6 RUANG PENJAGA
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pembongkaran Keramik Eksisting m² 28,32 - -
2 Pembuangan Bekas Bongkaran m³ 1,42 - -
3 Pembongkaran Pintu Eksisting Unit 1,00 - -
4 Pemindahan Perabot m² 28,32 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,84 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 18,72 - -
3 Pemasangan Granite Tile 60x60cm - Unpolished m² 9,36 - -
V PEKERJAAN SANITAIR
1 Pembongkaran + Pemasangan Bak Mandi PVC Baru Buah 1,00 - -
Sub Total -
B7 GUDANG
I PEKERJAAN PINTU & ALUMINIUM
1 Pasang Daun Pintu Aluminium (P1B) Unit 1,00 - -
2 Pemasangan Engsel Pintu 3 Inch Buah 3,00 - -
3 Pemasangan Handel Pintu Buah 1,00 - -
Sub Total -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
B8 RUANG POMPA, PANEL & JANITOR
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pembongkaran Keramik Eksisting m² 40,50 - -
2 Pembuangan Bekas Bongkaran m³ 2,03 - -
3 Pembongkaran Pintu Eksisting Unit 2,00 - -
4 Pemindahan Perabot m² 40,50 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m³ 40,50 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 37,80 - -
3 Pemasangan Granite Tile 60x60cm - Unpolished m² 2,70 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m³ 0,56 - -
2 Pemasangan Granit Lantai 30x30cm - Unpolished m² 18,72 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Stop Kontak Titik 5,00 - -
2 Pemasangan Stop Kontak Unit 5,00 - -
VI PEKERJAAN SANITAIR
1 Pemasangan Pipa PVC 3 Inch m' 7,00 - -
2 Pemasangan Pipa PVC 3/4 Inch m' 26,00 - -
3 Pasang Kran Stainless Unit 5,00 - -
4 Pasang Floor Drain Unit 5,00 - -
Sub Total -
B10 HALL/RUANG SERBAGUNA
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pembongkaran Keramik Eksisting m² 56,16 - -
2 Pembuangan Bekas Bongkaran m³ 2,81 - -
3 Pembongkaran Pintu Eksisting Unit 1,00 - -
4 Pemindahan Perabot m² 56,16 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 1,68 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 56,16 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,37 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 12,24 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 2,92 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished (Selasar) m² 97,20 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 12,00 - -
2 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 12,00 - -
3 Pasang Saklar Ganda Buah 1,00 - -
II PEKERJAAN PASANGAN
1 Pasang Keramik 40x40cm - Polished m² 120,50 - -
2 Waterproofing/Acian Grouting Permukaan Dinding m² 189,64 - -
Sub Total -
TOTAL B -
C PEKERJAAN LANTAI 2
C1 KAMAR TIDUR 1-6, 8-12
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pemindahan Perabot m² 191,81 - -
2 Pembongkaran Keramik Eksisting m² 191,81 - -
3 Pembuangan Bekas Bongkaran m³ 9,59 - -
4 Pembongkaran Pintu Eksisting Unit 11,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 5,75 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 191,81 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,79 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 26,44 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 15,00 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
4 Bongkar Lampu TL Eksisting Titik 2,00 - -
5 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 2,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m² 0,56 - -
2 Pemasangan Keramik Lantai40x40cm - Unpolished m² 19,65 - -
3 Pemasangan Keramik Dinding 30/60cm m² 16,80 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 16,15 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,20 - -
2 Rabat Beton Tb. 5cm m² 0,33 - -
3 Pasang Badukan Bata Ringan Tb. 10cm - Tinggi 20cm m² 0,15 - -
4 Pemasangan Granit Lantai 30x30cm - Unpolished m² 46,40 - -
5 Waterproofing Lantai Deck Beton m² 43,65 - -
6 Pemasangan Roster 20x20cm m² 2,52 - -
7 Pemasangan Dinding 30/60cm m² 79,58 - -
V PEKERJAAN SANITAIR
1 Pemasangan Kran Stainless 3/4" Unit 4,00 - -
2 Pasang Kran Stainless Tipe V Unit 8,00 - -
3 Pemasangan Pipa Galvanis 3/4 Inch - Air Bersih m' 4,17 - -
4 Pemasangan Pipa PVC AW 3 Inch m' 4,17 - -
5 Pemasangan Pipa PVC AW 4 Inch m' 4,17 - -
6 Pemasangan Handshower Set Dinding - Stainless Buah 4,00 - -
7 Pemasangan Avur Stainless Unit 11,00 - -
8 Bongkar Pasang Closet Jongkok Unit 4,00 - -
Sub Total -
C5 DAPUR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 9,91 - -
2 Pembuangan Bekas Bongkaran m³ 0,50 - -
3 Pembongkaran Pintu Eksisting Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,30 - -
2 Pemasangan Keramik Lantai 40x40cm m² 9,91 - -
3 Pasang Keramik Dinding 30x60cm m² 3,24 - -
4 Pasang Granit Meja Dapur 30x30cm m² 3,04 - -
V PEKERJAAN SANITAIR
1 Pasang Kran Leher Angsa Tembok Fleksibel Buah 1,00 - -
Sub Total -
C6 KORIDOR
I PEKERJAAN PESIAPAN & BONGKARAN
1 Pembongkaran Keramik Eksisting m² 101,40 - -
2 Pembuangan Bekas Bongkaran m³ 5,07 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 3,04 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished (Selasar) m² 101,40 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 16,00 - -
2 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 16,00 - -
3 Pasang Box Panel Indoor 60x40x20 Plat 1,2mm - Pilot lamp RST Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m² 0,11 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 3,83 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 5,75 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 191,81 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 55,00 - -
2 Pasang Kabel Duct 20x10mm m' 177,60 - -
3 Pasang Stop Kontak Outbow Buah 55,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,79 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 26,44 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 15,00 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
4 Bongkar Lampu TL Eksisting Titik 2,00 - -
5 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 2,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m² 0,56 - -
2 Pemasangan Keramik Lantai40x40cm - Unpolished m² 19,65 - -
3 Pemasangan Keramik Dinding 30/60cm m² 16,80 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 16,15 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,20 - -
2 Rabat Beton Tb. 5cm m² 0,33 - -
3 Pasang Badukan Bata Ringan Tb. 10cm - Tinggi 20cm m² 0,15 - -
4 Pemasangan Granit Lantai 30x30cm - Unpolished m² 46,40 - -
5 Waterproofing Lantai Deck Beton m² 43,65 - -
6 Pemasangan Roster 20x20cm m² 2,52 - -
7 Pemasangan Dinding 30/60cm m² 79,58 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
III PEKERJAAN PENGECATAN
1 Pengerokan Cat m² 129,25 - -
2 Pengecatan Dinding & Plat Deck Lama m² 129,25 - -
V PEKERJAAN SANITAIR
1 Pemasangan Kran Stainless 3/4" Unit 4,00 - -
2 Pasang Kran Stainless Tipe V Unit 8,00 - -
3 Pemasangan Pipa Galvanis 3/4 Inch - Air Bersih m' 4,17 - -
4 Pemasangan Pipa PVC AW 3 Inch m' 4,17 - -
5 Pemasangan Pipa PVC AW 4 Inch m' 4,17 - -
6 Pemasangan Handshower Set Dinding - Stainless Buah 4,00 - -
7 Pemasangan Avur Stainless Unit 11,00 - -
8 Bongkar Pasang Closet Jongkok Unit 4,00 - -
Sub Total -
D5 DAPUR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 9,91 - -
2 Pembuangan Bekas Bongkaran m³ 0,50 - -
3 Pembongkaran Pintu Eksisting Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,30 - -
2 Pemasangan Keramik Lantai 40x40cm m² 9,91 - -
3 Pasang Keramik Dinding 30x60cm m² 3,24 - -
4 Pasang Granit Meja Dapur 30x30cm m² 3,04 - -
V PEKERJAAN SANITAIR
1 Pasang Kran Leher Angsa Tembok Fleksibel Buah 1,00 - -
Sub Total -
D6 KORIDOR
I PEKERJAAN PESIAPAN & BONGKARAN
1 Pembongkaran Keramik Eksisting m² 101,40 - -
2 Pembuangan Bekas Bongkaran m³ 5,07 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 3,04 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished (Selasar) m² 101,40 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 16,00 - -
2 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 16,00 - -
3 Pasang Box Panel Indoor 60x40x20 Plat 1,2mm - Pilot lamp RST Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m² 0,11 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 3,83 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 5,75 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 191,81 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 55,00 - -
2 Pasang Kabel Duct 20x10mm m' 177,60 - -
3 Pasang Stop Kontak Outbow Buah 55,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,79 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 26,44 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 15,00 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
4 Bongkar Lampu TL Eksisting Titik 2,00 - -
5 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 2,00 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m² 0,56 - -
2 Pemasangan Keramik Lantai40x40cm - Unpolished m² 19,65 - -
3 Pemasangan Keramik Dinding 30/60cm m² 16,80 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 16,15 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,20 - -
2 Rabat Beton Tb. 5cm m² 0,33 - -
3 Pasang Badukan Bata Ringan Tb. 10cm - Tinggi 20cm m² 0,15 - -
4 Pemasangan Granit Lantai 30x30cm - Unpolished m² 46,40 - -
5 Waterproofing Lantai Deck Beton m² 43,65 - -
6 Pemasangan Roster 20x20cm m² 2,52 - -
7 Pemasangan Dinding 30/60cm m² 79,58 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,30 - -
2 Pemasangan Keramik Lantai 40x40cm m² 9,91 - -
3 Pasang Keramik Dinding 30x60cm m² 3,24 - -
4 Pasang Granit Meja Dapur 30x30cm m² 3,04 - -
V PEKERJAAN SANITAIR
1 Pasang Kran Leher Angsa Tembok Fleksibel Buah 1,00 - -
Sub Total -
E6 KORIDOR
I PEKERJAAN PESIAPAN & BONGKARAN
1 Pembongkaran Keramik Eksisting m² 101,40 - -
2 Pembuangan Bekas Bongkaran m³ 5,07 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 3,04 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished (Selasar) m² 101,40 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 16,00 - -
2 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 16,00 - -
3 Pasang Box Panel Indoor 60x40x20 Plat 1,2mm - Pilot lamp RST Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m² 0,11 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 3,83 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
III PEKERJAAN PENGECATAN
1 Pengerokan Cat m² 37,93 - -
2 Pengecatan Dinding & Plat Deck Lama m² 94,83 - -
3 Pengecatan Plat Tangga m² 21,61 - -
4 Perbaikan + Pengecatan Railling Tangga m' 5,80 - -
Sub Total -
TOTAL E -
F PEKERJAAN LANTAI 5
F1 KAMAR TIDUR 1-6, 8-12
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pemindahan Perabot m² 191,81 - -
2 Pembongkaran Keramik Eksisting m² 191,81 - -
3 Pembongkaran Plafon Eksisting + Rangka m² 205,92 - -
4 Pembuangan Bekas Bongkaran m³ 17,83 - -
5 Pembongkaran Pintu Eksisting Unit 11,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 5,75 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 191,81 - -
3 Pasang Rangka Plafon Hollow 20x40mm m² 205,92 - -
4 Pasang Plafon Kalsiboard Tb. 3mm m² 205,92 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 55,00 - -
2 Pasang Kabel Duct 20x10mm m' 177,60 - -
3 Pasang Stop Kontak Outbow Buah 55,00 - -
4 Bongkar + Pasang Lampu Eksisting Titik 2,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,79 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 26,44 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 15,00 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
4 Bongkar Lampu TL Eksisting Titik 2,00 - -
5 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 2,00 - -
6 Bongkar + Pasang Lampu Eksisting Titik 3,00 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
VI PEKERJAAN AKSESORIS DAN LAIN-LAIN
1 Pengerokan Stiker Kaca/Sandblast Eksisting m² 3,24 - -
2 Pasang Stiker Kaca/Sandblast Polos (Buram) m² 3,24 - -
Sub Total -
F3 KAMAR TIDUR 7
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pemindahan Perabot m² 18,72 - -
2 Pembongkaran Keramik Eksisting m² 18,72 - -
3 Pembongkaran Plafon Eksisting + Rangka m² 18,72 - -
4 Pembuangan Bekas Bongkaran m³ 0,94 - -
5 Pembongkaran Pintu Eksisting Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m² 0,56 - -
2 Pemasangan Keramik Lantai40x40cm - Unpolished m² 19,65 - -
3 Pemasangan Keramik Dinding 30/60cm m² 16,80 - -
4 Pasang Rangka Plafon Hollow 20x40mm m² 18,72 - -
5 Pasang Plafon Kalsiboard Tb. 3mm m² 18,72 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 16,15 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
4 Bongkar + Pasang Lampu Eksisting Titik 2,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,20 - -
2 Rabat Beton Tb. 5cm m² 0,33 - -
3 Pasang Badukan Bata Ringan Tb. 10cm - Tinggi 20cm m² 0,15 - -
4 Pemasangan Granit Lantai 30x30cm - Unpolished m² 46,40 - -
5 Waterproofing Lantai Deck Beton m² 43,65 - -
6 Pemasangan Roster 20x20cm m² 2,52 - -
7 Pemasangan Dinding 30/60cm m² 79,58 - -
8 Pasang Rangka Plafon Hollow 20x40mm m² 21,60 - -
9 Pasang Plafon Kalsiboard Tb. 3mm m² 21,60 - -
V PEKERJAAN SANITAIR
1 Pemasangan Kran Stainless 3/4" Unit 4,00 - -
2 Pasang Kran Stainless Tipe V Unit 8,00 - -
3 Pemasangan Pipa Galvanis 3/4 Inch - Air Bersih m' 4,17 - -
4 Pemasangan Pipa PVC AW 3 Inch m' 4,17 - -
5 Pemasangan Pipa PVC AW 4 Inch m' 4,17 - -
6 Pemasangan Handshower Set Dinding - Stainless Buah 4,00 - -
7 Pemasangan Avur Stainless Unit 11,00 - -
8 Bongkar Pasang Closet Jongkok Unit 4,00 - -
VI PEKERJAAN ELEKTRIKAL
1 Bongkar + Pasang Lampu Eksisting Titik 3,00 - -
Sub Total -
F5 DAPUR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 9,91 - -
2 Pembongkaran Plafon Eksisting + Rangka m² 9,91 - -
3 Pembuangan Bekas Bongkaran m³ 0,89 - -
4 Pembongkaran Pintu Eksisting Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,30 - -
2 Pemasangan Keramik Lantai 40x40cm m² 9,91 - -
3 Pasang Keramik Dinding 30x60cm m² 3,24 - -
4 Pasang Granit Meja Dapur 30x30cm m² 3,04 - -
3 Pasang Rangka Plafon Hollow 20x40mm m² 9,91 - -
4 Pasang Plafon Kalsiboard Tb. 3mm m² 9,91 - -
V PEKERJAAN SANITAIR
1 Pasang Kran Leher Angsa Tembok Fleksibel Buah 1,00 - -
VI PEKERJAAN ELEKTRIKAL
1 Bongkar + Pasang Lampu Eksisting Titik 2,00 - -
Sub Total -
F6 KORIDOR
I PEKERJAAN PESIAPAN & BONGKARAN
1 Pembongkaran Keramik Eksisting m² 101,40 - -
2 Pembuangan Bekas Bongkaran m³ 5,07 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 3,04 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished (Selasar) m² 101,40 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 16,00 - -
2 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 16,00 - -
3 Pasang Box Panel Indoor 60x40x20 Plat 1,2mm - Pilot lamp RST Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m² 0,11 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 3,83 - -
3 Pasang Rangka Plafon Hollow 20x40mm m² 12,24 - -
4 Pasang Plafon Kalsiboard Tb. 3mm m² 12,24 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar + Pasang Lampu Eksisting Titik 2,00 - -
Sub Total -
TOTAL F -
G PEKERJAAN LANTAI ATAP
I PEKERJAAN BONGKARAN & PERSIAPAN
1 Pengerokan & Pembersihan Lumut Dipermukaan Beton m² 194,40 - -
2 Bongkar Penutup Atap Canopi Eksisitng m² 72,75 - -
Sub Total -
II PEKERJAAN PASANGAN
1 Pekerjaan Plesteran Tb. 3cm m² 277,71 - -
2 Waterproofing/Acian Grouting Lantai Deck Beton m² 277,71 - -
3 Pasang Rangka Plafon Hollow 20x40mm m² 82,32 - -
4 Pasang Plafon Kalsiboard Tb. 3mm m² 82,32 - -
5 Pasang Rollag Bata Ringan Tb. 10cm - Dudukan Tandon m³ 2,66 - -
6 Pek. Plesteran 1ps : 3pp Tb. 15mm m² 9,12 - -
7 Pek. Acian m² 9,12 - -
8 Bongkar + Pasang Rangka Atap Canopi (Pipa Stainless 2 1/2 Inch) T=70cm Titik 14,00 - -
9 Pasang Polycarbonate Clear Atap Tinggi 70 cm + Rangka Hollow 40x40mm m² 25,27 - -
10 Pasang Atap Polycarbonate Clear Canopi Void m² 72,75 - -
Sub Total -
III PEKERJAAN BETON
1 Pek. Beton Kolom 20/20cm m³ 0,08 - -
2 Pek. Plat Beton Tb. 10cm m³ 1,08 - -
3 Pek. Beton Chemical Titik 16,00 - -
Sub Total -
IV PEKERJAAN SANITAIR
1 Bongkar Pasang Tandon Air PVC Unit 3,00 - -
2 Pasangag Roof Drain Stainless Buah 24,00 - -
3 Pasang Tutup Shaff - Plat Bordes 2mm m² 0,90 - -
Sub Total -
V PEKERJAAN ATAP
1 Bongkar Atap Metal Pasir Eksisting m² 5,00 - -
2 Pasang Atap Metal Pasir - Merah m² 5,00 - -
Sub Total -
TOTAL G -
H PEKERJAAN EKSTERIOR & FASAD
I PEKERJAAN PASANGAN
1 Bongkar Batu Prasasti Buah 1,00 - -
2 Pasang Keramik Dinding 60x120cm - Motif Marble (Putih) m² 18,90 - -
Sub Total -
II PEKERJAAN ALUMINIUM
1 Pasang Aluminium Composite Panel (ACP) - Cover Canopi Teras m² 34,81 - -
Sub Total -
III PEKERJAAN LETTER TEXT & LOGO
1 Pasang Neon Logo UINSA Tinggi 50cm t/cm' 50,00 - -
2 Pasang Neon Letter Text Acrylic (MA'HAD PUTRI) Tinggi 30cm t/cm' 250,00 - -
3 Pasang Neon Letter Text Acrylic (UIN SUNAN AMPEL SURABAYA) Tinggi 14cm t/cm' 210,00 - -
Sub Total -
IV PEKERJAAN SANITAIR/DRAINASE
1 Bongkar Paving Eksisting m² 12,80 - -
2 Pasang Kembali Paving Eksisting m² 10,35 - -
3 Galian Tanah Biasa m³ 14,80 - -
4 Pengurugan Tanah Bekas Galian m³ 13,20 - -
5 Pasang Bak Kontrol Bata Ringan Tb. 10cm + Fin. Plesteran & Acian Unit 5,00 - -
6 Pasang Beton Cover Bak Kontrol Tb. 10cm Unit 5,00 - -
7 Pasang Pipa PVC AW 6 Inch - Pembuangan Ke Saluran m' 32,00 - -
8 Pasang Pipa PVC AW 4 Inch - Sambungan Pipa Air hujan m' 12,00 - -
9 Pasang Elbow PVC D 4 Inch Buah 8,00 - -
Sub Total -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Lampu + Pipa Sparing PVC 5/8" Titik 4,00 - -
2 Instalasi Neon Text + Pipa Sparing PVC 5/8" Titik 1,00 - -
3 Instalasi Titik Saklar Titik 1,00 - -
4 Pasang Lampu Taman Standing 80cm (Fitting E27) + Bohlam LED 5Watt Buah 4,00 - -
5 Pasang Saklar Ganda Buah 1,00 - -
Sub Total -
TOTAL H -
JUMLAH -
PPN 11 % -
TOTAL -
KEMENTERIAN AGAMA REPLUBIK INDONESIA
UNIVERSITAS ISLAM NEGERI SUNAN AMPEL SURABAYA
Jl. A. Yani 117 Surabaya 60237 Telp. 031-8410298
Fax.: (031) 8413300, Website : www.uinsby.ac.id E-mail: dpu@gresikkab.go.id
E Personel K3 Konstruksi :
i Petugas K3 Konstruksi ob 4,00 - -
II PEKERJAAN BETON
1 Lantai Kerja Tb. 5cm m³ 0,08 - -
2 Pek. Beton Sloof 15/20cm m³ 0,45 - -
3 Rabat Beton Tb. 5cm m³ 1,76 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
III PEKERJAAN PASANGAN
1 Pasang Rollag Bata Ringan - Sisi Ramp m³ 0,22 - -
2 Pasang Dinding Bata Ringan Tb. 10cm - Cover Kolom m² 7,08 - -
3 Pek. Plesteran 1ps : 3pp Tb. 15mm m² 14,16 - -
4 Pek. Acian m² 14,16 - -
5 Urugan Pasir Tb. 10cm - Bawah Granit m³ 3,51 - -
6 Pasang Granite Tile 60x60cm - Polished m² 31,30 - -
7 Pasang Granite Tile 60x60cm - Unpolished m² 3,80 - -
8 Pekerjaan Rangka Plafon Hollow 20x40cm m² 10,90 - -
9 Pemasangan Plafon Kalsiboard Tb. 3mm m² 10,90 - -
10 Pek. Plesteran 1ps : 3pp Tb. 3cm - Deck Beton Kanopi Teras m² 0,53 - -
11 Waterproofing/Acian Grouting Lantai Deck Beton Kanopi Teras m² 17,55 - -
12 Pasang Granit Tile 30/30cm Motif Batu Alam m² 9,11 - -
13 Pengerokan & Pembersihan Lumut Dipermukaan Beton m² 17,55 - -
IV PEKERJAAN PENGECATAN
1 Pengecatan Plafon Kalsiboard m² 10,90 - -
2 Pengecatan Dinding Baru - Cover Kolom m² 14,16 - -
V PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 2,00 - -
2 Instalasi Titik Lampu Titik 6,00 - -
3 Pasang Kap Downlight 5" Fittiing E27 - Putih Buah 6,00 - -
4 Pasang Lampu Bohlam LED Bulb 10Watt Buah 6,00 - -
VI PEKERJAAN SANITAIR
1 Pasang Roof Drain Stainless Buah 2,00 - -
Sub Total -
B2 AREA LOBBY
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pemindahan Perabot m² 28,08 - -
2 Pengurugan Menggunakan Bekas Bongkaran m² 3,07 - -
3 Bongkar Pintu Jendela Aluminium m² 14,70 - -
4 Pasang Pintu Jendela Aluminium + Perbaikan m² 14,70 - -
II PEKERJAAN BETON
1 Pek. Beton Sloof 15/20cm m² 0,67 - -
2 Rabat Beton Tb. 5cm m³ 1,40 - -
IV PEKERJAAN PENGECATAN
1 Pengecatan Dinding Lama + Plat Deck Lama m² 45,42 - -
V PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Buah 3,00 - -
2 Pasang Lampu RMO 2x36 Watt + Kap Housing 59,5x59,5cm Buah 2,00 - -
Sub Total -
B3 RUANG LOKER
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pemindahan Perabot m² 18,72 - -
2 Pembongkaran Keramik Eksisting m² 18,72 - -
3 Pembuangan Bekas Bongkaran m³ 0,94 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,56 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 18,72 - -
II PEKERJAAN PASANGAN
1 Pemasangan Dinding Partisi Kalsi Board 3mm (Exclude Rangka) m² 1,00 - -
2 Urugan Pasir Tb.3cm m³ 1,68 - -
3 Pemasangan Keramik Lantai 40x40cm - Polished m² 56,16 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
III PEKERJAAN PENGECATAN
1 Pengerokan Cat m² 52,82 - -
2 Pengecatan Dinding Partisi Baru m² 1,00 - -
3 Pengecatan Dinding & Plat Deck Lama m² 88,04 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,84 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 18,72 - -
3 Pemasangan Granite Tile 60x60cm - Unpolished m² 9,36 - -
V PEKERJAAN SANITAIR
1 Pembongkaran + Pemasangan Bak Mandi PVC Baru Buah 1,00 - -
Sub Total -
B6 RUANG PENJAGA
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pembongkaran Keramik Eksisting m² 28,32 - -
2 Pembuangan Bekas Bongkaran m³ 1,42 - -
3 Pembongkaran Daun Pintu Eksisting Unit 3,00 - -
4 Pemindahan Perabot m² 28,32 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,84 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 18,72 - -
3 Pemasangan Granite Tile 60x60cm - Unpolished m² 9,36 - -
V PEKERJAAN SANITAIR
1 Pembongkaran + Pemasangan Bak Mandi PVC Baru Buah 1,00 - -
Sub Total -
B7 GUDANG
I PEKERJAAN PINTU & ALUMINIUM
1 Pasang Daun Pintu Aluminium (P1B) Unit 1,00 - -
2 Pemasangan Engsel Pintu 3 Inch Buah 3,00 - -
3 Pemasangan Handel Pintu Buah 1,00 - -
Sub Total -
B8 RUANG POMPA, PANEL & JANITOR
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pembongkaran Keramik Eksisting m² 40,50 - -
2 Pembuangan Bekas Bongkaran m³ 2,03 - -
3 Pembongkaran Pintu Eksisting Unit 2,00 - -
4 Pemindahan Perabot m² 40,50 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m³ 40,50 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 37,80 - -
3 Pemasangan Granite Tile 60x60cm - Unpolished m² 2,70 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m³ 0,56 - -
2 Pemasangan Granit Lantai 30x30cm - Unpolished m² 18,72 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Stop Kontak Titik 5,00 - -
2 Pemasangan Stop Kontak Unit 5,00 - -
VI PEKERJAAN SANITAIR
1 Pemasangan Pipa PVC 3 Inch - Air Bekas m' 7,00 - -
2 Pemasangan Pipa PVC 3/4 Inch - Air Bersih m' 26,00 - -
3 Pasang Kran Stainless Unit 5,00 - -
4 Pasang Floor Drain Unit 5,00 - -
Sub Total -
B10 HALL/RUANG SERBAGUNA
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pembongkaran Keramik Eksisting m² 56,16 - -
2 Pembuangan Bekas Bongkaran m³ 2,81 - -
3 Pembongkaran Pintu Eksisting Unit 1,00 - -
4 Pemindahan Perabot m² 56,16 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 1,68 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 56,16 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 2,92 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished (Selasar) m² 97,20 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 12,00 - -
2 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 12,00 - -
3 Pasang Saklar Ganda Buah 1,00 - -
II PEKERJAAN PASANGAN
1 Pasang Keramik 40x40cm - Polished m² 120,50 - -
2 Waterproofing/Acian Grouting Permukaan Dinding m² 189,64 - -
Sub Total -
TOTAL B -
C PEKERJAAN LANTAI 2
C1 KAMAR TIDUR 1-6, 8-12
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pemindahan Perabot m² 191,81 - -
2 Pembongkaran Keramik Eksisting m² 191,81 - -
3 Pembuangan Bekas Bongkaran m³ 9,59 - -
4 Pembongkaran Pintu Eksisting Unit 11,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 5,75 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 191,81 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 55,00 - -
2 Pasang Kabel Duct 20x10mm m' 177,60 - -
3 Pasang Stop Kontak Outbow Buah 55,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,79 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 26,44 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 15,00 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
4 Bongkar Lampu TL Eksisting Titik 2,00 - -
5 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 2,00 - -
-
VI PEKERJAAN AKSESORIS DAN LAIN-LAIN -
1 Pengerokan Stiker Kaca/Sandblast Eksisting m² 3,24 - -
2 Pasang Stiker Kaca/Sandblast Polos (Buram) m² 3,24 - -
Sub Total -
C3 KAMAR TIDUR 7
I PEKERJAAN PERSIAPAN & BONGKARAN
1 Pemindahan Perabot m² 18,72 - -
2 Pembongkaran Keramik Eksisting m² 18,72 - -
3 Pembuangan Bekas Bongkaran m³ 0,94 - -
4 Pembongkaran Pintu Eksisting Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m² 0,56 - -
2 Pemasangan Keramik Lantai40x40cm - Unpolished m² 19,65 - -
3 Pemasangan Keramik Dinding 30/60cm m² 16,80 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 16,15 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
V PEKERJAAN SANITAIR
1 Pemasangan Kran Stainless 3/4" Unit 4,00 - -
2 Pasang Kran Stainless Tipe V Unit 8,00 - -
3 Pemasangan Pipa Galvanis 3/4 Inch - Air Bersih m' 4,17 - -
4 Pemasangan Pipa PVC AW 3 Inch m' 4,17 - -
5 Pemasangan Pipa PVC AW 4 Inch m' 4,17 - -
6 Pemasangan Handshower Set Dinding - Stainless Buah 4,00 - -
7 Pemasangan Avur Stainless Unit 11,00 - -
8 Bongkar Pasang Closet Jongkok Unit 4,00 - -
Sub Total -
C5 DAPUR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 9,91 - -
2 Pembuangan Bekas Bongkaran m³ 0,50 - -
3 Pembongkaran Pintu Eksisting Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,30 - -
2 Pemasangan Keramik Lantai 40x40cm m² 9,91 - -
3 Pasang Keramik Dinding 30x60cm m² 3,24 - -
4 Pasang Granit Meja Dapur 30x30cm m² 3,04 - -
V PEKERJAAN SANITAIR
1 Pasang Kran Leher Angsa Tembok Fleksibel Buah 1,00 - -
Sub Total -
C6 KORIDOR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 100,32 - -
2 Pembuangan Bekas Bongkaran m³ 5,02 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 3,01 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished (Selasar) m² 100,32 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 16,00 - -
2 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 16,00 - -
3 Pasang Box Panel Indoor 60x40x20 Plat 1,2mm - Pilot lamp RST Unit 1,00 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
V PEKERJAAN AKSESORIS DAN LAIN-LAIN
1 Pasang Signage/No. Kamar - Acrilyc 3mm Buah 14,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m² 0,11 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 3,83 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 5,75 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 191,81 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 55,00 - -
2 Pasang Kabel Duct 20x10mm m' 177,60 - -
3 Pasang Stop Kontak Outbow Buah 55,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,79 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 26,44 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m² 0,56 - -
2 Pemasangan Keramik Lantai40x40cm - Unpolished m² 19,65 - -
3 Pemasangan Keramik Dinding 30/60cm m² 16,80 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 16,15 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,20 - -
2 Rabat Beton Tb. 5cm m² 0,33 - -
3 Pasang Badukan Bata Ringan Tb. 10cm - Tinggi 20cm m² 0,15 - -
4 Pemasangan Granit Lantai 30x30cm - Unpolished m² 46,40 - -
5 Waterproofing Lantai Deck Beton m² 43,65 - -
6 Pemasangan Roster 20x20cm m² 2,52 - -
7 Pemasangan Keramik Dinding 30/60cm - Tempat Cuci m² 79,58 - -
V PEKERJAAN SANITAIR
1 Pemasangan Kran Stainless 3/4" Unit 4,00 - -
2 Pasang Kran Stainless Tipe V Unit 8,00 - -
3 Pemasangan Pipa Galvanis 3/4 Inch - Air Bersih m' 4,17 - -
4 Pemasangan Pipa PVC AW 3 Inch m' 4,17 - -
5 Pemasangan Pipa PVC AW 4 Inch m' 4,17 - -
6 Pemasangan Handshower Set Dinding - Stainless Buah 4,00 - -
7 Pemasangan Avur Stainless Unit 11,00 - -
8 Bongkar Pasang Closet Jongkok Unit 4,00 - -
Sub Total -
D5 DAPUR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 9,91 - -
2 Pembuangan Bekas Bongkaran m³ 0,50 - -
3 Pembongkaran Pintu Eksisting Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,30 - -
2 Pemasangan Keramik Lantai 40x40cm m² 9,91 - -
3 Pasang Keramik Dinding 30x60cm m² 3,24 - -
4 Pasang Granit Meja Dapur 30x30cm m² 3,04 - -
V PEKERJAAN SANITAIR
1 Pasang Kran Leher Angsa Tembok Fleksibel Buah 1,00 - -
Sub Total -
D6 KORIDOR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 100,32 - -
2 Pembuangan Bekas Bongkaran m³ 5,02 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 3,01 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished (Selasar) m² 100,32 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 16,00 - -
2 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 16,00 - -
3 Pasang Box Panel Indoor 60x40x20 Plat 1,2mm - Pilot lamp RST Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m² 0,11 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 3,83 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 5,75 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 191,81 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 55,00 - -
2 Pasang Kabel Duct 20x10mm m' 177,60 - -
3 Pasang Stop Kontak Outbow Buah 55,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,79 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 26,44 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 15,00 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
4 Bongkar Lampu TL Eksisting Titik 2,00 - -
5 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 2,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m² 0,56 - -
2 Pemasangan Keramik Lantai40x40cm - Unpolished m² 19,65 - -
3 Pemasangan Keramik Dinding 30/60cm m² 16,80 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 16,15 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,20 - -
2 Rabat Beton Tb. 5cm m² 0,33 - -
3 Pasang Badukan Bata Ringan Tb. 10cm - Tinggi 20cm m² 0,15 - -
4 Pemasangan Granit Lantai 30x30cm - Unpolished m² 46,40 - -
5 Waterproofing Lantai Deck Beton m² 43,65 - -
6 Pemasangan Roster 20x20cm m² 2,52 - -
7 Pemasangan Keramik Dinding 30/60cm - Tempat Cuci m² 79,58 - -
V PEKERJAAN SANITAIR
1 Pemasangan Kran Stainless 3/4" Unit 4,00 - -
2 Pasang Kran Stainless Tipe V Unit 8,00 - -
3 Pemasangan Pipa Galvanis 3/4 Inch - Air Bersih m' 4,17 - -
4 Pemasangan Pipa PVC AW 3 Inch m' 4,17 - -
5 Pemasangan Pipa PVC AW 4 Inch m' 4,17 - -
6 Pemasangan Handshower Set Dinding - Stainless Buah 4,00 - -
7 Pemasangan Avur Stainless Unit 11,00 - -
8 Bongkar Pasang Closet Jongkok Unit 4,00 - -
Sub Total -
E5 DAPUR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 9,91 - -
2 Pembuangan Bekas Bongkaran m³ 0,50 - -
3 Pembongkaran Pintu Eksisting Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,30 - -
2 Pemasangan Keramik Lantai 40x40cm m² 9,91 - -
3 Pasang Keramik Dinding 30x60cm m² 3,24 - -
4 Pasang Granit Meja Dapur 30x30cm m² 3,04 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
III PEKERJAAN PENGECATAN
1 Pengerokan Cat m² 6,78 - -
2 Pengecatan Dinding & Plat Deck Lama m² 42,36 - -
V PEKERJAAN SANITAIR
1 Pasang Kran Leher Angsa Tembok Fleksibel Buah 1,00 - -
Sub Total -
E6 KORIDOR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 100,32 - -
2 Pembuangan Bekas Bongkaran m³ 5,02 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 3,01 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished (Selasar) m² 100,32 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 16,00 - -
2 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 16,00 - -
3 Pasang Box Panel Indoor 60x40x20 Plat 1,2mm - Pilot lamp RST Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m² 0,11 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 3,83 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 5,75 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 191,81 - -
3 Pasang Rangka Plafon Hollow 20x40mm m² 205,92 - -
4 Pasang Plafon Kalsiboard Tb. 3mm m² 205,92 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 55,00 - -
2 Pasang Kabel Duct 20x10mm m' 177,60 - -
3 Pasang Stop Kontak Outbow Buah 55,00 - -
4 Bongkar + Pasang Lampu Eksisting Titik 22,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,79 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 26,44 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 15,00 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
4 Bongkar Lampu TL Eksisting Titik 2,00 - -
5 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 2,00 - -
6 Bongkar + Pasang Lampu Eksisting Titik 3,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb. 3cm m² 0,56 - -
2 Pemasangan Keramik Lantai40x40cm - Unpolished m² 19,65 - -
3 Pemasangan Keramik Dinding 30/60cm m² 16,80 - -
4 Pasang Rangka Plafon Hollow 20x40mm m² 18,72 - -
5 Pasang Plafon Kalsiboard Tb. 3mm m² 18,72 - -
V PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Stop Kontak Titik 5,00 - -
2 Pasang Kabel Duct 20x10mm m' 16,15 - -
3 Pasang Stop Kontak Outbow Buah 5,00 - -
4 Bongkar + Pasang Lampu Eksisting Titik 2,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,20 - -
2 Rabat Beton Tb. 5cm m² 0,33 - -
3 Pasang Badukan Bata Ringan Tb. 10cm - Tinggi 20cm m² 0,15 - -
4 Pemasangan Granit Lantai 30x30cm - Unpolished m² 46,40 - -
5 Waterproofing Lantai Deck Beton m² 43,65 - -
6 Pemasangan Roster 20x20cm m² 2,52 - -
7 Pemasangan Keramik Dinding 30/60cm - Tempat Cuci m² 79,58 - -
8 Pasang Rangka Plafon Hollow 20x40mm m² 21,60 - -
9 Pasang Plafon Kalsiboard Tb. 3mm m² 21,60 - -
V PEKERJAAN SANITAIR
1 Pemasangan Kran Stainless 3/4" Unit 4,00 - -
2 Pasang Kran Stainless Tipe V Unit 8,00 - -
3 Pemasangan Pipa Galvanis 3/4 Inch - Air Bersih m' 4,17 - -
4 Pemasangan Pipa PVC AW 3 Inch m' 4,17 - -
5 Pemasangan Pipa PVC AW 4 Inch m' 4,17 - -
6 Pemasangan Handshower Set Dinding - Stainless Buah 4,00 - -
7 Pemasangan Avur Stainless Unit 11,00 - -
8 Bongkar Pasang Closet Jongkok Unit 4,00 - -
VI PEKERJAAN ELEKTRIKAL
1 Bongkar + Pasang Lampu Eksisting Titik 3,00 - -
Sub Total -
F5 DAPUR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 9,91 - -
2 Pembongkaran Plafon Eksisting + Rangka m² 9,91 - -
3 Pembuangan Bekas Bongkaran m³ 0,89 - -
4 Pembongkaran Pintu Eksisting Unit 1,00 - -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 0,30 - -
2 Pemasangan Keramik Lantai 40x40cm m² 9,91 - -
3 Pasang Keramik Dinding 30x60cm m² 3,24 - -
4 Pasang Granit Meja Dapur 30x30cm m² 3,04 - -
3 Pasang Rangka Plafon Hollow 20x40mm m² 9,91 - -
4 Pasang Plafon Kalsiboard Tb. 3mm m² 9,91 - -
V PEKERJAAN SANITAIR
1 Pasang Kran Leher Angsa Tembok Fleksibel Buah 1,00 - -
VI PEKERJAAN ELEKTRIKAL
1 Bongkar + Pasang Lampu Eksisting Titik 2,00 - -
Sub Total -
F6 KORIDOR
I PEKERJAAN BONGKARAN
1 Pembongkaran Keramik Eksisting m² 100,32 - -
2 Pembuangan Bekas Bongkaran m³ 5,02 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m³ 3,01 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished (Selasar) m² 100,32 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu TL Eksisting Titik 16,00 - -
2 Pasang Lampu Bohlam LED Bulb 10 Watt + Fitting Lampu Buah 16,00 - -
3 Pasang Box Panel Indoor 60x40x20 Plat 1,2mm - Pilot lamp RST Unit 1,00 - -
II PEKERJAAN PASANGAN
1 Urugan Pasir Tb.3cm m² 0,11 - -
2 Pemasangan Keramik Lantai 40x40cm - Polished m² 3,83 - -
3 Pasang Rangka Plafon Hollow 20x40mm m² 12,24 - -
4 Pasang Plafon Kalsiboard Tb. 3mm m² 12,24 - -
IV PEKERJAAN ELEKTRIKAL
1 Bongkar + Pasang Lampu Eksisting Titik 2,00 - -
Sub Total -
TOTAL F -
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
G PEKERJAAN LANTAI ATAP
I PEKERJAAN BONGKARAN & PERSIAPAN
1 Pengerokan & Pembersihan Lumut Dipermukaan Beton m² 194,40 - -
Sub Total -
II PEKERJAAN PASANGAN
1 Pekerjaan Plesteran Tb. 3cm m² 277,71 - -
2 Waterproofing/Acian Grouting Lantai Deck Beton m² 277,71 - -
3 Pasang Rangka Plafon Hollow 20x40mm m² 82,32 - -
4 Pasang Plafon Kalsiboard Tb. 3mm m² 82,32 - -
5 Bongkar + Pasang Rangka Atap Canopi (Pipa Stainless 2 1/2 Inch) T=70cm Titik 14,00 - -
6 Pasang Polycarbonate Clear Atap Tinggi 70 cm + Rangka Hollow 40x4mm m² 25,27 - -
Sub Total -
III PEKERJAAN SANITAIR
1 Pasang Roof Drain Stainless Buah 24,00 - -
2 Pasang Tutup Shaff - Plat Bordes 2mm m² 0,90 - -
Sub Total -
IV PEKERJAAN ATAP
1 Bongkar Atap Metal Pasir Eksisting m² 5,00 - -
2 Pasang Atap Metal Pasir - Merah m² 5,00 - -
Sub Total -
TOTAL G -
H PEKERJAAN EKSTERIOR & FASAD
I PEKERJAAN PASANGAN
1 Bongkar Batu Prasasti Buah 1,00 - -
2 Pasang Keramik Dinding 60x120cm - Motif Marble (Putih) m² 18,90 - -
Sub Total -
II PEKERJAAN ALUMINIUM
1 Pasang Aluminium Composite Panel (ACP) - Cover Canopi Teras m² 34,81 - -
Sub Total -
III PEKERJAAN LETTER TEXT & LOGO
1 Pasang Neon Logo UINSA Tinggi 50cm t/cm' 50,00 - -
2 Pasang Neon Letter Text Acrylic (MA'HAD PUTRA) Tinggi 30cm t/cm' 250,00 - -
3 Pasang Neon Letter Text Acrylic (UIN SUNAN AMPEL SURABAYA) Tinggi 14cm t/cm' 210,00 - -
Sub Total -
IV PEKERJAAN ELEKTRIKAL
1 Instalasi Titik Lampu + Pipa Sparing PVC 5/8" Titik 4,00 - -
2 Instalasi Neon Text + Pipa Sparing PVC 5/8" Titik 1,00 - -
3 Instalasi Titik Saklar Titik 1,00 - -
4 Pasang Lampu Taman Standing 80cm (Fitting E27) + Bohlam LED 5Watt Buah 4,00 - -
5 Pasang Saklar Ganda Buah 1,00 - -
Sub Total -
TOTAL H -
JUMLAH -
PPN 11 % -
TOTAL -