Anda di halaman 1dari 44

PEMERINTAH PROVINSI KALIMANTAN UTARA DINAS PEKERJAAN UMUM

KAWASAN PERMUKIMAN

HARGA SATUAN POKOK KEGIATAN BIDANG KE


PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

HARGA SATUAN DASAR (BAS


DAN PERALATAN
DAFTAR ISI
HARGA SATUAN DASAR (BASIC P
NO

A
B
C
D

A
B

harga satuan pokok k


PROVINSI KALIMANTAN UTA
HARGA SATUAN DASAR
PEMERINTAH PROVINSI KALIMANTAN UTARA DINAS PEKERJAAN UMUM, PENA
KAWASAN PERMUKIMAN

HARGA SATUAN POKOK KEGIATAN BIDANG KE PU AN


PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

HARGA SATUAN DASAR (BASIC P


DAN PERALATAN
DAFTAR ISI
HARGA SATUAN DASAR (BASIC PRICE
URAIAN

UPAH
ANALISIS HARGA SATUAN DASAR - UPAH
HONORORIUM TENAGA FASILITATOR, KOORDINATOR FASILITATOR TIM TEKNIS DAN POKJA PKP
REMUNERASI TENAGA AHLI
HONORORIUM TIM KOORDINASI PENATAAN RUANG DAERAH ( TKPRD )
ALAT
HARGA SATUAN DASAR ALAT
HARGA SEWA ALAT

BAHAN
HARGA SATUAN DASAR BAHAN

harga satuan pokok keg


PROVINSI KALIMANTAN UTARA
HARGA SATUAN DASAR - U
ENATAAN RUANG, PERUMAHAN DAN

U AN

C PRICE) UPAH, BAHAN

ICE)
HALAMAN

1 dari 3
2 dari 3
3 dari 3
3 dari 3

1 dari 4
2 dari 4

1 - 25

egiatan
RA 2021
- UPAH
Page 1 of 3
ANALISIS HARGA SATUAN DASAR UPAH BIDANG KE PU AN PROV
KALIMANTAN UTARA TAHUN 2021
NO URAIAN KODE SATUAN KAB MALINAU
Malinau Sungai Boh Long
Nawang
A TENAGA KERJA KONSTRUKSI DAN TEKNISI
I UPAH PER HARI
1 Pekerja (L01) oh 125,000.00 150,000.00 160,000.00
2 Tukang (L02) oh 150,000.00 205,000.00 200,000.00
3 Mandor (L03) oh 180,000.00 220,000.00 270,000.00
4 Operator (L04) oh 170,000.00 210,000.00 250,000.00
5 Pembantu Operator (L05) oh 120,000.00 180,000.00 180,000.00
6 Sopir / Driver (L06) oh 160,000.00 190,000.00 190,000.00
7 Pembantu Sopir / Driver (L07) oh 120,000.00 170,000.00 170,000.00
8 Mekanik (L08) oh 160,000.00 230,000.00 300,000.00
9 Pembantu Mekanik (L09) oh 120,000.00 190,000.00 225,000.00
10 Kepala Tukang (L10) oh 170,000.00 210,000.00 250,000.00
11 Surveyor oh 210,000.00 250,000.00 300,000.00
12 Pembantu juru ukur oh 120,000.00 150,000.00 150,000.00
13 Juru ukur oh 210,000.00 250,000.00 250,000.00
14 Drafter CAD oh 160,000.00 170,000.00 200,000.00
15 Desain engineer oh 370,000.00 370,000.00 400,000.00
16 Operator Komputer oh 120,000.00 130,000.00 140,000.00

II UPAH PER JAM jam/hari 7 7 7


1 Pekerja (L01) jam 17,857.14 22,857.14 22,857.14
2 Tukang (L02) jam 21,428.57 28,571.43 28,571.43
3 Mandor (L03) jam 25,714.29 38,571.43 38,571.43
4 Operator (L04) jam 24,285.71 35,714.29 35,714.29
5 Pembantu Operator (L05) jam 17,142.86 25,714.29 25,714.29
6 Sopir / Driver (L06) jam 22,857.14 27,142.86 27,142.86
7 Pembantu Sopir / Driver (L07) jam 17,142.86 24,285.71 24,285.71
8 Mekanik (L08) jam 22,857.14 42,857.14 42,857.14
9 Pembantu Mekanik (L09) jam 17,142.86 32,142.86 32,142.86
10 Kepala Tukang (L10) jam 24,285.71 35,714.29 35,714.29
11 Surveyor jam 30,000.00 42,857.14 42,857.14
12 Pembantu juru ukur jam 17,142.86 21,428.57 21,428.57
13 Juru ukur jam 30,000.00 35,714.29 35,714.29
14 Drafter CAD jam 22,857.14 28,571.43 28,571.43
15 Desain engineer jam 52,857.14 57,142.86 57,142.86
16 Operator Komputer jam 17,142.86 20,000.00 20,000.00
E PU AN PROVINSI
1
KAB TANA TIDUNG
Tideng Pale Tanah Merah

120,000.00 125,000.00
150,000.00 160,000.00
180,000.00 190,000.00
160,000.00 180,000.00
120,000.00 130,000.00
160,000.00 160,000.00
120,000.00 120,000.00
155,000.00 160,000.00
120,000.00 130,000.00
170,000.00 180,000.00
210,000.00 220,000.00
120,000.00 130,000.00
210,000.00 220,000.00
160,000.00 160,000.00
370,000.00 370,000.00
120,000.00 120,000.00

7 7
17,142.86 17,857.14
21,428.57 22,857.14
25,714.29 27,142.86
22,857.14 25,714.29
17,142.86 18,571.43
22,857.14 22,857.14
17,142.86 17,142.86
22,142.86 22,857.14
17,142.86 18,571.43
24,285.71 25,714.29
30,000.00 31,428.57
17,142.86 18,571.43
30,000.00 31,428.57
22,857.14 22,857.14
52,857.14 52,857.14
17,142.86 17,142.86
HONORORIUM TENAGA FASILITATOR,
B KOORDINATOR FASILITATOR TIM
TEKNIS DAN POKJA PKP

1 Fasilitator BSPS ob 3,500,000 3,500,000


2 Koordinator Fasilitator Kab/Kota ob 5,000,000 5,000,000
3 Ketua Tim Teknis Rumah Swadaya ob 500,000 500,000
4 Sekretaris Tim Teknis Rumah Swadaya ob 450,000 450,000
5 Anggota Tim Teknis Rumah Swadaya ob 400,000 400,000
6 Pengarah Pokja Perumahan dan Kawasan ok 700,000 700,000
Permukiman (PKP)
7 Ketua Pelaksana Pokja Perumahan dan ok 600,000 600,000
Kawasan Permukiman (PKP)
8 Sekretaris Pokja Perumahan dan Kawasan ok 500,000 500,000
Permukiman (PKP)
9 Anggota Pokja Perumahan dan Kawasan ok 400,000 400,000
Permukiman (PKP)
Page 2 of 3

3,500,000 3,500,000 3,500,000 3,500,000 3,500,000 3,500,000 3,500,000


5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000
500,000 500,000 500,000 500,000 500,000 500,000 500,000
450,000 450,000 450,000 450,000 450,000 450,000 450,000
400,000 400,000 400,000 400,000 400,000 400,000 400,000
700,000 700,000 700,000 700,000 700,000 700,000 700,000

600,000 600,000 600,000 600,000 600,000 600,000 600,000

500,000 500,000 500,000 500,000 500,000 500,000 500,000

400,000 400,000 400,000 400,000 400,000 400,000 400,000


3,500,000 3,500,000 3,500,000 3,500,000 3,500,000 3,500,000
5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000
500,000 500,000 500,000 500,000 500,000 500,000
450,000 450,000 450,000 450,000 450,000 450,000
400,000 400,000 400,000 400,000 400,000 400,000
700,000 700,000 700,000 700,000 700,000 700,000

600,000 600,000 600,000 600,000 600,000 600,000

500,000 500,000 500,000 500,000 500,000 500,000

400,000 400,000 400,000 400,000 400,000 400,000


REMUNERASI TENAGA AHLI
Berdasar KEPMEN PUPR Nomor : 897/KPTS/M/2017
C
BESARAN REMUNERASI MINIMAL TAHUN
UNTUK TENAGA AHLI NASIONAL BERPENDIDIKAN S1/S2/S3 BERDASARKAN PENGALAMAN PRO

KUALIFIKASI TENAGA AHLI PENGALAMAN

1 AHLI MUDA 1
2
1 3
2 AHLI MADYA 2 4
3 5
1 4 6
2 5 7
3 6 8
4 7 9
5 8 10
6 9 11
7 10 12
8 11 13
9 12 14
3 AHLI UTAMA
10 13 15
11 14 16
12 15 17
13 16 18
14 17 19
15 18 20
16 19 21
17 20 22
18 21 23
HONORARIUM TIM KOORDINASI PENATAAN
C RUANG DAERAH (TKPRD) Satuan Provinsi Kalimantan Utara

1 Penasehat/Pembina ok 10,000,000.00
2 Penanggung Jawab ok 6,000,000.00
3 Ketua ok 5,000,000.00
4 Wakil Ketua ok 4,500,000.00
5 Anggota ok 4,000,000.00

HONORARIUM KELOMPOK KERJA


D PEMANFAATAN DAN PENGENDALIAN TIM Provinsi Kalimantan Utara
KOORDINASI PENATAAN RUANG DAERAH
1 Ketua ok 3,000,000.00
2 Sekretaris ok 2,000,000.00
3 Anggota ok 1,500,000.00

HONORARIUM KELOMPOK KERJA PERENCANA


E TIM KOORDINASI PENATAAN RUANG DAERAH Provinsi Kalimantan Utara
1 Ketua ok 3,000,000.00
2 Sekretaris ok 2,000,000.00
3 Anggota ok 1,500,000.00

F HONORARIUM SEKRETARIAT TIM KOORDINASI Provinsi Kalimantan Utara


PENATAAN RUANG DAERAH
1 Ketua ob 1,000,000.00
2 Sekretaris ob 750,000.00
3 Anggota ob 500,000.00

harga satuan pokok


PROVINSI KALIMANTAN UTA
HARGA SATUAN DASA
Page 3 of 3
REMUNERASI TENAGA AHLI
EPMEN PUPR Nomor : 897/KPTS/M/2017
BESARAN REMUNERASI MINIMAL TAHUN 2018
KAN S1/S2/S3 BERDASARKAN PENGALAMAN PROFESIONAL YANG SETARA

RUPIAH RUPIAH RUPIAH


PER BULAN PER BULAN PER BULAN
S1/SETARA S2/SETARA S3/SETARA
17,982,000 26,473,500 30,969,000
19,480,500 28,221,750 32,967,000
20,979,000 29,970,000 34,965,000
22,477,500 31,718,250 36,963,000
23,976,000 33,466,500 38,961,000
25,474,500 35,464,500 42,957,000
26,973,000 37,212,750 44,955,000
28,471,500 38,961,000 46,953,000
29,970,000 40,959,000 48,951,000
31,468,500 42,707,250 50,949,000
32,967,000 44,455,500 52,947,000
34,465,500 46,453,500 54,945,000
35,964,000 48,201,750 56,943,000
37,462,500 49,950,000 58,941,000
38,961,000 51,948,000 60,939,000
40,459,500 53,696,250 62,937,000
41,958,000 55,444,500 64,935,000
43,456,500 57,442,500 66,933,000
44,955,000 59,190,750 68,931,000
46,453,500 60,939,000 70,929,000
47,952,000 62,937,000 72,927,000
49,450,500 64,685,250 74,925,000
50,949,000 66,433,500 76,923,000

Provinsi Kalimantan Utara

10,000,000.00
6,000,000.00
5,000,000.00
4,500,000.00
4,000,000.00

Provinsi Kalimantan Utara

3,000,000.00
2,000,000.00
1,500,000.00

Provinsi Kalimantan Utara


3,000,000.00
2,000,000.00
1,500,000.00

Provinsi Kalimantan Utara

1,000,000.00
750,000.00
500,000.00

atuan pokok kegiatan


MANTAN UTARA 2021
SATUAN DASAR - ALAT
HARGA SATUAN DASAR ALAT BIDANG KE PU AN PROVINSI KALIMAN
NO URAIAN KODE SATUAN KAB BULUNGAN KOTA
Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu TARAKAN
Tarakan

1
Aggregat (chip) Spreader E40 unit 426,300,000.00 429,284,100.00 428,431,500.00 430,563,000.00 441,000,000.00 420,000,000.00
2
AMP (Emulsi, Asbuton) E01a unit 6,050,000,000.00 6,092,350,000.00 6,080,250,000.00 6,110,500,000.00 6,063,750,000.00 5,775,000,000.00
3
AMP (Warm Mix) E01a unit 6,050,000,000.00 6,092,350,000.00 6,080,250,000.00 6,110,500,000.00 6,063,750,000.00 5,775,000,000.00
4
Asphalt Distributor E41 unit 434,500,000.00 437,541,500.00 436,672,500.00 438,845,000.00 435,487,500.00 414,750,000.00
5
Asphalt Finisher E02 unit 2,790,900,000.00 2,810,436,300.00 2,804,854,500.00 2,818,809,000.00 2,866,500,000.00 2,730,000,000.00
6
Asphalt Liquid Mixer E34a unit 165,000,000.00 166,155,000.00 165,825,000.00 166,650,000.00 165,375,000.00 157,500,000.00
7
Asphalt Liquid Mixer (kap 20000) E34 unit 132,000,000.00 132,924,000.00 132,660,000.00 133,320,000.00 132,300,000.00 126,000,000.00
8
Asphalt Mixing Plant E01a unit 6,050,000,000.00 6,092,350,000.00 6,080,250,000.00 6,110,500,000.00 6,063,750,000.00 5,775,000,000.00
9
Asphalt Tanker E45 unit 550,000,000.00 553,850,000.00 552,750,000.00 555,500,000.00 551,250,000.00 525,000,000.00
10 Bar Bender E53 unit 162,225,000.00 163,360,575.00 163,036,125.00 163,847,250.00 168,682,500.00 160,650,000.00
11 Bar Cutter E54 unit 70,245,000.00 70,736,715.00 70,596,225.00 70,947,450.00 72,213,750.00 68,775,000.00
12 Blending Equipment E52 unit 550,000,000.00 553,850,000.00 552,750,000.00 555,500,000.00 551,250,000.00 525,000,000.00
13 Bore Pile Machine E33 unit 2,475,000,000.00 2,492,325,000.00 2,487,375,000.00 2,499,750,000.00 2,480,625,000.00 2,362,500,000.00
14 Bore Pile Machine Dia 60 E33 unit 1,287,000,000.00 1,296,009,000.00 1,293,435,000.00 1,299,870,000.00 1,289,925,000.00 1,228,500,000.00
15 Breaker E55 unit 1,815,000,000.00 1,827,705,000.00 1,824,075,000.00 1,833,150,000.00 1,819,125,000.00 1,732,500,000.00
16 Bulldozer 100-150 Hp E04 unit 2,750,000,000.00 2,769,250,000.00 2,763,750,000.00 2,777,500,000.00 2,756,250,000.00 2,625,000,000.00
17 Cement Tanker E46 unit 550,000,000.00 553,850,000.00 552,750,000.00 555,500,000.00 551,250,000.00 525,000,000.00
18 Chain Saw unit 17,050,000.00 17,169,350.00 17,135,250.00 17,220,500.00 17,088,750.00 16,275,000.00
19 COLD MILLING E36 unit 5,830,000,000.00 5,870,810,000.00 5,859,150,000.00 5,888,300,000.00 5,843,250,000.00 5,565,000,000.00
20 Cold Paint Spray Machine E86 unit 77,000,000.00 77,539,000.00 77,385,000.00 77,770,000.00 77,175,000.00 73,500,000.00
21 Cold Recycler E38 unit 21,000,000,000.00 21,147,000,000.00 21,105,000,000.00 21,210,000,000.00 21,774,375,000.00 20,737,500,000.00
22 Compressor 4000-6500 L\M E05 unit 269,850,000.00 271,738,950.00 271,199,250.00 272,548,500.00 281,137,500.00 267,750,000.00
23 Concrete Breaker E44 unit 1,081,500,000.00 1,089,070,500.00 1,086,907,500.00 1,092,315,000.00 1,124,550,000.00 1,071,000,000.00
24 Concrete Cutter 130 Feet/Mnt E76 unit 28,600,000.00 28,800,200.00 28,743,000.00 28,886,000.00 28,665,000.00 27,300,000.00
25 Concrete Mixer (350) E47 unit 38,500,000.00 38,769,500.00 38,692,500.00 38,885,000.00 38,587,500.00 36,750,000.00
26 Concrete Mixer 0.3-0.6 M3 unit 38,500,000.00 38,769,500.00 38,692,500.00 38,885,000.00 38,587,500.00 36,750,000.00
27 Concrete Pan Mixer unit 1,050,000,000.00 1,057,350,000.00 1,055,250,000.00 1,060,500,000.00 1,102,500,000.00 1,050,000,000.00
28 Concrete Pump unit 2,478,000,000.00 2,495,346,000.00 2,490,390,000.00 2,500,302,000.00 2,487,744,000.00 2,468,000,000.00
29 Concrete Vibrator unit 26,250,000.00 26,433,750.00 26,381,250.00 26,512,500.00 27,562,500.00 26,250,000.00
30 Crane 10-15 Ton E07 unit 2,147,145,000.00 2,162,175,015.00 2,157,880,725.00 2,168,616,450.00 2,152,024,875.00 2,049,547,500.00
31 Crane On Track 35 Ton E31 unit 6,567,000,000.00 6,612,969,000.00 6,599,835,000.00 6,632,670,000.00 6,581,925,000.00 6,268,500,000.00
32 Crane On Track 75 - 100 Ton unit 11,594,000,000.00 11,675,158,000.00 11,651,970,000.00 11,709,940,000.00 11,620,350,000.00 11,067,000,000.00
33 Drum Mixer (Untuk Asphaltic Plug) unit 660,000,000.00 664,620,000.00 663,300,000.00 666,600,000.00 661,500,000.00 630,000,000.00
34 Dump Truck 10 T atau 8 M3 unit 515,000,000.00 518,605,000.00 517,575,000.00 520,150,000.00 535,342,500.00 509,850,000.00
35 Dump Truck 3-4 M3 unit 475,000,000.00 478,325,000.00 477,375,000.00 479,750,000.00 493,762,500.00 470,250,000.00
36 EXCAVATOR Long Arm 155 HP E10 unit 1,892,800,000.00 1,906,049,600.00 1,902,264,000.00 1,911,728,000.00 1,963,920,000.00 1,870,400,000.00
37 Excavator 80-140 Hp unit 1,690,000,000.00 1,701,830,000.00 1,698,450,000.00 1,706,900,000.00 1,753,500,000.00 1,670,000,000.00
38 MINI EXCAVATOR 40-60 HP unit 650,000,000.00 654,550,000.00 653,250,000.00 656,500,000.00 672,000,000.00 640,000,000.00
39 Flat Bed Truck 10 ton unit 770,000,000.00 775,390,000.00 773,850,000.00 777,700,000.00 771,750,000.00 735,000,000.00
40 Fulvi Mixer E27 unit 990,000,000.00 996,930,000.00 994,950,000.00 999,900,000.00 992,250,000.00 945,000,000.00
41 Generator Set E12 unit 227,700,000.00 229,293,900.00 228,838,500.00 229,977,000.00 228,217,500.00 217,350,000.00
42 GROUTING PUMP E56 unit 26,400,000.00 26,584,800.00 26,532,000.00 26,664,000.00 26,460,000.00 25,200,000.00
43 Hot Recycler E39 unit 17,600,000,000.00 17,723,200,000.00 17,688,000,000.00 17,776,000,000.00 17,640,000,000.00 16,800,000,000.00
44 Hydrolic Pump E83 unit 17,600,000.00 17,723,200.00 17,688,000.00 17,776,000.00 17,640,000.00 16,800,000.00
45 Jack Hammer E26 unit 162,750,000.00 163,889,250.00 163,563,750.00 164,377,500.00 160,650,000.00 153,000,000.00
46 Jack Hidrolic E57 unit 430,500,000.00 433,513,500.00 432,652,500.00 434,805,000.00 428,400,000.00 408,000,000.00
47 Jack Hidrolik Jembatan E82 unit 82,500,000.00 83,077,500.00 82,912,500.00 83,325,000.00 82,687,500.00 78,750,000.00
48 Kunci Torsi 200-1000N.M E74 unit 16,500,000.00 16,615,500.00 16,582,500.00 16,665,000.00 16,537,500.00 15,750,000.00
49 Manifold E84 unit 5,500,000.00 5,538,500.00 5,527,500.00 5,555,000.00 5,512,500.00 5,250,000.00
50 Mesin Las E58 unit 54,075,000.00 54,453,525.00 54,345,375.00 54,615,750.00 53,550,000.00 51,000,000.00
51 Mobile Crane 1 Ton E78 unit 990,000,000.00 996,930,000.00 994,950,000.00 999,900,000.00 992,250,000.00 945,000,000.00
52 Motor Grader >100 Hp E13 unit 2,730,000,000.00 2,749,110,000.00 2,743,650,000.00 2,757,300,000.00 2,709,000,000.00 2,580,000,000.00
53 Pedestrian Roller E24 unit 734,118,616.00 739,257,446.31 737,789,209.08 741,459,802.16 735,787,067.40 700,749,588.00
54 Peralatan Pengeboran lengkap unit 82,500,000.00 83,077,500.00 82,912,500.00 83,325,000.00 82,687,500.00 78,750,000.00
55 Peralatan Sondir lengkap unit 49,500,000.00 49,846,500.00 49,747,500.00 49,995,000.00 49,612,500.00 47,250,000.00
56 Pile Hammer E60 unit 440,000,000.00 443,080,000.00 442,200,000.00 444,400,000.00 644,962,500.00 614,250,000.00
57 Pile Driver + Hammer E30 unit 440,000,000.00 443,080,000.00 442,200,000.00 444,400,000.00 441,000,000.00 420,000,000.00
58 Pile Driver Leader, 75 Kw E59 unit 390,000,000.00 392,730,000.00 391,950,000.00 393,900,000.00 644,962,500.00 614,250,000.00
59 Pile Hammer, 2,5 Ton E61 unit 440,000,000.00 443,080,000.00 442,200,000.00 444,400,000.00 441,000,000.00 420,000,000.00
60 Pompa + Mixer Epoxy, 600 Watt unit 7,700,000.00 7,753,900.00 7,738,500.00 7,777,000.00 7,717,500.00 7,350,000.00
61 Power Broom E03 unit 37,897,200.00 38,162,480.40 38,086,686.00 38,276,172.00 37,983,330.00 36,174,600.00
62 Rock Drill Breaker E37 unit 13,200,000.00 13,292,400.00 13,266,000.00 13,332,000.00 13,230,000.00 12,600,000.00
63 Sand Blasting E77 unit 8,250,000.00 8,307,750.00 8,291,250.00 8,332,500.00 8,268,750.00 7,875,000.00
64 SLIP FORM PAVER unit 15,146,016,270.00 15,252,038,383.89 15,221,746,351.35 15,297,476,432.70 15,180,439,034.25 14,457,560,985.00
65 Stamper E81 unit 33,000,000.00 33,231,000.00 33,165,000.00 33,330,000.00 33,075,000.00 31,500,000.00
66 Stone Crusher E21 unit 3,850,000,000.00 3,876,950,000.00 3,869,250,000.00 3,888,500,000.00 3,858,750,000.00 3,675,000,000.00
67 Stressing Jack E62 unit 330,000,000.00 332,310,000.00 331,650,000.00 333,300,000.00 330,750,000.00 315,000,000.00
68 Tamper E25 unit 113,190,000.00 113,982,330.00 113,755,950.00 114,321,900.00 113,447,250.00 108,045,000.00
69 Tandem Roller 6-8 T. E17 unit 1,868,625,000.00 1,881,705,375.00 1,877,968,125.00 1,887,311,250.00 1,872,871,875.00 1,783,687,500.00
70 Tandem Roller 8-10 T. E17a unit 1,650,000,000.00 1,661,550,000.00 1,658,250,000.00 1,666,500,000.00 1,653,750,000.00 1,575,000,000.00
71 Thermoplastic spreading machine E.85 unit 132,000,000.00 132,924,000.00 132,660,000.00 133,320,000.00 132,300,000.00 126,000,000.00
72 Three Wheel Roller 6-8 T E16 unit 770,000,000.00 775,390,000.00 773,850,000.00 777,700,000.00 771,750,000.00 735,000,000.00
73 Tire Roller 8-10 T. E18 unit 1,567,500,000.00 1,578,472,500.00 1,575,337,500.00 1,583,175,000.00 1,571,062,500.00 1,496,250,000.00
74 Track Loader 75-100 Hp E14 unit 1,210,000,000.00 1,218,470,000.00 1,216,050,000.00 1,222,100,000.00 1,212,750,000.00 1,155,000,000.00
75 Trailer 20 Ton E29 unit 935,000,000.00 941,545,000.00 939,675,000.00 944,350,000.00 937,125,000.00 892,500,000.00
76 TRONTON 15 TON unit 880,000,000.00 886,160,000.00 884,400,000.00 888,800,000.00 882,000,000.00 840,000,000.00
77 Truk Mixer unit 1,567,500,000.00 1,578,472,500.00 1,575,337,500.00 1,583,175,000.00 1,571,062,500.00 1,496,250,000.00
78 Vibrating Rammer E48 unit 9,009,000.00 9,072,063.00 9,054,045.00 9,099,090.00 9,029,475.00 8,599,500.00
79 Vibratory Roller 5-8 T. E19 unit 708,730,000.00 713,691,110.00 712,273,650.00 715,817,300.00 710,340,750.00 676,515,000.00
80 Water Pump 70-100 Mm E22 unit 8,213,700.00 8,271,195.90 8,254,768.50 8,295,837.00 8,232,367.50 7,840,350.00
81 Water Tanker 3000-4500 L. E23 unit 726,000,000.00 731,082,000.00 729,630,000.00 733,260,000.00 727,650,000.00 693,000,000.00
82 Welding Machine, 300 A E63 unit 54,600,000.00 54,982,200.00 54,873,000.00 55,146,000.00 54,600,000.00 52,000,000.00
83 Welding Set E32 unit 52,500,000.00 52,867,500.00 52,762,500.00 53,025,000.00 52,500,000.00 50,000,000.00
84 Wheel Loader 1.0-1.6 M3 E15 unit 2,152,500,000.00 2,167,567,500.00 2,163,262,500.00 2,174,025,000.00 2,152,500,000.00 2,050,000,000.00
85 BABY VIBRATORY ROLLER 1-2 T. E19a unit 120,000,000.00 120,840,000.00 120,600,000.00 121,080,000.00 118,440,000.00 117,500,000.00
86 WATER JET BLASTING E64 unit 16,000,000.00 16,112,000.00 16,080,000.00 16,144,000.00 15,120,000.00 15,000,000.00
87 POMPA + MIXER EPOXY, 810 Watt E75 unit 7,000,000.00 7,049,000.00 7,035,000.00 7,063,000.00 6,350,400.00 6,300,000.00
88 THERMOPLASTIC ROAD MARKING MACHINE E85 unit 120,000,000.00 120,840,000.00 120,600,000.00 121,080,000.00 117,936,000.00 117,000,000.00
NG KE PU AN PROVINSI KALIMANTAN UTARA TAHUN 2021
KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

440,580,000.00 441,420,000.00 441,840,000.00 453,600,000.00 441,000,000.00 449,820,000.00 451,500,000.00 441,000,000.00 441,882,000.00


6,057,975,000.00 6,069,525,000.00 6,075,300,000.00 6,237,000,000.00 6,063,750,000.00 6,185,025,000.00 6,208,125,000.00 6,063,750,000.00 6,075,877,500.00
6,057,975,000.00 6,069,525,000.00 6,075,300,000.00 6,237,000,000.00 6,063,750,000.00 6,185,025,000.00 6,208,125,000.00 6,063,750,000.00 6,075,877,500.00
435,072,750.00 435,902,250.00 436,317,000.00 447,930,000.00 435,487,500.00 444,197,250.00 445,856,250.00 435,487,500.00 436,358,475.00
3,003,000,000.00 3,139,500,000.00 2,871,960,000.00 2,948,400,000.00 2,866,500,000.00 2,923,830,000.00 2,934,750,000.00 2,866,500,000.00 2,872,233,000.00
173,250,000.00 181,125,000.00 165,690,000.00 170,100,000.00 165,375,000.00 168,682,500.00 169,312,500.00 165,375,000.00 165,705,750.00
138,600,000.00 144,900,000.00 132,552,000.00 136,080,000.00 132,300,000.00 134,946,000.00 135,450,000.00 132,300,000.00 132,564,600.00
6,352,500,000.00 6,641,250,000.00 6,075,300,000.00 6,237,000,000.00 6,063,750,000.00 6,185,025,000.00 6,208,125,000.00 6,063,750,000.00 6,075,877,500.00
577,500,000.00 603,750,000.00 552,300,000.00 567,000,000.00 551,250,000.00 562,275,000.00 564,375,000.00 551,250,000.00 552,352,500.00
176,715,000.00 184,747,500.00 169,003,800.00 173,502,000.00 168,682,500.00 172,056,150.00 172,698,750.00 168,682,500.00 169,019,865.00
75,652,500.00 79,091,250.00 72,351,300.00 74,277,000.00 72,213,750.00 73,658,025.00 73,933,125.00 72,213,750.00 72,358,177.50
577,500,000.00 603,750,000.00 552,300,000.00 567,000,000.00 551,250,000.00 562,275,000.00 564,375,000.00 551,250,000.00 552,352,500.00
2,598,750,000.00 2,716,875,000.00 2,485,350,000.00 2,551,500,000.00 2,480,625,000.00 2,530,237,500.00 2,539,687,500.00 2,480,625,000.00 2,485,586,250.00
1,351,350,000.00 1,412,775,000.00 1,292,382,000.00 1,326,780,000.00 1,289,925,000.00 1,315,723,500.00 1,320,637,500.00 1,289,925,000.00 1,292,504,850.00
1,905,750,000.00 1,992,375,000.00 1,822,590,000.00 1,871,100,000.00 1,819,125,000.00 1,855,507,500.00 1,862,437,500.00 1,819,125,000.00 1,822,763,250.00
2,887,500,000.00 3,018,750,000.00 2,761,500,000.00 2,835,000,000.00 2,756,250,000.00 2,811,375,000.00 2,821,875,000.00 2,756,250,000.00 2,761,762,500.00
577,500,000.00 603,750,000.00 552,300,000.00 567,000,000.00 551,250,000.00 562,275,000.00 564,375,000.00 551,250,000.00 552,352,500.00
17,902,500.00 18,716,250.00 17,121,300.00 17,577,000.00 17,088,750.00 17,430,525.00 17,495,625.00 17,088,750.00 17,122,927.50
6,121,500,000.00 6,399,750,000.00 5,854,380,000.00 6,010,200,000.00 5,843,250,000.00 5,960,115,000.00 5,982,375,000.00 5,843,250,000.00 5,854,936,500.00
80,850,000.00 84,525,000.00 77,322,000.00 79,380,000.00 77,175,000.00 78,718,500.00 79,012,500.00 77,175,000.00 77,329,350.00
22,811,250,000.00 23,848,125,000.00 21,815,850,000.00 22,396,500,000.00 21,774,375,000.00 22,209,862,500.00 22,292,812,500.00 21,774,375,000.00 21,817,923,750.00
294,525,000.00 307,912,500.00 281,673,000.00 289,170,000.00 281,137,500.00 286,760,250.00 287,831,250.00 281,137,500.00 281,699,775.00
1,178,100,000.00 1,231,650,000.00 1,126,692,000.00 1,156,680,000.00 1,124,550,000.00 1,147,041,000.00 1,151,325,000.00 1,124,550,000.00 1,126,799,100.00
30,030,000.00 31,395,000.00 28,719,600.00 29,484,000.00 28,665,000.00 29,238,300.00 29,347,500.00 28,665,000.00 28,722,330.00
40,425,000.00 42,262,500.00 38,661,000.00 39,690,000.00 38,587,500.00 39,359,250.00 39,506,250.00 38,587,500.00 38,664,675.00
40,425,000.00 42,262,500.00 38,661,000.00 39,690,000.00 38,587,500.00 39,359,250.00 39,506,250.00 38,587,500.00 38,664,675.00
1,155,000,000.00 1,207,500,000.00 1,104,600,000.00 1,134,000,000.00 1,102,500,000.00 1,124,550,000.00 1,128,750,000.00 1,102,500,000.00 1,104,705,000.00
2,497,616,000.00 2,509,956,000.00 2,500,084,000.00 2,727,140,000.00 2,502,552,000.00 2,677,730,640.00 2,714,800,000.00 2,502,552,000.00 2,507,557,104.00
28,875,000.00 30,187,500.00 27,615,000.00 28,350,000.00 27,562,500.00 28,113,750.00 28,218,750.00 27,562,500.00 27,617,625.00
2,254,502,250.00 2,356,979,625.00 2,156,123,970.00 2,213,511,300.00 2,152,024,875.00 2,195,065,372.50 2,203,263,562.50 2,152,024,875.00 2,156,328,924.75
6,895,350,000.00 7,208,775,000.00 6,594,462,000.00 6,769,980,000.00 6,581,925,000.00 6,713,563,500.00 6,738,637,500.00 6,581,925,000.00 6,595,088,850.00
12,173,700,000.00 12,727,050,000.00 11,642,484,000.00 11,952,360,000.00 11,620,350,000.00 11,852,757,000.00 11,897,025,000.00 11,620,350,000.00 11,643,590,700.00
693,000,000.00 724,500,000.00 662,760,000.00 680,400,000.00 661,500,000.00 674,730,000.00 677,250,000.00 661,500,000.00 662,823,000.00
521,695,000.00 522,210,000.00 536,362,200.00 550,638,000.00 535,342,500.00 546,049,350.00 548,088,750.00 535,342,500.00 536,413,185.00
481,175,000.00 481,650,000.00 494,703,000.00 507,870,000.00 493,762,500.00 503,637,750.00 505,518,750.00 493,762,500.00 494,750,025.00
2,057,440,000.00 2,150,960,000.00 1,967,660,800.00 2,020,032,000.00 1,963,920,000.00 2,003,198,400.00 2,010,680,000.00 1,963,920,000.00 1,967,847,840.00
1,837,000,000.00 1,920,500,000.00 1,756,840,000.00 1,803,600,000.00 1,753,500,000.00 1,788,570,000.00 1,795,250,000.00 1,753,500,000.00 1,757,007,000.00
704,000,000.00 736,000,000.00 673,280,000.00 691,200,000.00 672,000,000.00 685,440,000.00 688,000,000.00 672,000,000.00 673,344,000.00
808,500,000.00 845,250,000.00 773,220,000.00 793,800,000.00 771,750,000.00 787,185,000.00 790,125,000.00 771,750,000.00 773,293,500.00
1,039,500,000.00 1,086,750,000.00 994,140,000.00 1,020,600,000.00 992,250,000.00 1,012,095,000.00 1,015,875,000.00 992,250,000.00 994,234,500.00
239,085,000.00 249,952,500.00 228,652,200.00 234,738,000.00 228,217,500.00 232,781,850.00 233,651,250.00 228,217,500.00 228,673,935.00
27,720,000.00 28,980,000.00 26,510,400.00 27,216,000.00 26,460,000.00 26,989,200.00 27,090,000.00 26,460,000.00 26,512,920.00
18,480,000,000.00 19,320,000,000.00 17,673,600,000.00 18,144,000,000.00 17,640,000,000.00 17,992,800,000.00 18,060,000,000.00 17,640,000,000.00 17,675,280,000.00
18,480,000.00 19,320,000.00 17,673,600.00 18,144,000.00 17,640,000.00 17,992,800.00 18,060,000.00 17,640,000.00 17,675,280.00
168,300,000.00 175,950,000.00 160,956,000.00 165,240,000.00 160,650,000.00 163,863,000.00 164,475,000.00 160,650,000.00 160,971,300.00
448,800,000.00 469,200,000.00 429,216,000.00 440,640,000.00 428,400,000.00 436,968,000.00 438,600,000.00 428,400,000.00 429,256,800.00
86,625,000.00 90,562,500.00 82,845,000.00 85,050,000.00 82,687,500.00 84,341,250.00 84,656,250.00 82,687,500.00 82,852,875.00
17,325,000.00 18,112,500.00 16,569,000.00 17,010,000.00 16,537,500.00 16,868,250.00 16,931,250.00 16,537,500.00 16,570,575.00
5,775,000.00 6,037,500.00 5,523,000.00 5,670,000.00 5,512,500.00 5,622,750.00 5,643,750.00 5,512,500.00 5,523,525.00
56,100,000.00 58,650,000.00 53,652,000.00 55,080,000.00 53,550,000.00 54,621,000.00 54,825,000.00 53,550,000.00 53,657,100.00
1,039,500,000.00 1,086,750,000.00 994,140,000.00 1,020,600,000.00 992,250,000.00 1,012,095,000.00 1,015,875,000.00 992,250,000.00 994,234,500.00
2,838,000,000.00 2,967,000,000.00 2,714,160,000.00 2,786,400,000.00 2,709,000,000.00 2,763,180,000.00 2,773,500,000.00 2,709,000,000.00 2,714,418,000.00
770,824,546.80 805,862,026.20 737,188,566.58 756,809,555.04 735,787,067.40 750,502,808.75 753,305,807.10 735,787,067.40 737,258,641.53
86,625,000.00 90,562,500.00 82,845,000.00 85,050,000.00 82,687,500.00 84,341,250.00 84,656,250.00 82,687,500.00 82,852,875.00
51,975,000.00 54,337,500.00 49,707,000.00 51,030,000.00 49,612,500.00 50,604,750.00 50,793,750.00 49,612,500.00 49,711,725.00
675,675,000.00 706,387,500.00 646,191,000.00 663,390,000.00 644,962,500.00 657,861,750.00 660,318,750.00 644,962,500.00 646,252,425.00
462,000,000.00 483,000,000.00 441,840,000.00 453,600,000.00 441,000,000.00 449,820,000.00 451,500,000.00 441,000,000.00 441,882,000.00
675,675,000.00 706,387,500.00 646,191,000.00 663,390,000.00 644,962,500.00 657,861,750.00 660,318,750.00 644,962,500.00 646,252,425.00
462,000,000.00 483,000,000.00 441,840,000.00 453,600,000.00 441,000,000.00 449,820,000.00 451,500,000.00 441,000,000.00 441,882,000.00
8,085,000.00 8,452,500.00 7,732,200.00 7,938,000.00 7,717,500.00 7,871,850.00 7,901,250.00 7,717,500.00 7,732,935.00
39,792,060.00 41,600,790.00 38,055,679.20 39,068,568.00 37,983,330.00 38,742,996.60 38,887,695.00 37,983,330.00 38,059,296.66
13,860,000.00 14,490,000.00 13,255,200.00 13,608,000.00 13,230,000.00 13,494,600.00 13,545,000.00 13,230,000.00 13,256,460.00
8,662,500.00 9,056,250.00 8,284,500.00 8,505,000.00 8,268,750.00 8,434,125.00 8,465,625.00 8,268,750.00 8,285,287.50
15,903,317,083.50 16,626,195,132.75 15,209,354,156.22 15,614,165,863.80 15,180,439,034.25 15,484,047,814.94 15,541,878,058.88 15,180,439,034.25 15,210,799,912.32
34,650,000.00 36,225,000.00 33,138,000.00 34,020,000.00 33,075,000.00 33,736,500.00 33,862,500.00 33,075,000.00 33,141,150.00
4,042,500,000.00 4,226,250,000.00 3,866,100,000.00 3,969,000,000.00 3,858,750,000.00 3,935,925,000.00 3,950,625,000.00 3,858,750,000.00 3,866,467,500.00
346,500,000.00 362,250,000.00 331,380,000.00 340,200,000.00 330,750,000.00 337,365,000.00 338,625,000.00 330,750,000.00 331,411,500.00
118,849,500.00 124,251,750.00 113,663,340.00 116,688,600.00 113,447,250.00 115,716,195.00 116,148,375.00 113,447,250.00 113,674,144.50
1,962,056,250.00 2,051,240,625.00 1,876,439,250.00 1,926,382,500.00 1,872,871,875.00 1,910,329,312.50 1,917,464,062.50 1,872,871,875.00 1,876,617,618.75
1,732,500,000.00 1,811,250,000.00 1,656,900,000.00 1,701,000,000.00 1,653,750,000.00 1,686,825,000.00 1,693,125,000.00 1,653,750,000.00 1,657,057,500.00
138,600,000.00 144,900,000.00 132,552,000.00 136,080,000.00 132,300,000.00 134,946,000.00 135,450,000.00 132,300,000.00 132,564,600.00
808,500,000.00 845,250,000.00 773,220,000.00 793,800,000.00 771,750,000.00 787,185,000.00 790,125,000.00 771,750,000.00 773,293,500.00
1,645,875,000.00 1,720,687,500.00 1,574,055,000.00 1,615,950,000.00 1,571,062,500.00 1,602,483,750.00 1,608,468,750.00 1,571,062,500.00 1,574,204,625.00
1,270,500,000.00 1,328,250,000.00 1,215,060,000.00 1,247,400,000.00 1,212,750,000.00 1,237,005,000.00 1,241,625,000.00 1,212,750,000.00 1,215,175,500.00
981,750,000.00 1,026,375,000.00 938,910,000.00 963,900,000.00 937,125,000.00 955,867,500.00 959,437,500.00 937,125,000.00 938,999,250.00
924,000,000.00 966,000,000.00 883,680,000.00 907,200,000.00 882,000,000.00 899,640,000.00 903,000,000.00 882,000,000.00 883,764,000.00
1,645,875,000.00 1,720,687,500.00 1,574,055,000.00 1,615,950,000.00 1,571,062,500.00 1,602,483,750.00 1,608,468,750.00 1,571,062,500.00 1,574,204,625.00
9,459,450.00 9,889,425.00 9,046,674.00 9,287,460.00 9,029,475.00 9,210,064.50 9,244,462.50 9,029,475.00 9,047,533.95
744,166,500.00 777,992,250.00 711,693,780.00 730,636,200.00 710,340,750.00 724,547,565.00 727,253,625.00 710,340,750.00 711,761,431.50
8,624,385.00 9,016,402.50 8,248,048.20 8,467,578.00 8,232,367.50 8,397,014.85 8,428,376.25 8,232,367.50 8,248,832.24
762,300,000.00 796,950,000.00 729,036,000.00 748,440,000.00 727,650,000.00 742,203,000.00 744,975,000.00 727,650,000.00 729,105,300.00
57,200,000.00 59,800,000.00 54,704,000.00 56,160,000.00 54,600,000.00 55,692,000.00 55,900,000.00 54,600,000.00 54,709,200.00
55,000,000.00 57,500,000.00 52,600,000.00 54,000,000.00 52,500,000.00 53,550,000.00 53,750,000.00 52,500,000.00 52,605,000.00
2,255,000,000.00 2,357,500,000.00 2,156,600,000.00 2,214,000,000.00 2,152,500,000.00 2,195,550,000.00 2,203,750,000.00 2,152,500,000.00 2,156,805,000.00
118,910,000.00 119,497,500.00 119,027,500.00 129,837,500.00 119,145,000.00 127,485,150.00 129,250,000.00 119,145,000.00 119,383,290.00
15,180,000.00 15,255,000.00 15,195,000.00 16,575,000.00 15,210,000.00 16,274,700.00 16,500,000.00 15,210,000.00 15,240,420.00
6,375,600.00 6,407,100.00 6,381,900.00 6,961,500.00 6,388,200.00 6,835,374.00 6,930,000.00 6,388,200.00 6,400,976.40
118,404,000.00 118,989,000.00 118,521,000.00 129,285,000.00 118,638,000.00 126,942,660.00 128,700,000.00 118,638,000.00 118,875,276.00
HARGA SEWA PERALATAN BIDANG KE PU AN PROVINSI KALIMANT
NO URAIAN KODE SATUAN KAB BULUNGAN KOTA
Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu TARAKAN
Tarakan
AALAT BERAT
1
AGGREGAT (CHIP) SPREADER E40 Rp/jam 419,333.54 429,707.90 426,424.26 453,009.44 450,832.17 410,827.61
2
Asphalt Tanker E45 Rp/jam 420,476.76 435,995.50 430,992.64 467,599.60 457,048.23 406,806.17
3
ASPHALT DISTRIBUTOR E41 Rp/jam 378,212.65 388,299.16 385,097.76 411,477.34 404,425.75 366,631.02
4
ASPHALT FINISHER E02 Rp/jam 794,427.77 804,723.19 801,580.48 819,736.65 826,804.18 776,624.34
5
ASPHALT LIQUID MIXER (kap 20000 ) E34 Rp/jam 70,125.64 70,630.25 70,474.11 72,794.90 72,383.40 68,773.12
6
ASPHALT LIQUID MIXER E34a Rp/jam 122,640.14 125,498.39 124,586.03 132,310.49 130,319.57 119,472.92
7
ASPHALT MIXING PLANT E01 Rp/jam 8,029,301.03 8,380,861.99 8,264,341.96 9,076,550.10 8,838,989.59 7,751,192.54
8
ASPHALT MIXING PLANT (MODIFIKASI, E01b Rp/jam 7,931,595.05 8,275,632.65 8,161,262.15 8,968,096.46 8,738,840.96 7,702,339.55
ASBUTON)
9
ASPHALT MIXING PLANT (WARM MIX) E01a Rp/jam 8,029,301.03 8,380,861.99 8,264,341.96 9,076,550.10 8,838,989.59 7,751,192.54
10 BABY VIBRATORY ROLLER 1-2 T. E19a Rp/jam 80,782.52 80,782.52 80,782.52 82,211.09 82,211.09 80,782.52
11 BAR BENDER E53 Rp/jam 77,523.99 78,004.02 77,858.54 80,018.40 80,875.60 77,032.99
12 BAR CUTTER E54 Rp/jam 58,178.79 58,523.40 58,416.60 60,479.75 60,586.32 57,709.87
13 BLENDING EQUIPMENT E52 Rp/jam 216,834.91 221,538.85 220,055.94 231,318.04 227,900.54 209,731.23
14 BORE PILE MACHINE E33 Rp/jam 608,959.15 621,463.50 617,531.90 643,845.72 634,408.29 585,485.27
15 BORE PILE MACHINE E50 Rp/jam 608,959.15 621,463.50 617,531.90 643,845.72 634,408.29 585,485.27
16 BREAKER E55 Rp/jam 564,115.52 577,440.85 573,226.83 602,254.21 592,492.64 543,007.04
17 BULLDOZER 100-150 HP E04 Rp/jam 699,219.56 712,639.46 708,434.31 735,933.88 725,631.31 671,724.70
18 CEMENT TANKER E46 Rp/jam 372,476.76 385,595.50 381,392.64 412,399.60 403,448.23 360,406.17
19 COLD MILLING E36 Rp/jam 1,356,279.83 1,378,882.41 1,371,850.25 1,417,806.37 1,399,841.19 1,301,866.98
20 COLD PAINT SRAY MACHINE E86 Rp/jam 57,915.80 57,915.80 57,915.80 59,344.37 59,344.37 57,915.80
21 COLD RECYCLER E38 Rp/jam 4,742,768.34 4,826,527.54 4,800,442.77 4,960,277.91 5,014,424.85 4,659,894.76
22 COMPRESSOR 4000-6500 L\M E05 Rp/jam 182,456.72 187,719.73 186,036.55 199,201.20 197,343.23 178,827.48
23 CONCRETE BREAKER E44 Rp/jam 635,523.78 655,918.28 649,397.35 699,094.14 691,748.26 621,096.34
G KE PU AN PROVINSI KALIMANTAN UTARA TAHUN 2021
KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

445,681.14 449,121.02 459,689.29 664,237.53 444,780.60 640,407.88 680,761.25 440,390.78 445,266.78


449,373.50 458,346.99 461,953.93 766,520.11 451,006.80 726,125.37 790,904.80 444,740.73 452,281.46
399,318.93 402,670.41 413,194.49 616,505.22 398,374.18 593,073.34 633,249.93 393,984.36 398,767.55
857,041.07 890,269.78 834,278.08 973,742.45 825,322.27 956,129.40 983,635.60 822,029.40 826,202.25
78,905.65 80,207.36 79,521.38 95,216.97 73,646.98 99,713.84 101,229.71 72,112.15 72,324.65
134,461.93 136,840.00 137,101.95 198,166.70 130,428.14 195,588.13 207,072.18 128,149.57 129,512.07
8,494,828.12 8,660,905.86 8,793,907.62 15,764,466.57 8,665,542.22 14,717,191.99 16,221,915.90 8,549,743.15 8,723,710.56
8,343,383.85 8,458,165.95 8,691,707.16 15,633,540.56 8,565,393.59 14,595,499.20 16,096,119.45 8,449,594.52 8,621,407.52

8,442,506.56 8,559,340.49 8,793,907.62 15,764,466.57 8,665,542.22 14,717,191.99 16,221,915.90 8,549,743.15 8,723,710.56


87,925.38 87,925.38 89,353.95 97,925.38 83,639.66 103,639.66 103,639.66 82,211.09 82,211.09
87,999.98 89,770.82 88,047.93 102,263.72 82,183.57 106,940.49 108,111.77 80,677.75 80,867.21
66,744.55 67,549.23 67,720.01 81,394.75 61,894.30 86,245.43 87,339.41 60,388.47 60,537.35
233,623.07 239,643.81 234,594.93 324,082.77 227,319.11 316,733.92 334,375.73 224,603.04 226,773.90
646,404.52 667,498.96 640,686.42 852,926.74 630,886.86 825,351.03 869,390.33 626,270.79 631,891.58
646,404.52 667,498.96 640,686.42 852,926.74 630,886.86 825,351.03 869,390.33 626,270.79 631,891.58
599,556.46 617,693.49 598,424.68 834,589.65 588,311.21 803,613.87 853,063.48 583,270.14 589,398.03
741,237.39 766,435.43 732,016.64 952,950.17 721,944.88 923,652.71 969,432.03 717,222.56 723,173.53
398,573.50 406,746.99 408,753.93 664,920.11 398,606.80 631,805.37 686,104.80 393,140.73 399,481.46
1,433,303.97 1,484,752.46 1,409,165.53 1,764,946.29 1,390,492.62 1,714,211.04 1,786,089.72 1,383,964.05 1,393,700.60
65,058.65 65,058.65 66,487.22 75,058.65 60,772.94 80,772.94 80,772.94 59,344.37 59,344.37
5,123,108.52 5,314,952.90 5,021,847.63 6,300,416.48 4,983,296.28 6,094,640.78 6,364,098.83 4,962,742.71 4,999,209.13
199,538.44 203,425.62 203,787.32 310,463.57 196,296.80 300,731.66 322,218.51 193,274.48 195,805.15
684,151.26 699,477.47 699,058.21 1,098,562.49 680,749.69 1,044,498.26 1,127,604.40 673,158.62 682,956.32
HARGA SEWA PERALATAN BIDANG KE PU AN PROVINSI KALIMANT
NO URAIAN KODE SATUAN KAB BULUNGAN KOTA
Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu TARAKAN
Tarakan
24 CONCRETE CUTTER 130 feet/mnt E76 Rp/jam 51,848.14 51,848.14 51,848.14 53,276.71 53,276.71 51,848.14
25 CONCRETE MIXER 0.3-0.6 M3 E06 Rp/jam 87,184.43 88,907.16 88,359.38 93,607.90 92,416.25 85,374.43
26 CONCRETE PAN MIXER E43 Rp/jam 284,198.45 286,742.32 285,972.71 294,069.33 300,710.47 283,378.40
27 CONCRETE PUMP E28 Rp/jam 609,410.12 621,917.63 617,985.12 643,928.70 635,478.44 601,344.39
28 CONCRETE VIBRATOR E20 Rp/jam 57,878.25 58,393.57 58,231.05 60,739.80 60,864.75 57,585.38
29 Concrete Mixer (350) E47 Rp/jam 76,808.43 78,210.97 77,762.39 82,319.92 81,353.80 75,397.43
30 CRANE 10-15 TON E07 Rp/jam 576,842.89 588,441.50 584,797.40 609,187.97 600,401.10 554,632.62
31 CRANE ON TRACK 35 TON E31 Rp/jam 1,191,025.93 1,206,186.14 1,201,555.54 1,227,107.48 1,214,010.58 1,140,685.67
32 CRANE ON TRACK 75-100 TON E51 Rp/jam 2,224,250.03 2,250,898.63 2,242,806.17 2,284,540.88 2,260,945.03 2,128,171.45
33 DRUM MIXER E79 Rp/jam 344,957.14 344,957.14 344,957.14 346,385.71 346,385.71 344,957.14
34 DUMP TRUCK 3 - 4 M3 E08 Rp/jam 249,508.14 256,659.12 254,376.70 271,548.83 269,495.82 244,346.02
35 DUMP TRUCK 6-8 M3 E09 Rp/jam 375,138.99 388,276.38 384,068.20 415,088.47 409,293.50 365,973.09
36 EXCAVATOR 80-140 HP E10 Rp/jam 494,478.66 505,217.00 501,830.65 525,074.96 526,978.25 485,345.74
37 EXCAVATOR Long Arm 155 HP Rp/jam 557,173.92 569,599.50 565,678.44 592,467.78 594,335.21 546,680.79
38 FLAT BED TRUCK 3-4 TON E11 Rp/jam 286,792.64 293,392.64 291,267.64 308,046.21 303,671.21 282,417.64
39 FULVI MIXER E27 Rp/jam 988,362.66 1,018,858.28 1,009,186.64 1,077,065.43 1,055,650.06 952,084.85
40 GENERATOR SET E12 Rp/jam 314,308.34 326,452.46 322,552.00 351,799.23 343,632.66 304,718.25
41 GROUTING PUMP E56 Rp/jam 175,171.14 181,801.77 179,668.02 196,468.46 192,059.66 170,597.29
42 HOT RECYCLER E39 Rp/jam 3,518,233.19 3,565,048.52 3,550,715.57 3,630,983.67 3,590,947.26 3,368,166.10
43 HYDROLIC PUMP E83 Rp/jam 42,993.00 42,993.00 42,993.00 44,421.57 44,421.57 42,993.00
44 JACK HAMMER E26 Rp/jam 46,194.04 46,194.04 46,194.04 47,622.61 47,622.61 46,194.04
45 JACK HIDROLIC E57 Rp/jam 123,131.60 124,290.96 123,935.78 127,256.04 125,757.18 118,965.65
46 JACK HIDROLIK JEMBATAN E82 Rp/jam 59,297.54 59,297.54 59,297.54 60,726.11 60,726.11 59,297.54
47 KUNCI TORSI 200-1000N.M E74 Rp/jam 46,231.07 46,231.07 46,231.07 47,659.64 47,659.64 46,231.07
48 MANIFOLD E84 Rp/jam 41,124.64 41,124.64 41,124.64 42,553.21 42,553.21 41,124.64
49 Mesin Amplas kayu E73 Rp/jam 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00
50 MESIN LAS E58 Rp/jam 70,809.09 71,242.12 71,110.06 73,236.35 72,536.50 69,090.98
51 MESIN POTONG RUMPUT E65 Rp/jam 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33
52 MINI EXCAVATOR 40-60 HP E10a Rp/jam 277,732.70 278,990.08 278,630.83 280,957.53 285,240.93 274,969.22
53 MOBILE CRANE 1 TON E78 Rp/jam 187,709.41 187,709.41 187,709.41 189,137.98 189,137.98 187,709.41
54 MOTOR GRADER >100 HP E13 Rp/jam 669,460.38 681,537.08 677,763.56 702,176.56 688,266.57 638,697.80
55 PEDESTRIAN ROLLER E24 Rp/jam 217,550.79 219,302.99 218,781.30 222,397.39 220,719.28 209,559.26
56 PILE DRIVER + HAMMER E30 Rp/jam 144,539.58 146,699.96 146,022.89 151,653.52 149,996.36 140,131.65
57 PILE DRIVER LEADER, 75 kw E59 Rp/jam 144,592.77 149,307.02 147,792.59 160,033.48 165,638.33 149,271.99
58 PILE HAMMER E60 Rp/jam 305,539.76 308,099.75 307,340.54 311,892.40 425,706.42 404,352.26
59 PILE HAMMER, 2,5 Ton E61 Rp/jam 58,121.65 58,315.25 58,257.54 59,930.76 59,746.15 57,249.36
60 POMPA + MIXER EPOXY, 810 Watt E75 Rp/jam 42,145.93 42,145.93 42,145.93 43,574.50 43,574.50 42,145.93
61 POWER BROOM E03 Rp/jam 69,003.35 70,045.84 69,714.64 73,441.50 72,716.75 67,859.89
62 ROCK DRILL BREAKER E37 Rp/jam 543,926.53 555,738.70 552,013.72 577,582.46 579,676.07 533,880.31
63 SAND BLASTING E77 Rp/jam 42,401.25 42,401.25 42,401.25 43,829.82 43,829.82 42,401.25
64 SLIP FORM PAVER E42 Rp/jam 2,579,728.11 2,607,149.71 2,598,898.61 2,641,277.32 2,616,071.37 2,468,624.73
65 STAMPER E81 Rp/jam 53,890.71 53,890.71 53,890.71 55,319.29 55,319.29 53,890.71
66 STONE CRUSHER E21 Rp/jam 984,588.42 1,003,574.28 997,623.32 1,037,440.36 1,022,885.52 945,964.37
67 STRESSING JACK E62 Rp/jam 217,011.60 223,310.92 221,298.15 236,692.02 232,328.76 210,356.03
68 TAMPER E25 Rp/jam 86,029.14 86,465.03 86,336.32 88,270.45 87,842.53 83,901.95
69 TANDEM ROLLER 6-8 T. E17 Rp/jam 446,449.11 453,519.79 451,321.83 465,702.15 460,059.23 429,124.03
70 TANDEM ROLLER 8-10 T. E17a Rp/jam 427,645.17 434,245.17 432,120.17 448,898.74 444,523.74 423,270.17
71 THERMOPLASTIC ROAD MARKING MACHINE E85 Rp/jam 71,733.20 71,733.20 71,733.20 73,161.77 73,161.77 71,733.20
72 THREE WHEEL ROLLER 6-8 T E16 Rp/jam 238,891.01 243,414.18 241,990.23 252,499.29 249,107.07 230,684.95
73 TIRE ROLLER 8-10 T. E18 Rp/jam 476,823.83 487,552.07 484,163.82 507,613.63 499,700.24 459,110.82
74 TRACK LOADER 75-100 HP E14 Rp/jam 331,636.66 337,660.21 335,771.70 348,947.81 344,335.93 319,460.17
75 TRAILER 20 TON E29 Rp/jam 410,517.48 423,051.35 419,051.50 448,045.33 439,302.99 396,472.49
76 TRONTON 15 TON E35 Rp/jam 470,859.21 484,013.52 479,838.36 512,940.72 503,745.22 455,765.82
77 Truk Mixer E49 Rp/jam 589,215.08 605,553.32 600,358.82 636,856.13 625,223.99 567,783.32
78 VIBRATING RAMMER E48 Rp/jam 48,744.78 49,106.30 48,991.34 51,221.92 50,971.95 48,366.28
79 VIBRATORY ROLLER 5-8 T. E19 Rp/jam 264,438.77 270,672.87 268,695.49 283,298.27 278,803.26 255,512.96
80 WATER JET BLASTING E64 Rp/jam 52,392.36 52,392.36 52,392.36 53,820.93 53,820.93 52,392.36
G KE PU AN PROVINSI KALIMANTAN UTARA TAHUN 2021
KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah
58,991.00 58,991.00 60,419.57 68,991.00 54,705.29 74,705.29 74,705.29 53,276.71 53,276.71
97,050.79 98,376.04 99,336.40 139,667.89 93,040.82 140,351.87 147,321.95 91,097.25 91,920.10
314,317.49 324,062.08 310,887.95 360,228.71 298,662.81 360,499.32 366,564.21 296,837.69 297,837.71
631,201.72 636,394.21 642,901.29 879,329.53 634,183.00 847,522.68 895,713.82 629,566.93 635,194.31
66,589.26 67,260.86 67,958.65 85,436.10 62,072.22 89,711.76 91,653.11 60,502.02 60,741.21
86,100.89 87,108.69 88,309.17 123,025.77 82,122.37 124,626.25 130,353.77 80,268.80 80,942.44
612,539.80 632,591.71 606,774.22 803,082.23 597,275.67 778,053.62 818,621.38 592,914.60 598,112.82
1,257,277.45 1,307,173.79 1,221,725.54 1,418,118.91 1,211,314.15 1,390,274.36 1,429,559.19 1,207,229.33 1,213,270.66
2,343,054.31 2,439,199.31 2,269,655.68 2,587,876.31 2,255,773.60 2,536,960.50 2,601,121.10 2,250,095.03 2,260,446.22
352,100.00 352,100.00 353,528.57 362,100.00 347,814.29 367,814.29 367,814.29 346,385.71 346,385.71
265,474.25 267,777.96 275,744.53 415,647.85 267,624.40 400,598.31 429,322.51 264,070.82 267,484.47
398,211.27 402,524.11 414,610.33 670,932.38 404,452.07 637,767.54 692,089.24 398,986.00 405,338.42
536,354.72 553,150.66 533,278.07 721,367.55 524,017.82 697,908.10 736,803.66 519,763.00 524,666.64
603,689.09 622,634.93 600,470.45 817,902.75 590,648.78 789,730.68 835,009.82 585,926.46 591,614.83
301,735.49 303,960.49 309,764.06 447,485.49 301,799.78 433,137.28 461,549.78 298,246.21 301,496.21
1,048,046.75 1,076,215.39 1,059,163.50 1,618,568.49 1,043,209.64 1,536,554.56 1,657,213.08 1,032,897.31 1,047,314.49
337,377.79 343,183.63 348,957.55 591,007.45 339,121.23 560,285.09 611,571.66 333,867.66 339,793.30
190,332.74 192,766.53 198,160.87 335,999.22 190,188.23 321,613.42 350,042.62 186,634.66 189,893.43
3,705,256.99 3,853,352.44 3,602,315.08 4,216,864.53 3,576,318.69 4,117,273.63 4,242,059.27 3,566,390.12 3,585,236.33
50,135.86 50,135.86 51,564.43 60,135.86 45,850.14 65,850.14 65,850.14 44,421.57 44,421.57
53,336.89 53,336.89 54,765.46 63,336.89 49,051.18 69,051.18 69,051.18 47,622.61 47,622.61
134,086.92 137,689.89 132,930.25 156,309.74 126,855.75 159,409.29 162,520.98 125,214.68 125,681.66
66,440.39 66,440.39 67,868.97 76,440.39 62,154.68 82,154.68 82,154.68 60,726.11 60,726.11
53,373.93 53,373.93 54,802.50 63,373.93 49,088.21 69,088.21 69,088.21 47,659.64 47,659.64
48,267.50 48,267.50 49,696.07 58,267.50 43,981.79 63,981.79 63,981.79 42,553.21 42,553.21
20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00
79,263.78 80,637.52 79,692.95 93,686.36 73,844.47 98,434.61 99,574.12 72,338.65 72,511.42
24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33 24,333.33
299,798.36 308,641.50 292,737.51 306,261.10 286,669.50 310,383.62 311,091.07 285,240.93 285,612.34
194,852.27 194,852.27 196,280.84 204,852.27 190,566.55 210,566.55 210,566.55 189,137.98 189,137.98
705,029.80 729,409.99 694,846.98 889,741.72 685,240.14 864,523.87 904,590.86 680,942.82 686,228.13
233,747.22 241,929.87 228,089.22 252,498.48 221,857.46 255,009.63 258,148.88 220,241.88 220,863.33
157,278.03 161,314.17 157,015.91 199,823.58 150,599.93 199,895.86 207,277.37 148,640.11 149,598.77
167,057.90 169,675.68 172,088.60 271,658.79 164,756.91 263,138.47 283,112.04 161,840.83 164,160.37
447,999.80 465,781.39 433,422.69 467,460.77 426,733.00 467,578.48 472,433.04 425,046.92 426,177.35
66,253.91 67,146.13 66,913.31 77,263.42 61,141.72 82,620.49 82,974.21 59,691.90 59,760.94
49,288.79 49,288.79 50,717.36 59,288.79 45,003.07 65,003.07 65,003.07 43,574.50 43,574.50
77,843.52 78,699.00 79,728.39 107,389.64 73,662.92 110,074.88 114,261.76 71,925.35 72,421.59
589,990.20 608,465.73 586,605.88 793,504.30 576,419.60 767,698.91 810,484.03 571,739.30 577,133.30
49,544.11 49,544.11 50,972.68 59,544.11 45,258.39 65,258.39 65,258.39 43,829.82 43,829.82
2,717,140.08 2,829,677.01 2,628,590.99 2,934,164.63 2,608,900.80 2,885,410.39 2,943,541.37 2,603,774.73 2,613,993.67
61,033.57 61,033.57 62,462.14 71,033.57 56,747.86 76,747.86 76,747.86 55,319.29 55,319.29
1,042,218.81 1,077,562.81 1,030,364.91 1,345,832.06 1,015,625.52 1,301,928.03 1,366,871.45 1,009,521.95 1,017,950.80
234,134.45 239,014.60 238,653.11 363,791.99 230,820.33 351,128.66 376,647.78 227,500.51 230,514.80
95,566.85 97,757.25 95,052.32 107,176.72 89,210.80 112,137.35 112,827.39 87,743.60 87,893.14
474,868.98 491,300.57 467,013.19 579,806.19 459,036.23 567,955.89 590,245.83 456,029.00 459,064.13
442,588.03 444,813.03 450,616.60 588,338.03 442,652.31 573,989.81 602,402.31 439,098.74 442,348.74
78,876.06 78,876.06 80,304.63 88,876.06 74,590.34 94,590.34 94,590.34 73,161.77 73,161.77
256,703.65 264,017.21 255,916.02 338,930.23 248,720.64 332,513.98 348,628.04 246,123.32 248,166.59
507,484.12 522,884.96 505,921.48 695,787.78 496,673.81 672,186.21 711,534.85 492,376.49 497,284.66
354,264.90 365,392.09 351,126.57 455,462.03 343,454.50 445,410.02 466,064.34 340,538.43 343,215.35
438,337.96 448,939.88 444,876.68 683,217.18 434,956.56 652,614.62 702,873.15 429,809.24 435,778.49
502,955.69 514,489.37 512,138.67 771,231.93 496,286.65 738,931.95 791,335.10 490,995.58 497,233.95
626,505.37 643,797.46 630,552.73 930,196.53 619,392.56 889,541.84 953,041.10 613,288.99 620,959.66
56,457.80 56,734.41 58,067.97 73,308.06 52,231.68 77,966.29 79,429.87 50,694.96 50,867.69
283,849.77 291,279.50 285,309.33 402,922.68 277,525.83 391,176.78 414,923.45 274,354.76 277,255.18
59,535.21 59,535.21 60,963.78 69,535.21 55,249.50 75,249.50 75,249.50 53,820.93 53,820.93
HARGA SEWA PERALATAN BIDANG KE PU AN PROVINSI KALIMANT
NO URAIAN KODE SATUAN KAB BULUNGAN KOTA
Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu TARAKAN
Tarakan
81 WATER PUMP 70-100 mm E22 Rp/jam 48,377.26 48,786.36 48,655.12 51,014.05 50,737.08 48,029.65
82 WATER TANKER 3000-4500 L. E23 Rp/jam 337,379.82 347,131.95 344,022.59 366,775.18 359,939.31 326,005.17
83 WELDING MACHINE, 300 A E63 Rp/jam 46,992.22 47,334.89 47,225.02 49,430.14 49,193.29 46,687.30
84 WELDING SET E32 Rp/jam 61,815.89 62,602.79 62,351.64 65,512.21 64,943.97 60,920.37
85 WHEEL LOADER 1.0-1.6 M3 E15 Rp/jam 522,195.76 531,028.58 528,275.21 546,223.22 538,456.33 501,010.60

BALAT LAINNYA
1
Alat pancang hammer 2 ton Rp/hari 500,000.00 525,000.00 520,000.00 575,000.00 560,000.00 485,000.00
2
Alat pancang hammer 0,5 ton Rp/hari 350,000.00 367,500.00 364,000.00 402,500.00 392,000.00 339,500.00
3
Alat pancang dengan tripod tinggi 5 - 7m beban Rp/hari 500,000.00 525,000.00 520,000.00 575,000.00 560,000.00 485,000.00
tumbuk 1-2 ton
4
Bor Listrik Rp/hari 100,000.00 105,000.00 104,000.00 115,000.00 112,000.00 97,000.00
5
Bore Pile Machine portable Rp/jam 250,000.00 262,500.00 260,000.00 287,500.00 280,000.00 242,500.00
6
Chain Saw Rp/jam 20,000.00 21,000.00 20,800.00 23,000.00 22,400.00 19,400.00
7
Drone Rp/hari 163,622.40 171,800.00 170,100.00 188,100.00 183,200.00 158,700.00
8
Generator Set 1500 watt Rp/jam 50,000.00 52,500.00 52,000.00 57,500.00 56,000.00 48,500.00
9
Jack Tension Rp/hari 2,500,000.00 2,625,000.00 2,600,000.00 2,875,000.00 2,800,000.00 2,425,000.00
10 Jack-in hydraulics kap 380 ton Rp/jam 2,000,000.00 2,100,000.00 2,080,000.00 2,300,000.00 2,240,000.00 1,940,000.00
11 Kendaraan roda 4 pick up L300 Rp/hari 300,000.00 315,000.00 312,000.00 345,000.00 336,000.00 291,000.00
12 Kertas HVS atau Kalkir rim 50,000.00 52,500.00 52,000.00 57,500.00 56,000.00 48,500.00
13 Lift Kerja Rp/hari 550,000.00 577,500.00 572,000.00 632,500.00 616,000.00 533,500.00
14 Mesin Las listrik 250 A diesel Rp/hari 250,000.00 262,500.00 260,000.00 287,500.00 280,000.00 242,500.00
15 Mesin potong besi Rp/hari 100,000.00 105,000.00 104,000.00 115,000.00 112,000.00 97,000.00
16 Molen/Beton Mixer Rp/hari 110,000.00 115,500.00 114,400.00 126,500.00 123,200.00 106,700.00
17 Motor 2 Kw 1350 rpm + pengkabelan Rp/hari 200,000.00 210,000.00 208,000.00 230,000.00 224,000.00 194,000.00
18 Perahu Rp/hari 100,000.00 105,000.00 104,000.00 115,000.00 112,000.00 97,000.00
19 Peralatan potong pipa T1/manual (gergaji) / saw Rp/hari 75,000.00 78,700.00 78,000.00 86,200.00 84,000.00 72,700.00
20 Peralatan potong pipa T2/mekanik / cilinder saw Rp/hari 150,000.00 157,500.00 156,000.00 172,500.00 168,000.00 145,500.00
21 Pompa air diesel 10 KW Rp/hari 150,000.00 157,500.00 156,000.00 172,500.00 168,000.00 145,500.00
22 Pompa air diesel 20 KW Rp/hari 200,000.00 210,000.00 208,000.00 230,000.00 224,000.00 194,000.00
23 Pompa air diesel 5 KW Rp/hari 100,000.00 105,000.00 104,000.00 115,000.00 112,000.00 97,000.00
24 Pompa Submersible 3m³/h Rp/hari 120,000.00 126,000.00 124,800.00 138,000.00 134,400.00 116,400.00
25 Ponton Rp/hari 600,000.00 630,000.00 624,000.00 690,000.00 672,000.00 582,000.00
26 Scaffolding Rp/hari 35,000.00 36,700.00 36,400.00 40,200.00 39,200.00 33,900.00
27 Sewa Komputer Rp/hari 50,000.00 52,500.00 52,000.00 57,500.00 56,000.00 48,500.00
28 Sewa scanner ukuran A4 Rp/hari 15,000.00 15,700.00 15,600.00 17,200.00 16,800.00 14,500.00
29 Stamper Rp/hari 200,000.00 210,000.00 208,000.00 230,000.00 224,000.00 194,000.00
30 Stamper Kodok Rp/hari 150,000.00 157,500.00 156,000.00 172,500.00 168,000.00 145,500.00
31 Support pipa Rp/hari 80,000.00 84,000.00 83,200.00 92,000.00 89,600.00 77,600.00
32 Tamper Rp/jam 35,000.00 36,700.00 36,400.00 40,200.00 39,200.00 33,900.00
33 Theodolith Rp/hari 350,000.00 367,500.00 364,000.00 402,500.00 392,000.00 339,500.00
34 Tinta hitam Rp/hari 150,000.00 157,500.00 156,000.00 172,500.00 168,000.00 145,500.00
35 Tongkang Rp/hari 500,000.00 525,000.00 520,000.00 575,000.00 560,000.00 485,000.00
36 Total Station Rp/hari 481,225.60 505,200.00 500,400.00 553,400.00 538,900.00 466,700.00
37 Tripod tinggi 5 m Rp/hari 125,000.00 131,200.00 130,000.00 143,700.00 140,000.00 121,200.00
38 Tripod tinggi 7 m Rp/hari 150,000.00 157,500.00 156,000.00 172,500.00 168,000.00 145,500.00
39 Tripot/tackel dan handle crane 2 T Rp/hari 250,000.00 262,500.00 260,000.00 287,500.00 280,000.00 242,500.00
40 Waterpass Rp/hari 300,000.00 315,000.00 312,000.00 345,000.00 336,000.00 291,000.00

harga satuan pokok


PROVINSI KALIMANTAN UTA
HARGA SATUAN DASA
G KE PU AN PROVINSI KALIMANTAN UTARA TAHUN 2021
KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah
56,081.73 56,304.59 57,820.51 74,190.98 51,967.65 78,685.43 80,397.33 50,411.58 50,610.34
361,067.90 369,813.47 365,894.34 552,033.68 356,912.88 529,630.06 568,446.28 352,615.56 357,244.21
54,611.25 54,808.66 56,287.09 71,364.28 50,456.86 76,059.93 77,487.45 48,922.04 49,088.16
70,231.02 70,890.05 71,987.89 94,997.81 66,009.54 98,430.66 101,589.17 64,347.22 64,722.11
553,811.78 572,932.94 545,270.60 687,337.72 536,716.91 670,734.67 699,369.49 533,248.33 537,081.71

550,000.00 560,000.00 575,000.00 1,000,000.00 565,000.00 1,000,000.00 1,000,000.00 560,000.00 570,000.00


385,000.00 392,000.00 402,500.00 700,000.00 395,500.00 700,000.00 700,000.00 392,000.00 399,000.00
550,000.00 560,000.00 575,000.00 1,000,000.00 565,000.00 1,000,000.00 1,000,000.00 560,000.00 570,000.00

110,000.00 112,000.00 115,000.00 200,000.00 113,000.00 200,000.00 200,000.00 112,000.00 114,000.00


275,000.00 280,000.00 287,500.00 500,000.00 282,500.00 500,000.00 500,000.00 280,000.00 285,000.00
22,000.00 22,400.00 23,000.00 40,000.00 22,600.00 40,000.00 40,000.00 22,400.00 22,800.00
179,900.00 183,200.00 188,100.00 327,200.00 184,800.00 327,200.00 327,200.00 183,200.00 186,500.00
55,000.00 56,000.00 57,500.00 100,000.00 56,500.00 100,000.00 100,000.00 56,000.00 57,000.00
2,750,000.00 2,800,000.00 2,875,000.00 5,000,000.00 2,825,000.00 5,000,000.00 5,000,000.00 2,800,000.00 2,850,000.00
2,200,000.00 2,240,000.00 2,300,000.00 4,000,000.00 2,260,000.00 4,000,000.00 4,000,000.00 2,240,000.00 2,280,000.00
330,000.00 336,000.00 345,000.00 600,000.00 339,000.00 600,000.00 600,000.00 336,000.00 342,000.00
55,000.00 56,000.00 57,500.00 100,000.00 56,500.00 100,000.00 100,000.00 56,000.00 57,000.00
605,000.00 616,000.00 632,500.00 1,100,000.00 621,500.00 1,100,000.00 1,100,000.00 616,000.00 627,000.00
275,000.00 280,000.00 287,500.00 500,000.00 282,500.00 500,000.00 500,000.00 280,000.00 285,000.00
110,000.00 112,000.00 115,000.00 200,000.00 113,000.00 200,000.00 200,000.00 112,000.00 114,000.00
121,000.00 123,200.00 126,500.00 220,000.00 124,300.00 220,000.00 220,000.00 123,200.00 125,400.00
220,000.00 224,000.00 230,000.00 400,000.00 226,000.00 400,000.00 400,000.00 224,000.00 228,000.00
110,000.00 112,000.00 115,000.00 200,000.00 113,000.00 200,000.00 200,000.00 112,000.00 114,000.00
82,500.00 84,000.00 86,200.00 150,000.00 84,700.00 150,000.00 150,000.00 84,000.00 85,500.00
165,000.00 168,000.00 172,500.00 300,000.00 169,500.00 300,000.00 300,000.00 168,000.00 171,000.00
165,000.00 168,000.00 172,500.00 300,000.00 169,500.00 300,000.00 300,000.00 168,000.00 171,000.00
220,000.00 224,000.00 230,000.00 400,000.00 226,000.00 400,000.00 400,000.00 224,000.00 228,000.00
110,000.00 112,000.00 115,000.00 200,000.00 113,000.00 200,000.00 200,000.00 112,000.00 114,000.00
132,000.00 134,400.00 138,000.00 240,000.00 135,600.00 240,000.00 240,000.00 134,400.00 136,800.00
660,000.00 672,000.00 690,000.00 1,200,000.00 678,000.00 1,200,000.00 1,200,000.00 672,000.00 684,000.00
38,500.00 39,200.00 40,200.00 70,000.00 39,500.00 70,000.00 70,000.00 39,200.00 39,900.00
55,000.00 56,000.00 57,500.00 100,000.00 56,500.00 100,000.00 100,000.00 56,000.00 57,000.00
16,500.00 16,800.00 17,200.00 30,000.00 16,900.00 30,000.00 30,000.00 16,800.00 17,100.00
220,000.00 224,000.00 230,000.00 400,000.00 226,000.00 400,000.00 400,000.00 224,000.00 228,000.00
165,000.00 168,000.00 172,500.00 300,000.00 169,500.00 300,000.00 300,000.00 168,000.00 171,000.00
88,000.00 89,600.00 92,000.00 160,000.00 90,400.00 160,000.00 160,000.00 89,600.00 91,200.00
38,500.00 39,200.00 40,200.00 70,000.00 39,500.00 70,000.00 70,000.00 39,200.00 39,900.00
385,000.00 392,000.00 402,500.00 700,000.00 395,500.00 700,000.00 700,000.00 392,000.00 399,000.00
165,000.00 168,000.00 172,500.00 300,000.00 169,500.00 300,000.00 300,000.00 168,000.00 171,000.00
550,000.00 560,000.00 575,000.00 1,000,000.00 565,000.00 1,000,000.00 1,000,000.00 560,000.00 570,000.00
529,300.00 538,900.00 553,400.00 962,400.00 543,700.00 962,400.00 962,400.00 538,900.00 548,500.00
137,500.00 140,000.00 143,700.00 250,000.00 141,200.00 250,000.00 250,000.00 140,000.00 142,500.00
165,000.00 168,000.00 172,500.00 300,000.00 169,500.00 300,000.00 300,000.00 168,000.00 171,000.00
275,000.00 280,000.00 287,500.00 500,000.00 282,500.00 500,000.00 500,000.00 280,000.00 285,000.00
330,000.00 336,000.00 345,000.00 600,000.00 339,000.00 600,000.00 600,000.00 336,000.00 342,000.00

n pokok kegiatan
TAN UTARA 2021
AN DASAR - BAHAN
HARGA SATUAN DASAR BAHAN BIDANG KE PU AN
PROVINSI KALIMANTAN UTARA TAHUN 2021
NO URAIAN KODE SATUAN KAB MALINAU
Malinau

I ALAT PERTUKANGAN, ALAT PERLENGKAPAN K3


A ALAT PERTUKANGAN
1 Batu Asahan Buah 43,800.00
2 Benang Nylon Roll 16,300.00
3 Bethel Buah 43,800.00
4 Bodem Buah 131,500.00
5 Cangkul Buah 104,000.00
6 Cangkul (lengkap) Buah 120,500.00
7 Cetakan armor Buah 1,644,100.00
8 Cetakan armor 0,5 ton Buah 2,740,200.00
9 Cetakan armor 0,75 ton Buah 3,836,300.00
10 Cetakan armor 1 ton Buah 4,384,400.00
11 Cetakan armor 1,5 ton Buah 5,480,500.00
12 Cetakan armor 2 ton Buah 6,576,600.00
13 Ember Cor Buah 19,600.00
14 Gergaji besi Buah 21,900.00
15 Gergaji Kayu Buah 136,900.00
16 Gerobak Pasir Buah 646,600.00
17 Gunting Pemotong Buah 493,200.00
18 Hammer Cabut Buah 104,000.00
19 Hammer konde Buah 93,100.00
20 Kain Majun Kg 24,000.00
21 Kasut Kayu Buah 21,900.00
22 Keranjang Buah 21,900.00
23 Kereta Dorong Buah 685,000.00
24 Kotak Adukan Jam 32,800.00
25 Kuas Buah 27,300.00
26 Kuas 2" - 4" Buah 20,500.00
27 Kunci Pembengkok Buah 21,900.00
28 Linggis Buah 93,100.00
28 Motor 2 Kw 1350 rpm + pengkabelan Set 5,480,500.00
28 Roll meter 50 m Buah 109,600.00
30 Pahat beton Buah 82,100.00
31 Palu Buah 71,100.00
32 Tang Pemotong Kawat Buah 40,400.00

B ALAT PELINDUNG DIRI (APD )


1 Topi pelindung (Safety helmet) Buah 109,600.00
2 Pelindung mata (Goggles, Spectacles) Psg 32,800.00
3 Tameng muka (Face shield) Buah 438,400.00
4 Pelindung pernafasan dan mulut (Masker) Box 54,800.00
5 Sarung tangan (Safety gloves) Psg 21,900.00
6 Sepatu keselamatan (Safety shoes) Psg 493,200.00
7 Penunjang seluruh tubuh (Full bodu harness) Buah 876,800.00
8 Rompi keselamatan (Safety vest) Buah 109,600.00
9 Celemek (A[ron/coveralls) Buah 274,000.00
10 Pelindung jatuh (Fall arrester) Buah 328,800.00

C ALAT PELINDUNG KERJA ( APK )


1 Jaring Pengaman (Safety Net) Ls 21,922,000.00
2 Tali Keselamatan (Life Line) Ls 5,480,500.00
3 Penahan Jatuh Ls 10,961,000.00
4 Pagar Pengaman (Guard Railling) Ls 10,961,000.00
5 Pembatas Area (Restricted Area) Ls 3,288,300.00

D FASILITAS SARANA DAN PRASARANA KESEHATAN


1 Peralatan P3K (Kotak P3K, Tandu,Obat Luka,Perban dll) Ls 2,192,200.00
2 Ruang P3K (Tempat Tidur Pasien,Stetoskop,timbangan Ls 16,441,500.00
berat Badan)
3 Peralatan Pengasapan (Fogging) Ls 1,096,100.00

II BAHAN
A BAHAN BERBUTIR
1 Abu Batu Filler M3 756,300.00
2 Abu Batu Filler (kg) Kg 415.00
3 Agr.Base Kelas A M26 M3 720,274.30
4 Agr.Base Kelas B M27 M3 720,274.30
5 Agr.Base Kelas S M28 M3 545,962.46
6 Agregat Pecah Kasar M03 M3 520,500.00
7 Agregat Pecah Mesin 0-5 mm M91 M3 550,000.00
8 Agregat Pecah Mesin 10-20 mm M92 M3 550,000.00
9 Agregat Pecah Mesin 20-30 mm M93 M3 550,000.00
10 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 550,000.00
11 Agregat Pecah Mesin 5-10 mm M92 M3 550,000.00
12 Arbocell M45 Kg. 35,000.00
13 Asbuton B 5/20 M161 KG 2,800.00
14 Asbuton B 50/20 M163 KG 2,900.00
15 Aspal M10 KG 20,700.00
16 Aspal Emulsi M31 Kg 20,700.00
17 Aspal Emulsi CRS-1 atau RS-1 M31b Liter 21,300.00
18 Aspal Emulsi CSS-1 atau SS-1 M31a Liter 21,300.00
19 Aspal Emulsi Modifikasi Polimer 1h M31c Liter 21,300.00
20 Aspal Emulsi Modifikasi Polimer 2h M31d Liter 21,300.00
21 Aspal modifikasi Kg 16,300.00
22 Asphaltic plug M255 Kg 44,800.00
23 Asphaltic plug Moveable M256 Kg 49,200.00
24 Bahan Pengisi (Filler) Tambahan Kg 700.00
25 Bahan Pilihan M65 M3 161,000.00
26 Bahan Tanah Timbunan M66 M3 94,900.00
27 Batu Belah / Kerakal M06 M3 496,100.00
28 Batu Gunung belah 15/20 M3 506,100.00
29 Batu Kali M02 M3 498,600.00
30 Batu Pecah 1 - 2 cm M3 520,500.00
31 Batu Pecah 10 -15 cm M3 409,300.00
32 Batu Pecah 2 - 3 cm M3 520,500.00
33 Batu Pecah 3 - 5 cm M3 520,500.00
34 Batu Pecah 5 - 7 cm M3 520,500.00
35 Batubara M88 Kg 500.00
36 Chipping M41 M3 550,000.00
37 Chipping (kg) M41kg Kg 400.00
38 F i l l e r M05 Kg 415.00
39 G r a v e l M07 M3 1,000,000.00
40 Ijuk Kg 43,800.00
41 Kapur M40 M3 328,800.00
42 Kerikil M3 197,700.00
43 Pasir Beton M3 252,100.00
44 Pasir Beton (Kasar) M01a M3 246,500.00
45 Pasir Beton ex Palu M3 569,900.00
46 Pasir Halus (untuk HRS) M01c M3 208,200.00
47 Pasir Kasar M164 M3 213,600.00
48 Pasir Pasang M3 219,200.00
49 Pasir Pasang (Sedang) M01b M3 208,200.00
50 Pasir Tailing M3 175,300.00
51 Pasir untuk sand blasting M219 M3 25,100.00
52 Pasir Urug M44 M3 142,400.00
53 Pasir Urug (ada unsur lempung) M01d M3 131,500.00
54 S i r t u M16 M3 175,300.00
55 Semen merah M3 164,400.00
56 Tanah liat M3 191,700.00
57 Tanah Urug M3 76,700.00
58 Tanah Urug Pilihan M3 109,600.00

B BAHAN PASANGAN
1 Bata berongga ekspose Buah 3,700.00
2 Bata Pelapis Buah 6,600.00
3 Bata Ringan 7,5 x 20 x 60 Buah 17,500.00
4 Bataco ukuran 8 x 15 x 30 Buah 3,700.00
5 Batu Bata 8 x 8 x 16 Buah 1,200.00
6 Batu candi Buah 13,600.00
7 Batu granit kg 30,000.00
8 Batu muka Buah 14,200.00
9 Batu paras m2 185,800.00
10 Batu tempel hitam m2 191,600.00
11 Batu teraso kg 20,200.00
12 Concrete Block Buah 12,600.00
13 Grass Block Abu-abu (6 cm) isi 9/m2 Bh 38,300.00
14 Hollow Block 20 Buah 6,500.00
15 Kaca glass block Buah 39,400.00
16 Kansteen Type 15/20 x 40 x 50 cm Bh 64,800.00
17 Kansteen Type K.225 15/20 x 20 x 50 cm Bh 34,300.00
18 Kansteen Type K.225 15/20 x 30 x 50 cm Bh 51,500.00
19 Kansteen Type K.225 15/20 x 30 x 50 cm L Bh 51,500.00
20 Kansteen Type K.225 15/20 x 40 x 50 cm Bh 68,800.00
21 Kansteen Type K.225 20/20 x 30 x 50 cm Bh 68,800.00
22 Kansteen Type K.300 15/20 x 20 x 50 cm Bh 35,900.00
23 Kansteen Type K.300 15/20 x 30 x 50 cm Bh 53,900.00
24 Kansteen Type K.300 15/20 x 30 x 50 cm L Bh 53,900.00
25 Kansteen Type K.300 20/20 x 30 x 50 cm Bh 71,800.00
26 Paving Block M78 Buah 3,000.00
27 Paving Block Bata Merah (8 cm) isi 48/m2 Bh 3,800.00
28 Paving Block Benteng Merah (8 cm) isi 35/m2 Bh 4,100.00
29 Paving Block Bata Abu-abu (6 cm) isi 48/m2 Bh 3,100.00
30 Paving Block Bata Abu-abu (8 cm) isi 48/m2 Bh 5,100.00
31 Paving Block Bata Merah (6 cm) isi 48/m2 Bh 3,200.00
32 Paving Block Benteng Abu-abu (6 cm) isi 35/m2 Bh 3,900.00
33 Paving Block Benteng Abu-abu (8 cm) isi 35/m2 Bh 4,800.00
34 Paving Block Benteng Merah (6 cm) isi 35/m2 Bh 4,100.00
35 Paving Block Diagonal Abu-abu (6 cm) isi 40/m2 Bh 3,500.00 140000
36 Paving Block Diagonal Abu-abu (8 cm) isi 40/m2 Bh 4,400.00 176000
37 Paving Block Diagonal Jumbo Abu-abu (6 cm) isi 30/m2 Bh 4,500.00 198000
38 Paving Block Diagonal Jumbo Abu-abu (8 cm) isi 30/m2 Bh 5,800.00
39 Paving Block Diagonal Jumbo Merah (6 cm) isi Bh 4,500.00 180000
40 Paving Block Diagonal Jumbo Merah (8 cm) isi 30/m2 Bh 5,900.00 236000
41 Paving Block Diagonal Merah (6 cm) isi 40/m2 Bh 3,600.00 144000
42 Paving Block Diagonal Merah (8 cm) isi 40/m2 Bh 4,500.00
43 Paving Block Serasi Abu-abu (6 cm) isi 44/m2 Bh 3,600.00 158400
44 Paving Block Serasi Abu-abu (6 cm) isi 44/m2 Bh 3,600.00 158400
45 Paving Block Serasi Merah (6 cm) isi 44/m2 Bh 3,900.00 171600
46 Paving Block Serasi Merah (8 cm) isi 44/m2 Bh 4,400.00 193600
47 Paving Block Tiga Berlian Abu-abu (6 cm) isi Bh 3,100.00
48 Paving Block Tiga Berlian Abu-abu (8 cm) isi 35/m2 Bh 3,600.00
49 Paving Block Tiga Berlian Merah (6 cm) isi 35/m2 Bh 3,200.00
50 Paving Block Tiga Berlian Merah (8 cm) isi 35/m2 Bh 4,100.00
51 Paving Blok Abu-abu Besar Ukuran Tbl 6 cm Buah 3,200.00
52 Paving Blok Abu-abu Kecil Ukuran Tbl 6 cm Buah 3,000.00
53 Roster Ukuran 10 x 20 x 20 Buah 4,700.00
54 Roster Ukuran 10 x 20 x 25 Buah 5,900.00

C BAHAN SEMEN
1 Bahan Grouting M141 Kg 38,300.00
2 Bahan grouting tersedia jenis preformed M181 Kg 26,200.00
3 Beton K 175 Ready-mix (slump 10 + 2 cm) m3 1,440,700.00
4 Beton K 225 Ready-mix (slump 10 + 2 cm) m3 1,525,500.00
5 Beton K 250 Ready-mix (slump 10 + 2 cm) m3 1,565,000.00
6 Beton K 300 Ready-mix (slump 10 + 2 cm) m3 1,768,400.00
7 Beton K 350 Ready-mix (slump 10 + 2 cm) m3 1,898,400.00
8 Beton K 400 Ready-mix (slump 10 + 2 cm) m3 1,977,500.00
9 Beton K-125 M47 M3 1,496,100.00
10 Beton K-175 M60 M3 1,583,800.00
11 Beton K-250 M37 M3 1,748,200.00
12 Beton K-300 M59 M3 1,813,900.00
13 Beton K-350 M72 M3 1,956,400.00
14 Beton K-400 M3 1,977,500.00
15 Beton K-475 M3 1,977,500.00
16 Beton K-550 M3 2,486,000.00
17 Casing M100 M2 9,800.00
18 Grouting berbahan dasar Cellular Plastic M270 Kg 438,400.00
19 Grouting berbahan dasar semen M269 Kg 383,600.00
20 Grouting M119 M2 82,100.00
21 Grouting Semen kg 8,100.00
22 Joint Sealent M94 Kg 82,100.00
23 Kerb jenis 1 Bh 49,200.00
24 Kerb jenis 2 Bh 54,800.00
25 Kerb jenis 3 Bh 60,200.00
26 Kerb Type A M77 Bh 49,200.00
27 Mata Kucing M64 Bh 82,100.00
28 Matras Concrete M85 Buah 334,200.00
29 Mikro Pile 16x16x16 M84 M1 66,500.00
30 Mortar m3 876,800.00
31 Mortar Instant (40 kg) Zak 104,000.00
32 PCI Girder L=17m M58a Bh 94,264,600.00
33 PCI Girder L=21m M58b Bh 106,321,700.00
34 PCI Girder L=26m M58c Bh 135,916,400.00
35 PCI Girder L=32m M58d Bh 172,087,700.00
36 PCI Girder L=36m M58e Bh 184,144,800.00
37 PCI Girder L=41m M58f Bh 210,451,200.00
38 Perkerasan beton fast track <8 jam M226 Kg 3,178,600.00
39 Polyfelt TS 50 146,500.00
40 Screening untuk grouting Kg 2,700.00
41 Semen Kg 2,100.00
42 Semen / PC (kg) M12 Kg 2,100.00
43 Semen 50 kg Zak 95,000.00
44 Semen grout Kg 4,900.00
45 Semen Patching Kg 10,300.00
46 Semen Putih 40 Kg Zak 175,300.00
47 Semen Warna Kg 11,400.00
48 Tiang pancang spun pile d = 30 cm m 682,800.00
49 Tiang pancang spun pile d = 35 cm m 904,700.00
50 Tiang pancang spun pile d = 40 cm m 1,158,400.00
51 Tiang pancang spun pile d = 45 cm m 1,463,800.00
52 Tiang pancang spun pile d = 50 cm m 1,776,600.00
53 Tiang pancang spun pile d = 60 cm m 2,412,400.00
54 Tiang pancang square pile 20 x 20 cm m 394,500.00
55 Tiang pancang square pile 25 x 25 cm m 556,100.00
56 Tiang pancang square pile 30 x 30 cm m 738,600.00
57 Tiang pancang square pile 35 x 35 cm m 964,000.00
58 Tiang pancang square pile 40 x 40 cm m 1,218,800.00
59 Tiang pancang square pile 45 x 45 cm m 1,525,100.00
60 Turap beton tulang precast 30x12 cm m 374,800.00
61 Turap beton tulang precast 40 x 15 cm m 582,700.00
62 Water stop PVC lebar 150 mm m2 182,800.00
63 Water stop PVC lebar 200 mm m2 243,900.00
64 Water stop PVC lebar 230 - 320 mm m2 307,000.00
65 Water stop rubber lebar 150 - 200 mm m2 247,200.00
66 Bore Pile D 30 cm M' 653,800.00
67 Bore Pile D 35 cm M' 728,200.00
68 Bore Pile D 40 cm M' 841,200.00
69 Bore Pile D 45 cm M' 930,400.00

D BAHAN KAYU
1 Ajir tinggi 2 m Batang 27,300.00
2 Bahan Turap Kayu dengan pengawetan M196 M3 2,740,200.00
3 Bahan turap kayu tanpa pengawetan M192 M3 2,521,000.00
4 Bambu Batang 24,200.00
5 Bekisting m2 136,900.00
6 Bibit Mangrove bh 13,100.00
7 Bilik bambu m2 24,000.00
8 Cerucuk M61 M 8,100.00
9 Dolken Kayu Galam Diameter 8-10 cm panjang 300 cm Batang 36,700.00
10 Dolken Kayu Galam Diameter 8-10 cm panjang 400 cm Btg 41,000.00
11 Floordeck m2 274,000.00
12 Formite/penjaga jarak bekisting/spacer Buah 36,700.00
13 Gebalan Rumput M32 M2 65,700.00
14 Karung goni m2 42,600.00
15 Karung plastik / bagor bh 5,900.00
16 Kayu Acuan M99 M3 1,644,100.00
17 Kayu Bekisting M3 1,534,500.00
18 Kayu Bengkirai Papan 2 cm x 20 cm x 4 m M3 4,329,500.00
19 Kayu Bengkirai Papan 2,5 cm x 20 cm x 4 m M3 4,329,500.00
20 Kayu Bengkirai Ukuran 10 cm x 10 cm x 4 m M3 4,000,700.00
21 Kayu Bengkirai Ukuran 5 cm x 10 cm x 4 m M3 4,110,300.00
22 Kayu Bengkirai Ukuran 5 cm x 3 cm x 4 m M3 4,110,300.00
23 Kayu Bengkirai Ukuran 5 cm x 5 cm x 4 m M3 4,110,300.00
24 Kayu Bengkirai Ukuran 5 cm x 7 cm x 4 m M3 4,110,300.00
25 Kayu Bengkirai Ukuran 7 cm x 14 cm x 4 m M3 4,329,500.00
26 Kayu Kelas 1 M142 M3 5,206,400.00
27 Kayu List Profil Panjang 400 cm Btg 98,600.00
28 Kayu Meranti Ukuran 2,5 cm x 20 cm x 4 m M3 3,233,400.00
29 Kayu Meranti Ukuran 10 cm x 10 cm x 4 m M3 3,123,800.00
30 Kayu Meranti Ukuran 5 cm x 10 cm x 4 m M3 3,123,800.00
31 Kayu Meranti Ukuran 5 cm x 3 cm x 4 m M3 3,233,400.00
32 Kayu Meranti Ukuran 5 cm x 5 cm x 4 m M3 3,233,400.00
33 Kayu Meranti Ukuran 5 cm x 7 cm x 4 m M3 3,233,400.00
34 Kayu Meranti Ukuran 6 cm x 12 cm x 4 m M3 3,233,400.00
35 Kayu Perancah M19 M3 1,644,100.00
36 Kayu Ulin Papan 2.5 x 20 x 400 cm M3 5,699,700.00
37 Kayu Ulin Ukuran 10 cm x 10 cm x 4 m M3 5,425,600.00
38 Kayu Ulin Ukuran 12 cm x 12 cm x 4 m M3 5,699,700.00
39 Kayu Ulin Ukuran 15 cm x 15 cm x 4 m M3 6,028,500.00
40 Kayu Ulin Ukuran 2 cm x 10 cm x 4 m M3 5,425,600.00
41 Kayu Ulin Ukuran 2,5 cm x 20 cm x 4 m M3 5,699,700.00
42 Kayu Ulin Ukuran 20 cm x 20 cm x 4 m M3 6,138,100.00
43 Kayu Ulin Ukuran 5 cm x 10 cm x 4 m M3 5,425,600.00
44 Kayu Ulin Ukuran 5 cm x 20 cm x 4 m M3 5,699,700.00
45 Kayu Ulin Ukuran 5 cm x 5 cm x 4 m M3 5,699,700.00
46 Kayu Ulin Ukuran 5 cm x 7 cm x 4 m M3 5,699,700.00
47 Kayu Ulin Ukuran 7 cm x 14 cm x 4 m M3 6,028,500.00
48 Lem kayu Kg 38,300.00
49 Lumbercoll 16 mm Lembar 223,500.00
50 Melamine Lembar 85,400.00
51 Mini Timber Pile M79 Buah 71,100.00
52 Multipleks Mega Sungkai Lembar 120,500.00
53 Multipleks 12 mm M73 Lembar 282,500.00
54 Multipleks 18 mm Lembar 395,500.00
55 Multipleks 9 mm Lembar 223,700.00
56 Multiplek Sengon 12 mm Lembar 259,900.00
57 Multiplek Sengon 18 mm Lembar 350,300.00
58 Multiplek Sengon 9 mm Lembar 192,100.00
59 Multiplek Mega Sungkai Lembar 131,500.00
60 Papan Sungkai Btg 32,800.00
61 Phenol film 12 mm Lembar 169,800.00
62 Plastic aerator Lembar 21,900.00
63 Plastic sheet m2 19,600.00
64 Plastik Filter M23 M2 54,800.00
65 Tali rapia / plastik m 54.00
66 Tali pengikat m 548.00
67 Teakwood 3 mm Lembar 175,300.00
68 Teakwood 4 mm Lembar 202,700.00
69 Tiang Pancang Kayu M245 M3 3,836,300.00
70 Tiang pancang kayu dia 20 cm m 186,300.00
71 Triplek 3 mm Lembar 79,100.00
72 Triplek 3,6 mm Lembar 117,500.00
73 Triplek 4 mm Lembar 104,000.00
74 Triplek 5 mm Lembar 112,800.00
75 Triplek 6 mm Lembar 146,900.00
76 Triplek Lapisan Aluminium Lembar 136,900.00
77 HPL Lembar 372,900.00

E BAHAN BESI DAN ALUMUNIUM


1 Alat penyambung tiang pancang baja bh 67,900.00
2 Alat penyambung tiang pancang beton bh 93,100.00
3 Alat penyambung tiang pancang kayu bh 38,300.00
4 Alat Penyuntik Anti Gravitasi M127 Kg 147,900.00
5 Aluminium Foil Ds 820 1,25 x 60 m Roll 257,500.00
6 Aluminium Foil SS 810 1,25 x 60 m Roll 246,500.00
7 Alumunium gelombang 0.55 mm Lembar 41,500.00
8 Alumunium strip m 9,800.00
9 Ampelas Lembar 6,500.00
10 Anchorage M65 buah 712,400.00
11 Angkur M120 M2 274,000.00
12 Anti Korosif Baja M129 Kg 87,600.00
13 Anyaman Kawat Baja Dilas M258 Kg 35,000.00
14 Atap spandek zincalume 0,4 mm m2 104,000.00
15 Backer rod 1 1/6 inci M179 M1 18,500.00
16 Backer rod 3/8 inci M165 Kg 13,100.00
17 Backrod m' 38,300.00
18 Baja Bergelombang M46 Kg 38,300.00
19 Baja Grade 250 M220 Kg 27,300.00
20 Baja Grade 345 M221 Kg 32,800.00
21 Baja Grade 485 M222 Kg 43,800.00
22 Baja pelat tebal 3 mm kg 30,600.00
23 Baja Prategang M56 Kg 48,200.00
24 Baja profil 40.40.4 kg 29,400.00
25 Baja profil 50.50.5 kg 30,600.00
26 Baja Profil WF Kg 28,400.00
27 Baja Ringan Canal Dingin C75 ; 4 m Batang 144,600.00
28 Baja Struktur M48 Kg 27,300.00
29 Baja Tulangan Angkur M267 Kg 21,900.00
30 Baja Tulangan (Polos) U24 M39a Kg 18,000.00
31 Baja Tulangan (Polos) U32 M57a Kg 18,000.00
32 Baja Tulangan (Ulir) D32 M39b Kg 18,500.00
33 Baja Tulangan (Ulir) D39 M39c Kg 19,000.00
34 Baja Tulangan (Ulir) D48 M39d Kg 19,000.00
35 Baja untuk pelat buhul dan pelat ganjal M209 Buah 11,400.00
36 Batang Skoor L.40.40.4 (* Kg 32,800.00
37 Baut & Mur Buah 16,300.00
38 Baut Angkur M134 Kg 54,800.00
39 Baut Biasa Grade A diameter M25 M212 Buah 82,100.00
40 Baut Biasa Grade B diameter M25 M213 Buah 65,700.00
41 Baut Biasa Grade C untuk anchor bolts diameter M25 M214 Buah 54,800.00
42 Baut dan Mur M223 Buah 14,200.00
43 Baut diameter 12 mm panjang 20 mm kg 5,400.00
44 Baut mutu tinggi A325 Tipe 1 diameter M25 M210 Buah 82,100.00
45 Baut Mutu Tinggi A490 Tipe 1 diameter M25 M211 Buah 136,900.00
46 Besi Beton M13 Kg 18,000.00
47 Besi beton polos kg 18,000.00
48 Besi beton ulir kg 19,000.00
49 Besi hollow 20.20.2 m' 21,900.00
50 Besi hollow 40.40.2 kg 82,100.00
51 Besi hollow 40.40.2 m' 43,800.00
52 Besi hollow 50.50.3 kg 82,100.00
53 Besi plat kg 27,300.00
54 Besi profil kg 29,400.00
55 Besi siku 30.30.3 kg 29,400.00
56 Besi strip kg 30,000.00
57 Bonding Agent M198 Ltr 43,800.00
58 Bracket Besi Hollow Buah 21,900.00
59 Bracket Besi Rangka Hollow Buah 21,900.00
60 Bracket Siku Panel ACP Buah 16,300.00
61 Bridging Plate PL 125 x 6 M261 Kg 17,500.00
62 Canal C-75 tebal 0,6 mm m 32,800.00
63 Canal C-75 tebal 0,8 mm m 38,300.00
64 CPHMA M162 Ton 986,400.00
65 Curing membrane M259 Kg 219,200.00
66 Deck Drain M239 Buah 109,600.00
67 Dinabolt 12 mm bh 38,300.00
68 Ducting (Kabel prestress) M70 M' 96,300.00
69 Ducting (Strand prestress) M71 M' 96,300.00
70 Dynabolt / raamset Ø 8 mm panjang 4 - 5 cm buah 27,300.00
71 Elastomer M62 buah 361,700.00
72 Elastomer bearing pad; (450x400x45) mm3 M264 Buah 1,178,200.00
73 Elastomer Alam Kg 372,600.00
74 Elastomer jenis 1 M74a buah 339,700.00
75 Elastomer jenis 2 M74b buah 712,400.00
76 Elastomer jenis 3 M74c buah 969,900.00
77 Elastomer Sintesis Kg 416,500.00
78 Elektroda Las FCAW M218 Kg 32,800.00
79 Elektroda Las GMAW M217 Kg 43,800.00
80 Elektroda Las SAW M216 Kg 27,300.00
81 Elektroda Las SMAW M215 Kg 38,300.00
82 Epoxy Bahan Penutup (sealant) M126 Kg 37,200.00
83 Expansion Cap M96 M2 6,700.00
84 Expansion Join Baja Siku M75f M 301,300.00
85 Expansion Join Tipe Rubber M75e M 1,315,300.00
86 Expansion Joint Tipe Torma M80 M1 1,644,100.00
87 Expansion Tipe Joint Asphaltic Plug M75d M 1,096,100.00
88 Fibre jenis e-glass M2 1,918,100.00
89 Formwork plate m2 131,500.00
90 FRP jenis carbon untuk daerah basah M208 M2 164,400.00
91 FRP jenis carbon untuk daerah kering M207 M2 153,400.00
92 FRP jenis E-glass untuk daerah basah M205 M2 219,200.00
93 FRP jenis E-glass untuk daerah kering M204 M2 164,400.00
94 FRP jenis glass untuk daerah kering M206 M2 131,500.00
95 Insulasi M257 m2 328,800.00
96 Jendela nako M2 76,700.00
97 Joint Socket Pile 16x16x16 M83 Set 73,900.00
98 Joint Socket Pile 35x35 M82 Set 82,100.00
99 Kabel Prategang M116 Kg 71,100.00
100 Kabel pre-stressed kg 71,100.00
101 Karet Pengisi Sambungan Compression Seal M229 M' 1,315,300.00
102 Karet Pengisi Sambungan Strip Seal M228 M' 1,315,300.00
103 Kawat Bendrat Kg 28,400.00
104 Kawat Beton M14 Kg 28,400.00
105 Kawat Bronjong (bm) M15 Kg 22,900.00
105 Kawat bronjong pabrikasi kg 24,000.00
105 Kawat bronjong dia 10 mm kg 22,900.00
106 Kawat bronjong dia 2 mm kg 22,900.00
107 Kawat bronjong dia 3 mm kg 22,900.00
108 Kawat bronjong dia 8 mm kg 22,900.00
109 Kawat Duri Roll 115,000.00
110 Kawat Kasa Lebar 90 cm M 20,700.00
111 Kawat Las Kg 40,400.00
112 Kawat Las M51 Dos 197,200.00
113 Kawat Las Ukuran 2,6 mm RB 26 Dos 203,200.00
114 Kawat Las Ukuran 3,2 mm RB 26 Dos 210,400.00
115 Kawat Las Ukuran 4 mm RB 26 Dos 268,400.00
116 Kawat Nyamuk Lebar 90 cm M 39,400.00
117 Kawat penggantung Kg 100,700.00
118 Kawat seng Kg 82,100.00
119 Kawat Wiremesh Ukuran 8 mm x 2,25 m 50 m m 87,600.00
120 Kawat Wiremesh Ukuran 5 mm ulir kg 23,500.00
121 Kusen Allumunium SF 4" m' 233,400.00
122 Kusen Allumunium SF 6" m' 255,300.00
123 Lampu LED 100 watt M278 Buah 2,630,600.00
124 Lampu penerangan Jalan Tipe Merkuri 250 Watt M277 Buah 767,200.00
125 Lampu penerangan Jalan Tipe Merkuri 400 Watt M276 Buah 1,041,200.00
126 Landasan logam berongga (Pot Bearing) M234 Buah 3,836,300.00
127 Landasan logam jenis Spherical M235 Buah 4,932,400.00
128 Marmer M266 M2 548,000.00
129 Mistar ukur besi/allumunium pelat m' 136,900.00
130 Nok spandek zincalume m 32,800.00
131 P a k u M18 Kg 25,100.00
132 Pagar BRC 0,90 x 2,40 m bh 274,000.00
133 Pagar BRC 1,20 x 2,40 m bh 383,600.00
134 Paku asbes kg 49,200.00
135 Paku beton kg 38,300.00
136 Paku Biasa Kg 24,000.00
137 Paku hak kg 27,300.00
138 Paku Jalan Memantul Bujur Sangkar M281 Buah 81,000.00
139 Paku Jalan Memantul Persegi Panjang M282 Buah 94,200.00
140 Paku jalan Tidak Memantul M280 Buah 74,400.00
141 Paku pancing kg 27,300.00
142 Paku Payung Kg 35,000.00
143 Paku Sekrup bh 400.00
144 Paku seng kg 30,700.00
145 Paku Seng 1 3/4 " Kecil Kg 36,700.00
146 Paku Seng 2" Besar Kg 36,700.00
147 Paku Sumbat Kg 36,700.00
148 Paku Tripleks Kg 36,700.00
149 Paku Ulin Kg 32,800.00
150 Panel ACP m2 657,600.00
151 Pelat Baja M133 Kg 27,300.00
152 Pelat Rambu (Eng. Grade) M35a Bh 301,300.00
153 Pelat Rambu (High I. Grade) M35b Bh 335,300.00
154 Pelat Strip / 3 x 30 x 300 mm Kg 32,800.00
155 Pemantul Cahaya (Reflector) M43 Bh 21,900.00
156 Penutup karet neoprene M233 M' 54,800.00
157 Perancah/ formwoks M195 M2 49,200.00
158 Perletakan logam tipe fixed 150 Ton M262 Buah 1,644,100.00
159 Perletakan logam tipe movable 150 Ton M263 Buah 2,192,200.00
160 Pintu Besi M2 1,315,300.00
161 Pintu gulung besi M2 301,800.00
162 Pintu Klep Fiber ukuran 100 x 100 bh 21,045,100.00
163 Pintu Klep Fiber ukuran 120 x 120 bh 30,252,300.00
164 Pintu Klep Fiber ukuran 60 x 60 bh 14,468,500.00
165 Pintu Klep Fiber ukuran 80 x 80 bh 18,414,400.00
166 Pintu lipat M2 241,300.00
167 Pipa Galvanis Dia 8" M132 M 93,100.00
168 Pipa Galvanise Dia 6" M275 M 548,000.00
169 Pipa Porus diameter 5" M25a M' 84,200.00
170 Pipa Porus diameter 6" M25b M' 120,500.00
171 Pipa Porus diameter 8" M25c M' 155,600.00
172 Profil alumunim T m 54,800.00
173 Profil Alumunium kg 82,100.00
174 Profil holow kg 82,100.00
175 Profil kaca m 15,900.00
176 Ramset bh 46,800.00
177 Rel Pengaman M36 M' 471,300.00
178 Rolling Door M2 1,660,500.00
179 Rolling door alumunium M2 1,610,200.00
180 Sambungan Pipa Baja M243 Buah 71,100.00
181 Sambungan Pipa PVC M242 Buah 27,300.00
182 Sambungan siar muai tipe dobel siku M232 M' 164,400.00
183 Sambungan siar muai tipe finger plate M231 M' 3,836,300.00
184 Sambungan siar muai tipe Karet (Preformed T-shape) M260 Kg 54,800.00
185 Sambungan siar muai tipe modular M230 M' 43,800.00
186 Screw Cteks 10x16-16 bh 400.00
187 Screw Cteks 12-4x50 bh 300.00
188 Selongsong Kabel prategang M117 M' 109,600.00
189 Seng Aluminium Plat Tebal 0.35 mm Lembar 36,400.00
190 Seng Gelombang Besar BJLS 20 Kl Lembar 60,200.00
191 Seng Gelombang Besar BJLS 30 Lembar 71,100.00
192 Seng Gelombang Kecil BJLS 20 Kl Lembar 60,200.00
193 Seng Gelombang Kecil BJLS 30 Lembar 71,100.00
194 Seng Plat BJLS 20 Kl Lembar 23,000.00
195 Seng Plat BJLS 20 Lebar 30 M 23,000.00
196 Seng Plat BJLS 20 Lebar 40 M 26,600.00
197 Seng Plat BJLS 20 Lebar 50 M 36,400.00
198 Seng Plat BJLS 30 Lebar 30 M 24,200.00
199 Seng Plat BJLS 30 Lebar 40 M 30,300.00
200 Seng Plat BJLS 30 Lebar 50 M 48,700.00
201 Serat Selulosa M158 KG 24,600.00
202 Silicon Seal M227 Kg 32,800.00
203 Skrup Fixer bh 500.00
204 Spandrel Aluminium m2 493,200.00
205 Stang ulir diameter 16 mm bh 548,800.00
206 Stang ulir diameter 20 mm + gear bh 975,800.00
207 Stopper Lateral dan Horizontal M236 Buah 548,000.00
208 Strand 1/2 inci M194 0 21,900.00
209 Strip Bearing M81 Buah 320,500.00
210 Sunscreen alumunium M2 243,900.00
211 Super plastiziser, maks 0,3 % Sm M171 Kg 43,800.00
212 Talang jurai atap spandek m 38,300.00
213 Termoplastik (sealant tuang panas) M178 Kg 32,800.00
214 Termoseting (sealant tuang dingin) M180 Kg 76,700.00
215 Tiang Pagar BRC d=1,5 in t=0,90 m bh 191,700.00
216 Tiang Pagar BRC d=1,5 in t=1,20 m bh 219,200.00
217 Tiang pancang baja dia 30 cm m 426,900.00
218 Tiang pancang baja kotak 30x30 cm m 463,500.00
219 Tiang sandaran baja M238 M' 164,400.00
220 Turap baja profi larsen lebar 350 mm m 487,900.00
221 Ulir halus diameter 20 mm kg 152,400.00
222 Ulir kasar diameter 16 mm kg 91,300.00
223 Venetions blinds dan vertical blinds M2 182,800.00

F BAHAN PLAFOND
1 Accoustic Ceiling Ukuran 15 x 600 x 1200 mm Lbr 336,500.00
2 Akustik 30 x 30 cm Lembar 25,600.00
3 Akustik 30 x 60 cm Lembar 45,000.00
4 Akustik 60 x 120 cm Lembar 129,000.00
5 Asbes semen M2 25,600.00
6 Gypsum Denseshield Ukuran 12 x 1200 M2 80,500.00
7 Gypsum Denseshield Ukuran 15 x 1200 M2 84,400.00
8 Gypsum Fireshield Ukuran 12 x 1200 M2 86,300.00
9 Gypsum Fireshield Ukuran 15 x 1200 M2 85,000.00
10 Gypsum Moistureshield Ukuran 12 x 1200 M2 80,500.00
11 Gypsum Moistureshield Ukuran 15 x 1200 M2 84,400.00
12 Gypsum Moistureshield Ukuran 9 x 1200 M2 77,200.00
13 Gypsum Standard Board Ukuran 12 x 1200 M2 35,900.00
14 Gypsum Standard Board Ukuran 9 x 1200 M2 34,400.00
15 Gypsumboard 1200 x 2400 x 9 mm M2 91,400.00
16 Kalsi Board Ukuran 1200 x 2400 x 3,5 Lembar 116,100.00
17 Kalsi Board Ukuran 1200 x 2400 x 4,5 Lembar 79,700.00
18 Lis profil gypsum m 35,100.00
19 Plafon plywood 4 mm M2 93,700.00
20 Tepung gypsum kg 7,400.00

G BAHAN PELAPIS LANTAI DAN DINDING


1 Floor hardener kg 26,600.00
2 Granit alam m2 2,079,800.00
3 Homogenous tile 30 x 30 cm Box 150,900.00
4 Homogenous tile 30 x 60 cm m2 220,600.00
5 Homogenous tile 40 x 40 cm m2 226,400.00
6 Homogenous tile 50 x 50 cm m2 278,700.00
7 Homogenous tile 60 x 60 cm m2 307,800.00
8 Internal cove 5x5x20 Bh 33,400.00
9 Karpet M2 402,300.00
10 Keramik dinding 10 x 20 cm bh 76,700.00
11 Keramik Polos 20 x 20 cm Kotak 84,700.00
12 Keramik Polos 20 x 30 cm Kotak 84,700.00
13 Keramik Polos 30 x 30 cm Kotak 88,100.00
14 Keramik polos 40 x 40 cm Kotak 101,700.00
15 Keramik Warna 10 x 20 cm Kotak 79,100.00
16 Keramik Warna 20 x 20 cm Kotak 87,000.00
17 Keramik Warna 20 x 25 cm Kotak 76,800.00
18 Keramik Warna 20 x 40 cm Kotak 88,100.00
19 Keramik Warna 25 x 40 cm Kotak 88,100.00
20 Keramik Warna 30 x 30 cm Kotak 82,400.00
21 Keramik Warna 50 x 50 cm Kotak 126,500.00
22 Keramik Warna 60 x 60 cm Kotak 192,100.00
23 Keramik Warna 30 x 60 cm Kotak 146,900.00
24 Lem kg 59,000.00
25 Lem Perekat Khusus kg 100,700.00
26 Marmer 1 x 1 m bh 2,683,800.00
27 Nat Pengisi AM-50 kg 26,600.00
28 Parquet m2 329,200.00
29 Plin Lantai MDF 4 cm x Pj Btg 247,800.00
30 Plin Lantai MDF 6 cm x Pj Btg 271,400.00
31 Plin Ubin abu-abu 10 x 20 bh 3,800.00
32 Plin Ubin abu-abu 10 x 30 bh 3,800.00
33 Plin Ubin abu-abu 10 x 40 bh 3,800.00
34 Plin Ubin abu-abu 15 x 20 bh 3,800.00
35 Plin Ubin granit 10 x 30 bh 12,000.00
36 Plin Ubin granit 10 x 40 bh 14,500.00
37 Plin Ubin teralux 10 x 30 bh 18,100.00
38 Plin Ubin teralux 10 x 40 bh 24,200.00
39 Plin Ubin teralux marmer 10 x 30 bh 12,000.00
40 Plin Ubin teralux marmer 10 x 40 bh 14,400.00
41 Plin Ubin teralux marmer 10 x 60 bh 15,900.00
42 Plin Ubin teraso 10 x 30 bh 4,800.00
43 Plin Ubin teraso 10 x 40 bh 5,900.00
44 Plin Ubin warna 10 x 20 bh 4,200.00
45 Plin Ubin warna 10 x 30 bh 4,800.00
46 Plin Ubin warna 10 x 40 bh 5,000.00
47 Plint Keramik 10 x 10 cm bh 6,600.00
48 Plint Keramik 10 x 20 cm Buah 10,200.00
49 Plint Keramik 10 x 30 cm Buah 10,900.00
50 Plint Keramik 10 x 40 cm Buah 12,300.00
51 Plint Keramik 5 x 20 cm bh 26,600.00
52 Porselen 10 x 20 cm bh 9,600.00
53 Porselen 11 x 11 cm bh 6,600.00
54 Porselen 20 x 20 cm bh 21,400.00
55 Step Nosing Kayu 1,2 m Btg 47,500.00
56 Step Nosing Kayu 2,4 m Btg 81,300.00
57 Step Nosing Tangga Aluminium Panjang 2,7 m Btg 134,100.00
58 Steptread Bullnose 10 x 30 cm boks 20,000.00
59 Ubin abu-abu 20 x 20 bh 5,900.00
60 Ubin abu-abu 30 x 30 bh 10,600.00
61 Ubin abu-abu 40 x 40 bh 16,700.00
62 Ubin granit 20 x 20 bh 16,700.00
63 Ubin granit 30 x 30 bh 19,300.00
64 Ubin granit 40 x 40 bh 22,000.00
65 Ubin teralux 20 x 20 bh 15,900.00
66 Ubin teralux 30 x 30 bh 18,600.00
67 Ubin teralux 40 x 40 bh 21,300.00
68 Ubin teralux marmer 30 x 30 bh 26,600.00
69 Ubin teralux marmer 40 x 40 bh 33,400.00
70 Ubin teralux marmer 60 x 60 bh 40,100.00
71 Ubin teraso 20 x 20 bh 10,600.00
72 Ubin teraso 30 x 30 bh 16,700.00
73 Ubin teraso 40 x 40 bh 20,000.00
74 Ubin warna 20 x 20 bh 5,900.00
75 Ubin warna 30 x 30 bh 10,600.00
76 Ubin warna 40 x 40 bh 16,700.00
77 Under-layer M2 20,000.00
78 Vynil bh 15,900.00
79 Wallpaper m2 34,800.00

H BAHAN PENUTUP ATAP


1 Aluminium Tape Roll 350,700.00
2 Alumunium foil Roll 854,900.00
3 Asbes gelombang Lembar 60,300.00
4 Asbes gelombang 105 x 150 x 4 mm Lembar 44,200.00
5 Asbes gelombang 105 x 180 x 6 mm Lembar 57,900.00
6 Asbes gelombang 105 x 210 x 4 mm Lembar 47,100.00
7 Asbes gelombang 105 x 210 x 6 mm Lembar 59,400.00
8 Asbes gelombang 105 x 240 x 4 mm Lembar 48,300.00
9 Asbes gelombang 105 x 240 x 6 mm Lembar 61,900.00
10 Asbes gelombang 105 x 270 x 4 mm Lembar 49,400.00
11 Asbes gelombang 105 x 270 x 6 mm Lembar 64,200.00
12 Asbes gelombang 105 x 300 x 4 mm Lembar 53,100.00
13 Asbes gelombang 105 x 300 x 6 mm Lembar 76,500.00
14 Asbes gelombang 105 x 300 x 6 mm Lembar 76,500.00
15 Asbes gelombang 92 x 180 x 5 mm Lembar 44,200.00
16 Asbes gelombang 92 x 225 x 5 mm Lembar 47,300.00
17 Asbes gelombang 92 x 250 x 5 mm Lembar 48,100.00
18 Asbes Gelombang Plat Lbr 42,700.00
19 Atap Metal Multy Roop 0,4 mm Lembar 106,800.00
20 Atap Metal Nok C M 50,900.00
21 Atap Metal Nok C M 50,900.00
22 Atap Metal Nok Pinggir L M 44,100.00
23 Atap Metal Nok Pinggir L M 44,100.00
24 Atap Metal Nok U M 46,500.00
25 Atap Metal Nok U M 46,500.00
26 Atap Metal Spyro roop 0.3 mm Lembar 61,900.00
27 SENG SPANDEX 0,30 SILVER /MERAH M 51,900.00
28 SENG SPANDEX 0,35 SILVER /MERAH M 62,900.00
29 SPANDEX GEL.9 M 76,700.00
30 Bubungan Spandek M 38,300.00
31 Bubung stel gelombang 105 cm bh 26,600.00
32 Bubung stel gelombang 108 cm bh 26,600.00
33 Bubung stel gelombang 92 cm bh 26,600.00
34 Bumbungan Asbes Gelombang Buah 41,200.00
35 Genteng aspal bh 9,700.00
36 Genteng beton bh 9,000.00
37 Genteng bubung kodok glazur bh 9,000.00
38 Genteng bubung palentong besar bh 5,900.00
39 Genteng kodok glazuur bh 9,000.00
40 Genteng metal bh 26,600.00
41 Genteng palentong besar bh 6,600.00
42 Genteng palentong kecil bh 2,500.00
43 Glasswoll D. 16 Kg/M3 Tebal 25 mm x 1,2 m x 30 m Roll 257,500.00
44 Glasswoll D. 24 Kg/M3 Tebal 25 mm x 1,2 m x 30 m Roll 367,500.00
45 Glasswoll D. 32 Kg/M3 Tebal 25 mm x 1,2 m x 30 m Roll 514,600.00
46 Nok genteng aspal bh 9,700.00
47 Nok genteng beton bh 23,700.00
48 Nok genteng metal bh 12,000.00
49 Nok paten 105 cm bh 12,800.00
50 Nok paten 108 cm bh 13,200.00
51 Nok paten 92 cm bh 11,100.00
52 Nok standar 18 x 40 cm bh 12,000.00
53 Rockwoll Blanket D. 40 Kg/M3 Tebal 50 mm x 0,6 m x 5 m Roll 109,100.00
54 Rooflight 90 x 180 Lembar 26,600.00
55 Roofmesh 3315 : 1.8 x 30 m Roll 297,300.00
56 Sirap kayu bh 3,900.00

I BAHAN CAT DAN CAIRAN LAINNYA


1 Additive M67a Ltr 50,600.00
2 Aditif anti pengelupasan Kg 32,800.00
3 Aditif pelunak liter 18,100.00
4 Air liter 71.00 71000
5 Alang - Alang bh 3,300.00
6 Anti strpping agent M66 liter 43,800.00
7 Assetilline M86 Botol 251,500.00
8Bensin M20 LITER 13,300.00
9 Bahan pengawet: kreosot M63 liter 5,400.00
10 Bensin Industri lt 13,800.00
11 Bunker Oil M54 Liter 16,300.00
12 Cairan Perekat (Epoxy Resin) M125 Kg 32,800.00
13 Cairan Perekat (Epoxy Resin) 2 komponen M166 Ltr 383,600.00
14 Cat M42 Kg 62,300.00
15 Cat akhir dekoratif beton M201 Kg 43,800.00
16 Cat akhir protektif baja M203 M2 65,700.00
17 Cat akhir protektif beton M200 Kg 43,800.00
18 Cat akhir protektif kayu M225 Kg 58,000.00
19 Cat Anti Karat M95 Kg 60,200.00
20 Cat Besi kg 65,700.00
21 Cat Dasar Alkali Sealer liter 56,900.00
22 Cat dasar baja M202 Kg 54,800.00
23 Cat dasar beton M199 Kg 32,800.00
24 Cat dasar kayu M224 Kg 58,000.00
25 Cat Kayu Transparan Melamine liter 71,800.00
26 Cat Kilap untuk kayu kg 58,000.00
27 Cat Lap. Tennis TNK - 1000 WA 5 Kg Klg 237,700.00
28 Cat Marka (Non Thermoplas) M17a Kg 82,100.00
29 Cat Marka (Thermoplastic) M17b Kg 87,600.00
30 Cat Meni Besi Kg 38,300.00
31 Cat Meni Kayu Kg 35,000.00
32 Cat Tembok Eksterior Mutu A Kg 131,500.00
33 Cat Tembok Interior Mutu A kg 93,100.00
34 Cat Tembok Eksterior Mutu B kg 60,200.00
35 Cat Tembok Interior Mutu B kg 49,200.00
36 Cat Zincromate Kg 37,100.00
37 Curing Compound M98 Ltr 50,600.00
38 Dempul 1 Kg KG 35,000.00
39 Dempul kayu Kg 31,700.00
40 Kalkarium Kg 43,900.00
41 Kerosen / Minyak Tanah M11 LITER 13,100.00
42 Kerosin Liter 13,300.00
43 Kreosol M197 Kg 13,100.00
44 Melamine Lack liter 114,800.00
45 Minyak Bekisting Liter 12,700.00
46 Minyak Cat 1 Kg Kaleng 22,000.00
47 Minyak Fluks (bm) M53 Liter 13,400.00
48 Minyak pelumas liter 48,700.00
49 Minyak Pelumas / Olie M22 LITER 46,800.00
50 Oli SAE 20 liter 43,800.00
51 Oli SAE 90 liter 65,700.00
52 Olie liter 53,500.00
53 Oxygen M87 Botol 153,400.00
54 Petroleum jelly Kg 20,700.00
55 Plamir Kg 32,800.00
56 Plamir kayu kg 35,000.00
57 Polimer kg 49,200.00
58 Politur liter 63,500.00
59 Politur Transparan liter 58,400.00
60 Polytene 125 mikron M97 Kg 25,300.00
61 Residu Kg 14,500.00
62 S o l a r M21 LITER 13,100.00
63 Sabun kg 24,200.00
64 Sending Sealer liter 26,600.00
65 Soda api liter 18,100.00
66 Solar industri liter 13,100.00
67 Stempet kg 32,800.00
68 Teak oil liter 41,300.00
69 Ter liter 18,100.00
70 Thinner M33 Liter 32,800.00
71 Tyfo Epoxy S Kg 712,400.00
72 Tyfo Epoxy SW Kg 1,370,100.00
73 Tyfo SCH41 m2 2,740,200.00
74 Tyfo SEH51A m2 876,800.00
75 Vernis liter 51,000.00
76 Wall Filler Decor DWF - 200 4 Kg Kg 140,100.00
77 Water Proofing 1 Kg Kaleng 59,600.00
78 WaterProofing Membrane sheet m2 100,500.00
79 WaterProofing Sika 120 Kg 41,400.00
80 WaterProofing Sika Rain Tite Compound (Red & Grey) Kg 46,800.00
81 WaterProofing Sikaproof 400 SBS Kg 143,500.00
82 WaterProofing Sikaproof Primer Kg 53,500.00
83 WaterProofing Sikaset Accelerator Per Kg Kg 20,000.00
84 Wood filler Kg 17,400.00

J BAHAN KACA PENGGANTUNG DAN PENGUNCI


1 Card Lock ( Card Issuer, Handset Program/Software, Key Card ) unit 1,665,200.00
2 Cylinder - BK - 60 mm - SN bh 143,000.00
3 Door closer bh 107,200.00
4 Door holder bh 60,200.00
5 Door stop bh 40,100.00
6 Door Viewer 200 C-PB bh 95,800.00
7 Engsel angin bh 43,900.00
8 Engsel kupu kupu bh 26,600.00
9 Engsel Kupu -Kupu 4" Pasang 23,100.00
10 Engsel pintu bh 38,300.00
11 Engsel Standart Mutu A 3" Pasang 29,300.00
12 Engsel Standart utu A 4" Pasang 41,200.00
13 Engsel Laci Set 28,200.00
14 Handle Laci Bh 22,600.00
15 Rel Laci Set 33,900.00
16 Escutheon - ESCN - DKS - SQ01 - SS bh 91,300.00
17 Flush Bolt - FB - Mico - 508 - NA bh 21,900.00
18 Grendel Buah 36,100.00
19 Grendel Tanam Buah 93,100.00
20 Hak Angin Kuningan 20 cm Buah 32,800.00
21 Handle 4" Buah 23,500.00
22 Hinges - ES - S/S - EL - 4" x 3" x 2" mm - 2BB psg 88,400.00
23 Kaca Bening 3 mm M2 138,300.00
24 Kaca Bening 5 mm M2 188,200.00
25 Kaca Bening 8 mm M2 237,700.00
26 Kaca Buram 12 mm M2 249,900.00
27 Kaca patri tebal 5 mm M2 1,280,800.00
28 Kaca Penasap Grey 10 mm M2 469,600.00
29 Kaca Penasap Grey 6 mm M2 335,300.00
30 Kaca Penasap Grey 8 mm M2 402,300.00
31 Kaca Rayband 3 mm M2 180,800.00
32 Kaca Rayband 5 mm M2 208,200.00
33 Kaca Tempered 10 mm M2 559,000.00
34 Kaca wireglassed tebal 5 mm M2 262,300.00
35 Kait angin bh 12,700.00
36 Kunci lemari bh 38,600.00
37 Kunci Pintu Besar Standart 1 x slag Set 193,500.00
38 Kunci Pintu Besar Standart 2 x slag Set 184,500.00
39 Kunci Pintu Kecil Standart 1 x slag Set 109,600.00
40 Kunci Pintu Kecil Standart 2 x slag Set 141,900.00
41 Kunci silinder bh 64,500.00
42 Kunci slot bh 19,200.00
43 Kunci tanam bh 58,500.00
44 Kunci tanam kamar mandi bh 87,900.00
45 Profil kaca m 15,300.00
46 Rel pintu sorong bh 161,200.00
47 Sealent tube 35,100.00
48 Spring knip bh 64,500.00

K BAHAN SANITAIR
1 Bak air fiberglass Buah 2,012,800.00
2 Bak Cuci Piring Almunium, Lubang 1 Buah 274,000.00
3 Bak Cuci Piring Almunium, Lubang 2 Buah 854,900.00
4 Bak cuci piring stainless steel Buah 1,096,100.00
5 Bak cuci piring teraso Buah 268,200.00
6 Bak Mandi Viber 9.3.13.2. Closet Ukuran 80 x 60 x 60 Buah 469,600.00
7 Bathcuip porselen Buah 3,836,300.00
8 Bathup W / Apported Anti Selip ( 1700 x 800 x 410 ) bh 5,854,300.00
9 Bathup w / Apported Anti Selip 9 1700 x 700 x 390 ) + 4 bh 3,491,000.00
10 Closet Duduk Standar Set 3,014,200.00
11 Closet Jongkok Keramik Buah 246,500.00
12 Closet Jongkok Porselen Buah 292,600.00
13 Closet jongkok teraso Buah 174,200.00
14 Fiberglass 1 m3 Buah 2,012,800.00
15 Floor drain Buah 67,000.00
16 Floordrain Type TX 1 BN bh 354,200.00
17 Grab Bar TX 3 A1 bh 219,200.00
18 Head Shower Type TX 436 S bh 438,400.00
19 Jet Washer ex - Toto type TB 19 CSN CR bh 164,400.00
20 Kaca Cermin Wastafel t = 5 mm m² 356,100.00
21 Kaca Cermin Wastafel t = 5 mm bh 356,100.00
22 Klosed duduk Type CW 420 J / SW 420 JP bh 2,904,600.00
23 Kran Air Galvanis Ukuran 3/4 " Buah 54,800.00
24 Kran Air Steinliss Ukuran 1/2 " Buah 60,200.00
25 Kran Air Steinliss Ukuran 3/4 " Buah 71,100.00
26 Kran Bebek Steinliss Buah 274,000.00
27 Kran Shoower Steinliss Buah 548,000.00
28 Kran Washtafel Steinliss Buah 274,000.00
29 Paper Holder Type TX 703 AC bh 460,300.00
30 Shower curtain bh 241,900.00
31 Shower Tray (komplit) bh 4,384,400.00
32 Singel Lever Shower Mixer Type TX 405 SJ bh 986,400.00
33 Soap Holder bh 164,400.00
34 Tandon Air 1.000 Ltr Buah 1,370,100.00
35 Tandon Air 1.200 Ltr Buah 1,918,800.00
36 Tandon Air 2.000 Ltr Buah 4,133,000.00
37 Tandon Air 3.000 Ltr Buah 5,609,200.00
38 Tandon Air 450 Ltr Buah 1,200,900.00
39 Tandon Air 5.000 Ltr Buah 8,709,200.00
40 Urinoir Set 3,049,800.00
41 Wastafel Under Counter Type L 546 bh 1,677,200.00
42 Waterdrain Buah 65,700.00

L BAHAN PIPA
Pipa PVC Type AW
1 PIPA PVC AW diameter 1 1/2" Batang 78,800.00
2 PIPA PVC AW diameter 1 1/4" Batang 66,700.00
3 PIPA PVC AW diameter 1" Batang 45,900.00
4 PIPA PVC AW diameter 1/2" Batang 25,100.00
5 PIPA PVC AW diameter 2 1/2" Batang 131,500.00
6 PIPA PVC AW diameter 2" Batang 104,000.00
7 PIPA PVC AW diameter 3" Batang 186,300.00
8 PIPA PVC AW diameter 3/4" Batang 30,600.00
9 PIPA PVC AW diameter 4" Batang 274,000.00
10 PIPA PVC AW diameter 5" Batang 531,500.00
11 PIPA PVC AW diameter 6" Batang 651,600.00

Pipa Galvanis
1 Pipa galvanis diameter 1/2" Batang 208,200.00
2 Pipa galvanis diameter 3/4" Batang 274,000.00
3 Pipa galvanis diameter 1" Batang 350,700.00
4 Pipa galvanis diameter 1 1/2" Batang 575,300.00
5 Pipa galvanis diameter 2" Batang 816,500.00
6 Pipa galvanis diameter 3" Batang 1,479,700.00
7 Pipa galvanis diameter 4" Batang 2,137,300.00
8 Pipa Baja M52 Kg 28,700.00
9 Pipa Galvanis Dia 1,5" M24b M 61,500.00
10 Pipa Galvanis Dia 3" M24a M 123,200.00
11 Pipa Galvanis Dia. 1.6" M24 Batang 246,500.00
12 Pipa Porus M25 M' 104,000.00

Pipa GIP medium


1 Pipa GIP diameter 63 mm Batang 1,105,800.00
2 Pipa GIP diameter 100 mm Batang 2,027,700.00
3 Pipa GIP diameter 125 mm Batang 2,603,100.00
4 Pipa GIP diameter 150 mm Batang 3,313,300.00
5 Pipa GIP diameter 200 mm Batang 4,758,600.00

Pipa HDPE
1 Pipa HDPE diameter 63 mm m 58,000.00
2 Pipa HDPE diameter 100 mm m 117,500.00
3 Pipa HDPE diameter 125 mm m 226,300.00
4 Pipa HDPE diameter 150 mm m 281,900.00
5 Pipa HDPE diameter 200 mm m 577,000.00
6 Pipa HDPE diameter 250 mm m 899,200.00
7 Pipa HDPE diameter 300 mm m 1,427,400.00
8 Pipa HDPE diameter 400 mm m 2,297,800.00
9 Pipa HDPE diameter 450 mm m 2,910,400.00
10 Pipa HDPE diameter 500 mm m 4,590,600.00
11 Pipa HDPE diameter 600 mm m 5,751,000.00
12 Pipa HDPE diameter 700 mm m 7,286,500.00
13 Pipa HDPE diameter 800 mm m 8,740,800.00

Pipa PP R-PN 10
1 Pipa PP R PN-10 diameter 1/2" Batang 50,800.00
2 Pipa PP R PN-10 diameter 3/4" Batang 66,400.00
3 Pipa PP R PN-10 diameter 1" Batang 107,000.00
4 Pipa PP R PN-10 diameter 1 1/2" Batang 263,000.00
5 Pipa PP R PN-10 diameter 2" Batang 416,600.00
6 Pipa PP R PN-10 diameter 3" Batang 841,600.00
7 Pipa PP R PN-10 diameter 4" Batang 1,249,800.00
8 Pipa PP R PN-10 diameter 6" Batang 4,260,100.00

Pipa PVC AW
1 Pipa PVC AW diameter 63 mm Batang 131,500.00
2 Pipa PVC AW diameter 90 mm Batang 219,200.00
3 Pipa PVC AW diameter 110 mm Batang 297,400.00
4 Pipa PVC AW diameter 150 mm Batang 652,100.00
5 Pipa PVC AW diameter 200 mm Batang 1,160,300.00
6 Pipa PVC AW diameter 250 mm Batang 1,794,200.00
7 Pipa PVC AW diameter 300 mm Batang 2,529,900.00

Valve Pipa HDPE


1 Valve HDPE Ø 50 mm bh 2,225,300.00
2 Valve HDPE Ø 75 mm bh 3,252,400.00
3 Valve HDPE Ø 100 mm bh 5,991,700.00
4 Valve HDPE Ø 150 mm bh 7,874,700.00
5 Valve HDPE Ø 200 mm bh 9,929,000.00
6 Valve HDPE Ø 250 mm bh 11,812,200.00
7 Valve HDPE Ø 300 mm bh 13,866,500.00

Tee Pipa HDPE


1 Tee HDPE Ø 63 mm bh 243,900.00
2 Tee HDPE Ø 90 mm bh 487,900.00
3 Tee HDPE Ø 110 mm bh 1,103,600.00
4 Tee HDPE Ø 160 mm bh 1,746,000.00
5 Tee HDPE Ø 200 mm bh 1,883,000.00
6 Tee HDPE Ø 250 mm bh 3,081,300.00

Lain-lain
1 Lem PVC Kecil 1/2 Kg Klg 65,700.00
2 Lem PVC Kecil (2 ons) Klg 21,900.00
3 Lem PVC Tube 10,900.00
4 Lem PVC Tube 10,900.00
5 Isolatif TBA Buah 10,900.00
6 Selotif Bh 3,900.00
7 Water stop PVC lebar 150 mm m2 182,800.00
8 Water stop PVC lebar 200 mm m2 243,900.00
9 Water stop PVC lebar 230 - 320 mm m2 307,000.00
10 Water stop rubber lebar 150 - 200 mm m2 247,200.00

M BAHAN MEKANIKAL ELEKTRIKAL


1 MCFA-5 Zone bh 6,587,600.00
2 Antena UHF bh 788,500.00
3 AC Split 1/2 PK Flash Inventer Setara Daikin Unit 5,886,000.00
4 AC Split 1 PK Flash Inventer Setara Daikin Unit 5,359,900.00
5 BC-50 mm m 120,400.00
6 Bell Alarm bh 175,300.00
7 Box 40x40x40cm bh 522,700.00
8 Box hager bh 105,300.00
9 Coaxial 7c-2v m 18,300.00
10 Conduit pipa 2 x dia. 32 m 19,500.00
11 Conduit pipa dia. 20 m 21,900.00
12 Conduit pipa dia. 32 m 32,800.00
13 Elbow w=400 mm bh 280,300.00
14 fittings bh 32,800.00
15 FITTING GANTUNG 216 L Pcs 13,100.00
16 FITTING KOMBINASI 226 Pcs 19,600.00
17 FITTING PLAFON 1210 Pcs 22,900.00
18 FITTING PLAFON 1211 Pcs 24,000.00
19 FITTING PLAFON 1212 Pcs 22,900.00
20 FITTING PLAFON 327 (210L) Pcs 14,200.00
21 FRC 3x 2.5 mm m 98,500.00
22 FRC 4x4 mm m 175,000.00
23 FRC 4x6 mm m 232,700.00
24 Genset-25 kVA unit 125,340,900.00

25 gronding rod Gip 1" m 389,900.00


26 Heat detector bh 78,300.00
27 Indikator Lamp bh 81,000.00
28 Jelly armoured 10x2x0,6 mm m 22,600.00
29 Kabel Coaxial 5V-2C m 12,200.00
30 Kabel ITC 4x0,6 mm m 4,100.00
31 Kabel NYA 2x1,5 mm2 m 6,500.00
32 Kabel NYA 2x2,5 mm2 m 7,500.00
33 Kabel NYFGBY 3x2,5 mm2 m 29,100.00
34 Kabel NYM 3x2,5 mm2 m 16,300.00
35 Lampu armatur HPI-T 250 W bh 1,278,000.00
36 Lampu Baret-32w bh 264,100.00
37 Lampu -Pijar 40W bh 8,500.00
38 Lampu Pijar SL 13w bh 20,200.00
39 Lampu Pl-7w bh 32,400.00
40 Lampu Taman-SL26W bh 379,200.00
41 Lampu LED 3 Watt bh 28,400.00
42 Lampu LED 5 Watt bh 38,300.00
43 Lampu LED 10 Watt bh 50,300.00
44 Lampu LED 12 Watt bh 63,500.00
45 Lampu LED 19 Watt bh 108,400.00
46 Lampu TL-D 10 Watt bh 16,300.00
47 Lampu TL-D 18 Watt bh 19,600.00
48 Lampu TL-D BRIGHT BOOST 18 W bh 19,600.00
49 Lampu TL-E 22 W LIFEMAX (RING) bh 24,000.00
50 Lampu TL-E 32 W LIFEMAX (RING) bh 60,200.00
51 Lampu SIMBAT TMS012 1XTL-D18W SINGLE LAMP bh 136,900.00
52 Lampu SIMBAT TMS012 1XTL-D36W SINGLE LAMP bh 164,400.00
53 Lampu SIMBAT TMS012 2XTL-D18W TWIN LAMP bh 164,400.00
54 Lampu SIMBAT TMS012 2XTL-D36W TWIN LAMP bh 263,000.00
55 Lampu TL Bulk-36W bh 175,300.00
56 manual push button bh 180,000.00
57 Master Amplifier unit 544,400.00
58 MCB,1p, 6A bh 58,400.00
59 MDF-FA bh 431,000.00
60 NYA 16 mm m 31,900.00
61 NYA 2,5 mm m 5,400.00
62 NYA 20x1,5 mm m 65,700.00
63 NYA 3x2x2,5 mm m 19,600.00
64 NYA 4 mm m 8,100.00
65 NYA 5x2x2,5 mm m 32,800.00
66 NYA 6 mm m 12,300.00
67 NYA 95 mm m 179,700.00
68 NYFGBY 4x240 mm m 1,491,100.00
69 NYM 3x2,5 mm m 16,400.00
70 NYM 3x4 mm m 22,200.00
71 NYY 3x2,5 mm m 20,700.00
72 NYY 4x16 mm m 124,800.00
73 NYY 4x185 mm m 810,300.00
74 NYY 4x2,5 mm m 27,300.00
75 NYY 4x240 mm m 1,108,800.00
76 NYY 4x4 mm m 40,400.00
77 NYY 4x6 mm m 56,000.00
78 NYY 70 mm m 117,200.00
79 Reducer w=400 mm bh 196,900.00
80 Saklar ganda bh 58,100.00
81 skalar tunggal bh 29,000.00
82 Smoke detector bh 400,800.00
83 Splitter 6 port bh 144,900.00
84 splitzle bh 13,942,300.00
85 Stop kontak 13 A bh 38,300.00
86 Stop kontak-TELEPON bh 60,200.00
87 Stop kontak-TV bh 61,500.00
88 TEE w=200 mm bh 184,700.00
89 TEE w=400 mm bh 305,600.00
90 Terminal bh 27,300.00
91 Terminal Fire Alarm bh 277,100.00
92 Terminal TV bh 290,700.00
93 Tiang Lampu 1.5 m bh 185,800.00
94 Tiang Lampu 2.5 m bh 302,000.00
95 Tray w=200 mm m 142,700.00
96 Tray w=400 mm m 219,200.00
97 Tray w=600 mm m 287,500.00
98 Tray w=900 mm m 472,400.00
99 Panel MDP unit 68,820,800.00
100 Panel DB Pengelola unit 11,673,800.00
101 Panel DB Unit lt 1 unit 16,104,700.00
102 Panel DB Unit lt 2,3,4,5 unit 14,458,100.00
103 Panel Kebakaran unit 6,688,000.00
104 pipa Gip ø 100" m 262,700.00
105 Panel Pompa Air Bersih unit 12,040,400.00
106 Panel Unit unit 580,500.00
107 Box Panel unit 1,182,900.00
108 Cu Bar unit 604,200.00
109 MCCB,3p 300 A unit 4,592,800.00
110 Kabel NYY 3x2,5 mm2 M 16,400.00

N BAHAN LANSEKAP
1 Ara Rea Polyback 48,700.00
2 Asoka Polyback 33,300.00
3 Bakung Polyback 10,900.00
4 Brokoli Polyback 52,800.00
5 Brokoli Kuning Polyback 52,800.00
6 Bugenvil Parigata t = 0,75 m pohon 418,200.00
7 Bunga Krisan Polyback 111,400.00
8 Dolar t= 1 m Pohon 3,485,500.00
9 Kalatea kodok Polyback 111,400.00
10 Kalatea Merah Polyback 97,500.00
11 Kucai Polyback 27,700.00
12 Lili Brasil Polyback 20,700.00
13 Lili Paris Polyback 20,700.00
14 Nanas nanasan Polyback 104,500.00
15 Palem Putri t = 2 m pohon 627,300.00
16 Palem Kuning Rumpun 348,400.00
17 Palem Phonik t= 1 m Pohon 487,900.00
18 Palem Regu Rumpun 278,700.00
19 Pucuk Merah t = 0,75 m pohon 209,000.00
20 Pupuk Kompos kg 2,100.00
21 Rembusa Hijau Polyback 50,000.00
22 Rembusa Putih Polyback 50,000.00
23 Rumput Jepang m2 111,400.00
24 Sambang dara Polyback 50,000.00
25 Tabib Buya t = 3-4 m pohon 697,000.00
26 Taiwan Beuty Polyback 20,700.00
27 Terang Bulan Polyback 20,700.00
28 Top soil m3 278,700.00
29 Rumput Gajah Mini m2 90,500.00
30 Melati putih Polyback 30,500.00
31 Bulu domba Polyback 36,100.00
32 Adam hawa Polyback 33,300.00
33 Trembesi Polyback 38,300.00
34 Palm Ekor Tupai Polyback 43,800.00
35 Asam jawa Polyback 54,800.00

O BAHAN GEOTEKSTIL DAN LAINNYA


1 Accelerator M256 Kg 19,000.00
2 Bahan Geosynthetic M2 107,300.00
3 Bahan Modifikasi M67 Kg 10,900.00
4 Geogrid Biaxial M2 153,400.00
5 Geotekstil Filter M2 153,400.00
6 Geotekstil Separator kelas 1 m2 120,500.00
7 Geotekstil Separator kelas 2 m2 107,300.00
8 Geotekstil Separator kelas 3 m2 93,100.00
9 Geotekstil Stabilisator kelas 1 m2 120,500.00
10 Geotextile M30 m2 131,500.00
11 Geotextile Non Woven M2 131,500.00
12 Geotextile Woven M2 120,500.00
13 Glass Bead M34 m2 142,400.00
14 Glass Bead M34 Kg 109,600.00
15 Plastizier M182 Kg 43,800.00
16 Pupuk M272 Kg 32,800.00
17 Tanah humus M271 M3 153,400.00
18 Wax M160 KG 38,300.00
19 Zeolit M159 KG 6,500.00