Anda di halaman 1dari 41

LAMPIRAN BERITA ACARA KLARIFIKASI DAN NEGOSIASI

KEGIATAN : SURVEI KONTUR JALAN DAN JEMBATAN


PEKERJAAN : SURVEI KONTUR JEMBATAN BUNGKU
LOKASI : BUNGKU
TAHUN ANGGARAN : 2009

Harga Perhitungan Sendiri Total Biaya Hasil Koreksi


No Uraian (Rp) (Rp)
Total Biaya Hasil Negosiasi (Rp)

A1 Tenaga Ahli (Harga Satuan Tetap) 33,750,000.00 33,750,000.00 33,750,000.00

A2 Tenaga Pendukung (Harga Satuan Tetap) 13,750,000.00 13,750,000.00 13,750,000.00

B1 Biaya Perlengkapan / Umum Kantor (Harga Satuan Tetap) 6,500,000.00 6,500,000.00 6,375,000.00

B2 Survei Pendahuluan (Harga Satuan Tetap) 4,250,000.00 4,000,000.00 4,000,000.00

B3 Survei Topografi (Harga Satuan Tetap) 6,200,000.00 6,125,000.00 6,125,000.00

B4 Laporan (Harga Satuan Tetap) 3,500,000.00 3,250,000.00 3,250,000.00

Jumlah Diluar PPN 67,950,000.00 67,375,000.00 67,250,000.00


PPN 10% 6,795,000.00 6,737,500.00 6,725,000.00
Jumlah Termasuk PPN 74,745,000.00 74,112,500.00 73,975,000.00
Dibulatkan 74,745,000.00 74,112,500.00 73,975,000.00

Panitia Pengadaan Jasa Konsultansi Dinas Pekerjaan Umum


Menyetujui : Daerah Kabupaten Morowali TA. 2009
CV. 09 CCA Engineering Consultant

1 Leins Mario Lambo Ketua 1 ....


2 Mirhan Triandi Do'e Sekretaris 2 ....
3 Kusmaryanto Anggota 3 ....
IMAM MASHURI, ST
Direktur
RENCANA ANGGARAN BIAYA
HARGA PERHITUNGAN SENDIRI HARGA TERKOREKSI HARGA NEGOSIASI
No Jabatan Jumlah Jumlah Orang
Personil Bulan BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA
PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp)
A. BIAYA LANGSUNG PERSONIL

A.1 Tenaga Ahli


1 Ketua Tim 1 2.50 7,500,000.00 18,750,000.00 7,500,000.00 18,750,000.00 7,500,000.00 18,750,000.00
2 Ahli Geodesi 1 2.50 6,000,000.00 15,000,000.00 6,000,000.00 15,000,000.00 6,000,000.00 15,000,000.00

JUMLAH A1 33,750,000.00 33,750,000.00 33,750,000.00

RENCANA ANGGARAN BIAYA


No Jabatan Jumlah Jumlah Orang HARGA PERHITUNGAN SENDIRI HARGA TERKOREKSI HARGA NEGOSIASI
Personil Bulan BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA
PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp)
A.2 Tenaga Pendukung

1 Sekretaris / Operator Komputer (1 orang) 1 2.50 1,700,000.00 4,250,000.00 1,700,000.00 4,250,000.00 1,700,000.00 4,250,000.00
2 Juru Gambar (CAD) (1 orang) 1 2.00 3,500,000.00 7,000,000.00 3,500,000.00 7,000,000.00 3,500,000.00 7,000,000.00
3 Surveyor (1 orang) 1 1.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00

JUMLAH A2 13,750,000.00 13,750,000.00 13,750,000.00

RENCANA ANGGARAN BIAYA


No Jenis Bahan HARGA PERHITUNGAN SENDIRI HARGA TERKOREKSI HARGA NEGOSIASI
Volume Satuan BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA
PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp)
B.1 Biaya Perlengkapan/Umum Kantor

1 Komputer+Printer (1 unit) 2.50 Bulan 900,000.00 2,250,000.00 850,000.00 2,125,000.00 850,000.00 2,125,000.00
2 ATK 2.50 Bulan 400,000.00 1,000,000.00 400,000.00 1,000,000.00 400,000.00 1,000,000.00
3 Biaya Komunikasi 2.50 Bulan 300,000.00 750,000.00 350,000.00 875,000.00 300,000.00 750,000.00
4 Sewa Kendaraan Roda Empat - Bulan
5 Sewa Kendaraan Roda Dua (1 unit) 2.00 Bulan 1,250,000.00 2,500,000.00 1,250,000.00 2,500,000.00 1,250,000.00 2,500,000.00

JUMLAH B1 6,500,000.00 6,500,000.00 6,375,000.00


RENCANA ANGGARAN BIAYA
No Jenis Bahan HARGA PERHITUNGAN SENDIRI HARGA TERKOREKSI HARGA NEGOSIASI
Volume Satuan BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA
PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp)
B.2 Survey Pendahuluan
1 Uang Harian
- Ketua Tim (1 org x 10 hari) 10 OH 150,000.00 1,500,000.00 150,000.00 1,500,000.00 150,000.00 1,500,000.00
- Tenaga Ahli (1 org x 10 hari) 10 OH 150,000.00 1,500,000.00 150,000.00 1,500,000.00 150,000.00 1,500,000.00
2 Peralatan Lapangan, Bahan, dll. 1 Ls 1,250,000.00 1,250,000.00 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00

JUMLAH B2 4,250,000.00 4,000,000.00 4,000,000.00

RENCANA ANGGARAN BIAYA


No Uraian HARGA PERHITUNGAN SENDIRI HARGA TERKOREKSI HARGA NEGOSIASI
Volume Satuan BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA
PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp)
B.3 Survey Topografi
Biaya Perjalanan (1 org x 1 kali) 1 OT 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00
1 Uang Harian
2 - Surveyor (1 org x 15 hari) 15 OH 125,000.00 1,875,000.00 120,000.00 1,800,000.00 120,000.00 1,800,000.00
- Buruh (1 org x 15 hari) 15 OH 75,000.00 1,125,000.00 75,000.00 1,125,000.00 75,000.00 1,125,000.00
3 Peralatan Lapangan, Bahan, dll. 1 Ls 3,000,000.00 3,000,000.00 3,000,000.00 3,000,000.00 3,000,000.00 3,000,000.00

JUMLAH B3 6,200,000.00 6,125,000.00 6,125,000.00

RENCANA ANGGARAN BIAYA


No Uraian HARGA PERHITUNGAN SENDIRI HARGA TERKOREKSI HARGA NEGOSIASI
Volume Satuan BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA BEBAN BIAYA JUMLAH BIAYA
PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp) PERSONIL (Rp) (Rp)
B.4 Laporan
1 Laporan Pendahuluan 5 Buku 50,000.00 250,000.00 50,000.00 250,000.00 50,000.00 250,000.00
2 Laporan Hasil Survey 10 Buku 75,000.00 750,000.00 75,000.00 750,000.00 75,000.00 750,000.00
2 Laporan akhir + Peta Hasil Survei 10 Buku 250,000.00 2,500,000.00 225,000.00 2,250,000.00 225,000.00 2,250,000.00

JUMLAH B4 3,500,000.00 3,250,000.00 3,250,000.00


SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
BAGIAN UMUM
Jln. Bukit Trikora Kompleks Perkantoran No. Salakan Kabupaten banggai Kepulauan

HARGA PERKIRAAN SENDIRI


DINAS : SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI

NILAI TAGIHAN S/D PROSENTASE S/D


NO. U R A I A N BOBOT NILAI KONTRAK BULAN INI BULAN INI
(%) Rp. Rp.

A BIAYA LANGSUNG PERSONIL

A.1 Tenaga Ahli 35.68 1,800,000.00 1,800,000.00 35.68

A.2 Tenaga Pendukung 51.53 2,600,000.00 2,600,000.00 51.53

B BIAYA LANGSUNG NON PERSONIL

B.1. Operasional Lapangan 4.95 250,000.00 250,000.00 4.95

B.2. Operasional Tenaga Ahli - - - -

B.3. Operasional Kantor 5.86 295,500.00 295,500.00 5.86

B.4. Dokumen Perencanaan 1.98 100,000.00 100,000.00 1.98

JUMLAH 100.00 5,045,500.00 5,045,500.00 100.00


JUMLAH 5,045,500.00 5,045,500.00
NILAI TAGIHAN BULAN PERTAMA 5,045,500.00
POTONGAN
1. Total Nilai Tagihan S/ D Bulan lalu
2. Pengembalian Uang Muka -
TOTAL POTONGAN ( 1 + 2 ) -
NILAI TAGIHAN BULAN INI 5,045,500.00
Pajak PPn 11% 555,005.00
Jumlah 5,600,505.00
NILAI TAGIHAN BULAN PERTAMA DIBULATKAN 5,600,000.00

Terbilang : Lima Juta Enam Ratus Ribu Rupiah

S/D BULAN LALU -


PROSENTASE YANG DICAPAI BULAN INI 100.00
S/D BULAN INI 100.00

DIBUAT OLEH :
SATKER DAERAH KABUPATEN BANGGAI KEPULAUAN
BAGIAN UMUM

…………………………………..
………………………………
KONSULTAN : SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI

A. BIAYA LANGSUNG PERSONIL


A.1 Tenaga Ahli
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah
Jumlah Jumlah Orang Jumlah Orang
Orang Personil Orang
Personil ( Rp Bulan Bulan
Bulan ( Rp ) Bulan ( Rp ) ( Rp ) ( Rp )
) ( Rp )
1 Team Leader (Ketua Tim) 1 1.00 1,800,000 1,800,000 1.00 1,800,000 1.00 1,800,000 -

JUMLAH A.1 1,800,000 - 1,800,000 1,800,000 -

A.2 Tenaga Pendukung


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah
Jumlah Jumlah Orang Jumlah Orang
Orang Personil Orang
Personil ( Rp Bulan Bulan
Bulan ( Rp ) Bulan ( Rp ) ( Rp ) ( Rp )
) ( Rp )
2 Cad drafter 1 1.00 1,300,000 1,300,000 1.00 1,300,000 1.00 1,300,000

3 Engineer Estgimate 1 1.00 1,300,000 1,300,000 1.00 1,300,000 1.00 1,300,000

JUMLAH A.2 2,600,000 - 2,600,000 2,600,000 -


KONSULTAN : SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI

B. BIAYA LANGSUNG NON PERSONIL


B.1. Biaya Operasional Lapangan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Sewa Kendaraan Roda Dua (1 Unit) Unit 1.00 250,000 250,000 - 1.00 250,000 1.00 250,000 -

JUMLAH B.1 250,000 - 250,000 250,000 -

B.2. Biaya Survey Pendataan


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 Operasional Tenaga Ahli


- Tenaga Ahli Unit

2 Peralatan Lapangan, Bahan Dll Unit

JUMLAH B.2 - - - - -

B.3. Biaya Operasional Kantor


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Biaya ATK dan Bahan Habis Pakai Unit 1.00 295,500 295,500 - 1.00 295,500 1.00 295,500 -

JUMLAH B.3 295,500 - 295,500 295,500 -


KONSULTAN : SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI

B.4. Biaya Dokumen Perencanaan


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Biaya Laporan Buku 1.00 100,000 100,000.00 - 1.00 100,000 1.00 100,000 -

JUMLAH B.3 100,000 - 100,000 100,000 -

-
JUMLAH A + B 5,045,500 5,045,500 5,045,500 -
BIAYA PEKERJAAN 5,045,500 - 5,045,500 5,045,500 -
TOTAL 5,045,500 5,045,500 5,045,500 -

DIBUAT OLEH :
SATKER DAERAH KABUPATEN BANGGAI KEPULAUAN

………………………………………………..
Nip. …………………………………………….
INVOICE
KONSULTAN : SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 02 (Dua) Bulan Ke Dua


Periode : 04 Agustus s/d 02 September 2018

NILAI TAGIHAN S/D PROSENTASE S/D


NO. U R A I A N BOBOT NILAI KONTRAK BULAN INI BULAN INI
(%) Rp. Rp.

A BIAYA LANGSUNG PERSONIL

A.1 Tenaga Ahli #REF! 1,800,000.00 12,000,000.00 #REF!

A.2 Tenaga Pendukung #REF! 2,600,000.00 9,500,000.00 #REF!

B BIAYA LANGSUNG NON PERSONIL

B.1. Operasional Lapangan #REF! 250,000.00 3,000,000.00 #REF!

B.2. Operasional Kantor #REF! 295,500.00 2,600,000.00 #REF!

B.3. Uang Harian #REF! #REF! 1,810,000.00 #REF!

C BIAYA DOKUMEN PENGAWASAN

B.2. Biaya Pelaporan #REF! 100,000.00 1,200,000.00 #REF!

JUMLAH #REF! #REF! 30,110,000.00 #REF!


JUMLAH #REF! 30,110,000.00
NILAI TAGIHAN BULAN PERTAMA 30,110,000.00
POTONGAN
1. Total Nilai Tagihan S/ D Bulan lalu
2. Pengembalian Uang Muka -
TOTAL POTONGAN ( 1 + 2 ) -
NILAI TAGIHAN BULAN INI 30,110,000.00
NILAI TAGIHAN BULAN PERTAMA DIBULATKAN 30,110,000.00

Terbilang : Tiga Puluh Juta Seratus Sepuluh Ribu Rupiah

S/D BULAN LALU -


PROSENTASE YANG DICAPAI BULAN INI #REF!
S/D BULAN INI #REF!

DISETUJUI OLEH : DIBUAT OLEH :


#VALUE! SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
DINAS KESEHATAN DAERAH KABUPATEN MOROWALI UTARA

YAMER Y. PAGALU, SKM,M.Kes YOSEPH, ST


NIP. 19780701 200003 1 003 Site Engineer
INVOICE
KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PENGADAAN,PENINGKATAN, DAN PERBAIKAN SARANA DAN PRASARANA KANTOR
PEKERJAAN : PENGAWASAN PEMBANGUNAN JALAN KORONGKAMA - ULULA'A
NO.KONTRAK : 622/01a/SPK/PL-PWS/DISPUHUB/IX/2014
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 02 (Dua) Bulan Kedua


Periode : 17 Oktober s/d 13 November 2014

NILAI TAGIHAN S/D PROSENTASE S/D


NO. U R A I A N BOBOT NILAI KONTRAK BULAN INI BULAN INI
(%) Rp. Rp.

A BIAYA LANGSUNG PERSONIL

A.1 Tenaga Ahli 27.69 1,800,000.00 15,000,000.00 230.77

A.2 Tenaga Pendukung 40.00 2,600,000.00 2,600,000.00 40.00

B BIAYA LANGSUNG NON PERSONIL

B.1. Fasilitas Kantor 32.31 2,100,000.00 1,400,000.00 21.54

B.2. #REF! - - 1,350,000.00 20.77

JUMLAH 100.00 6,500,000.00 20,350,000.00 313.08


PPN 10 % 650,000.00 2,035,000.00
JUMLAH 7,150,000.00 22,385,000.00
NILAI TAGIHAN BULAN PERTAMA 22,385,000.00
POTONGAN
1. Total Nilai Tagihan S/ D Bulan lalu
2. Pengembalian Uang Muka -
TOTAL POTONGAN ( 1 + 2 ) -
NILAI TAGIHAN BULAN INI 22,385,000.00
NILAI TAGIHAN BULAN PERTAMA DIBULATKAN 22,385,000.00

Terbilang : Dua Belas Juta Sembilan Ratus Dua Puluh Lima Ribu Rupiah

S/D BULAN LALU 100.00


PROSENTASE YANG DICAPAI BULAN INI 213.08
S/D BULAN INI 313.08

DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) #REF!

LAODE MUH. YANI SAMU,ST,.Msi #REF!


NIP. 19750930 200212 1 010 Site Engineer
KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PEMBANGUNAN JALAN
PEKERJAAN : PENGAWASAN PEMBANGUNAN JALAN KORONGKAMA - ULULA'A
NO.KONTRAK : 622/01a/SPK/PL-PWS/DISPUHUB/IX/2014
TANGGAL KONTRAK : 19 September 2014
Invoice : 02 (Dua ) Bulan Kedua

Periode : 17 Oktober s/d 13 November 2014


A. BIAYA LANGSUNG PERSONIL
A.1 Tenaga Ahli
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah Jumlah
Jumlah Jumlah Jumlah Orang
Orang Personil Orang
Personil ( Rp Orang Bulan Bulan
Bulan ( Rp ) Bulan ( Rp ) ( Rp ) ( Rp ) ( Rp )
)
1 Site Engineer 1 3.0 7,500,000 22,500,000 1.0 7,500,000 1.0 7,500,000 2.0 15,000,000 7,500,000

JUMLAH A.1 22,500,000 7,500,000 7,500,000 15,000,000 7,500,000

A.2 Tenaga Pendukung


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah Jumlah Jumlah
Jumlah Jumlah Orang
Orang Personil Orang Orang
Personil ( Rp Bulan
Bulan ( Rp ) Bulan ( Rp ) Bulan ( Rp ) ( Rp ) ( Rp )
)

1 Inspector - - - - - -

2 Operator Computer

JUMLAH A.2 - - - - -
KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PEMBANGUNAN JALAN
PEKERJAAN : PENGAWASAN PEMBANGUNAN JALAN KORONGKAMA - ULULA'A
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 19 September 2014

Invoice : 02 (Dua ) Bulan Kedua


B. BIAYA LANGSUNG NON PERSONIL
Periode : 17 Oktober s/d 13 November 2014
B.1. Fasilitas Kantor
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah DANA
NO. URAIAN Jumlah Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp ) ( Rp )
( Rp )

1 - Komputer + Printer Buku 3.0 700,000 2,100,000 1.0 700,000 1.0 700,000 2.0 1,400,000 700,000

2 - ATK

3 - Biaya Komunikasi - - - - - - -

4 - Sewa Kendaraan Roda Dua. - - - - -

JUMLAH B.3 2,100,000 700,000.00 700,000 1,400,000 700,000

-
JUMLAH A + B 24,600,000 8,200,000 16,400,000 8,200,000
PPN 10% 2,460,000 - 820,000 1,640,000 820,000
BIAYA PEKERJAAN 27,060,000 - 9,020,000 18,040,000 9,020,000
TOTAL 27,060,000 9,020,000 18,040,000 9,020,000

DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK) CV. ARCADE, Eng. Consultant

LAODE MUH. YANI SAMU,ST,.Msi ASWIN, ST


NIP. 19750930 200212 1 010 Site Engineer
KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PEMBANGUNAN JALAN
PEKERJAAN : PENGAWASAN PEMBANGUNAN JALAN KORONGKAMA - ULULA'A
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 19 September 2014

Invoice : 02 (Dua ) Bulan Kedua


B. BIAYA LANGSUNG NON PERSONIL
Periode : 17 Oktober s/d 13 November 2014
B.1. Biaya Pelaporan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah DANA
NO. URAIAN Jumlah Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp ) ( Rp )
( Rp )

1 - Laporan Bulanan Buku 15.0 70,000 1,050,000 5.0 350,000 5.0 350,000 10.0 700,000 350,000

2 - Laporan Triwulan

3 - Laporan Akhir Set 5.0 200,000 1,000,000 - - - - - 1,000,000

JUMLAH B.3 2,050,000 350,000.00 350,000 700,000 1,350,000

-
JUMLAH A + B 26,650,000 8,550,000 17,100,000 9,550,000
PPN 10% 2,665,000 - 855,000 1,710,000 955,000
BIAYA PEKERJAAN 29,315,000 - 9,405,000 18,810,000 10,505,000
TOTAL 29,310,000 9,405,000 18,810,000 10,505,000

DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK) CV. ARCADE, Eng. Consultant

LAODE MUH. YANI SAMU,ST,.Msi ASWIN, ST


NIP. 19750930 200212 1 010 Site Engineer
INVOICE
KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PENGADAAN,PENINGKATAN, DAN PERBAIKAN SARANA DAN PRASARANA KANTOR
PEKERJAAN : PENGAWASAN PEMBANGUNAN JALAN KORONGKAMA - ULULU'A
NO.KONTRAK : 622/01a/SPK/PL-PWS/DISPUHUB/IX/2014
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 03 (Tiga) Bulan Ketiga


Periode : 14 November s/d 11 Desember 2014

NILAI TAGIHAN S/D


NO. U R A I A N BOBOT NILAI KONTRAK BULAN INI
(%) Rp. Rp.

A BIAYA LANGSUNG PERSONIL

A.1 Tenaga Ahli 20.00 1,800,000.00 22,500,000.00

A.2 Tenaga Pendukung 28.89 2,600,000.00 2,600,000.00

B BIAYA LANGSUNG NON PERSONIL

B.1. Fasilitas Kantor 23.33 2,100,000.00 2,100,000.00

B.2. Biaya Pelaporan 27.78 2,500,000.00 2,500,000.00

JUMLAH 100.00 9,000,000.00 29,700,000.00


PPN 10 % 900,000.00 2,970,000.00
JUMLAH 9,900,000.00 32,670,000.00
NILAI TAGIHAN BULAN PERTAMA 32,670,000.00
POTONGAN
1. Total Nilai Tagihan S/ D Bulan lalu
2. Pengembalian Uang Muka -
TOTAL POTONGAN ( 1 + 2 ) -
NILAI TAGIHAN BULAN INI 32,670,000.00
NILAI TAGIHAN BULAN PERTAMA DIBULATKAN 32,670,000.00

Terbilang : Dua Belas Juta Sembilan Ratus Dua Puluh Lima Ribu Rupiah

S/D BULAN LALU


PROSENTASE YANG DICAPAI BULAN INI
S/D BULAN INI

DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) #REF!

LAODE MUH. YANI SAMU,ST,.Msi #REF!


NIP. 19750930 200212 1 010 Site Engineer
NA DAN PRASARANA KANTOR
A - ULULU'A

(Tiga) Bulan Ketiga


November s/d 11 Desember 2014

PROSENTASE S/D
BULAN INI

250.00

28.89

23.33

27.78

330.00

313.08
16.92
330.00

DIBUAT OLEH :
#REF!

#REF!
Site Engineer
KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PEMBANGUNAN JALAN
PEKERJAAN : PENGAWASAN PEMBANGUNAN JALAN KORONGKAMA - ULULA'A
NO.KONTRAK : 622/01a/SPK/PL-PWS/DISPUHUB/IX/2014
TANGGAL KONTRAK : 19 September 2014
Invoice : 03 ( Tiga ) Bulan Ketiga

Periode : 14 November s/d 11 Desember 2014


A. BIAYA LANGSUNG PERSONIL
A.1 Tenaga Ahli
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI
Jumlah
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah
Jumlah Jumlah Jumlah Jumlah Orang
Orang Personil
Personil ( Rp Orang Bulan Orang Bulan Bulan
Bulan ( Rp ) ( Rp ) ( Rp ) ( Rp )
)
1 Site Engineer 1 3.0 7,500,000 22,500,000 2.0 15,000,000 1.0 7,500,000 3.0 22,500,000

JUMLAH A.1 22,500,000 15,000,000 7,500,000 22,500,000

A.2 Tenaga Pendukung


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI
Jumlah
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah Jumlah
Jumlah Jumlah Orang Jumlah Orang
Orang Personil Orang
Personil ( Rp Bulan Bulan
Bulan ( Rp ) ( Rp ) Bulan ( Rp ) ( Rp )
)

1 Inspector - - - - -

2 Operator Computer

JUMLAH A.2 - - - -
KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PEMBANGUNAN JALAN
PEKERJAAN : PENGAWASAN PEMBANGUNAN JALAN KORONGKAMA - ULULA'A
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 19 September 2014

Invoice : 03 ( Tiga ) Bulan Ketiga


B. BIAYA LANGSUNG NON PERSONIL
Periode : 14 November s/d 11 Desember 2014
B.1. Fasilitas Kantor
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI
Jumlah
NO. URAIAN Jumlah Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp )

1 - Komputer + Printer Buku 3.0 700,000 2,100,000 2.0 1,400,000 1.0 700,000 3.0 2,100,000

2 - ATK

3 - Biaya Komunikasi - - - - - -

4 - Sewa Kendaraan Roda Dua. - - - - -

JUMLAH B.3 2,100,000 1,400,000 700,000 2,100,000

-
JUMLAH A + B 24,600,000 8,200,000 8,200,000
PPN 10% 2,460,000 - 820,000 820,000
BIAYA PEKERJAAN 27,060,000 - 9,020,000 9,020,000
TOTAL 27,060,000 9,020,000 9,020,000

DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK) CV. ARCADE, Eng. Consultant

LAODE MUH. YANI SAMU,ST,.Msi ASWIN, ST


NIP. 19750930 200212 1 010 Site EnginEer
KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PEMBANGUNAN JALAN
PEKERJAAN : PENGAWASAN PEMBANGUNAN JALAN KORONGKAMA - ULULA'A
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 19 September 2014

Invoice : 03 ( Tiga ) Bulan Ketiga


B. BIAYA LANGSUNG NON PERSONIL
Periode : 14 November s/d 11 Desember 2014
B.1. Biaya Pelaporan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI
Jumlah
NO. URAIAN Jumlah Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp )

1 - Laporan Bulanan Buku 15.0 100,000 1,500,000 10.0 1,000,000 5.0 500,000 15.0 1,500,000

2 - Laporan Triwulan

3 - Laporan Akhir Set 5.0 200,000 1,000,000 - 5.0 1,000,000 5.0 1,000,000

JUMLAH B.3 2,500,000 1,000,000 1,500,000 2,500,000

-
JUMLAH A + B 27,100,000 9,700,000 9,700,000
PPN 10% 2,710,000 - 970,000 970,000
BIAYA PEKERJAAN 29,810,000 - 10,670,000 10,670,000
TOTAL 29,810,000 10,670,000 10,670,000

DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK) CV. ARCADE, Eng. Consultant

LAODE MUH. YANI SAMU,ST,.Msi ASWIN, ST


NIP. 19750930 200212 1 010 Site EnginEer
14 November s/d 11 Desember 2014

SISA
DANA

( Rp )

SISA
DANA

( Rp )

-
14 November s/d 11 Desember 2014

SISA
DANA

( Rp )

-
-
-
-

DIBUAT OLEH :
CV. ARCADE, Eng. Consultant

ASWIN, ST
Site EnginEer
14 November s/d 11 Desember 2014

SISA
DANA

( Rp )

-
-
-
-

DIBUAT OLEH :
CV. ARCADE, Eng. Consultant

ASWIN, ST
Site EnginEer
INVOICE
KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PENGADAAN,PENINGKATAN, DAN PERBAIKAN SARANA DAN PRASARANA KANTOR
PEKERJAAN : Perencanaan Pembangunan Rumah Medis Puskesmas Lee (Rumah Dokter)
NO.KONTRAK : Err:540
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 02 (Dua) Bulan Kedua


Periode : 22 November s/d 22 Desember

NILAI TAGIHAN S/D PROSENTASE S/D


NO. U R A I A N BOBOT NILAI KONTRAK BULAN INI BULAN INI
(%) Rp. Rp.

A BIAYA LANGSUNG PERSONIL

A.1 Tenaga Ahli #REF! 1,800,000.00 1,800,000.00 #REF!

A.2 Tenaga Pendukung #REF! 2,600,000.00 - #REF!

B BIAYA LANGSUNG NON PERSONIL

B.1. Operasional Kantor #REF! 295,500.00 295,500.00 #REF!

B.1. Uang Harian #REF! #REF! #REF! #REF!

B.2. Biaya Pelaporan #REF! 100,000.00 100,000.00 #REF!

JUMLAH #REF! #REF! #REF! #REF!


PPN 10 % #REF! #REF!
JUMLAH #REF! #REF!
NILAI TAGIHAN BULAN PERTAMA #REF!
POTONGAN
1. Total Nilai Tagihan S/ D Bulan lalu
2. Pengembalian Uang Muka -
TOTAL POTONGAN ( 1 + 2 ) -
NILAI TAGIHAN BULAN INI #REF!
NILAI TAGIHAN BULAN PERTAMA DIBULATKAN #REF!

Terbilang : Lima Juta Enam Ratus Ribu Rupiah

S/D BULAN LALU -


PROSENTASE YANG DICAPAI BULAN INI #REF!
S/D BULAN INI #REF!

DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN

DELNAN LAUENDE, S.Sos, M.Kes Frins Encik Yakub, ST


NIP. 196823198802 2 002 Site Engineer
INVOICE
KONSULTAN : SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 03 (Tiga) Bulan Ke Tiga


Periode : 03 September s/d 02 Oktober 2018

NILAI TAGIHAN S/D PROSENTASE S/D


NO. U R A I A N BOBOT NILAI KONTRAK BULAN INI BULAN INI
(%) Rp. Rp.

A BIAYA LANGSUNG PERSONIL

A.1 Tenaga Ahli #REF! 1,800,000.00 18,000,000.00 #REF!

A.2 Tenaga Pendukung #REF! 2,600,000.00 14,250,000.00 #REF!

B BIAYA LANGSUNG NON PERSONIL

B.1. Operasional Lapangan #REF! 250,000.00 4,500,000.00 #REF!

B.2. Operasional Kantor #REF! 295,500.00 3,900,000.00 #REF!

B.3. Uang Harian #REF! #REF! 2,715,000.00 #REF!

C BIAYA DOKUMEN PENGAWASAN

B.2. Biaya Pelaporan #REF! 100,000.00 1,800,000.00 #REF!

JUMLAH #REF! #REF! 45,165,000.00 #REF!


JUMLAH #REF! 45,165,000.00
NILAI TAGIHAN BULAN PERTAMA 45,160,000.00
POTONGAN
1. Total Nilai Tagihan S/ D Bulan lalu
2. Pengembalian Uang Muka -
TOTAL POTONGAN ( 1 + 2 ) -
NILAI TAGIHAN BULAN INI 45,160,000.00
NILAI TAGIHAN BULAN PERTAMA DIBULATKAN 45,160,000.00

Terbilang : Empat Puluh Lima Juta Seratus Enam Puluh Ribu Rupiah

S/D BULAN LALU -


PROSENTASE YANG DICAPAI BULAN INI #REF!
S/D BULAN INI #REF!

DISETUJUI OLEH : DIBUAT OLEH :


#VALUE! SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
DINAS KESEHATAN DAERAH KABUPATEN MOROWALI UTARA

YAMER Y. PAGALU, SKM,M.Kes YOSEPH, ST


NIP. 19780701 200003 1 003 Site Engineer
INVOICE
KONSULTAN : SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 04 (Empat) Bulan Ke Empat


Periode : 03 Oktober s/d 01 November 2018

NILAI TAGIHAN S/D PROSENTASE S/D


NO. U R A I A N BOBOT NILAI KONTRAK BULAN INI BULAN INI
(%) Rp. Rp.

A BIAYA LANGSUNG PERSONIL

A.1 Tenaga Ahli #REF! 1,800,000.00 24,000,000.00 #REF!

A.2 Tenaga Pendukung #REF! 2,600,000.00 19,000,000.00 #REF!

B BIAYA LANGSUNG NON PERSONIL

B.1. Operasional Lapangan #REF! 250,000.00 6,000,000.00 #REF!

B.2. Operasional Kantor #REF! 295,500.00 5,200,000.00 #REF!

B.3. Uang Harian #REF! #REF! 3,620,000.00 #REF!

C BIAYA DOKUMEN PENGAWASAN

B.2. Biaya Pelaporan #REF! 100,000.00 2,400,000.00 #REF!

JUMLAH #REF! #REF! 60,220,000.00 #REF!


JUMLAH #REF! 60,220,000.00
NILAI TAGIHAN BULAN PERTAMA 60,220,000.00
POTONGAN
1. Total Nilai Tagihan S/ D Bulan lalu
2. Pengembalian Uang Muka -
TOTAL POTONGAN ( 1 + 2 ) -
NILAI TAGIHAN BULAN INI 60,220,000.00
NILAI TAGIHAN BULAN PERTAMA DIBULATKAN 60,220,000.00

Terbilang : Enam Puluh Juta Dua Ratus Dua Puluh Ribu Rupiah

S/D BULAN LALU -


PROSENTASE YANG DICAPAI BULAN INI #REF!
S/D BULAN INI #REF!

DISETUJUI OLEH : DIBUAT OLEH :


#VALUE! SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
DINAS KESEHATAN DAERAH KABUPATEN MOROWALI UTARA

YAMER Y. PAGALU, SKM,M.Kes YOSEPH, ST


NIP. 19780701 200003 1 003 Site Engineer
INVOICE
KONSULTAN : SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 05 (Lima) Bulan Ke Lima


Periode : 02 November s/d 03 Desember 2018

NILAI TAGIHAN S/D PROSENTASE S/D


NO. U R A I A N BOBOT NILAI KONTRAK BULAN INI BULAN INI
(%) Rp. Rp.

A BIAYA LANGSUNG PERSONIL

A.1 Tenaga Ahli #REF! 1,800,000.00 30,000,000.00 #REF!

A.2 Tenaga Pendukung #REF! 2,600,000.00 23,750,000.00 #REF!

B BIAYA LANGSUNG NON PERSONIL

B.1. Operasional Lapangan #REF! 250,000.00 7,500,000.00 #REF!

B.2. Operasional Kantor #REF! 295,500.00 6,500,000.00 #REF!

B.3. Uang Harian #REF! #REF! 4,525,000.00 #REF!

C BIAYA DOKUMEN PENGAWASAN

B.2. Biaya Pelaporan #REF! 100,000.00 3,000,000.00 #REF!

JUMLAH #REF! #REF! 75,275,000.00 #REF!


JUMLAH #REF! 75,275,000.00
NILAI TAGIHAN BULAN PERTAMA 75,270,000.00
POTONGAN
1. Total Nilai Tagihan S/ D Bulan lalu
2. Pengembalian Uang Muka -
TOTAL POTONGAN ( 1 + 2 ) -
NILAI TAGIHAN BULAN INI 75,270,000.00
NILAI TAGIHAN BULAN PERTAMA DIBULATKAN 75,270,000.00

Terbilang : Tujuh Puluh Lima Juta Dua Ratus Tujuh Puluh Ribu Rupiah

S/D BULAN LALU -


PROSENTASE YANG DICAPAI BULAN INI #REF!
S/D BULAN INI #REF!

DISETUJUI OLEH : DIBUAT OLEH :


#VALUE! SEKRETARIAT DAERAH KABUPATEN BANGGAI KEPULAUAN
DINAS KESEHATAN DAERAH KABUPATEN MOROWALI UTARA

YAMER Y. PAGALU, SKM,M.Kes YOSEPH, ST


NIP. 19780701 200003 1 003 Site Engineer
KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PEMBANGUNAN GEDUNG
PEKERJAAN : Pengawasan Pembangunan Gedung Perawatan Bedah Lt.1 dan Penyakit Dalam Lt.2
NO.KONTRAK : 445/275.c/SPK/PL/Konslt-PWS/RSUD-Kodal/X/2015
TANGGAL KONTRAK : 22 Oktober 2015
Invoice : 02 (Dua) Bulan Kedua

Periode : 22 November s/d 22 Desember


A. BIAYA LANGSUNG PERSONIL
A.1 Tenaga Ahli
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah
Jumlah Jumlah Jumlah
Orang Personil Orang
Personil ( Rp Orang Bulan Orang Bulan
Bulan ( Rp ) Bulan ( Rp ) ( Rp ) ( Rp )
) ( Rp )
1 Site Engineer ( ARSITEKTUR ) 1 2.0 5,500,000 11,000,000 1.0 5,500,000 1.0 5,500,000 5,500,000

JUMLAH A.1 11,000,000 - 5,500,000 5,500,000 5,500,000

A.2 Tenaga Pendukung


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah Jumlah
Jumlah Jumlah
Orang Personil Orang Orang
Personil ( Rp Orang Bulan
Bulan ( Rp ) Bulan ( Rp ) Bulan ( Rp ) ( Rp )
) ( Rp )

1 Inspector 3 2.0 2,500,000 15,000,000 1.0 7,500,000 1.0 7,500,000 7,500,000

JUMLAH A.2 15,000,000 - 7,500,000 7,500,000 7,500,000


KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PEMBANGUNAN GEDUNG
PEKERJAAN : Pengawasan Pembangunan Gedung Perawatan Bedah Lt.1 dan Penyakit Dalam Lt.2
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 22 Oktober 2015

Invoice : 02 (Dua) Bulan Kedua


B. BIAYA LANGSUNG NON PERSONIL
Periode : 22 November s/d 22 Desember
B.1. Operasional Kantor
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Sewa Komputer Bulan 2.0 1,000,000 2,000,000 - 1.0 1,000,000 1.0 1,000,000 1,000,000

2 - Sewa Printer Bulan 2.0 500,000 1,000,000 - 1.0 500,000 1.0 500,000 500,000

3 - Biaya ATK dan Bahan Habis Pakai Bulan 2.0 400,000 800,000 - 1.0 400,000 1.0 400,000 400,000

3 - Biaya Komunikasi Bulan 2.0 350,000 700,000 - 1.0 350,000 1.0 350,000 350,000

4 - Sewa Kendaraan Roda Dua (1 Unit) Bulan 2.0 900,000 3,600,000 - 2.0 1,800,000 2.0 1,800,000 1,800,000

5 - Operasional Kendaraan Roda Dua (1 Unit) Bulan 2.0 500,000 2,000,000 - 2.0 1,000,000 2.0 1,000,000 1,000,000

JUMLAH B.3 10,100,000 - 5,050,000 5,050,000 5,050,000

B.2. Uang Harian


KONTRAK TAGIHAN S/D. BULANTAGIHAN
LALU BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Site Enginer OB 1.0 1,800,000 1,800,000 - 1.0 900,000 1.0 900,000 900,000

2 - Inspector OB 3.0 1,350,000 4,050,000 - 3.0 1,350,000 3.0 1,350,000 2,700,000

JUMLAH B.3 5,850,000 - 2,250,000 2,250,000 3,600,000


KONSULTAN : CV. ARCADE, Eng. Consultant
KEGIATAN : PEMBANGUNAN GEDUNG
Pengawasan Pembangunan Gedung Perawatan Bedah Lt.1 dan Penyakit Dalam
PEKERJAAN : Lt.2
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 22 Oktober 2015

Invoice : 02 (Dua) Bulan Kedua

Periode : 22 November s/d 22 Desember


B.2. Biaya Pelaporan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Laporan Bulanan Buku 5.0 200,000 1,000,000 - 5.0 500,000 5.0 500,000 500,000

2 - Laporan Akhir Buku 5.0 250,000 1,250,000 - 5.0 5.0 625,000 625,000

JUMLAH B.3 2,250,000 - 500,000 1,125,000 1,125,000

-
JUMLAH A + B 44,200,000 18,550,000 19,175,000 19,175,000
PPN 10% 4,420,000 - 1,855,000 1,917,500 1,917,500
BIAYA PEKERJAAN 48,620,000 - 20,405,000 21,092,500 21,092,500
TOTAL 48,620,000 20,405,000 20,405,000 21,092,500

DISETUJUI DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK) SATKER DAERAH KABUPATEN BANGGAI KEPULAUAN
RUMAH SAKIT UMUM DAERAH KOLONODALE

DELNAN LAUENDE, S.Sos, M.Kes SYALDI, ST


NIP. 196823198802 2 002 Direktur
KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 0274b/SPK/Konsult-Pws/DINKES/VI/2018
TANGGAL KONTRAK : 25 Februari 2019
Invoice : 02 ( Dua ) Bulan Ke Dua

Periode : 04 Agustus s/d 02 September 2018


A. BIAYA LANGSUNG PERSONIL
A.1 Tenaga Ahli
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah
Jumlah Jumlah Jumlah
Orang Personil Orang
Personil ( Rp Orang Bulan Orang Bulan
Bulan ( Rp ) Bulan ( Rp ) ( Rp ) ( Rp )
) ( Rp )
1 Site Engineer 1 5.0 6,000,000 30,000,000 1.00 1,800,000 5.0 6,000,000 2.0 12,000,000 18,000,000

JUMLAH A.1 30,000,000 1,800,000 6,000,000 12,000,000 18,000,000

A.2 Tenaga Pendukung


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah Jumlah
Jumlah Jumlah
Orang Personil Orang Orang
Personil ( Rp Orang Bulan
Bulan ( Rp ) Bulan ( Rp ) Bulan ( Rp ) ( Rp )
) ( Rp )

1 Inspector/Pengawas Lapangan 1 5.0 3,250,000 16,250,000 1.00 #REF! 5.0 3,250,000 2.0 6,500,000 13,000,000

2 Administrasi 1 5.0 1,500,000 7,500,000 1.00 1,300,000 5.0 1,500,000 2.0 3,000,000 6,000,000

JUMLAH A.2 23,750,000 #REF! 4,750,000 9,500,000 19,000,000


KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 02 ( Dua ) Bulan Ke Dua


Periode : 04 Agustus s/d 02 September 2018
B. BIAYA LANGSUNG NON PERSONIL
B.1. Biaya Operasional Lapangan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Sewa Kendaraan Roda Dua (1 Unit) Unit 5.0 750,000 3,750,000 1.00 250,000 5.0 750,000 2.0 1,500,000 2,250,000

2 - Operasional Kendaraan Roda Dua (1 Unit) Unit 5.0 750,000 3,750,000 1.00 - 5.0 750,000 2.0 1,500,000 2,250,000

JUMLAH B.3 7,500,000 250,000.00 1,500,000 3,000,000 4,500,000

B.2. Biaya Operasional Kantor


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Sewa Komputer Unit 5.0 300,000 1,500,000 1.00 295,500 5.0 300,000 2.0 600,000 900,000

2 - Sewa Printer Unit 5.0 300,000 1,500,000 1.00 - 5.0 300,000 2.0 600,000 900,000

3 - Biaya ATK dan Bahan Habis Pakai Bulan 5.0 400,000 2,000,000 1.00 #REF! 5.0 400,000 2.0 800,000 1,200,000

4 - Biaya Komunikasi OB 5.0 300,000 1,500,000 1.00 #REF! 5.0 300,000 2.0 600,000 900,000

JUMLAH B.3 6,500,000 #REF! 1,300,000 2,600,000 3,900,000

B.3. Uang Harian


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Site Enginer OB 5.0 350,000 1,750,000 1.00 #REF! 5.0 350,000 2.0 700,000 1,050,000

2 - Inspector OB 5.0 355,000 1,775,000 1.00 #REF! 5.0 355,000 2.0 710,000 1,065,000

3 - Administrasi OB 5.0 200,000 1,000,000 1.00 #REF! 5.0 200,000 2.0 400,000 600,000

JUMLAH B.3 4,525,000 #REF! 905,000 1,810,000 2,715,000


KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 02 ( Dua ) Bulan Ke Dua


Periode : 04 Agustus s/d 02 September 2018
C. BIAYA DOKUMEN PENGAWASAN
C.1. Biaya Pelaporan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Laporan Bulanan Buku 5.0 350,000 1,750,000 1.00 100,000 5.0 350,000 2.0 700,000 1,050,000

2 - Laporan Akhir Buku 5.0 250,000 1,250,000 1.00 - 5.0 250,000 2.0 500,000 750,000

JUMLAH B.3 3,000,000 100,000.00 600,000 1,200,000 1,800,000

-
JUMLAH A + B + C 75,275,000 #REF! 15,055,000 30,110,000 49,915,000
BIAYA PEKERJAAN 75,275,000 #REF! 15,055,000 30,110,000 49,915,000
TOTAL 75,270,000 #REF! 15,050,000 30,110,000 49,910,000

DISETUJUI DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK) SATKER DAERAH KABUPATEN BANGGAI KEPULAUAN
DINAS KESEHATAN DAERAH KABUPATEN MOROWALI UTARA

YAMER Y. PAGALU, SKM,M,Kes AMRAN, ST


NIP. 19780701 200003 1 003 Direktur
KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 0274b/SPK/Konsult-Pws/DINKES/VI/2018
TANGGAL KONTRAK : 25 Februari 2019
Invoice : 03 ( Tiga ) Bulan Ke Tiga

Periode : 03 September s/d 02 Oktober 2018


A. BIAYA LANGSUNG PERSONIL
A.1 Tenaga Ahli
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah
Jumlah Jumlah Jumlah
Orang Personil Orang
Personil ( Rp Orang Bulan Orang Bulan
Bulan ( Rp ) Bulan ( Rp ) ( Rp ) ( Rp )
) ( Rp )
1 Site Engineer 1 5.0 6,000,000 30,000,000 2.00 12,000,000 5.0 6,000,000 3.0 18,000,000 12,000,000

JUMLAH A.1 30,000,000 12,000,000 6,000,000 18,000,000 12,000,000

A.2 Tenaga Pendukung


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah Jumlah
Jumlah Jumlah
Orang Personil Orang Orang
Personil ( Rp Orang Bulan
Bulan ( Rp ) Bulan ( Rp ) Bulan ( Rp ) ( Rp )
) ( Rp )

1 Inspector/Pengawas Lapangan 1 5.0 3,250,000 16,250,000 2.00 6,500,000 5.0 3,250,000 3.0 9,750,000 13,000,000

2 Administrasi 1 5.0 1,500,000 7,500,000 2.00 3,000,000 5.0 1,500,000 3.0 4,500,000 6,000,000

JUMLAH A.2 23,750,000 9,500,000.00 4,750,000 14,250,000 19,000,000


KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 03 ( Tiga ) Bulan Ke Tiga


Periode : 03 September s/d 02 Oktober 2018
B. BIAYA LANGSUNG NON PERSONIL
B.1. Biaya Operasional Lapangan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Sewa Kendaraan Roda Dua (1 Unit) Unit 5.0 750,000 3,750,000 2.00 1,500,000 5.0 750,000 3.0 2,250,000 1,500,000

2 - Operasional Kendaraan Roda Dua (1 Unit) Unit 5.0 750,000 3,750,000 2.00 1,500,000 5.0 750,000 3.0 2,250,000 1,500,000

JUMLAH B.3 7,500,000 3,000,000.00 1,500,000 4,500,000 3,000,000

B.2. Biaya Operasional Kantor


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Sewa Komputer Unit 5.0 300,000 1,500,000 2.00 600,000 5.0 300,000 3.0 900,000 600,000

2 - Sewa Printer Unit 5.0 300,000 1,500,000 2.00 600,000 5.0 300,000 3.0 900,000 600,000

3 - Biaya ATK dan Bahan Habis Pakai Bulan 5.0 400,000 2,000,000 2.00 800,000 5.0 400,000 3.0 1,200,000 800,000

4 - Biaya Komunikasi OB 5.0 300,000 1,500,000 2.00 600,000 5.0 300,000 3.0 900,000 600,000

JUMLAH B.3 6,500,000 2,600,000.00 1,300,000 3,900,000 2,600,000

B.3. Uang Harian


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Site Enginer OB 5.0 350,000 1,750,000 2.00 700,000 5.0 350,000 3.0 1,050,000 700,000

2 - Inspector OB 5.0 355,000 1,775,000 2.00 710,000 5.0 355,000 3.0 1,065,000 710,000

3 - Administrasi OB 5.0 200,000 1,000,000 2.00 400,000 5.0 200,000 3.0 600,000 400,000

JUMLAH B.3 4,525,000 1,810,000.00 905,000 2,715,000 1,810,000


KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 03 ( Tiga ) Bulan Ke Tiga


Periode : 03 September s/d 02 Oktober 2018
C. BIAYA DOKUMEN PENGAWASAN
C.1. Biaya Pelaporan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Laporan Bulanan Buku 5.0 350,000 1,750,000 2.00 700,000 5.0 350,000 3.0 1,050,000 700,000

2 - Laporan Akhir Buku 5.0 250,000 1,250,000 2.00 500,000 5.0 250,000 3.0 750,000 500,000

JUMLAH B.3 3,000,000 1,200,000.00 600,000 1,800,000 1,200,000

-
JUMLAH A + B + C 75,275,000 30,110,000 15,055,000 45,165,000 39,610,000
BIAYA PEKERJAAN 75,275,000 30,110,000 15,055,000 45,165,000 39,610,000
TOTAL 75,270,000 30,110,000 15,050,000 45,160,000 39,610,000

DISETUJUI DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK) SATKER DAERAH KABUPATEN BANGGAI KEPULAUAN
DINAS KESEHATAN DAERAH KABUPATEN MOROWALI UTARA

YAMER Y. PAGALU, SKM,M,Kes AMRAN, ST


NIP. 19780701 200003 1 003 Direktur
KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 0274b/SPK/Konsult-Pws/DINKES/VI/2018
TANGGAL KONTRAK : 25 Februari 2019
Invoice : 04 ( Empat Bulan Ke Empat

Periode : 03 Oktober s/d 01 November 2018


A. BIAYA LANGSUNG PERSONIL
A.1 Tenaga Ahli
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah
Jumlah Jumlah Jumlah
Orang Personil Orang
Personil ( Rp Orang Bulan Orang Bulan
Bulan ( Rp ) Bulan ( Rp ) ( Rp ) ( Rp )
) ( Rp )
1 Site Engineer 1 5.0 6,000,000 30,000,000 3.00 18,000,000 5.0 6,000,000 4.0 24,000,000 6,000,000

JUMLAH A.1 30,000,000 18,000,000 6,000,000 24,000,000 6,000,000

A.2 Tenaga Pendukung


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah Jumlah
Jumlah Jumlah
Orang Personil Orang Orang
Personil ( Rp Orang Bulan
Bulan ( Rp ) Bulan ( Rp ) Bulan ( Rp ) ( Rp )
) ( Rp )

1 Inspector/Pengawas Lapangan 1 5.0 3,250,000 16,250,000 3.00 9,750,000 5.0 3,250,000 4.0 13,000,000 13,000,000

2 Administrasi 1 5.0 1,500,000 7,500,000 3.00 4,500,000 5.0 1,500,000 4.0 6,000,000 6,000,000

JUMLAH A.2 23,750,000 14,250,000 4,750,000 19,000,000 19,000,000


KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 04 ( Empat Bulan Ke Empat


Periode : 03 Oktober s/d 01 November 2018
B. BIAYA LANGSUNG NON PERSONIL
B.1. Biaya Operasional Lapangan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Sewa Kendaraan Roda Dua (1 Unit) Unit 5.0 750,000 3,750,000 3.00 2,250,000 5.0 750,000 4.0 3,000,000 750,000

2 - Operasional Kendaraan Roda Dua (1 Unit) Unit 5.0 750,000 3,750,000 3.00 2,250,000 5.0 750,000 4.0 3,000,000 750,000

JUMLAH B.3 7,500,000 4,500,000.00 1,500,000 6,000,000 1,500,000

B.2. Biaya Operasional Kantor


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Sewa Komputer Unit 5.0 300,000 1,500,000 3.00 900,000 5.0 300,000 4.0 1,200,000 300,000

2 - Sewa Printer Unit 5.0 300,000 1,500,000 3.00 900,000 5.0 300,000 4.0 1,200,000 300,000

3 - Biaya ATK dan Bahan Habis Pakai Bulan 5.0 400,000 2,000,000 3.00 1,200,000 5.0 400,000 4.0 1,600,000 400,000

4 - Biaya Komunikasi OB 5.0 300,000 1,500,000 3.00 900,000 5.0 300,000 4.0 1,200,000 300,000

JUMLAH B.3 6,500,000 3,900,000.00 1,300,000 5,200,000 1,300,000

B.3. Uang Harian


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Site Enginer OB 5.0 350,000 1,750,000 3.00 1,050,000 5.0 350,000 4.0 1,400,000 350,000

2 - Inspector OB 5.0 355,000 1,775,000 3.00 1,065,000 5.0 355,000 4.0 1,420,000 355,000

3 - Administrasi OB 5.0 200,000 1,000,000 3.00 600,000 5.0 200,000 4.0 800,000 200,000

JUMLAH B.3 4,525,000 2,715,000.00 905,000 3,620,000 905,000


KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 04 ( Empat Bulan Ke Empat


Periode : 03 Oktober s/d 01 November 2018
C. BIAYA DOKUMEN PENGAWASAN
C.1. Biaya Pelaporan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Laporan Bulanan Buku 5.0 350,000 1,750,000 3.00 1,050,000 5.0 350,000 4.0 1,400,000 350,000

2 - Laporan Akhir Buku 5.0 250,000 1,250,000 3.00 750,000 5.0 250,000 4.0 1,000,000 250,000

JUMLAH B.3 3,000,000 1,800,000.00 600,000 2,400,000 600,000

-
JUMLAH A + B + C 75,275,000 45,165,000 15,055,000 60,220,000 29,305,000
BIAYA PEKERJAAN 75,275,000 45,165,000 15,055,000 60,220,000 29,305,000
TOTAL 75,270,000 45,160,000 15,050,000 60,220,000 29,300,000

DISETUJUI DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK) SATKER DAERAH KABUPATEN BANGGAI KEPULAUAN
DINAS KESEHATAN DAERAH KABUPATEN MOROWALI UTARA

YAMER Y. PAGALU, SKM,M,Kes AMRAN, ST


NIP. 19780701 200003 1 003 Direktur
KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 0274b/SPK/Konsult-Pws/DINKES/VI/2018
TANGGAL KONTRAK : 25 Februari 2019
Invoice : 05 ( Lima ) Bulan Ke Lima

Periode : 02 November s/d 03 Desember 2018


A. BIAYA LANGSUNG PERSONIL
A.1 Tenaga Ahli
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah
Jumlah Jumlah Jumlah
Orang Personil Orang
Personil ( Rp Orang Bulan Orang Bulan
Bulan ( Rp ) Bulan ( Rp ) ( Rp ) ( Rp )
) ( Rp )
1 Site Engineer 1 5.0 6,000,000 30,000,000 4.00 24,000,000 5.0 6,000,000 5.0 30,000,000 -

JUMLAH A.1 30,000,000 24,000,000 6,000,000 30,000,000 -

A.2 Tenaga Pendukung


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Beban Biaya Jumlah Jumlah Jumlah Jumlah
Jumlah Jumlah
Orang Personil Orang Orang
Personil ( Rp Orang Bulan
Bulan ( Rp ) Bulan ( Rp ) Bulan ( Rp ) ( Rp )
) ( Rp )

1 Inspector/Pengawas Lapangan 1 5.0 3,250,000 16,250,000 4.00 13,000,000 5.0 3,250,000 5.0 16,250,000 -

2 Administrasi 1 5.0 1,500,000 7,500,000 4.00 6,000,000 5.0 1,500,000 5.0 7,500,000 -

JUMLAH A.2 23,750,000 19,000,000 4,750,000 23,750,000 -


KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 05 ( Lima ) Bulan Ke Lima


Periode : 02 November s/d 03 Desember 2018
B. BIAYA LANGSUNG NON PERSONIL
B.1. Biaya Operasional Lapangan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Sewa Kendaraan Roda Dua (1 Unit) Unit 5.0 750,000 3,750,000 4.00 3,000,000 5.0 750,000 5.0 3,750,000 -

2 - Operasional Kendaraan Roda Dua (1 Unit) Unit 5.0 750,000 3,750,000 4.00 3,000,000 5.0 750,000 5.0 3,750,000 -

JUMLAH B.3 7,500,000 6,000,000.00 1,500,000 7,500,000 -

B.2. Biaya Operasional Kantor


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Sewa Komputer Unit 5.0 300,000 1,500,000 4.00 1,200,000 5.0 300,000 5.0 1,500,000 -

2 - Sewa Printer Unit 5.0 300,000 1,500,000 4.00 1,200,000 5.0 300,000 5.0 1,500,000 -

3 - Biaya ATK dan Bahan Habis Pakai Bulan 5.0 400,000 2,000,000 4.00 1,600,000 5.0 400,000 5.0 2,000,000 -

4 - Biaya Komunikasi OB 5.0 300,000 1,500,000 4.00 1,200,000 5.0 300,000 5.0 1,500,000 -

JUMLAH B.3 6,500,000 5,200,000.00 1,300,000 6,500,000 -

B.3. Uang Harian


KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Site Enginer OB 5.0 350,000 1,750,000 4.00 1,400,000 5.0 350,000 5.0 1,750,000 -

2 - Inspector OB 5.0 355,000 1,775,000 4.00 1,420,000 5.0 355,000 5.0 1,775,000 -

3 - Administrasi OB 5.0 200,000 1,000,000 4.00 800,000 5.0 200,000 5.0 1,000,000 -

JUMLAH B.3 4,525,000 3,620,000.00 905,000 4,525,000 -


KONSULTAN : CV. GRAFIKA REKA CIPTA
PEKERJAAN : PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI
NO.KONTRAK : 440/007/SPK-PL/Perc-DAK/DINKES/II/2019
TANGGAL KONTRAK : 25 Februari 2019

Invoice : 05 ( Lima ) Bulan Ke Lima


Periode : 02 November s/d 03 Desember 2018
C. BIAYA DOKUMEN PENGAWASAN
C.1. Biaya Pelaporan
KONTRAK TAGIHAN S/D. BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D. BULAN INI SISA
Jumlah Jumlah DANA
NO. URAIAN Jumlah Jumlah
Harga Satuan
Satuan Volume Volume Volume Volume
( Rp )
( Rp ) ( Rp ) ( Rp )
( Rp ) ( Rp )

1 - Laporan Bulanan Buku 5.0 350,000 1,750,000 4.00 1,400,000 5.0 350,000 5.0 1,750,000 -

2 - Laporan Akhir Buku 5.0 250,000 1,250,000 4.00 1,000,000 5.0 250,000 5.0 1,250,000 -

JUMLAH B.3 3,000,000 2,400,000.00 600,000 3,000,000 -

-
JUMLAH A + B + C 75,275,000 60,220,000 15,055,000 75,275,000 -
BIAYA PEKERJAAN 75,275,000 60,220,000 15,055,000 75,275,000 -
TOTAL 75,270,000 60,220,000 15,050,000 75,270,000 -

DISETUJUI DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK) SATKER DAERAH KABUPATEN BANGGAI KEPULAUAN
DINAS KESEHATAN DAERAH KABUPATEN MOROWALI UTARA

YAMER Y. PAGALU, SKM,M,Kes AMRAN, ST


NIP. 19780701 200003 1 003 Direktur
PEMERINTAH KABUPATEN MOROWALI UTARA
DAFTAR HADIR KONSULTAN
DINAS KESEHATAN DAERAH
KONSULTAN : CV. ALL DESIGN CONSULTANT
KONTRAK NOMO : 08/SPK/PL/JS Konsul/DINKES/MU/III/2019
PEKERJAAN : TANGGAL : 04 Maret 2019
PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI TAHUN ANGGARAN: 2019

INVOICE 1 PERIODE 04 Maret 2019 S/D 17 April 2019


NO. NAMA JABATAN Maret April KETERANGAN
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
I. TENAGA AHLI

1 Sardianto, ST Team Leader

2 Syarifuddin A.R, ST Surveyor

II. TENAGA PENDUKUNG

1 Martinus Paulus, ST Juru Gambar

2 Suwardi Operator Komputer

DL= DINAS LUAR

DIBUAT OLEH:
KONSULTAN PERENCANAAN
CV. ALL DESIGN CONSULTANT

SUARDIN, ST
Direktur
PEMERINTAH KABUPATEN MOROWALI UTARA
TIME SHEET
DINAS KESEHATAN DAERAH
KONSULTAN : CV. ALL DESIGN CONSULTANT
KONTRAK NOMO : 08/SPK/PL/JS Konsul/DINKES/MU/III/2019
PEKERJAAN : TANGGAL : 04 Maret 2019
PERENCANAAN PENATAAN HALAMAN KANTOR BUPATI TAHUN ANGGARAN: 2019

INVOICE 1 PERIODE 04 Maret 2019 S/D 17 April 2019


NO. NAMA JABATAN Maret April KETERANGAN
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
I. TENAGA AHLI

1 Sardianto, ST Team Leader

2 Syarifuddin A.R, ST Surveyor

II. TENAGA PENDUKUNG

1 Martinus Paulus, ST Juru Gambar

2 Suwardi Operator Komputer

DL= DINAS LUAR

DIBUAT OLEH:
KONSULTAN PERENCANAAN
CV. ALL DESIGN CONSULTANT

SUARDIN, ST
Direktur

Anda mungkin juga menyukai