JUMLAH HARGA
No URAIAN
(Rp)
JUMLAH 318,774,000
PPN 10 % 31,877,400
DIBULATKAN 350,000,000
TOTAL 318,774,000.00
PPN 10 % 31,877,400.00
DIBULATKAN 350,000,000.00
HARGA SATUAN JUMLAH HARGA BOBOT BULAN LALU BULAN INI S/D BULAN INI
WAKTU/
No URAIAN SATUAN VOLUME BULAN
TOTAL HARGA BOBOT TOTAL HARGA BOBOT TOTAL HARGA BOBOT
(Rp) (Rp) (%) VOL. (Rp) (%) VOL. (Rp) (%) VOL. (Rp) (%)
1 2 3 4 5 6
A BIAYA LANGSUNG PERSONIL 39,887,100.00 73.35 6,043,500.00 12.23 6,043,500.00 12.23 12,087,000.00 24.45
1 Site Engineer OB 1.00 6.00 3,568,500.00 21,411,000.00 43.31 1.00 3,568,500.00 7.22 1.00 3,568,500.00 7.22 2.00 7,137,000.00 14.44
2 Tenaga Administrasi OB 1.00 6.00 2,475,000.00 14,850,000.00 30.04 1.00 2,475,000.00 5.01 1.00 2,475,000.00 5.01 2.00 4,950,000.00 10.01
]
HARGA SATUAN JUMLAH HARGA BOBOT BULAN LALU BULAN INI S/D BULAN INI
WAKTU/
No URAIAN SATUAN VOLUME BULAN TOTAL HARGA BOBOT TOTAL HARGA BOBOT TOTAL HARGA BOBOT
(Rp) (Rp) (%) VOL. (Rp) (%) VOL. (Rp) (%) VOL. (Rp) (%)
1 2 3 4 5 6
B BIAYA LANGSUNG NON PERSONIL 9,547,010.00 9.47 2,404,300.00 1,096,100.00 1.21 3,500,400.00 3.04
1 Transport
- Site Engineer/Inspector (Non SKA) OB 1.00 6.00 535,000.00 3,210,000.00 6.49 1.00 535,000.00 1.08 1.00 535,000.00 1.08 2.00 1,070,000.00 2.16
- Administrasi (Non SKT) OB 1.00 6.00 500,000.00 3,000,000.00 6.07 1.00 500,000.00 1.01 1.00 500,000.00 1.01 2.00 1,000,000.00 2.02
- Alat Tulis Kantor LS 1.00 1.00 1,000,000.00 1,000,000.00 2.02 1.00 1,000,000.00 2.02 - - 1.00 1,000,000.00 2.02
II Biaya Pelaporan 1,469,100.00 2.97 0.12 0.87
1 Laporan Pendahuluan (1 Asli+2Copy) Buku 3.00 1.00 62,000.00 186,000.00 0.38 3.00 186,000.00 0.38 - - 3.00 186,000.00 0.38
2 Laporan Bulanan (1 Asli+2Copy Buku 3.00 6.00 61,100.00 1,099,800.00 2.22 3.00 183,300.00 0.37 1.00 61,100.00 0.12 4.00 244,400.00 0.49
PRESENTASE BULAN INI 54,377,000.00 82.82 % 9,000,000.00 12.23 7,000,000.00 13.43 17,000,000.00 27.49
Ternate, 7-Aug-2018
Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :
PEJABAT PEMBUAT KOMITMEN (PPK) DIREKSI LAPANGAN Konsultan Supervisi
DINAS PERHUBUNGAN DINAS PERHUBUNGAN CV. PESONA CIPTA ENGINEERING
PROVINSI MALUKU UTARA PROVINSI MALUKU UTARA
32/11/KONTRAK/PPK-SPV/DER-TEPI-III
SISA
24,174,000.00
14,274,000.00
14,274,000.00
9,900,000.00
9,900,000.00
SISA
#REF!
2,140,000.00
2,140,000.00
2,000,000.00
-
1,038,700.00
855,400.00
183,300.00
#REF!
#REF!
#REF!
#REF!
#REF!
DAFTAR HADIR PERSONIL
Periode : Tgl 11-Juli-2018 S/D 07-Agustus-2018
PAKET / PEKERJAAN : SUPERVISI PEMBANGUNAN DERMAGA TEPI TAHAP III Tanggal Kontrak : 11 Juli 2018
LOKASI : DESA BAJO SANGKUANG, KAB. HALMAHERA SELATAN Nomor Kontrak : 32/11/KONTRAK/PPK-SPV/DER-TEPI-III
TAHUN ANGGARAN : 2018 /DISHUB/MU/2018
Konsultan Supervisi
CV. PESONA CIPTA ENGINEERING
Rp 186,000.00
Ternate, 19-Jul-18
CV. PESONA CIPTA ENGINEERING
KWITANSI
KWITANSI
3/CV.PCE/INVC-01/DER-TEPI/DISHUB/MU/VII/2018
Rp 267,500.00
Ternate, 15-Jul-18
CV. PESONA CIPTA ENGINEERING
KWITANSI
4/CV.PCE/INVC-01/DER-TEPI/DISHUB/MU/VII/2018
Rp 267,500.00
Ternate, 15-Jul-18
CV. PESONA CIPTA ENGINEERING
SUPRAPTO AMIN, ST ABD. RISDAM TARAJU, SH
Tenaga Administrasi Direktur
KWITANSI
5/CV.PCE/INVC-01/DER-TEPI/DISHUB/MU/VIII/2018
Untuk Pembayaran : Gaji Site Engineer selama 1 Bulan Terhitung dari 11 Juli 2018 - 7 Agustus 2018
Rp 3,568,500.00
Ternate, 7-Aug-18
CV. PESONA CIPTA ENGINEERING
KWITANSI
6/CV.PCE/INVC-01/DER-TEPI/DISHUB/MU/VIII/2018
Untuk Pembayaran : Gaji Administrasi selama 1 Bulan Terhitung dari 11 Juli 2018 - 7 Agustus 2018
Rp 2,475,000.00
Ternate, 7-Aug-18
CV. PESONA CIPTA ENGINEERING
SUPRAPTO AMIN, ST ABD. RISDAM TARAJU, SH
Tenaga Administrasi Direktur
KWITANSI
7/CV.PCE/INVC-01/DER-TEPI/DISHUB/MU/VIII/2018
Untuk Pembayaran : Biaya Kendaraan Roda 2 1 Unit Periode Bln Juli 2018 - Agustus 2018
Transportasi Di Labuha
Pekerjaan : SUPERVISI PEMBANGUNAN DERMAGA TEPI TAHAP III
LOKASI : DESA BAJO SANGKUANG, KAB. HALMAHERA SELATAN
#REF!
Ternate, 7-Aug-18
CV. PESONA CIPTA ENGINEERING
KWITANSI
8/CV.PCE/INVC-01/DER-TEPI/DISHUB/MU/VIII/2018
Untuk Pembayaran : Biaya Sewa Kamera Digital 1 Unit Periode Bln Juli 2018 - Agustus 2018
#REF!
Ternate, 7-Aug-18
CV. PESONA CIPTA ENGINEERING
AUDY WITIANTO, ST ABD. RISDAM TARAJU, SH
Site Engineer Direktur
KWITANSI
9/CV.PCE/INVC-01/DER-TEPI/DISHUB/MU/VIII/2018
#REF!
Ternate, 7-Aug-18
CV. PESONA CIPTA ENGINEERING
KWITANSI
10/CV.PCE/INVC-01/DER-TEPI/DISHUB/MU/VIII/2018
#REF!
Ternate, 7-Aug-18
CV. PESONA CIPTA ENGINEERING
AUDY WITIANTO, ST ABD. RISDAM TARAJU, SH
Site Engineer Direktur
KWITANSI
11/CV.PCE/INVC-01/DER-TEPI/DISHUB/MU/VIII/2018
Untuk Pembayaran : Biaya Biaya Penyediaan ATK Periode Bln Juli 2018 - Agustus 2018
#REF!
Ternate, 7-Aug-18
CV. PESONA CIPTA ENGINEERING
KWITANSI
12/CV.PCE/INVC-01/DER-TEPI/DISHUB/MU/VIII/2018
Untuk Pembayaran : Biaya Laporan Bulanan 3 Buku Periode Bln Juli 2018 - Agustus 2018
Rp 183,300.00
Ternate, 7-Aug-18
CV. PESONA CIPTA ENGINEERING
AUDY WITIANTO, ST ABD. RISDAM TARAJU, SH
Site Engineer Direktur
PERINCIAN BIAYA TENAGA AHLI (PROFESIONAL STAF)
1. SITE ENGINEER
1 Gaji Dasar GD = Rp 5,200,000
TOTAL Rp 10,816,000
2. QUALITY ENGINEER
TOTAL Rp 9,221,000
3. QUANTITY ENGINEER
1 Gaji Dasar GD = Rp 3,750,000
TOTAL Rp 9,221,000