Anda di halaman 1dari 2

KOP PERUSAHAAN

KEGIATAN : PENINGKATAN DISTRIBUSI AIR BAKU


PEKERJAAN : PENYUSUNAN MASTER PLAN AIR BERSIH DAN AIR BAKU KOTA BAUBAU
LOKASI : KOTA BAUBAU
TAHUN ANGGARAN : 2017

NO URAIAN JUMLAH BIAYA (Rp)

I BIAYA LANGSUNG PERSONIL 296,060,000.00

II BIAYA LANGSUNG NON PERSONIL 112,577,000.00

REAL COST 408,637,000.00


PPN 10 % 40,863,700.00
TOTAL COST 449,500,700.00
DIBULATKAN 449,500,000.00
TERBILANG :
………………………………………………….. RUPIAH

………………., …………… 2017


Di Buat Oleh
PT./CV. ………………………..

Nama Lengkap
Jabatan
KOP PERUSAHAAN

HARGA PERKIRAAN SENDIRI (HPS)


PEKERJAAN : PENYUSUNAN DOKUMEN FEASIBILITY STUDY (FS) PEMASANGAN PIPA TRANSMISI AIR BAKU
SUNGAI LAHELO SAMPARONA MENUJU LABALAWA
LOKASI : KOTA BAUBAU
TA : 2017

I. BIAYA LANGSUNG PERSONIL


VOLUME HARGA
NAMA PERSONIL POSISI SATUAN JUMLAH (Rp)
Org Waktu SATUAN (Rp)
A TENAGA AHLI
Team Leader/AhlI Air Minum 1.00 Org 2.00 Bulan 13,100,000.00 26,200,000.00
Ahli Ekonomi/Keuangan 3.00 Org 2.00 Bulan 10,480,000.00 62,880,000.00
Ahli Sosial 2.00 Org 2.00 Bulan 10,480,000.00 41,920,000.00
Ahli Prasarana Sumber Daya Air 2.00 Org 2.00 Bulan 10,480,000.00 41,920,000.00
Ahli Hukum/Kelembagaan 1.00 Org 2.00 Bulan 10,480,000.00 20,960,000.00

B TENAGA SUB PROFESIONAL


Asisten Ahli Air Minum 1.00 Org 2.00 Bulan 7,860,000.00 15,720,000.00
Asisten Ahli Ekonomi/Keuangan 1.00 Org 2.00 Bulan 7,860,000.00 15,720,000.00
Asisten Ahli Prasarana 1.00 Org 2.00 Bulan 7,860,000.00 15,720,000.00

C TENAGA PENDUKUNG
Surveyor 4.00 Org 2.00 Bulan 3,930,000.00 31,440,000.00
Estimator 1.00 Org 2.00 Bulan 3,930,000.00 7,860,000.00
Drafter/CAD & Keuangan
Administrasi 1.00 Org 2.00
- Bulan 3,930,000.00 7,860,000.00
-
Operator Komputer 1.00 Org 2.00 Bulan 3,930,000.00 7,860,000.00
JUMLAH BIAYA LANGSUNG PERSONIL (I) 296,060,000.00

II. BIAYA LANGSUNG NON PERSONIL


JENIS BIAYA URAIAN BIAYA SATUAN BIAYA LUM SUM (Rp) JUMLAH (Rp)

Biaya kantor 1. Biaya Komunikasi (Telp, Fax, Telex) Bln 2.00 2,000,000.00 4,000,000.00
2. Biaya Pemelliharaan Peralatan Kantor Bln 2.00 2,931,500.00 5,863,000.00
(Komputer, Printer, Alat Ukur, Kamera Dll)
3. Biaya ATK, Dokumentasi dan Lainnya Bln 2.00 5,000,000.00 10,000,000.00

Biaya perjalanan/Survey 1. Uang Harian (Makan dan Minum)


Personil Bln 2.00 7,500,000.00 15,000,000.00
2. Biaya Perlengkapan Survey
Patok BM Beton (50 X 10 X 10) Cm Buah 5.00 250,000.00 1,250,000.00
Cat Kayu/Meny 5 Kg Buah 9.00 30,000.00 270,000.00
Sewa Alat Ukur (theodolit) Bulan 1.00 1,000,000.00 1,000,000.00
Sewa Alat Ukur Debit Bulan 1.00 1,000,000.00 1,000,000.00
Sewa Rol Meter Unit 5.00 50,000.00 250,000.00
Sewa Camera Bulan 1.00 700,000.00 700,000.00

Biaya Dokumen/ 1. Laporan Pendahuluan


Laporan - Hard Copy Dok 5.00 500,000.00 2,500,000.00
2. Laporan Antara
- Hard Copy Dok 5.00 500,000.00 2,500,000.00
3. Laporan Akhir
- Hard Copy Dok 10.00 800,000.00 8,000,000.00
- Hardisk External 500 Gb Bh 1.00 650,000.00 650,000.00
Seminar Master Plan Air Bersih
1. Seminar Pendahuluan
sewa ruanagan, konsumsi,akomodasi, Ls 1.00 12,594,000.00 12,594,000.00
transportasi peserta seminar

3. Seminar Akhir
sewa ruanagan, konsumsi,akomodasi, Ls 1.00 17,000,000.00 17,000,000.00
transportasi peserta seminar

Biaya 1. Sewa Kendaraan Roda 2, 2 unit Bulan 3.00 2,500,000.00 7,500,000.00


Kendaraan Kerja 2. Sewa Kendaraan Roda 4, 1 Unit Bulan 3.00 7,500,000.00 22,500,000.00
JUMLAH BIAYA LANGSUNG NON PERSONIL (II) 112,577,000.00

………………., …………… 2017


Di Buat Oleh
PT./CV. ………………………..

Nama Lengkap
Jabatan

Anda mungkin juga menyukai