NO URAIAN JUMLAH ( Rp )
Jumlah 327.049.500,00
PPN 11% 35.975.445,00
Total Biaya 363.024.945,00
Dibulatkan 363.024.000,00
Terbilang : Tiga Ratus Enam Puluh Tiga Juta Dua Puluh Empat Ribu Rupiah
BUDIMAN, ST NAMA
NIP. 19720808 200012 1 002 Jabatan
RENCANA ANGGARAN BIAYA
A PROFESIONAL STAFF
(TENAGA AHLI)
1 Supervisi Engineer OB 1,00 3,50 3,5 24.675.000,00 86.362.500,00
2 Quality/Quantity Engineer OB 1,00 3,50 3,5 21.714.000,00 75.999.000,00
3 Ahli K3 OB 1,00 2,00 2,0 21.714.000,00 43.428.000,00
A BIAYA ATK
1 Alat Tulis Kantor Set/Bulan 1,00 3,50 3,50 1.000.000,00 3.500.000,00
B SEWA KENDARAAN
1 Sewa Kendaraan Roda Empat + Bahan Bakar Unit/Bulan 2,00 3,50 7,00 10.000.000,00 70.000.000,00
C BIAYA KOMUNIKASI
1 Biaya Komunikasi ( Telepon, Faximile, Internet) Bulan 1,00 3,50 3,50 1.000.000,00 3.500.000,00