JUMLAH 44,875,000.00
PPN 10 % 4,487,500.00
TOTAL BIAYA 49,362,500.00
DIBULATKAN 49,362,000.00
TERBILANG :
Empat Puluh Sembilan Juta Tiga Ratus Enam Puluh Dua Ribu Rupiah
AZWARNO, ST
DIREKTUR
RAB BIAYA KONSULTAN
HARGA TOTAL
NO. URAIAN KEGIATAN SATUAN VOLUME SATUAN BIAYA
(Rp.) (Rp.)
A. BIAYA LANGSUNG PERSONIL
I. Tenaga Ahli
1 Team Leader (Ahli Arsitek) OB 0.50 18,000,000.00 9,000,000.00
9,000,000.00
II. TENAGA PENDUKUNG
1 Administrasi OB 0.50 10,000,000.00 5,000,000.00
2 CAD Operator OB 0.50 12,000,000.00 6,000,000.00
3 Estimator OB 0.50 12,000,000.00 6,000,000.00
3 Surveyor OB 0.50 12,000,000.00 6,000,000.00
23,000,000.00
JUMLAH BIAYA LANGSUNG PERSONIL (I) 32,000,000.00