PERINCIAN BIAYA LANGSUNG PERSONIL

A. TEAM LEADER
1 Gaji Dasar 2,000,000.00
2 Beban Biaya Sosial 0.4 X GD 800,000.00
3 Beban Biaya Umum 1 X GD 2,000,000.00
4 Tunjangan Penugasan 0.3 X GD 600,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 480,000.00
TOTAL 5,880,000.00

B. ARSITECTURE ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00

C. STRUCTURE ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00

D. GEODETIC ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00

E. COST & QUANTITY ESTIMATOR


1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00
F. ASS. AHLI TEKNIK PENGUKURAN
1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.3 X GD 300,000.00
3 Beban Biaya Umum 0.75 X GD 750,000.00
4 Tunjangan Penugasan 0.2 X GD 200,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 205,000.00
TOTAL 2,455,000.00

G. ASS. STRUCTURE
1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.3 X GD 300,000.00
3 Beban Biaya Umum 0.75 X GD 750,000.00
4 Tunjangan Penugasan 0.2 X GD 200,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 205,000.00
TOTAL 2,455,000.00

H. ASS. AHLI KUANTITAS DAN HARGA


1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.3 X GD 300,000.00
3 Beban Biaya Umum 0.75 X GD 750,000.00
4 Tunjangan Penugasan 0.2 X GD 200,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 205,000.00
TOTAL 2,455,000.00

I. DRAFTMAN
1 Gaji Dasar 750,000.00
2 Beban Biaya Sosial 0.35 X GD 262,500.00
3 Beban Biaya Umum 0.5 X GD 375,000.00
4 Tunjangan Penugasan 0.1 X GD 75,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 138,750.00
TOTAL 1,601,250.00
REKAPITULASI

PEKERJAAN : Perencanaan Pembangunan Gedung SLB Halmahera Tengah


LOKASI : Kota Tidore Kepulauan
TAHUN ANGGARAN : 2016

JUMLAH HARGA
NO URAIAN
Rp

A BIAYA LANGSUNG PERSONIL #REF!

B BIAYA LANGSUNG NON PERSONIL #REF!

DIBULATKAN #REF!

TERBILANG : Lima Puluh Delapan Juta Tujuh Ratus Tiga Belas Ribu Rupiah

2 Estimator 3300000
3 Juru Surveyor (SMA/Sederajat - 3 Thn)
Ternate, 27 Februari 2016
CV. ALENADA PROJECT PLANNING

Biaya Kantor
Alat Tulis dan Bahan HaLs 1 1 1000000
Biaya Komunikasi Bulan 4 1 100000
Perlengkapan LapanganLs 1 1 1900000

II Biaya Transportasi
Biaya Perjalanan Dinas/ Org/Bula 4 1 500000
Akomodasi dan Transpor Org/Trip 4 2 846200

III WIJOYO SANTOSO, ST


Laporan Akhir (EE & Ga Buku 5 1 350000
PERINCIAN BIAYA LANGSUNG PERSONIL

A. SITE ENGINEERING
1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.4 X GD 400,000.00
3 Beban Biaya Umum 1 X GD 1,000,000.00
4 Tunjangan Penugasan 0.3 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 240,000.00
TOTAL 2,940,000.00

B. CHIEF INSPECTOR
1 Gaji Dasar 750,000.00
2 Beban Biaya Sosial 0.35 X GD 262,500.00
3 Beban Biaya Umum 0.9 X GD 675,000.00
4 Tunjangan Penugasan 0.2 X GD 150,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 168,750.00
TOTAL 2,006,250.00

C SURVEYOR
1 Gaji Dasar 450,000.00
2 Beban Biaya Sosial 0.3 X GD 135,000.00
3 Beban Biaya Umum 0.75 X GD 337,500.00
4 Tunjangan Penugasan 0.2 X GD 90,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 92,250.00
TOTAL 1,104,750.00

D INSPECTOR
1 Gaji Dasar 450,000.00
2 Beban Biaya Sosial 0.3 X GD 135,000.00
3 Beban Biaya Umum 0.75 X GD 337,500.00
4 Tunjangan Penugasan 0.2 X GD 90,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 92,250.00
TOTAL 1,104,750.00
REKAPITULASI

PEKERJAAN : PERENCANAAN PEMBANGUNAN WORKSHOP KEJURUAN PARIWISATA


LOKASI : BLK AMBON
TAHUN ANGGARAN : 2018

JUMLAH HARGA
NO URAIAN
Rp

A BIAYA LANGSUNG PERSONIL 216,000,000.00

B BIAYA LANGSUNG NON PERSONIL 76,275,000.00

JUMLAH 292,275,000.00
PPN 10 % 29,227,500.00
TOTAL ( Termasuk PPN ) 321,502,500.00
DIBULATKAN 321,503,000.00

TERBILANG : Empat Puluh Sembilan Juta Dua Ratus Dua Puluh Lima Ribu Rupiah
RENCANA ANGGARAN BIAYA

PEKERJAAN : PERENCANAAN PEMBANGUNAN WORKSHOP KEJURUAN PARIWISATA


LOKASI : BLK AMBON
TAHUN ANGGARAN : 2018

Waktu HARGA SATUAN JUMLAH HARGA


NO URAIAN SATUAN Vol.
(Bln/Hr) Rp Rp
A BIAYA LANGSUNG PERSONIL
Professional Staff :
1 Ketua Tim (S1 Tenik Sipil - 8 Thn) Org/Bln 1 1 35,000,000.00 35,000,000.00
2 Tenaga Ahli Struktur (S1 Teknik Sipil - 5 Thn) Org/Bln 1 1 25,000,000.00 25,000,000.00
3 Tenaga Ahli Arsitek (S1 Teknik Arsitek - 5 Thn) Org/Bln 1 1 25,000,000.00 25,000,000.00
4 Tenaga Ahli Elektrikal/Mekanikal (S1 Teknik Listrik-5 Thn) Org/Bln 1 1 25,000,000.00 25,000,000.00
5 Tenaga Ahli Plumbing (S1 Teknik Sipil - 5 Thn) Org/Bln 1 1 25,000,000.00 25,000,000.00
6 Tenaga Ahli Estimasi Biaya (S1 Teknik Sipil - 5 Thn) Org/Bln 1 1 25,000,000.00 25,000,000.00
Sub Total I 160,000,000.00
II Asisten Tenaga Ahli
1 Ass. Ahli Struktur Org/Bln 1 1 10,000,000.00 10,000,000.00
2 Ass. Ahli Arsitek Org/Bln 1 1 10,000,000.00 10,000,000.00
3 Ass. Ahli Estimasi Biaya Org/Bln 1 1 10,000,000.00 10,000,000.00
Sub Total II 30,000,000.00
III Supporting Staff :
1 Juru Gambar/Drafter (SMA/Sederajat - 3 Thn) Org/Bln 2 1 7,500,000.00 15,000,000.00
2 Surveyor (SMA/Sederajat - 3 Thn) Org/Hr 2 7 500,000.00 7,000,000.00
3 Administrasi Org/Bln 1 1 4,000,000.00 4,000,000.00
Sub Total III 26,000,000.00
TOTAL I + II + III 216,000,000.00
B BIAYA LANGSUNG NON PERSONIL
I Biaya Kantor
1### Alat Tulis Kantor Ls 1 2,000,000.00 2,000,000.00
2 Komputer Supplies Ls 1 2,000,000.00 2,000,000.00
3 Draffting Supplies Ls 1 1,500,000.00 1,500,000.00
4 Kamera Digital (sewa) Unit/Bln 1 1 300,000.00 300,000.00
5 Alat Ukur (sewa) Unit/hr 1 7 450,000.00 3,150,000.00
6 Komputer Administrasi (sewa) Unit/Bln 1 1 1,500,000.00 1,500,000.00
7 Komputer CAD (sewa) Unit/Bln 1 1 2,500,000.00 2,500,000.00
8 Printer Administrasi (sewa) Unit/Bln 1 1 500,000.00 500,000.00
9 Printer CAD (sewa) Unit/Bln 1 1 1,000,000.00 1,000,000.00
10 Biaya Komunikasi Org/Bln 14 1 100,000.00 1,400,000.00
Sub Total I 15,850,000.00
II Biaya Transportasi
1 Kendaraan Roda Empat (sewa) Unit/Bln 1 1 15,000,000.00 15,000,000.00
2 Kendaraan Roda Dua (sewa) Unit/Bln 2 1 3,000,000.00 6,000,000.00
Sub Total II 21,000,000.00
III Biaya Survey
1 Biaya Survey dan Pengumpulan Data :
- Koordinator Lapangan Org/Hr 1 7 500,000.00 3,500,000.00
- Tenaga Ahli Org/Hr 5 7 350,000.00 12,250,000.00
- Asisten Tenaga Ahli Org/Hr 3 7 300,000.00 6,300,000.00
- Surveyor Org/Hr 2 7 175,000.00 2,450,000.00
Sub Total III 24,500,000.00
IV Produksi Laporan
1 Laporan Pendahuluan Buku 5 300,000.00 1,500,000.00
2 Laporan Struktur Buku 5 750,000.00 3,750,000.00
3 Laporan Akhir Buku 5 500,000.00 2,500,000.00
4 Dokumen Pelelangan
- Gambar Rencana (Format A3) Buku 5 750,000.00 3,750,000.00
- RKS Buku 5 300,000.00 1,500,000.00
- BQ Buku 5 250,000.00 1,250,000.00
- Flashdisk Bh 5 135,000.00 675,000.00
Sub Total IV 14,925,000.00
JUMLAH TOTAL (I + II + III + IV) 76,275,000.00
REKAPITULASI

PEKERJAAN : PERENCANAAN PEMBANGUNAN WORKSHOP KEJURUAN PARIWISATA


LOKASI : BLK AMBON
TAHUN ANGGARAN : 2018

JUMLAH HARGA
NO URAIAN
Rp

A BIAYA LANGSUNG PERSONIL 216,000,000.00

B BIAYA LANGSUNG NON PERSONIL 76,125,000.00

JUMLAH 292,125,000.00
PPN 10 % 29,212,500.00
TOTAL ( Termasuk PPN ) 321,337,500.00
DIBULATKAN 321,338,000.00
RENCANA ANGGARAN BIAYA

PEKERJAAN : PERENCANAAN PEMBANGUNAN WORKSHOP KEJURUAN PARIWISATA


LOKASI : BLK AMBON
TAHUN ANGGARAN : 2018

Waktu HARGA SATUAN JUMLAH HARGA


NO URAIAN SATUAN Vol.
(Bln/Hr) Rp Rp
A BIAYA LANGSUNG PERSONIL
Professional Staff :
1 Ketua Tim Org/Bln 1 1 35,000,000.00 35,000,000.00
2 Tenaga Ahli Struktur Org/Bln 1 1 25,000,000.00 25,000,000.00
3 Tenaga Ahli Arsitek Org/Bln 1 1 25,000,000.00 25,000,000.00
4 Tenaga Ahli Desain Interior Org/Bln 1 1 25,000,000.00 25,000,000.00
5 Tenaga Ahli Elektrikal Org/Bln 1 1 25,000,000.00 25,000,000.00
6 Tenaga Ahli Estimasi Biaya Org/Bln 1 1 25,000,000.00 25,000,000.00
Sub Total I 160,000,000.00
II Asisten Tenaga Ahli
1 Ass. Ahli Struktur Org/Bln 1 1 10,000,000.00 10,000,000.00
2 Ass. Ahli Arsitek Org/Bln 1 1 10,000,000.00 10,000,000.00
3 Ass. Ahli Estimasi Biaya Org/Bln 1 1 10,000,000.00 10,000,000.00
Sub Total II 30,000,000.00
III Supporting Staff :
1 Juru Gambar/Drafter Org/Bln 2 1 7,500,000.00 15,000,000.00
2 Surveyor Org/Hr 2 7 500,000.00 7,000,000.00
3 Administrasi Org/Bln 1 1 4,000,000.00 4,000,000.00
Sub Total III 26,000,000.00
TOTAL I + II + III 216,000,000.00
B BIAYA LANGSUNG NON PERSONIL
I Biaya Kantor
1### Alat Tulis Kantor Ls 1 2,000,000.00 2,000,000.00
2 Komputer Supplies Ls 1 2,000,000.00 2,000,000.00
3 Draffting Supplies Ls 1 1,500,000.00 1,500,000.00
4 Kamera Digital (sewa) Unit/Bln 1 1 300,000.00 300,000.00
5 Alat Ukur (sewa) Unit/hr 1 7 450,000.00 3,150,000.00
6 Komputer Administrasi (sewa) Unit/Bln 1 1 1,500,000.00 1,500,000.00
7 Komputer CAD (sewa) Unit/Bln 2 1 2,500,000.00 5,000,000.00
8 Printer Administrasi (sewa) Unit/Bln 1 1 500,000.00 500,000.00
9 Printer CAD (sewa) Unit/Bln 1 1 1,000,000.00 1,000,000.00
10 Biaya Komunikasi Org/Bln 14 1 100,000.00 1,400,000.00
Sub Total I 18,350,000.00
II Biaya Transportasi
1 Kendaraan Roda Empat (sewa) Unit/Bln 1 1 15,000,000.00 15,000,000.00
2 Kendaraan Roda Dua (sewa) Unit/Bln 2 1 3,000,000.00 6,000,000.00
Sub Total II 21,000,000.00
III Biaya Survey
1 Biaya Survey dan Pengumpulan Data :
- Koordinator Lapangan Org/Hr 1 7 500,000.00 3,500,000.00
- Tenaga Ahli Org/Hr 3 7 350,000.00 7,350,000.00
- Asisten Tenaga Ahli Org/Hr 3 7 300,000.00 6,300,000.00
- Surveyor Org/Hr 2 7 175,000.00 2,450,000.00
Sub Total III 19,600,000.00
IV Produksi Laporan
1 Laporan Pendahuluan Buku 5 300,000.00 1,500,000.00
2 Laporan Struktur Buku 5 1,000,000.00 5,000,000.00
3 Laporan Akhir Buku 5 700,000.00 3,500,000.00
4 Dokumen Pelelangan
- Gambar Rencana (Format A3) Buku 5 750,000.00 3,750,000.00
- RKS Buku 5 300,000.00 1,500,000.00
- BQ Buku 5 250,000.00 1,250,000.00
- Flashdisk Bh 5 135,000.00 675,000.00
Sub Total IV 17,175,000.00
JUMLAH TOTAL (I + II + III + IV) 76,125,000.00
REKAPITULASI DAFTAR KUANTITAS DAN HARGA

Pekerjaan : Pengadaan Peralatan dan Mesin Penangkapan Ikan di Kab. Halsel


Lokasi : Kab. Halsel
Tahun Anggaran : 2022

HARGA SATUAN JUMLAH HARGA


NO JENIS BARANG SATUAN VOL
Rp Rp
1 2 3 4 5 6

I PENGADAAN PERALATAN DAN MESIN PENANGKAPAN PAKET 1.00 179,030,000 179,030,000


IKAN DI KAB. HALSEL

JUMLAH 179,030,000.00
PPN 11 % 19,693,300.00
JUMLAH TOTAL 198,723,300.00
PEMBULATAN 198,723,000.00
Terbilang :
Seratus Sembilan Puluh Delapan Juta Tujuh Ratus Dua Puluh Tiga Ribu Rupiah

Ternate, 27 Juni 2022


Penawar,
CV. TRISAKTI

ALWI WAHAB
Direktur
DAFTAR KUANTITAS DAN HARGA

Pekerjaan : Pengadaan Peralatan dan Mesin Penangkapan Ikan di Kab. Halsel


Lokasi : Kab. Halsel
Tahun Anggaran : 2022

HARGA SATUAN JUMLAH HARGA


NO JENIS BARANG SATUAN VOL
Rp Rp
1 2 3 4 5 6

I PERALATAN DAN MESIN PENANGKAPAN IKAN


1 Perahu Fibber Glass 3 GT Unit 2 42,150,000 84,300,000
2 Mesin tempel 15 PK Unit 2 41,850,000 83,700,000
3 Cool Box 100 Liter Unit 2 3,015,000 6,030,000
4 Jaring Soma Unit 2 2,500,000 5,000,000
JUMLAH 179,030,000.00
DAFTAR HARGA SATUAN

Pekerjaan : Pengadaan Peralatan dan Mesin Penangkapan Ikan di Kab. Halsel


Lokasi : Kab. Halsel
Tahun Anggaran : 2022

HARGA SATUAN JUMLAH HARGA


NO JENIS BARANG SATUAN VOL
Rp Rp
1 2 3 4 5 6

I PERALATAN DAN MESIN PENANGKAPAN IKAN


1 Perahu Fibber Glass 3 GT Unit 2 42,150,000 84,300,000
2 Mesin tempel 15 PK Unit 2 41,850,000 83,700,000
3 Cool Box 100 Liter Unit 2 3,015,000 6,030,000
4 Jaring Soma Unit 2 2,500,000 5,000,000
JADWAL PENGIRIMAN DAN PENYERAHAN

Pekerjaan : Pengadaan Peralatan dan Mesin Penangkapan Ikan di Kab. Halsel


Lokasi : Kab. Halsel
Tahun Anggaran : 2022

BULAN KE - 1 BULAN KE - 2 BULAN KE - 3


NO JENIS BARANG MINGGU KE- MINGGU KE- MINGGU KE-
1 2 3 4 1 2 3 4 1 2 3 4
1 2

I PEMBERIAN

II PENGIRIMAN

III PENYERAHAN

KET :
1. PEMBERIAN

2. PENGIRIMAN

3. PENYERAHAN
Ternate, 27 Juni 2022
CV. TRISAKTI

ALWI WAHAB
direktur