A. TEAM LEADER
1 Gaji Dasar 2,000,000.00
2 Beban Biaya Sosial 0.4 X GD 800,000.00
3 Beban Biaya Umum 1 X GD 2,000,000.00
4 Tunjangan Penugasan 0.3 X GD 600,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 480,000.00
TOTAL 5,880,000.00
B. ARSITECTURE ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00
C. STRUCTURE ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00
D. GEODETIC ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00
G. ASS. STRUCTURE
1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.3 X GD 300,000.00
3 Beban Biaya Umum 0.75 X GD 750,000.00
4 Tunjangan Penugasan 0.2 X GD 200,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 205,000.00
TOTAL 2,455,000.00
I. DRAFTMAN
1 Gaji Dasar 750,000.00
2 Beban Biaya Sosial 0.35 X GD 262,500.00
3 Beban Biaya Umum 0.5 X GD 375,000.00
4 Tunjangan Penugasan 0.1 X GD 75,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 138,750.00
TOTAL 1,601,250.00
REKAPITULASI
JUMLAH HARGA
NO URAIAN
Rp
DIBULATKAN #REF!
TERBILANG : Lima Puluh Delapan Juta Tujuh Ratus Tiga Belas Ribu Rupiah
2 Estimator 3300000
3 Juru Surveyor (SMA/Sederajat - 3 Thn)
Ternate, 27 Februari 2016
CV. ALENADA PROJECT PLANNING
Biaya Kantor
Alat Tulis dan Bahan HaLs 1 1 1000000
Biaya Komunikasi Bulan 4 1 100000
Perlengkapan LapanganLs 1 1 1900000
II Biaya Transportasi
Biaya Perjalanan Dinas/ Org/Bula 4 1 500000
Akomodasi dan Transpor Org/Trip 4 2 846200
A. SITE ENGINEERING
1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.4 X GD 400,000.00
3 Beban Biaya Umum 1 X GD 1,000,000.00
4 Tunjangan Penugasan 0.3 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 240,000.00
TOTAL 2,940,000.00
B. CHIEF INSPECTOR
1 Gaji Dasar 750,000.00
2 Beban Biaya Sosial 0.35 X GD 262,500.00
3 Beban Biaya Umum 0.9 X GD 675,000.00
4 Tunjangan Penugasan 0.2 X GD 150,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 168,750.00
TOTAL 2,006,250.00
C SURVEYOR
1 Gaji Dasar 450,000.00
2 Beban Biaya Sosial 0.3 X GD 135,000.00
3 Beban Biaya Umum 0.75 X GD 337,500.00
4 Tunjangan Penugasan 0.2 X GD 90,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 92,250.00
TOTAL 1,104,750.00
D INSPECTOR
1 Gaji Dasar 450,000.00
2 Beban Biaya Sosial 0.3 X GD 135,000.00
3 Beban Biaya Umum 0.75 X GD 337,500.00
4 Tunjangan Penugasan 0.2 X GD 90,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 92,250.00
TOTAL 1,104,750.00
REKAPITULASI
JUMLAH HARGA
NO URAIAN
Rp
JUMLAH 292,275,000.00
PPN 10 % 29,227,500.00
TOTAL ( Termasuk PPN ) 321,502,500.00
DIBULATKAN 321,503,000.00
TERBILANG : Empat Puluh Sembilan Juta Dua Ratus Dua Puluh Lima Ribu Rupiah
RENCANA ANGGARAN BIAYA
JUMLAH HARGA
NO URAIAN
Rp
JUMLAH 292,125,000.00
PPN 10 % 29,212,500.00
TOTAL ( Termasuk PPN ) 321,337,500.00
DIBULATKAN 321,338,000.00
RENCANA ANGGARAN BIAYA
JUMLAH 179,030,000.00
PPN 11 % 19,693,300.00
JUMLAH TOTAL 198,723,300.00
PEMBULATAN 198,723,000.00
Terbilang :
Seratus Sembilan Puluh Delapan Juta Tujuh Ratus Dua Puluh Tiga Ribu Rupiah
ALWI WAHAB
Direktur
DAFTAR KUANTITAS DAN HARGA
I PEMBERIAN
II PENGIRIMAN
III PENYERAHAN
KET :
1. PEMBERIAN
2. PENGIRIMAN
3. PENYERAHAN
Ternate, 27 Juni 2022
CV. TRISAKTI
ALWI WAHAB
direktur