Anda di halaman 1dari 11

LAMPIRAN ADENDUM 01

Nomor : 910.916/620/11.BM/DPUPRKP-KS/2020/ADD.01
Tanggal 07 Oktober 2020

JADWAL WAKTU PELAKSANAAN


PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN PELAKSANA : PT. PELANGI PERSADA NUSANTARA
KEGIATAN : PEKERJAAN JEMBATAN NOMOR SPK : 910.916/620/11.BM/DPUPRKP-KS/VI/2020
PEKERJAAN : PEMBANGUNAN JEMBATAN AIR FUATA (TAHAP I) TANGGAL : 24 JUNI 2020
LOKASI : DESA FUATA, KEC. SULABESI SELATAN, KAB. KEPULAUAN SULA
T.A : 2020

No. KONTRAK
BOBOT
Pembayar URAIAN PEKERJAAN JUMLAH HARGA Mg-1 Mg-2 Mg-3 Mg-4 Mg-5 Mg-6 Mg-7 Mg-8 Mg-9 Mg-10 Mg-11 Mg-12 Mg-13 Mg-14 Mg-15 Mg-16 Mg-17 Mg-18 Mg-19 Mg-20 Mg-21 Mg-22 Mg-23 Mg-24 Mg-25 Mg-26 KET
an (%) 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 5 Hari

I DIVISI 1. UMUM
1.2 Mobilisasi 68,650,000.00 2.33 0.63 0.63 0.63 0.45 100
1.1.9.1 Topi Pelindung (Safety Helmet) ; 2,100,000.00 0.07 0.07
1.1.9.2 Pelindung Mata (Goggles, Spectacles); 200,000.00 0.01 0.01
1.1.9.3 Tameng Muka (Face Shield); 350,000.00 0.01 0.01
1.1.9.4 Sarung Tangan (Safety Gloves); 180,000.00 0.01 0.01
1.1.9.5 Sepatu Keselamatan (Safety Shoes); untuk Staf 1,200,000.00 0.04 0.04
1.1.9.6 Rompi Keselamatan (Safety Vest); 720,000.00 0.02 0.02
1.1.9.7 Rompi Keselamatan (Safety Vest); 3,000,000.00 0.10 0.10
III DIVISI III. PEKERJAAN TANAH
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter 10,822,978.39 0.37 0.37
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter 10,538,563.70 0.36 0.36
Galian Struktur dengan kedalaman 2 - 4 meter K : > 10% 939,493.47 0.03 0.03
3.2.(1a) Timbunan Biasa dari sumber galian 263,486,389.12 8.96 1.79 1.79 1.79 1.79 1.79
Timbunan Biasa dari sumber galian K : > 10% 172,986,833.52 5.88 1.18 1.18 1.18 1.18 1.18
3.2.(1b) Timbunan Biasa Dari Galian 6,629,518.14 0.23 0.23
-
VII DIVISI VII. STRUKTUR
7.1 (7) Beton mutu sedang fc’20 MPa 652,592,545.12 22.18 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85
7.1 (9) Beton Siklop fc’15 Mpa 32,654,844.69 1.11 0.37 0.37 0.37
7.1 (10) Beton mutu rendah fc’10 Mpa 20,478,355.85 0.70 0.70
7.3 (3) Baja Tulangan U 32 Ulir 668,435,722.24 22.72 2.84 2.84 2.84 2.84 2.84 2.84 2.84 2.84
7.7 (1) Dinding Sumuran Silinder terpasang, Diameter 300 cm 246,772,519.72 8.39 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84
7.9.(1) Pasangan Batu 779,259,508.77 26.49 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31
JUMLAH 2,941,997,272.72 100.00
Rencana Minggu 0.72 0.80 3.73 4.82 4.82 4.82 4.82 1.85 1.85 1.85 1.85 1.85 1.85 2.48 2.07 3.21 4.05 8.06 6.99 6.99 6.99 6.99 6.99 4.15 4.15 1.29
Akumulasi 0 0.72 1.52 5.25 10.06 14.88 19.69 24.51 26.36 28.20 30.05 31.90 33.75 35.60 38.08 40.15 43.36 47.41 55.46 62.45 69.44 76.43 83.42 90.41 94.56 98.71 100.00

Disetujui Oleh : Diperiksa Oleh ; Diperiksa Oleh ; Diperiksa Oleh ; Diperiksa Oleh : Diajukan Oleh :
Pejabat Pembuat Komitmen (PPK) PPTK DIREKSI LAPANGAN PENGAWAS KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPUPRPKP KAB. KEPULAUAN SULA DPUPRPKP KAB. KEPULAUAN SULA DPUPRPKP KAB. KEPULAUAN SULA DPUPRPKP KAB. KEPULAUAN SULA CV. DELA CONCIETA PT. PELANGI PERSADA NUSANTARA

RUSMIN LOHY, ST BUDI SULISTIYO, ST BAMBANG AGUNG SULAKSONO, Amd TONI PORA LUTFI SOAMOLE, ST ABRAHAM PRANOTOADI
NIP. 198005152008041002 NIP. 19830413 201503 1 001 NIP. 19630424 201409 1 001 NIP. 19770915 200801 1 016 Site Engineer KUASA DIREKTUR
LAMPIRAN ADENDUM 01
Nomor : 910.916/620/11.BM/DPUPRKP-KS/2020/ADD.01
Tanggal 07 Oktober 2020
PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN
KEGIATAN : PEKERJAAN JEMBATAN
PEKERJAAN : PEMBANGUNAN JEMBATAN AIR FUATA (TAHAP I) PELAKSANA : PT. PELANGI PERSADA NUSANTARA
LOKASI : DESA FUATA, KEC. SULABESI SELATAN, KAB. KEPULAUAN SULA NOMOR SPK : 910.916/620/11.BM/DPUPRKP-KS/VI/2020
T.A : 2020 TANGGAL : 24 JUNI 2020

SPK AWAL PERUBAHAN SPK ADENDUM ( CCO )


NO URAIAN SAT HARGA SATUAN VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA KET
VOLUME JUMLAH HARGA BOBOT (%) VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%)
( Rp ) TAMBAH ( Rp. ) KURANG ( Rp. )

I DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 Rp 68,650,000.00 Rp 68,650,000.00 2.33 - Rp - - Rp - 1.00 68,650,000.00 Rp 68,650,000.00 2.33
1.1.9.1 Topi Pelindung (Safety Helmet) ; BH 30.00 Rp 70,000.00 Rp 2,100,000.00 0.07 - Rp - - Rp - 30.00 70,000.00 Rp 2,100,000.00 0.07
1.1.9.2 Pelindung Mata (Goggles, Spectacles); BH 10.00 Rp 20,000.00 Rp 200,000.00 0.01 - Rp - - Rp - 10.00 20,000.00 Rp 200,000.00 0.01
1.1.9.3 Tameng Muka (Face Shield); BH 5.00 Rp 70,000.00 Rp 350,000.00 0.01 - Rp - - Rp - 5.00 70,000.00 Rp 350,000.00 0.01
1.1.9.4 Sarung Tangan (Safety Gloves); PSG 36.00 Rp 5,000.00 Rp 180,000.00 0.01 - Rp - - Rp - 36.00 5,000.00 Rp 180,000.00 0.01
1.1.9.5 Sepatu Keselamatan (Safety Shoes); untuk Staf PSG 6.00 Rp 200,000.00 Rp 1,200,000.00 0.04 - Rp - - Rp - 6.00 200,000.00 Rp 1,200,000.00 0.04
1.1.9.6 Rompi Keselamatan (Safety Vest); BH 36.00 Rp 20,000.00 Rp 720,000.00 0.02 - Rp - - Rp - 36.00 20,000.00 Rp 720,000.00 0.02
Sepatu Keselamatan (Rubber Safety Shoes_and
1.1.9.7 PSG 30.00 Rp 100,000.00 Rp 3,000,000.00 0.10 - Rp - - Rp - 30.00 100,000.00 Rp 3,000,000.00 0.10
toe cap)

Rp 76,400,000.00 2.60 Rp - Rp 76,400,000.00 2.60


III DIVISI III. PEKERJAAN TANAH
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 751.84 Rp 26,996.03 Rp 20,296,803.18 0.69 - Rp - 350.93 Rp 9,473,824.79 400.91 26,996.03 Rp 10,822,978.39 0.37 Vol Berkurang
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3 157.35 Rp 60,885.09 Rp 9,580,512.45 0.33 15.74 Rp 958,051.25 - Rp - 173.09 60,885.09 Rp 10,538,563.70 0.36 Vol Bertambah
Galian Struktur dengan kedalaman 2 - 4 meter Kuantitas > 10% M3 15.43 Rp 939,493.47 - Rp - 15.43 60,885.09 Rp 939,493.47 0.03 Vol Bertambah
3.2.(1a) Timbunan Biasa dari sumber galian M3 820.19 Rp 292,044.42 Rp 239,533,081.02 8.14 82.02 Rp 23,953,308.10 - Rp - 902.21 292,044.42 Rp 263,486,389.12 8.96 Vol Bertambah
Timbunan Biasa dari sumber galian Kuantitas > 10% M3 773.16 Rp 172,986,833.52 - Rp - 773.16 223,740.28 Rp 172,986,833.52 5.88 Vol Bertambah
3.2.(1b) Timbunan Biasa Dari Galian M3 147.36 Rp 6,629,518.14 - Rp - 147.36 44,989.35 Rp 6,629,518.14 0.23 Item Baru

Rp 269,410,396.65 9.16 Rp 205,467,204.48 Rp 9,473,824.79 Rp 465,403,776.33 15.82


VII DIVISI VII. STRUKTUR
7.1 (7) Beton mutu sedang fc’20 MPa M3 544.26 Rp 2,570,071.46 Rp 1,398,792,138.22 47.55 - Rp - 290.34 Rp 746,199,593.10 253.92 2,570,071.46 Rp 652,592,545.12 22.18 Vol Berkurang
7.1 (8) Beton mutu rendah fc’15 MPa M3 40.00 Rp 1,884,794.39 Rp 75,391,775.60 2.56 - Rp - 40.00 Rp 75,391,775.60 - Rp - 0.00 Vol Dihilangkan
7.1 (9) Beton Siklop fc’15 Mpa M3 84.78 Rp 1,637,655.20 Rp 138,842,700.57 4.72 - Rp - 64.84 Rp 106,187,855.89 19.94 1,637,655.20 Rp 32,654,844.69 1.11 Vol Berkurang
7.1 (10) Beton mutu rendah fc’10 Mpa M3 15.12 Rp 1,494,770.50 Rp 22,600,929.96 0.77 - Rp - 1.42 Rp 2,122,574.11 13.70 1,494,770.50 Rp 20,478,355.85 0.70 Vol Berkurang
7.3 (3) Baja Tulangan U 32 Ulir Kg 22,410.01 Rp 30,157.14 Rp 675,821,808.97 22.97 - Rp - 244.92 Rp 7,386,086.73 22,165.09 30,157.14 Rp 668,435,722.24 22.72 Vol Berkurang
7.7 (1) Dinding Sumuran Silinder terpasang, Diameter 300 cm M3 28.80 Rp 9,886,719.54 Rp 284,737,522.75 9.68 - Rp - 3.84 Rp 37,965,003.03 24.96 9,886,719.54 Rp 246,772,519.72 8.39 Vol Berkurang
7.9.(1) Pasangan Batu M3 630.31 Rp 779,259,508.77 - Rp - 630.31 1,236,315.23 Rp 779,259,508.77 26.49 Item Baru

Rp 2,596,186,876.08 88.25 Rp 779,259,508.77 Rp 975,252,888.45 Rp 2,400,193,496.39 81.58


Total Harga Rp 2,941,997,272.72 984,726,713.25 984,726,713.25 Rp 2,941,997,272.72

.
A TOTAL HARGA KONTRAK Rp 2,941,997,272.72 100.00 Rp 984,726,713.25 Rp 984,726,713.25 Rp 2,941,997,272.72 100.00
B PAJAK PERTAMBAHAN NILAI ( A x 10% ) Rp 294,199,727.27 Rp 294,199,727.27
C JUMLAH TOTAL HARGA PERKEJAAN ( A + B ) Rp 3,236,197,000.00 Rp 3,236,197,000.00
D DIBULATKAN Rp 3,236,197,000.00 Rp 3,236,197,000.00

Disetujui Oleh : Diperiksa Oleh ; Diperiksa Oleh ; Diperiksa Oleh ; Diperiksa Oleh : Diajukan Oleh :
Pejabat Pembuat Komitmen (PPK) PPTK DIREKSI LAPANGAN PENGAWAS KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPUPRPKP KAB. KEPULAUAN SULA DPUPRPKP KAB. KEPULAUAN SULA DPUPRPKP KAB. KEPULAUAN SULA DPUPRPKP KAB. KEPULAUAN SULA CV. DELA CONCIETA PT. PELANGI PERSADA NUSANTARA

RUSMIN LOHY, ST BUDI SULISTIYO, ST BAMBANG AGUNG SULAKSONO, Amd TONI PORA LUTFI SOAMOLE, ST ABRAHAM PRANOTOADI
NIP. 198005152008041002 NIP. 19830413 201503 1 001 NIP. 19630424 201409 1 001 NIP. 19770915 200801 1 016 Site Engineer KUASA DIREKTUR
LAMPIRAN USULAN PERUBAHAN KUANTITAS KONTRAK
PEKERJAAN TAMBAH / KURANG
Program : PEMBANGUNAN JALAN DAN JEMBATAN
Kegiatan : PEKERJAAN JEMBATAN
Pekerjaan : PEMBANGUNAN JEMBATAN AIR FUATA (TAHAP I) PELAKSANA : PT. PELANGI PERSADA NUSANTARA
Lokasi : DESA FUATA, KEC. SULABESI SELATAN, KAB. KEPULAUAN SULA NOMOR SPK : 910.916/620/11.BM/DPUPRKP-KS/VI/2020
T.A : 2020 TANGGAL : 24 JUNI 2020

SPK AWAL PERUBAHAN SPK ADENDUM ( CCO )


NO URAIAN SAT HARGA SATUAN BOBOT VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA BOBOT KET
VOLUME JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
( Rp ) (%) TAMBAH ( Rp. ) KURANG ( Rp. ) (%)

I DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 Rp 68,650,000.00 Rp 68,650,000.00 2.33 - Rp - - Rp - 1.00 68,650,000.00 Rp 68,650,000.00 2.33
1.1.9.1 Topi Pelindung (Safety Helmet) ; BH 30.00 Rp 70,000.00 Rp 2,100,000.00 0.07 - Rp - - Rp - 30.00 70,000.00 Rp 2,100,000.00 0.07
1.1.9.2 Pelindung Mata (Goggles, Spectacles); BH 10.00 Rp 20,000.00 Rp 200,000.00 0.01 - Rp - - Rp - 10.00 20,000.00 Rp 200,000.00 0.01
1.1.9.3 Tameng Muka (Face Shield); BH 5.00 Rp 70,000.00 Rp 350,000.00 0.01 - Rp - - Rp - 5.00 70,000.00 Rp 350,000.00 0.01
1.1.9.4 Sarung Tangan (Safety Gloves); PSG 36.00 Rp 5,000.00 Rp 180,000.00 0.01 - Rp - - Rp - 36.00 5,000.00 Rp 180,000.00 0.01
1.1.9.5 Sepatu Keselamatan (Safety Shoes); untuk Staf PSG 6.00 Rp 200,000.00 Rp 1,200,000.00 0.04 - Rp - - Rp - 6.00 200,000.00 Rp 1,200,000.00 0.04
1.1.9.6 Rompi Keselamatan (Safety Vest); BH 36.00 Rp 20,000.00 Rp 720,000.00 0.02 - Rp - - Rp - 36.00 20,000.00 Rp 720,000.00 0.02
Sepatu Keselamatan (Rubber Safety Shoes_and
1.1.9.7 PSG 30.00 Rp 100,000.00 Rp 3,000,000.00 0.10 - Rp - - Rp - 30.00 100,000.00 Rp 3,000,000.00 0.10
toe cap)

Rp 76,400,000.00 2.60 Rp - Rp 76,400,000.00 2.60


III DIVISI III. PEKERJAAN TANAH
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 751.84 Rp 26,996.03 Rp 20,296,803.18 0.69 - Rp - 350.93 Rp 9,473,824.79 400.91 26,996.03 Rp 10,822,978.39 0.37 Vol Berkurang
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3 157.35 Rp 60,885.09 Rp 9,580,512.45 0.33 31.17 Rp 1,897,544.71 - Rp - 188.52 60,885.09 Rp 11,478,057.17 0.39 Vol Bertambah
3.2.(1a) Timbunan Biasa dari sumber galian M3 820.19 Rp 292,044.42 Rp 239,533,081.02 8.14 855.18 Rp 249,750,109.03 - Rp - 1,675.37 292,044.42 Rp 489,283,190.05 16.63 Vol Bertambah
3.2.(1b) Timbunan Biasa Dari Galian M3 147.36 Rp 6,629,518.14 - Rp - 147.36 44,989.35 Rp 6,629,518.14 0.23 Item Baru

Rp 269,410,396.65 9.16 Rp 258,277,171.89 Rp 9,473,824.79 Rp 518,213,743.74 17.61


VII DIVISI VII. STRUKTUR
7.1 (7) Beton mutu sedang fc’20 MPa M3 544.26 Rp 2,570,071.46 Rp 1,398,792,138.22 47.55 - Rp - 290.34 Rp 746,199,593.10 253.92 2,570,071.46 Rp 652,592,545.12 22.18 Vol Berkurang
7.1 (8) Beton mutu rendah fc’15 MPa M3 40.00 Rp 1,884,794.39 Rp 75,391,775.60 2.56 - Rp - 40.00 Rp 75,391,775.60 - Rp - 0.00 Vol Dihilangkan
7.1 (9) Beton Siklop fc’15 Mpa M3 84.78 Rp 1,637,655.20 Rp 138,842,700.57 4.72 - Rp - 64.84 Rp 106,187,855.89 19.94 1,637,655.20 Rp 32,654,844.69 1.11 Vol Berkurang
7.1 (10) Beton mutu rendah fc’10 Mpa M3 15.12 Rp 1,494,770.50 Rp 22,600,929.96 0.77 - Rp - 1.42 Rp 2,122,574.11 13.70 1,494,770.50 Rp 20,478,355.85 0.70 Vol Berkurang
7.3 (3) Baja Tulangan U 32 Ulir Kg 22,410.01 Rp 30,157.14 Rp 675,821,808.97 22.97 - Rp - 244.92 Rp 7,386,086.73 22,165.09 30,157.14 Rp 668,435,722.24 22.72 Vol Berkurang
7.7 (1) Dinding Sumuran Silinder terpasang, Diameter 300 cm M3 28.80 Rp 9,886,719.54 Rp 284,737,522.75 9.68 - Rp - 3.84 Rp 37,965,003.03 24.96 9,886,719.54 Rp 246,772,519.72 8.39 Vol Berkurang
7.9.(1) Pasangan Batu 587.59 Rp 726,449,541.36 - Rp - 587.59 1,236,315.23 Rp 726,449,541.36 24.69 Item Baru

Rp 2,596,186,876.08 88.25 Rp 726,449,541.36 Rp 975,252,888.45 Rp 2,347,383,528.98 79.79


Total Harga Rp 2,941,997,272.72 984,726,713.25 984,726,713.25 Rp 2,941,997,272.72

.
A TOTAL HARGA KONTRAK Rp 2,941,997,272.72 Rp 984,726,713.25 Rp 984,726,713.25 Rp 2,941,997,272.72
B PAJAK PERTAMBAHAN NILAI ( A x 10% ) Rp 294,199,727.27 Rp 294,199,727.27
100.00 100.00
C JUMLAH TOTAL HARGA PERKEJAAN ( A + B ) Rp 3,236,197,000.00 Rp 3,236,197,000.00
D DIBULATKAN Rp 3,236,197,000.00 Rp 3,236,197,000.00

SANANA, 24 SEPTEMBER 2020


DIAJUKAN OLEH
KONTRAKTOR PELAKSANA
PT. PELANGI PERSADA NUSANTARA

ABRAHAM PRANOTOADI
KUASA DIREKTUR
CONTRACT CHANGE ORDER (CCO)

PEKERJAAN : PEMBANGUNAN JEMBATAN AIR FUATA (TAHAP I)


KONTRAKTOR PELAKSANA : PT. PELANGI PERSADA NUSANTARA
NO. KONTRAK :
TANGGAL :
NO. ADENDUM 01 :
TANGGAL ADD 01 :
TAHUN ANGGARAN : 2020
LOKASI PEKERJAAN DESA FUATA, KEC. SULABESI SELATAN, KAB. KEPULAUAN SULA
Contra ct Change O r d e r (CCO)
KONTRAK PEKERJAAN TAMBAH KURANG CCO
NO SATUAN JUMLAH BOBOT PEKERJAAN TAMBAH PEKERJAAN KURANG SATUAN JUMLAH BOBOT KET
URAIAN SAT VOLUME VOLUME
HARGA (Rp) HARGA (Rp) (%) VOLUME JUMLAH (Rp) VOLUME JUMLAH (Rp) HARGA (Rp) HARGA (Rp) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16)
I DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 68,650,000.00 68,650,000.00 2.33 - - - - 1.00 68,650,000.00 68,650,000.00 2.33
1.1.9.1 Topi Pelindung (Safety Helmet) ; BH 30.00 70,000.00 2,100,000.00 0.07 - - - - 30.00 70,000.00 2,100,000.00 0.07
1.1.9.2 Pelindung Mata (Goggles, Spectacles); BH 10.00 20,000.00 200,000.00 0.01 - - - - 10.00 20,000.00 200,000.00 0.01
1.1.9.3 Tameng Muka (Face Shield); BH 5.00 70,000.00 350,000.00 0.01 - - - - 5.00 70,000.00 350,000.00 0.01
1.1.9.4 Sarung Tangan (Safety Gloves); PSG 36.00 5,000.00 180,000.00 0.01 - - - - 36.00 5,000.00 180,000.00 0.01
1.1.9.5 Sepatu Keselamatan (Safety Shoes); untuk Staf PSG 6.00 200,000.00 1,200,000.00 0.04 - - - - 6.00 200,000.00 1,200,000.00 0.04
1.1.9.6 Rompi Keselamatan (Safety Vest); BH 36.00 20,000.00 720,000.00 0.02 - - - - 36.00 20,000.00 720,000.00 0.02
Sepatu Keselamatan (Rubber Safety Shoes_and
1.1.9.7 PSG 30.00 100,000.00 3,000,000.00 0.10 - - - - 30.00 100,000.00 3,000,000.00 0.10
toe cap)

III DIVISI III. PEKERJAAN TANAH


3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 751.84 26,996.03 20,296,803.18 0.69 - - 350.93 9,473,824.79 400.91 26,996.03 10,822,978.39 0.37 Berkurang
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3 157.35 60,885.09 9,580,512.45 0.33 173.09 10,538,563.70 - - 188.52 60,885.09 11,478,057.17 0.39 Bertambah
Galian Struktur dengan kedalaman 2 - 4 meter > 10%
3.2.(1a) Timbunan Biasa dari sumber galian M3 820.19 292,044.42 239,533,081.02 8.14 855.18 249,750,109.03 - - 1,675.37 292,044.42 489,283,190.05 16.63 Bertambah
Timbunan Biasa dari sumber galian > 10%
3.2.(1b) Timbunan Biasa Dari Galian 147.36 6,673,088.47 147.36 45,285.03 6,673,088.47 0.23 Item Baru

VII DIVISI VII. STRUKTUR


7.1 (7) Beton mutu sedang fc’20 MPa M3 544.26 2,570,071.46 1,398,792,138.22 47.55 - - 290.34 746,199,593.10 253.92 2,570,071.46 652,592,545.12 22.18 Berkurang
7.1 (8) Beton mutu rendah fc’15 MPa M3 40.00 1,884,794.39 75,391,775.60 2.56 - - 40.00 75,391,775.60 - - - - Dihilangkan
7.1 (9) Beton Siklop fc’15 Mpa M3 84.78 1,637,655.20 138,842,700.57 4.72 - - 64.84 106,187,855.89 19.94 1,637,655.20 32,654,844.69 1.11 Berkurang
7.1 (10) Beton mutu rendah fc’10 Mpa M3 15.12 1,494,770.50 22,600,929.96 0.77 - - 1.42 2,122,574.11 13.70 1,494,770.50 20,478,355.85 0.70 Berkurang
7.3 (3) Baja Tulangan U 32 Ulir Kg 22,410.01 30,157.14 675,821,808.97 22.97 - 244.92 7,386,086.73 22,165.09 30,157.14 668,435,722.24 22.72 Berkurang
7.7 (1) Dinding Sumuran Silinder terpasang, Diameter 300 cm M3 28.80 9,886,719.54 284,737,522.75 9.68 - - 3.84 37,965,003.03 24.96 9,886,719.54 246,772,519.72 8.39 Berkurang
7.9.(1) Pasangan Batu 502.22 726,405,971.03 502.22 1,446,386.81 726,405,971.03 24.69 Item Baru

A. TOTAL Rp. 2,941,997,272.72 100.00 993,367,732.23 984,726,713.25 2,941,997,272.72 100.00


B. PPN ( 10% x A ) Rp. 294,199,727.27
C. TOTAL ( A + B ) Rp. 3,236,197,000.00
D. DIBULATKAN Rp. 3,236,197,000.00

Mengetahui ; Diperiksa / Disetujui ; Diperiksa : Dibuat oleh :


0 0 Konsultan Pengawas Kontraktor Pelaksana
0 0 CV. DELA CONCIETA PT. PELANGI PERSADA NUSANTARA

0 0 LUTFI SOAMOLE, ST ABRAHAM PRANOTOADI


0 0 Site Engineer Kuasa Direktur
Kuantitas
No. Item Uraian Pekerjaan Sat Usulan Ket
Kontrak Awal Perubahan
(CCO)
I DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 1.00 Tetap
1.1.9.1 Topi Pelindung (Safety Helmet) ; BH 30.00 30.00 Tetap
1.1.9.2 Pelindung Mata (Goggles, Spectacles); BH 10.00 10.00 Tetap
1.1.9.3 Tameng Muka (Face Shield); BH 5.00 5.00 Tetap
1.1.9.4 Sarung Tangan (Safety Gloves); PSG 36.00 36.00 Tetap
1.1.9.5 Sepatu Keselamatan (Safety Shoes); untuk Staf PSG 6.00 6.00 Tetap
1.1.9.6 Rompi Keselamatan (Safety Vest); BH 36.00 36.00 Tetap
Sepatu Keselamatan (Rubber Safety Shoes_and
1.1.9.7 PSG 30.00 30.00 Tetap
toe cap)
SUB TOTAL DIVISI I
III DIVISI III. PEKERJAAN TANAH
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 751.84 400.91 Berkurang
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3 157.35 188.52 Bertambah
3.2.(1a) Timbunan Biasa dari sumber galian M3 820.19 1,675.37 Bertambah
3.2.(1b) Timbunan Biasa Dari Galian M3 - 147.36 Item Baru
SUB TOTAL DIVISI III
VII DIVISI VII. STRUKTUR
7.1 (7) Beton mutu sedang fc’20 MPa M3 544.26 253.92 Berkurang
7.1 (8) Beton mutu rendah fc’15 MPa M3 40.00 - Dihilangkan
7.1 (9) Beton Siklop fc’15 Mpa M3 84.78 19.94 Berkurang
7.1 (10) Beton mutu rendah fc’10 Mpa M3 15.12 13.70 Berkurang
7.3 (3) Baja Tulangan U 32 Ulir Kg 22,410.01 22,165.09 Berkurang
7.7 (1) Dinding Sumuran Silinder terpasang, Diameter 300 cm M3 28.80 24.96 Berkurang
7.9.(1) Pasangan Batu M3 - 587.59 Item Baru
SUB TOTAL DIVISI VII
Usulan
No. Item Uraian Pekerjaan Sat Perubahan Permasalahan Penanganan
Volume

DIVISI III. PEKERJAAN TANAH

Pengurangan Volume disebabkan adanya


3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 400.91 Volume Pekerjaan Berkurang
penyesuaian dilapangan yang sebenarnya

Penambahan Volume disebabkan adanya


3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3 188.52 Volume Pekerjaan Bertambah
penyesuaian dilapangan yang sebenarnya

Penambahan Volume disebabkan adanya


3.2.(1a) Timbunan Biasa dari sumber galian M3 1,675.37 Volume Pekerjaan Bertambah
penyesuaian dilapangan yang sebenarnya

Volume pekerjaan Terdapat Item Baru


3.2.(1b) Timbunan Biasa Dari Galian M3 147.36 Karena disesuaikan dengan Kondisi di Volume Pekerjaan Item Baru
Lapangan

DIVISI VII. STRUKTUR

Pengurangan Volume disebabkan adanya


7.1 (7) Beton mutu sedang fc’20 MPa M3 253.92 Volume Pekerjaan Berkurang
penyesuaian dilapangan yang sebenarnya

Volume Pekerjaan dihilangkan karena tidak


7.1 (8) Beton mutu rendah fc’15 MPa M3 - Volume Pekerjaan Dihilangkan
masuk pada pekerjaan Tahap I

Pengurangan Volume disebabkan adanya


7.1 (9) Beton Siklop fc’15 Mpa M3 19.94 Volume Pekerjaan Berkurang
penyesuaian dilapangan yang sebenarnya

Pengurangan Volume disebabkan adanya


7.1 (10) Beton mutu rendah fc’10 Mpa M3 13.70 Volume Pekerjaan Berkurang
penyesuaian dilapangan yang sebenarnya

Pengurangan Volume disebabkan adanya


7.3 (3) Baja Tulangan U 32 Ulir Kg 22,165.09 Volume Pekerjaan Berkurang
penyesuaian dilapangan yang sebenarnya

Pengurangan Volume disebabkan adanya


7.7 (1) Dinding Sumuran Silinder terpasang, Diameter 300 cm M3 24.96 Volume Pekerjaan Berkurang
penyesuaian dilapangan yang sebenarnya

Volume pekerjaan Terdapat Item Baru


7.9.(1) Pasangan Batu M3 587.59 Karena disesuaikan dengan Kondisi di Volume Pekerjaan Item Baru
Lapangan
Kuantitas
Presentase
No. Item Uraian Pekerjaan Sat Usulan Perubahan Ket
Kontrak Awal Perubahan Kuantitas
(CCO)
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 1.00 0% Tetap
1.1.9.1 Topi Pelindung (Safety Helmet) ; BH 30.00 30.00 0% Tetap
1.1.9.2 Pelindung Mata (Goggles, Spectacles); BH 10.00 10.00 0% Tetap
1.1.9.3 Tameng Muka (Face Shield); BH 5.00 5.00 0% Tetap
1.1.9.4 Sarung Tangan (Safety Gloves); PSG 36.00 36.00 0% Tetap
1.1.9.5 Sepatu Keselamatan (Safety Shoes); untuk Staf PSG 6.00 6.00 0% Tetap
1.1.9.6 Rompi Keselamatan (Safety Vest); BH 36.00 36.00 0% Tetap
Sepatu Keselamatan (Rubber Safety Shoes_and
1.1.9.7 PSG 30.00 30.00 0% Tetap
toe cap)
DIVISI III. PEKERJAAN TANAH
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 751.84 400.91 -46.68 % Berkurang
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3 157.35 173.09 10 % Bertambah
Galian Struktur dengan kedalaman 2 - 4 meter > 10% M3 - 15.43 9.81 % Bertambah
3.2.(1a) Timbunan Biasa dari sumber galian M3 820.19 902.21 10 % Bertambah
Timbunan Biasa dari sumber galian > 10% M3 773.16 94.27 % Bertambah
3.2.(1b) Timbunan Biasa Dari Galian M3 - 147.36 100.00% Item Baru
DIVISI VII. STRUKTUR
7.1 (7) Beton mutu sedang fc’20 MPa M3 544.26 253.92 -53.35 % Berkurang
7.1 (8) Beton mutu rendah fc’15 MPa M3 40.00 - -100 % Dihilangkan
7.1 (9) Beton Siklop fc’15 Mpa M3 84.78 19.94 -76.48 % Berkurang
7.1 (10) Beton mutu rendah fc’10 Mpa M3 15.12 13.70 -9.39 % Berkurang
7.3 (3) Baja Tulangan U 32 Ulir Kg 22,410.01 22,165.09 -1.09 % Berkurang
7.7 (1) Dinding Sumuran Silinder terpasang, Diameter 300 cm M3 28.80 24.96 -13 % Berkurang
7.9.(1) Pasangan Batu M3 - 630.31 100.00% Item Baru
Usulan
No. Item Uraian Pekerjaan Sat Perubahan Permasalahan Penanganan
Volume

DIVISI III. PEKERJAAN TANAH

Pengurangan Volume disebabkan


Penyesuaian Hasil Galian Area Terbuka
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 400.91 Volume Pekerjaan Berkurang
pada Area Rawan Longsor, bagian atas
Sepatu Abutment dan Lantai Kerja

Penambahan Volume disebabkan


3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3 188.52 Penyesuaian Hasil Galian Sumuran dan Volume Pekerjaan Bertambah
Sepatu Abutment

Penambahan Volume disebabkan adanya


3.2.(1a) Timbunan Biasa dari sumber galian M3 1,675.37 Penambahan Volume Timbunan Oprit dan Volume Pekerjaan Bertambah
Kekurangan Timbunan dari Hasil Galian

Penambahan Volume disebabkan adanya


Hasil Galian Struktur yang didistribusikan di
3.2.(1b) Timbunan Biasa Dari Galian M3 147.36 ( Item Baru )
Area Oprit dan area di depan sepatu
abutment

DIVISI VII. STRUKTUR

Pengurangan Volume disebabkan adanya


hasil perhitungan kembali volume Beton
7.1 (7) Beton mutu sedang fc’20 MPa M3 253.92 Volume Pekerjaan Berkurang
pada Abutment, Wing wall, Plat Injak dan
Sumuran dengan tinggi 2m

Volume Pekerjaan dihilangkan karena tidak


7.1 (8) Beton mutu rendah fc’15 MPa M3 - Volume Pekerjaan Dihilangkan
masuk pada Item Pekerjaan Trotoar

Pengurangan Volume disebabkan adanya


7.1 (9) Beton Siklop fc’15 Mpa M3 19.94 penyesuaian Pengecoran Sumuran area Volume Pekerjaan Berkurang
bawah dengan ketinggian 1 meter

Pengurangan Volume disebabkan adanya


hasil perhitungan kembali volume Beton
7.1 (10) Beton mutu rendah fc’10 Mpa M3 13.70 Volume Pekerjaan Berkurang
pada Lantai Kerja Abutment dan Lantai
Kerja Plat Injak dengan tebal 10 cm

Pengurangan Volume disebabkan adanya


7.3 (3) Baja Tulangan U 32 Ulir Kg 22,165.09 penyesuaian volume Abutmen, Wing wall Volume Pekerjaan Berkurang
dan Plat Injak.

Pengurangan Volume disebabkan adanya


7.7 (1) Dinding Sumuran Silinder terpasang, Diameter 300 cm M3 24.96 Volume Pekerjaan Berkurang
penyesuaian dimensi pada Gambar Kerja

Penambahan Volume disebabkan


penyesuaian desain yang ada (Tahap I)
7.9.(1) Pasangan Batu M3 630.31 ( Item Baru )
pada bangunan bawah jembatan, Drainase
dan Tembok Penahan
Kuantitas
No. Item Uraian Pekerjaan Sat Usulan Keterangan
Kontrak Awal Perubahan
(CCO)
I DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 1.00 Tetap
1.1.9.1 Topi Pelindung (Safety Helmet) ; BH 30.00 30.00 Tetap
1.1.9.2 Pelindung Mata (Goggles, Spectacles); BH 10.00 10.00 Tetap
1.1.9.3 Tameng Muka (Face Shield); BH 5.00 5.00 Tetap
1.1.9.4 Sarung Tangan (Safety Gloves); PSG 36.00 36.00 Tetap
1.1.9.5 Sepatu Keselamatan (Safety Shoes); untuk Staf PSG 6.00 6.00 Tetap
1.1.9.6 Rompi Keselamatan (Safety Vest); BH 36.00 36.00 Tetap
Sepatu Keselamatan (Rubber Safety Shoes_and
1.1.9.7 PSG 30.00 30.00 Tetap
toe cap)
SUB TOTAL DIVISI I
III DIVISI III. PEKERJAAN TANAH
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 751.84 400.91 Berkurang
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3 157.35 188.52 Bertambah
3.2.(1a) Timbunan Biasa dari sumber galian M3 820.19 1,675.37 Bertambah
3.2.(1b) Timbunan Biasa Dari Galian M3 - 147.36 Item Baru
SUB TOTAL DIVISI III
VII DIVISI VII. STRUKTUR
7.1 (7) Beton mutu sedang fc’20 MPa M3 544.26 253.92 Berkurang
7.1 (8) Beton mutu rendah fc’15 MPa M3 40.00 - Dihilangkan
7.1 (9) Beton Siklop fc’15 Mpa M3 84.78 19.94 Berkurang
7.1 (10) Beton mutu rendah fc’10 Mpa M3 15.12 13.70 Berkurang
7.3 (3) Baja Tulangan U 32 Ulir Kg 22,410.01 22,165.09 Berkurang
7.7 (1) Dinding Sumuran Silinder terpasang, Diameter 300 cm M3 28.80 24.96 Berkurang
7.9.(1) Pasangan Batu M3 - 630.31 Item Baru
SUB TOTAL DIVISI VII
K Awal Usulan
g bisa 452 497.2 10
g bisa >10 0 202.80 44.87
700 54.87
248.0124
700.0124
700
VOL
NO. VOL HASIL
URAIAN PEKERJAAN SAT KONTRAK SELISIH KET VOLUME
DIVISI REKAYASA
AWAL

I -
1.2 Mobilisasi LS 1.00 1.00 - Tetap
1.1.9.1 Topi Pelindung (Safety Helmet) ; BH 30.00 30.00 - Tetap
1.1.9.2 Pelindung Mata (Goggles, Spectacles); BH 10.00 10.00 - Tetap
1.1.9.3 Tameng Muka (Face Shield); BH 5.00 5.00 - Tetap
1.1.9.4 Sarung Tangan (Safety Gloves); PSG 36.00 36.00 - Tetap
1.1.9.5 Sepatu Keselamatan (Safety Shoes); untuk Staf PSG 6.00 6.00 - Tetap
1.1.9.6 Rompi Keselamatan (Safety Vest); BH 36.00 36.00 - Tetap
Sepatu Keselamatan (Rubber Safety Shoes_and
1.1.9.7 PSG 30.00 30.00 - Tetap
toe cap)
III DIVISI III. PEKERJAAN TANAH
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 751.84 400.91 350.93 Berkurang
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3 157.35 188.52 31.17 Bertambah ###
3.2.(1a) Timbunan Biasa dari sumber galian M3 820.19 1,675.37 855.18 Bertambah
3.2.(1b) Timbunan Biasa Dari Galian M3 - 147.36 147.36 Item Baru
VII DIVISI VII. STRUKTUR
7.1 (7) Beton mutu sedang fc’20 MPa M3 544.26 253.92 290.34 Berkurang
7.1 (8) Beton mutu rendah fc’15 MPa M3 40.00 - 40.00 Dihilangkan
7.1 (9) Beton Siklop fc’15 Mpa M3 84.78 19.94 64.84 Berkurang
7.1 (10) Beton mutu rendah fc’10 Mpa M3 15.12 13.70 1.42 Berkurang
7.3 (3) Baja Tulangan U 32 Ulir Kg 22,410.01 22,165.09 244.92 Berkurang
7.7 (1) Dinding Sumuran Silinder terpasang, Diameter 300 cm M3 28.80 24.96 3.84 Berkurang
7.9.(1) Pasangan Batu M3 - 630.31 630.31 Item Baru

Anda mungkin juga menyukai