DEVISI 7. STRUKTUR
7.1.(5a)1 Beton Struktur fc’30 Mpa M3 619,86 3.624.139,00 2.246.458.800,54 42,42 7,070 7,070 7,070 7,070 7,070 7,070
7.1 (10) Beton fc’10 MPa (untuk lantai kerja) M3 123,58 2.328.069,00 287.702.767,02 5,43 1,087 1,087 1,087 1,087 1,087
7.3 (1) Baja Tulangan Polos BJTP 280 Kg 1.321,78 24.993,00 33.035.247,54 0,62 0,156 0,156 0,156 0,156
7.3 (3) Baja Tulangan Sirip BJTS 420A Kg 55.846,64 26.724,00 1.492.445.607,36 28,18 3,523 3,523 3,523 3,523 3,523 3,523 3,523 3,523
7.6.(16).a Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1 216,00 175.330,00 37.871.280,00 0,72 0,18 0,179 0,179 0,179
7.9.(1) Pasangan Batu M3 39,46 1.687.053,00 66.571.111,38 1,26 1,257
7.12.(3) Perletakan Elastomerik Sintetis ( Uk. 400 X 400 X 50 mm ) Buah 14,00 1.293.652,00 18.111.128,00 0,34 0,342
7.13.(1) Sandaran (Railing) M1 33,20 295.847,00 9.822.120,40 0,19 0,185
7.16.(1a) Cutting Spun Pile Buah 24,00 171.130,00 4.107.120,00 0,08 0,078
7.16.(2a) Pipa Drainase Baja diameter 75 mm M1 10,00 157.552,00 1.575.520,00 0,03 0,030
DEVISI 11. PEMBANGUNAN PAGAR KANTOR KESATUAN PELAKSANAAN PENGAMANAN PELABUHAN (KP3)
A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank Ls 1,00 2.400.000,00 2.400.000,00 0,05 0,045
2 Pembersihan Akhir Ls 1,00 1.500.000,00 1.500.000,00 0,03 0,028
D. PEKERJAAN ARSITEKTUR
I. PEKERJAAN DINDING
1 Pekerjaan Bata Merah 1 Pc : 4 Ps M2 133,84 176.414,00 23.611.249,76 0,45 0,149 0,149 0,149
2 Pekerjaan Plasteran 1 Pc : Ps M2 267,69 77.735,00 20.808.882,15 0,39 0,131 0,131 0,131
3 Acian Kolom dan Balok M2 137,81 44.968,00 6.197.040,08 0,12 0,039 0,039 0,039
4 Pembuatan Topi Kolom Pagar Depan Unit 10,00 275.000,00 2.750.000,00 0,05 0,052
5 Rlief Tiang Kolom Pagar Depan M2 15,50 220.000,00 3.410.000,00 0,06 0,064
E. PEKERJAAN PENGECATAN
1 Ca Tembok M2 405,50 49.988,00 20.270.134,00 0,38 0,191 0,191