REKAPITULASI BIAYA

KEGIATAN : PENGGANTIAN PUSKESMAS WAEMULANG


PEKERJAAN : PEMBANGUNAN PUSKESMAS
LOKASI : DESA WAEMULANG, KEC. KAPALA MADAN
TAHUN ANGGARAN : 2018

JUMLAH
NO. URAIAN PEKERJAAN HARGA
(Rp.)

I. PEKERJAAN PERSIAPAN 139,282,831.94


II. PEKERJAAN TANAH 87,710,756.67
III. PEKERJAAN PASANGAN DAN BETON 1,034,467,618.36
IV. PEKERJAAN PLESTERAN DINDING DAN LANTAI 361,711,370.39
V. PEKERJAAN PLAFOND 173,332,557.45
VI. PEKERJAAN ALLUMUNIUM DAN ATAP 629,197,662.76
VII. PEKERJAAN PENGGANTUNG 32,488,942.50
VIII. PEKERJAAN INSTALASI LISTRIK 28,450,000.00
IX. PEKERJAAN SANITASI 81,797,919.38
X. PEKERJAAN PENGECATAN 152,560,062.52
XI. PEKERJAAN AKHIR 9,000,000.00

JUMLAH (I + II + III) 2,729,999,721.96


PPN 10 % 272,999,972.20
TOTAL 3,002,999,694.16
DIBULATKAN 3,002,999,000.00
TERBILANG :

Tiga Milyar Dua Juta Sembilan Ratus Sembilan Puluh Sembilan Ribu Rupiah
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PENGGANTIAN PUSKESMAS WAEMULANG


PEKERJAAN : PEMBANGUNAN PUSKESMAS
LOKASI : DESA WAEMULANG, KEC. KAPALA MADAN
TAHUN ANGGARAN : 2018

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SATUAN VOLUME
Rp. Rp.

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Ls 1.00 25,000,000.00 25,000,000.00
2 Pematangan Lahan
- Pembersihan dan Pengupasan Lahan M2 7,000.00 11,720.00 82,040,000.00
- Pemotongan Pohon Pilihan Ø 15 - 40 Btng 40.00 125,000.00 5,000,000.00
3 Pengukuran dan Pemasangan Bowplank M' 244.00 81,937.50 19,992,831.94
4 Air Kerja Ls 1.00 2,500,000.00 2,500,000.00
5 Pembuatan Papan Nama Proyek Bh 1.00 250,000.00 250,000.00
6 Pembuatan Direksi Keet M2 20.00 225,000.00 4,500,000.00
JUMLAH 139,282,831.94
II. PEKERJAAN TANAH
1 Galian Tanah Pondasi M3 244.00 82,512.50 20,133,132.51
2 Urugan Tanah Bekas Galian M3 71.94 61,525.00 4,426,059.28
3 Urugan Pasir dibawah Pondasi M3 33.01 489,923.00 16,174,317.92
4 Urugan Pasir dibawah Lantai M3 56.86 489,923.00 27,856,531.86
5 Urug Tanah dibawah Lantai dipadatkan M3 56.86 336,283.00 19,120,715.10
JUMLAH 87,710,756.67
III. PEKERJAAN PASANGAN DAN BETON
1 Pasangan Pondasi Batu Kali, ad. 1 : 5 M3 183.03 1,381,908.54 252,924,363.30
2 Timbrisan Batu Kali M3 44.88 677,546.27 30,408,276.72
3 Pasangan Batako, ad. 1 : 4 M2 930.22 235,890.88 219,431,447.66
4 Beton Bertulang Mutu Beton, ad. (K 225)
- Balok Sloof 15/20 cm ( 174 Kg/M3) M3 8.98 11,179,903.91 100,350,817.49
- Kolom Praktis 15/15 cm ( 223 Kg/M3) M3 4.96 14,798,790.83 73,387,203.74
- Kolom Beton 20/25 cm ( 148 Kg/M3) M3 3.42 13,796,929.61 47,185,499.25
- Kolom Beton 15/45 cm ( 145 Kg/M3) M3 0.58 13,594,112.42 7,891,382.26
- Balok, Elev. +3.00 15/20 cm ( 145 Kg/M3) M3 3.73 13,120,260.58 48,964,812.47
- Balok enterance, Elev. +3.40 15/20 cm ( 174 Kg/M3) M3 0.15 13,120,260.58 1,968,039.09
- Balok kanopi, Elev. +3.00 15/20 cm ( 174 Kg/M3) M3 0.30 13,120,260.58 3,963,630.72
- Balok kanopi enterance, Elev. +3.40 15/20 cm ( 174 Kg/M3) M3 0.04 13,120,260.58 495,453.84
- Ring Balok 15/20 cm ( 174 Kg/M3) M3 8.98 13,120,260.58 117,767,458.93
- Plat Beton kanopi Tebal 8 cm ( 129 Kg/M3) M3 5.83 15,746,683.51 91,751,515.74
- Plat Beton enterance Tebal 8 cm ( 129 Kg/M3) M3 0.20 15,746,683.51 3,132,015.35
- Lisplank Beton Tebal 6 cm ( 173 Kg/M3) M3 1.70 20,437,841.23 34,845,701.79
- Lisplank Beton enterance Tebal 6 cm ( 173 Kg/M3) M3 0.17 20,437,841.23 3,527,980.15
5 Pengecoran Lantai Tegel, ad. (K 125) Tebal 5 cm M3 23.55 1,493,736.80 35,177,501.66
6 Rabat Beton Keliling (K125), tebal 7 cm M3 6.83 1,493,736.80 10,204,164.21
JUMLAH 1,034,467,618.36
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME
Rp. Rp.
IV. PEKERJAAN PLESTERAN DINDING DAN LANTAI
1 Plesteran Dinding, ad. 1 : 5 M2 1,860.45 81,313.58 151,279,759.03
2 Lantai Keramik 40 x 40 cm (Warna) M2 436.50 381,530.33 166,537,986.86
3 Lantai Keramik 40 x 40 cm (Anti Slip) M2 6.00 381,530.33 2,289,181.95
4 Keramik 20 x 20 cm Anti Slip pada Lantai Wc/Km M2 28.50 323,551.24 9,221,210.20
5 Keramik 20 x 25 cm pada Dinding Wc/Km (polos) M2 88.64 365,334.30 32,383,232.35
JUMLAH 361,711,370.39
V. PEKERJAAN PLAFOND
1 Langit-Langit Kalsi Board 9 mm M2 595.40 58,408.50 34,776,420.90
2 Rangka Plafond Kalsi Board Besi Hollow M2 595.40 190,710.25 113,548,882.85
3 List Profil Plafond M' 722.80 34,597.75 25,007,253.70
JUMLAH 173,332,557.45
VI. PEKERJAAN ALLUMUNIUM DAN ATAP
1 Kusen Pintu, Jendela dan Ventilasi Allumunium 4 Inci (black) M' 514.01 226,997.35 116,678,453.88
2 Daun Pintu Kaca Rangka Allumunium + Pemasangan M2 9.60 1,100,000.00 10,560,000.00
3 Daun Pintu Alllumunium rangka Allumunium + Pemasangan M2 48.40 1,000,000.00 48,400,000.00
4 Daun Jendela Kaca Rangka Allumunium + Pemasangan M2 37.31 1,050,000.00 39,179,700.00
5 Ventilasi Kaca Bening 5 mm Rangka Allumunium 3 Inci (black) M2 7.31 400,000.00 2,924,480.00
6 Lisptlank Bahan Kalsiplank M' 124.40 74,980.00 9,327,512.00
7 Konstruksi Atap Baja Ringan M2 679.91 388,685.63 264,271,282.16
8 Atap Genteng Rainbow M' 679.91 184,103.50 125,173,829.10
9 Bubungan Atap Genteng Rainbow (bulat) M' 91.24 139,000.50 12,682,405.62
JUMLAH 629,197,662.76
VII. PEKERJAAN PENGGANTUNG
1 Engsel Pintu 4 Inci Mutu Baik (1 pintu dipasang 3 bh) Bh 75.00 60,731.50 4,554,862.50
2 Engsel Pintu 3 dan Ventilasi Inci Mutu Baik Bh 270.00 40,422.50 10,914,075.00
3 Grendel Pintu 3 Inci Mutu Baik Bh 33.00 25,000.00 825,000.00
4 Grendel Jendela dan Ventilasi 2 Inci Mutu Baik Bh 135.00 10,000.00 1,350,000.00
5 Kait Angin Jendela dan Ventilasi Mutu Baik Bh 270.00 54,981.50 14,845,005.00
JUMLAH 32,488,942.50
VIII. PEKERJAAN INSTALASI LISTRIK
1 Instalasi Titik Lampu dan Stop Kontak Ttk 138.00 125,000.00 17,250,000.00
2 Philips PLC 23 Watt Bh 61.00 55,000.00 3,355,000.00
3 Philips PLC 18 Watt Bh 17.00 45,000.00 765,000.00
4 Fetting Down Light - 888 4 inci Bh 61.00 60,000.00 3,660,000.00
5 Fetting Down Light - 888 3 inci Bh 17.00 55,000.00 935,000.00
6 Fetting Kembang Merk Broco Bh 7.00 15,000.00 105,000.00
7 Stop Kontak Merk Broco Bh 60.00 25,000.00 1,500,000.00
8 Saklar Ganda Merk Broco Bh 13.00 35,000.00 455,000.00
9 Saklar Tunggal Merk Broco Bh 15.00 25,000.00 375,000.00
10 Box MCB + MCB 1 Group Unit 1.00 50,000.00 50,000.00
JUMLAH 28,450,000.00
IX. PEKERJAAN SANITASI
1 Titik Instalasi Air Bersih Ttk 11.00 150,000.00 1,650,000.00
2 Titik Instalasi Air Kotor Ttk 11.00 125,000.00 1,375,000.00
3 Closed Duduk Setara KW - 1 (complite) Unit 4.00 4,427,040.00 17,708,160.00
4 Closed Jongkok Setara KW - 1 Unit 3.00 786,709.25 2,360,127.75
5 Wastafel Warna/Keramik + Cermin Setara KW - 1 Unit 3.00 1,165,180.00 3,495,540.00
6 Kran Air Stainless Steel 1/2 Inci Bh 11.00 98,224.38 1,080,468.13
7 Floor Drain Stainless Steel Bh 11.00 132,422.50 1,456,647.50
8 Hand Shower Mandi Bh 4.00 297,252.00 1,189,008.00
9 Hand Shower Closed Bh 4.00 268,502.00 1,074,008.00
10 Pipa Pembuangan Air Kotor PVC 3 Inci Type AW M' 150.00 154,763.55 23,214,532.50
11 Pipa Pembuangan Kotor PVC 4 Inci Type AW M' 50.00 243,888.55 12,194,427.50
12 Septic Tank dan Peresapan Kapasitas Type Sedang Unit 3.00 5,000,000.00 15,000,000.00
JUMLAH 81,797,919.38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME
Rp. Rp.
X. PEKERJAAN PENGECATAN
1 Cat Plafond dengan Metrolite M2 595.40 27,774.80 16,537,115.92
2 Cat Dinding Bagian Luar/Dalam dengan Metrolite M2 1,860.45 27,774.80 51,673,593.33
3 Acian Bidang Dinding Bagian Luar/Dalam M2 1,860.45 45,338.18 84,349,353.27
JUMLAH 152,560,062.52
XI. PEKERJAAN AKHIR
1 Pembersihan Akhir Pekerjaan Ls 1.00 4,000,000.00 4,000,000.00
2 Dokumentasi dan Pelaporan Ls 1.00 2,500,000.00 2,500,000.00
3 As Built Drawing Ls 1.00 2,500,000.00 2,500,000.00
JUMLAH 9,000,000.00
DAFTAR ANALISA
HARGA SATUAN UPAH DAN BAHAN

I. A.2.3.1. HARGA SATUAN PEKERJAAN TANAH


1. A.2.2.1.4. Pengukuran dan Pemasangan 1 m bouwplank
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.005 170,000.00 850.00
JUMLAH TENAGA KERJA 23,250.00
B. BAHAN
Kayu balok 5/7 M3 0.0120 2,500,000.00 30,000.00
Paku 2”-3” Kg 0.0200 25,000.00 500.00
Kayu papan 3/20 M3 0.0070 2,500,000.00 17,500.00
JUMLAH HARGA BAHAN 48,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 71,250.00


E. Overhead & Profit 15 % 10,687.50
F. Harga Satuan Pekerjaan (D+E) 81,937.50

I. A.2.3.1. HARGA SATUAN PEKERJAAN TANAH


1. A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.7500 90,000.00 67,500.00
Mandor L.04 OH 0.0250 170,000.00 4,250.00
JUMLAH TENAGA KERJA 71,750.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 71,750.00


E. Overhead & Profit 15 % 10,762.50
F. Harga Satuan Pekerjaan (D+E) 82,512.50
2. A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.5000 90,000.00 45,000.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
JUMLAH TENAGA KERJA 53,500.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 53,500.00


E. Overhead & Profit 15 % 8,025.00
F. Harga Satuan Pekerjaan (D+E) 61,525.00

3. A.2.3.1.11. Pengurungan 1 m3 dengan pasir urug


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Mandor L.04 OH 0.010 170,000.00 1,700.00
JUMLAH TENAGA KERJA 28,700.00
B. BAHAN
Pasir Urug M3 1.200 331,100.00 397,320.00
JUMLAH HARGA BAHAN 397,320.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 426,020.00


E. Overhead & Profit 15 % 63,903.00
F. Harga Satuan Pekerjaan (D+E) 489,923.00

5. A.2.3.1.10. Pemadatan tanah 1 m3 tanah (per 20 cm)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.500 90,000.00 45,000.00
Mandor L.04 OH 0.050 170,000.00 8,500.00
JUMLAH TENAGA KERJA 53,500.00
B. BAHAN
Tanah Urug M3 1.200 199,100.00 238,920.00
JUMLAH HARGA BAHAN 238,920.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 292,420.00


E. Overhead & Profit 15 % 43,863.00
F. Harga Satuan Pekerjaan (D+E) 336,283.00
II. A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
1. A.3.2.1.3. Pemasangan 1 m3 pondasi batu kali campuran 1 SP : 5 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 90,000.00 135,000.00
Tukang Batu L.02 OH 0.750 120,000.00 90,000.00
Kepala Tukang L.03 OH 0.075 140,000.00 10,500.00
Mandor L.04 OH 0.075 170,000.00 12,750.00
JUMLAH TENAGA KERJA 248,250.00
B. BAHAN
Batu Belah M3 1.200 382,700.00 459,240.00
Semen Portland Kg 136.000 1,946.00 264,656.00
Pasir Pasang M3 0.544 421,900.00 229,513.60
JUMLAH HARGA BAHAN 953,409.60
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 1,201,659.60


E. Overhead & Profit 15 % 180,248.94
F. Harga Satuan Pekerjaan (D+E) 1,381,908.54

2. A.3.2.1.9. Pemasangan 1 m3 batu kosong (aanstamping)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.780 90,000.00 70,200.00
Tukang Batu L.02 OH 0.390 120,000.00 46,800.00
Kepala Tukang L.03 OH 0.039 140,000.00 5,460.00
Mandor L.04 OH 0.039 170,000.00 6,630.00
JUMLAH TENAGA KERJA 129,090.00
B. BAHAN
Bata Belah M3 1.200 382,700.00 459,240.00
Pasir Pasang M3 0.432 1,946.00 840.67
JUMLAH HARGA BAHAN 460,080.67
C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A+B+C) 589,170.67
E. Overhead & Profit 15 % 88,375.60
F. Harga Satuan Pekerjaan (D+E) 677,546.27
III. A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
1. A.4.4.2.3. Pemasangan 1 m2 dinding batako (27x14x8 cm) Campuran, 1 SP : 4 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Tukang Batu L.03 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.015 170,000.00 2,550.00
JUMLAH TENAGA KERJA 42,950.00
B. BAHAN
Semen Portland Kg 11.000 1,946.00 21,406.00
Pasir Pasang M3 0.035 421,900.00 14,766.50
Batako Bh 30.000 4,200.00 126,000.00
JUMLAH HARGA BAHAN 162,172.50
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 205,122.50


E. Overhead & Profit 15 % 30,768.38
F. Harga Satuan Pekerjaan (D+E) 235,890.88

IV. A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN DINDING


1. A.4.4.2.5. Pemasangan 1 m2 plesteran dinding campuran, 1 SP : 5 PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Tukang Batu L.03 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.015 170,000.00 2,550.00
JUMLAH TENAGA KERJA 49,650.00
B. BAHAN
Semen Portland Kg 5.184 1,946.00 10,088.06
Pasir Pasang M3 0.026 421,900.00 10,969.40
JUMLAH HARGA BAHAN 21,057.46
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 70,707.46


E. Overhead & Profit 15 % 10,606.12
F. Harga Satuan Pekerjaan (D+E) 81,313.58
2. A.4.4.2.3. Pemasangan 1 m2 plesteran dinding campuran, 1 SP : 3 PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Tukang Batu L.03 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.015 170,000.00 2,550.00
JUMLAH TENAGA KERJA 49,650.00
B. BAHAN
Semen Portland Kg 7.778 1,946.00 15,135.21
Pasir Pasang M3 0.023 421,900.00 9,703.70
JUMLAH HARGA BAHAN 24,838.91
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 74,488.91


E. Overhead & Profit 15 % 11,173.34
F. Harga Satuan Pekerjaan (D+E) 85,662.25

V. A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1. A.4.4.3.35. Pemasangan 1 m2 lantai keramik ukuran 40 x 40 cm (warna)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 90,000.00 63,000.00
Tukang Batu L.03 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.035 170,000.00 5,950.00
JUMLAH TENAGA KERJA 115,850.00
B. BAHAN
Lantai Keramik 40 x 40 cm M2 1.100 147,700.00 162,470.00
Semen Portland Kg 10.000 1,946.00 19,460.00
Pasir Pasang M3 0.045 421,900.00 18,985.50
Semen Warna Kg 1.500 10,000.00 15,000.00
JUMLAH HARGA BAHAN 215,915.50
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 331,765.50


E. Overhead & Profit 15 % 49,764.83
F. Harga Satuan Pekerjaan (D+E) 381,530.33
2. A.4.4.3.35. Pemasangan 1 m2 lantai keramik ukuran 40 x 40 cm (polos)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 90,000.00 63,000.00
Tukang Batu L.03 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.035 170,000.00 5,950.00
JUMLAH TENAGA KERJA 115,850.00
B. BAHAN
Lantai Keramik 40 x 40 cm M2 1.100 112,400.00 123,640.00
Semen Portland Kg 10.000 1,946.00 19,460.00
Pasir Pasang M3 0.045 421,900.00 18,985.50
Semen Warna Kg 1.500 10,000.00 15,000.00
JUMLAH HARGA BAHAN 177,085.50
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 292,935.50


E. Overhead & Profit 15 % 43,940.33
F. Harga Satuan Pekerjaan (D+E) 336,875.83

3. A.4.4.3.35. Pemasangan 1 m2 lantai keramik ukuran 40 x 40 cm (anti slip)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 90,000.00 63,000.00
Tukang Batu L.03 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.035 170,000.00 5,950.00
JUMLAH TENAGA KERJA 115,850.00
B. BAHAN
Lantai Keramik 40 x 40 cm M2 1.100 147,700.00 162,470.00
Semen Portland Kg 10.000 1,946.00 19,460.00
Pasir Pasang M3 0.045 421,900.00 18,985.50
Semen Warna Kg 1.500 10,000.00 15,000.00
JUMLAH HARGA BAHAN 215,915.50
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 331,765.50


E. Overhead & Profit 15 % 49,764.83
F. Harga Satuan Pekerjaan (D+E) 381,530.33
4. A.4.4.3.36. Pemasangan 1 m2 lantai keramik ukuran 20 x 20 cm (anti slip)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 90,000.00 63,000.00
Tukang Batu L.03 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.035 170,000.00 5,950.00
JUMLAH TENAGA KERJA 115,850.00
B. BAHAN
Lantai Keramik 20 x 20 cm M2 1.050 115,500.00 121,275.00
Semen Portland Kg 10.400 1,946.00 20,238.40
Pasir Pasang M3 0.045 421,900.00 18,985.50
Semen Warna Kg 0.500 10,000.00 5,000.00
JUMLAH HARGA BAHAN 165,498.90
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 281,348.90


E. Overhead & Profit 15 % 42,202.34
F. Harga Satuan Pekerjaan (D+E) 323,551.24

5. A.4.4.3.54. Pemasangan 1 m2 dinding keramik ukuran 20 x 25 cm (polos)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.900 90,000.00 81,000.00
Tukang Batu L.03 OH 0.450 120,000.00 54,000.00
Kepala Tukang L.03 OH 0.045 140,000.00 6,300.00
Mandor L.04 OH 0.045 170,000.00 7,650.00
JUMLAH TENAGA KERJA 148,950.00
B. BAHAN
Keramik 20 x 25 cm M2 1.100 112,400.00 123,640.00
Semen Portland Kg 9.300 1,946.00 18,097.80
Pasir Pasang M3 0.018 421,900.00 7,594.20
Semen Warna Kg 1.940 10,000.00 19,400.00
JUMLAH HARGA BAHAN 168,732.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 317,682.00


E. Overhead & Profit 15 % 47,652.30
F. Harga Satuan Pekerjaan (D+E) 365,334.30
6. A.4.4.3.57. Pemasangan 1 m2 batu alam type marmer ukuran 20 x 25 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 90,000.00 63,000.00
Tukang Batu L.03 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.035 170,000.00 5,950.00
JUMLAH TENAGA KERJA 115,850.00
B. BAHAN
Batu alam type marmer bakar M2 1.100 350,000.00 385,000.00
Semen Portland Kg 11.750 1,946.00 22,865.50
Pasir Pasang M3 0.035 421,900.00 14,766.50
JUMLAH HARGA BAHAN 422,632.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 538,482.00


E. Overhead & Profit 15 % 80,772.30
F. Harga Satuan Pekerjaan (D+E) 619,254.30

7. A.4.4.3.58. Pemasangan 1 m2 batu alam type alur fress ukuran 20 x 40 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 90,000.00 63,000.00
Tukang Batu L.03 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.035 170,000.00 5,950.00
JUMLAH TENAGA KERJA 115,850.00
B. BAHAN
Batu alam type alur fress M2 1.100 300,000.00 330,000.00
Semen Portland Kg 11.750 1,946.00 22,865.50
Pasir Pasang M3 0.035 421,900.00 14,766.50
JUMLAH HARGA BAHAN 367,632.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 483,482.00


E. Overhead & Profit 15 % 72,522.30
F. Harga Satuan Pekerjaan (D+E) 556,004.30
VI. A.4.1.1. HARGA SATUAN PEKERJAAN BETON
1. A.4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 MPA (K 125), slump (12 + 2) w/c= 0,78
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 90,000.00 148,500.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 170,000.00 14,110.00
JUMLAH TENAGA KERJA 199,530.00
B. BAHAN
Semen Portland Kg 276.000 1,946.00 537,096.00
Pasir Pasang Kg 828.000 301.36 249,523.71
Kerikil Cor Kg 1,012.000 296.30 299,851.85
Air Ltr 215.000 60.00 12,900.00
JUMLAH HARGA BAHAN 1,099,371.57
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 1,298,901.57


E. Overhead & Profit 15 % 194,835.23
F. Harga Satuan Pekerjaan (D+E) 1,493,736.80

2. A.4.1.1.5. Membuat 1 m3 beton mutu f'c = 19,3 MPA (K 225)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 90,000.00 148,500.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 170,000.00 14,110.00
JUMLAH TENAGA KERJA 199,530.00
B. BAHAN
Semen Portland Kg 371.00 1,946.00 721,966.00
Pasir Beton Kg 698.00 301.36 210,347.29
Kerikil (Maks 30 mm) Kg 1,047.00 296.30 310,222.22
Air Liter 215.00 60.00 12,900.00
JUMLAH HARGA BARANG 1,255,435.51
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 1,454,965.51


E. Overhead & Profit 15 % 218,244.83
F. Harga Satuan Pekerjaan (D+E) 1,673,210.33
3. A.4.1.1.17. Pembesian 10 kg dengan besi polos
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.070 90,000.00 6,300.00
Tukang Besi L.03 OH 0.070 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.004 170,000.00 680.00
JUMLAH TENAGA KERJA 16,360.00
B. BAHAN
Besi Polos Kg 10.500 28,000.00 294,000.00
Kawat Beton Kg 0.150 40,000.00 6,000.00
JUMLAH HARGA BAHAN 300,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 316,360.00


E. Overhead & Profit 15 % 47,454.00
F. Harga Satuan Pekerjaan (D+E) 363,814.00
G. Untuk 1 Kg Besi = (F / 10) 36,381.40

4. a.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.520 90,000.00 46,800.00
Tukang Kayu L.02 OH 0.260 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.026 140,000.00 3,640.00
Mandor L.04 OH 0.026 170,000.00 4,420.00
JUMLAH TENAGA KERJA 86,060.00
B. BAHAN
Balok Kayu Kelas II M3 0.045 2,500,000.00 112,500.00
Paku 5 - 12 cm Kg 0.300 25,000.00 7,500.00
Minyak Bekisting Ltr 0.100 6,500.00 650.00
JUMLAH HARGA BARANG 120,650.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 206,710.00


E. Overhead & Profit 15 % 31,006.50
F. Harga Satuan Pekerjaan (D+E) 237,716.50
5. A.4.1.1.22. Pemasangan 1 m2 bekisting untuk kolom
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 140,000.00 4,620.00
Mandor L.04 OH 0.033 170,000.00 5,610.00
JUMLAH TENAGA KERJA 109,230.00
B. BAHAN
Kayu Kelas II M3 0.040 2,500,000.00 100,000.00
Paku 5 - 12 cm Kg 0.400 25,000.00 10,000.00
Minyak Bekisting Ltr 0.200 6,500.00 1,300.00
Balok Kayu Kelas II M3 0.015 2,500,000.00 37,500.00
Plywood tebal 9 mm Lbr 0.350 193,500.00 67,725.00
JUMLAH HARGA BARANG 216,525.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 325,755.00


E. Overhead & Profit 15 % 48,863.25
F. Harga Satuan Pekerjaan (D+E) 374,618.25

6. A.4.1.1.23. Pemasangan 1 m2 bekisting untuk balok


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 140,000.00 4,620.00
Mandor L.04 OH 0.033 170,000.00 5,610.00
JUMLAH TENAGA KERJA 109,230.00
B. BAHAN
Kayu Kelas II M3 0.040 2,500,000.00 100,000.00
Paku 5 - 12 cm Kg 0.400 25,000.00 10,000.00
Minyak Bekisting Ltr 0.200 6,500.00 1,300.00
Balok Kayu Kelas II M3 0.018 2,500,000.00 45,000.00
Plywood 9 mm Lbr 0.350 193,500.000 67,725.00
JUMLAH HARGA BARANG 224,025.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 333,255.00


E. Overhead & Profit 15 % 49,988.25
F. Harga Satuan Pekerjaan (D+E) 383,243.25
7. A.4.1.1.24. Pemasangan 1 m2 bekesting untuk lantai
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 140,000.00 4,620.00
Mandor L.04 OH 0.033 170,000.00 5,610.00
JUMLAH TENAGA KERJA 109,230.00
B. BAHAN
Kayu Kelas II M3 0.040 2,500,000.00 100,000.00
Paku 5 - 12 cm Kg 0.400 25,000.00 10,000.00
Minyak Bekesting Ltr 0.200 6,500.00 1,300.00
Balok Kayu Kelas II M3 0.015 2,500,000.00 37,500.00
Plywood Tebal 9 mm Lbr 0.350 193,500.00 67,725.00
JUMLAH HARGA BARANG 216,525.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 325,755.00


E. Overhead & Profit 15 % 48,863.25
F. Harga Satuan Pekerjaan (D+E) 374,618.25

PENGUMPULAN :
1 M3 - Balok Sloof 15/20 cm
1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
13.333 M2 Begesting Sloof Rp 237,716.50 3,169,553.33
174.186 Kg Pembesian Rp 36,381.40 6,337,140.24
11,179,903.91

1 M3 - Kolom Praktis 15/15 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
13.333 M2 Begesting Kolom Rp 374,618.25 4,994,910.00
223.484 Kg Pembesian Rp 36,381.40 8,130,670.50
14,798,790.83

1 M3 - Kolom Beton 20/25 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
18.000 M2 Begesting Kolom Rp 374,618.25 6,743,128.50
147.894 Kg Pembesian Rp 36,381.40 5,380,590.77
13,796,929.61

1 M3 - Kolom Beton 15/45 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
17.778 M2 Begesting Kolom Rp 374,618.25 6,659,880.00
144.607 Kg Pembesian Rp 36,381.40 5,261,022.09
13,594,112.42

1 M3 - Balok, Elev. +3.00 15/20 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
13.333 M2 Begesting Balok Rp 383,243.25 5,109,910.00
174.186 Kg Pembesian Rp 36,381.40 6,337,140.24
13,120,260.58
1 M3 - Balok enterance, Elev. +3.40 15/20 cm
1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
13.333 M2 Begesting Balok Rp 383,243.25 5,109,910.00
174.186 Kg Pembesian Rp 36,381.40 6,337,140.24
13,120,260.58

1 M3 - Balok kanopi, Elev. +3.00 15/20 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
13.333 M2 Begesting Balok Rp 383,243.25 5,109,910.00
174.186 Kg Pembesian Rp 36,381.40 6,337,140.24
13,120,260.58

1 M3 - Balok kanopi enterance, Elev. +3.40 15/20 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
13.333 M2 Begesting Balok Rp 383,243.25 5,109,910.00
174.186 Kg Pembesian Rp 36,381.40 6,337,140.24
13,120,260.58

1 M3 - Ring Balok 15/20 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
13.333 M2 Begesting Balok Rp 383,243.25 5,109,910.00
174.186 Kg Pembesian Rp 36,381.40 6,337,140.24
13,120,260.58

1 M3 - Plat Beton kanopi Tebal 8 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
25.000 M2 Begesting Lantai Rp 374,618.25 9,365,456.25
129.407 Kg Pembesian Rp 36,381.40 4,708,016.93
15,746,683.51

1 M3 - Plat Beton enterance Tebal 8 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
25.000 M2 Begesting Lantai Rp 374,618.25 9,365,456.25
129.407 Kg Pembesian Rp 36,381.40 4,708,016.93
15,746,683.51

1 M3 - Lisplank Beton Tebal 6 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
33.333 M2 Begesting Lantai Rp 374,618.25 12,487,275.00
172.543 Kg Pembesian Rp 36,381.40 6,277,355.90
20,437,841.23

1 M3 - Lisplank Beton enterance Tebal 6 cm


1.000 M3 Beton mutu K 225 Rp 1,673,210.33 1,673,210.33
33.333 M2 Begesting Lantai Rp 374,618.25 12,487,275.00
172.543 Kg Pembesian Rp 36,381.40 6,277,355.90
20,437,841.23
VII. A.4.2.1. HARGA SATUAN PEKERJAAN ALLUMUNIUM
1. A.4.2.1.1. Pemasangan 1 m' kusen pintu allumunium 4 inci (black)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.043 90,000.00 3,870.00
Tukang Allumunium L.02 OH 0.043 120,000.00 5,160.00
Kepala Tukang L.03 OH 0.0043 140,000.00 602.00
Mandor L.04 OH 0.0021 170,000.00 357.00
JUMLAH TENAGA KERJA 9,989.00
B. BAHAN
Profil Allumunium M' 1.100 150,000.00 165,000.00
Skrup Fixer Bh 2.000 700.00 1,400.00
Sealant Tube 0.600 35,000.00 21,000.00
JUMLAH HARGA BAHAN 187,400.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 197,389.00


E. Overhead & Profit 15 % 29,608.35
F. Harga Satuan Pekerjaan (D+E) 226,997.35

2. A.4.2.1.13. Pemasangan 1 m2 kaca kusen rangka allumunium 4 inci (black)


Harga Satuan Jumlah Harga
NO. URAIAN Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.043 90,000.00 3,870.00
Tukang Allumunium L.02 OH 0.043 120,000.00 5,160.00
Kepala Tukang L.03 OH 0.0043 140,000.00 602.00
Mandor L.04 OH 0.0021 170,000.00 357.00
JUMLAH TENAGA KERJA 9,989.00
B. BAHAN
Profil Allumunium M' 1.100 150,000.00 165,000.00
Skrup Fixer Bh 2.000 700.00 1,400.00
Kaca Bening 5 mm M2 1.100 204,400.00 224,840.00
Sealant Tube 0.600 35,000.00 21,000.00
JUMLAH HARGA BAHAN 412,240.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 422,229.00


E. Overhead & Profit 15 % 63,334.35
F. Harga Satuan Pekerjaan (D+E) 485,563.35
VIII. A.4.5.1. HARGA SATUAN PEKERJAAN PLAFOND
1. A.4.5.1.7. Pemasangan 1 m2 plafond kalsiboard ukuran 122 x 244 cm, tebal 6 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Tukang Kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.005 140,000.00 700.00
Mandor L.04 OH 0.005 170,000.00 850.00
JUMLAH TENAGA KERJA 16,550.00
B. BAHAN
Kalsiboard Lbr 0.364 85,000.00 30,940.00
Sekrup Kg 0.110 30,000.00 3,300.00
JUMLAH HARGA BAHAN 34,240.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 50,790.00


E. Overhead & Profit 15 % 7,618.50
F. Harga Satuan Pekerjaan (D+E) 58,408.50

2. A.4.2.1.21. Pemasangan 1 m2 rangka plafond besi hollow 4 x 4 x 0,30 mm, grid 60 x 60 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 90,000.00 31,500.00
Tukang Besi L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.018 170,000.00 3,060.00
JUMLAH TENAGA KERJA 81,460.00
B. BAHAN
Besi Hollow M' 4.000 18,750.00 75,000.00
Assesories % 0.500 18,750.00 9,375.00
JUMLAH HARGA BAHAN 84,375.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 165,835.00


E. Overhead & Profit 15 % 24,875.25
F. Harga Satuan Pekerjaan (D+E) 190,710.25
3. A.4.5.1.9. Pemasangan 1 m list profil gypsum 10 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 90,000.00 4,500.00
Tukang Kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.0050 140,000.00 700.00
Mandor L.04 OH 0.0030 170,000.00 510.00
JUMLAH TENAGA KERJA 11,710.00
B. BAHAN
List kayu profil 1 x 8 cm M' 1.050 12,500.00 13,125.00
Sekrup Kg 0.150 35,000.00 5,250.00
JUMLAH HARGA BAHAN 18,375.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 30,085.00


E. Overhead & Profit 15 % 4,512.75
F. Harga Satuan Pekerjaan (D+E) 34,597.75

IX. A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1. A.4.5.2. Pemasangan 1 m2 kaap konstruksi baja ringan
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 90,000.00 31,500.00
Tukang Kayu L.02 OH 0.315 120,000.00 37,800.00
Kepala Tukang L.03 OH 0.025 140,000.00 3,500.00
Mandor L.04 OH 0.001 170,000.00 170.00
JUMLAH TENAGA KERJA 72,970.00
B. BAHAN
Truss Zam Uk. 75, L = 10 CM M' 1.440 35,000.00 50,400.00
Truss Zam Uk. 75, L = 6 CM M' 1.636 30,000.00 49,080.00
Reng/G-DB Roof Battens Btg 3.960 25,000.00 99,000.00
Food Plate 1,4 mm Bh 0.310 2,000.00 620.00
PLD - Diapragma Plate (dudukan) Bh 8.000 4,500.00 36,000.00
Wing Bracing M' 0.715 4,500.00 3,217.50
Tensioner Bh 1.000 15,000.00 15,000.00
Baut dia. 12 mm Bh 2.000 600.00 1,200.00
Dynabolt Bh 3.000 3,500.00 10,500.00
JUMLAH HARGA BAHAN 265,017.50
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 337,987.50


E. Overhead & Profit 15 % 50,698.13
F. Harga Satuan Pekerjaan (D+E) 388,685.63
2. A.4.5.2.32. Pemasangan 1 m2 atap genteng rainbow
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.001 170,000.00 170.00
JUMLAH TENAGA KERJA 31,570.00
B. BAHAN
Genteng Rainbow Lbr 1.600 74,700.00 119,520.00
Paku Genteng Kg 0.200 45,000.00 9,000.00
JUMLAH HARGA BAHAN 128,520.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 160,090.00


E. Overhead & Profit 15 % 24,013.50
F. Harga Satuan Pekerjaan (D+E) 184,103.50

3. A.4.5.2.36. Pemasangan 1 m' bubungan genteng rainbow (bulat)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 90,000.00 22,500.00
Tukang Besi L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.013 170,000.00 2,210.00
JUMLAH TENAGA KERJA 44,810.00
B. BAHAN
Bubungan Genteng M' 1.100 67,100.00 73,810.00
Paku Genteng Kg 0.050 45,000.00 2,250.00
JUMLAH HARGA BAHAN 76,060.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 120,870.00


E. Overhead & Profit 15 % 18,130.50
F. Harga Satuan Pekerjaan (D+E) 139,000.50
4. SNI 7393-2008. 6.18 Pemasangan 1 m' talang patahan/zink datar bjls 0,25, lebar 50 cm + papan kayu kls. I
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.250 140,000.00 35,000.00
Mandor L.04 OH 0.010 170,000.00 1,700.00
JUMLAH TENAGA KERJA 72,700.00
B. BAHAN
Papan Kayu Kls. I M3 0.019 5,200,000.00 98,800.00
Zink Datar Kg 0.015 55,000.00 825.00
Paku Zink M' 1.050 50,000.00 52,500.00
JUMLAH HARGA BAHAN 152,125.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 224,825.00


E. Overhead & Profit 15 % 33,723.75
F. Harga Satuan Pekerjaan (D+E) 258,548.75

5. A.4.6.1.21. Pemasangan m' kalsiplank


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.005 170,000.00 850.00
JUMLAH TENAGA KERJA 36,650.00
B. BAHAN
Kalsiplank M' 1.100 25,000.00 27,500.00
Paku Sekrup Kg 0.030 35,000.00 1,050.00
JUMLAH HARGA BAHAN 28,550.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 65,200.00


E. Overhead & Profit 15 % 9,780.00
F. Harga Satuan Pekerjaan (D+E) 74,980.00
X. A.4.6.2. HARGA SATUAN PEKERJAAN PENGGANTUNG
1. A.4.6.2.5. Pemasangan 1 bh engsel pintu 4"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 90,000.00 1,350.00
Tukang Kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.008 170,000.00 1,360.00
JUMLAH TENAGA KERJA 22,810.00
B. BAHAN
Engsel Pintu 4" Bh 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 52,810.00


E. Overhead & Profit 15 % 7,921.50
F. Harga Satuan Pekerjaan (D+E) 60,731.50

2. A.4.6.2.6. Pemasangan 1 bh engsel jendela 3"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.005 170,000.00 850.00
JUMLAH TENAGA KERJA 15,150.00
B. BAHAN
Engsel Jendela 3" Bh 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 35,150.00


E. Overhead & Profit 15 % 5,272.50
F. Harga Satuan Pekerjaan (D+E) 40,422.50
3. A.4.6.2.9. Pemasangan 1 bh kait angin jendela dan ventilasi
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 90,000.00 1,350.00
Tukang Kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.008 170,000.00 1,360.00
JUMLAH TENAGA KERJA 22,810.00
B. BAHAN
Kait Angin Bh 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 47,810.00


E. Overhead & Profit 15 % 7,171.50
F. Harga Satuan Pekerjaan (D+E) 54,981.50

XI. A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI


1. A.5.1.1.1. Pemasangan 1 bh closed duduk
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 3.300 90,000.00 297,000.00
Tukang Batu L.02 OH 1.100 120,000.00 132,000.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.160 170,000.00 27,200.00
JUMLAH TENAGA KERJA 457,600.00
B. BAHAN
Closed Duduk Unit 1.000 3,200,000.00 3,200,000.00
Perlengkapan % 6.000 3,200,000.00 192,000.00
JUMLAH HARGA BAHAN 3,392,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 3,849,600.00


E. Overhead & Profit 15 % 577,440.00
F. Harga Satuan Pekerjaan (D+E) 4,427,040.00
2. A.5.1.1.2. Pemasangan 1 bh closed jongkok
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 90,000.00 90,000.00
Tukang Batu L.02 OH 1.500 120,000.00 180,000.00
Kepala Tukang L.03 OH 0.150 140,000.00 21,000.00
Mandor L.04 OH 0.160 170,000.00 27,200.00
JUMLAH TENAGA KERJA 318,200.00
B. BAHAN
Closed Jongkok Unit 1.000 350,000.00 350,000.00
Semen Portland Kg 6.000 1,946.00 11,676.00
Pasir Pasang M3 0.010 421,900.00 4,219.00
JUMLAH HARGA BAHAN 365,895.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 684,095.00


E. Overhead & Profit 15 % 102,614.25
F. Harga Satuan Pekerjaan (D+E) 786,709.25

3. A.5.1.1.5. Pemasangan 1 bh wastafel + cermin


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.200 90,000.00 108,000.00
Tukang Batu L.02 OH 1.450 120,000.00 174,000.00
Kepala Tukang L.03 OH 0.150 140,000.00 21,000.00
Mandor L.04 OH 0.060 170,000.00 10,200.00
JUMLAH TENAGA KERJA 313,200.00
B. BAHAN
Wastafel + Cermin Unit 1.000 700,000.00 700,000.00
JUMLAH HARGA BAHAN 700,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 1,013,200.00


E. Overhead & Profit 15 % 151,980.00
F. Harga Satuan Pekerjaan (D+E) 1,165,180.00
4. A.5.1.1.14. Pemasangan 1 bh floor drain
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.005 170,000.00 850.00
JUMLAH TENAGA KERJA 15,150.00
B. BAHAN
Floor Drain Stainles Steel Bh 1.000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 100,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 115,150.00


E. Overhead & Profit 15 % 17,272.50
F. Harga Satuan Pekerjaan (D+E) 132,422.50

5. A.5.1.1.19. Pemasangan 1 bh kran air


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Batu L.02 OH 0.400 120,000.00 48,000.00
Kepala Tukang L.03 OH 0.040 140,000.00 5,600.00
Mandor L.04 OH 0.005 170,000.00 850.00
JUMLAH TENAGA KERJA 55,350.00
B. BAHAN
Kran Air Bh 1.000 30,000.00 30,000.00
Sealtape Bh 0.025 2,500.00 62.50
JUMLAH HARGA BAHAN 30,062.50
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 85,412.50


E. Overhead & Profit 15 % 12,811.88
F. Harga Satuan Pekerjaan (D+E) 98,224.38
6. A.5.1.1.6. Pemasangan 1 unit hand shower mandi
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.003 90,000.00 270.00
Tukang Batu L.02 OH 0.060 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.006 140,000.00 840.00
Mandor L.04 OH 0.001 170,000.00 170.00
JUMLAH TENAGA KERJA 8,480.00
B. BAHAN
Hand Shower Mandi Unit 1.000 250,000.00 250,000.00
JUMLAH HARGA BAHAN 250,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 258,480.00


E. Overhead & Profit 15 % 38,772.00
F. Harga Satuan Pekerjaan (D+E) 297,252.00

7. A.5.1.1.6. Pemasangan 1 unit hand shower closed


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.003 90,000.00 270.00
Tukang Batu L.02 OH 0.060 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.006 140,000.00 840.00
Mandor L.04 OH 0.001 170,000.00 170.00
JUMLAH TENAGA KERJA 8,480.00
B. BAHAN
Hand Shower Closed Unit 1.000 225,000.00 225,000.00
JUMLAH HARGA BAHAN 225,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 233,480.00


E. Overhead & Profit 15 % 35,022.00
F. Harga Satuan Pekerjaan (D+E) 268,502.00
8. AN. SNI 2002. 6.31. Memasang 1 m'pipa PVC 3"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 90,000.00 7,290.00
Tukang Batu L.02 OH 0.135 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.0135 140,000.00 1,890.00
Mandor L.04 OH 0.0041 170,000.00 697.00
JUMLAH TENAGA KERJA 26,077.00
B. BAHAN
Pipa PVC 3" M' 1.200 70,000.00 84,000.00
Perlengkapan % 35.000 70,000.00 24,500.00
JUMLAH HARGA BAHAN 108,500.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 134,577.00


E. Overhead & Profit 15 % 20,186.55
F. Harga Satuan Pekerjaan (D+E) 154,763.55

9. AN. SNI 2002. 6.32. Memasang 1 m'pipa PVC 4"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 90,000.00 7,290.00
Tukang Batu L.02 OH 0.135 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.0135 140,000.00 1,890.00
Mandor L.04 OH 0.0041 170,000.00 697.00
JUMLAH TENAGA KERJA 26,077.00
B. BAHAN
Pipa PVC 4" M' 1.200 120,000.00 144,000.00
Perlengkapan % 35.000 120,000.00 42,000.00
JUMLAH HARGA BAHAN 186,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 212,077.00


E. Overhead & Profit 15 % 31,811.55
F. Harga Satuan Pekerjaan (D+E) 243,888.55
XII. A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN
1. A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.020 90,000.00 1,800.00
Tukang Cat L.02 OH 0.063 120,000.00 7,560.00
Kepala Tukang L.03 OH 0.0063 140,000.00 882.00
Mandor L.04 OH 0.003 170,000.00 510.00
JUMLAH TENAGA KERJA 10,752.00
B. BAHAN
Plamir Temmbok Kg 0.100 65,000.00 6,500.00
Cat Dasar Kg 0.100 30,000.00 3,000.00
Cat Penutup Kg 0.260 65,000.00 3,900.00
JUMLAH HARGA BAHAN 13,400.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 24,152.00


E. Overhead & Profit 15 % 3,622.80
F. Harga Satuan Pekerjaan (D+E) 27,774.80

2. A.4.7.1.7. Pengecatan 1 m2 batu alam


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.040 90,000.00 3,600.00
Tukang Cat L.02 OH 0.060 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.016 140,000.00 2,240.00
Mandor L.04 OH 0.003 170,000.00 510.00
JUMLAH TENAGA KERJA 13,550.00
B. BAHAN
Cat Batu Alam Ltr 0.150 20,000.00 3,000.00
JUMLAH HARGA BAHAN 3,000.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 16,550.00


E. Overhead & Profit 15 % 2,482.50
F. Harga Satuan Pekerjaan (D+E) 19,032.50
3. A.4.7.1.17. Pemakaian 1,8 m2 waterproofing
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 90,000.00 22,500.00
Tukang Cat L.02 OH 0.225 120,000.00 27,000.00
Kepala Tukang L.03 OH 0.0225 140,000.00 3,150.00
Mandor L.04 OH 0.0075 170,000.00 1,275.00
JUMLAH TENAGA KERJA 53,925.00
B. BAHAN
Waterproofing MU Kg 3.300 85,000.00 280,500.00
JUMLAH HARGA BAHAN 280,500.00
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 334,425.00


E. Overhead & Profit 15 % 50,163.75
F. Harga Satuan Pekerjaan (D+E) 384,588.75
G. Untuk 1 M2 F/1,8 213,660.42

4. A.4.4.2.27. Pemasangan 1 m2 acian


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Kofisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.010 170,000.00 1,700.00
JUMLAH TENAGA KERJA 33,100.00
B. BAHAN
Semen PC Kg 3.250 1,946.00 6,324.50
JUMLAH HARGA BAHAN 6,324.50
C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A+B+C) 39,424.50


E. Overhead & Profit 15 % 5,913.68
F. Harga Satuan Pekerjaan (D+E) 45,338.18
DAFTAR HARGA SATUAN
UPAH DAN BAHAN

HARGA SATUAN
NO. URAIAN SATUAN
( Rp. )
I. SATUAN UPAH :
1 Pekerja Org/Hr 90,000.00
2 Tukang Batu, Kayu, Besi, Allumunium dan Cat Org/Hr 120,000.00
3 Kepala Tukang Org/Hr 140,000.00
4 Mandor Org/Hr 170,000.00

II. SATUAN BAHAN :


A. BAHAN BETON
1 Tanah Urug M3 199,100.00
2 Pasir Urug M3 331,100.00
3 Pasir Pasangan M3 421,900.00
4 Pasir Pasangan Kg 301.36
5 Batako Bh 4,200.00
6 Batu Belah/Kali M3 382,700.00
7 Kerikil Kacang M3 400,000.00
8 Kerikil Kacang Kg 296.30
9 Semen PC 50 Kg Sak 97,300.00
10 Semen PC 50 Kg Kg 1,946.00
11 Semen Warna Kg 10,000.00
12 Air Tgk 300,000.00
13 Air Ltr 60.00

B. BAHAN KAYU
1 Papan Kayu Kls. I M3 5,200,000.00
2 Papan Kayu Kls. II M3 2,500,000.00
3 Kayu Kls. II M3 2,500,000.00
4 Kalsiplank M' 25,000.00
5 Kalsioard Lbr 85,000.00
6 List Profif Kayu Klas II M' 12,500.00
7 Plywood 9 mm Lbr 193,500.00

C. BAHAN KERAMIK
1 Keramik 20/20 cm (Anti Slip) M2 115,500.00
2 Keramik 20/25 cm (Polos) M2 112,400.00
3 Keramik 40/40 cm (Polos) M2 112,400.00
4 Keramik 40/40 cm (Warna) M2 147,700.00
5 Keramik 40/40 cm (Anti Slip) M2 147,700.00
6 Batu Alam Type Marmer Bakar Uk. 20/25 cm M2 350,000.00
7 Batu Alam Type Alur Fress Uk. 20/40 cm M2 300,000.00

D. BAHAN BESI
1 Paku 5 - 10 cm Kg 25,000.00
2 Paku Sekrup Kg 35,000.00
3 Paku Zink Kg 50,000.00
4 Paku Genteng Kg 45,000.00
5 Ikat Beton (Bendrat) Kg 40,000.00
6 Besi Beton Polos Kg 28,000.00
HARGA SATUAN
NO. URAIAN SATUAN
( Rp. )
7 Baut Diameter 16 mm Bh 600.00
8 Baut Diameter 12 mm Bh 600.00
9 Dynabolt Bh 3,500.00
10 Sekrup/Mur Allumunium Bh 700.00
11 Sekrup Gypsum Kg 30,000.00
12 Besi Hollow 4x4x0,3 mm M' 18,750.00
13 Besi Hollow 2x4x0,3 mm M' 15,000.00
14 Kosen Pintu dan Jendela Allumunium 4" (black) M' 150,000.00
15 Kosen Jendela dan Ventilasi Allumunium 3" (blac) M' 135,000.00
16 Daun Pintu Kaca Rangka Allumunium + Pemasangan M2 1,100,000.00
17 Daun Pintu Allumunium rangka Allumunium + Pemasangan M2 1,000,000.00
18 Daun Jendela Kaca Rangka Allumunium + Pemasangan M2 1,050,000.00
19 Daun Ventilasi Kaca Rangka Allumunium + Pemasangan M2 1,050,000.00
20 Ventilasi Kaca Bening 5 mm Rangka allumunium 3 Inci (Black) M2 400,000.00
21 Atap Genteng Raibow Lbr 74,700.00
22 Bubungan Atap Genteng Rainbow M' 67,100.00
23 Bubungan Zink Plat Bjls 0,25 mm Lbr 120,000.00
24 Bubungan Zink Plat Bjls 0,25 mm M' 55,000.00
25 Truss Zam Uk. 75, L = 10 cm M' 35,000.00
26 Truss Zam Uk. 75, L = 6 cm M' 30,000.00
27 Reng /G-DB Roof Bettens Btg 25,000.00
28 Food Plate 1,4 mm Bh 2,000.00
29 PLD - Diaprama Plate (dudukan) Bh 4,500.00
30 Wind Bracing M' 4,500.00
31 Tensioner Bh 15,000.00

E. BAHAN PIPA
1 Pipa PVC 3" M' 70,000.00
2 Pipa PVC 4" M' 120,000.00
3 Tee 4" Set 20,000.00

F. BAHAN PENGGANTUNG DAN KACA


1 Engsel Pintu 4" Bh 30,000.00
2 Engsel Pintu 3" Bh 20,000.00
3 Grendel Pintu 3" Bh 25,000.00
4 Grendel Pintu 2" Bh 10,000.00
5 Kait Angin Bh 25,000.00
6 Kaca Bening 5 mm M2 204,400.00
7 Sealant Tube 35,000.00
8 Karet M' 2,600.00
HARGA SATUAN
NO. URAIAN SATUAN
( Rp. )
G. BAHAN INSTALASI LISTRIK
1 Titik Cahaya Ttk 125,000.00
2 Saklar Ganda Bh 35,000.00
3 Saklar Tunggal Bh 25,000.00
4 Stop Kontak Bh 25,000.00
5 Fetting Down Ligh - 888 4" Bh 60,000.00
6 Fetting Down Ligh - 888 3" Bh 55,000.00
7 Fetting Tempel Bh 50,000.00
8 Fetting Kembang Bh 15,000.00
9 Philips PLC 23 Watt Bh 55,000.00
10 Philips PLC 18 Watt Bh 45,000.00
11 Seal Type Bh 15,000.00
12 Box MCB 1 - 4 Group Unit 50,000.00

H. BAHAN SANITASI
1 Titik Instalasi Air Bersih Ttk 150,000.00
2 Titik Instalasi Air Kotor Ttk 125,000.00
3 Clesed Duduk Unit 3,200,000.00
4 Closed Jongkok Unit 350,000.00
5 Wastafer Warna + Kaca Unit 700,000.00
6 Kran Air Stainless Steel Bh 30,000.00
7 Floor Drain Stainless Steel Bh 100,000.00
8 Hand Shower Mandi Bh 250,000.00
9 Hand Shower Closed Bh 225,000.00
10 Seal Type Bh 2,500.00
11 Septic Tank dan Perseapan Unit 6,500,000.00

I. BAHAN CAT
1 Plamir Tembok Kg 65,000.00
2 Waterproofing (MU) Kg 85,000.00
3 Thiner Ltr 45,000.00
4 Minyak Cat Batu Alam Ltr 20,000.00
5 Cat Dasar Tembok Kg 30,000.00
6 Cat Tembok Kg 65,000.00
7 Minyak Bakesting Ltr 6,500.00
8 Tepung Gypsum /Compout Kg 7,000.00
9 Kertas Aplas Lbr 7,000.00

J. PERALATAN
1 BULLDOZER 150-215 HP /Jam 865,422.46
2 MOTOR GRADER >100 HP 350,490.09
3 VIBRATORY ROLLER 309,878.03
4 WATER TANKER 269,116.58
5 EXCAVATOR 341,208.70
6 WHEEL ROLLER 520,433.21
7 DUMP TRUCK 193,165.12