NO. URAIAN SAT AGUSTUS AGUSTUS - SEPTEMBER OKTOBER NOVEMBER DESEMBER KETERANGAN
VOLUME JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA BOBOT 02-06 07-13 14-20 21-27 28-03 04-10 11-17 18-24 25-01 02-08 09-15 16-22 23-29 30-05 06-12 13-19 20-26 27-03 04-10 11-14
IV
1
PEKERJAAN TROTOAR & KANSTEEN
Kanstin Trotoar 40 x 28 x 15 x 12 (Pengunci Lantai) K250 ml 1,222.00 344,481,800.00 2.74 1,279.00 360,550,100.00 2.87 0.96 0.96 0.96
80.00
2 Kanstin Type S 40 x 20 x 20 (Pinggir Aspal ) K250 ml 1,931.00 532,569,800.00 4.24 1,469.07 405,169,506.00 3.23 1.08 1.08 1.08
3 Kanstin Taman 40 x20 x10 K250 ml 1,145.00 315,791,000.00 2.51 1,549.00 427,214,200.00 3.40 1.13 1.13 1.13
4 Pek. Pondasi Footplat Lampu Jalan (PJU)
Beton Campuran 1:2:3 (Pc:Ps:Kr) m3 0.43 473,000.00 0.004 0.43 473,000.00 0.00 0.004
Bekisting m2 32.06 - 32.06 - -
Pembesian Kg 32.06 522,578.00 0.004 32.06 522,578.00 0.00 0.004
5 Pek. Kolom Pedestal Lampu Jalan (PJU)
Beton Campuran 1:2:3 (Pc:Ps:Kr) m3 1.26 1,386,000.00 0.01 1.26 1,386,000.00 0.01 0.01 70.00
Bekisting m2 15.36 - 15.36 - -
Pembesian Kg 93.47 1,523,561.00 0.01 4,638.33 75,604,808.31 0.60 0.60
Angkur m16 x 60 cm Bh 24.00 799,200.00 0.01 24.00 799,200.00 0.01 0.01
Base Plate 10 mm Kg 71.48 3,130,824.00 0.02 71.48 3,130,824.00 0.02 0.02
VI PEKERJAAN BAJA/BESI
1 Plat Baja Cor Tutup Bak Control/Manhole UK. 80x80 cm ( Engsel) bh 26.00 29,874,000.00 0.24 11.00 12,639,000.00 0.10 0.10
2 Grill Inlet Beton dan Penutup 40x20 cm tebal plat 8 cm K300 bh 26.00 39,556,400.00 0.32 11.00 16,735,400.00 0.13
VI PEKERJAAN ELEKTRIKAL
1
2
Pengadaan PJU SOLAR PANEL TIANG GANDA 9 METER 100 WATT
Pemasangan PJU SOLAR PANEL TIANG GANDA 9 METER 100 WATT
titik
titik
6.00
6.00
110,994,000.00
8,602,200.00
0.88
0.07
6.00
6.00
110,994,000.00
8,602,200.00
0.88
0.07
0.88
0.03 0.03
40.00
B PEKERJAAN JALAN
I UMUM
1.17 Pengamanan Lingkungan Hidup
1.17.(2c) pengujian Parameter Kebisingan dan/atau Getaran Lainnya…. buah 3.00 1,420,500.00 0.01 3.00 1,420,500.00 0.01 0.004 0.004 0.004
1.17.(3b) Pengujian sulfurdioksida (SO2) buah 3.00 1,642,500.00 0.01 3.00 1,642,500.00 0.01
1.17.(3f)
1.17.(3g)
Pengujian Total Partikulat (TSP) - Debu
Pengujian Timah Hitam (Pb)
buah
buah
3.00
3.00
1,652,700.00
1,582,800.00
0.01
0.01
3.00
3.00
1,652,700.00
1,582,800.00
0.01
0.01
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
30.00
II DRAINASE
2.1 (1) Galian Untuk Selokan Drainase dan Saluran Air m3 3,326.92 173,332,532.00 1.38 252.28 13,143,788.00 0.10 0.03 0.03 0.03
2.3 (13) Gorong-gorong Kotak Beton Bertulang, Uk. Dalam 60 x 60 cm m1 390.00 588,978,000.00 4.69 196.52 296,787,524.40 2.36 0.59 0.59 0.59 0.59
2.3 (14) Gorong-gorong Kotak Beton Bertulang, Uk. Dalam 80 x 80 cm m1 268.00 607,422,000.00 4.84 90.00 203,985,000.00 1.62 0.41 0.41 0.41 0.41
IV PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A m3 4,480.59 2,134,105,017.00 17.00 4,638.33 2,209,237,435.44 17.59 3.52 3.52 3.52 3.52 3.52
V PERKERASAN ASPAL
6.1.(1) Lapis Resap Pengikat - Aspal cair/Emulsi Liter 11,948.23 172,054,512.00 1.37 13,001.78 187,225,689.60 1.49 0.30 0.30 0.30 0.30 0.30
6.3.(6a) Laston Lapis Antara (AC-BC) Ton 2,139.49 3,681,679,321.29 29.32 2,213.55 3,809,123,324.55 30.34 6.07 6.07 6.07 6.07 6.07 10.00
VI STRUKTUR
7.9.(1) Pasangan Batu m3 81.14 82,024,426.00 0.65 576.46 582,743,414.00 4.64 2.32 2.32
IV
1
PEKERJAAN TROTOAR & KANSTEEN
Kanstin Trotoar 40 x 28 x 15 x 12 (Pengunci Lantai) K250 ml 1,222.00 344,481,800.00 2.74 0.91 0.91 0.91
80.00
2 Kanstin Type S 40 x 20 x 20 (Pinggir Aspal ) K250 ml 1,931.00 532,569,800.00 4.24 1.41 1.41 1.41
3 Kanstin Taman 40 x20 x10 K250 ml 1,145.00 315,791,000.00 2.51 0.84 0.84 0.84
4 Pek. Pondasi Footplat Lampu Jalan (PJU)
Beton Campuran 1:2:3 (Pc:Ps:Kr) m3 0.43 473,000.00 0.00 0.00
Bekisting m2 32.06 -
Pembesian Kg 32.06 522,578.00 0.00 0.00
5 Pek. Kolom Pedestal Lampu Jalan (PJU)
Beton Campuran 1:2:3 (Pc:Ps:Kr) m3 1.26 1,386,000.00 0.01 0.01
70.00
Bekisting m2 15.36 -
Pembesian Kg 93.47 1,523,561.00 0.01 0.01
Angkur m16 x 60 cm Bh 24.00 799,200.00 0.01 0.01
Base Plate 10 mm Kg 71.48 3,130,824.00 0.02 0.02
VI PEKERJAAN BAJA/BESI
1 Plat Baja Cor Tutup Bak Control/Manhole UK. 80x80 cm ( Engsel) bh 26.00 29,874,000.00 0.24 0.24
2
VII
Grill Inlet Beton dan Penutup 40x20 cm tebal plat 8 cm K300
VI PEKERJAAN ELEKTRIKAL
1
2
Pengadaan PJU SOLAR PANEL TIANG GANDA 9 METER 100 WATT
Pemasangan PJU SOLAR PANEL TIANG GANDA 9 METER 100 WATT
titik
titik
6.00
6.00
110,994,000.00
8,602,200.00
0.88
0.07
0.88
0.03 0.03
40.00
B PEKERJAAN JALAN
I UMUM
1.17 Pengamanan Lingkungan Hidup
1.17.(2c) pengujian Parameter Kebisingan dan/atau Getaran Lainnya…. buah 3.00 1,420,500.00 0.01 0.00 0.00 0.00
1.17.(3b)
1.17.(3f)
Pengujian sulfurdioksida (SO2)
Pengujian Total Partikulat (TSP) - Debu
buah
buah
3.00
3.00
1,642,500.00
1,652,700.00
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00 30.00
1.17.(3g) Pengujian Timah Hitam (Pb) buah 3.00 1,582,800.00 0.01 0.00 0.00 0.00
II DRAINASE
2.1 (1) Galian Untuk Selokan Drainase dan Saluran Air m3 3,326.92 173,332,532.00 1.38 0.46 0.46 0.46
2.3 (13) Gorong-gorong Kotak Beton Bertulang, Uk. Dalam 60 x 60 cm m1 390.00 588,978,000.00 4.69 1.17 1.17 1.17 1.17
2.3 (14) Gorong-gorong Kotak Beton Bertulang, Uk. Dalam 80 x 80 cm m1 268.00 607,422,000.00 4.84 1.21 1.21 1.21 1.21
IV PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A m3 4,480.59 2,134,105,017.00 17.00 3.40 3.40 3.40 3.40 3.40
V PERKERASAN ASPAL
6.1.(1) Lapis Resap Pengikat - Aspal cair/Emulsi
6.3.(6a) Laston Lapis Antara (AC-BC)
Liter
Ton
11,948.23
2,139.49
172,054,512.00
3,681,679,321.29
1.37
29.32
0.27
5.86
0.27
5.86
0.27
5.86
0.27
5.86
0.27
5.86 10.00
VI STRUKTUR
7.9.(1) Pasangan Batu m3 81.14 82,024,426.00 0.65 0.33 0.33
Jumlah
Kumulatif
12,556,439,295.29 100.00 0.02
0.02
0.74
0.76
0.74
1.50
2.22
3.72
1.76
5.48
3.02
8.50
3.47
11.97
2.38
14.35
3.31
17.66
3.15
20.81
3.28
24.09
5.65
29.74
11.88
41.62
11.99
53.62
14.32
67.94
14.32
82.26
9.42
91.68
3.28
94.96
2.06
97.02
2.98
100.00
0.00
Deviasi (+/-)