Anda di halaman 1dari 56

DAFTAR KUANTITAS DAN HARGA

PROGRAM : (1.03.1.03.01.15) PEMBANGUNAN JALAN DAN JEMBATAN


KEGIATAN : (1.03.1.03.01.15.03) PEMBANGUNAN JALAN
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
LOKASI : KECAMATAN BALONGOPANGGANG KABUPATEN GRESIK
VOLUME : PJ. 825,00 M ; LB. 7,00 M
SUMBER DANA : APBD TAHUN ANGGARAN 2016
KONTRAKTOR : PT. BIMA SAKTI ADHINATA

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
( Rp ) ( Rp )

DIVISI 1 UMUM
- Pembuatan Direksikeet Unit 1.00 5,000,000.00 5,000,000.00
- Pengukuran Ls 1.00 5,000,000.00 5,000,000.00
- Pas. Papan Nama Proyek Bh 2.00 1,000,000.00 2,000,000.00
- Pengaman Lalu Lintas Ls 1.00 3,000,000.00 3,000,000.00
- Mobilisasi / Demobilisasi Alat Ls 1.00 10,000,000.00 10,000,000.00
- Pembersihan Ls 1.00 3,000,000.00 3,000,000.00
Sub total I 28,000,000.00
DIVISI 3 PEKERJAAN TANAH
3.1(1) Galian Biasa (menggunakan alat berat) M3 1,466.15 25,757.84 37,764,850.83
- Galian Tanah Biasa M3 253.07 51,562.50 13,048,921.88
- Urugan Pasir M3 36.32 180,391.75 6,551,828.36
- Urugan Tanah Kembali Dengan Pemadatan M3 566.63 19,855.00 11,250,438.65
3.3 Penyiapan Badan Jalan/ Pemadatan Tanah Dasar M2 3,294.60 2,596.16 8,553,299.32
Sub total II 77,169,339.04
DIVISI 5 PEKERJAAN BERBUTIR DAN BETON SEMEN
5.1(1) Lapis Pondasi Agregat Klas A CBR ≥ 90% M3 1,489.74 185,092.68 275,739,966.98
5.1(3) Lapis Pondasi Agregat Klas C (Sirtu) CBR ≥ 35% M3 713.45 171,892.68 122,636,831.53
5.8(1) Lapis Pondasi Dengan Cement Treated Base (CTB) M3 2,277.57 395,779.84 901,416,296.70
5.8(1) Lapis Pondasi Dengan Cement Treated Base (CTB) Leveling M3 262.30 395,779.84 103,813,052.78
Sub total III 1,403,606,147.98
DIVISI 6 PERKERASAN BERASPAL
6.1(1) Lapis Resap Pengikat Ltr 4,678.06 11,598.71 54,259,481.35
6.1(2) Lapis Perekat Ltr 2,339.03 11,652.61 27,255,814.39
6.3(5a) Laston Lapis Aus (AC-WC) = 4cm M2 5,847.57 97,356.22 569,297,293.69
6.3(6a) Laston Lapis Antara (AC-BC) = 6cm M3 350.85 2,247,180.29 788,423,204.47
8.4(1) Marka Jalan Thermoplastic M2 239.53 103,906.79 24,888,792.38
Sub total IV 1,464,124,586.28
DIVISI 7 STRUKTUR
- Pasangan Batu Kali 1:4 M3 611.14 496,128.60 303,205,936.50
- Plesteran 1Pc : 3Psr Tebal 1,5cm M2 258.75 60,909.20 15,760,255.50
- Pemasangan Geotextile Woven 250gr/m2 M2 6,109.80 15,502.30 94,715,952.54
Sub total V 413,682,144.54
TOTAL 3,386,582,217.84

Gresik, _________2016

3,386,582,217.84
Pagu

#REF! B. PENGADAAN DAN PEMASANGAN L. GUTTER 2500


PERHITUNGAN STRUKTUR PERHITUNGAN STRUKTUR
Panjang Area Vol Panjang Area Vol
Lapis Pondasi Agregat Klas A CBR ≥ 90% Leg Gutter 2500/1250 -1200
99.00 2.000 198.00 81.60 2.00 163.20
Galian Tanah Timbunan Pasir t = 10cm
198.00 0.220 43.56 81.60 0.94 76.70
Rabat Beton t = 5 cm Rabat Beton t = 5 cm
198.00 0.015 2.97 81.60 0.47 38.35
Sloof 20 x 20 Sloof 20 x 20
0.040 - 163.20 0.04 6.53
Plat Beton t = 20 cm Plat Beton t = 20 cm
0.900 - 81.60 1.30 106.08

Pasang Terucuk Bongkotan panjang 2 m - jarak 0.50 m Pasang Terucuk Bongkotan panjang 3 m - jarak 0.50 m
4.00 2.00 198.000 1,584.00 19.00 1.00 81.60 1,550.40

Pekerjaan Pengecatan
81.60 0.40 32.64

Urugan Pedel dipadatkan


Patok Jarak Luas timbunan Rata2
P61 0 3.0698 4.7070
P62 32 6.3442 4.0710
MOROWUDI P63 50 1.7988 0.8990
Patok Jarak Luas Galian Luas Galian Rata2 Volume
P0 5.1561 5.2060 -
P1 5.2571 6.6670 -
P2 8.0778 5.6620 -
P3 3.2468 4.4460 -
P4 5.6455 5.3100 -
P5 4.9745 5.1380 -
P6 5.3023 6.0300 -
P7 6.7579 6.9350 -
P8 7.1136 4.4910 -
P9 1.8696 3.6660 -
P10 5.4632 6.4290 -
P11 7.3956 5.9530 -
P12 4.5118 4.3320 -
P13 4.1540 4.8330 -
P14 5.5125 6.3740 -
P15 7.2372 5.9120 -
P16 4.5882 5.9220 -
P17 7.2575 7.2740 -
P18 7.2911 6.3950 -
P19 5.5000 6.3780 -
P20 7.2560 5.7240 -
P21 4.1927 5.7160 -
P22 7.2410 7.7370 -
P23 8.2334 6.7580 -
P24 5.2831 5.7020 -
P25 6.1221 6.8930 -
P26 7.6658 6.9310 -
P27 50 6.1972 4.6400 232.000
P28 50 3.0956 4.6000 230.000
P29 50 6.1238 5.0000 250.000
P30 50 3.8846 3.8300 191.500
P31 50 3.7811 3.3600 168.000
P32 50 2.9485 6.1700 308.500
P33 50 9.4012 10.1300 506.500
P34 50 10.8787 9.9200 496.000
P35 50 8.9798 9.5100 475.500
P36 50 10.0542 8.0900 404.500
P37 50 6.1288 6.5300 326.500
P38 50 6.9441 6.9000 345.000
P39 50 6.8584 7.5700 378.500
P40 50 8.3011 9.4500 472.500
P41 50 10.6141 8.6700 433.500
P42 50 6.7390 7.3300 366.500
P43 50 7.9318 6.3500 317.500
P44 50 4.7764 4.7600 238.000
P45 50 4.7515 4.6700 233.500
P46 50 4.6039 4.6600 233.000
P47 50 4.7321 4.6600 233.000
P48 50 4.5970 5.9800 299.000
P49 50 7.3719 7.3800 369.000
P50 50 7.4012 6.7400 337.000
P51 50 6.0816 6.4800 324.000
P52 50 6.8902 5.9900 299.500
P53 50 5.0966 5.1500 257.500
P54 50 5.2164 5.5800 279.000
P55 50 5.9437 6.0000 300.000
P56 50 6.0611 4.6300 231.500
P57 50 3.2188 4.4000 220.000
P58 50 5.5910 7.0400 352.000
P59 50 8.4891 6.4200 321.000
P60 50 4.3573 4.0200 201.000
P61 50 3.6918 3.7000 185.000
P62 50 3.7110 3.8000 190.000
P63 50 3.8973 4.1900 209.500
P64 50 4.4998 4.4100 220.500
P65 50 4.3361 4.8200 241.000
P66 50 5.3143 5.7800 289.000
P67 50 6.2466 5.8600 293.000
P68 50 5.4883 5.4700 273.500
P69 50 5.4683 5.8800 294.000
P70 50 6.2928 6.8000 340.000
P71 0 7.3205 3.6600 -
2,200.00 ###
pcs

B. PENGADAAN DAN PEMASANGAN L. GUTTER 2500 /1250 -1200 K -300

68.00 pcs
81.60

p. plat 6.50

Pasang Terucuk Bongkotan panjang 3 m - jarak 0.50 m

Volume
-
128.640
44.950
173.590
CONTRACT CHANGE ORDER
MUTUAL CHECK 100 %
PROGRAM : (1.03.1.03.01.15) PEMBANGUNAN JALAN DAN JEMBATAN
KEGIATAN : (1.03.1.03.01.15.03) PEMBANGUNAN JALAN
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
LOKASI : KECAMATAN BALONGOPANGGANG KABUPATEN GRESIK
VOLUME : PJ. 825,00 M ; LB. 7,00 M
SUMBER DANA : APBD TAHUN ANGGARAN 2016
KONTRAKTOR : PT. BIMA SAKTI ADHINATA

MUTUAL CHECK (MC-0) TAMBAH KURANG MUTUAL CHECK (MC-100)


No. Mata
URAIAN PEKERJAAN SAT.
Pembayaran Volume PROSEN (%) Volume
Volume Harga Satuan Jumlah Harga JUMLAH JUMLAH Volume Jumlah Harga
Tambah VOLUME Kurang
1 2 3 4 6 7 = 4*6 8 9 = 8*6 10 11 12 = 11*6 13 14 = 13*6
DIVISI 1 UMUM
- Pembuatan Direksikeet Unit 1.00 5,000,000.00 5,000,000.00 - - 0.00% - - 1.00 5,000,000.00
- Pengukuran Ls 1.00 5,000,000.00 5,000,000.00 - - 0.00% - - 1.00 5,000,000.00
- Pas. Papan Nama Proyek Bh 2.00 1,000,000.00 2,000,000.00 - - 0.00% - - 2.00 2,000,000.00
- Pengaman Lalu Lintas Ls 1.00 3,000,000.00 3,000,000.00 - - 0.00% - - 1.00 3,000,000.00
- Mobilisasi / Demobilisasi Alat Ls 1.00 10,000,000.00 10,000,000.00 - - 0.00% - - 1.00 10,000,000.00
- Pembersihan Ls 1.00 3,000,000.00 3,000,000.00 - - 0.00% - - 1.00 3,000,000.00
Jumlah harga pekerjaan DIVISI 1 ( Masuk Pada Rekapitulasi Perkiraan Harga Pekerjaan ) 28,000,000.00 - - 28,000,000.00
DIVISI 3 PEKERJAAN TANAH
3.1(1) Galian Biasa (menggunakan alat berat) M3 1,461.60 25,757.84 37,647,652.68 - - 0.00% - - 1,461.60 37,647,652.68
- Galian Tanah Biasa M3 226.73 51,562.50 11,690,550.61 - - 1.59% 3.61 186,390.20 223.11 11,504,160.41
- Urugan Pasir M3 34.68 180,391.75 6,256,617.26 1.47 265,980.29 4.25% - - 36.16 6,522,597.56
- Urugan Tanah Kembali Dengan Pemadatan M3 212.33 19,855.00 4,215,750.10 44.16 876,763.71 20.80% - - 256.49 5,092,513.81
3.3 Penyiapan Badan Jalan/ Pemadatan Tanah Dasar M2 3,450.00 2,596.16 8,956,742.14 - - 0.00% - - 3,450.00 8,956,742.14
Jumlah harga pekerjaan DIVISI 3 ( Masuk Pada Rekapitulasi Perkiraan Harga Pekerjaan ) 68,767,312.80 1,142,744.00 186,390.20 69,723,666.60
DIVISI 5 PEKERJAAN BERBUTIR DAN BETON SEMEN
5.1(1) Lapis Pondasi Agregat Klas A CBR ≥ 90% M3 1,211.40 185,092.68 224,221,270.82 - - 0.00% - - 1,211.40 224,221,270.82
5.1(3) Lapis Pondasi Agregat Klas C (Sirtu) CBR ≥ 35% M3 873.23 171,892.68 150,102,381.10 - - 7.14% 62.39 10,724,326.32 810.84 139,378,054.78
5.8(1) Lapis Pondasi Dengan Cement Treated Base (CTB) M3 2,278.66 395,779.84 901,848,686.17 - - 0.00% - - 2,278.66 901,848,686.17
Lapis Pondasi Dengan Cement Treated Base (CTB) Leveling M3 255.77 395,779.84 101,229,352.49 - - 0.00% - - 255.77 101,229,352.49
Jumlah harga pekerjaan DIVISI 5 ( Masuk Pada Rekapitulasi Perkiraan Harga Pekerjaan ) 1,377,401,690.59 - 10,724,326.32 1,366,677,364.27
DIVISI 6 PERKERASAN BERASPAL
6.1(1) Lapis Resap Pengikat Ltr 4,341.60 11,598.71 50,356,977.94 - - 0.00% - - 4,341.60 50,356,977.94
6.1(2) Lapis Perekat Ltr 2,458.00 11,652.61 28,642,125.91 - - 0.00% - - 2,458.00 28,642,125.91
6.3(5a) Laston Lapis Aus (AC-WC) = 4cm M2 6,117.50 97,356.22 595,576,657.34 - - 0.00% - - 6,117.50 595,576,657.34
6.3(6a) Laston Lapis Antara (AC-BC) = 6cm M3 367.56 2,247,180.29 825,973,587.10 - - 0.00% - - 367.56 825,973,587.10
8.4(1) Marka Jalan Thermoplastic M2 252.84 103,906.79 26,271,791.70 - - 0.00% - - 252.84 26,271,791.70
Jumlah harga pekerjaan DIVISI 6 ( Masuk Pada Rekapitulasi Perkiraan Harga Pekerjaan ) 1,526,821,139.99 - - 1,526,821,139.99
DIVISI 7 STRUKTUR
- Pasangan Batu Kali 1:4 M3 541.918 496,128.60 268,860,849.97 19.69 9,767,972.52 3.63% - - 561.61 278,628,822.49
- Plesteran 1Pc : 3Psr Tebal 1,5cm M2 301.95 60,909.20 18,391,532.94 - - 0.00% - - 301.95 18,391,532.94
- Pemasangan Geotextile Woven 250gr/m2 M2 6,344.20 15,502.30 98,349,691.66 - - 0.00% - - 6,344.20 98,349,691.66
Jumlah harga pekerjaan DIVISI 7 ( Masuk Pada Rekapitulasi Perkiraan Harga Pekerjaan ) 385,602,074.57 9,767,972.52 - 395,370,047.09
NILAI PEKERJAAN (JUMLAH SUB TOTAL) 3,386,592,217.95 10,910,716.52 10,910,716.52 3,386,592,217.95
DIBULATKAN 3,386,592,000.00 10,910,000.00 10,910,000.00 3,386,592,000.00
PPN 10% 338,659,200.00 1,091,000.00 1,091,000.00 338,659,200.00
TOTAL NILAI PEKERJAAN 3,725,251,200.00 12,001,000.00 12,001,000.00 3,725,251,200.00
0.28 0.26 -
Mengetahui/Diketahui Oleh, Disetujui Oleh, Diperiksa oleh, Dibuat oleh, 1.36
KABID PENINGKATAN DAN PEMBANGUNAN KASIE OPERASI DAN PEMELIHARAAN Konsultan Supervisi Kontraktor Pelaksana
JALAN DAN JEMBATAN BIDANG PENINGKATAN DAN PEMBANGUNAN JALAN CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA
DPU KABUPATEN GRESIK DPU KABUPATEN GRESIK
Selaku ; Selaku ;
PEJABAT PEMBUAT KOMITMEN (PPK) PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

DHIANNITA TRI ASTUTI, ST. RIZAL SULISTYO NUGROHO, ST. MT SONNY ADINAWAN, ST VREDO EKA ADHINATA
Pembina Tingkat 1 Penata Tingkat 1 Direktur Direktur
NIP. 19730416 199901 2 002 NIP. 19730616 199901 11
REKAPITULASI VOLUME PEKERJAAN

KEGIATAN : PEMBANGUNAN JALAN


PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA
KONSULTAN : CV. MCE CONSULTANT

NO. ITEM URAIAN SATUAN KUANTITAS KETERANGAN

DIVISI 1 UMUM

- Pembuatan Direksikeet Unit 1.00

- Pengukuran Ls 1.00

- Pas. Papan Nama Proyek Bh 2.00

- Pengaman Lalu Lintas Ls 1.00

- Mobilisasi / Demobilisasi Alat Ls 1.00

- Pembersihan Ls 1.00

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST Ir. ABDUL HARIS.HA, MT AKHMAD ZAINUL ABIDIN, ST


NIP.19780708 201001 1 010 Site Engineer General Superintendent
REKAPITULASI VOLUME PEKERJAAN

KEGIATAN : PEMBANGUNAN JALAN


PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA
KONSULTAN : CV. MCE CONSULTANT

NO. ITEM URAIAN SATUAN KUANTITAS KETERANGAN

DIVISI 3 PEKERJAAN TANAH

3.1(1) Galian Biasa (menggunakan alat berat) M3 1,461.60

- Galian Tanah Biasa (manual) M3 223.11

- Urugan pasir M3 36.16

- Urugan tanah kembali dan pemadatan M3 256.49

3.3 Penyiapan Badan Jalan M2 3,450.00

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST Ir. ABDUL HARIS.HA, MT AKHMAD ZAINUL ABIDIN, ST


NIP.19780708 201001 1 010 Site Engineer General Superintendent
Item Pekerjaan : Galian Biasa (menggunakan alat
berat)
KEGIATAN : PEMBANGUNAN JALAN
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 3.1(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 4

MUTUAL CHECK
MC 0 %
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Atas Lebar Bawah Lebar Tebal Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m) (m3)
1 2 3 4 5 6 7=(5+6)/2 8 9 = 4*7

Pelebaran

0+000.00 - 0+025.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+025.00 - 0+050.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+050.00 - 0+075.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+075.00 - 0+100.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+100.00 - 0+125.00 L 25.00 2.00 2.00 2.00 0.80 40.00

0+125.00 - 0+150.00 L 25.00 2.00 2.00 2.00 0.80 40.00

0+150.00 - 0+175.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+175.00 - 0+200.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+200.00 - 0+225.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+225.00 - 0+250.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+250.00 - 0+275.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+275.00 - 0+300.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+300.00 - 0+325.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+325.00 - 0+350.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+350.00 - 0+375.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+375.00 - 0+400.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+400.00 - 0+425.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+425.00 - 0+450.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+450.00 - 0+475.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+475.00 - 0+500.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+500.00 - 0+525.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+525.00 - 0+550.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+550.00 - 0+575.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+575.00 - 0+600.00 L 25.00 2.00 2.00 2.00 0.40 20.00

Total : 520.00

Komulatif : 520.00
Item Pekerjaan : Galian Biasa (menggunakan alat
KEGIATAN : PEMBANGUNAN JALAN berat)
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 3.1(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 2 dari 4

MUTUAL CHECK
MC 0 %
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Atas Lebar Bawah Lebar Tebal Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m) (m3)
1 2 3 4 5 6 7=(5+6)/2 8 9 = 4*7

Pelebaran

0+600.00 - 0+621.00 L 21.00 2.00 2.00 2.00 0.40 16.80

0+621.00 - 0+625.00 JEMBATAN

0+625.00 - 0+651.00 L 26.00 2.00 2.00 2.00 0.40 20.80

0+651.00 - 0+676.00 L 25.00 1.60 1.60 1.60 0.40 16.00

0+676.00 - 0+701.00 L 25.00 1.60 1.60 1.60 0.40 16.00

0+701.00 - 0+726.00 L 25.00 1.60 1.60 1.60 0.40 16.00

0+726.00 - 0+735.00 L 9.00 2.00 2.00 2.00 0.40 7.20

0+735.00 - 0+750.00 L 15.00 2.00 2.00 2.00 0.40 12.00

0+750.00 - 0+775.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+775.00 - 0+800.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+800.00 - 0+825.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+825.00 - 0+840.00 L 15.00 2.00 2.00 2.00 0.40 12.00

0+840.00 0+870.00 L 30.00 2.00 2.00 2.00 0.40 24.00

Total : 200.80

Komulatif : 720.80

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
Item Pekerjaan : Galian Biasa (menggunakan alat
KEGIATAN : PEMBANGUNAN JALAN berat)
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 3.1(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 3 dari 4

MUTUAL CHECK
MC 0 %
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Atas Lebar Bawah Lebar Tebal Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m) (m3)
1 2 3 4 5 6 7=(5+6)/2 8 9 = 4*7

Pelebaran

0+000.00 - 0+025.00 R 25.00 2.00 2.00 2.00 0.80 40.00

0+025.00 - 0+050.00 R 25.00 2.00 2.00 2.00 0.80 40.00

0+050.00 - 0+075.00 R 25.00 2.00 2.00 2.00 0.80 40.00

0+075.00 - 0+100.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+100.00 - 0+125.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+125.00 - 0+150.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+150.00 - 0+175.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+175.00 - 0+200.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+200.00 - 0+225.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+225.00 - 0+250.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+250.00 - 0+275.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+275.00 - 0+300.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+300.00 - 0+325.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+325.00 - 0+350.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+350.00 - 0+375.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+375.00 - 0+400.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+400.00 - 0+425.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+425.00 - 0+450.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+450.00 - 0+475.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+475.00 - 0+500.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+500.00 - 0+525.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+525.00 - 0+550.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+550.00 - 0+575.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+575.00 - 0+600.00 R 25.00 2.00 2.00 2.00 0.40 20.00

Total : 540.00

Komulatif : 1,260.80
Item Pekerjaan : Galian Biasa (menggunakan alat
KEGIATAN : PEMBANGUNAN JALAN berat)
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 3.1(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 4 dari 4

MUTUAL CHECK
MC 0 %
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Atas Lebar Bawah Lebar Tebal Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m) (m3)
1 2 3 4 5 6 7=(5+6)/2 8 9 = 4*7*8

Pelebaran

0+600.00 - 0+621.00 R 21.00 2.00 2.00 2.00 0.40 16.80

0+621.00 - 0+625.00 R
JEMBATAN
0+625.00 - 0+650.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+650.00 - 0+675.00 R 25.00 1.60 1.60 1.60 0.40 16.00

0+675.00 - 0+700.00 R 25.00 1.60 1.60 1.60 0.40 16.00

0+700.00 - 0+725.00 R 25.00 1.60 1.60 1.60 0.40 16.00

0+725.00 - 0+735.00 R 10.00 2.00 2.00 2.00 0.40 8.00

0+735.00 - 0+750.00 R 15.00 2.00 2.00 2.00 0.40 12.00

0+750.00 - 0+775.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+775.00 - 0+800.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+800.00 - 0+825.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+825.00 - 0+840.00 R 15.00 2.00 2.00 2.00 0.40 12.00

0+840.00 - 0+870.00 R 30.00 2.00 2.00 2.00 0.40 24.00

Total : 200.80

Komulatif : 1,461.60

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Galian Tanah Biasa (manual)
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No Item Pemby. : -
KONSULTAN : CV. MCE CONSULTANT Satuan : M3
Halaman : 1 dari 2
MUTUAL CHECK
MC -100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar 1 Tebal Luas Luas Rata2 Volume
L/R ( m' ) ( m' ) ( m' ) (m) (m) (m3)

0+175.00 L 0.55 0.65 0.36


46.00 0.35 15.90
0+221.00 L 0.53 0.63 0.33

0+229.00 L 0.50 0.60 0.30


21.00 0.32 6.62
0+250.00 L 0.55 0.60 0.33
45.00 0.30 13.70
0+295.00 L 0.56 0.50 0.28
55.00 0.26 14.55
0+350.00 L 0.50 0.50 0.25
47.00 0.28 12.93
0+397.00 L 0.50 0.60 0.30

0+463.00 L 0.50 0.50 0.25


6.00 0.28 1.65
0+469.00 L 0.50 0.60 0.30
28.00 0.30 8.40
0+497.00 L 0.50 0.60 0.30

0+522.00 L 0.60 0.70 0.42


28.00 0.42 11.76
0+550.00 L 0.60 0.70 0.42
50.00 0.36 18.00
0+600.00 L 0.50 0.60 0.30
21.00 0.30 6.30
0+621.00 L 0.50 0.60 0.30

0+638.00 L 0.50 0.50 0.25


12.00 0.28 3.30
0+650.00 L 0.50 0.60 0.30
35.00 0.30 10.50
0+685.00 L 0.50 0.60 0.30

0+695.00 L 0.50 0.60 0.30


5.00 0.30 1.50
0+700.00 L 0.50 0.60 0.30
25.00 0.30 7.50
0+725.00 L 0.50 0.60 0.30

0+828.00 L 0.50 0.60 0.30


15.00 0.30 4.50
0+843.00 L 0.50 0.60 0.30
10.00 0.30 3.00
0+853.00 L 0.50 0.60 0.30
Total : 140.11
Komulatif : 140.11

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Galian Tanah Biasa (manual)
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No Item Pemby. : -
KONSULTAN : CV. MCE CONSULTANT Satuan : M3
Halaman : 2 dari 2
MUTUAL CHECK
MC -100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar 1 Tebal Luas Luas Rata2 Volume
L/R ( m' ) ( m' ) ( m' ) (m) (m) (m3)

Pasangan Batu
0+095.00 R 0.60 0.70 0.42
44.00 0.37 16.31
0+139.00 R 0.52 0.62 0.32

0+271.00 R 0.60 0.70 0.42


24.00 0.42 10.08
0+295.00 R 0.60 0.70 0.42

0+469.00 R 0.65 0.75 0.49


33.00 0.45 14.97
0+502.00 R 0.60 0.70 0.42

0+522.00 R 0.60 0.70 0.42


28.00 0.42 11.76
0+550.00 R 0.60 0.70 0.42
50.00 0.39 19.44
0+600.00 R 0.55 0.65 0.36
21.00 0.30 6.25
0+621.00 R 0.44 0.54 0.24

0+830.00 R 0.60 0.50 0.30


13.00 0.28 3.64
0+843.00 R 0.52 0.50 0.26

0+853.00 R 0.60 0.10 0.06


2.00 0.06 0.12
0+855.00 R 0.60 0.10 0.06
7.00 0.06 0.44
0+862.00 R 0.65 0.10 0.07

Total : 83.00
Komulatif : 223.11

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Urugan pasir
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No Item Pemby. : -
KONSULTAN : CV. MCE CONSULTANT Satuan : M3
Halaman : 1 dari 2
MUTUAL CHECK
MC - 100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar 1 Tebal Luas Luas Rata2 Volume
L/R ( m' ) ( m' ) ( m' ) (m2) (m2) (m3)

0+175.00 L 0.55 0.10 0.06


46.00 0.05 2.48
0+221.00 L 0.53 0.10 0.05

0+229.00 L 0.50 0.10 0.05


21.00 0.05 1.10
0+250.00 L 0.55 0.10 0.06
45.00 0.06 2.49
0+295.00 L 0.56 0.10 0.06
55.00 0.05 2.91
0+350.00 L 0.50 0.10 0.05
47.00 0.05 2.35
0+397.00 L 0.50 0.10 0.05

0+463.00 L 0.50 0.10 0.05


6.00 0.05 0.30
0+469.00 L 0.50 0.10 0.05
28.00 0.05 1.40
0+497.00 L 0.50 0.10 0.05

0+522.00 L 0.60 0.10 0.06


28.00 0.06 1.68
0+550.00 L 0.60 0.10 0.06
50.00 0.06 2.75
0+600.00 L 0.50 0.10 0.05
21.00 0.05 1.05
0+621.00 L 0.50 0.10 0.05

0+638.00 L 0.50 0.10 0.05


12.00 0.05 0.60
0+650.00 L 0.50 0.10 0.05
35.00 0.05 1.75
0+685.00 L 0.50 0.10 0.05

0+695.00 L 0.50 0.10 0.05


5.00 0.05 0.25
0+700.00 L 0.50 0.10 0.05
25.00 0.05 1.25
0+725.00 L 0.50 0.10 0.05

0+828.00 L 0.50 0.10 0.05


15.00 0.05 0.75
0+843.00 L 0.50 0.10 0.05
10.00 0.05 0.50
0+853.00 L 0.50 0.10 0.05
Total : 23.62
Komulatif : 23.62

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Urugan pasir
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No Item Pemby. : -
KONSULTAN : CV. MCE CONSULTANT Satuan : M3
Halaman : 2 dari 2
MUTUAL CHECK
MC - 100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar 1 Tebal Luas Luas Rata2 Volume
L/R ( m' ) ( m' ) ( m' ) (m2) (m2) (m3)

0+095.00 R 0.60 0.10 0.06


44.00 0.06 2.46
0+139.00 R 0.52 0.10 0.05

0+271.00 R 0.60 0.10 0.06


24.00 0.06 1.44
0+295.00 R 0.60 0.10 0.06

0+469.00 R 0.65 0.10 0.07


33.00 0.06 2.06
0+502.00 R 0.60 0.10 0.06

0+522.00 R 0.60 0.10 0.06


28.00 0.06 1.68
0+550.00 R 0.60 0.10 0.06
50.00 0.06 2.75
0+600.00 R 0.50 0.10 0.05
21.00 0.05 1.05
0+621.00 R 0.50 0.10 0.05

0+830.00 R 0.55 0.10 0.06


13.00 0.05 0.64
0+843.00 R 0.44 0.10 0.04

0+853.00 R 0.50 0.10 0.05


2.00 0.05 0.10
0+855.00 R 0.50 0.10 0.05
7.00 0.05 0.35
0+862.00 R 0.50 0.10 0.05

Total : 12.54
Komulatif : 36.16

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Urugan tanah kembali dan pemadatan
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : -
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 2

MUTUAL CHECK
MC -100%
Bidang 1 Bidang 2
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Tinggi Luas Lebar Tinggi Luas Luas Total Volume
L/R ( m' ) ( m' ) ( m' ) (m2) ( m' ) ( m' ) (m2) (m2) (m3)

0+175.00 L 0.50 0.55 0.28 0.50 0.35 0.09 0.36


46.00 15.53
0+221.00 L 0.50 0.45 0.23 0.50 0.35 0.09 0.31
0+229.00 L 0.75 0.35 0.26 0.75 0.30 0.11 0.38
21.00 9.65
0+250.00 L 0.75 0.50 0.38 0.75 0.45 0.17 0.54
45.00 22.42
0+295.00 L 0.85 0.40 0.34 0.75 0.30 0.11 0.45
55.00 17.26
0+350.00 L 0.35 0.40 0.14 0.35 0.20 0.04 0.18
47.00 8.23
0+397.00 L 0.35 0.40 0.14 0.35 0.20 0.04 0.18
0+463.00 L 0.75 0.40 0.30 0.30
6.00 3.00
0+469.00 1.75 0.40 0.70 0.70
L 28.00 13.62
0+497.00 0.75 0.36 0.27 0.27
L
0+522.00 0.85 0.35 0.30 0.85 0.65 0.28 0.57
28.00 14.65
0+550.00 L 0.70 0.35 0.25 0.70 0.65 0.23 0.47
50.00 17.44
0+600.00 L 0.50 0.35 0.18 0.50 0.20 0.05 0.23
21.00 4.73
0+621.00 0.50 0.35 0.18 0.50 0.20 0.05 0.23
L
0+638.00 0.50 0.35 0.18 0.50 0.20 0.05 0.23
L 12.00 2.70
0+650.00 0.50 0.35 0.18 0.50 0.20 0.05 0.23
L 35.00 7.88
0+685.00 0.50 0.35 0.18 0.50 0.20 0.05 0.23
L
0+695.00 0.50 0.35 0.18 0.50 0.20 0.05 0.23
L 5.00 1.09
0+700.00 0.50 0.35 0.18 0.50 0.15 0.04 0.21
L 25.00 5.31
0+725.00 0.50 0.35 0.18 0.50 0.15 0.04 0.21
0+828.00 0.50 0.35 0.18 0.50 0.15 0.04 0.21
L 15.00 3.19
0+843.00 0.50 0.35 0.18 0.50 0.15 0.04 0.21
L 10.00 2.06
0+853.00 0.50 0.35 0.18 0.50 0.10 0.03 0.20
Total : 148.74
Komulatif : 148.74

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Urugan tanah kembali dan pemadatan
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : -
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 2 dari 2

MUTUAL CHECK

Bidang 1 Bidang 2
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Tinggi Luas Lebar Tinggi Luas Volume
L/R ( m' ) ( m' ) Rata2 ( m' ) (m2) ( m' ) Rata2 ( m' ) (m2) (m3)

00+095 R 0.95 0.55 0.52 1.00 0.50 0.25 0.77


44.00 31.90
00+139 R 0.95 0.45 0.43 1.00 0.50 0.25 0.68
00+271 R 0.75 0.55 0.41 0.80 0.50 0.20 0.61
24.00 14.94
00+295 R 0.75 0.55 0.41 0.80 0.55 0.22 0.63
00+469 R 0.75 0.70 0.53 0.80 0.65 0.26 0.79
33.00 25.20
00+502 R 0.75 0.75 0.56 0.80 0.45 0.18 0.74
00+522 R 0.75 0.70 0.53 0.80 0.60 0.24 0.77
28.00 21.42
00+550 R 0.75 0.70 0.53 0.80 0.60 0.24 0.77
50.00
00+600 R 0.75 0.45 0.34 0.70 0.50 0.18 0.51
21.00 9.98
00+621 R 0.75 0.35 0.26 0.70 0.50 0.18 0.44
00+830 R 0.75 0.35 0.26 0.26
13.00 3.64
00+843 R 0.85 0.35 0.30 0.30
00+853 R 0.25 0.15 0.04 0.04
2.00 0.12
00+855 R 0.55 0.15 0.08 0.08
7.00 0.55
00+862 R 0.50 0.15 0.08 0.08

Total : 107.75
Komulatif : 256.49

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
BACK UP PERHITUNGAN
PROGRAM : 1.03.1.03.01.15 PEMBANGUNAN JALAN DAN JEMBATAN
KEGIATAN : 1.03.1.03.01.15.03 PEMBANGUNAN JALAN
KODE REKENING : 5.2.3.21.01 BELANJA MODAL PENGADAAN KONSTRUKSI JALAN
PEKERJAAN : PERENCANAAN PENINGKATAN JALAN BALONGPANGGANG - METATU
LOKASI : KECAMATAN BENJENG KABUPATEN GRESIK
VOLUME : PJ. 1265 M ; L= 7.0 M
SUMBER DANA : APBD TAHUN ANGGARAN 2015
Item Pekerjaan : Urugan pilihan (pedel)

BIDANG 1 BIDANG 2
LUAS TOTAL VOLUME
No URAIAN PEKERJAAN STA SISI PANJANG LEBAR LEBAR RATA - RATA TINGGI TINGGI RATA - RATA LUAS 1 LEBAR LEBAR RATA - RATA TINGGI TINGGI RATA - RATA Luas 2 SATUAN
(M' ) (M' ) (M' ) (M' ) (M2) (M' ) (M' ) (M' ) (M' ) (M2) (M2) (M3)
1 2 3 4 5 6 7 8 9 10 =7*9 11 12 13 14 15=12*14 16=10+15 17=5*16 18
DIVISI 3 PEKERJAAN TANAH
.

0 + 000.0 KIRI 1.99 0.38 - 0.00


50.00 1.78 0.38 0.67 - - 0.00 0.67 33.38
0 + 050.0 KIRI 1.58 0.37 - 0.00
50.00 1.61 0.41 0.66 - - 0.00 0.66 32.80
0 + 100.0 KIRI 1.65 0.45 - 0.00
50.00 1.71 0.43 0.74 - - 0.00 0.74 36.77
0 + 150.0 KIRI 1.78 0.42 - 0.00
28.00 1.78 0.42 0.74 - - 0.00 0.74 20.63
0 + 178.0 KIRI 1.78 0.42 - 0.00

0 + 178.0 KIRI 0.48 0.32 - 0.00


22.00 0.48 0.32 0.15 - - 0.00 0.15 3.35
POSISI PASANGAN 0 + 200.0 KIRI 0.48 0.32 - 0.00
25.00 0.48 0.32 0.15 - - 0.00 0.15 3.81
0 + 225.0 KIRI 0.48 0.32 - 0.00

0 + 225.0 KIRI 1.78 0.42 - 0.00


10.00 1.78 0.42 0.74 - - 0.00 0.74 7.37
0 + 235.0 KIRI 1.78 0.42 - 0.00

0 + 235.0 KIRI 0.77 0.40 1.34 0.53


15.00 0.77 0.40 0.31 1.34 0.53 0.71 1.02 15.27
0 + 250.0 KIRI 0.77 0.40 1.34 0.53
50.00 0.77 0.40 0.31 0.67 0.27 0.18 0.49 24.37
POSISI PASANGAN 0 + 300.0 KIRI 0.77 0.41 - 0.00
50.00 0.39 0.20 0.08 - - 0.00 0.08 3.90
0 + 350.0 KIRI 0.00 0.00 - 0.00
41.00 0.00 0.00 0.00 - - 0.00 0.00 0.00
0 + 391.0 KIRI 0.00 0.00 - 0.00

0 + 391.0 KIRI 1.82 0.47 - 0.00


9.00 1.82 0.47 0.84 - - 0.00 0.84 7.60
0 + 400.0 KIRI 1.82 0.47 - 0.00
50.00 0.91 0.23 0.21 - - 0.00 0.21 10.55
0 + 450.0 KIRI 0.00 0.00 - 0.00
50.00 0.55 0.11 0.06 0.32 0.20 0.06 0.13 6.28
0 + 500.0 KIRI 1.11 0.23 0.64 0.40
50.00 1.08 0.17 0.18 0.62 0.39 0.24 0.42 21.09
0 + 550.0 KIRI 1.05 0.11 0.61 0.38
50.00 1.08 0.19 0.21 0.59 0.49 0.29 0.50 24.80
0 + 600.0 KIRI 1.12 0.27 0.58 0.60
14.00 1.12 0.27 0.30 0.58 0.60 0.35 0.65 9.11
0 + 614.0 KIRI 1.12 0.27 0.58 0.60

0 + 614.0 KIRI 0.57 0.51 - 0.00


POSISI PASANGAN 10.00 0.57 0.51 0.29 - - 0.00 0.29 2.88
0 + 624.0 KIRI 0.57 0.51 - 0.00

0 + 624.0 KIRI 1.12 0.27 0.58 0.60


18.00 1.12 0.27 0.30 0.58 0.60 0.35 0.65 11.71
0 + 642.0 KIRI 1.12 0.27 0.58 0.60

0 + 642.0 KIRI 0.57 0.51 - 0.00


8.00 0.57 0.51 0.29 - - 0.00 0.29 2.30
POSISI PASANGAN 0 + 650.0 KIRI 0.57 0.51 - 0.00

0 + 000.0 KANAN 1.66 0.34 2.20 0.27


50.00 1.65 0.32 0.53 2.20 0.31 0.67 1.20 59.95
0 + 050.0 KANAN 1.65 0.31 2.21 0.34
50.00 1.65 0.31 0.50 1.10 0.17 0.19 0.69 34.46
0 + 100.0 KANAN 1.65 0.31 - 0.00

0 + 100.0 KANAN 0.77 0.19 - 0.00


POSISI PASANGAN 44.00 0.77 0.19 0.14 - - 0.00 0.14 6.27
0 + 144.0 KANAN 0.77 0.19 - 0.00

0 + 144.0 KANAN 1.20 0.40 - 0.00


6.00 1.20 0.40 0.47 - - 0.00 0.47 2.84
0 + 150.0 KANAN 1.20 0.40 - 0.00
50.00 1.47 0.42 0.62 - - 0.00 0.62 30.95
0 + 200.0 KANAN 1.73 0.45 - 0.00
50.00 1.44 0.39 0.56 0.19 0.20 0.04 0.60 29.78
0 + 250.0 KANAN 1.15 0.33 0.38 0.40
20.00 1.15 0.33 0.37 0.38 0.40 0.15 0.52 10.48
0 + 270.0 KANAN 1.15 0.33 0.38 0.40

0 + 270.0 KANAN 0.00 0.00 - 0.00


POSISI PASANGAN 9.00 0.00 0.00 0.00 - - 0.00 0.00 0.00
0 + 279.0 KANAN 0.00 0.00 - 0.00
0 + 279.0 KANAN 1.15 0.33 0.38 0.40
6.00 1.15 0.33 0.37 0.38 0.40 0.15 0.52 3.14
0 + 285.0 KANAN 1.15 0.33 0.38 0.40

0 + 285.0 KANAN 0.00 0.00 - 0.00


POSISI PASANGAN 14.00 0.00 0.00 0.00 - - 0.00 0.00 0.00
0 + 299.0 KANAN 0.00 0.00 - 0.00

0 + 299.0 KANAN 0.00 0.00 - 0.00


51.00 0.93 0.16 0.15 - - 0.00 0.15 7.55
0 + 350.0 KANAN 1.85 0.32 - 0.00
5.00 1.85 0.32 0.59 - - 0.00 0.59 2.96
0 + 355.0 KANAN 1.85 0.32 - 0.00

0 + 355.0 KANAN 0.00 0.00 - 0.00


POSISI PASANGAN 30.00 0.00 0.00 0.00 - - 0.00 0.00 0.00
0 + 385.0 KANAN 0.00 0.00 - 0.00

0 + 385.0 KANAN 1.85 0.30 - 0.00


15.00 1.85 0.30 0.56 - - 0.00 0.56 8.33
0 + 400.0 KANAN 1.85 0.30 - 0.00
50.00 1.47 0.25 0.37 - - 0.00 0.37 18.31
0 + 450.0 KANAN 1.08 0.20 - 0.00
23.00 1.08 0.20 0.22 - - 0.00 0.22 4.97
0 + 473.0 KANAN 1.08 0.20 - 0.00

0 + 473.0 KANAN 0.23 1.26 - 0.00


27.00 0.23 1.26 0.28 - - 0.00 0.28 7.65
POSISI PASANGAN 0 + 500.0 KANAN 0.23 1.26 - 0.00
5.00 0.23 1.26 0.28 - - 0.00 0.28 1.42
0 + 505.0 KANAN 0.23 1.26 - 0.00

0 + 505.0 KANAN 1.08 0.20 - 0.00


20.00 1.08 0.20 0.22 - - 0.00 0.22 4.32
0 + 525.0 KANAN 1.08 0.20 - 0.00

0 + 525.0 KANAN 0.21 1.43 - 0.00


25.00 0.21 1.43 0.30 - - 0.00 0.30 7.51
0 + 550.0 KANAN 0.21 1.43 - 0.00
POSISI PASANGAN 50.00 0.27 1.47 0.40 - - 0.00 0.40 19.96
0 + 600.0 KANAN 0.34 1.50 - 0.00
24.00 0.34 1.50 0.50 - - 0.00 0.50 12.06
0 + 624.0 KANAN 0.34 1.50 - 0.00

0 + 624.0 KANAN 1.08 0.20 - 0.00


6.00 1.08 0.20 0.22 - - 0.00 0.22 1.30
0 + 630.0 KANAN 1.08 0.20 - 0.00

0 + 630.0 KANAN 0.77 0.40 0.95 0.44


POSISI PASANGAN 20.00 0.77 0.40 0.31 0.95 0.44 0.42 0.72 14.48
0 + 650.0 KANAN 0.77 0.40 0.95 0.44

TOTAL KOMULATIF 566.63 M3


KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Penyiapan Badan Jalan
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 3.3
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan M2
KONSULTAN : CV. MCE CONSULTANT Halaman 1 dari 4

MUTUAL CHECK
MC -100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar 1 Lebar 2 Lebar Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m2)

Pelebaran

0+000.00 - 0+025.00 L 25.00 2.00 2.00 2.00 50.00

0+025.00 - 0+050.00 L 25.00 2.00 2.00 2.00 50.00

0+050.00 - 0+075.00 L 25.00 2.00 2.00 2.00 50.00

0+075.00 - 0+100.00 L 25.00 2.00 2.00 2.00 50.00

0+100.00 - 0+125.00 L 25.00 2.00 2.00 2.00 50.00

0+125.00 - 0+150.00 L 25.00 2.00 2.00 2.00 50.00

0+150.00 - 0+175.00 L 25.00 2.00 2.00 2.00 50.00

0+175.00 - 0+200.00 L 25.00 2.00 2.00 2.00 50.00

0+200.00 - 0+225.00 L 25.00 2.00 2.00 2.00 50.00

0+225.00 - 0+250.00 L 25.00 2.00 2.00 2.00 50.00

0+250.00 - 0+275.00 L 25.00 2.00 2.00 2.00 50.00

0+275.00 - 0+300.00 L 25.00 2.00 2.00 2.00 50.00

0+300.00 - 0+325.00 L 25.00 2.00 2.00 2.00 50.00

0+325.00 - 0+350.00 L 25.00 2.00 2.00 2.00 50.00

0+350.00 - 0+375.00 L 25.00 2.00 2.00 2.00 50.00

0+375.00 - 0+400.00 L 25.00 2.00 2.00 2.00 50.00

0+400.00 - 0+425.00 L 25.00 2.00 2.00 2.00 50.00

0+425.00 - 0+450.00 L 25.00 2.00 2.00 2.00 50.00

0+450.00 - 0+475.00 L 25.00 2.00 2.00 2.00 50.00

0+475.00 - 0+500.00 L 25.00 2.00 2.00 2.00 50.00

0+500.00 - 0+525.00 L 25.00 2.00 2.00 2.00 50.00

0+525.00 - 0+550.00 L 25.00 2.00 2.00 2.00 50.00

0+550.00 - 0+575.00 L 25.00 2.00 2.00 2.00 50.00

Total : 1,150.00

Komulatif : 1,150.00
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Penyiapan Badan Jalan
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 3.3
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan M2
KONSULTAN : CV. MCE CONSULTANT Halaman 2 dari 4

MUTUAL CHECK
MC -100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar 1 Lebar 2 Lebar Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m2)

Pelebaran

0+575.00 - 0+600.00 L 25.00 2.00 2.00 2.00 50.00

0+600.00 - 0+625.00 L 25.00 2.00 2.00 2.00 50.00

0+625.00 - 0+650.00 L 25.00 2.00 2.00 2.00 50.00

0+650.00 - 0+675.00 L 25.00 1.60 1.60 2.00 50.00

0+675.00 - 0+700.00 L 25.00 1.60 1.60 2.00 50.00

0+700.00 - 0+725.00 L 25.00 1.60 1.60 2.00 50.00

0+725.00 - 0+750.00 L 25.00 2.00 2.00 2.00 50.00

0+750.00 - 0+775.00 L 25.00 2.00 2.00 2.00 50.00

0+775.00 - 0+800.00 L 25.00 2.00 2.00 2.00 50.00

0+800.00 - 0+825.00 L 25.00 2.00 2.00 2.00 50.00

0+825.00 - 0+840.00 L 15.00 2.00 2.00 2.00 30.00

0+840.00 - 0+870.00 L 30.00 2.00 2.00 2.00 60.00


Total : 590.00

Komulatif : 1,740.00

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN PEMBANGUNAN JALAN Item Pekerjaan : Penyiapan Badan Jalan
PEKERJAAN PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 3.3
KONTRAKTOR PT. BIMA SAKTI ADHINATA Satuan : M2
KONSULTAN CV. MCE CONSULTANT Halaman : 3 dari 4

MUTUAL CHECK
MC -100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar 1 Lebar 2 Lebar Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m2)
1 2 3 4 5 6 7=(5+6)/2 9 = 4*7

Pelebaran

0+000.00 - 0+025.00 R 25.00 2.00 2.00 2.00 50.00

0+025.00 - 0+050.00 R 25.00 2.00 2.00 2.00 50.00

0+050.00 - 0+075.00 R 25.00 2.00 2.00 2.00 50.00

0+075.00 - 0+100.00 R 25.00 2.00 2.00 2.00 50.00

0+100.00 - 0+125.00 R 25.00 2.00 2.00 2.00 50.00

0+125.00 - 0+150.00 R 25.00 2.00 2.00 2.00 50.00

0+150.00 - 0+175.00 R 25.00 2.00 2.00 2.00 50.00

0+175.00 - 0+200.00 R 25.00 2.00 2.00 2.00 50.00

0+200.00 - 0+225.00 R 25.00 2.00 2.00 2.00 50.00

0+225.00 - 0+250.00 R 25.00 2.00 2.00 2.00 50.00

0+250.00 - 0+275.00 R 25.00 2.00 2.00 2.00 50.00

0+275.00 - 0+300.00 R 25.00 2.00 2.00 2.00 50.00

0+300.00 - 0+325.00 R 25.00 2.00 2.00 2.00 50.00

0+325.00 - 0+350.00 R 25.00 2.00 2.00 2.00 50.00

0+350.00 - 0+375.00 R 25.00 2.00 2.00 2.00 50.00

0+375.00 - 0+400.00 R 25.00 2.00 2.00 2.00 50.00

0+400.00 - 0+425.00 R 25.00 2.00 2.00 2.00 50.00

0+425.00 - 0+450.00 R 25.00 2.00 2.00 2.00 50.00

0+450.00 - 0+475.00 R 25.00 2.00 2.00 2.00 50.00

0+475.00 - 0+500.00 R 25.00 2.00 2.00 2.00 50.00

0+500.00 - 0+525.00 R 25.00 2.00 2.00 2.00 50.00

0+525.00 - 0+550.00 R 25.00 2.00 2.00 2.00 50.00

0+550.00 - 0+575.00 R 25.00 2.00 2.00 2.00 50.00

Total : 1,150.00

Komulatif : 2,890.00
KEGIATAN PEMBANGUNAN JALAN Item Pekerjaan : Penyiapan Badan Jalan
PEKERJAAN PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 3.3
KONTRAKTOR PT. BIMA SAKTI ADHINATA Satuan : M2
KONSULTAN CV. MCE CONSULTANT Halaman : 4 dari 4

MUTUAL CHECK
MC -100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar 1 Lebar 2 Lebar Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m3)
1 2 3 4 5 6 7=(5+6)/2 9 = 4*7*8

Pelebaran

0+575.00 - 0+600.00 R 25.00 2.00 2.00 2.00 50.00

0+600.00 - 0+625.00 R 25.00 2.00 2.00 2.00 50.00

0+625.00 - 0+650.00 R 25.00 2.00 2.00 2.00 50.00

0+650.00 - 0+675.00 R 25.00 1.60 1.60 1.60 40.00

0+675.00 - 0+700.00 R 25.00 1.60 1.60 1.60 40.00

0+700.00 - 0+725.00 R 25.00 1.60 1.60 1.60 40.00

0+725.00 - 0+750.00 R 25.00 2.00 2.00 2.00 50.00

0+750.00 - 0+775.00 R 25.00 2.00 2.00 2.00 50.00

0+775.00 - 0+800.00 R 25.00 2.00 2.00 2.00 50.00

0+800.00 - 0+825.00 R 25.00 2.00 2.00 2.00 50.00

0+825.00 - 0+840.00 R 15.00 2.00 2.00 2.00 30.00

0+840.00 - 0+870.00 R 30.00 2.00 2.00 2.00 60.00

Total : 560.00

Komulatif : 3,450.00

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
REKAPITULASI VOLUME PEKERJAAN

KEGIATAN : PEMBANGUNAN JALAN


PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA
KONSULTAN : CV. MCE CONSULTANT

NO. ITEM URAIAN SATUAN KUANTITAS KETERANGAN

DIVISI 5 PERKERASAN BERBUTIR DAN BETON SEMEN

5.1(1) Lapis Pondasi Agregat klas A CBR ≥ 90% M3 1,211.40

5.1(3) Urugan Agregat Klas C (sirtu) Bahu Jalan CBR ≥ 35% M3 810.84

5.8(1) Lapis Pondasi Dengan Cement Treated Base (CTB) M3 2278.66

5.8(1) Lapis Pondasi Dengan Cement Treated Base (CTB) Leveling M3 255.77

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST Ir. ABDUL HARIS.HA, MT AKHMAD ZAINUL ABIDIN, ST


NIP.19780708 201001 1 010 Site Engineer General Superintendent
Item Pekerjaan : Lapis Pondasi Agregat klas A
KEGIATAN : PEMBANGUNAN JALAN CBR ≥ 90%
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 5.1(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 4

MUTUAL CHECK
MC -100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Atas Lebar Bawah Lebar Tebal Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m) (m3)
1 2 3 4 5 6 7=(5+6)/2 8 9 = 4*7

Pelebaran

0+000.00 - 0+025.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+025.00 - 0+050.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+050.00 - 0+075.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+075.00 - 0+100.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+100.00 - 0+125.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+125.00 - 0+150.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+150.00 - 0+175.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+175.00 - 0+200.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+200.00 - 0+225.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+225.00 - 0+250.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+250.00 - 0+275.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+275.00 - 0+300.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+300.00 - 0+325.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+325.00 - 0+350.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+350.00 - 0+375.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+375.00 - 0+400.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+400.00 - 0+425.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+425.00 - 0+450.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+450.00 - 0+475.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+475.00 - 0+500.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+500.00 - 0+525.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+525.00 - 0+550.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+550.00 - 0+575.00 L 25.00 2.00 2.00 2.00 0.40 20.00

Total : 460.00

Komulatif : 460.00
Item Pekerjaan : Lapis Pondasi Agregat klas A
KEGIATAN : PEMBANGUNAN JALAN CBR ≥ 90%
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 5.1(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 2 dari 4

MUTUAL CHECK
MC -100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Atas Lebar Bawah Lebar Tebal Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m) (m3)
1 2 3 4 5 6 7=(5+6)/2 8 9 = 4*7

Pelebaran

0+575.00 - 0+600.00 L 25.00 2.00 2.00 2.00 0.40 20.00

0+600.00 0+621.00 L 21.00 2.00 2.00 2.00 0.40 16.80

0+621.00 - 0+625.00 L 4.00 0.00 0.00 0.00 0.00 0.00

0+624.00 - 0+650.00 L 26.00 2.00 2.00 2.00 0.40 20.80

0+650.00 - 0+675.00 L 25.00 1.70 1.70 1.70 0.40 17.00

0+675.00 - 0+700.00 L 25.00 1.75 1.75 1.75 0.40 17.50

0+700.00 - 0+725.00 L 25.00 1.80 1.80 1.80 0.40 18.00

0+725.00 - 0+735.00 L 10.00 2.00 2.00 2.00 0.00 0.00

0+735.00 - 0+750.00 L 15.00 2.00 2.00 2.00 0.00 0.00

0+750.00 - 0+775.00 L 25.00 2.00 2.00 2.00 0.00 0.00

0+775.00 - 0+800.00 L 25.00 2.00 2.00 2.00 0.00 0.00

0+800.00 - 0+825.00 L 25.00 2.00 2.00 2.00 0.00 0.00

0+825.00 - 0+840.00 L 15.00 2.00 2.00 2.00 0.40 12.00

0+840.00 - 0+870.00 L 30.00 2.00 2.00 2.00 0.40 24.00

Total : 146.10

Komulatif : 606.10

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
Lapis Pondasi Agregat klas A
Item Pekerjaan :
KEGIATAN PEMBANGUNAN JALAN CBR ≥ 90%
PEKERJAAN PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 5.1(1)
KONTRAKTOR PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN CV. MCE CONSULTANT Halaman : 3 dari 4

MUTUAL CHECK
MC -100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Atas Lebar Bawah Lebar Tebal Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m) (m3)
1 2 3 4 5 6 7=(5+6)/2 8 9 = 4*7

Pelebaran

0+000.00 - 0+025.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+025.00 - 0+050.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+050.00 - 0+075.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+075.00 - 0+100.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+100.00 - 0+125.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+125.00 - 0+150.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+150.00 - 0+175.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+175.00 - 0+200.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+200.00 - 0+225.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+225.00 - 0+250.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+250.00 - 0+275.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+275.00 - 0+300.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+300.00 - 0+325.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+325.00 - 0+350.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+350.00 - 0+375.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+375.00 - 0+400.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+400.00 - 0+425.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+425.00 - 0+450.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+450.00 - 0+475.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+475.00 - 0+500.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+500.00 - 0+525.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+525.00 - 0+550.00 R 25.00 2.00 2.00 2.00 0.40 20.00

Total : 440.00

Komulatif : 1,046.10
Item Pekerjaan : Lapis Pondasi Agregat klas A
KEGIATAN PEMBANGUNAN JALAN CBR ≥ 90%
PEKERJAAN PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 5.1(1)
KONTRAKTOR PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN CV. MCE CONSULTANT Halaman :: 4 dari 4

MUTUAL CHECK
MC -100%
Dimensi
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Atas Lebar Bawah Lebar Tebal Volume
L/R ( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m) (m3)
1 2 3 4 5 6 7=(5+6)/2 8 9 = 4*7*8

Pelebaran

0+550.00 - 0+575.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+575.00 - 0+600.00 R 25.00 2.00 2.00 2.00 0.40 20.00

0+600.00 0+620.00 20.00 2.00 2.00 2.00 0.40 16.00

0+620.00 - 0+624.00 R 4.00 0.00 0.00 0.00 0.40 0.00

0+624.00 - 0+650.00 R 26.00 2.00 2.00 2.00 0.40 20.80

0+650.00 - 0+675.00 R 25.00 1.70 1.70 1.70 0.40 17.00

0+675.00 - 0+700.00 R 25.00 1.75 1.75 1.75 0.40 17.50

0+700.00 - 0+725.00 R 25.00 1.80 1.80 1.80 0.40 18.00

0+725.00 - 0+735.00 R 10.00 2.00 2.00 2.00 0.00 0.00

0+735.00 - 0+750.00 R 15.00 2.00 2.00 2.00 0.00 0.00

0+750.00 - 0+775.00 R 25.00 2.00 2.00 2.00 0.00 0.00

0+775.00 - 0+800.00 R 25.00 2.00 2.00 2.00 0.00 0.00

0+800.00 0+825.00 R 25.00 2.00 2.00 2.00 0.00 0.00

0+825.00 - 0+840.00 R 15.00 2.00 2.00 2.00 0.40 12.00

0+840.00 - 0+870.00 R 30.00 2.00 2.00 2.00 0.40 24.00

Total : 165.30

Komulatif : 1,211.40

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
Urugan Agregat Klas C (sirtu) Bahu
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan :
Jalan CBR ≥ 35%
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 5.1(3)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 4

MUTUAL CHECK
MC - 100%
Dimensi
Bidang 1 Bidang 2
Panjang
Sket / Type Konstruksi STATION Lokasi Lebar rata2 Tinggi rata2 Luas Lebar rata2 Tinggi rata2 Luas Volume
L/R ( m' ) ( m' ) ( m' ) (m2) ( m' ) (m) (m2) (m3)
1 2 3 4 5 6 7 = 5*6 8 9 10 = 8*9 11 = (7+10)*4
Urugan
0+100.00 - 0+125.00 L 25.00 2.00 0.40 0.80 20.00
0+125.00 - 0+150.00 L 25.00 2.00 0.40 0.80 20.00
Pelebaran
0+000.00 - 0+025.00 L 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+025.00 - 0+050.00 L 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+050.00 - 0+075.00 L 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+075.00 - 0+100.00 L 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+100.00 - 0+125.00 L 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+125.00 - 0+150.00 L 25.00 1.00 0.15 0.15 0.75 0.30 0.23 9.38
0+150.00 - 0+175.00 L 25.00 1.45 0.10 0.15 1.20 0.30 0.36 12.63
0+175.00 - 0+200.00 L 25.00 1.60 0.10 0.16 1.35 0.35 0.47 15.81
0+200.00 - 0+225.00 L 25.00 1.60 0.10 0.16 1.35 0.35 0.47 15.81
0+225.00 - 0+250.00 L 25.00 1.50 0.10 0.15 1.25 0.35 0.44 14.69
0+250.00 - 0+275.00 L 25.00 1.50 0.10 0.15 1.25 0.35 0.44 14.69
0+275.00 - 0+300.00 L 25.00 1.40 0.10 0.14 1.15 0.35 0.40 13.56
0+300.00 - 0+325.00 L 25.00 1.40 0.10 0.14 1.15 0.30 0.35 12.13
0+325.00 - 0+350.00 L 25.00 1.75 0.10 0.18 1.50 0.30 0.45 15.63
0+350.00 - 0+375.00 L 25.00 1.75 0.10 0.18 1.50 0.30 0.45 15.63
0+375.00 - 0+400.00 L 25.00 1.80 0.10 0.18 1.55 0.30 0.47 16.13
0+400.00 - 0+424.00 L 24.00 1.00 0.10 0.10 0.75 0.30 0.23 7.80
0+424.00 - 0+431.00 L 7.00 0.00 0.10 0.00 0.00 0.30 0.00 0.00
0+431.00 - 0+450.00 L 19.00 1.00 0.10 0.10 0.75 0.30 0.23 6.18
0+450.00 - 0+475.00 L 25.00 1.50 0.10 0.15 1.25 0.35 0.44 14.69
0+475.00 - 0+500.00 L 25.00 1.00 0.12 0.12 0.75 0.30 0.23 8.53
0+500.00 - 0+525.00 L 25.00 1.90 0.10 0.19 1.65 0.35 0.58 19.19
0+525.00 - 0+550.00 L 25.00 1.80 0.10 0.18 1.55 0.35 0.54 18.06

Total : 311.13
Komulatif : 311.13
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Urugan Agregat Klas C (sirtu) Bahu
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 5.1(3)
Jalan CBR ≥ 35%
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 2 dari 4

MUTUAL CHECK
MC - 100%
Dimensi
Panjang Bidang 1 Bidang 2
Sket / Type Konstruksi STATION Lokasi Lebar rata2 Tinggi rata2 Luas Lebar rata2 Tinggi rata2 Luas Volume
L/R ( m' ) ( m' ) ( m' ) (m2) ( m' ) (m) (m2) (m3)
1 2 3 4 5 6 7 = 5*6 8 9 10 = 8*9 11 = (7+10)*4

Pelebaran

0+550.00 - 0+575.00 L 25.00 1.70 0.10 0.17 1.45 0.35 0.51 16.94
0+575.00 - 0+600.00 L 25.00 1.40 0.10 0.14 1.15 0.35 0.40 13.56
0+600.00 - 0+621.00 L 21.00 1.60 0.10 0.16 1.35 0.30 0.41 11.87
0+621.00 - 0+625.00 L 4.00 0.00 0.00 0.00 0.00 0.30 0.00 0.00
0+625.00 - 0+650.00 L 25.00 1.70 0.10 0.17 1.45 0.35 0.51 16.94
0+650.00 - 0+675.00 L 25.00 1.70 0.10 0.17 1.45 0.35 0.51 16.94
0+675.00 - 0+700.00 L 25.00 1.75 0.10 0.18 1.50 0.35 0.53 17.50
0+700.00 - 0+725.00 L 25.00 1.75 0.10 0.18 1.50 0.35 0.53 17.50
0+725.00 - 0+750.00 L 25.00 1.45 0.10 0.15 1.20 0.35 0.42 14.13
0+750.00 - 0+775.00 L 25.00 1.45 0.10 0.15 1.20 0.30 0.36 12.63
0+775.00 - 0+800.00 L 25.00 0.90 0.10 0.09 0.65 0.30 0.20 7.13
0+800.00 - 0+825.00 L 25.00 0.90 0.10 0.09 0.65 0.30 0.20 7.13
0+825.00 - 0+850.00 L 25.00 0.70 0.10 0.07 0.45 0.30 0.14 5.13
0+850.00 0+870.00 L 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total : 157.37
Komulatif : 468.49

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
Item Pekerjaan : Urugan Agregat Klas C (sirtu) Bahu
KEGIATAN : PEMBANGUNAN JALAN Jalan CBR ≥ 35%
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 5.1(3)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 3 dari 4

MUTUAL CHECK
MC - 100%
Dimensi
Panjang Bidang 1 Bidang 2
Sket / Type Konstruksi STATION Lokasi Lebar rata2 Tinggi rata2 Luas Lebar rata2 Tinggi rata2 Luas Volume
L/R ( m' ) ( m' ) ( m' ) (m2) ( m' ) (m) (m2) (m3)
1 2 3 4 5 6 7 = 5*6 8 9 10 = 8*9 11 = (7+10)*4
Urugan
0+000.00 - 0+025.00 R 25.00 2.00 0.40 0.80 20.00
0+025.00 - 0+050.00 R 25.00 2.00 0.40 0.80 20.00
0+050.00 - 0+075.00 R 25.00 2.00 0.40 0.80 20.00
Pelebaran
0+000.00 - 0+025.00 R 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+025.00 - 0+050.00 R 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+050.00 - 0+075.00 R 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+075.00 - 0+100.00 R 25.00 2.30 0.10 0.23 2.05 0.35 0.72 23.69
0+100.00 - 0+125.00 R 25.00 2.30 0.10 0.23 2.05 0.35 0.72 23.69
0+125.00 - 0+150.00 R 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+150.00 - 0+175.00 R 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+175.00 - 0+200.00 R 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+200.00 - 0+225.00 R 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+225.00 - 0+250.00 R 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+250.00 - 0+275.00 R 25.00 1.00 0.10 0.10 0.75 0.35 0.26 9.06
0+275.00 - 0+300.00 R 25.00 1.00 0.10 0.10 0.75 0.35 0.26 9.06
0+300.00 - 0+325.00 R 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+325.00 - 0+350.00 R 25.00 0.50 0.10 0.05 0.25 0.30 0.08 3.13
0+350.00 - 0+375.00 R 25.00 0.50 0.10 0.05 0.25 0.30 0.08 3.13
0+375.00 - 0+400.00 R 25.00 0.50 0.10 0.05 0.25 0.30 0.08 3.13
0+400.00 - 0+427.00 R 27.00 0.50 0.10 0.05 0.25 0.35 0.09 3.71
0+427.00 - 0+437.00 R 10.00 0.00 0.00 0.00 0.00 0.30 0.00 0.00
0+437.00 - 0+450.00 R 13.00 0.50 0.10 0.05 0.25 0.30 0.08 1.63
0+450.00 - 0+475.00 R 25.00 0.50 0.10 0.05 0.25 0.30 0.08 3.13
0+475.00 - 0+500.00 R 25.00 1.40 0.10 0.14 1.15 0.35 0.40 13.56
0+500.00 - 0+525.00 R 25.00 0.50 0.10 0.05 0.25 0.30 0.08 3.13
0+525.00 - 0+550.00 R 25.00 1.20 0.10 0.12 0.95 0.30 0.29 10.13

Total : 243.28
Komulatif : 711.77
Item Pekerjaan : Urugan Agregat Klas C (sirtu) Bahu
KEGIATAN : PEMBANGUNAN JALAN Jalan CBR ≥ 35%
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 5.1(3)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 4 dari 4

MUTUAL CHECK
MC - 100%
Dimensi
Panjang Bidang 1 Bidang 2
Sket / Type Konstruksi STATION Lokasi Lebar rata2 Tinggi rata2 Luas 1 Lebar rata2 Tinggi rata2 Luas 2 Volume
L/R ( m' ) ( m' ) ( m' ) (m2) ( m' ) (m) (m2) (m3)
1 2 3 4 5 6 7 = 5*6 8 9 10 = 8*9 11 = (7+10)*4

Pelebaran
0+550.00 - 0+575.00 R 25.00 1.20 0.10 0.12 0.95 0.35 0.33 11.31
0+575.00 - 0+600.00 R 25.00 1.30 0.10 0.13 1.05 0.35 0.37 12.44
0+600.00 - 0+621.00 R 21.00 1.30 0.10 0.13 1.05 0.35 0.37 10.45
0+621.00 - 0+625.00 R 4.00 0.00 0.00 0.00 0.00 0.30 0.00 0.00
0+625.00 - 0+650.00 R 25.00 1.00 0.10 0.10 0.75 0.35 0.26 9.06
0+650.00 - 0+675.00 R 25.00 1.00 0.10 0.10 0.75 0.35 0.26 9.06
0+675.00 - 0+700.00 R 25.00 0.70 0.10 0.07 0.45 0.30 0.14 5.13
0+700.00 - 0+725.00 R 25.00 0.70 0.10 0.07 0.45 0.30 0.14 5.13
0+725.00 - 0+750.00 R 25.00 0.70 0.10 0.07 0.45 0.30 0.14 5.13
0+750.00 - 0+775.00 R 25.00 0.70 0.10 0.07 0.45 0.30 0.14 5.13
0+775.00 - 0+800.00 R 25.00 1.00 0.10 0.10 0.75 0.30 0.23 8.13
0+800.00 0+825.00 R 25.00 1.00 0.10 0.10 0.75 0.35 0.26 9.06
0+825.00 0+850.00 R 25.00 1.00 0.10 0.10 0.75 0.35 0.26 9.07
0+850.00 0+870.00 R 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total : 99.08
Komulatif : 810.84

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
Item Pekerjaan : Lapis Pondasi Dengan Cement Treated Base
KEGIATAN : PEMBANGUNAN JALAN (CTB)
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 5.8(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 2

MUTUAL CHECK
MC - 100%
Dimensi
Sket / Type Konstruksi STATION Panjang Lebar Atas Lebar Bawah Lebar Tebal Tebal Volume
( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m) Rata2 ( m ) (m3)
1 2 3 4 5 6=(4+5)/2 7 8 9 =8*3

Pelebaran

0+000.00 7.00 7.00 0.00


7.00 7.00 0.13 6.13
0+007.00 7.50 8.00 0.25
18.00 7.75 0.25 34.88
0+025.00 7.50 8.00 0.25
25.00 7.75 0.25 48.44
0+050.00 7.50 8.00 0.25
25.00 7.75 0.25 48.44
0+075.00 7.50 8.00 0.25
25.00 7.75 0.25 48.44
0+100.00 7.50 8.00 0.25
25.00 7.75 0.25 48.44
0+125.00 7.50 8.00 0.25
25.00 7.75 0.25 48.44
0+150.00 7.50 8.00 0.25
25.00 7.75 0.25 48.44
0+175.00 7.50 8.00 0.25
25.00 7.75 0.25 48.44
0+200.00 7.50 8.00 0.25
25.00 7.75 0.28 53.28
0+225.00 7.50 8.10 0.30
25.00 7.80 0.30 58.50
0+250.00 7.50 8.10 0.30
25.00 7.80 0.30 58.50
0+275.00 7.50 8.10 0.30
25.00 7.80 0.30 58.50
0+300.00 7.50 8.10 0.30
25.00 7.80 0.30 58.50
0+325.00 7.50 8.10 0.30
25.00 7.80 0.30 58.50
0+350.00 7.50 8.10 0.30
25.00 7.80 0.30 58.50
0+375.00 7.50 8.10 0.30
25.00 7.80 0.33 63.38
0+400.00 7.50 8.20 0.35
25.00 7.85 0.43 83.41
0+425.00 7.50 8.50 0.50
25.00 8.00 0.55 110.00
0+450.00 7.50 8.70 0.60
25.00 8.10 0.63 126.56
0+475.00 7.50 8.80 0.65
25.00 8.15 0.65 132.44
0+500.00 7.50 8.80 0.65
25.00 8.15 0.63 127.34
0+525.00 7.50 8.70 0.60
25.00 8.10 0.58 116.44
0+550.00 7.50 8.60 0.55
25.00 8.05 0.48 95.59
0+575.00 7.50 8.30 0.40
25.00 7.90 0.33 64.19
0+600.00 7.50 8.00 0.25
20.00 7.75 0.25 38.75
0+620.00 7.00 7.50 0.25
4.00 JEMBATAN 7.25 0.25 7.25
0+624.00 7.00 7.50 0.25
26.00 7.25 0.28 51.84
0+650.00 7.50 8.10 0.30
25.00 7.80 0.35 68.25
0+675.00 7.50 8.30 0.40
25.00 7.90 0.40 79.00
0+700.00 7.50 8.30 0.40
25.00 7.90 0.33 64.19
0+725.00 7.50 8.00 0.25
10.00 7.75 0.13 9.69
0+735.00 7.50 7.50 0.00
15.00 7.50 0.00 0.00
0+750.00 7.50 7.50 0.00
25.00 7.50 0.00 0.00
0+775.00 7.50 7.50 0.00
25.00 7.50 0.00 0.00
0+800.00 7.50 7.50 0.00
15.00 7.50 0.00 0.00
0+815.00 7.50 7.50 0.00
10.00 7.50 0.15 11.25
0+825.00 7.50 8.10 0.30
35.00 7.80 0.28 75.08
0+860.00 7.50 8.00 0.25
10.00 7.75 0.13 9.69
0+870.00 8.50 8.50 0.00
Item Pekerjaan : Lapis Pondasi Dengan Cement Treated Base
KEGIATAN : PEMBANGUNAN JALAN (CTB)
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 5.8(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 2 dari 2

MUTUAL CHECK
MC - 100%
Dimensi
Sket / Type Konstruksi STATION Panjang Lebar Atas Lebar Bawah Lebar Tebal Jumlah Volume
( m' ) ( m' ) ( m' ) Rata2 ( m' ) (m) (m3)
1 2 3 4 5 6=(4+5)/2 7 8 9 =8*3

CTB GALIAN PELEBARAN 0+725.00


25.00 2.00 2.00 2.00 0.40 2.00 40.00
0+750.00
25.00 2.00 2.00 2.00 0.40 2.00 40.00
0+775.00
25.00 2.00 2.00 2.00 0.40 2.00 40.00
0+800.00
25.00 2.00 2.00 2.00 0.40 2.00 40.00
0+825.00

Total : 2,278.66

Komulatif : 2,278.66

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
Item Pekerjaan : Lapis Pondasi Dengan Cement Treated
KEGIATAN : PEMBANGUNAN JALAN Base (CTB) Leveling
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No. Item Pemby : 5.8(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 2

MUTUAL CHEK
MC 0 %
VOLUME SATUAN
STA PANJANG LEBAR LEBAR TINGGI TINGGI LUAS
M RATA-RATA M RATA-RATA (M2) (M3)
1 2 3 4 5 6 7=4*6 8=7*2 9

0 + 000.0 7.00 0.05


25.00 6.95 0.05 0.35 8.69
0 + 025.0 6.90 0.05
25.00 6.45 0.05 0.32 8.06
0 + 050.0 6.00 0.05
25.00 6.40 0.05 0.32 8.00
0 + 075.0 6.80 0.05
25.00 6.90 0.05 0.31 7.76
0 + 100.0 7.00 0.04
25.00 7.00 0.04 0.28 7.00
0 + 125.0 7.00 0.04
25.00 6.85 0.04 0.24 5.99
0 + 150.0 6.70 0.03
25.00 6.60 0.03 0.20 4.95
0 + 175.0 6.50 0.03
25.00 6.50 0.03 0.20 4.88
0 + 200.0 6.50 0.03
25.00 6.25 0.03 0.17 4.30
0 + 225.0 6.00 0.03
25.00 6.40 0.02 0.14 3.60
0 + 250.0 6.80 0.02
25.00 6.80 0.03 0.17 4.25
0 + 275.0 6.80 0.03
25.00 6.75 0.04 0.24 5.91
0 + 300.0 6.70 0.04
25.00 6.85 0.05 0.31 7.71
0 + 325.0 7.00 0.05
25.00 7.00 0.04 0.27 6.71
0 + 350.0 7.00 0.03
25.00 6.95 0.03 0.23 5.80
0 + 375.0 6.90 0.04
25.00 6.90 0.04 0.28 6.90
0 + 400.0 6.90 0.04
25.00 6.95 0.05 0.35 8.69

Total : 109.19

Komulatif : 109.19

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
Item Pekerjaan : Lapis Pondasi Dengan Cement Treated
Base (CTB) Leveling
KEGIATAN : PEMBANGUNAN JALAN
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No. Item Pemby : 5.8(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M3
KONSULTAN : CV. MCE CONSULTANT Halaman : 2 dari 2

MUTUAL CHEK
MC 0 %
VOLUME SATUAN
STA PANJANG LEBAR LEBAR TINGGI TINGGI LUAS
M RATA-RATA M RATA-RATA (M2) (M3)
1 2 3 4 5 6 7=4*6 8=7*2 9

0 + 425.0 7.00 0.06


25.00 7.00 0.06 0.42 10.50
0 + 450.0 7.00 0.06
25.00 6.95 0.06 0.42 10.43
0 + 475.0 6.90 0.06
25.00 6.80 0.06 0.41 10.20
0 + 500.0 6.70 0.06
25.00 6.60 0.06 0.36 9.08
0 + 525.0 6.50 0.05
25.00 6.65 0.05 0.30 7.48
0 + 550.0 6.80 0.04
25.00 6.80 0.05 0.31 7.65
0 + 575.0 6.80 0.05
25.00 6.85 0.06 0.38 9.42
0 + 600.0 6.90 0.06
25.00 6.88 0.06 0.41 10.31
0 + 625.0 6.85 0.06
25.00 6.78 0.07 0.44 11.01
0 + 650.0 6.70 0.07
25.00 7.00 0.07 0.49 12.25
0 + 675.0 7.30 0.07
25.00 7.15 0.07 0.50 12.51
0 + 700.0 7.00 0.07
25.00 7.15 0.07 0.48 12.07
0 + 725.0 7.30 0.07
10.00 7.15 0.06 0.45 4.47
0 + 735.0 7.00 0.06

0 + 825.0 7.00 0.07


25.00 7.15 0.07 0.48 12.07
0 + 850.0 7.30 0.07
20.00 7.15 0.05 0.36 7.15
0 + 870.0 7.00 0.03

Total : 146.58

Komulatif : 255.77

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
REKAPITULASI VOLUME PEKERJAAN

KEGIATAN : PEMBANGUNAN JALAN


PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA
KONSULTAN : CV. MCE CONSULTANT

NO. ITEM URAIAN SATUAN KUANTITAS KETERANGAN

DIVISI 6 PERKERASAN BERASPAL

6.1 (1) Lapis resap pengikat Ltr 4341.60

6.1(2) Lapis perekat Ltr 2458.00

6.3(5a) Laston Lapis Aus (AC-WC) = 4cm M2 6117.50

6.3(6a) Laston Lapis Antara (AC-BC) = 6cm M3 367.56

8.4(1) Marka Jalan Thermoplastic M2 252.84

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST Ir. ABDUL HARIS.HA, MT AKHMAD ZAINUL ABIDIN, ST


NIP.19780708 201001 1 010 Site Engineer General Superintendent
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Lapis resap pengikat
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No. Mata Pemby. : 6.1 (1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : Ltr
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 2

MUTUAL CHECK
MC - 100%
Pemakaian
Keterangan Station Panjang Lebar Lebar Luas PC/m2 Volume
(m') (m') Rata-Rata (m') (m2) (Liter) (Liter)
1 2 4 5 6 = (5.1+5.2)/2 7 = 4*6 8 9 = 7*8

AC-BC 0+000.00 7.00


25.00 7.00 175.00 0.80 140.00
0+025.00 7.00
25.00 7.00 175.00 0.80 140.00
0+050.00 7.00
25.00 7.00 175.00 0.80 140.00
0+075.00 7.00
25.00 7.00 175.00 0.80 140.00
0+100.00 7.00
25.00 7.00 175.00 0.80 140.00
0+125.00 7.00
25.00 7.00 175.00 0.80 140.00
0+150.00 7.00
25.00 7.00 175.00 0.80 140.00
0+175.00 7.00
25.00 7.00 175.00 0.80 140.00
0+200.00 7.00
25.00 7.00 175.00 0.80 140.00
0+225.00 7.00
25.00 7.00 175.00 0.80 140.00
0+250.00 7.00
25.00 7.00 175.00 0.80 140.00
0+275.00 7.00
25.00 7.00 175.00 0.80 140.00
0+300.00 7.00
25.00 7.00 175.00 0.80 140.00
0+325.00 7.00
25.00 7.00 175.00 0.80 140.00
0+350.00 7.00
25.00 7.00 175.00 0.80 140.00
0+375.00 7.00
25.00 7.00 175.00 0.80 140.00
0+400.00 7.00
25.00 7.00 175.00 0.80 140.00
0+425.00 7.00
25.00 7.00 175.00 0.80 140.00
0+450.00 7.00
25.00 7.00 175.00 0.80 140.00
0+475.00 7.00
25.00 7.00 175.00 0.80 140.00
0+500.00 7.00
25.00 7.00 175.00 0.80 140.00
0+525.00 7.00
25.00 7.00 175.00 0.80 140.00
0+550.00 7.00
25.00 7.00 175.00 0.80 140.00
0+575.00 7.00
25.00 7.00 175.00 0.80 140.00
0+600.00 7.00

Sub Total : 3360.00

Komulatif : 3360.00
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Lapis resap pengikat
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No. Mata Pemby. : 6.1 (1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : Ltr
KONSULTAN : CV. MCE CONSULTANT Halaman : : 2 dari 2

MUTUAL CHECK
MC - 100%
Pemakaian
Keterangan Station Panjang Lebar Lebar Luas TC/m2 Volume
(m') (m') Rata-Rata (m') (m2) (Liter) (Liter)
1 2 4 5 6 = (5.1+5.2)/2 7 = 4*6 8 9 = 7*8

0+600.00 7.00
25.00 7.00 175.00 0.80 140.00
0+625.00 7.00
25.00 7.00 175.00 0.80 140.00
AC-BC 0+650.00 7.00
25.00 7.00 175.00 0.80 140.00
0+675.00 7.00
25.00 7.00 175.00 0.80 140.00
0+700.00 7.00
25.00 7.00 175.00 0.80 140.00
0+725.00 7.00
10.00 7.00 70.00 0.80 56.00
0+735.00 7.00
15.00 7.00 105.00 0.00 0.00
0+750.00 7.00
25.00 7.00 175.00 0.00 0.00
0+775.00 7.00
25.00 7.00 175.00 0.00 0.00
0+800.00 7.00
10.00 7.00 70.00 0.00 0.00
0+810.00 7.00
30.00 7.00 210.00 0.00 0.00
0+840.00 7.00
30.00 7.00 210.00 0.80 168.00
0+870.00 7.00

OPRITAN MASUK DESA BANTER 7.00 6.00 6.00 42.00 0.80 33.60
OPRITAN MASUK DESA JOGO DALU 6.00 5.00 5.00 30.00 0.80 24.00
Sub Total : 981.60

Komulatif : 4341.60

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Lapis perekat
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No. Mata Pemby. : 6.1 (1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : Ltr
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 2

MUTUAL CHECK
MC - 100%
Pemakaian
Keterangan Station Panjang Lebar Lebar Luas TC/m2 Volume
(m') (m') Rata-Rata (m') (m2) (Liter) (Liter)
1 2 4 5 6 = (5.1+5.2)/2 7 = 4*6 8 9 = 7*8
AC-WC 0+000.00 7.00
25.00 7.00 175.00 0.40 70.00
0+025.00 7.00
25.00 7.00 175.00 0.40 70.00
0+050.00 7.00
25.00 7.00 175.00 0.40 70.00
0+075.00 7.00
25.00 7.00 175.00 0.40 70.00
0+100.00 7.00
25.00 7.00 175.00 0.40 70.00
0+125.00 7.00
25.00 7.00 175.00 0.40 70.00
0+150.00 7.00
25.00 7.00 175.00 0.40 70.00
0+175.00 7.00
25.00 7.00 175.00 0.40 70.00
0+200.00 7.00
25.00 7.00 175.00 0.40 70.00
0+225.00 7.00
25.00 7.00 175.00 0.40 70.00
0+250.00 7.00
25.00 7.00 175.00 0.40 70.00
0+275.00 7.00
25.00 7.00 175.00 0.40 70.00
0+300.00 7.00
25.00 7.00 175.00 0.40 70.00
0+325.00 7.00
25.00 7.00 175.00 0.40 70.00
0+350.00 7.00
25.00 7.00 175.00 0.40 70.00
0+375.00 7.00
25.00 7.00 175.00 0.40 70.00
0+400.00 7.00
25.00 7.00 175.00 0.40 70.00
0+425.00 7.00
25.00 7.00 175.00 0.40 70.00
0+450.00 7.00
25.00 7.00 175.00 0.40 70.00
0+475.00 7.00
25.00 7.00 175.00 0.40 70.00
0+500.00 7.00
25.00 7.00 175.00 0.40 70.00
0+525.00 7.00
25.00 7.00 175.00 0.40 70.00
0+550.00 7.00

Sub Total : 1540.00

Komulatif : 1540.00
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Lapis perekat
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No. Mata Pemby. : 6.1 (1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : Ltr
KONSULTAN : CV. MCE CONSULTANT Halaman : 2 dari 2

MUTUAL CHECK
MC - 100%
Pemakaian
Keterangan Station Panjang Lebar Lebar Luas TC/m2 Volume
(m') (m') Rata-Rata (m') (m2) (Liter) (Liter)
1 2 4 5 6 = (5.1+5.2)/2 7 = 4*6 8 9 = 7*8

0+550.00 7.00
25.00 7.00 175.00 0.40 70.00
0+575.00 7.00
25.00 7.00 175.00 0.40 70.00
0+600.00 7.00
25.00 7.00 175.00 0.40 70.00
0+625.00 7.00
25.00 7.00 175.00 0.40 70.00
0+650.00 7.00
25.00 7.00 175.00 0.40 70.00
0+675.00 7.00
25.00 7.00 175.00 0.40 70.00
0+700.00 7.00
25.00 7.00 175.00 0.40 70.00
0+725.00 7.00
10.00 7.00 70.00 0.40 28.00
0+735.00 7.00
15.00 7.00 105.00 0.40 42.00
0+750.00 7.00
25.00 7.00 175.00 0.40 70.00
0+775.00 7.00
25.00 7.00 175.00 0.40 70.00
AC-WC 0+800.00 7.00
25.00 7.00 175.00 0.40 70.00
0+825.00 7.00
15.00 7.00 105.00 0.40 42.00
0+840.00 7.00
30.00 7.00 210.00 0.40 84.00
0+870.00 7.00

OPRITAN MASUK DESA BANTER 5.00 7.00 5.00 30.00 0.40 12.00
OPRITAN MASUK DESA JOGO DALU 5.00 6.00 4.00 25.00 0.40 10.00
Sub Total : 918.00

Komulatif : 2458.00

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Laston Lapis Aus (AC-WC) = 4cm
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No. Mata Pemby. : 6.3(5a)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M2
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 2

MUTUAL CHECK
MC - 100%

Station Panjang Lebar Lebar Tebal Volume


(m') (m') Rata-Rata (m') (m) (m2)

0+000.00 7.00
25.00 7.00 0.04 175.00
0+025.00 7.00
25.00 7.00 0.04 175.00
0+050.00 7.00
25.00 7.00 0.04 175.00
0+075.00 7.00
25.00 7.00 0.04 175.00
0+100.00 7.00
25.00 7.00 0.04 175.00
0+125.00 7.00
25.00 7.00 0.04 175.00
0+150.00 7.00
25.00 7.00 0.04 175.00
0+175.00 7.00
25.00 7.00 0.04 175.00
0+200.00 7.00
25.00 7.00 0.04 175.00
0+225.00 7.00
25.00 7.00 0.04 175.00
0+250.00 7.00
25.00 7.00 0.04 175.00
0+275.00 7.00
25.00 7.00 0.04 175.00
0+300.00 7.00
25.00 7.00 0.04 175.00
0+325.00 7.00
25.00 7.00 0.04 175.00
0+350.00 7.00
25.00 7.00 0.04 175.00
0+375.00 7.00
25.00 7.00 0.04 175.00
0+400.00 7.00
25.00 7.00 0.04 175.00
0+425.00 7.00
25.00 7.00 0.04 175.00
0+450.00 7.00
25.00 7.00 0.04 175.00
0+475.00 7.00
25.00 7.00 0.04 175.00
0+500.00 7.00
25.00 7.00 0.04 175.00
0+525.00 7.00
25.00 7.00 0.04 175.00
0+550.00 7.00

Total : 3850.00

Komulatif : 3850.00
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Laston Lapis Aus (AC-WC) = 4cm
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No. Mata Pemby. : 6.3(5a)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M2
KONSULTAN : CV. MCE CONSULTANT Halaman : 2 dari 2

MUTUAL CHECK
MC - 100%

Station Panjang Lebar Lebar Tebal Volume


(m') (m') Rata-Rata (m') (m) (m2)

0+550.00 7.00
25.00 7.00 0.04 175.00
0+575.00 7.00
25.00 7.00 0.04 175.00
0+600.00 7.00
25.00 7.00 0.04 175.00
0+625.00 7.00
25.00 7.00 0.04 175.00
0+650.00 7.00
25.00 7.00 0.04 175.00
0+675.00 7.00
25.00 7.00 0.04 175.00
0+700.00 7.00
25.00 7.00 0.04 175.00
0+725.00 7.00
25.00 7.00 0.04 175.00
0+750.00 7.00
25.00 7.00 0.04 175.00
0+775.00 7.00
25.00 7.00 0.04 175.00
0+800.00 7.00
25.00 7.00 0.04 175.00
0+825.00 7.00
10.00 7.00 0.04 70.00
0+835.00 7.00
35.00 7.00 0.04 245.00
0+870.00 7.00

OPRITAN MASUK DESA BANTER 5.00 7.00 5.00 0.04 15.00


OPRITAN MASUK DESA JOGO DALU 5.00 6.00 4.00 0.04 12.50
Total : 2267.50

Komulatif : 6117.50

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Laston Lapis Antara (AC-
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU BC) = 6cm
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No. Mata Pemby. : 6.3(6a)
KONSULTAN : CV. MCE CONSULTANT Satuan : M3
Halaman : 1 dari 2
MUTUAL CHECK
MC - 100%

Station Panjang Lebar Lebar Tebal Luas Volume


(m') (m') Rata-Rata (m') (m) (m2) (m3)

0+000.00 7.00
25.00 7.00 0.06 175.00 10.50
0+025.00 7.00
25.00 7.00 0.06 175.00 10.50
0+050.00 7.00
25.00 7.00 0.06 175.00 10.50
0+075.00 7.00
25.00 7.00 0.06 175.00 10.50
0+100.00 7.00
25.00 7.00 0.06 175.00 10.50
0+125.00 7.00
25.00 7.00 0.06 175.00 10.50
0+150.00 7.00
25.00 7.00 0.06 175.00 10.50
0+175.00 7.00
25.00 7.00 0.06 175.00 10.50
0+200.00 7.00
25.00 7.00 0.06 175.00 10.50
0+225.00 7.00
25.00 7.00 0.06 175.00 10.50
0+250.00 7.00
25.00 7.00 0.06 175.00 10.50
0+275.00 7.00
25.00 7.00 0.06 175.00 10.50
0+300.00 7.00
25.00 7.00 0.06 175.00 10.50
0+325.00 7.00
25.00 7.00 0.06 175.00 10.50
0+350.00 7.00
25.00 7.00 0.06 175.00 10.50
0+375.00 7.00
25.00 7.00 0.06 175.00 10.50
0+400.00 7.00
25.00 7.00 0.06 175.00 10.50
0+425.00 7.00
25.00 7.00 0.06 175.00 10.50
0+450.00 7.00
25.00 7.00 0.06 175.00 10.50
0+475.00 7.00
25.00 7.00 0.06 175.00 10.50
0+500.00 7.00
25.00 7.00 0.06 175.00 10.50
0+525.00 7.00
25.00 7.00 0.06 175.00 10.50
0+550.00 7.00
25.00 7.00 0.06 175.00 10.50
0+575.00 7.00
25.00 7.00 0.06 175.00 10.50
0+600.00 7.00

Total : 252.00

Komulatif : 252.00
Item Pekerjaan : Laston Lapis Antara (AC-
KEGIATAN : PEMBANGUNAN JALAN BC) = 6cm
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No. Mata Pemby. : 6.3(6a)
KONSULTAN : CV. MCE CONSULTANT Satuan : M3
Halaman : 2 dari 2
MUTUAL CHECK
MC - 100%

Station Panjang Lebar Lebar Tebal Luas Volume


(m') (m') Rata-Rata (m') (m) (m2) (m3)

0+600.00 7.00
25.00 7.00 0.06 175.00 10.50
0+625.00 7.00
25.00 7.00 0.06 175.00 10.50
0+650.00 7.00
25.00 7.00 0.06 175.00 10.50
0+675.00 7.00
25.00 7.00 0.06 175.00 10.50
0+700.00 7.00
25.00 7.00 0.06 175.00 10.50
0+725.00 7.00
25.00 7.00 0.06 175.00 10.50
0+750.00 7.00
25.00 7.00 0.06 175.00 10.50
0+775.00 7.00
25.00 7.00 0.06 175.00 10.50
0+800.00 7.00
25.00 7.00 0.06 175.00 10.50
0+825.00 7.00
10.00 7.00 0.06 70.00 4.20
0+835.00 7.00
35.00 7.00 0.06 245.00 14.70
0+870.00 7.00

OPRITAN MASUK DESA BANTER 7.00 6.00 6.00 0.06 42.00 1.26
OPRITAN MASUK DESA JOGO DALU 6.00 5.00 5.00 0.06 30.00 0.90
Total : 115.56

Komulatif : 367.56

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Marka Jalan Thermoplastic
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU No Item Pemby. : 8.4(1)
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan M2
KONSULTAN : CV. MCE CONSULTANT Halaman 1 dari 1

MUTUAL CHECK
MC - 100%
Dimensi Marka
Sket / Type Konstruksi STATION Lokasi Panjang Lebar Panjang Total Volume
L/R ( m' ) ( m' ) ( m' ) (Bh) (m2)
1 2 3 4 5 6 7 8= 5*6*7

Putus

0+000.00 - 0+410.00 AS 410.00 0.12 3.00 52.00 18.72


0+450.00 - 0+602.00 AS 152.00 0.12 3.00 19.00 6.84
0+642.00 - 0+870.00 AS 228.00 0.12 3.00 29.00 10.44

Solid

0+000.00 - 0+870.00 kiri 870.00 0.12 870.00 1.00 104.40

0+000.00 - 0+870.00 kanan 870.00 0.12 870.00 1.00 104.40

0+410.00 - 0+450.00 AS 40.00 0.12 40.00 1.00 4.80

0+602.00 - 0+642.00 AS 40.00 0.12 40.00 1.00 4.80

Total : 254.40

Masuk desa banter kiri 7.00 0.12 1.00 0.84

Masuk jogo dalu kanan 6.00 0.12 1.00 0.72

Total : 1.56

Komulatif : 252.84

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
0 CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA
0
0
0
0
0
0
0
0
FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST
NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
REKAPITULASI VOLUME PEKERJAAN

KEGIATAN : PEMBANGUNAN JALAN


PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA
KONSULTAN : CV. MCE CONSULTANT

NO. ITEM URAIAN SATUAN KUANTITAS KETERANGAN

DIVISI 7 STRUKTUR

- Pasangan Batu Kali 1:4 M3 561.61

- Plesteran 1Pc : 3Psr Tebal 1,5cm M2 301.95

- Pemasangan Geotextile Woven 250gr/m2 M2 6344.20

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST Ir. ABDUL HARIS.HA, MT AKHMAD ZAINUL ABIDIN, ST


NIP.19780708 201001 1 010 Site Engineer General Superintendent
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Pasangan Batu Kali 1:4
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No Item Pemby. : -
KONSULTAN : CV. MCE CONSULTANT Satuan : M3
Halaman : 1 dari 3
MUTUAL CHECK
MC - 100 %
DIMENSI
No Sket / Type Konstruksi STATION Panjang h1 h2 h3 w1 w2 w3 w4 Luas Luas Rata2 Volume
(m') (m') (m') (m') (m') (m') (m') (m') (m2) (m2) (m3)

0 + 175.0 L 1.25 0.55 - 0.30 0.55 0.55 - 0.83


46.00 0.80 36.61
0 + 221.0 L 1.15 0.53 - 0.30 0.53 0.53 - 0.76

0 + 229.0 L 1.00 0.50 - 0.30 0.50 0.50 - 0.65


21.00 0.75 15.80
0 + 250.0 L 1.30 0.55 - 0.30 0.55 0.55 - 0.86
45.00 0.86 38.80
0 + 295.0 L 1.30 0.56 - 0.30 0.56 0.56 - 0.87
55.00 0.79 43.43
0 + 350.0 L 1.15 0.50 - 0.30 0.50 0.50 - 0.71
47.00 0.71 33.56
0 + 397.0 L 1.17 0.50 - 0.30 0.50 0.50 - 0.72

0 + 463.0 L 0.95 0.50 - 0.30 0.50 0.50 - 0.63


6.00 0.65 3.90
0 + 469.0 L 0.95 0.50 - 0.30 0.50 0.50 - 0.63
28.00 0.88 24.57
0 + 497.0 L 1.05 0.50 - 0.30 0.50 0.50 - 0.67
-
0 + 522.0 L 1.70 0.60 - 0.30 0.60 0.60 - 1.13
28.00 0.93 25.97
0 + 550.0 L 1.68 0.60 - 0.30 0.60 0.60 - 1.12
50.00 0.92 46.15
0 + 600.0 L 1.15 0.50 - 0.30 0.50 0.50 - 0.71
21.00 0.70 14.70
0 + 621.0 L 1.20 0.50 - 0.30 0.50 0.50 - 0.73

0 + 638.0 L 1.20 0.50 - 0.30 0.50 0.50 - 0.73


12.00 0.71 8.52
0 + 650.0 L 1.20 0.50 - 0.30 0.50 0.50 - 0.73
35.00 0.73 25.41
0 + 685.0 L 1.10 0.50 - 0.30 0.50 0.50 - 0.69

0 + 695.0 L 1.18 0.50 - 0.30 0.50 0.50 - 0.72


5.00 0.72 3.61
0 + 700.0 L 1.18 0.50 - 0.30 0.50 0.50 - 0.72
25.00 0.71 17.65
0 + 725.0 L 1.10 0.50 - 0.30 0.50 0.50 - 0.69

0 + 828.0 L 1.15 0.50 - 0.30 0.50 0.50 - 0.71


15.00 0.70 10.50
0 + 843.0 L 1.10 0.50 - 0.30 0.50 0.50 - 0.69
10.00 0.70 7.00
0 + 853.0 L 1.15 0.50 - 0.30 0.50 0.50 - 0.71
Total : 356.19
Kumulatif : 356.19

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Pasangan Batu Kali 1:4
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No Item Pemby. : -
KONSULTAN : CV. MCE CONSULTANT Satuan : M3
Halaman : 2 dari 4
MUTUAL CHECK
MC - 100 %
DIMENSI
No Sket / Type Konstruksi STATION Panjang h1 h2 h3 w1 w2 w3 w4 Luas Luas Rata2 Volume
(m') (m') (m') (m') (m') (m') (m') (m') (m2) (m2) (m3)

0 + 095.0 R 1.40 0.60 - 0.30 0.60 0.60 - 0.99


44.00 0.90 39.42
0 + 139.0 R 1.30 0.52 - 0.30 0.52 0.52 - 0.80

0 + 271.0 R 1.40 0.60 - 0.30 0.60 0.60 - 0.99


24.00 1.00 24.03
0 + 295.0 R 1.45 0.60 - 0.30 0.60 0.60 - 1.01

0 + 469.0 R 1.70 0.65 - 0.30 0.65 0.65 - 1.23


33.00 1.14 37.74
0 + 502.0 R 1.55 0.60 - 0.30 0.60 0.60 - 1.06

0 + 522.0 R 1.65 0.60 - 0.30 0.60 0.60 - 1.10


28.00 1.10 30.87
0 + 550.0 R 1.65 0.60 - 0.30 0.60 0.60 - 1.10
50.00 0.94 46.81
0 + 600.0 R 1.30 0.50 - 0.30 0.50 0.50 - 0.77
21.00 0.75 15.75
0 + 621.0 1.20 0.50 - 0.30 0.50 0.50 - 0.73
Total : 194.63
Kumulatif : 550.81
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan :
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU Pasangan Batu Kali 1:4
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No Item Pemby. :
KONSULTAN : CV. MCE CONSULTANT Satuan : M3
Halaman : 3 dari 4
MUTUAL CHECK
MC - 100 %
DIMENSI
No Sket / Type Konstruksi STATION Panjang h1 h2 h3 w1 w2 w3 w4 Luas Luas Rata2 Volume
(m') (m') (m') (m') (m') (m') (m') (m') (m2) (m2) (m3)

0 + 830.0 R 0.70 0.55 - 0.30 0.55 0.55 - 0.60


13.00 0.53 6.84
0 + 843.0 R 0.70 0.44 - 0.30 0.44 0.44 - 0.45

0 + 853.0 R 0.50 0.40 - 0.30 0.50 0.50 - 0.40


2.00 0.40 0.80
0 + 855.0 R 0.50 0.40 - 0.30 0.50 0.50 - 0.40
7.00 0.45 3.15
0 + 862.0 R 0.50 0.60 - 0.30 0.50 0.50 - 0.50

Total : 10.79
Kumulatif : 561.61

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Plesteran 1Pc : 3Psr Tebal 1,5cm
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - ME No Item Pemby. : -
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M2
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 2

PANJANG LEBAR LEBAR RATA - RATA VOLUME


No URAIAN PEKERJAAN STA SISI SATUAN
(m') (m') (m') (m2)
1 2 3 4 5 6 7 8=7*5 9
DIVISI 3 PEKERJAAN TANAH
.
Plesteran halus
0 + 175.0 KIRI 0.45
46.00 0.45 20.70
0 + 221.0 KIRI 0.45

0 + 229.0 KIRI 0.45


168.00 0.45 75.60
0 + 397.0 KIRI 0.45

0 + 463.0 KIRI 0.45


34.00 0.45 15.30
0 + 497.0 KIRI 0.45

0 + 522.0 KIRI 0.45


99.00 0.45 44.55
0 + 621.0 KIRI 0.45

0 + 638.0 KIRI 0.45


47.00 0.45 21.15
0 + 685.0 KIRI 0.45

0 + 695.0 KIRI 0.45


30.00 0.45 13.50
0 + 725.0 KIRI 0.45

0 + 828.0 KIRI 0.45


25.00 0.45 11.25
0 + 853.0 KIRI 0.45

Total 202.05

Komulatif 202.05

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Plesteran 1Pc : 3Psr Tebal 1,5cm
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - ME No Item Pemby. : -
KONTRAKTOR : PT. BIMA SAKTI ADHINATA Satuan : M2
KONSULTAN : CV. MCE CONSULTANT Halaman : 1 dari 2

PANJANG LEBAR LEBAR RATA - RATA VOLUME


No URAIAN PEKERJAAN STA SISI SATUAN
(m') (m') (m') (m2)
1 2 3 4 5 6 7 8=7*5 9

0 + 095.0 KANAN 0.45


44.00 0.45 19.80
0 + 139.0 KANAN 0.45

0 + 271.0 KANAN 0.45


24.00 0.45 10.80
0 + 295.0 KANAN 0.45

0 + 469.0 KANAN 0.45


33.00 0.45 14.85
0 + 502.0 KANAN 0.45

0 + 522.0 KANAN 0.45


99.00 0.45 44.55
0 + 621.0 KANAN 0.45

0 + 830.0 KANAN 0.45


13.00 0.45 5.85
0 + 843.0 KANAN 0.45

0 + 853.0 KANAN 0.45


9.00 0.45 4.05
0 + 862.0 KANAN 0.45

Total 99.90 m2

Komulatif 301.95

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Pemasangan Geotextile Woven
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU 250gr/m2
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No Item Pemby. : -
KONSULTAN : CV. MCE CONSULTANT Satuan : M2
Halaman : 1 dari 2

PANJANG a b c d e Keliling Keliling rata-rata Volume


No URAIAN PEKERJAAN STA SISI SATUAN
(m') (m') (m') (m') (m') (m') (m2)
1 2 3 4 5 7 8 9 10 11
DIVISI 7 PEKERJAAN TANAH
.
Pemasangan geotextil
0 + 000.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 025.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 050.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 075.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 100.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 125.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 150.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 175.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 200.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 225.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 250.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 275.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 300.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 325.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 350.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 375.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 400.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 425.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 450.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 475.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 500.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 525.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 550.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 575.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 600.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
21.00 3.70 77.70
0 + 621.0 0.50 0.4 2.00 0.3 0.50 3.70

0 + 621.0 KIRI
JEMBATAN 4.00 0.00 0.00
0 + 625.0 KIRI

0 + 625.0 0.50 0.4 2.00 0.3 0.50 3.70


25.00 3.50 87.50
0 + 650.0 KIRI 0.50 0.4 1.60 0.3 0.50 3.30
25.00 3.30 82.50
0 + 675.0 KIRI 0.50 0.4 1.60 0.3 0.50 3.30
25.00 3.30 82.50
0 + 700.0 KIRI 0.50 0.4 1.60 0.3 0.50 3.30
25.00 3.50 87.50
0 + 725.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 750.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 775.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 800.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 825.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
15.00 3.70 55.50
0 + 840.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
30.00 3.70 111.00
0 + 870.0 KIRI 0.50 0.4 2.00 0.3 0.50 3.70
Total 3174.20 m2
Komulatif 3174.20 m2

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA
FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST
NIP.19780708 201001 1 010 Inspector Lapangan Manager Project
KEGIATAN : PEMBANGUNAN JALAN Item Pekerjaan : Pemasangan Geotextile Woven
250gr/m2
PEKERJAAN : PENINGKATAN JALAN BALONGPANGGANG - METATU
KONTRAKTOR : PT. BIMA SAKTI ADHINATA No Item Pemby. : -
KONSULTAN : CV. MCE CONSULTANT Satuan : M2
Halaman : 2 dari 2

PANJANG a b c d e Keliling Keliling rata-rata Volume


No URAIAN PEKERJAAN STA SISI SATUAN
(m') (m') (m') (m') (m') (m') (m2)
1 2 3 4 5 7 8 9 10 11
DIVISI 7 PEKERJAAN TANAH 0 + 000.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
Pemasangan geotextil
0 + 025.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 050.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 075.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 100.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 125.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 150.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 175.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 200.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 225.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 250.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 275.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 300.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 325.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 350.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 375.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 400.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 425.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 450.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 475.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 500.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 525.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 550.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 575.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 600.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
21.00 3.50 73.50
0 + 621.0 KANAN 0.50 0.40 1.60 0.3 0.50 3.30

0 + 621.0 KANAN
JEMBATAN 4.00
0 + 625.0 KANAN

0 + 625.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70


25.00 3.50 87.50
0 + 650.0 KANAN 0.50 0.40 1.60 0.3 0.50 3.30
25.00 3.30 82.50
0 + 675.0 KANAN 0.50 0.40 1.60 0.3 0.50 3.30
25.00 3.30 82.50
0 + 700.0 KANAN 0.50 0.40 1.60 0.3 0.50 3.30
25.00 3.50 87.50
0 + 725.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 750.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 775.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 800.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
25.00 3.70 92.50
0 + 825.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
15.00 3.70 55.50
0 + 840.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70
30.00 3.70 111.00
0 + 870.0 KANAN 0.50 0.40 2.00 0.3 0.50 3.70

Total 3170.00 m2
Komulatif 6344.20 m2

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


PENGAWAS DIREKSI LAPANGAN Konsultan Pengawas Kontraktor Pelaksana
CV. MCE CONSULTANT PT. BIMA SAKTI ADHINATA

FIFIN ACHMADI, ST ERWAN AGUNG. N, A.Md MUSRINING, ST


NIP.19780708 201001 1 010 Inspector Lapangan Manager Project

Anda mungkin juga menyukai