Page 1 of 1
Tittle Block Scale 1 : 1000
SEGMEN / RUAS - 1
RUNWAY STRIP
SEGMEN / RUAS - 2
JALAN INSPEKSI
8
SHOP DRAWING
9 6
1 1 1
12
14
16
15
MENGETAHUI
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
22
13
23 27
23 A3
28
28
11
22
22
DISETUJUI
DIPERIKSA
3
6
28
5
29
13
Tittle Block Scale 1 : 1000
23
23
23
28
Top Surface AC
Top Surface AC
20
Existing Ground
Existing Ground
104
114
104
114
106
108
110
116
106
108
110
116
118
120
102
112
102
112
23
Top Surface Timbunan
1
107.155 107.555 106.608 GRADE BREAK STA = 0+000.00 110.714 111.114 111.114 GRADE BREAK STA = 0+000.00
23
PRASARANA BANDARA
ELEV = 107.555 ELEV = 111.114
KOMPLEX 20
0+000
0+000
-2.00%
23
1
PERTAMINA
ELEV:107.47
STA:0+005.00
21
KASI PROGRAM DAN STANDARISASI
23
0+010
0+010
27
12
14
106.887 107.285 106.504 110.323 110.723 110.314
14
0+020
0+020
16
15
18 19
106.763 107.159 106.477 110.127 110.527 110.149
0+030
0+030
0+040
0+040
KONTRAKTOR
106.514 106.906 106.368 109.736 110.136 109.819
DIAJUKAN OLEH :
0+050
0+050
0+060
0+060
0+070
0+070
MENGETAHUI
106.141 106.528 106.396 109.150 109.550 109.318
0+080
0+080
0+090
0+090
-1.96%
Top Surface of AC
0+110
0+110
PERIKSA OLEH :
0+130
0+130
Alignment - Ruas 1
CV. GEOMETRIC
105.270 105.646 105.870 107.781 108.181 107.384
0+150
0+150
Top Surface Urugan
NURASMA, SE
0+160
0+160
ELEV = 107.555
0+210
0+210
STA:0+209.00
0+220
0+220
ELEV = 106.760
SHOP DRAWING
1/1
0+240
0+240
0+250
1
KEMENTRIAN PERHUBUNGAN
A3
Tittle Block Scale 1 : 1000
1:1 1:1
0.25 0.25
2.50 2.50
0.25 0.25
1:1 1:1
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
0+010.00 0+030.00
115 115
114 114
113 113
112 112
111 -4% -2% -2% -4% 111 -4% -2% -2% -4%
110 110
109 109
108 108
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
110.69
110.68
110.67
110.66
110.66
110.65
110.63
110.62
110.66
110.68
110.70
110.73
110.73
110.75
110.75
110.76
110.76
110.77
110.79
110.82
110.87
110.89
110.91
110.12
110.11
110.10
110.10
110.09
110.09
110.08
110.08
110.09
110.10
110.10
110.11
110.12
110.13
110.15
110.15
110.16
110.16
110.17
110.17
110.18
110.20
110.21
110.23
110.25
110.27
110.29
110.30
110.32
110.64
110.64
110.64
110.74
110.74
110.84
110.14
110.34
EXISTING ELEVATIONS EXISTING ELEVATIONS
110.65
110.71
110.82
110.92
110.82
110.77
110.12
110.19
110.25
110.32
110.39
110.43
110.47
110.49
110.51
110.53
110.51
110.49
110.47
110.43
110.39
110.32
110.25
110.78
110.86
110.88
110.90
110.90
110.88
110.86
110.78
110.76
PROPOSED ELEVATION PROPOSED ELEVATION
0+000.00
116 0+020.00
115 115
114 114
113 113
112 112
-4% -2% -2% -4%
111 111 1:15 -4% -2% -2% -4% 1:15
110 110
109 109
108 108
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
111.02
111.03
111.05
111.06
111.07
111.08
111.09
111.10
111.11
111.12
111.13
111.13
111.14
111.15
111.16
111.16
111.17
110.31
110.30
110.29
110.28
110.27
110.26
110.25
110.24
110.25
110.26
110.27
110.28
110.29
110.29
110.30
110.31
110.32
110.33
110.34
110.35
110.36
110.37
110.38
110.39
110.41
110.43
110.46
110.48
110.50
110.52
110.55
EXISTING ELEVATIONS EXISTING ELEVATIONS
110.97
111.01
111.05
111.07
111.09
111.11
111.09
111.07
111.05
111.01
110.97
111.11
110.32
110.38
110.45
110.52
110.58
110.62
110.66
110.68
110.72
110.68
110.66
110.62
110.58
110.52
110.45
111.04
111.04
110.70
110.70
PROPOSED ELEVATION PROPOSED ELEVATION
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
0+050.00
115 0+070.00
114 114
113 113
112 112
111 111
1:15 -4% -2% -2% -4% 1:15
110 110 1:15 -4% -2% -2% -4% 1:15
109 109
108 108
107 107
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
109.75
109.75
109.75
109.73
109.75
109.76
109.78
109.79
109.80
109.81
109.82
109.82
109.82
109.82
109.82
109.83
109.86
109.87
109.88
109.89
109.91
109.92
109.93
109.96
109.45
109.45
109.45
109.45
109.45
109.45
109.45
109.45
109.45
109.46
109.46
109.47
109.49
109.50
109.51
109.52
109.53
109.53
109.53
109.55
109.55
109.56
109.57
109.57
109.58
109.59
109.60
109.61
109.74
109.74
109.74
109.74
109.74
109.84
109.94
109.54
109.54
109.54
EXISTING ELEVATIONS EXISTING ELEVATIONS
109.93
110.12
110.12
109.93
109.47
109.61
109.65
109.69
109.71
109.73
109.75
109.73
109.71
109.69
109.65
109.61
109.80
109.86
110.00
110.04
110.08
110.10
110.14
110.10
110.08
110.04
110.00
109.86
109.54
109.54
PROPOSED ELEVATION PROPOSED ELEVATION
0+040.00
115 0+060.00
114 114
113 113
112 112
111 111
1:15 -4% -2% -2% -4% 1:15
110 110 1:15 -4% -2% -2% -4% 1:15
109 109
108 108
107 107
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
109.90
109.90
109.89
109.89
109.88
109.88
109.87
109.87
109.88
109.89
109.90
109.90
109.91
109.92
109.93
109.94
109.94
109.95
109.96
109.97
109.98
109.99
110.00
110.01
110.03
110.04
110.06
110.08
110.10
110.11
110.13
109.61
109.61
109.61
109.60
109.60
109.60
109.60
109.60
109.61
109.62
109.63
109.64
109.64
109.64
109.65
109.65
109.65
109.65
109.65
109.66
109.66
109.66
109.67
109.67
109.68
109.70
109.71
109.72
109.73
109.74
109.75
EXISTING ELEVATIONS EXISTING ELEVATIONS
109.93
109.99
110.06
110.13
110.19
110.23
110.27
110.29
110.31
110.33
110.31
110.29
110.27
110.23
110.19
110.13
110.06
109.67
109.73
109.88
109.92
109.92
109.88
109.73
109.60
109.80
109.84
109.90
109.94
109.90
109.84
109.80
PROPOSED ELEVATION PROPOSED ELEVATION
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
0+090.00
114 0+110.00
113 113
112 112
111 111
110 110
1:15 -4% -2% -2% -4% 1:15
1:15 -4% -2% -2% -4% 1:15
109 109
108 108
107 107
106 106
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
109.00
109.00
109.00
109.00
109.00
109.00
109.00
109.00
109.01
109.02
109.03
109.05
109.06
109.07
109.08
109.08
109.08
109.08
109.08
109.09
109.09
109.10
109.11
109.13
109.15
109.16
109.18
109.19
109.20
108.50
108.49
108.49
108.49
108.49
108.49
108.49
108.49
108.50
108.50
108.51
108.52
108.53
108.55
108.56
108.56
108.57
108.57
108.58
108.58
108.59
108.59
108.60
108.61
108.63
108.66
108.67
108.69
108.70
109.04
109.14
108.54
108.64
EXISTING ELEVATIONS EXISTING ELEVATIONS
109.01
109.15
109.21
109.25
109.29
109.31
109.33
109.35
109.33
109.31
109.29
109.25
109.21
109.15
108.62
108.69
108.82
108.92
108.92
108.82
108.69
108.62
109.08
108.56
108.76
108.86
108.90
108.94
108.96
108.94
108.90
108.86
108.76
PROPOSED ELEVATION PROPOSED ELEVATION
0+100.00
0+080.00 114
114 113
113 112
112 111
111 110
1:15 -4% -2% -2% -4% 1:15
110 -4% -2% -2%
109
1:15 -4% 1:15
109 108
108 107
107 106
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
109.25
109.25
109.24
109.24
109.23
109.22
109.22
109.21
109.23
109.25
109.27
109.28
109.29
109.30
109.31
109.32
109.32
109.33
109.33
109.33
109.34
109.33
109.33
109.33
109.34
109.35
109.36
109.37
109.38
109.39
109.40
108.72
108.72
108.72
108.72
108.72
108.72
108.72
108.72
108.73
108.74
108.75
108.77
108.78
108.79
108.80
108.82
108.82
108.83
108.84
108.84
108.85
108.85
108.85
108.85
108.87
108.89
108.90
108.92
108.94
108.95
108.97
EXISTING ELEVATIONS EXISTING ELEVATIONS
109.28
109.41
109.45
109.49
109.51
109.53
109.55
109.53
109.51
109.49
109.45
109.41
108.75
108.82
108.89
108.95
109.02
109.06
109.12
109.16
109.12
109.06
109.02
108.95
108.89
109.34
109.34
109.10
109.14
109.14
109.10
PROPOSED ELEVATION PROPOSED ELEVATION
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
0+130.00 0+150.00
113 113
112 112
111 111
110 110
107 107
106 106
105 105
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
107.99
107.99
107.99
108.00
108.00
108.00
108.00
108.00
108.00
108.00
108.00
108.00
108.01
108.02
108.02
108.03
108.05
108.07
108.08
108.09
108.09
108.09
108.09
108.10
108.12
108.13
108.15
108.16
108.17
108.19
107.46
107.45
107.43
107.41
107.39
107.37
107.35
107.33
107.36
107.37
107.37
107.38
107.38
107.38
107.38
107.41
107.47
107.50
107.53
107.56
107.59
107.61
107.63
107.65
107.67
107.69
107.71
107.72
108.04
107.34
107.44
107.74
EXISTING ELEVATIONS EXISTING ELEVATIONS
107.97
108.03
108.17
108.23
108.37
108.43
108.47
108.51
108.53
108.55
108.57
108.55
108.53
108.51
108.47
108.43
108.37
108.23
108.17
107.51
107.57
107.71
107.77
107.91
107.97
108.12
108.12
107.97
107.91
107.77
107.71
108.10
108.30
108.30
107.64
107.84
108.04
108.08
108.14
108.16
108.18
108.16
108.14
108.08
108.04
107.84
107.64
PROPOSED ELEVATION PROPOSED ELEVATION
0+140.00
0+120.00 113
113 112
112 111
111 110
110 109
1:15 -4% -2% -2% -4% 1:15
109 1:15 -4% -2% -2% -4% 1:15 108
108 107
107 106
106 105
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
108.29
108.30
108.30
108.30
108.30
108.30
108.30
108.31
108.31
108.32
108.32
108.33
108.33
108.34
108.34
108.35
108.35
108.34
108.34
108.34
108.34
108.34
108.33
108.33
108.34
108.36
108.37
108.39
108.40
108.42
108.43
107.65
107.65
107.66
107.67
107.68
107.69
107.69
107.70
107.70
107.70
107.70
107.71
107.72
107.72
107.73
107.74
107.75
107.76
107.77
107.78
107.79
107.81
107.83
107.85
107.87
107.88
107.90
107.92
107.93
107.95
107.97
EXISTING ELEVATIONS EXISTING ELEVATIONS
108.23
108.29
108.36
108.43
108.49
108.56
108.63
108.67
108.71
108.73
108.75
108.77
108.75
108.73
108.71
108.67
108.63
108.56
108.49
108.43
108.36
107.77
107.97
108.17
108.28
108.32
108.36
108.38
108.36
108.32
108.28
108.17
107.97
107.70
107.84
107.90
108.04
108.10
108.24
108.34
108.34
108.24
108.10
108.04
107.90
PROPOSED ELEVATION PROPOSED ELEVATION
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
11
22
22
24
DISETUJUI
DIPERIKSA
17
4
6
28
5
29
EXISTING ELEVATIONS
EXISTING ELEVATIONS
PROPOSED ELEVATION
PROPOSED ELEVATION
13
Tittle Block Scale 1 : 1000
23
23
2
104
106
110
104
106
110
105
107
108
109
111
112
105
107
108
109
111
112
23
28
1
20
24
10
23
0+160.00
0+170.00
23
PRASARANA BANDARA
KOMPLEX 20
23
1
PERTAMINA
107.22 107.03
107.18 106.98
21
107.19 106.98
23
107.25 107.05
107.16 106.94
17
107.31 107.12
27
24
12
107.14 106.89
14
107.38 107.18
107.11 106.85
14
107.45 107.25
107.08 106.80
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
107.51 107.32
16
107.05 106.75
-9
-9
107.58 107.38
15
106.78 106.80
18 19
-8
-8
BAK SAMPAH
107.65 107.45
106.86 106.79
-7
-7
107.71 107.52
106.94 106.78
-6
-6
107.78 107.58
1:15
1:15
107.02 106.77
-5
-5
107.85 107.65
107.02 106.78
-4
-4
-4%
-4%
107.89 107.69
107.02 106.79
-3
-3
107.93 107.73
107.03 106.80
KONTRAKTOR
-2
-2
107.95 107.75
107.03 106.82
-2%
-2%
-1
-1
DIAJUKAN OLEH :
107.97 107.77
107.04 106.83
0
0
107.99 107.79
107.07 106.85
1
1
-2%
-2%
107.97 107.77
107.09 106.88
2
2
107.95 107.75
107.12 106.90
3
3
107.93 107.73
107.15 106.93
-4%
-4%
4
4
107.89 107.69
107.18 106.96
5
5
107.85 107.65
107.20 106.95
1:15
1:15
6
6
107.78 107.58
107.23 106.95
7
7
107.71 107.52
107.25 106.94
8
8
107.65 107.45
107.27 106.97
9
9
MENGETAHUI
107.58 107.38
107.30 106.99
10
10
11
11
107.45 107.25
PT.FAJARRAYA USAHANUSA
107.35 107.04
12
12
13
13
107.12
107.39 107.09
14
14
107.42 107.12
16
16
17
17
18
18
19
19
20
20
PERIKSA OLEH :
EXISTING ELEVATIONS
EXISTING ELEVATIONS
PROPOSED ELEVATION
PROPOSED ELEVATION
104
104
106
107
108
110
106
107
108
110
105
109
111
112
105
109
111
112
KONSULTAN SUPERVISI
106.62 106.36
106.63 106.36
106.29
CV. GEOMETRIC
0+180.00
0+190.00
106.62 106.35
106.36
106.61 106.35
106.59 106.43
106.60 106.35
106.65 106.49
106.59 106.35
106.72 106.56
106.58 106.37
NURASMA, SE
106.79 106.63
106.58 106.38
106.85 106.69
106.99 106.83
106.60 106.43
BANDAR UDARA SIS ALJUFRI - PALU
107.05 106.89
106.61 106.45
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
107.12 106.96
106.57 106.33
-9
-9
107.19 107.03
106.53 106.18
-8
-8
107.25 107.09
106.54 106.21
-7
-7
107.32 107.16
106.55 106.23
-6
-6
107.39 107.23
1:15
1:15
106.56 106.25
-5
-5
107.45 107.29
106.59 106.27
-4
-4
-4%
-4%
107.49 107.33
106.61 106.29
-3
-3
107.53 107.37
106.63 106.31
-2
-2
107.55 107.39
106.65 106.33
-2%
-2%
-1
-1
107.57 107.41
106.67 106.35
0
0
107.59 107.43
106.69 106.37
1
1
-2%
-2%
107.57 107.41
106.70 106.38
2
2
107.55 107.39
106.72 106.39
3
3
107.53 107.37
106.74 106.41
-4%
-4%
4
4
107.49 107.33
106.75 106.42
5
5
107.45 107.29
106.74 106.42
1:15
1:15
6
6
107.39 107.23
106.73 106.42
7
7
107.32 107.16
106.73 106.42
8
8
107.25 107.09
106.74 106.44
9
9
107.19 107.03
106.76 106.47
10
10
107.12 106.96
SHOP DRAWING
106.77 106.49
11
11
107.05 106.89
106.79 106.51
12
12
106.99 106.83
106.81 106.53
13
13
106.92 106.76
106.82 106.56
14
14
106.85 106.69
106.84 106.58
15
15
106.63
106.87 106.60
16
16
106.56
106.89 106.63
17
17
106.92 106.65
18
18
KEMENTRIAN PERHUBUNGAN
A3
106.94 106.67
19
19
20
20
25
7
11
22
22
24
DISETUJUI
DIPERIKSA
17
4
6
28
5
29
EXISTING ELEVATIONS
EXISTING ELEVATIONS
PROPOSED ELEVATION
PROPOSED ELEVATION
13
Tittle Block Scale 1 : 1000
23
23
2
104
106
110
104
106
110
105
107
108
109
111
112
105
107
108
109
111
112
103
23
28
1
20
106.00 105.79
106.08 105.94
106.01 105.82
106.14 106.01
24
10
23
0+200.00
0+209.00
106.02 105.84
1
106.21 106.08
106.03 105.86
106.28 106.14
23
PRASARANA BANDARA
106.04 105.87
KOMPLEX 20
106.34 106.21
106.05 105.88
23
1
PERTAMINA
106.41 106.28
106.06 105.89
106.48 106.34
21
106.07 105.90
23
106.54 106.41
106.08 105.90
17
106.61 106.48
27
24
12
106.09 105.91
14
106.68 106.54
106.09 105.91
14
106.74 106.61
106.10 105.91
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
106.81 106.68
16
106.11 105.91
-9
-9
106.88 106.74
15
106.12 105.90
18 19
-8
-8
BAK SAMPAH
106.94 106.81
106.10 105.90
-7
-7
107.01 106.88
106.07 105.90
-6
-6
107.08 106.94
1:15
1:15
106.05 105.90
-5
-5
107.14 107.01
106.09 105.91
-4
-4
-4%
-4%
107.18 107.05
106.12 105.90
-3
-3
107.22 107.09
106.16 105.89
KONTRAKTOR
-2
-2
107.24 107.11
106.20 105.88
-2%
-2%
-1
-1
DIAJUKAN OLEH :
107.26 107.13
106.23 105.87
0
0
107.28 107.15
106.21 105.88
1
1
-2%
-2%
107.26 107.13
106.19 105.93
2
2
107.24 107.11
106.16 105.98
3
3
107.22 107.09
106.14 106.03
-4%
-4%
4
4
107.18 107.05
106.12 106.07
5
5
107.14 107.01
106.16 106.10
1:15
1:15
6
6
107.08 106.94
106.20 106.09
7
7
107.01 106.88
106.23 106.08
8
8
106.94 106.81
106.27 106.07
9
9
MENGETAHUI
106.88 106.74
106.30 106.03
10
10
11
11
106.74 106.61
PT.FAJARRAYA USAHANUSA
106.36 105.97
12
12
13
13
106.61 106.48
106.39 105.90
14
14
106.54 106.41
106.37 105.86
106.48 106.34
106.33 105.83
16
16
106.41 106.28
106.30 105.92
17
17
106.34 106.21
106.26 106.03
18
18
106.28 106.14
106.30 106.07
19
19
106.08
20
20
PERIKSA OLEH :
KONSULTAN SUPERVISI
CV. GEOMETRIC
NURASMA, SE
NIP : 19741025 200604 2 001
PEJABAT PEMBUAT KOMITMEN
BANDAR UDARA SIS ALJUFRI - PALU
SHOP DRAWING
KEMENTRIAN PERHUBUNGAN
A3
7
11
22
22
DISETUJUI
DIPERIKSA
3
6
28
5
29
13
Tittle Block Scale 1 : 1000
23
23
23
28
1
20
EXISTING ELEVATIONS
EXISTING ELEVATIONS
23
PROPOSED ELEVATION
PROPOSED ELEVATION
1
104
110
104
110
106
107
108
106
107
108
103
105
109
111
112
103
105
109
111
112
23
PRASARANA BANDARA
KOMPLEX 20
105.50 105.48
23
1
PERTAMINA
105.48 105.47
21
KASI PROGRAM DAN STANDARISASI
0+209.00
0+210.00
105.47 105.45
23
106.25 106.23
105.46 105.44
27
12
107.15 107.13
14
105.45 105.43
14
107.15 107.13
105.44 105.42
16
107.15 107.13
105.43 105.41
15
18 19
107.15 107.13
105.44 105.41
107.15 107.13
105.45 105.42
107.15 107.13
105.46 105.43
107.15 107.13
105.47 105.44
107.15 107.13
105.49 105.46
KONTRAKTOR
107.15 107.13
105.50 105.47
DIAJUKAN OLEH :
107.15 107.13
105.51 105.49
107.15 107.13
105.54 105.51
107.15 107.13
105.56 105.53
107.15 107.13
105.58 105.56
107.15 107.13
105.60 105.58
107.15 107.13
105.63 105.60
107.15 107.13
105.65 105.63
107.15 107.13
105.67 105.65
MENGETAHUI
107.15 107.13
105.70 105.67
PT.FAJARRAYA USAHANUSA
107.15 107.13
PERIKSA OLEH :
107.15 107.13
105.91 105.89
107.15 107.13
KONSULTAN SUPERVISI
105.91 105.88
-47 -46 -45 -44 -43 -42 -41 -40 -39 -38 -37 -36 -35 -34 -33 -32 -31 -30 -29 -28 -27 -26 -25 -24 -23 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
-47 -46 -45 -44 -43 -42 -41 -40 -39 -38 -37 -36 -35 -34 -33 -32 -31 -30 -29 -28 -27 -26 -25 -24 -23 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
107.15 107.13
105.90 105.88
-9
-9
107.15 107.13
CV. GEOMETRIC 105.90 105.88
-8
-8
107.15 107.13
105.89 105.88
-7
-7
107.15 107.13
105.90 105.88
-6
-6
107.15 107.13
105.90 105.88
-5
-5
107.15 107.13
NURASMA, SE
105.91 105.87
-4
-4
107.15 107.13
107.15 107.13
105.89 105.85
PEJABAT PEMBUAT KOMITMEN
-2
-2
107.15 107.13
BANDAR UDARA SIS ALJUFRI - PALU
105.88 105.84
-1
-1
107.15 107.13
105.87 105.83
0
0
107.15 107.13
105.88 105.88
1
1
107.15 107.13
105.93 105.93
2
2
107.15 107.13
105.98 105.97
3
3
107.15 107.13
106.02 106.02
4
4
107.15 107.13
106.07 106.07
5
5
107.15 107.13
106.10 106.06
6
6
107.15 107.13
106.09 106.05
7
7
107.15 107.13
106.08 106.04
8
8
107.15 107.13
106.06 106.01
9
9
107.15 107.13
106.03 105.97
10
10
107.15 107.13
106.00 105.94
11
11
107.15 107.13
105.96 105.91
12
12
107.15 107.13
105.93 105.87
13
13
107.15 107.13
105.89 105.84
14
14
107.15 107.13
105.86 105.80
15
15
107.15 107.13
105.83 105.79
SHOP DRAWING
16
16
107.15 107.13
105.92 105.90
17
17
107.15 107.13
106.03 105.98
18
18
106.65 106.63
106.07 106.01
19
19
106.09 106.03
20
20
21
21
KEMENTRIAN PERHUBUNGAN
A3
7
11
22
22
DISETUJUI
DIPERIKSA
3
6
28
5
29
13
Tittle Block Scale 1 : 1000
23
23
23
28
1
20
EXISTING ELEVATIONS
EXISTING ELEVATIONS
23
PROPOSED ELEVATION
PROPOSED ELEVATION
1
104
110
104
110
106
107
108
106
107
108
103
105
109
111
103
105
109
111
23
PRASARANA BANDARA
KOMPLEX 20
105.33 105.06
23
1
PERTAMINA
105.31 105.08
21
KASI PROGRAM DAN STANDARISASI
0+220.00
0+230.00
105.28 105.10
23
106.08 105.93
105.26 105.13
27
12
106.98 106.83
14
105.24 105.15
14
106.98 106.83
105.22 105.16
16
106.98 106.83
105.20 105.17
15
18 19
106.98 106.83
105.18 105.18
106.98 106.83
105.21 105.19
106.98 106.83
105.23 105.20
106.98 106.83
105.25 105.21
106.98 106.83
105.28 105.22
KONTRAKTOR
106.98 106.83
105.30 105.23
DIAJUKAN OLEH :
106.98 106.83
105.32 105.24
106.98 106.83
105.35 105.25
106.98 106.83
105.37 105.26
106.98 106.83
105.39 105.27
106.98 106.83
105.42 105.28
106.98 106.83
105.44 105.29
106.98 106.83
105.46 105.30
106.98 106.83
105.49 105.31
MENGETAHUI
106.98 106.83
105.51 105.31
PT.FAJARRAYA USAHANUSA
106.98 106.83
PERIKSA OLEH :
106.98 106.83
105.56 105.24
106.98 106.83
KONSULTAN SUPERVISI
105.55 105.24
-47 -46 -45 -44 -43 -42 -41 -40 -39 -38 -37 -36 -35 -34 -33 -32 -31 -30 -29 -28 -27 -26 -25 -24 -23 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
-47 -46 -45 -44 -43 -42 -41 -40 -39 -38 -37 -36 -35 -34 -33 -32 -31 -30 -29 -28 -27 -26 -25 -24 -23 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
106.98 106.83
105.54 105.24
-9
-9
106.98 106.83
CV. GEOMETRIC 105.53 105.23
-8
-8
106.98 106.83
105.55 105.25
-7
-7
106.98 106.83
105.58 105.27
-6
-6
106.98 106.83
105.60 105.28
-5
-5
106.98 106.83
NURASMA, SE
105.59 105.30
-4
-4
106.98 106.83
106.98 106.83
105.55 105.31
PEJABAT PEMBUAT KOMITMEN
-2
-2
106.98 106.83
BANDAR UDARA SIS ALJUFRI - PALU
105.54 105.31
-1
-1
106.98 106.83
105.52 105.31
0
0
106.98 106.83
105.57 105.29
1
1
106.98 106.83
105.62 105.26
2
2
106.98 106.83
105.68 105.25
3
3
106.98 106.83
105.73 105.30
4
4
106.98 106.83
105.78 105.35
5
5
106.98 106.83
105.78 105.35
6
6
106.98 106.83
105.78 105.35
7
7
106.98 106.83
105.78 105.35
8
8
106.98 106.83
105.79 105.36
9
9
106.98 106.83
105.80 105.36
10
10
106.98 106.83
105.81 105.37
11
11
106.98 106.83
105.82 105.38
12
12
106.98 106.83
105.83 105.39
13
13
106.98 106.83
105.84 105.39
14
14
106.98 106.83
105.84 105.40
15
15
106.98 106.83
105.85 105.41
SHOP DRAWING
16
16
106.98 106.83
105.86 105.42
17
17
106.98 106.83
105.87 105.43
18
18
106.48 106.33
105.88 105.44
19
19
105.89 105.45
20
20
21
21
KEMENTRIAN PERHUBUNGAN
A3
Tittle Block Scale 1 : 1000
106.09
106.03
105.97
105.92
105.86
106.09
106.09
106.08
106.08
106.07
105.97
105.95
105.93
105.92
105.90
105.51
105.48
105.46
105.54
105.44
EXISTING ELEVATIONS EXISTING ELEVATIONS EXISTING ELEVATIONS EXISTING ELEVATIONS
107.17
107.13
107.17
107.13
107.17
107.13
107.17
107.13
106.68
107.16
107.14
106.68
107.16
107.14
106.68
107.16
107.14
106.68
107.16
107.14
PROPOSED ELEVATION PROPOSED ELEVATION PROPOSED ELEVATION PROPOSED ELEVATION
0+235.00
111
110
109
108
107
106
105
104
103
102
-47 -46 -45 -44 -43 -42 -41 -40 -39 -38 -37 -36 -35 -34 -33 -32 -31 -30 -29 -28 -27 -26 -25 -24 -23 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
105.03
105.13
105.13
105.13
105.13
105.13
105.13
105.13
105.01
105.01
105.02
105.04
105.04
105.05
105.06
105.07
105.08
105.09
105.10
105.11
105.12
105.14
105.15
105.16
105.14
105.14
105.14
105.12
105.12
105.12
105.11
105.11
105.11
105.11
105.10
105.10
105.10
105.09
105.09
105.09
105.09
105.10
105.12
105.15
105.17
105.19
105.20
105.20
105.18
105.16
105.14
105.11
105.14
105.14
105.14
105.14
105.15
105.16
105.17
105.17
105.18
105.18
105.14
105.15
105.19
105.24
105.24
EXISTING ELEVATIONS
105.86
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.76
106.26
105.26
PROPOSED ELEVATION
8
SHOP DRAWING
9 6
1 1 1
12
14
16
15
MENGETAHUI
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
22
13
23 27
23 A3
28
28
0+030.00
0+010.00 112
112 111
111 110
110 109
109 108
1:5 -4% -2% -2% -4% 1:5
108 107
1:5 -4% -2% -2% -4% 1:5
107 106
106 105
105 104
104 103
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
106.83
106.80
106.80
106.80
106.81
106.81
106.82
106.82
106.78
106.72
106.66
106.63
106.61
106.58
106.56
106.59
106.61
106.61
106.57
106.53
106.49
106.45
106.41
106.38
106.31
106.27
106.23
106.73
106.71
106.69
106.67
106.65
106.63
106.61
106.59
106.59
106.60
106.61
106.58
106.55
106.51
106.48
106.45
106.42
106.39
106.37
106.36
106.35
106.32
106.23
106.06
106.03
106.00
105.97
106.64
106.34
106.14
105.94
EXISTING ELEVATIONS EXISTING ELEVATIONS
106.87
107.07
107.27
107.31
107.35
107.37
107.39
107.41
107.39
107.37
107.35
107.31
107.27
106.62
106.82
107.02
107.12
107.12
107.02
107.06
107.10
107.14
107.16
107.14
107.10
107.06
PROPOSED ELEVATION PROPOSED ELEVATION
0+005.00 0+020.00
112 112
111 111
110 110
109 109
108 108
1:5 -4% -2% -2% -4% 1:5
1:5 -4% -2% -2% -4% 1:5
107 107
106 106
105 105
104 104
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
106.82
106.80
106.77
106.77
106.77
106.76
106.76
106.76
106.75
106.75
106.72
106.64
106.56
106.53
106.50
106.47
106.44
106.41
106.38
106.34
106.31
106.28
106.25
106.23
106.21
106.19
106.17
106.15
106.13
107.15
107.09
107.03
106.97
106.91
106.86
106.80
106.74
106.73
106.73
106.73
106.69
106.63
106.56
106.50
106.50
106.50
106.50
106.50
106.51
106.51
106.48
106.36
106.24
106.21
106.17
106.13
106.11
106.09
EXISTING ELEVATIONS EXISTING ELEVATIONS
106.93
107.13
107.33
107.37
107.41
107.43
107.45
107.47
107.45
107.43
107.41
107.37
107.33
106.33
107.18
107.22
107.26
107.28
107.26
107.22
107.18
106.74
106.94
107.14
107.24
107.24
107.14
PROPOSED ELEVATION PROPOSED ELEVATION
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
0+070.00
0+050.00 112
112 111
111 110
110 109
109 108
106 105
105 104
104 103
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
107.02
106.95
106.88
106.81
106.67
106.60
106.53
106.50
106.47
106.42
106.40
106.38
106.37
106.36
106.36
106.35
106.32
106.30
106.27
106.25
106.23
106.20
106.18
106.15
106.13
106.11
107.01
106.86
106.78
106.71
106.63
106.55
106.48
106.45
106.43
106.45
106.46
106.47
106.46
106.45
106.43
106.41
106.39
106.35
106.31
106.26
106.22
106.17
106.12
106.08
106.03
106.74
106.44
106.34
106.94
106.44
106.44
106.44
EXISTING ELEVATIONS EXISTING ELEVATIONS
106.57
106.77
106.81
106.85
106.87
106.89
106.91
106.89
106.87
106.85
106.81
106.77
106.51
106.55
106.59
106.61
106.63
106.65
106.63
106.61
106.59
106.55
106.51
PROPOSED ELEVATION PROPOSED ELEVATION
0+040.00
112 0+060.00
111 112
110 111
109 110
108 109
1:5 -4% -2% -2% -4% 1:5
107 108
105 106
104 105
103 104
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
106.92
106.87
106.83
106.78
106.73
106.69
106.64
106.59
106.51
106.42
106.32
106.32
106.34
106.36
106.37
106.37
106.37
106.36
106.36
106.35
106.34
106.27
106.14
106.02
105.93
105.90
105.87
105.84
105.81
107.04
106.97
106.89
106.81
106.73
106.65
106.57
106.49
106.47
106.46
106.45
106.45
106.45
106.46
106.46
106.45
106.44
106.42
106.40
106.39
106.37
106.34
106.31
106.29
106.26
106.23
106.18
106.14
106.09
EXISTING ELEVATIONS EXISTING ELEVATIONS
106.69
106.89
106.93
106.97
106.99
107.01
107.03
107.01
106.99
106.97
106.93
106.89
106.68
106.72
106.76
106.78
106.76
106.72
106.68
106.64
106.74
106.74
106.64
PROPOSED ELEVATION PROPOSED ELEVATION
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
0+090.00 0+110.00
112 112
111 111
110 110
109 109
108 108
107 107
-4% -2% -2% -4%
-4% -2% -2% -4%
106 106
105 105
104 104
103 103
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
106.97
106.91
106.85
106.78
106.72
106.65
106.59
106.53
106.51
106.52
106.52
106.51
106.50
106.49
106.48
106.48
106.47
106.47
106.43
106.38
106.33
106.28
106.19
106.09
106.05
106.00
105.95
106.99
106.95
106.92
106.89
106.86
106.83
106.79
106.76
106.73
106.69
106.66
106.62
106.58
106.51
106.46
106.42
106.38
106.33
106.29
106.25
106.20
106.15
106.11
106.06
106.01
105.97
105.92
105.87
106.24
106.14
106.54
EXISTING ELEVATIONS EXISTING ELEVATIONS
106.81
106.61
106.41
106.21
106.01
106.05
106.09
106.11
106.13
106.15
106.13
106.11
106.09
106.05
106.01
106.46
106.26
106.30
106.34
106.36
106.38
106.40
106.38
106.36
106.34
106.30
106.26
PROPOSED ELEVATION PROPOSED ELEVATION
0+080.00
112 0+100.00
111 111
110 110
109 109
108 108
107 -4%
107
-2% -2% -4%
-4% -2% -2% -4%
106 106
105 105
104 104
103 103
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
106.97
106.90
106.82
106.75
106.68
106.61
106.54
106.46
106.42
106.38
106.34
106.35
106.36
106.38
106.40
106.40
106.41
106.41
106.39
106.36
106.33
106.28
106.24
106.20
106.15
106.11
106.06
106.02
105.97
106.93
106.88
106.83
106.78
106.73
106.68
106.63
106.58
106.57
106.58
106.59
106.56
106.52
106.48
106.44
106.45
106.46
106.47
106.42
106.35
106.28
106.23
106.18
106.13
106.09
106.04
105.99
105.95
105.90
EXISTING ELEVATIONS EXISTING ELEVATIONS
106.39
106.43
106.47
106.49
106.51
106.53
106.51
106.49
106.47
106.43
106.39
106.18
106.22
106.26
106.28
106.26
106.22
106.18
106.54
106.34
106.14
106.24
106.24
106.14
PROPOSED ELEVATION PROPOSED ELEVATION
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
0+130.00 0+150.00
111 111
110 110
109 109
108 108
107 107
106 -4% -2% -2% -4% 106 -4% -2% -2% -4%
105 105
104 104
103 103
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
106.60
106.55
106.50
106.46
106.41
106.36
106.32
106.29
106.27
106.21
106.17
106.10
106.10
106.11
106.11
106.11
106.12
106.12
106.09
106.06
106.02
105.98
105.95
105.91
105.88
106.38
106.33
106.27
106.22
106.17
106.12
106.06
106.01
106.00
105.99
105.98
105.96
105.93
105.90
105.87
105.85
105.82
105.80
105.79
105.77
105.75
105.73
105.70
105.68
105.66
105.63
105.62
105.61
106.64
106.24
106.14
105.84
105.84
EXISTING ELEVATIONS EXISTING ELEVATIONS
105.91
105.71
105.51
105.55
105.59
105.61
105.63
105.65
105.63
105.61
105.59
105.55
105.51
106.36
106.16
105.96
105.76
105.80
105.84
105.86
105.88
105.90
105.88
105.86
105.84
105.80
105.76
PROPOSED ELEVATION PROPOSED ELEVATION
0+120.00 0+140.00
111 111
110 110
109 109
108 108
107 107
-4% -2% -2% -4%
106 106 -4% -2% -2% -4%
105 105
104 104
103 103
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
106.79
106.74
106.69
106.63
106.58
106.52
106.47
106.42
106.39
106.38
106.36
106.34
106.33
106.31
106.29
106.31
106.33
106.36
106.32
106.26
106.20
106.15
106.11
106.06
106.02
105.97
105.93
105.88
105.84
106.57
106.53
106.48
106.43
106.39
106.34
106.30
106.25
106.21
106.18
106.14
106.13
106.12
106.11
106.11
106.11
106.11
106.11
106.10
106.09
106.08
106.06
106.03
106.01
105.98
105.96
105.93
105.90
105.88
EXISTING ELEVATIONS EXISTING ELEVATIONS
106.48
106.28
106.08
105.88
105.92
105.96
105.98
106.02
105.98
105.96
105.92
105.88
106.23
106.03
105.83
105.63
105.67
105.71
105.73
105.75
105.77
105.75
105.73
105.71
105.67
105.63
106.00
106.00
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
0+170.00
111 0+190.00
110 110
109 109
108 108
107 107
106 106
-4% -2% -2% -4%
-4% -2% -2% -4%
105 105
104 104
103 103
102 102
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
106.11
106.01
105.92
105.86
105.80
105.76
105.72
105.68
105.60
105.56
105.53
105.52
105.56
105.57
105.53
105.46
105.39
105.36
105.33
105.30
105.27
105.60
105.49
105.40
105.32
105.29
105.27
105.25
105.23
105.22
105.21
105.23
105.26
105.22
105.15
105.02
105.64
105.54
105.54
105.54
105.24
105.24
EXISTING ELEVATIONS EXISTING ELEVATIONS
105.65
105.45
105.25
105.29
105.33
105.35
105.37
105.39
105.37
105.35
105.33
105.29
105.25
105.12
105.12
105.20
105.00
105.04
105.08
105.10
105.14
105.10
105.08
105.04
105.00
PROPOSED ELEVATION PROPOSED ELEVATION
0+160.00 0+180.00
111 110
110 109
109 108
108 107
107 106
-4% -2% -2% -4%
106 105
-4% -2% -2% -4%
105 104
104 103
103 102
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
106.19
106.13
106.10
106.06
106.01
105.95
105.90
105.85
105.81
105.77
105.73
105.71
105.68
105.66
105.64
105.62
105.61
105.60
105.59
105.57
105.56
105.56
105.56
105.57
105.59
105.56
105.49
105.44
105.42
105.85
105.74
105.66
105.58
105.52
105.46
105.44
105.42
105.41
105.39
105.37
105.36
105.34
105.36
105.39
105.41
105.35
105.25
105.15
EXISTING ELEVATIONS EXISTING ELEVATIONS
105.78
105.58
105.38
105.42
105.46
105.48
105.52
105.48
105.46
105.42
105.38
105.33
105.13
105.17
105.21
105.23
105.25
105.27
105.25
105.23
105.21
105.17
105.13
105.50
105.50
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
0+210.00
110
109
108
107
106
104
103
102
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
105.12
105.05
104.99
104.97
104.97
104.96
104.96
104.95
104.95
104.90
104.85
104.73
104.94
EXISTING ELEVATIONS
104.75
104.79
104.83
104.85
104.87
104.89
104.87
104.85
104.83
104.79
104.75
PROPOSED ELEVATION
0+200.00 0+218.00
110 110
109 109
108 108
107 107
106 106
-4% -2% -2% -4%
105 105 -4% -2% -2% -4%
104 104
103 103
102 102
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
105.34
105.23
105.17
105.12
105.07
105.06
105.06
105.05
105.05
105.07
105.08
105.09
105.06
105.01
104.96
104.98
104.94
104.92
104.90
104.87
104.86
104.86
104.85
104.84
104.82
104.77
104.70
104.68
EXISTING ELEVATIONS EXISTING ELEVATIONS
105.08
104.88
104.92
104.96
104.98
105.02
104.98
104.96
104.92
104.88
104.65
104.69
104.73
104.75
104.77
104.79
104.77
104.75
104.73
104.69
104.65
105.00
105.00
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
5.00
2.50 2.50
223.20
5.00
215.50 5.20
6.40
5.00
27.00
5.00
10.00
R5
3.50
. 00
R5
.0
0
26.00
26.00
13.00
2.50
Bangunan PKP-PK
2.00
12.00
43.60 8.00
2.00
15.00 40.60
8
SHOP DRAWING
9 6
1 1 1
12
14
16
15
MENGETAHUI
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
22
13
23 27
23 A3
28
28
5.50
2.25 2.25
223.20
5.00
215.50 5.20
6.40
R5
5.50
26.75
5.00
10.00
R5 .0
3.25
.0 0
0
26.25
26.25
13.00
2.25
Bangunan PKP-PK
2.00
12.00
43.60 8.25
2.00
15.25 40.85
8
SHOP DRAWING
9 6
1 1 1
12
14
16
15
MENGETAHUI
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
22
13
23 27
23 A3
28
28
6.00
2.00 2.00
Scala 1 : 100
223.20
5.00
215.50 5.20
6.40
6.00
26.50
5.00
10.00
R5
3.00
R5
.00
.
00
26.50
26.50
13.00
2.00
Bangunan PKP-PK
2.00
12.00
43.60 8.50
2.00
15.50 41.10
8
SHOP DRAWING
9 6
1 1 1
12
14
16
15
MENGETAHUI
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
22
13
23 27
23 A3
28
28
10.00
0.80
1.90
1.50
0.40
0.20
0.20
0.60
1.00
1.40
28
0.
0.40
0.30
0.05
0.10
2.00
0.20 9.60 0.20
3.80
0.80
0.80
0.20
0.20
0.20
0.20
1.00
2.70
1.40
0.20
28
0.
0.30
0.20
0.30
0.20 0.20
2.50
8
SHOP DRAWING
9 6
1 1 1
12
14
16
15
MENGETAHUI
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 KOMPLEX 20
PERTAMINA 21 14
22
29 23 20 23
18 19
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
22
13
23 27
23 A3
28
28
BENYAMIN NOACH APITULEY, SE NURASMA, SE Perhitungan Volume Besi Box Culvert 1/1 1
NIP : 19680516 199003 1 006 NIP : 19741025 200604 2 001
Tittle Block Scale 1 : 1000
1000.00
D16-150
- Tebal = 0.2 m = 23.76 m3
- Volume = 5.2 x 10 x 0.2
= 10.4 m3 - Volume Urugan Pasir, t = 10 cm
D16 - 150
= ((0.40m x 0.10m x 10.20m) x 2) + (0.10m x 3.60m x 10.20m)
Perhitungan Berat Besi Arah X : = 0.816 m3 + 3.672 m3
- Diameter Besi = 16 mm = 4.488 m3
520.00
- Berat Besi per M' = 1.578 Kg/m'
- Pajang Besi = 10 - (2 x 0.03) + (2 x 0.08) - Volume Lantai Kerja, t = 5 cm
= 10 - 0.06 + 0.16 = Luas Penampang x 10.10m
= 10.10 m x 2 = 20.20 m = 0.189 m2 x 10.10 m
- Jumlah Besi = (5.2 - (2 x 0.03)) : 0.15 = 1.908 m3
= 34.2 + 1
= 35 buah - Volume Pasangan Batu I :
- Berat Besi = 35 buah x 20.20 m x 1.578 Kg/m' = Luas penampang x 10 m
= 1115.65 Kg = 0.2495 m2 x 10 m
= 2.495 m3
Perhitungan Berat Besi Arah Y :
- Diameter Besi = 16 mm - Volume Pasangan Batu II :
- Berat Besi per M' = 1.578 Kg/m' = Luas penampang x 10 m
- Pajang Besi = (5.2 - (2 x 0.03)) + (2 x 0.14) + (5.2 - (2 x 0.03)) + (2 x 0.08) = 0.2175 m2 x 10 m
A = 5.14 + 0.28 + 5.14 + 0.16 = 2.175 m3
= 10.72 m
- Jumlah Besi = (10 - (2 x 0.03)) : 0.15
= 66.3 + 1
= 67 buah
- Berat Besi = 67 buah x 10.72 m x 1.578 Kg/m'
= 1133.38 Kg
520.00
20.50 10.00 32.50
15.00
3.00
D16 - 150 D16 - 150
20.00
14.00
15.00
60.00
3.00
5.00
60.00
60.00
376.25
POTONGAN A-A
10.00
10.00
Urugan Kembali
Urugan Kembali
40.00 40.00 Skala 1:40
60.00
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 20
KOMPLEX PERTAMINA 21 14
22
29 23 20
23
18 19
BAK SAMPAH
BANDAR UDARA MUTIARA SIS ALJUFRI - PALU BANDAR UDARA SIS ALJUFRI - PALU
5
4
22
13
23 27
23 A3
28
28
60.00
Pasir Urug
50.00 200.00 50.00 200.00 50.00
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 20
KOMPLEX PERTAMINA 21 14
22
29 23 20
23
18 19
BAK SAMPAH
13
ALJUFRI - PALU
23 27
23 A3
28
28
200.00
200.00
4
105.0
60.00
85.00 50.00
8 2 10
SHOP DRAWING
MENGETAHUI
25 12
9 6 24 16
1 1 1 14 15
17 17 24
24
23
23 23
KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
11 3 20
KOMPLEX PERTAMINA 21 14
22
29 23 20
23
18 19
BAK SAMPAH
13
ALJUFRI - PALU
23 27
23 A3
28
28