Anda di halaman 1dari 36

RENCANA ANGGARAN BIAYA

PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 )


LOKASI : DESA BANTUAS KEC. PALARAN
TA : 2019

KUANTITAS SATUAN KUANTITAS


No. URAIAN PEKERJAAN SATUAN KUANTITAS CCO BERTAMBAH/BE VOLUME HARGA SATUAN JUMLAH HARGA AWAL JUMLAH HARGA SETELAH CCO
AWAL RKURANG

I PEKERJAAN PERSIAPAN
1 Mobilisasi 1.00 Ls Ls 1.00 5,900,000.00 5,900,000.00 5,900,000.00
2 serobong kerja & stocking 1.00 Ls Ls - 1.00 7,500,000.00 7,500,000.00 7,500,000.00
3 construction drawing 1.00 Ls Ls - 1.00 5,000,000.00 5,000,000.00 5,000,000.00
4 pelaporan, test Mutu, Dan dokumentasi 1.00 ls ls - 1.00 8,000,000.00 8,000,000.00 8,000,000.00
5 pembersihan lokasi 1,250.00 m2 m2 - 1,250.00 10,258.00 12,822,500.00 12,822,500.00
6 Langsiran Material 387.20 m3 m3 - 387.20 118,019.00 45,696,956.80 45,696,956.80
SUB JUMLAH 84,919,456.80 84,919,456.80
II.2 Pekerjaan Saluran
1 Beton B0 133.10 M3 115.90 M3 - 17.20 115.90 1,762,369.00 234,571,313.90 204,257,670.05
2 Beton K-225 254.10 M3 256.70 M3 + (2.60) 256.70 1,928,398.00 490,005,931.80 495,016,821.94
3 Pembesian 10,248.70 Kg 9,739.88 Kg - 508.82 9,739.88 26,786.00 274,521,678.20 260,892,481.77
4 Bekisting 1,210.00 M2 1,348.32 M2 + (138.32) 1,348.32 182,735.00 221,109,350.00 246,386,141.46
5 Galian Tanah 404.65 m3 484.84 m3 + (80.19) 484.84 103,615.00 41,927,809.75 50,236,696.60
6 pancang kayu galam 1,210.00 Titik 1,348.32 Titik + (138.32) 1,348.32 38,652.00 46,768,920.00 52,115,452.10
SUB JUMLAH 1,308,905,003.65 1,308,905,263.93
II.4 Pekerjaan Bangunan pintu air
1 Beton B0 0.60 M3 M3 0.60 1,762,369.00 1,057,421.40 1,057,421.40
2 Beton K-225 1.50 M3 M3 1.50 1,928,398.00 2,892,597.00 2,892,597.00
3 Pembesian 60.00 Kg Kg 60.00 26,786.00 1,607,160.00 1,607,160.00
4 Bekisting 10.00 M2 M2 10.00 182,735.00 1,827,350.00 1,827,350.00
5 Pintu uk. B = 0.7 ; h = 1.3 2.00 Bh Bh 2.00 5,000,000.00 10,000,000.00 10,000,000.00
6 Pancang Kayu galam 12.00 Titik Titik 12.00 38,652.00 463,824.00 463,824.00
SUB JUMLAH 17,848,352.40 17,848,352.40
JUMLAH TOTAL 1,411,672,812.85 1,411,673,073.13
PPN 10 % ( A ) 141,167,281.29 141,167,307.31
TOTAL ( A + B ) 1,552,840,094.14 1,552,840,380.44
DIBULATKAN 1,552,840,000.00 1,552,840,000.00
JADWAL PELAKSANAAN PEKERJAAN
KONSULTAN PENGAWAS : CV. ARCSIND
DINAS : PEKERJAAN UMUN DAN PENATAAN RUANG NO. KONTRAK : 611/SP-24.350.0
KEGIATAN : PENINGKATAN IRIGASI TEKNIS D.I BANTUAS DALAM KONTRAKTOR PELAKSANA : CV. WARNA P
PEKERJAAN NO. KONTRAK : 611/SP-24.350.0
LOKASI : BANTUAS DALAM KONSULTAN PENGAWAS : CV. PUSAKA D
TAHUN ANGGARAN : 2019 PERIODE : 22 APRIL - 22 D
KONTRAK WAKTU PELAKSANAAN PEKERJAAN
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT MC 01 MC 02 MC 03 MC 04 MC 05 MC 06
VOL
( Rp. ) ( Rp. ) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

A. PEKERJAAN PENDAHULUAN
1 mobilisasi ls 1.00 5,900,000.00 5,900,000.00 0.418 0.2 0.2

2 serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 0.531 0.5

3 construcion drawing ls 1.00 5,000,000.00 5,000,000.00 0.354 0.2 0.2

4 pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 0.567 0.1 0.1 0.1 0.1 0.1 0.1

5 pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 0.908 0.2 0.2 0.2 0.2

6 langsiran material m3 387.20 118,019.00 45,696,956.80 3.237 0.5 0.5 0.5 0.5 0.5 0.5

-
B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8

Beton Fc ' 20 Mpa m3 256.70 1,928,398.00 495,016,821.94 35.066 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

-
C. PEKERJAAN BANGUNAN PINTU AIR
Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075 0.0
Beton Fc ' 20 Mpa m3 1.500 1,928,398.00 2,892,597.00 0.205 0.1
Pembesian kg 60.000 26,786.00 1,607,160.00 0.114 0.1
Bekisting m2 10.000 182,735.00 1,827,350.00 0.129 0.1

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000.00 0.708 0.4

Pancang Kayu galam titik 12.000 38,652.00 463,824.00 0.033 0.0

JUMLAH NILAI PEKERJAAN 1,411,672,814.09 100.0

RENCANA KEMAJUAN PEKERJAAN - - - 0.2 0.4 0.7 0.9 1.3 2.2 3.9 5.4 5.4 4.8 4.8 4.8 4.8 4.8 4.9 4.9 5.1 4.8 4.8

RENCANA KOMULATIF KEMAJUAN PEKERJAAN - - - - 0.2 0.6 1.3 2.2 3.5 5.6 9.5 14.9 20.3 25.1 29.9 34.7 39.5 44.2 49.1 54.1 59.2 64.0 68.8

REALISASI KEMAJUAN PEKERJAAN 1.3 1.0 1.2 1.3 1.7 6.5 6.9 8.7 7.1 8.6 9.3 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9

REALISASI KOMULATIF KEMAJUAN PEKERJAAN - 1.3 2.3 3.5 4.9 6.6 13.1 20.0 28.6 35.7 44.3 53.6 55.5 57.4 59.3 61.2 63.1 65.0 66.9 68.8 70.7 72.7 74.6

PERBEDAAN KOMULATIF 1.3 2.3 3.5 4.6 6.0 11.8 17.8 25.2 30.1 34.8 38.7 35.2 32.3 29.5 26.6 23.7 20.8 17.82 14.78 11.55 8.67 5.79

Diketahui Oleh : DisetujuiOleh :


DINAS PEKERJAAN UMUM DAN PENATAN RUANG konsultan pengawas
PEJABAT PEMBUAT KOMITMEN CV. PUSAKA DIGJAYA

IZRULSYAH EFFENDY,ST SUHARTO,ST.,MT


PEJABAT PEMBUAT KOMITMEN SITE ENGINEER
: CV. ARCSINDO KARYA UTAMA
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
WAKTU PELAKSANAAN PEKERJAAN
MC 06 MC 07 MC 08 MC 09
23 24 25 26 27 28 29 30 31 32 33 34

0.8 0.8 0.8 0.8 0.8

1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8

0.9 0.9 0.9 0.9 0.9 0.9 0.9

0.9 0.9 0.9 0.9 0.9 0.9

0.2 0.2

0.2 0.2

0.0

0.1

0.1
0.1

0.4

0.0

4.8 4.8 4.4 4.4 4.5 3.7 3.0 1.8 - - - -

73.5 78.3 82.7 87.0 91.5 95.2 98.2 100.0 100.0 100.0 100.0 100.0

1.9 1.9 10.9 10.8 - - 0.6 1.3 - -

76.5 78.4 89.3 100.1 100.1 100.1 100.6 101.9 101.9 101.9 101.9 101.9

2.91 0.03 6.60 13.02 8.56 4.85 2.38 1.90 1.90 1.90 1.90 1.90

Di Buat oleh :Oleh :


kontraktor pelaksana
CV. WARNA PELANGI

WINDY IMELDA
DIREKTUR
JADWAL PELAKSANAAN PEKERJAAN
KONSULTAN PENGAWAS : CV. ARCSIND
DINAS : PEKERJAAN UMUN DAN PENATAAN RUANG NO. KONTRAK : 611/SP-24.350.0
KEGIATAN : PENINGKATAN IRIGASI TEKNIS D.I BANTUAS DALAM KONTRAKTOR PELAKSANA : CV. WARNA P
PEKERJAAN NO. KONTRAK : 611/SP-24.350.0
LOKASI : BANTUAS DALAM KONSULTAN PENGAWAS : CV. PUSAKA D
TAHUN ANGGARAN : 2019 PERIODE : 08 OKTOBER
KONTRAK WAKTU PELAKSANAAN PEKERJAAN
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT MC 01 MC 02 MC 03 MC 04 MC 05 MC 06
VOL
( Rp. ) ( Rp. ) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

A. PEKERJAAN PENDAHULUAN
1 mobilisasi ls 1.00 5,900,000.00 5,900,000.00 0.418 0.2 0.2

2 serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 0.531 0.5

3 construcion drawing ls 1.00 5,000,000.00 5,000,000.00 0.354 0.2 0.2

4 pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 0.567 0.1 0.1 0.1 0.1 0.1 0.1

5 pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 0.908 0.2 0.2 0.2 0.2

6 langsiran material m3 387.20 118,019.00 45,696,956.80 3.237 0.5 0.5 0.5 0.5 0.5 0.5

-
B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8

Beton Fc ' 20 Mpa m3 256.70 1,928,398.00 495,016,821.94 35.066 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

-
C. PEKERJAAN BANGUNAN PINTU AIR
Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075 0.0
Beton Fc ' 20 Mpa m3 1.500 1,928,398.00 2,892,597.00 0.205 0.1
Pembesian kg 60.000 26,786.00 1,607,160.00 0.114 0.1
Bekisting m2 10.000 182,735.00 1,827,350.00 0.129 0.1

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000.00 0.708 0.4

Pancang Kayu galam titik 12.000 38,652.00 463,824.00 0.033 0.0

JUMLAH NILAI PEKERJAAN 1,411,672,814.09 100.0

RENCANA KEMAJUAN PEKERJAAN - - - 0.2 0.4 0.7 0.9 1.3 2.2 3.9 5.4 5.4 4.8 4.8 4.8 4.8 4.8 4.9 4.9 5.1 4.8 4.8

RENCANA KOMULATIF KEMAJUAN PEKERJAAN - - - - 0.2 0.6 1.3 2.2 3.5 5.6 9.5 14.9 20.3 25.1 29.9 34.7 39.5 44.2 49.1 54.1 59.2 64.0 68.8

REALISASI KEMAJUAN PEKERJAAN 1.3 1.0 1.2 1.3 1.7 6.5 6.9 8.7 7.1 8.6 9.3 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9

REALISASI KOMULATIF KEMAJUAN PEKERJAAN - 1.30 2.33 3.55 4.86 6.60 13.09 19.96 28.62 35.69 44.29 53.64 55.54 57.44 59.34 61.25 63.15 65.05 66.95 68.85 70.75 72.65 74.55

PERBEDAAN KOMULATIF 1.3 2.3 3.5 4.6 6.0 11.8 17.8 25.2 30.1 34.8 38.7 35.2 32.3 29.5 26.6 23.7 20.8 17.82 14.78 11.55 8.67 5.79

Diketahui Oleh : DisetujuiOleh :


DINAS PEKERJAAN UMUM DAN PENATAN RUANG konsultan pengawas
PEJABAT PEMBUAT KOMITMEN CV. PUSAKA DIGJAYA

IZRULSYAH EFFENDY,ST SUHARTO,ST.,MT


PEJABAT PEMBUAT KOMITMEN SITE ENGINEER
: CV. ARCSINDO KARYA UTAMA
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 08 OKTOBER - 05 NOVEMBER 2019
WAKTU PELAKSANAAN PEKERJAAN
MC 06 MC 07 MC 08 MC 09
23 24 25 26 27 28 29 30 31 32 33 34

0.8 0.8 0.8 0.8 0.8

1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8

0.9 0.9 0.9 0.9 0.9 0.9 0.9

0.9 0.9 0.9 0.9 0.9 0.9

0.2 0.2

0.2 0.2

0.0

0.1

0.1
0.1

0.4

0.0

4.8 4.8 4.4 4.4 4.5 3.7 3.0 1.8 - - - -

73.5 78.3 82.7 87.0 91.5 95.2 98.2 100.0 100.0 100.0 100.0 100.0

1.9 - 10.9 10.8 - -

76.45 76.45 87.38 98.17 98.17 98.17

2.91 (1.87) 4.70 11.12 6.66 2.95

Di Buat oleh :Oleh :


kontraktor pelaksana
CV. WARNA PELANGI

WINDY IMELDA
DIREKTUR
JADWAL PELAKSANAAN PEKERJAAN
KONSULTAN PENGAWAS : CV. ARCSIND
DINAS : PEKERJAAN UMUN DAN PENATAAN RUANG NO. KONTRAK : 611/SP-24.350.0
KEGIATAN : PENINGKATAN IRIGASI TEKNIS D.I BANTUAS DALAM KONTRAKTOR PELAKSANA : CV. WARNA P
PEKERJAAN NO. KONTRAK : 611/SP-24.350.0
LOKASI : BANTUAS DALAM KONSULTAN PENGAWAS : CV. PUSAKA D
TAHUN ANGGARAN : 2019 PERIODE : 06 NOVEMBER
KONTRAK WAKTU PELAKSANAAN PEKERJAAN
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT MC 01 MC 02 MC 03 MC 04 MC 05 MC 06
VOL
( Rp. ) ( Rp. ) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

A. PEKERJAAN PENDAHULUAN
1 mobilisasi ls 1.00 5,900,000.00 5,900,000.00 0.418 0.2 0.2

2 serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 0.531 0.5

3 construcion drawing ls 1.00 5,000,000.00 5,000,000.00 0.354 0.2 0.2

4 pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 0.567 0.1 0.1 0.1 0.1 0.1 0.1

5 pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 0.908 0.2 0.2 0.2 0.2

6 langsiran material m3 387.20 118,019.00 45,696,956.80 3.237 0.5 0.5 0.5 0.5 0.5 0.5

-
B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8

Beton Fc ' 20 Mpa m3 256.70 1,928,398.00 495,016,821.94 35.066 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

-
C. PEKERJAAN BANGUNAN PINTU AIR
Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075 0.0
Beton Fc ' 20 Mpa m3 1.500 1,928,398.00 2,892,597.00 0.205 0.1
Pembesian kg 60.000 26,786.00 1,607,160.00 0.114 0.1
Bekisting m2 10.000 182,735.00 1,827,350.00 0.129 0.1

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000.00 0.708 0.4

Pancang Kayu galam titik 12.000 38,652.00 463,824.00 0.033 0.0

JUMLAH NILAI PEKERJAAN 1,411,672,814.09 100.0

RENCANA KEMAJUAN PEKERJAAN - - - 0.2 0.4 0.7 0.9 1.3 2.2 3.9 5.4 5.4 4.8 4.8 4.8 4.8 4.8 4.9 4.9 5.1 4.8 4.8

RENCANA KOMULATIF KEMAJUAN PEKERJAAN - - - - 0.2 0.6 1.3 2.2 3.5 5.6 9.5 14.9 20.3 25.1 29.9 34.7 39.5 44.2 49.1 54.1 59.2 64.0 68.8

REALISASI KEMAJUAN PEKERJAAN 1.3 1.0 1.2 1.3 1.7 6.5 6.9 8.7 7.1 8.6 9.3 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9

REALISASI KOMULATIF KEMAJUAN PEKERJAAN - 1.3 2.3 3.5 4.9 6.6 13.1 20.0 28.6 35.7 44.3 53.6 55.5 57.4 59.3 61.2 63.1 65.0 66.9 68.8 70.7 72.7 74.6

PERBEDAAN KOMULATIF 1.3 2.3 3.5 4.6 6.0 11.8 17.8 25.2 30.1 34.8 38.7 35.2 32.3 29.5 26.6 23.7 20.8 17.82 14.78 11.55 8.67 5.79

Diketahui Oleh : DisetujuiOleh :


DINAS PEKERJAAN UMUM DAN PENATAN RUANG konsultan pengawas
PEJABAT PEMBUAT KOMITMEN CV. PUSAKA DIGJAYA

IZRULSYAH EFFENDY,ST SUHARTO,ST.,MT


PEJABAT PEMBUAT KOMITMEN SITE ENGINEER
: CV. ARCSINDO KARYA UTAMA
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 06 NOVEMBER - 03 DESEMBER 2019
WAKTU PELAKSANAAN PEKERJAAN
MC 06 MC 07 MC 08 MC 09
23 24 25 26 27 28 29 30 31 32 33 34

0.8 0.8 0.8 0.8 0.8

1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8

0.9 0.9 0.9 0.9 0.9 0.9 0.9

0.9 0.9 0.9 0.9 0.9 0.9

0.2 0.2

0.2 0.2

0.0

0.1

0.1
0.1

0.4

0.0

4.8 4.8 4.4 4.4 4.5 3.7 3.0 1.8 - - - -

73.5 78.3 82.7 87.0 91.5 95.2 98.2 100.0 100.0 100.0 100.0 100.0

1.9 - 10.9 10.8 - - 0.6 1.3 - -

76.5 76.5 87.4 98.2 98.2 98.2 98.72 100.0 100.0 100.0

2.91 (1.87) 4.70 11.12 6.66 2.95 0.48 - - -

Di Buat oleh :Oleh :


kontraktor pelaksana
CV. WARNA PELANGI

WINDY IMELDA
DIREKTUR
JADWAL PELAKSANAAN PEKERJAAN
KONSULTAN PENGAWAS : CV. ARCSIND
DINAS : PEKERJAAN UMUN DAN PENATAAN RUANG NO. KONTRAK : 611/SP-24.350.0
KEGIATAN : PENINGKATAN IRIGASI TEKNIS D.I BANTUAS DALAM KONTRAKTOR PELAKSANA : CV. WARNA P
PEKERJAAN NO. KONTRAK : 611/SP-24.350.0
LOKASI : BANTUAS DALAM KONSULTAN PENGAWAS : CV. PUSAKA D
TAHUN ANGGARAN : 2019 PERIODE : 04 DESEMBER
KONTRAK WAKTU PELAKSANAAN PEKERJAAN
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT MC 01 MC 02 MC 03 MC 04 MC 05 MC 06
VOL
( Rp. ) ( Rp. ) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

A. PEKERJAAN PENDAHULUAN
1 mobilisasi ls 1.00 5,900,000.00 5,900,000.00 0.418 0.2 0.2

2 serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 0.531 0.5

3 construcion drawing ls 1.00 5,000,000.00 5,000,000.00 0.354 0.2 0.2

4 pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 0.567 0.1 0.1 0.1 0.1 0.1 0.1

5 pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 0.908 0.2 0.2 0.2 0.2

6 langsiran material m3 387.20 118,019.00 45,696,956.80 3.237 0.5 0.5 0.5 0.5 0.5 0.5

-
B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8

Beton Fc ' 20 Mpa m3 256.70 1,928,398.00 495,016,821.94 35.066 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

-
C. PEKERJAAN BANGUNAN PINTU AIR
Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075 0.0
Beton Fc ' 20 Mpa m3 1.500 1,928,398.00 2,892,597.00 0.205 0.1
Pembesian kg 60.000 26,786.00 1,607,160.00 0.114 0.1
Bekisting m2 10.000 182,735.00 1,827,350.00 0.129 0.1

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000.00 0.708 0.4

Pancang Kayu galam titik 12.000 38,652.00 463,824.00 0.033 0.0

JUMLAH NILAI PEKERJAAN 1,411,672,814.09 100.0

RENCANA KEMAJUAN PEKERJAAN - - - 0.2 0.4 0.7 0.9 1.3 2.2 3.9 5.4 5.4 4.8 4.8 4.8 4.8 4.8 4.9 4.9 5.1 4.8 4.8

RENCANA KOMULATIF KEMAJUAN PEKERJAAN - - - - 0.2 0.6 1.3 2.2 3.5 5.6 9.5 14.9 20.3 25.1 29.9 34.7 39.5 44.2 49.1 54.1 59.2 64.0 68.8

REALISASI KEMAJUAN PEKERJAAN 1.3 1.0 1.2 1.3 1.7 6.5 6.9 8.7 7.1 8.6 9.3 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9

REALISASI KOMULATIF KEMAJUAN PEKERJAAN - 1.3 2.3 3.5 4.9 6.6 13.1 20.0 28.6 35.7 44.3 53.6 55.5 57.4 59.3 61.2 63.1 65.0 66.9 68.8 70.7 72.7 74.6

PERBEDAAN KOMULATIF 1.3 2.3 3.5 4.6 6.0 11.8 17.8 25.2 30.1 34.8 38.7 35.2 32.3 29.5 26.6 23.7 20.8 17.82 14.78 11.55 8.67 5.79

Diketahui Oleh : DisetujuiOleh :


DINAS PEKERJAAN UMUM DAN PENATAN RUANG konsultan pengawas
PEJABAT PEMBUAT KOMITMEN CV. PUSAKA DIGJAYA

IZRULSYAH EFFENDY,ST SUHARTO,ST.,MT


PEJABAT PEMBUAT KOMITMEN SITE ENGINEER
: CV. ARCSINDO KARYA UTAMA
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 04 DESEMBER - 17 DESEMBER 2019
WAKTU PELAKSANAAN PEKERJAAN
MC 06 MC 07 MC 08 MC 09
23 24 25 26 27 28 29 30 31 32 33 34

0.8 0.8 0.8 0.8 0.8

1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8

0.9 0.9 0.9 0.9 0.9 0.9 0.9

0.9 0.9 0.9 0.9 0.9 0.9

0.2 0.2

0.2 0.2

0.0

0.1

0.1
0.1

0.4

0.0

4.8 4.8 4.4 4.4 4.5 3.7 3.0 1.8 - - - -

73.5 78.3 82.7 87.0 91.5 95.2 98.2 100.0 100.0 100.0 100.0 100.0

1.9 - 10.9 10.8 - - 0.6 1.3 - - - -

76.5 76.5 87.4 98.2 98.2 98.2 98.7 100.0 100.0 100.0 100.0 100.0

2.91 (1.87) 4.70 11.12 6.66 2.95 0.48 - - - - -

Di Buat oleh :Oleh :


kontraktor pelaksana
CV. WARNA PELANGI

WINDY IMELDA
DIREKTUR
LAPORAN KEMAJUAN MINGGUAN
MINGGU KE 4 (EMPAT)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D MIGGU LALU MINGGU INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 0.418 1.00 100.00 0.418

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 0.531 1.00 100.00 0.531

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 0.354 1.00 100.00 0.354

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 0.567 1.00 100.00 0.567

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 0.908 312.00 24.96 0.227

langsiran material m3 387.20 118,019.00 45,696,956.80 3.237

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469


Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075

Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708


Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033
JUMLAH NILAI PEKERJAAN 1,411,672,814.1 100.000 - 2.097 2.097

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
KEMAJUAN MINGGUAN
GGU KE 4 (EMPAT)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D MINGGU INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

1.00 1.00 0.418

1.00 1.00 0.531

1.00 1.00 0.354

1.00 1.00 0.567


312.00 24.96 0.227

2.10 2.097

0.209
2.097
2.097
1.89
LAPORAN KEMAJUAN MINGGUAN
BULAN KE 1 (SATU)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D BULAN LALU BULAN INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 0.418 1.00 100.00 0.418

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 0.531 1.00 100.00 0.531

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 0.354 1.00 100.00 0.354

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 0.567 1.00 100.00 0.567

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 0.908 312.00 24.96 0.227

langsiran material m3 387.20 118,019.00 45,696,956.80 3.237

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075


Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 100.000 - 2.097 2.097

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
KEMAJUAN MINGGUAN
LAN KE 1 (SATU)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D BULAN INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

1.00 1.00 0.418

1.00 1.00 0.531

1.00 1.00 0.354

1.00 1.00 0.567

312.00 24.96 0.227

2.10 2.097

0.209
2.097
2.097
1.89
LAPORAN KEMAJUAN MINGGUAN
MINGGU KE 4 (EMPAT)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D MIGGU LALU MINGGU INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 0.418

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 0.531

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 0.354

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 0.567

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 0.908

langsiran material m3 387.20 118,019.00 45,696,956.80 3.237 117.00 30.22 0.978

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075


Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 100.000 - 0.978 0.978

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
EMAJUAN MINGGUAN
GU KE 4 (EMPAT)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D MINGGU INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

117.00 117.00 0.978

0.98 0.978

0.595
0.978
0.978
0.38
LAPORAN KEMAJUAN MINGGUAN
MINGGU KE 4 (EMPAT)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D MIGGU LALU MINGGU INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 1,272.034

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 1,616.993

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 1,077.995

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 1,724.792

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 2,764.518

langsiran material m3 387.20 118,019.00 45,696,956.80 9,852.219 117.00 30.22 2,977.039

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075

Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 18,402.536 - 16.177 2,977.039

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
KEMAJUAN MINGGUAN
NGGU KE 4 (EMPAT)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D MINGGU INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

234.00 117.00 2,977.039

16.18 2,977.039

1.303
2,977.039
2,977.039
2,975.74
LAPORAN KEMAJUAN MINGGUAN
MINGGU KE 4 (EMPAT)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D MIGGU LALU MINGGU INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 59.000

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 75.000

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 50.000

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 80.000

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 128.225

langsiran material m3 387.20 118,019.00 45,696,956.80 456.970 117.00 30.22 138.082

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 60.60 12.50 0.445

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 134.83 10.00 0.369

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075


Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 943.179 - 14.726 138.896

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
KEMAJUAN MINGGUAN
GGU KE 4 (EMPAT)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D MINGGU INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

351.00 117.00 138.082

60.60 60.60 0.445

134.83 134.83 0.369

14.73 138.896

2.164
138.896
138.896
136.73
LAPORAN KEMAJUAN MINGGUAN
MINGGU KE 4 (EMPAT)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D MIGGU LALU MINGGU INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 0.418

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 0.531

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 0.354

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 0.567

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 0.908

langsiran material m3 387.20 118,019.00 45,696,956.80 3.237

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453


Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 60.60 12.50 0.445
pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 134.83 10.00 0.369

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075

Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205


Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 100.000 - 0.814 0.814

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
KEMAJUAN MINGGUAN
GGU KE 4 (EMPAT)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D MINGGU INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

121.21 587.67 0.445


269.66 3,635.96 0.369

0.81 0.814

3.452
0.814
0.814
(2.64)
LAPORAN KEMAJUAN MINGGUAN
BULAN KE 1 (SATU)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D BULAN LALU BULAN INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 0.418

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 0.531

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 0.354

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 0.567

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 0.908

langsiran material m3 387.20 118,019.00 45,696,956.80 3.237

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 121.21 25.00 0.890

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 269.66 20.00 0.738

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075


Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 100.000 - 1.628 1.628

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
EMAJUAN MINGGUAN
LAN KE 1 (SATU)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D BULAN INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

1.00 121.21 0.890

1.00 269.66 0.738

1.63 1.628

3.452
1.628
1.628
(1.82)
LAPORAN KEMAJUAN MINGGUAN
MINGGU KE 4 (EMPAT)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D MIGGU LALU MINGGU INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 59.000

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 75.000

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 50.000

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 80.000

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 128.225

langsiran material m3 387.20 118,019.00 45,696,956.80 456.970

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469 19.00 16.39

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481 2,000.00 20.53

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453 337.08 25.00

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 121.2 587.7 0.44 56.00 11.55

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 269.7 3,636.0 0.37 84.00 6.23

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075


Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 943.179 0.814 1.184

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
N KEMAJUAN MINGGUAN
MINGGU KE 4 (EMPAT)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
MINGGU INI S/D MINGGU INI
THD THD THD KETERANGAN
VOLUME
TOTAL PEK TOTAL

2.372 19.0 22 2.372

3.795 2,000.0 194,798 3.795

4.363 337.1 4,544.95 4.363

0.411 177.21 859.18 0.411

0.230 353.66 4,768.55 0.230

11.171 1.18 11.171

5.612
11.171
11.171
5.56
LAPORAN KEMAJUAN MINGGUAN
MINGGU KE 4 (EMPAT)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D MIGGU LALU MINGGU INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 322.872

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 410.430

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 273.620

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 437.792

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 701.699

langsiran material m3 387.20 118,019.00 45,696,956.80 2,500.723

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469 19 22 2.37 25.00 21.57 3.121

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066 56.00 21.82 7.650

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481 2,000 194,798 3.79 2,000.00 20.53 3.795

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453 337 4,545 4.36 325.00 24.10 4.207

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 177 859 0.41 75.00 15.47 0.550

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 354 4,769 0.23 54.00 4.00 0.148

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075


Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 4,741.121 11.171 0.411 19.471

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
EMAJUAN MINGGUAN
GU KE 4 (EMPAT)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D MINGGU INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

44.00 51 3.121

56.00 144 7.650

4,000.00 389,595 3.795

662.08 8,927 4.207

252.21 1,223 0.550

407.66 5,497 0.148

0.41 19.471

9.500
19.471
19.471
9.97
LAPORAN KEMAJUAN MINGGUAN
MINGGU KE 4 (EMPAT)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D MIGGU LALU MINGGU INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 322.872

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 410.430

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 273.620

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 437.792

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 701.699

langsiran material m3 387.20 118,019.00 45,696,956.80 2,500.723

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469 44 51 3.1

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066 56 144 7.6 79.00 30.78 10.792

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481 4,000 389,595 3.8 1,200.00 12.32 2.277

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453 662 8,927 4.2 200.00 14.83 2.589

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 252 1,223 0.6

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 408 5,497 0 125.00 9.27 0.342

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075


Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 4,741.121 19.471 0.337 16.000

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
KEMAJUAN MINGGUAN
GGU KE 4 (EMPAT)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D MINGGU INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

44.00 51.00 3.12

135.00 384.99 44.240

5,200.00 28,136.87 2.277

862.08 4,939.31 2.589

532.66 14,428.52 0.342

1.11 52.569

14.915
16.000
52.569
37.65
LAPORAN KEMAJUAN MINGGUAN
MINGGU KE 4 (EMPAT)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D MIGGU LALU MINGGU INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

1 mobilisasi ls 1.00 5,900,000.00 5,900,000.00 322.872

2 serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 410.430

3 construcion drawing ls 1.00 5,000,000.00 5,000,000.00 273.620

4 pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 437.792

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 701.699

langsiran material m3 387.20 118,019.00 45,696,956.80 2,500.723

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469 44 51 3.121 65.00 56.08 8.115

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066 135 385 44.240 45.00 17.53 6.147

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481 5,200 28,137 2.277 300.00 3.08 0.569

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453 862 4,939 2.589 53.00 3.93 0.686

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559 - - -

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692 533 14,429 0.342 65.00 4.82 0.178

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075


Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 4,741.121 52.569 0.331 15.695

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
EMAJUAN MINGGUAN
GGU KE 4 (EMPAT)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D MINGGU INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

109.00 753.32 28.600

180.00 513.32 67.490

5,500.00 29,760.15 866.649

915.08 5,242.97 194.154

- - -

597.66 16,189.20 695.569

39.07 1,852.463

20.329
15.695
1,852.463
1,832.13
LAPORAN KEMAJUAN MINGGUAN
BULAN KE 1 (SATU)
KEGIATAN : Pengembangan Dan Peningkatan Jaringan Irigasi, Rawa Dan Jaringan Pengairan Lain nya NO. KONTRAK
PEKERJAAN : Peningkatan Irigasi Teknis D.I Bantuas Dalam ( Benkeu 2019 ) KONTRAKTOR PELAKSANA
LOKASI : Desa Bantuas, Kec. Palaran NO. KONTRAK
TAHUN ANGGARAN : 2019 KONSULTAN PENGAWAS
PERIODE
KONTRAK S/D BULAN LALU BULAN INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT THD THD THD THD
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) PEK TOTAL PEK TOTAL

A. PEKERJAAN PENDAHULUAN

mobilisasi ls 1.00 5,900,000.00 5,900,000.00 0.418

serobong kerja dan stocking ls 1.00 7,500,000.00 7,500,000.00 0.531

construcion drawing ls 1.00 5,000,000.00 5,000,000.00 0.354

pelaporan, test mutu, dan dokumentasi ls 1.00 8,000,000.00 8,000,000.00 0.567

pembersihan lokasi m2 1250.00 10,258.00 12,822,500.00 0.908


langsiran material m3 387.20 118,019.00 45,696,956.80 3.237

B. PEKERJAAN SALURAN

Beton B0 m3 115.90 1,762,369.00 204,257,670.05 14.469

Beton K-225 m3 256.70 1,928,398.00 495,016,821.94 35.066

Pembesian kg 9,739.88 26,786.00 260,892,481.77 18.481

Bekisting m2 1,348.32 182,735.00 246,386,141.46 17.453

Galian Tanah m3 484.84 103,615.00 50,236,437.56 3.559

pancang kayu galam Titik 1,348.32 38,652.00 52,115,452.10 3.692

C. PEKERJAAN BANGUNAN PINTU AIR

Beton B0 m3 0.600 1,762,369.00 1,057,421.40 0.075


Beton K-225 m3 1.500 1,928,398.00 2,892,597.00 0.205

Pembesian kg 60.000 26,786.00 1,607,160.00 0.114

Bekisting m2 10.000 182,735.00 1,827,350.00 0.129

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000 5,000,000.00 10,000,000 0.708

Pancang Kayu galam titik 12.000 38,652.00 463,824 0.033


JUMLAH NILAI PEKERJAAN 1,411,672,814.1 100.000

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
KEMAJUAN MINGGUAN
ULAN KE 1 (SATU)
: 611/SP-24.350.01/100/07/IV/2019
: CV. WARNA PELANGI
: 611/SP-24.350.02/100/07/IV/2019
: CV. PUSAKA DIGJAYA
: 22 APRIL - 22 DESEMBER 2019
S/D BULAN INI
THD THD KETERANGAN
VOLUME
PEK TOTAL

5.414
-
-
(5.41)
BACK UP VOLUME

NO. URAIAN PEKERJAAN KETERANGAN

A. PEKERJAAN PENDAHULUAN LS LS VOLUME

1 mobilisasi LS 1.00
LS LS VOLUME
2 sarana prasarana personil LS 2.00
LS LS VOLUME

3 construction drawing Ls 1.00

PER 1 METER PANJANG VOLUME

4 Langsiran Material m3 351.00 0.55

B. PEKERJAAN SALURAN
LUASAN PANJANG VOLUME

Beton B0 m3 78.00 0.22


LUASAN PANJANG VOLUME
Beton K-225 m3 273.00 0.40

PER METER PANJANG VOLUME


Pembesian kg 11,011 5.82

LUASAN PANJANG VOLUME


Bekisting m2 1,300 2.00
RATA2/M PANJANG VOLUME

Galian Tanah m3 424.0 0.81


RATA2/M PANJANG VOLUME
Timbunan m3 538.1
PER METER PANJANG VOLUME

pancang kayu galam Titik 1,300 2.00

C. PEKERJAAN BANGUNAN PINTU AIR LUASAN PANJANG VOLUME

Beton B0 m3 0.600
LUASAN PANJANG VOLUME

Beton K-225 m3 1.500


PER METER PANJANG VOLUME

Pembesian kg 60.00

LUASAN PANJANG VOLUME

Bekisting m2 10.00
LUASAN PANJANG VOLUME

Pintu uk. B = 0.7 ; h = 1.3 bh 2.000


PER METER PANJANG VOLUME

Pancang Kayu galam titik 12.00


REKAPITULASI KEMAJUAN PEKERJAAN
BULAN OKTOBER, KE 5 ( LIMA )

KEMENTRIAN NEGARA : KEMENTRIAN PERHUBUNGAN NO. KONTRAK


SATKER : UNIT PENYELENGGARA BANDAR UDARA LONG APUNG KAB. MALINAU KONTRAKTOR PELAKS
KEGIATAN : PEMBANGUNAN, REHABILITASI & PEMELIHARAAN PRASARANA BANDAR UDARA NO. KONTRAK
PEKERJAAN : PEMBUATAN DRAINASE SISI UDARA DAN SISI DARAT KONSULTAN PENGAW
TAHUN ANGGARAN : 2017 PERIODE
### #REF! #REF!
KONTRAK S/D BULAN LALU BULAN INI
NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA BOBOT BOBOT
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) (%)

A. PEKERJAAN PENDAHULUAN

1 Pengukuran dan Pemasangan Bouwplank m 1,000 70,000.00 70,000,000.00 2.436 1,000.00 2.436
2 Penmbersihan Lokasi m2 431 17,500.00 7,542,500.00 0.263 431 0.263

B PEKERJAAN TANAH DAN DRAINASE

1 Galian Tanah M3 1,360.0 67,500.0 91,800,000.0 3.195 1,360.00 3.195


2 Pasir Urug bawah Pondasi M3 61.0 627,000.0 38,247,000.0 1.331 30.00 0.655 4.00
3 Pasangan Pondasi Batu Kali M3 552.0 3,890,761.4 2,147,700,292.8 74.750 209.00 28.302 42.30

4 Plesteran saluran / Drainase M2 3,000.00 172,625.00 517,875,000.00 18.025

JUMLAH NILAI PEKERJAAN 2,873,164,792.80 100.000 34.851

RENCANA KOMULATIF (%)


REALISASI (%)
REALISASI KOMULATIF (%)
PERBEDAAN KOMULATIF (%)
KEMAJUAN PEKERJAAN
TOBER, KE 5 ( LIMA )

: KU.003/03/829/LPU.2017
KONTRAKTOR PELAKSANA : PT. GITA LESTARI BULUNGAN
: KU.003/03/609/LPU.2017
KONSULTAN PENGAWAS : CV. NAMIRA CONSULTANT
: 30 MEI - 25 DESEMBER 2017 ( 210 HARI )
#REF!
BULAN INI S/D BULAN INI
BOBOT BOBOT KETERANGAN
VOLUME
(%) (%)

1,000.00 2.436
431.00 0.263

1,360.00 3.195
0.014 34.00 0.669
5.728 251.30 34.030

5.742 40.593

49.130
5.742
40.593
-8.537