JUMLAH I 5,500,000.00
II PEMBANGUNAN REHAB RUANG SERBAGUNA DAN KANTIN
A PEKERJAAN STRUKTUR
1 PEKERJAAN KOLOM Uk. 150 x 150
- Beton 0.32 M3 G.6 1,250,000.00 393,750.00
- Besi 4Ø10 49.73 KG G.25 16,000.00 795,648.00
- Besi Sengkang Ø6-100 14.75 KG G.24 16,000.00 235,946.67
- Perbaikan Kolom Praktis 6.00 Unit 500,000.00 3,000,000.00
2 PEKERJAAN BALOK Uk. 150 x 200
- Beton 1.05 M3 G.6 1,250,000.00 1,312,500.00
- Besi 4Ø10 180.00 KG G.25 16,000.00 2,880,000.00
- Besi Sengkang Ø6-100 150.00 KG G.24 16,000.00 2,400,000.00
- Bekising 3x Pakai 21.00 M2 G.10 180,660.16 3,793,863.36
3 PEKERJAAN ATAP
- Pek. Rangka Atap 42.90 M2 Taksir 175,000.00 7,507,500.00
- Pasang Penutup Atap 42.90 M2 Taksir 35,000.00 1,501,500.00
- Pek. Pasang Listplank 35.00 M Taksir 40,000.00 1,400,000.00
1 PEKERJAAN PLAFOND
- Pek. Pasang Rangka Plafond Hollow 4/4, 2/4 42.90 M2 I.3 81,286.00 3,487,169.40
- Pekerjaan pasang plafond Gipsum 42.90 M2 I.2 73,619.00 3,158,255.10
- Pekerjaan List Plafond Gipsum 38.50 M' I.4 38,536.00 1,483,636.00
2 PEKERJAAN PLESTERAN DAN ACIAN
- Pek. Pas. Pleteran 79.50 M2 E.1 76,335.00 6,068,632.50
- Pek . Acian 79.50 M2 E.3 37,540.00 2,984,430.00
2 PEKERJAAN PENGECATAN
- Pengecatan Dinding Interior 79.50 M2 P.12 35,000.00 2,782,500.00
- Pengecatan Plafond 42.90 M2 P.3 35,000.00 1,501,500.00