TOTAL 1,388,483,216.31
DIBULATKAN 1,388,400,000.00
SATU MILYAR TIGA RATUS DELAPAN PULUH DELAPAN JUTA EMPAT RATUS RIBU
TERBILANG :
RUPIAH
JUMLAH V 135,125,304.81
VI PEKERJAAN LISTRIK KANTOR & RUMAH KARYAWAN
1 Pasangan Ttitk lampu dan Stop Kontak 65.000 Titik 350,000.00 22,750,000.00
2 Pasangan Lampu LED Down Light 29.000 Bh 150,000.00 4,350,000.00
3 Pasangan Saklar Tunggal 13.000 Bh 50,000.00 650,000.00
4 Pasangan Salkar Ganda 9.000 Bh 50,000.00 450,000.00
5 Pasangan Salkar Triple 3.000 Bh 50,000.00 150,000.00
6 Pasangan Stop Kontak 21.000 Bh 50,000.00 1,050,000.00
7 Pasangan MCB AC 7.000 Bh 80,000.00 560,000.00
8 Box MCB 3.000 Bh 750,000.00 2,250,000.00
9 Pasangan Lampu LED 11 Watt 8.000 Bh 100,000.00 800,000.00
10 Grounding 1.000 LS 1,500,000.00 1,500,000.00
JUMLAH VI 34,510,000.00
VII PEKERJAAN SANITASI
1 Pasangan Kloset Duduk 5.000 Bh 2,622,200.00 13,111,000.00
2 Pasangan Kloset Jongkok 5.000 Bh 984,300.00 4,921,500.00
3 Pasangan Wastafel 5.000 Bh 1,322,200.00 6,611,000.00
4 Pasangan Shower 3.000 Bh 1,031,650.00 3,094,950.00
5 Pasangan Bak Air Fiber 5.000 Bh 1,233,500.00 6,167,500.00
6 Pasanga Karan Air 1/2 " 5.000 Bh 56,025.00 280,125.00
7 Pasangan Floor Drain 10.000 Bh 99,150.00 991,500.00
8 Grond Tank 14.500 liter, beton bertulang 1.000 Unit 47,879,569.81 47,879,569.81
9 Septictank 2.000 Unit 16,500,000.00 33,000,000.00
10 Peresapan 2.000 Unit 3,000,000.00 6,000,000.00
11 Jaringan Pipa Air Besrih PVC dia 1 " 100.000 m' 50,705.00 5,070,500.00
12 Jaringan Pipa Air Besrih PVC dia 3/4 " 50.000 m' 45,035.00 2,251,750.00
13 Jaringan Pipa Air Kotor PVC dia 4 " 66.000 m' 168,965.00 11,151,690.00
14 Jaringan Pipa Air Bekas PVC dia 2" 36.000 m' 79,865.00 2,875,140.00
15 Jaringan Pipa Air Hujan PVC dia 3" 40.000 m' 120,365.00 4,814,600.00
JUMLAH VII 148,220,824.81
VIII PEKERJAAN PINTU PAGAR
1 Pintu Pagar Besi 1 (8.5 m x 3 m) 25.500 m2 1,200,000.00 30,600,000.00
2 Pintu Pagar Besi 2 ( 8.5 m x 2 m) 17.000 m2 1,200,000.00 20,400,000.00
3 Pintu Pagar Besi 3 ( 1 m x 2.2 m) 2.200 m2 1,200,000.00 2,640,000.00
JUMLAH VIII 53,640,000.00
IX PEKERJAAN GUDANG ALAT
1 Pas. Bata Merah 1 Batu 1 pc : 5 psr, 127.000 m2 360,000.00 45,720,000.00
2 Ringbalk 20/20
3
- Pekerjaan beton 2.720 m 1,233,000.00 3,353,760.00
- Pekerjaan besi sesuia gambar 368.421 kg 20,035.00 7,381,314.74
- Pekerjaan beksting Sloof 27.200 m2 175,500.00 4,773,600.00
3 Kolom 20/25
3
- Pekerjaan beton 2.000 m 1,233,000.00 2,466,000.00
- Pekerjaan besi sesuia gambar 230.500 kg 20,035.00 4,618,067.50
- Pekerjaan beksting kolom 36.000 m2 309,000.00 11,124,000.00
2
4 Plesteran Tembok 1 pc : 5 psr , tebal 2,5 cm 288.000 m 57,935.20 16,685,337.60
2
5 Acian Plesteran Tembok dan Beton dengan Saus Semen 288.000 m 42,537.50 12,250,800.00
2
6 Lantai Rabat beton 1PC : 3 Psr : 5 Krl, tebal 10 cm 12.650 m 1,100,000.00 13,915,000.00
2
7 Pasangan Rangka Kuda - Kuda & Gording Baja Ringan C-75 150.000 m 275,000.00 41,250,000.00
2
8 Pasangan Atap Seng Gelombang Galvalum 0,35 150.000 m 124,800.00 18,720,000.00
2
9 Pintu Besi 3,2 m x 3 m 9.600 m 1,200,000.00 11,520,000.00
2
10 Pengecatan Interior Kantor dan Mes 1,249.000 m 45,175.00 56,423,575.00
2
11 Pengecatan Eksterior Kantor dan Mes 265.000 m 45,175.00 11,971,375.00
JUMLAH IX 262,172,829.84
X PEKERJAAN LISTRIK GUDANG & PELATARAN
1 Pasangan Ttitk lampu Sorot Luar (Gudang) 6.000 Titik 2,898,900.00 17,393,400.00
2 Pasangan Ttitk lampu Sorot Dalam (Gudang) 4.000 Titik 2,590,500.00 10,362,000.00
3 Pasangan Ttitk lampu Sorot Pelataran Luar 2.000 Titik 2,643,900.00 5,287,800.00
4 Pasangan Stop Kontak 6.000 Bh 60,000.00 360,000.00
5 Pasangan MCB AC 1.000 Bh 96,000.00 96,000.00
6 Box Panel 1.000 Ls 540,000.00 540,000.00
7 Handle Genset 1.000 Bh 1,000,000.00 1,000,000.00
8 Pemindahan Meteran Listrik 1.000 Ls 500,000.00 500,000.00
JUMLAH X 35,539,200.00
XI PEKERJAAN LANTAI RABAT LUAR
1 Galian Pondasi 7.440 M3 62,770.00 467,008.80
2 Urugan Tanah Kembali 1.860 M3 24,583.33 45,725.00
3 Urugan Sirtu Peninggi Lantai 4.650 M3 224,500.00 1,043,925.00
4 Urugan Pasir Bawah Lantai & Pondasi 5.580 M3 279,500.00 1,559,610.00
5 Pasangan Pondasi Batu Kali/karang 6.975 M3 613,650.00 4,280,208.75
6 Plesteran Pondasi 1 pc : 5 psr , tebal 2,5 cm 11.625 M2 57,935.20 673,496.70
7 Lantai Rabat beton 1PC : 3 Psr : 5 Krl, tebal 10 cm 4.650 M3 1,000,900.00 4,654,185.00
JUMLAH XI 12,724,159.25
TOTAL 1,388,483,216.31