Disusun Oleh:
PEJABAT PEMBUAT KOMITMEN
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JABOTABEK
DAN JALUR GANDA TANAH ABANG - SERPONG - MAJA - MERAK
WINDY MAHATESYASNA, ST
Penata (III/c)
NIP. 19821221 200312 1 001
ANALISA HARGA SATUAN
HARGA HARGA
KODE BAHAN UPAH ALAT SATUAN
INDEK SAT. U RAIAN DASAR
ANALISA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi
0.500 oh Mandor 174,400.00 87,200.00 87,200.00
5.000 oh Pekerja 130,200.00 651,000.00 651,000.00
0.500 kg Kawat pral 40,000.00 20,000.00 20,000.00
31.000 km ongkos angkut dengan Truck 2,400.00 74,400.00 74,400.00
Jumlah 832,600.00
Dibulatkan 832,600.00
2 Direksi Keet dan gudang kerja
0.444 oh Pekerja 130,200.00 57,860.88 57,860.88
0.111 oh Tukang Kayu 149,700.00 16,631.67 16,631.67
0.167 kg Paku 22,000.00 3,667.40 3,667.40
0.042 kg Paku Seng 24,000.00 1,000.80 1,000.80
0.044 m3 Kayu Kelas III 3,745,000.00 164,405.50 164,405.50
1.110 lbr Triplek t=4 mm 51,000.00 56,610.00 56,610.00
1.110 lbr Seng BJLS 50,000.00 55,500.00 55,500.00
0.050 m3 Lantai Kerja 1 pc : 3 ps : 5 kr per m3 1,551,352.00 77,567.60 77,567.60
Jumlah/m2 433,243.85
Dibulatkan 433,200.00
Lantai Kerja 1 pc : 3 ps : 5 kr per m3
6.000 oh Pekerja. 130,200.00 781,200.00 781,200.00
0.300 oh Mandor 174,400.00 52,320.00 52,320.00
0.500 oh Tukang Batu. 149,700.00 74,850.00 74,850.00
0.050 oh Kepala Tukang. 164,000.00 8,200.00 8,200.00
0.928 m3 Agregat Pecah Mesin 20-30 mm 244,000.00 226,432.00 226,432.00
0.557 m3 Pasir beton 150,000.00 83,550.00 83,550.00
232.000 kg Semen PC 1,400.00 324,800.00 324,800.00
Harga lantai kerja/m3 1,551,352.00
3 Pengukuran, pasang patok dan bouwplank, membuat gambar kerja, dan As Built Drawing
0.042 oh Pekerja 130,200.00 5,468.40 5,468.40
0.012 oh Kepala Tukang 164,000.00 1,968.00 1,968.00
0.002 oh Mandor 174,400.00 348.80 348.80
0.030 oh Juru Gambar 95,000.00 2,850.00 2,850.00
0.020 oh Juru ukur 95,000.00 1,900.00 1,900.00
0.125 oh Tukang kayu 149,700.00 18,712.50 18,712.50
0.040 kg Paku 22,000.00 880.00 880.00
0.009 m3 Kayu kelas III 3,745,000.00 33,705.00 33,705.00
Jumlah 65,832.70
Dibulatkan 65,800.00
4 Pembersihan Lapangan termasuk buangan hasil Striping
0.005 Oh Mandor 174,400.00 872.00 872.00
0.050 oh Tukang Kayu 149,700.00 7,485.00 7,485.00
0.050 oh Pekerja 130,200.00 6,510.00 6,510.00
Jumlah 14,867.00
Dibulatkan 14,800.00
5 Penjagaan Direksi keet/gudang dan Penerangan selama pekerjaan berlangsung
1.0000 OH Tenaga Keamanan 130,200.00 130,200.00 130,200.00
2.0000 OH Keselamatan Kerja dan Penjaga Semboyan 65,000.00 130,000.00 130,000.00
Jumlah /Oh 260,200.00
Dibulatkan 260,200.00
II. PEKERJAAN PAGAR PANEL BETON PRECAST
1 Pekerjaan Galian Tanah Pondasi Pagar
0.0250 Oh Mandor 174,400.00 4,360.00 4,360.00
0.7500 Oh Pekerja 130,200.00 97,650.00 97,650.00
Jumlah /m3 102,010.00
Dibulatkan 102,000.00
2 Timbunan Tanah
0.2500 Oh Pekerja 130,200.00 32,550.00 32,550.00
0.0083 Oh Mandor 174,400.00 1,453.33 1,453.33
Jumlah 34,003.33
Dibulatkan 34,000.00
3 Pekerjaan Pasir Urug
1.2000 M3 Pasir Urug 210,000.00 252,000.00 252,000.00
0.0100 Oh Mandor 174,400.00 1,744.00 1,744.00
0.3000 Oh Pekerja 130,200.00 39,060.00 39,060.00
Harga per m3 292,804.00
Dibulatkan 292,800.00
4 Pekerjaan Pasangan Batu Kali untuk pondasi pagar (camp. 1 PC : 3 Pp)
1.500 Oh Pekerja 130,200.00 195,300.00 195,300.00
0.750 Oh Tukang batu 149,700.00 112,275.00 112,275.00
0.075 Oh Kepala Tukang 164,000.00 12,300.00 12,300.00
0.075 Oh Mandor 174,400.00 13,080.00 13,080.00
202.000 kg Semen PC 1,400.00 282,800.00 282,800.00
0.485 M3 Pasir pasang 150,000.00 72,750.00 72,750.00
1.200 M3 Batu kali 150,000.00 180,000.00 180,000.00
Jumlah 868,505.00
Dibulatkan 868,500.00
5 Pekerjaan Pagar precast tinggi 2,5 meter
12.0000 m Kawat Duri 1,500.00 18,000.00 18,000.00
4.5000 kg Besi siku L 40x40x4 14,500.00 65,250.00 65,250.00
5.0000 bh Pagar panel beton 80 x 450 x 3000 mm 235,000.00 1,175,000.00 1,175,000.00
1.0000 btg Kolom Pagar Beton 340 x 18 x 20 cm 467,500.00 467,500.00 467,500.00
5.0800 OH Pekerja 130,200.00 661,416.00 661,416.00
2.8000 OH Tukang besi 149,700.00 419,160.00 419,160.00
3.1800 Oh Tukang batu 149,700.00 476,046.00 476,046.00
0.3180 OH Mandor 174,400.00 55,459.20 55,459.20
0.1350 M³ Ring Balok (praktis) K.175, 20x18x480 cm 1,758,900.00 237,451.50 237,451.50
0.1620 m3 Pondasi beton K. 175 45 x 45 x 80 cm 1,758,900.00 284,941.80 284,941.80
0.2500 hari Chain block kapasitas 2 ton 187,500.00 46,875.00 46,875.00
1.0000 Ls Alat bantu 22,481.43 22,481.43 22,481.43
Jumlah harga panjang 3,0 meter 3,929,580.93
Harga per m 1,309,860.31
Dibulatkan 1,309,860.00
III. PEKERJAAN PAGAR BESI ORNAMEN
1 Pekerjaan Galian Tanah Pondasi Pagar
0.0250 Oh Mandor 174,400.00 4,360.00 4,360.00
0.7500 Oh Pekerja 130,200.00 97,650.00 97,650.00
Jumlah /m3 102,010.00
Dibulatkan 102,000.00
HARGA HARGA
KODE BAHAN UPAH ALAT SATUAN
INDEK SAT. U RAIAN DASAR
ANALISA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
2 Timbunan Tanah
0.2500 Oh Pekerja 130,200.00 32,550.00 32,550.00
0.0083 Oh Mandor 174,400.00 1,453.33 1,453.33
Jumlah 34,003.33
Dibulatkan 34,000.00
3 Lantai Kerja K.175
Beton
1.600 oh Pekerja 130,200.00 208,320.00 208,320.00
0.275 oh Tukang 149,700.00 41,167.50 41,167.50
0.028 oh Kepala tukang 164,000.00 4,592.00 4,592.00
0.083 oh Mandor 174,400.00 14,475.20 14,475.20
1.100 m3 Beton Ready mix K.175 830,000.00 913,000.00 913,000.00
Bekisting
2.149 oh Pekerja 130,200.00 279,799.80 279,799.80
1.075 oh Tukang 149,700.00 160,852.65 160,852.65
0.572 oh Mandor 174,400.00 99,756.80 99,756.80
0.004 m3 Kayu Klas III 3,745,000.00 14,980.00 14,980.00
1.000 kg Paku 22,000.00 22,000.00 22,000.00
Harga per m3 1,758,943.95
Dibulatkan 1,758,900.00
4 Pondasi / Kolom Beton K.250
Beton
1.650 oh Pekerja 130,200.00 214,830.00 214,830.00
0.275 oh Tukang batu 149,700.00 41,167.50 41,167.50
0.028 oh Kepala tukang 164,000.00 4,592.00 4,592.00
0.083 oh Mandor 174,400.00 14,475.20 14,475.20
1.100 m3 Beton Ready mix K.250 slump 12 872,000.00 959,200.00 959,200.00
1.100 m3 Concrete Pump 75,000.00 82,500.00 82,500.00
0.094 jam Concrete Vibrator 43,700.00 4,112.17 4,112.17
Bekisting
0.030 m3 Kayu Kelas III 3,745,000.00 112,350.00 112,350.00
2.000 kg Paku 22,000.00 44,000.00 44,000.00
2.000 ltr Minyak bekisting 2,600.00 5,200.00 5,200.00
0.300 btg Kayu gelam / dolken 8-10 cm 25,000.00 7,500.00 7,500.00
1.700 lbr Multiplek 12 mm 144,000.00 244,800.00 244,800.00
2.149 oh Pekerja 130,200.00 279,799.80 279,799.80
0.075 oh Tukang Kayu 149,700.00 11,152.65 11,152.65
1.485 oh Tukang kayu (bongkar) 149,700.00 222,304.50 222,304.50
0.572 oh Mandor 174,400.00 99,756.80 99,756.80
4.000 Unit Formite/penjaga jarak bekisting/spacer 1,000.00 4,000.00 4,000.00
Jumlah 2,351,740.62
Dibulatkan 2,351,700.00
5 Pekerjaan Sloff Beton Expos K.250
Beton
1.650 oh Pekerja 130,200.00 214,830.00 214,830.00
0.275 oh Tukang batu 149,700.00 41,167.50 41,167.50
0.028 oh Kepala tukang 164,000.00 4,592.00 4,592.00
0.083 oh Mandor 174,400.00 14,475.20 14,475.20
1.100 m3 Beton Ready mix K.250 slump 12 872,000.00 959,200.00 959,200.00
1.100 m3 Concrete Pump 75,000.00 82,500.00 82,500.00
0.094 jam Concrete Vibrator 43,700.00 4,112.17 4,112.17
Bekisting
0.030 m3 Kayu Kelas III 3,745,000.00 112,350.00 112,350.00
2.000 kg Paku 22,000.00 44,000.00 44,000.00
2.000 ltr Minyak bekisting 2,600.00 5,200.00 5,200.00
0.300 btg Kayu gelam / dolken 8-10 cm 25,000.00 7,500.00 7,500.00
1.700 lbr Multiplek 12 mm 144,000.00 244,800.00 244,800.00
2.149 oh Pekerja 130,200.00 279,799.80 279,799.80
0.075 oh Tukang Kayu 149,700.00 11,152.65 11,152.65
1.485 oh Tukang kayu (bongkar) 149,700.00 222,304.50 222,304.50
0.572 oh Mandor 174,400.00 99,756.80 99,756.80
4.000 Unit Formite/penjaga jarak bekisting/spacer 1,000.00 4,000.00 4,000.00
Jumlah 2,351,740.62
Dibulatkan 2,351,700.00
6 Plesteran dan Acian
a. Plesteran 1 PC : 5 PP tebal 15 mm
5.1840 kg Semen PC 1,400.00 7,257.60 7,257.60
0.0260 m3 Pasir 150,000.00 3,900.00 3,900.00
0.1500 Oh Pekerja 130,200.00 19,530.00 19,530.00
0.0750 Oh Tukang batu 149,700.00 11,227.50 11,227.50
0.0080 Oh Mandor 174,400.00 1,395.20 1,395.20
b. Acian
3.2500 kg Semen PC 1,400.00 4,550.00 4,550.00
0.2000 Oh Pekerja 130,200.00 26,040.00 26,040.00
0.1000 Oh Tukang batu 149,700.00 14,970.00 14,970.00
0.0100 Oh Mandor 174,400.00 1,744.00 1,744.00
Jumlah 90,614.30
Dibulatkan 90,600.00
7 Pagar Besi Ornamen tinggi 1,50 meter
Bahan
123.0060 kg Besi Ulir dia. 16 mm 11,100.00 1,365,366.60 1,365,366.60
120.1050 kg Plat Strip tebal 6 mm 13,500.00 1,621,417.50 1,621,417.50
156.8400 kg Hollow125X125X4,5 mm (3 batang) 13,500.00 2,117,340.00 2,117,340.00
0.1450 kg Kawat las 26,700.00 3,871.50 3,871.50
0.0300 bh Mata bor dia. 16 mm 295,000.00 8,850.00 8,850.00
0.0760 bh Batu Gerinda tangan 13,500.00 1,026.00 1,026.00
3.0000 bh Ornamen bola besi 46,300.00 138,900.00 138,900.00
Tenaga
21.6000 Oh Pekerja 130,200.00 2,812,320.00 2,812,320.00
0.8000 Oh Tukang Las 149,700.00 119,760.00 119,760.00
0.6500 Oh Tukang Bubut besi 149,700.00 97,305.00 97,305.00
0.2160 Oh Kepala Tukang las 164,000.00 35,424.00 35,424.00
0.0108 Oh Mandor 174,400.00 1,883.52 1,883.52
Alat
10.4000 Jam Mesin Bor tangan 9,375.00 97,500.00 97,500.00
4.5714 Jam Mesin Gerinda 16,075.00 73,485.71 73,485.71
0.9700 Jam Mesin bubut 462,500.00 448,625.00 448,625.00
2.5600 Jam Bar bending 312,300.00 799,488.00 799,488.00
0.8000 Jam Mesin las 6,875.00 5,500.00 5,500.00
Transport
0.4000 ton Transpor Kelokasi kerja 832,600.00 332,999.20 332,999.20
Harga panjang 8 meter 10,081,062.04
HARGA HARGA
KODE BAHAN UPAH ALAT SATUAN
INDEK SAT. U RAIAN DASAR
ANALISA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
Harga / meter 1,260,132.75
Dibulatkan 1,260,100.00
8 Mengecat Tembok
0.1000 kg Plamir 23,000.00 2,300.00 2,300.00
0.1000 kg Cat Dasar 76,000.00 7,600.00 7,600.00
0.2600 kg Cat Penutup 135,000.00 35,100.00 35,100.00
0.0200 oh Pekerja 130,200.00 2,604.00 2,604.00
0.0630 oh Tukang Cat 149,700.00 9,431.10 9,431.10
0.0063 oh Kepala Tukang 164,000.00 1,033.20 1,033.20
Harga per 2 58,068.30
Dibulatkan 58,000.00
9 Mengecat Pagar Besi
0.1000 kg Cat Meni Besi 65,000.00 6,500.00 6,500.00
0.2000 kg Cat Besi 108,000.00 21,600.00 21,600.00
0.4000 kg Amplas 2,500.00 1,000.00 1,000.00
0.0100 bh Kuas 3 inch 8,000.00 80.00 80.00
0.2000 oh Pekerja 130,200.00 26,040.00 26,040.00
0.2250 oh Tukang Cat 149,700.00 33,682.50 33,682.50
0.0225 oh Kepala Tukang 164,000.00 3,690.00 3,690.00
Harga per m2 92,592.50
Dibulatkan 92,500.00
10 Pasir Urug
1.2000 M3 Pasir Urug 210,000.00 252,000.00 252,000.00
0.0100 Oh Mandor 174,400.00 1,744.00 1,744.00
0.3000 Oh Pekerja 130,200.00 39,060.00 39,060.00
Harga per m3 292,804.00
Dibulatkan 292,800.00
11 Pekerjaan Pasangan Batu Kali untuk pondasi pagar 1 PC : 3 PS
1.200 M3 Batu kali 150,000.00 180,000.00 180,000.00
202.000 kg Semen PC 1,400.00 282,800.00 282,800.00
0.485 M3 Pasir 150,000.00 72,750.00 72,750.00
1.500 Oh Pekerja 130,200.00 195,300.00 195,300.00
0.750 Oh Tukang batu 149,700.00 112,275.00 112,275.00
0.075 Oh Kepala tukang 164,000.00 12,300.00 12,300.00
0.075 Oh Mandor 174,400.00 13,080.00 13,080.00
Jumlah 868,505.00
Dibulatkan 868,500.00
IV. RELOKASI KABEL SINYAL DAN TELKOM
1 Point Control Cable
1.00000 m Point Control Cable 95,000.00 95,000.00 95,000.00
Galian Tanah
0.025 oh Mandor 174,400.00 4,360.00 4,360.00
0.750 oh Pekerja 130,200.00 97,650.00 97,650.00
Jumlah/m3 102,010.00
0.280 m1 Galian Tanah Jumlah /m 28,562.80
Pasir Urug
1.200 m3 Pasir urug 210,000.00 252,000.00 252,000.00
0.300 oh Pekerja 130,200.00 39,060.00 39,060.00
0.010 oh Mandor 174,400.00 1,744.00 1,744.00
Jumlah/m3 292,804.00
0.028 m3 Pasir Urug Jumlah /m 8,198.51
Timbunan
0.008 oh Mandor 174,400.00 1,453.33 1,453.33
0.250 oh Pekerja 130,200.00 32,550.00 32,550.00
Jumlah/m3 34,003.33
0.028 m3 Timbunan Jumlah /m 952.09
Jumlah 167,832.85
Dibulatkan 167,800.00
2 Point Detector Cable
1.00000 m Point Detector Cable 55,400.00 55,400.00 55,400.00
Galian Tanah
0.025 oh Mandor 174,400.00 4,360.00 4,360.00
0.750 oh Pekerja 130,200.00 97,650.00 97,650.00
Jumlah/m3 102,010.00
0.280 m1 Galian Tanah Jumlah /m 28,562.80
Pasir Urug
1.200 m3 Pasir urug 210,000.00 252,000.00 252,000.00
0.300 oh Pekerja 130,200.00 39,060.00 39,060.00
0.010 oh Mandor 174,400.00 1,744.00 1,744.00
Jumlah/m3 292,804.00
0.028 m3 Pasir Urug Jumlah /m 8,198.51
Timbunan
0.008 oh Mandor 174,400.00 1,453.33 1,453.33
0.250 oh Pekerja 130,200.00 32,550.00 32,550.00
Jumlah/m3 34,003.33
0.028 m3 Timbunan Jumlah /m 952.09
Jumlah 128,232.85
Dibulatkan 128,200.00
3 Wheel Sensor Cable
1.00000 m Wheel Sensor Cable 31,300.00 31,300.00 31,300.00
Galian Tanah
0.025 oh Mandor 174,400.00 4,360.00 4,360.00
0.750 oh Pekerja 130,200.00 97,650.00 97,650.00
Jumlah/m3 102,010.00
HARGA HARGA
KODE BAHAN UPAH ALAT SATUAN
INDEK SAT. U RAIAN DASAR
ANALISA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
0.280 m1 Galian Tanah Jumlah /m 28,562.80
Pasir Urug
1.200 m3 Pasir urug 210,000.00 252,000.00 252,000.00
0.300 oh Pekerja 130,200.00 39,060.00 39,060.00
0.010 oh Mandor 174,400.00 1,744.00 1,744.00
Jumlah/m3 292,804.00
0.028 m3 Pasir Urug Jumlah /m 8,198.51
Timbunan
0.008 oh Mandor 174,400.00 1,453.33 1,453.33
0.250 oh Pekerja 130,200.00 32,550.00 32,550.00
Jumlah/m3 34,003.33
0.028 m3 Timbunan Jumlah /m 952.09
Jumlah 104,132.85
Dibulatkan 104,100.00
4 Contra Flow Home Signal Cable
1.00000 m Contra Flow Home Signal Cable 56,400.00 56,400.00 56,400.00
Galian Tanah
0.025 oh Mandor 174,400.00 4,360.00 4,360.00
0.750 oh Pekerja 130,200.00 97,650.00 97,650.00
Jumlah/m3 102,010.00
0.280 m1 Galian Tanah Jumlah /m 28,562.80
Pasir Urug
1.200 m3 Pasir urug 210,000.00 252,000.00 252,000.00
0.300 oh Pekerja 130,200.00 39,060.00 39,060.00
0.010 oh Mandor 174,400.00 1,744.00 1,744.00
Jumlah/m3 292,804.00
0.028 m3 Pasir Urug Jumlah /m 8,198.51
Timbunan
0.008 oh Mandor 174,400.00 1,453.33 1,453.33
0.250 oh Pekerja 130,200.00 32,550.00 32,550.00
Jumlah/m3 34,003.33
0.028 m3 Timbunan Jumlah /m 952.09
Jumlah 129,232.85
Dibulatkan 129,200.00
5 Block Signal Cable
1.00000 m Block Signal Cable 169,000.00 169,000.00 169,000.00
Galian Tanah
0.025 oh Mandor 174,400.00 4,360.00 4,360.00
0.750 oh Pekerja 130,200.00 97,650.00 97,650.00
Jumlah/m3 102,010.00
0.280 m1 Galian Tanah Jumlah /m 28,562.80
Pasir Urug
1.200 m3 Pasir urug 210,000.00 252,000.00 252,000.00
0.300 oh Pekerja 130,200.00 39,060.00 39,060.00
0.010 oh Mandor 174,400.00 1,744.00 1,744.00
Jumlah/m3 292,804.00
0.028 m3 Pasir Urug Jumlah /m 8,198.51
Timbunan
0.008 oh Mandor 174,400.00 1,453.33 1,453.33
0.250 oh Pekerja 130,200.00 32,550.00 32,550.00
Jumlah/m3 34,003.33
0.028 m3 Timbunan Jumlah /m 952.09
Jumlah 241,832.85
Dibulatkan 241,800.00
DAFTAR HARGA DASAR UPAH, BAHAN DAN ALAT
HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
(Rp)
A HARGA DASAR UPAH
1 Pekerja Hari 130,200.00 Jurnal 2017 hal. 323
2 Mandor Hari 174,400.00 Jurnal 2017 Hal 323
3 Tukang kayu / batu / besi Hari 149,700.00 Reviu Itjend
4 Tukang cat Hari 149,700.00 Reviu Itjend
5 Tukang las / bubut besi Hari 149,700.00 Reviu Itjend
6 Kepala tukang Hari 164,000.00 Jurnal 2017 Hal 323
7 Ongkos angkut dengan Truck km 2,400.00 Reviu Itjend
8 Tenaga Keamanan Hari 130,200.00 Reviu Itjend
9 Juru gambar oh 95,000.00 Reviu Itjend
10 Juru Ukur oh 95,000.00 Reviu Itjend
11 Keselamatan Kerja dan Penjaga Semboyan oh 65,000.00 Reviu Itjend
C SEWA PERALATAN
1 Concrete Vibrator Jam 43,700.00 pasar
2 Mesin gerinda tangan Hari 128,600.00 PM 78 Harga Dasar Hal 5/55 no 714
3 Mesin Weldahear manual hari 55,000.00 Reviu Itjend
4 Mesin Bor tangan hari 75,000.00 Harga Pasar
5 Chain block kapasitas 2 ton Hari 1,500,000.00 PM 78 Harga Dasar Hal. 6/55 no 911
6 Concrete Pump m3 75,000.00 Jurnal 2017 Hal 286
7 Mesin bubut Hari 462,500.00
8 Bar bending Hari 312,300.00
RENCANA ANGGARAN BIAYA TAHUN ANGGARAN 2013
MUHAMAD AURIES
Penata (III/c)
NIP. 19791002 200712 1 002
STERILISASI JALUR KA ANTARA MAJA - RANGKASBITUNG KM.62+700 - KM 79+900 (17,2 KM' SP) LINTAS MAJA - RANGKASBITUNG
5 Penjagaan Direksi keet/gudang dan Penerangan selama pekerjaan berlangsung 6.00 Bln 280,500.00 1,683,000.00 270,000.00 96.26% 1,620,000.00 270,000.00 1,620,000.00