Anda di halaman 1dari 71

DATA PERIODIK PELAPORAN

WAKTU PELAKSANAAN : 866 (Delapan Ratus Enam Puluh Enam ) Hari Kalender
MULAI TANGGAL : 18 AGUSTUS 2017
S/D TANGGAL : 31 DESEMBER 2019

HARI KE :
BULAN MINGGU
PERIODE TANGGAL KET.

Minggu
Selasa
KE : KE :

Kamis

Jumat

Sabtu
Senin

Rabu
1 1 2 3 18 Agustus 2017 s/d 20 Agustus 2017
I 2 4 5 6 7 8 9 10 21 Agustus 2017 s/d 27 Agustus 2017
(AGUSTUS) 2017
3 11 12 13 14 15 16 17 28 Agustus 2017 s/d 03 September 2017

4 18 19 20 21 22 23 24 04 September 2017 s/d 10 September 2017

II 5 25 26 27 28 29 30 31 11 September 2017 s/d 17 September 2017


(SEPTEMBER)
2017 6 32 33 34 35 36 37 38 18 September 2017 s/d 24 September 2017

7 39 40 41 42 43 44 45 25 September 2017 s/d 01 Oktober 2017

8 46 47 48 49 50 51 52 02 Oktober 2017 s/d 08 Oktober 2017

III 9 53 54 55 56 57 58 59 09 Oktober 2017 s/d 15 Oktober 2017


(OKTOBER)
2017 10 60 61 62 63 64 65 66 16 Oktober 2017 s/d 22 Oktober 2017

11 67 68 69 70 71 72 73 23 Oktober 2017 s/d 29 Oktober 2017

12 74 75 76 77 78 79 80 30 Oktober 2017 s/d 05 November 2017

13 81 82 83 84 85 86 87 06 November 2017 s/d 12 November 2017


IV
(NOVEMBER) 14 88 89 90 91 92 93 94 13 November 2017 s/d 19 November 2017
2017
15 95 96 97 98 99 100 101 20 November 2017 s/d 26 November 2017

16 102 103 104 105 106 107 108 27 November 2017 s/d 03 Desember 2017

17 109 110 111 112 113 114 115 04 Desember 2017 s/d 10 Desember 2017

V 18 116 117 118 119 120 121 122 11 Desember 2017 s/d 17 Desember 2017
(DESEMBER)
2017 19 123 124 125 126 127 128 129 18 Desember 2017 s/d 24 Desember 2017

20 130 131 132 133 134 135 136 25 Desember 2017 s/d 31 Desember 2017

21 137 138 139 140 141 142 143 01 Januari 2018 s/d 07 Januari 2018

VI 22 144 145 146 147 148 149 150 08 Januari 2018 s/d 14 Januari 2018
(JANUARI)
2018 23 151 152 153 154 155 156 157 15 Januari 2018 s/d 21 Januari 2018

24 158 159 160 161 162 163 164 22 Januari 2018 s/d 28 Januari 2018

25 165 166 167 168 169 170 171 29 Januari 2018 s/d 04 Februari 2018

VII 26 172 173 174 175 176 177 178 05 Februari 2018 s/d 11 Februari 2018
(FEBRUARI)
2018 27 179 180 181 182 183 184 185 12 Februari 2018 s/d 18 Februari 2018
(FEBRUARI)
2018

28 186 187 188 189 190 191 192 19 Februari 2018 s/d 25 Februari 2018

29 193 194 195 196 197 198 199 26 Februari 2018 s/d 04 Maret 2018

30 200 201 202 203 204 205 206 05 Maret 2018 s/d 11 Maret 2018
VIII
(MARET) 31 207 208 209 210 211 212 213 12 Maret 2018 s/d 18 Maret 2018
2018
32 214 215 216 217 218 219 220 19 Maret 2018 s/d 25 Maret 2018

33 221 222 223 224 225 226 227 26 Maret 2018 s/d 01 April 2018

34 228 229 230 231 232 233 234 02 April 2018 s/d 08 April 2018

IX 35 235 236 237 238 239 240 241 09 April 2018 s/d 15 April 2018
(APRIL)
2018 36 242 243 244 245 246 247 248 16 April 2018 s/d 22 April 2018

37 249 250 251 252 253 254 255 23 April 2018 s/d 29 April 2018

38 256 257 258 259 260 261 262 30 April 2018 s/d 06 Mei 2018

39 263 264 265 266 267 268 269 07 Mei 2018 s/d 13 Mei 2018
X
(MEI) 40 270 271 272 273 274 275 276 14 Mei 2018 s/d 20 Mei 2018
2018
41 277 278 279 280 281 282 283 21 Mei 2018 s/d 27 Mei 2018

42 284 285 286 287 288 289 290 28 Mei 2018 s/d 03 Juni 2018

43 291 292 293 294 295 296 297 04 Juni 2018 s/d 10 Juni 2018

XI 44 298 299 300 301 302 303 304 11 Juni 2018 s/d 17 Juni 2018
(JUNI)
2018 45 305 306 307 308 309 310 311 18 Juni 2018 s/d 24 Juni 2018

46 312 313 314 315 316 317 318 25 Juni 2018 s/d 01 Juli 2018

47 319 320 321 322 323 324 325 02 Juli 2018 s/d 08 Juli 2018

XII 48 326 327 328 329 330 331 332 09 Juli 2018 s/d 15 Juli 2018
(JULI)
2018 49 333 334 335 336 337 338 339 16 Juli 2018 s/d 22 Juli 2018

50 340 341 342 343 344 345 346 23 Juli 2018 s/d 29 Juli 2018

51 347 348 349 350 351 352 353 30 Juli 2018 s/d 05 Agustus 2018

52 354 355 356 357 358 359 360 06 Agustus 2018 s/d 12 Agustus 2018
XIII
(AGUSTUS) 53 361 362 363 364 365 366 367 13 Agustus 2018 s/d 19 Agustus 2018
2018
54 368 369 370 371 372 373 374 20 Agustus 2018 s/d 26 Agustus 2018

55 375 376 377 378 379 380 381 27 Agustus 2018 s/d 02 September 2018

56 382 383 384 385 386 387 388 03 September 2018 s/d 09 September 2018

XIV 57 389 390 391 392 393 394 395 10 September 2018 s/d 16 September 2018
(SEPTEMBER)
2018 58 396 397 398 399 400 401 402 17 September 2018 s/d 23 September 2018

59 403 404 405 406 407 408 409 24 September 2018 s/d 30 September 2018
60 410 411 412 413 414 415 416 01 Oktober 2018 s/d 07 Oktober 2018

XV 61 417 418 419 420 421 422 423 08 Oktober 2018 s/d 14 Oktober 2018
(OKTOBER)
2018 62 424 425 426 427 428 429 430 15 Oktober 2018 s/d 21 Oktober 2018

63 431 432 433 434 435 436 437 22 Oktober 2018 s/d 28 Oktober 2018

64 438 439 440 441 442 443 444 29 Oktober 2018 s/d 04 November 2018

65 445 446 447 448 449 450 451 05 November 2018 s/d 11 November 2018
XVI
(NOVEMBER) 66 452 453 454 455 456 457 458 12 November 2018 s/d 18 November 2018
2018
67 459 460 461 462 463 464 465 19 November 2018 s/d 25 November 2018

68 466 467 468 469 470 471 472 26 November 2018 s/d 02 Desember 2018

69 473 474 475 476 477 478 479 03 Desember 2018 s/d 09 Desember 2018

XVII 70 480 481 482 483 484 485 486 10 Desember 2018 s/d 16 Desember 2018
(DESEMBER)
2018 71 487 488 489 490 491 492 493 17 Desember 2018 s/d 23 Desember 2018

72 494 495 496 497 498 499 500 24 Desember 2018 s/d 30 Desember 2018
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIMUR
PPK PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH
Email : ppj.btpwjb@dephub.go.id

LAPORAN MINGGUAN

11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017
NOMOR KONTRAK :
TANGGAL KONTRAK : 18 AGUSTUS 2017

PAKET : STMK

MINGGU KE : 30 (TIGAPULUH)

TANGGAL : 05 Maret 2018 S.D 11 Maret 2018

PEKERJAAN

PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI


ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
PAKET ( STMK )

TAHUN ANGGARAN
2017 - 2019

KONTRAKTOR PELAKSANA :
PT. LEN RAILWAY SYSTEMS
JALAN SOEKARNO HATTA NO. 442 BANDUNG
Telp : (022) 5231685, 5202682 (Ext. 600) Fax : (022) 5208035,

KONSULTAN SJGMK - 1
PT. DAYA CIPTA DIANRANCANA KSO
PT. BINAMITRA BANGUNSARANA PRATAMA
JALAN MEKARSARI NO. 103 BABAKANSARI KIARACONDONG BANDUNG

KONSULTAN SJGMK - 2
PT. RAYAKONSULT
JALAN BABAKAN JERUK II NO. 34 BANDUNG 40163 INDONESIA
GIAN TIMUR
R WILAYAH II

et 2018

KASI

022) 5208035, 5208036


AMA
G BANDUNG

DONESIA
LAPORAN KEMAJUAN FISIK

PAKET : STMK
PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI
ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIM
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH II
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_
TANGGAL KONTRAK : 18 AGUSTUS 2017
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari Kalender
NO. KONTRAK :

NO URAIAN PEKERJAAN

A MATERIAL
A.1 Vital Interlocking System
A.2 Non Vital Interlocking System
A.3 Sistem Perangkat Luar Persinyalan
A.4 Sistem Catu Daya
A.5 Sistem Telekomunikasi
B INSTALASI (Termasuk Material Instalasi dan Jasa Instalasi)
B.1 Instalasi Vital Interlocking System
B.2 Instalasi Non Vital Interlocking System
B.3 Instalasi Sistem Perangkat Luar Persinyalan
B.4 Instalasi Sistem Catu Daya
B.5 Instalasi Sistem Telekomunikasi
B.6 Instalasi Grounding
C PEKERJAAN NON INSTALASI
C.1 Disain Interlocking
C.2 Project Management
C.3 Pekerjaan Sipil
C.4 Mobilisasi dan Demobilisasi

JUMLAH A+B+C =
BOBOT RENCANA KOMULATIF = 36.727
BOBOT REALISASI KOMULATIF = 33.107
DEVIASI = (3.620)

Diperiksa : Dipe
Konsultan Supervisi Konsulta
PT. DAYA CIPTA DIANRANCANA KSO PT. RAYA
PT. BINAMITRA BANGUNSARANA PRATAMA

Ir. Atjep Sudarjanto, MT. Ir. Amizar Gau


Ketua Tim Ket
MAJUAN FISIK PEKERJAAN
REKAPITULASI FISIK MINGGUAN

MINGGU KE : 30 (TIGAPULUH)
JAWA BAGIAN TIMUR
TIMUR WILAYAH II TANGGAL
05 Maret 2018

S.D

11 Maret 2018

REALISASI REALISASI REALISASI SISA FISIK


BOBOT (%) S/D S/D S/D
MINGGU LALU MINGGU INI MINGGU INI MINGGU INI

83.273 30.118 - 30.118 53.155


27.486 12.329 - 12.329 15.157
3.745 - - - 3.745
40.990 15.121 - 15.121 25.870
3.167 1.091 - 1.091 2.076
7.884 1.577 - 1.577 6.307
14.385 2.334 0.507 2.841 11.544
0.188 - - - 0.188
0.070 - - - 0.070
12.044 2.334 0.507 2.841 9.204
0.178 - - - 0.178
1.135 - - - 1.135
0.769 - - - 0.769
2.342 0.145 0.003 0.148 2.194
0.263 0.031 0.001 0.032 0.232
0.117 0.084 0.0003 0.084 0.033
1.827 - - - 1.827
0.134 0.031 0.001 0.032 0.102

100.000 32.597 0.509 33.107 66.893


%
%
%

Surabaya, 12 Maret 2018

Diperiksa : Dibuat :
Konsultan Supervisi Kontraktor Pelaksana
PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS

Ir. Amizar Gautama, M.I.Kom. Ir. Ferinsyah Zwie Husodo


Ketua Tim Project Manager
LAPORAN KEMAJUAN FISIK PEKERJAAN

PAKET : STMK LAPORAN MINGGUAN


PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI
ANTARA MADIUN - KEDUNGBANTENG MINGGU KE : 30 (TIGAPULUH)
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIMUR TANGGAL
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH II
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS 05 Maret 2018
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_x000D_
TANGGAL KONTRAK : 18 AGUSTUS 2017 S.D
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari Kalender Tanggal :
NO. KONTRAK : 11 Maret 2018

REALISASI SISA YANG BELUM


NO. URAIAN PEKERJAAN SATUAN VOLUME BOBOT s.d MINGGU LALU MINGGU INI s.d MINGGU INI DIKERJAKAN
VOLUME BOBOT% VOLUME BOBOT% VOLUME BOBOT% VOLUME BOBOT%
A MATERIAL
A.1 Vital Interlocking System
A.1.a Interlocking Rack System
A.1.a.1 Central Interlocking Processing Rack with Vital Processor System Set 6.00 2.406 3.00 1.203 - 3.00 1.203 3.00 1.203
A.1.a.2 Distributed Axle Counter Rack with Distributed I/O System (up to 3 Evaluator) Set 20.00 4.597 10.00 2.299 - 10.00 2.299 10.00 2.299
A.1.a.3 Distributed Block Controller Rack with Distributed I/O System (up to 3 block directions) Set 7.00 0.723 3.50 0.362 - 3.50 0.362 3.50 0.362
A.1.a.4 Distributed Multi Purposes Rack with Distributed I/O System Set 24.00 2.318 12.00 1.159 - 12.00 1.159 12.00 1.159
A.1.b Signal Control Module
A.1.b.1 Home & Distant Signal Control Module (Main Aspect + Emergency + Variable Speed Indicator) Set 12.00 0.534 - - - - - 12.00 0.534
A.1.b.2 Starter Signal Control Module (Main Aspect + Emergency ) Set 13.00 0.237 - - - - - 13.00 0.237
A.1.b.3 Starter Signal Control Module (Main Aspect + Emergency + Contraflow + Fix Speed Indicator) Set 12.00 0.282 - - - - - 12.00 0.282
A.1.b.4 Starter Signal Control Module(Main Aspect + Emergency + Shunt + Contraflow) Set 6.00 0.272 - - - - - 6.00 0.272
A.1.b.5 Starter Signal Control Module(Main Aspect + Emergency + Shunt + Fixed Speed Indicator) Set 4.00 0.095 - - - - - 4.00 0.095
A.1.b.6 Shunt Signal Control Module (2 Aspect) Set 10.00 0.053 - - - - - 10.00 0.053
A.1.b.7 Home Signal Contraflow Control Module Set 12.00 0.064 - - - - - 12.00 0.064
A.1.b.8 Repeater Signal Control Module Set 3.00 0.006 - - - - - 3.00 0.006
A.1.b.9 Distant Intermediate Block Signal Control Module Set 2.00 0.044 - - - - - 2.00 0.044
A.1.b.10 Intermediate Block Signal Control Module Set 2.00 0.044 - - - - - 2.00 0.044
A.1.c Point Control Module
A.1.c.1 Point Control Module Set 58.00 1.541 - - - - - 58.00 1.541
A.1.c.2 Electric Lock & Point Detector Control Module Set 11.00 0.155 - - - - - 11.00 0.155
A.1.d Train Detection Module
A.1.d.1 Axle Counter Evaluator Module Set 52.00 12.666 30.00 7.307 - 30.00 7.307 22.00 5.359
A.1.d.2 Axle Counter Interface Module Set 52.00 0.297 - - - - - 52.00 0.297
A.1.e Vital Interlocking Software
A.1.e.1 Block Control Module (1 direction) Set 13.00 0.441 - - - - - 13.00 0.441
A.1.e.2 Interface Block Module (1 direction) Set 1.00 0.016 - - - - - 1.00 0.016
A.1.f Vital Interlocking Software
A.1.f.1 Vital Interlocking Application Software (4 to 6 Spoor) Set 6.00 0.696 - - - - - 6.00 0.696
JUMLAH A.1 27.486 12.329 - - 12.329 15.157
A.2 Non Vital Interlocking System
A.2.a Mosaic Type Operator Control
A.2.a.1 Mosaic Tile Local Control Panel (4 to 6 Spoor) Set 6.00 2.912 - - - - - 6.00 2.912
A.2.b IPC Based Operator Control & Maintenance Terminal
A.2.b.1 IPC Based Technician Terminal With KVM Industrial Monitor Set 6.00 0.485 - - - - - 6.00 0.485
A.2.c Non Vital Interlocking Software
A.2.c.1 Mosaic LCP Application Software (4 to 6 Spoor) Set 6.00 0.237 - - - - - 6.00 0.237
A.2.c.2 Technician Terminal Application Software (4 to 6 Spoor) Set 6.00 0.111 - - - - - 6.00 0.111
JUMLAH A.2 3.745 - - - 3.745
A.3 Sistem Perangkat Luar Persinyalan
A.3.a LED Signal
A.3.a.1 Distant Signal (Main Aspect) Set 12.00 0.772 - - - - - 12.00 0.772
A.3.a.2 Home Signal (Main Aspect + Emergency + Variable Speed Indicator) Set 12.00 1.730 - - - - - 12.00 1.730
A.3.a.3 Starter Signal (Main Aspect + Emergency ) Set 10.00 0.849 - - - - - 10.00 0.849
A.3.a.4 Starter Signal (Main Aspect + Emergency + Fix Speed Indicator ) Set 3.00 0.261 - - - - - 3.00 0.261
A.3.a.5 Starter Signal (Main Aspect + Emergency + Contraflow + Fix Speed Indicator) Set 12.00 1.458 - - - - - 12.00 1.458
A.3.a.6 Starter Signal (Main Aspect + Emergency + Shunt + Contraflow) Set 2.00 0.221 - - - - - 2.00 0.221
A.3.a.7 Starter Signal (Main Aspect + Emergency + Shunt + Fixed Speed Indicator) Set 4.00 0.437 - - - - - 4.00 0.437
A.3.a.8 Starter Signal (Main Aspect + Emergency + Shunt + Contraflow + Fix Speed Indicator) Set 4.00 0.576 - - - - - 4.00 0.576
A.3.a.9 Shunt Signal (2 Aspect) Set 10.00 0.573 - - - - - 10.00 0.573
A.3.a.10 Home Signal Contraflow Set 12.00 0.543 - - - - - 12.00 0.543
A.3.a.11 Repeater Signal Set 3.00 0.118 - - - - - 3.00 0.118
A.3.a.12 Distant Intermediate Block Signal Set 2.00 0.129 - - - - - 2.00 0.129
A.3.a.13 Intermediate Block Signal Set 2.00 0.129 - - - - - 2.00 0.129
A.3.b Fixed Marker
A.3.b.1 Shunt Stop Marker Set 5.00 0.021 - - - - - 5.00 0.021
A.3.b.2 Stop Marker Set 7.00 0.030 - - - - - 7.00 0.030
A.3.b.3 Distant Signal Contraflow Marker Set 12.00 0.050 - - - - - 12.00 0.050
A.3.c Point Control
A.3.c.1 Electric Point Control System Set 75.00 15.957 32.00 6.808 - 32.00 6.808 43.00 9.148
A.3.c.2 Point Lock & Detector System Set 7.00 0.749 - - - - - 7.00 0.749
A.3.c.3 Point Detector System Set 4.00 0.305 - - - - - 4.00 0.305
A.3.d Train Detection Equipment
A.3.d.1 Wheel Sensor System Set 172.00 10.220 48.00 2.852 - 48.00 2.852 124.00 7.368
A.3.e Outdoor Cable (Direct Burried)
A.3.e.1 Distant Signal Cable Meter 19,041.00 0.495 19,041.00 0.495 - 19,041.00 0.495 - -
A.3.e.2 Home Signal Cable Meter 9,906.00 0.330 9,906.00 0.330 - 9,906.00 0.330 - -
A.3.e.3 Starter Signal Cable Meter 22,260.00 0.742 22,260.00 0.742 - 22,260.00 0.742 - -
A.3.e.4 Shunt Signal Cable Meter 7,643.00 0.198 7,643.00 0.198 - 7,643.00 0.198 - -
A.3.e.5 Point Control Cable Meter 37,761.00 1.665 37,761.00 1.665 - 37,761.00 1.665 - -
A.3.e.6 Point Lock & Detector Cable Meter 7,286.00 0.189 7,286.00 0.189 - 7,286.00 0.189 - -
A.3.e.7 Wheel Sensor Cable Meter 127,165.00 1.889 100,000.00 1.485 - 100,000.00 1.485 27,165.00 0.404
A.3.e.8 Home Signal Contraflow Cable Meter 8,016.00 0.207 8,016.00 0.207 - 8,016.00 0.207 - -
A.3.e.9 Repeater signal cable Meter 3,416.00 0.089 3,416.00 0.089 - 3,416.00 0.089 - -
A.3.e.10 Distant Intermediate Block Signal Cable Meter 1,200.00 0.030 1,200.00 0.030 - 1,200.00 0.030 - -
A.3.e.11 Intermediate Block Signal Cable Meter 1,200.00 0.030 1,200.00 0.030 - 1,200.00 0.030 - -
JUMLAH A.3 40.990 15.121 - 15.121 25.870
A.4 Sistem Catu Daya
A.4.a Sistem Tenaga Listrik
A.4.a.1 UPS System included Rack for Interlocking Set 6.00 0.549 6.00 0.549 - 6.00 0.549 - -
A.4.a.2 UPS System included Rack for IB Set 1.00 0.042 1.00 0.042 - 1.00 0.042 - -
A.4.a.3 UPS System Included Rack for JPL Set 12.00 0.074 - - - - - 12.00 0.074
A.4.a.4 Battery System included Rack for Interlocking Set 6.00 0.853 - - - - - 6.00 0.853
A.4.a.5 Battery System included Rack for IB Set 1.00 0.029 - - - - - 1.00 0.029
A.4.a.6 Genset System for Interlocking Set 6.00 0.462 6.00 0.462 - 6.00 0.462 - -
A.4.a.7 Genset System for IB Set 1.00 0.038 1.00 0.038 - 1.00 0.038 - -
A.4.b Sistem Kontrol Catudaya
A.4.b.1 Power Distribution Panel System Set 7.00 0.966 - - - - - 7.00 0.966
A.4.c Sistem Perkabelan Catudaya
A.4.c.1 Power System Cable Set 7.00 0.154 - - - - - 7.00 0.154
JUMLAH A.4 3.167 1.091 - 1.091 2.076
A.5 Sistem Telekomunikasi
A.5.a Sistem Telekomunikasi Optik
A.5.a.1 SDH Optical Communication System Set 7.00 1.684 - - - - - 7.00 1.684
A.5.a.2 IP Hybrid PABX Set 7.00 0.332 - - - - - 7.00 0.332
A.5.a.3 Back Up Link Module Set 16.00 0.390 - - - - - 16.00 0.390
A.5.a.4 Optical Distribution Frame (ODF) For LX Set 34.00 0.469 - - - - - 34.00 0.469
A.5.a.5 Industrial Switch for JPL Set 22.00 0.357 - - - - - 22.00 0.357
A.5.b Sistem Telepon
A.5.b.1 Telephone Handset Unit 25.00 0.047 - - - - - 25.00 0.047
A.5.b.2 Telephone Console System Unit 6.00 0.200 - - - - - 6.00 0.200
A.5.b.3 Voice Recorder System Unit 6.00 0.525 - - - - - 6.00 0.525
A.5.b.4 Communication Rack Unit 7.00 0.020 - - - - - 7.00 0.020
A.5.b.5 Communication Rack for JPL Unit 12.00 0.022 - - - - - 12.00 0.022
A.5.c Sistem Perkabelan Telekomunikasi
A.5.c.1 Signaling Telekomunikasi Kabel SDH (24 core) Meter 116,466.00 2.882 50,000.00 1.237 - 50,000.00 1.237 66,466.00 1.644
A.5.c.2 Signaling Telekomunikasi Kabel SDH (6 core) Meter 58,546.00 0.946 21,000.00 0.339 - 21,000.00 0.339 37,546.00 0.607
A.5.c.3 Signaling Telekomunikasi Kabel Telepon System Meter 240.00 0.010 - - - - - 240.00 0.010
JUMLAH A.5 7.884 1.577 - 1.577 6.307
JUMLAH A 83.273 30.118 - 30.118 53.155
B INSTALASI (Termasuk Material Instalasi dan Jasa Instalasi)
B.1 Instalasi Vital Interlocking System
B.1.a Interlocking Rack System
B.1.a.1 Instalasi Central Interlocking Processing Rack with Vital Processor System Set 6.00 0.007 - - - - - 6.00 0.007
B.1.a.2 Instalasi Distributed Axle Counter Rack with Distributed I/O System (up to 3 Evaluator) Set 20.00 0.022 - - - - - 20.00 0.022
B.1.a.3 Instalasi Distributed Block Controller Rack with Distributed I/O System (up to 3 block directions) Set 7.00 0.008 - - - - - 7.00 0.008
B.1.a.4 Instalasi Distributed Multi Purposes Rack with Distributed I/O System Set 24.00 0.027 - - - - - 24.00 0.027
B.1.b Instalasi Signal Control Module
B.1.b.1 Instalasi Home & Distant Signal Control Module (Main Aspect + Emergency + Variable Speed Indicator) Set 12.00 0.005 - - - - - 12.00 0.005
B.1.b.2 Instalasi Starter Signal Control Module (Main Aspect + Emergency ) Set 13.00 0.005 - - - - - 13.00 0.005
B.1.b.3 Instalasi Starter Signal Control Module (Main Aspect + Emergency + Contraflow + Fix Speed Indicator) Set 12.00 0.005 - - - - - 12.00 0.005
B.1.b.4 Instalasi Starter Signal Control Module(Main Aspect + Emergency + Shunt + Contraflow) Set 6.00 0.003 - - - - - 6.00 0.003
B.1.b.5 Instalasi Starter Signal Control Module(Main Aspect + Emergency + Shunt + Fixed Speed Indicator) Set 4.00 0.002 - - - - - 4.00 0.002
B.1.b.6 Instalasi Shunt Signal Control Module (2 Aspect) Set 10.00 0.004 - - - - - 10.00 0.004
B.1.b.7 Instalasi Home Signal Contraflow Control Module Set 12.00 0.005 - - - - - 12.00 0.005
B.1.b.8 Instalasi Repeater Signal Control Module Set 3.00 0.001 - - - - - 3.00 0.001
B.1.b.9 Instalasi Distant Intermediate Block Signal Control Module Set 2.00 0.001 - - - - - 2.00 0.001
B.1.b.10 Instalasi Intermediate Block Signal Control Module Set 2.00 0.001 - - - - - 2.00 0.001
B.1.c Instalasi Point Control Module
B.1.c.1 Instalasi Point Control Module Set 58.00 0.024 - - - - - 58.00 0.024
B.1.c.2 Instalasi Electric Lock & Point Detector Control Module Set 11.00 0.005 - - - - - 11.00 0.005
B.1.d Instalasi Train Detection Module -
B.1.d.1 Instalasi Axle Counter Evaluator Module Set 52.00 0.022 - - - - - 52.00 0.022
B.1.d.2 Instalasi Axle Counter Interface Module Set 52.00 0.022 - - - - - 52.00 0.022
B.1.e Block Control Module
B.1.e.1 Instalasi Block Control Module (1 direction) Set 13.00 0.005 - - - - - 13.00 0.005
B.1.e.2 Instalasi Interface Block Module (1 direction) Set 1.00 0.000 - - - - - 1.00 0.000
B.1.f Instalasi Vital Interlocking Software
B.1.f.1 Instalasi Vital Interlocking Application Software (4 to 6 Spoor) Set 6.00 0.014 - - - - - 6.00 0.014
JUMLAH B.1 0.188 - - - 0.188
B.2 Instalasi Non Vital Interlocking System
B.2.a Instalasi Mosaic Type Operator Control
B.2.a.1 Instalasi Mosaic Tile Local Control Panel (4 to 6 Spoor) Set 6.00 0.039 - - - - - 6.00 0.039
B.2.b Instalasi IPC Based Operator Control & Maintenance Terminal
B.2.b.1 Instalasi IPC Based Technician Terminal With KVM Industrial Monitor Set 6.00 0.013 - - - - - 6.00 0.013
B.2.c Instalasi Non Vital Interlocking Software
B.2.c.1 Instalasi Mosaic LCP Application Software (4 to 6 Spoor) Set 6.00 0.011 - - - - - 6.00 0.011
B.2.c.2 Instalasi Technician Terminal Application Software (4 to 6 Spoor) Set 6.00 0.007 - - - - - 6.00 0.007
JUMLAH B.2 0.070 - - - 0.070
B.3 Instalasi Sistem Perangkat Luar Persinyalan
B.3.a Instalasi LED Signal
B.3.a.1 Instalasi Distant Signal (Main Aspect) Set 12.00 0.042 - - - - - 12.00 0.042
B.3.a.2 Instalasi Home Signal (Main Aspect + Emergency + Variable Speed Indicator) Set 12.00 0.042 - - - - - 12.00 0.042
B.3.a.3 Instalasi Starter Signal (Main Aspect + Emergency) Set 10.00 0.035 - - - - - 10.00 0.035
B.3.a.4 Instalasi Starter Signal (Main Aspect + Emergency + Fix Speed Indicator) Set 3.00 0.011 - - - - - 3.00 0.011
B.3.a.5 Instalasi Starter Signal (Main Aspect + Emergency + Contraflow + Fix Speed Indicator) Set 12.00 0.042 - - - - - 12.00 0.042
B.3.a.6 Instalasi Starter Signal (Main Aspect + Emergency + Shunt + Contraflow) Set 2.00 0.007 - - - - - 2.00 0.007
B.3.a.7 Instalasi Starter Signal (Main Aspect + Emergency + Shunt + Fixed Speed Indicator) Set 4.00 0.014 - - - - - 4.00 0.014
B.3.a.8 Instalasi Starter Signal (Main Aspect + Emergency + Shunt + Fix Speed Indicator + Contraflow) Set 4.00 0.014 - - - - - 4.00 0.014
B.3.a.9 Instalasi Shunt Signal (2 Aspect) Set 10.00 0.035 - - - - - 10.00 0.035
B.3.a.10 Instalasi Home Signal Contraflow Set 12.00 0.042 - - - - - 12.00 0.042
B.3.a.11 Repeater Signal Set 3.00 0.011 - - - - - 3.00 0.011
B.3.a.12 Instalasi Distant Intermediate Block Signal Set 2.00 0.007 - - - - - 2.00 0.007
B.3.a.13 Instalasi Intermediate Block Signal Set 2.00 0.007 - - - - - 2.00 0.007
B.3.b Instalasi Fixed Marker
B.3.b.1 Instalasi Shunt Stop Marker Set 5.00 0.000 - - - - - 5.00 0.000
B.3.b.2 Instalasi Stop Marker Set 7.00 0.000 - - - - - 7.00 0.000
B.3.b.3 Instalasi Distant Signal Contraflow Marker Set 12.00 0.001 - - - - - 12.00 0.001
B.3.c Instalasi Point Control -
B.3.c.1 Instalasi Electric Point Control System Set 75.00 0.567 - - - - - 75.00 0.567
B.3.c.2 Point Lock & Detector System Set 7.00 0.043 - - - - - 7.00 0.043
B.3.c.3 Point Detector System Set 4.00 0.008 - - - - - 4.00 0.008
B.3.c.4 Pemadatan Ballast pada bantalan point machine / electric lock Set 82.00 0.050 - - - - - 82.00 0.050
B.3.d Instalasi Train Detection Equipment
B.3.d.1 Instalasi Wheel Sensor System Set 172.00 0.190 - - - - - 172.00 0.190
B.3.d.2 Instalasi Axle Counter Deflector berikut bahan Set 172.00 0.326 - - - - - 172.00 0.326
B.3.d.3 Instalasi Trackside Connection Box berikut bahan & pelindung Set 172.00 0.475 - - - - - 172.00 0.475
B.3.e Instalasi Outdoor Cable (Direct Burried)
B.3.e.1 Menggali dan mengurug kembali saluran kabel berikut bahan pndukung (rubber sheet dan warning tape) Meter 20,241.00 0.844 - - - - - 20,241.00 0.844
B.3.e.2 Membuat/ memasang saluran kabel tertutup sistem boring (termasuk bahan pendukung) Meter 97,425.00 6.638 31,017.00 2.113 7,040.00 0.480 38,057.00 2.593 59,368.00 4.045
B.3.e.3 Membuat/memasang saluran kabel dibawah jalan KA per titik UTX (Under Track Crossing) Metode Bor Titik 155.00 0.248 - - - - - 155.00 0.248
B.3.e.4 Membuat/memasang saluran kabel dibawah jalan raya per meter (URX) Meter 650.00 0.174 225.00 0.060 101.00 0.027 326.00 0.087 324.00 0.087
B.3.e.5 Membuat/memasang saluran kabel di bawah lantai per meter (UPX) Meter 325.00 0.087 - - - - - 325.00 0.087
B.3.e.6 Membuat/memasang saluran kabel dibawah jembatan / dibawah saluran air per meter (UBX) Meter 650.00 0.161 650.00 0.161 - 650.00 0.161 - -
B.3.e.7 Membuat/memasang saluran kabel udara Meter 94.00 0.221 - - - - - 94.00 0.221
B.3.e.8 Membuat/memasang patok tanda rute kabel termasuk bahan per buah Buah 998.00 0.029 - - - - - 998.00 0.029
B.3.e.9 Menggelar Distant Signal Cable Meter 19,041.00 0.106 - - - - - 19,041.00 0.106
B.3.e.10 Menggelar Home Signal Cable Meter 9,906.00 0.055 - - - - - 9,906.00 0.055
B.3.e.11 Menggelar Starter Signal Cable Meter 22,260.00 0.124 - - - - - 22,260.00 0.124
B.3.e.12 Menggelar Shunt Signal Cable Meter 7,643.00 0.043 - - - - - 7,643.00 0.043
B.3.e.13 Menggelar Point Control Cable Meter 37,761.00 0.211 - - - - - 37,761.00 0.211
B.3.e.14 Menggelar Point Lock & Detector Cable Meter 7,286.00 0.041 - - - - - 7,286.00 0.041
B.3.e.15 Menggelar Wheel Sensor Cable Meter 127,165.00 0.709 - - - - - 127,165.00 0.709
B.3.e.16 Menggelar Contraflow Home Signal Cable Meter 8,016.00 0.045 - - - - - 8,016.00 0.045
B.3.e.17 Menggelar Repeater signal cable Meter 3,416.00 0.019 - - - - - 3,416.00 0.019
B.3.e.18 Menggelar Distant Intermediate Block Signal Cable Meter 1,200.00 0.007 - - - - - 1,200.00 0.007
B.3.e.19 Menggelar Intermediate Block Signal Cable Meter 1,200.00 0.007 - - - - - 1,200.00 0.007
B.3.e.20 Terminasi kabel Titik 345.00 0.044 - - - - - 345.00 0.044
B.3.e.21 Jointing Kabel Fiber Optik Titik 91.00 0.264 - - - - - 91.00 0.264
JUMLAH B.3 12.044 2.334 0.507 2.841 9.204
B.4 Instalasi Sistem Catu Daya
B.4.a Instalasi Sistem Tenaga Listrik Set 7.00 0.078 - - - - - 7.00 0.078
B.4.b Instalasi Sistem Kontrol Catudaya Set 7.00 0.011 - - - - - 7.00 0.011
B.4.c Instalasi Sistem Perkabelan Catudaya Set 7.00 0.007 - - - - - 7.00 0.007
B.4.d Pemasangan Baru PLN Set 7.00 0.082 - - - - - 7.00 0.082
JUMLAH B.4 0.178 - - - 0.178
B.5 Instalasi Sistem Telekomunikasi
B.5.a Instalasi Sistem Telekomunikasi Optik
B.5.a.1 Instalasi SDH Optical Communication System Set 7.00 0.015 - - - - - 7.00 0.015
B.5.a.2 Instalasi IP Hybrid PABX Set 7.00 0.011 - - - - - 7.00 0.011
B.5.a.3 Instalasi Back Up Link Module Set 16.00 0.018 - - - - - 16.00 0.018
B.5.a.4 Instalasi Optical Distribution Frame (ODF) For LX Set 34.00 0.054 - - - - - 34.00 0.054
B.5.a.5 Instalasi Industrial Switch for JPL Set 22.00 0.035 - - - - - 22.00 0.035
B.5.b Instalasi Sistem Telepon
B.5.b.1 Instalasi Telephone Handset Unit 25.00 0.011 - - - - - 25.00 0.011
B.5.b.2 Instalasi Telephone Console System Unit 6.00 0.003 - - - - - 6.00 0.003
B.5.b.3 Instalasi Voice Recorder System Unit 6.00 0.003 - - - - - 6.00 0.003
B.5.b.4 Instalasi Communication Rack Unit 7.00 0.003 - - - - - 7.00 0.003
B.5.b.5 Instalasi Communication Rack for JPL Unit 12.00 0.005 - - - - - 12.00 0.005
B.5.c Instalasi / Menggelar Sistem Perkabelan Telekomunikasi
B.5.c.1 Menggelar Kabel Telekomunikasi SDH (24 core) Meter 116,466.00 0.649 - - - - - 116,466.00 0.649
B.5.c.2 Menggelar Kabel Telekomunikasi SDH (6 core) Meter 58,546.00 0.326 - - - - - 58,546.00 0.326
B.5.c.3 Menggelar Kabel Telepon System Meter 240.00 0.001 - - - - - 240.00 0.001
JUMLAH B.5 1.135 - - - 1.135
B.6 Instalasi Grounding
B.6.a Instalasi Grounding berikut bahan
B.6.a.1 Instalasi Grounding Sinyal Set 84.00 0.222 - - - - - 84.00 0.222
B.6.a.2 Instalasi Grounding Ruang ER Set 7.00 0.049 - - - - - 7.00 0.049
B.6.a.3 Instalasi Grounding Axle Counter Set 169.00 0.446 - - - - - 169.00 0.446
B.6.a.4 Instalasi Grounding Sistem Telekomunikasi Set 7.00 0.018 - - - - - 7.00 0.018
B.6.a.5 Instalasi Grounding Sistem Pintu Perlintasan Set 12.00 0.034 - - - - - 12.00 0.034
JUMLAH B.6 0.769 - - - 0.769
JUMLAH B 14.385 2.334 0.507 2.841 11.544
C PEKERJAAN NON INSTALASI
C.1 Disain Interlocking
C.1.a Survei Detail Stasiun dan IB Lot 1.00 0.034 0.91 0.031 0.03 0.001 0.94 0.032 0.06 0.002
C.1.b Simulasi Prinsip Interlocking (Outdoor & Blok) Lot 1.00 0.061 - - - - - 1.00 0.061
C.1.c Simulasi Interlocking Circuit (Outdoor) Lot 1.00 0.061 - - - - - 1.00 0.061
C.1.d Simulasi Software LCP Lot 1.00 0.034 - - - - - 1.00 0.034
C.1.e Desain Mechanical Support Lot 1.00 0.036 - - - - - 1.00 0.036
C.1.f Sistem Integrasi Lot 1.00 0.037 - - - - - 1.00 0.037
JUMLAH C.1 0.263 0.031 0.001 0.032 0.232
C.2 Project Management
C.2.a Dokumentasi SIL Lot 1.00 0.007 0.23 0.002 0.01 0.0001 0.24 0.002 0.76 0.005
C.2.b Direksi Kit Lot 1.00 0.028 1.00 0.028 - 1.00 0.028 - -
C.2.c Gudang Lot 1.00 0.045 1.00 0.045 - 1.00 0.045 - -
C.2.d Project Administration Lot 1.00 0.037 0.23 0.008 0.01 0.0003 0.24 0.009 0.76 0.028
JUMLAH C.2 0.117 0.084 0.0003 0.084 0.033
C.3 Pekerjaan Sipil
C.3.a Bangunan ER Stasiun Unit 6.00 1.603 - - - - - 6.00 1.603
C.3.b Bangunan ER IB Unit 1.00 0.225 - - - - - 1.00 0.225
JUMLAH C.3 1.827 - - - 1.827
C.4 Mobilisasi dan Demobilisasi Lot 1.00 0.134 0.23 0.031 0.01 0.001 0.24 0.032 0.76 0.102
JUMLAH C.4 0.134 0.031 0.001 0.032 0.102
JUMLAH C 2.342 0.145 0.003 0.148 2.194
JUMLAH A + B + C 100.000 32.597 0.509 33.107 66.893

BOBOT REALISASI : 33.107


BOBOT RENCANA : 36.727
DEVIASI : (3.620)

Surabaya, 12 Maret 2018

Diperiksa : Diperiksa : Dibuat :


Konsultan Supervisi Konsultan Supervisi Kontraktor Pelaksana
PT. DAYA CIPTA DIANRANCANA KSO PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS
PT. BINAMITRA BANGUNSARANA PRATAMA

Ir. Atjep Sudarjanto, MT. Ir. Amizar Gautama, M.I.Kom. Ir. Ferinsyah Zwie Husodo
Ketua Tim Ketua Tim Project Manager
LAPORAN KEMAJUAN FIS

PAKET : STMK
PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIK
ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_
TANGGAL KONTRAK : 18 AGUSTUS 2017
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari K
NO. KONTRAK :

HARI Senin Selasa Rabu


HARI KE 200 201 202
TANGGAL 05/03/2018 06/03/2018 07/03/2018
JAM KERJA EFEKTIF 8 8 8
JUMLAH JAM KERJA
No. TENAGA KERJA JUMLAH
1 Project Manager 1 1 1
2 Site Manager 1 1 1
3 Supervisi 7 7 7
4 Engineer 2 2 2
5 Administrasi 2 2 2
6 Drafter 2 2 2
7 Logistik 1 1 1
8 Teknisi 2 2 2
9 Driver 4 4 4
10 Train Watcher 1 1 1
11 Operator
12 Keamanan 2 2 2
13 Mandor 4 4 4
14 Tukang 42 42 42
15 Penjaga Gudang 2 2 2
16 Sipil 1 1 1
17 Pengawas 7 7 7
18 Tukang Gali 60 60 60
TOTAL 141 141 141

NO PEKERJAAN YANG DI KERJAKAN VOLUME SATUAN

1 Membuat/ memasang saluran kabel tertutup sistem boring (termasuk bahan pendukung) 7,040.00 Meter
2 Membuat/memasang saluran kabel dibawah jalan raya per meter (URX) 101.00 Meter
3 Survei Detail Stasiun dan IB 0.03 Lot
4 Dokumentasi SIL 0.01 Lot
5 Project Administration 0.01 Lot
6 Mobilisasi dan Demobilisasi 0.01 Lot
7
8
9
10
11
12
13
14

Diperiksa :
Konsultan Supervisi K
PT. DAYA CIPTA DIANRANCANA KSO P
PT. BINAMITRA BANGUNSARANA PRATAMA

Sigit Ario Wibowo, ST I


Tenaga Ahli Sinyal
UAN FISIK PEKERJAAN
REKAPITULASI FISIK HARIAN
ELEKOMUNIKASI

MINGGU KE : 30 (TIGAPULUH)
AN WILAYAH JAWA BAGIAN TIMUR
APIAN JAWA TIMUR WILAYAH II TANGGAL
05 Maret 2018

S.D
Enam) Hari Kalender
11 Maret 2018

Kamis Jum'at Sabtu Minggu


203 204 205 206
08/03/2018 09/03/2018 10/03/2018 11/03/2018
KETERANGAN
8 8 8 8
56 Jam
JUMLAH TENAGA KERJA
1 1 1 1
1 1 1 1
7 7 7 7
2 2 2 2
2 2 2 2
2 2 2 2
1 1 1 1
2 2 2 2
4 4 4 4
1 1 1 1

2 2 2 2
4 4 4 4
42 42 42 42
2 2 2 2
1 1 1 1
7 7 7 7
60 60 60 60
141 141 141 141
PENERIMAAN VOLUME VOLUME
KET
MATERIAL / BAHAN DITERIMA DITOLAK

Pole 4520 32.00

Surabaya, 12 Maret 2018

Diperiksa : Dibuat :
Konsultan Supervisi Kontraktor Pelaksana
PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS

Ir. Dedih Supriadi Yurdika Hamdan, ST


Tenaga Ahli Sinyal Site Manager
LAPORAN KEMAJUAN FIS

PAKET : STMK
PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI
ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIMUR
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH II
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_x000D_
TANGGAL KONTRAK : 18 AGUSTUS 2017
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari Kalend 0
NO. KONTRAK : -

TENAGA KERJA
NO
KEAHLIAN JUMLAH JENIS BAHAN
1 Project Manager 1 org Pole 4520
2 Site Manager 1 org
3 Supervisi 7 org
4 Engineer 2 org
5 Administrasi 2 org
6 Drafter 2 org
7 Logistik 1 org
8 Teknisi 2 org
9 Driver 4 org
10 Train Watcher 1 org
11 Operator org
12 Keamanan 2 org
13 Mandor 4 org
14 Tukang 42 org
15 Penjaga Gudang 2 org
16 Sipil 1 org
17 Pengawas 7 org
18 Tukang Gali 60 org

Jumlah 141 org


PEKERJAAN YANG DILAKSANAKAN
NO
JENIS PEKERJAAN

1 Membuat/ memasang saluran kabel tertutup sistem boring (termasuk bahan pendukung)
2 Membuat/memasang saluran kabel dibawah jalan raya per meter (URX)
3 Dokumentasi SIL
4 Project Administration
5 Mobilisasi dan Demobilisasi
Pekerjaan :
Mulai : Jam 08.00 Wib
Akhir : Jam 17.00 Wib
Work Window :
Hari dapat / tidak dapat seluruhnya digunakan untuk pekerjaan karena cuaca :
Hujan mulai jam : -
Waktu Efektif : 8 Jam

Diperiksa : D
Konsultan Supervisi Konsul
PT. DAYA CIPTA DIANRANCANA KSO PT. RA
PT. BINAMITRA BANGUNSARANA PRATAMA

Sigit Ario Wibowo, ST Ir. De


Tenaga Ahli Sinyal Tenag
MAJUAN FISIK PEKERJAAN

LAPORAN HARIAN

WA BAGIAN TIMUR HARI KE : 200


UR WILAYAH II
HARI : Senin

TANGGAL : 05 Maret 2018

BAHAN PERALATAN
JENIS BAHAN SATUAN DATANG DITERIMA JENIS PERALATAN JUMLAH
Buah 32.00 32.00 Laptop 5
Printer 5
Kamera 5
Handycam 1
Meteran 4
Cangkul 60
Belincong 8

ANAKAN
KETERANGAN
VOLUME SATUAN

1,005.714 Meter
14.429 Meter
0.001 Lot
0.001 Lot
` 0.001 Lot
CERAH / HUJAN / BANJIR / MENDUNG

Surabaya, 05 Maret 2018

Diperiksa : Dibuat :
Konsultan Supervisi Kontraktor Pelaksana
PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS

Ir. Dedih Supriadi Yurdika Hamdan, ST


Tenaga Ahli Sinyal Site Manager
LAPORAN KEMAJUAN FIS

PAKET : STMK
PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI
ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIMUR
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH II
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_x000D_
TANGGAL KONTRAK : 18 AGUSTUS 2017
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari Kalend 0
NO. KONTRAK : -

TENAGA KERJA
NO
KEAHLIAN JUMLAH JENIS BAHAN
1 Project Manager 1 org
2 Site Manager 1 org
3 Supervisi 7 org
4 Engineer 2 org
5 Administrasi 2 org
6 Drafter 2 org
7 Logistik 1 org
8 Teknisi 2 org
9 Driver 4 org
10 Train Watcher 1 org
11 Operator org
12 Keamanan 2 org
13 Mandor 4 org
14 Tukang 42 org
15 Penjaga Gudang 2 org
16 Sipil 1 org
17 Pengawas 7 org
18 Tukang Gali 60 org

Jumlah 141 org


PEKERJAAN YANG DILAKSANAKAN
NO
JENIS PEKERJAAN

1 Membuat/ memasang saluran kabel tertutup sistem boring (termasuk bahan pendukung)
2 Membuat/memasang saluran kabel dibawah jalan raya per meter (URX)
3 Dokumentasi SIL
4 Project Administration
5 Mobilisasi dan Demobilisasi
Pekerjaan :
Mulai : Jam 08.00 Wib
Akhir : Jam 17.00 Wib
Work Window :
Hari dapat / tidak dapat seluruhnya digunakan untuk pekerjaan karena cuaca :
Hujan mulai jam : -
Waktu Efektif : 8 Jam

Diperiksa : D
Konsultan Supervisi Konsul
PT. DAYA CIPTA DIANRANCANA KSO PT. RA
PT. BINAMITRA BANGUNSARANA PRATAMA

Sigit Ario Wibowo, ST Ir. De


Tenaga Ahli Sinyal Tenag
MAJUAN FISIK PEKERJAAN

LAPORAN HARIAN

WA BAGIAN TIMUR HARI KE : 201


UR WILAYAH II
HARI : Selasa

TANGGAL : 06 Maret 2018

BAHAN PERALATAN
JENIS BAHAN SATUAN DATANG DITERIMA JENIS PERALATAN JUMLAH
Laptop 5
Printer 5
Kamera 5
Handycam 1
Meteran 4
Cangkul 60
Belincong 8

ANAKAN
KETERANGAN
VOLUME SATUAN

1,005.714 Meter
14.429 Meter
0.001 Lot
0.001 Lot
0.001 Lot
CERAH / HUJAN / BANJIR / MENDUNG

Surabaya, 06 Maret 2018

Diperiksa : Dibuat :
Konsultan Supervisi Kontraktor Pelaksana
PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS

Ir. Dedih Supriadi Yurdika Hamdan, ST


Tenaga Ahli Sinyal Site Manager
LAPORAN KEMAJUAN FIS

PAKET : STMK
PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI
ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIMUR
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH II
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_x000D_
TANGGAL KONTRAK : 18 AGUSTUS 2017
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari Kalend 0
NO. KONTRAK : -

TENAGA KERJA
NO
KEAHLIAN JUMLAH JENIS BAHAN
1 Project Manager 1 org
2 Site Manager 1 org
3 Supervisi 7 org
4 Engineer 2 org
5 Administrasi 2 org
6 Drafter 2 org
7 Logistik 1 org
8 Teknisi 2 org
9 Driver 4 org
10 Train Watcher 1 org
11 Operator org
12 Keamanan 2 org
13 Mandor 4 org
14 Tukang 42 org
15 Penjaga Gudang 2 org
16 Sipil 1 org
17 Pengawas 7 org
18 Tukang Gali 60 org

Jumlah 141 org


PEKERJAAN YANG DILAKSANAKAN
NO
JENIS PEKERJAAN

1 Membuat/ memasang saluran kabel tertutup sistem boring (termasuk bahan pendukung)
2 Membuat/memasang saluran kabel dibawah jalan raya per meter (URX)
3 Survei Detail Stasiun dan IB
4 Dokumentasi SIL
5 Project Administration
6 Mobilisasi dan Demobilisasi
Pekerjaan :
Mulai : Jam 08.00 Wib
Akhir : Jam 17.00 Wib
Work Window :
Hari dapat / tidak dapat seluruhnya digunakan untuk pekerjaan karena cuaca :
Hujan mulai jam : -
Waktu Efektif : 8 Jam

Diperiksa : D
Konsultan Supervisi Konsul
PT. DAYA CIPTA DIANRANCANA KSO PT. RA
PT. BINAMITRA BANGUNSARANA PRATAMA

Sigit Ario Wibowo, ST Ir. De


Tenaga Ahli Sinyal Tenag
MAJUAN FISIK PEKERJAAN

LAPORAN HARIAN

WA BAGIAN TIMUR HARI KE : 202


UR WILAYAH II
HARI : Rabu

TANGGAL : 07 Maret 2018

BAHAN PERALATAN
JENIS BAHAN SATUAN DATANG DITERIMA JENIS PERALATAN JUMLAH
Laptop 5
Printer 5
Kamera 5
Handycam 1
Meteran 4
Cangkul 60
Belincong 8

ANAKAN
KETERANGAN
VOLUME SATUAN

1,005.714 Meter
14.429 Meter
0.033 Lot
0.001 Lot
0.001 Lot
0.001 Lot
CERAH / HUJAN / BANJIR / MENDUNG

Surabaya, 07 Maret 2018

Diperiksa : Dibuat :
Konsultan Supervisi Kontraktor Pelaksana
PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS

Ir. Dedih Supriadi Yurdika Hamdan, ST


Tenaga Ahli Sinyal Site Manager
LAPORAN KEMAJUAN FIS

PAKET : STMK
PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI
ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIMUR
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH II
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_x000D_
TANGGAL KONTRAK : 18 AGUSTUS 2017
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari Kalend 0
NO. KONTRAK : -

TENAGA KERJA
NO
KEAHLIAN JUMLAH JENIS BAHAN
1 Project Manager 1 org
2 Site Manager 1 org
3 Supervisi 7 org
4 Engineer 2 org
5 Administrasi 2 org
6 Drafter 2 org
7 Logistik 1 org
8 Teknisi 2 org
9 Driver 4 org
10 Train Watcher 1 org
11 Operator org
12 Keamanan 2 org
13 Mandor 4 org
14 Tukang 42 org
15 Penjaga Gudang 2 org
16 Sipil 1 org
17 Pengawas 7 org
18 Tukang Gali 60 org

Jumlah 141 org


PEKERJAAN YANG DILAKSANAKAN
NO
JENIS PEKERJAAN

1 Membuat/ memasang saluran kabel tertutup sistem boring (termasuk bahan pendukung)
2 Membuat/memasang saluran kabel dibawah jalan raya per meter (URX)
3 Dokumentasi SIL
4 Project Administration
5 Mobilisasi dan Demobilisasi
Pekerjaan :
Mulai : Jam 08.00 Wib
Akhir : Jam 17.00 Wib
Work Window :
Hari dapat / tidak dapat seluruhnya digunakan untuk pekerjaan karena cuaca :
Hujan mulai jam : -
Waktu Efektif : 8 Jam

Diperiksa : D
Konsultan Supervisi Konsul
PT. DAYA CIPTA DIANRANCANA KSO PT. RA
PT. BINAMITRA BANGUNSARANA PRATAMA

Sigit Ario Wibowo, ST Ir. De


Tenaga Ahli Sinyal Tenag
MAJUAN FISIK PEKERJAAN

LAPORAN HARIAN

WA BAGIAN TIMUR HARI KE : 203


UR WILAYAH II
HARI : Kamis

TANGGAL : 08 Maret 2018

BAHAN PERALATAN
JENIS BAHAN SATUAN DATANG DITERIMA JENIS PERALATAN JUMLAH
Laptop 5
Printer 5
Kamera 5
Handycam 1
Meteran 4
Cangkul 60
Belincong 8

ANAKAN
KETERANGAN
VOLUME SATUAN

1,005.714 Meter
14.429 Meter
0.001 Lot
0.001 Lot
0.001 Lot
CERAH / HUJAN / BANJIR / MENDUNG

Surabaya, 08 Maret 2018

Diperiksa : Dibuat :
Konsultan Supervisi Kontraktor Pelaksana
PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS

Ir. Dedih Supriadi Yurdika Hamdan, ST


Tenaga Ahli Sinyal Site Manager
LAPORAN KEMAJUAN FIS

PAKET : STMK
PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI
ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIMUR
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH II
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_x000D_
TANGGAL KONTRAK : 18 AGUSTUS 2017
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari Kalend 0
NO. KONTRAK : -

TENAGA KERJA
NO
KEAHLIAN JUMLAH JENIS BAHAN
1 Project Manager 1 org
2 Site Manager 1 org
3 Supervisi 7 org
4 Engineer 2 org
5 Administrasi 2 org
6 Drafter 2 org
7 Logistik 1 org
8 Teknisi 2 org
9 Driver 4 org
10 Train Watcher 1 org
11 Operator org
12 Keamanan 2 org
13 Mandor 4 org
14 Tukang 42 org
15 Penjaga Gudang 2 org
16 Sipil 1 org
17 Pengawas 7 org
18 Tukang Gali 60 org

Jumlah 141 org


PEKERJAAN YANG DILAKSANAKAN
NO
JENIS PEKERJAAN

1 Membuat/ memasang saluran kabel tertutup sistem boring (termasuk bahan pendukung)
2 Membuat/memasang saluran kabel dibawah jalan raya per meter (URX)
3 Dokumentasi SIL
4 Project Administration
5 Mobilisasi dan Demobilisasi

Pekerjaan :
Mulai : Jam 08.00 Wib
Akhir : Jam 17.00 Wib
Work Window :
Hari dapat / tidak dapat seluruhnya digunakan untuk pekerjaan karena cuaca :
Hujan mulai jam :
Waktu Efektif : 8 Jam

Diperiksa : D
Konsultan Supervisi Konsul
PT. DAYA CIPTA DIANRANCANA KSO PT. RA
PT. BINAMITRA BANGUNSARANA PRATAMA

Sigit Ario Wibowo, ST Ir. De


Tenaga Ahli Sinyal Tenag
MAJUAN FISIK PEKERJAAN

LAPORAN HARIAN

WA BAGIAN TIMUR HARI KE : 204


UR WILAYAH II
HARI : Jum'at

TANGGAL : 09 Maret 2018

BAHAN PERALATAN
JENIS BAHAN SATUAN DATANG DITERIMA JENIS PERALATAN JUMLAH
Laptop 5
Printer 5
Kamera 5
Handycam 1
Meteran 4
Cangkul 60
Belincong 8

ANAKAN
KETERANGAN
VOLUME SATUAN

1,005.714 Meter
14.429 Meter
0.001 Lot
0.001 Lot
0.001 Lot
CERAH / HUJAN / BANJIR / MENDUNG

Surabaya, 09 Maret 2018

Diperiksa : Dibuat :
Konsultan Supervisi Kontraktor Pelaksana
PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS

Ir. Dedih Supriadi Yurdika Hamdan, ST


Tenaga Ahli Sinyal Site Manager
LAPORAN KEMAJUAN FIS

PAKET : STMK
PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI
ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIMUR
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH II
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_x000D_
TANGGAL KONTRAK : 18 AGUSTUS 2017
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari Kalend 0
NO. KONTRAK : -

TENAGA KERJA
NO
KEAHLIAN JUMLAH JENIS BAHAN
1 Project Manager 1 org
2 Site Manager 1 org
3 Supervisi 7 org
4 Engineer 2 org
5 Administrasi 2 org
6 Drafter 2 org
7 Logistik 1 org
8 Teknisi 2 org
9 Driver 4 org
10 Train Watcher 1 org
11 Operator org
12 Keamanan 2 org
13 Mandor 4 org
14 Tukang 42 org
15 Penjaga Gudang 2 org
16 Sipil 1 org
17 Pengawas 7 org
18 Tukang Gali 60 org

Jumlah 141 org


PEKERJAAN YANG DILAKSANAKAN
NO
JENIS PEKERJAAN

1 Membuat/ memasang saluran kabel tertutup sistem boring (termasuk bahan pendukung)
2 Membuat/memasang saluran kabel dibawah jalan raya per meter (URX)
3 Dokumentasi SIL
4 Project Administration
5 Mobilisasi dan Demobilisasi

Pekerjaan :
Mulai : Jam 08.00 Wib
Akhir : Jam 17.00 Wib
Work Window :
Hari dapat / tidak dapat seluruhnya digunakan untuk pekerjaan karena cuaca :
Hujan mulai jam : -
Waktu Efektif : 8 Jam

Diperiksa : D
Konsultan Supervisi Konsul
PT. DAYA CIPTA DIANRANCANA KSO PT. RA
PT. BINAMITRA BANGUNSARANA PRATAMA

Sigit Ario Wibowo, ST Ir. De


Tenaga Ahli Sinyal Tenag
MAJUAN FISIK PEKERJAAN

LAPORAN HARIAN

WA BAGIAN TIMUR HARI KE : 205


UR WILAYAH II
HARI : Sabtu

TANGGAL : 10 Maret 2018

BAHAN PERALATAN
JENIS BAHAN SATUAN DATANG DITERIMA JENIS PERALATAN JUMLAH
Laptop 5
Printer 5
Kamera 5
Handycam 1
Meteran 4
Cangkul 60
Belincong 8

ANAKAN
KETERANGAN
VOLUME SATUAN

1,005.714 Meter
14.429 Meter
0.001 Lot
0.001 Lot
` 0.001 Lot
CERAH / HUJAN / BANJIR / MENDUNG

Surabaya, 10 Maret 2018

Diperiksa : Dibuat :
Konsultan Supervisi Kontraktor Pelaksana
PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS

Ir. Dedih Supriadi Yurdika Hamdan, ST


Tenaga Ahli Sinyal Site Manager
LAPORAN KEMAJUAN FIS

PAKET : STMK
PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI
ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIMUR
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH II
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_x000D_
TANGGAL KONTRAK : 18 AGUSTUS 2017
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari Kalend 0
NO. KONTRAK : -

TENAGA KERJA
NO
KEAHLIAN JUMLAH JENIS BAHAN
1 Project Manager 1 org
2 Site Manager 1 org
3 Supervisi 7 org
4 Engineer 2 org
5 Administrasi 2 org
6 Drafter 2 org
7 Logistik 1 org
8 Teknisi 2 org
9 Driver 4 org
10 Train Watcher 1 org
11 Operator org
12 Keamanan 2 org
13 Mandor 4 org
14 Tukang 42 org
15 Penjaga Gudang 2 org
16 Sipil 1 org
17 Pengawas 7 org
18 Tukang Gali 60 org

Jumlah 141 org


PEKERJAAN YANG DILAKSANAKAN
NO
JENIS PEKERJAAN

1 Membuat/ memasang saluran kabel tertutup sistem boring (termasuk bahan pendukung)
2 Membuat/memasang saluran kabel dibawah jalan raya per meter (URX)
3 Dokumentasi SIL
4 Project Administration
5 Mobilisasi dan Demobilisasi

Pekerjaan :
Mulai : Jam 08.00 Wib
Akhir : Jam 17.00 Wib
Work Window :
Hari dapat / tidak dapat seluruhnya digunakan untuk pekerjaan karena cuaca :
Hujan mulai jam : -
Waktu Efektif : 8 Jam

Diperiksa : D
Konsultan Supervisi Konsul
PT. DAYA CIPTA DIANRANCANA KSO PT. RA
PT. BINAMITRA BANGUNSARANA PRATAMA

Sigit Ario Wibowo, ST Ir. De


Tenaga Ahli Sinyal Tenag
MAJUAN FISIK PEKERJAAN

LAPORAN HARIAN

WA BAGIAN TIMUR HARI KE : 206


UR WILAYAH II
HARI : Minggu

TANGGAL : 11 Maret 2018

BAHAN PERALATAN
JENIS BAHAN SATUAN DATANG DITERIMA JENIS PERALATAN JUMLAH
Laptop 5
Printer 5
Kamera 5
Handycam 1
Meteran 4
Cangkul 60
Belincong 8

ANAKAN
KETERANGAN
VOLUME SATUAN

1,005.714 Meter
14.429 Meter
0.001 Lot
0.001 Lot
` 0.001 Lot
CERAH / HUJAN / BANJIR / MENDUNG

Surabaya, 11 Maret 2018

Diperiksa : Dibuat :
Konsultan Supervisi Kontraktor Pelaksana
PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS

Ir. Dedih Supriadi Yurdika Hamdan, ST


Tenaga Ahli Sinyal Site Manager
L

PAKET : STMK
PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI
ANTARA MADIUN - KEDUNGBANTENG
LINTAS SURABAYA - SOLO
INSTANSI : BALAI TEKNIK PERKERETAPIAAN WILAYAH JAWA BAGIAN TIMU
KEGIATAN PENGEMBANGAN PERKERETAAPIAN JAWA TIMUR WILAYAH II
KONTRAKTOR PELAKSANA : PT. LEN RAILWAY SYSTEMS
NO. KONTRAK : 11/SPP/STMK/SBSN/JT-II/BTP-JT/VIII/2017_x000D_
TANGGAL KONTRAK : 18 AGUSTUS 2017
JANGKA WAKTU : 866 (Delapan Ratus Enam Puluh Enam) Hari Kalender
NO. KONTRAK :

No. TANGGAL

1 2 3 4 5 6 7 8 9
1 05 Maret 2018 C C C C C C C C C
2 06 Maret 2018 C C C C C C C C C
3 07 Maret 2018 C C C C C C C C C
4 08 Maret 2018 C C C C C C C C C
5 09 Maret 2018 C C C C C C C C C
6 10 Maret 2018 C C C C C C C C C
7 11 Maret 2018 C C C C C C C C C

Diperiksa :
Konsultan Supervisi
PT. DAYA CIPTA DIANRANCANA KSO
PT. BINAMITRA BANGUNSARANA PRATAMA

Sigit Ario Wibowo, ST


Tenaga Ahli Sinyal
LAPORAN CUACA

AGIAN TIMUR
WILAYAH II

JAM

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
C C C C C C C C C C C C C C C
C C C C C C C C C C C C C C C
C C C C C C C C C C C C C C C
C C C C C C C C C C C C C C C
C C C C C C C C C C C C C C C
C C C C C C C C C C C C C C C
C C C C C C C C C C C C C C C

Diperiksa :
Konsultan Supervisi
PT. RAYAKONSULT

Ir. Dedih Supriadi


Tenaga Ahli Sinyal
REKAPITULASI CUACA

MINGGU KE : 30 (TIGAPULUH)

TANGGAL
05 Maret 2018

S.D

11 Maret 2018

KETERANGAN

C : CERAH
H : HUJAN
B : BANJIR
M : MENDUNG

Surabaya, 12 Maret 2018

Dibuat :
Kontraktor Pelaksana
PT. LEN RAILWAY SYSTEMS

Yurdika Hamdan, ST
Site Manager
JADWAL PELAKSANAAN PEKERJAAN / KURVA S
PAKET : STMK
NAMA PEKERJAAN : PEMBANGUNAN SINYAL DAN TELEKOMUNIKASI ANTARA MADIUN - KEDUNGBANTENG LINTAS SURABAYA - SOLO TAHUN 2017 TAHUN 2018 TAHUN 2019

AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 12 Minggu 13 Minggu 14 Minggu 15 Minggu 16 Minggu 17 Minggu 18 Minggu 19 Minggu 20 Minggu 21 Minggu 22 Minggu 23 Minggu 24 Minggu 25 Minggu 26 Minggu 27 Minggu 28 Minggu 29 Minggu 30 Minggu 31 Minggu 32 Minggu 33 Minggu 34 Minggu 35 Minggu 36 Minggu 37 Minggu 38 Minggu 39 Minggu 40 Minggu 41 Minggu 42 Minggu 43 Minggu 44 Minggu 45 Minggu 46 Minggu 47 Minggu 48 Minggu 49 Minggu 50 Minggu 51 Minggu 52 Minggu 53 Minggu 54 Minggu 55 Minggu 56 Minggu 57 Minggu 58 Minggu 59 Minggu 60 Minggu 61 Minggu 62 Minggu 63 Minggu 64 Minggu 65 Minggu 66 Minggu 67 Minggu 68 Minggu 69 Minggu 70 Minggu 71 Minggu 72 Minggu 73 Minggu 74 Minggu 75 Minggu 76 Minggu 77 Minggu 78 Minggu 79 Minggu 80 Minggu 81 Minggu 82 Minggu 83 Minggu 84 Minggu 85 Minggu 86 Minggu 87 Minggu 88 Minggu 89 Minggu 90 Minggu 91 Minggu 92 Minggu 93 Minggu 94 Minggu 95 Minggu 96 Minggu 97 Minggu 98 Minggu 99 Minggu 100 Minggu 101 Minggu 102 Minggu 103 Minggu 104 Minggu 105 Minggu 106 Minggu 107 Minggu 108 Minggu 109 Minggu 110 Minggu 111 Minggu 112 Minggu 113 Minggu 114 Minggu 115 Minggu 116 Minggu 117 Minggu 118 Minggu 119 Minggu 120 Minggu 121 Minggu 122 Minggu 123 Minggu 124 Minggu 125
18/08/17 21/08/17 28/08/17 04/09/17 11/09/17 18/09/17 25/09/17 02/10/17 09/10/17 16/10/17 23/10/17 30/10/17 06/11/17 13/11/17 20/11/17 27/11/17 04/12/17 11/12/17 18/12/17 25/12/17 01/01/18 08/01/18 15/01/18 22/01/18 29/01/18 05/02/18 12/02/18 19/02/18 26/02/18 05/03/18 12/03/18 19/03/18 26/03/18 02/04/18 09/04/18 16/04/18 23/04/18 30/04/18 07/05/18 14/05/18 21/05/18 28/05/18 04/06/18 11/06/18 18/06/18 25/06/18 02/07/18 09/07/18 16/07/18 23/07/18 30/07/18 06/08/18 13/08/18 20/08/18 27/08/18 03/09/18 10/09/18 17/09/18 24/09/18 01/10/18 08/10/18 15/10/18 22/10/18 29/10/18 05/11/18 12/11/18 19/11/18 26/11/18 03/12/18 10/12/18 17/12/18 24/12/18 31/12/18 07/01/19 14/01/19 21/01/19 28/01/19 04/02/19 11/02/19 18/02/19 25/02/19 04/03/19 11/03/19 18/03/19 25/03/19 01/04/19 08/04/19 15/04/19 22/04/19 29/04/19 06/05/19 13/05/19 20/05/19 27/05/19 03/06/19 10/06/19 17/06/19 24/06/19 01/07/19 08/07/19 15/07/19 22/07/19 29/07/19 05/08/19 12/08/19 19/08/19 26/08/19 02/09/19 09/09/19 16/09/19 23/09/19 30/09/19 07/10/19 14/10/19 21/10/19 28/10/19 04/11/19 11/11/19 18/11/19 25/11/19 02/12/19 09/12/19 16/12/19 23/12/19 30/12/19
NO URAIAN PEKERJAAN Total SATUAN BOBOT SKALA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
20/08/17 27/08/17 03/09/17 10/09/17 17/09/17 24/09/17 01/10/17 08/10/17 15/10/17 22/10/17 29/10/17 05/11/17 12/11/17 19/11/17 26/11/17 03/12/17 10/12/17 17/12/17 24/12/17 31/12/17 07/01/18 14/01/18 21/01/18 28/01/18 04/02/18 11/02/18 18/02/18 25/02/18 04/03/18 11/03/18 18/03/18 25/03/18 01/04/18 08/04/18 15/04/18 22/04/18 29/04/18 06/05/18 13/05/18 20/05/18 27/05/18 03/06/18 10/06/18 17/06/18 24/06/18 01/07/18 08/07/18 15/07/18 22/07/18 29/07/18 05/08/18 12/08/18 19/08/18 26/08/18 02/09/18 09/09/18 16/09/18 23/09/18 30/09/18 07/10/18 14/10/18 21/10/18 28/10/18 04/11/18 11/11/18 18/11/18 25/11/18 02/12/18 09/12/18 16/12/18 23/12/18 30/12/18 06/01/19 13/01/19 20/01/19 27/01/19 03/02/19 10/02/19 17/02/19 24/02/19 03/03/19 10/03/19 17/03/19 24/03/19 31/03/19 07/04/19 14/04/19 21/04/19 28/04/19 05/05/19 12/05/19 19/05/19 26/05/19 02/06/19 09/06/19 16/06/19 23/06/19 30/06/19 07/07/19 14/07/19 21/07/19 28/07/19 04/08/19 11/08/19 18/08/19 25/08/19 01/09/19 08/09/19 15/09/19 22/09/19 29/09/19 06/10/19 13/10/19 20/10/19 27/10/19 03/11/19 10/11/19 17/11/19 24/11/19 01/12/19 08/12/19 15/12/19 22/12/19 29/12/19 31/12/19
A MATERIAL 100
A.1 Vital Interlocking System
A.1.a Interlocking Rack System
A.1.a.1 Central Interlocking Processing Rack with Vital Processor System 6 Set 2.406 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056
A.1.a.2 Distributed Axle Counter Rack with Distributed I/O System (up to 3 Evaluator) 20 Set 4.597 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107 0.107

A.1.a.3 Distributed Block Controller Rack with Distributed I/O System (up to 3 block directions) 7 Set 0.723 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017

A.1.a.4 Distributed Multi Purposes Rack with Distributed I/O System 24 Set 2.318 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054
A.1.b Signal Control Module

A.1.b.1 Home & Distant Signal Control Module (Main Aspect + Emergency + Variable Speed 12 Set 0.534 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
Indicator)
A.1.b.2 Starter Signal Control Module (Main Aspect + Emergency ) 13 Set 0.237 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
Starter Signal Control Module (Main Aspect + Emergency + Contraflow + Fix Speed
A.1.b.3 12 Set 0.282 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
Indicator)
A.1.b.4 Starter Signal Control Module(Main Aspect + Emergency + Shunt + Contraflow) 6 Set 0.272 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
Starter Signal Control Module(Main Aspect + Emergency + Shunt + Fixed Speed
A.1.b.5 4 Set 0.095 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
Indicator)
A.1.b.6 Shunt Signal Control Module (2 Aspect) 10 Set 0.053 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
A.1.b.7 Home Signal Contraflow Control Module 12 Set 0.064 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
A.1.b.8 Repeater Signal Control Module 3 Set 0.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
A.1.b.9 Distant Intermediate Block Signal Control Module 2 Set 0.044 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
A.1.b.10 Intermediate Block Signal Control Module 2 Set 0.044 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
A.1.c Point Control Module
A.1.c.1 Point Control Module 58 Set 1.541 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036
A.1.c.2 Electric Lock & Point Detector Control Module 11 Set 0.155 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
A.1.d Train Detection Module
90
A.1.d.1 Axle Counter Evaluator Module 52 Set 12.666 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295 0.295
A.1.d.2 Axle Counter Interface Module 52 Set 0.297 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
A.1.e ViBlock Control Module
A.1.e.1 Block Control Module (1 direction) 13 Set 0.441 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
A.1.e.2 Interface Block Module (1 direction) 1 Set 0.016 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
A.1.f Vital Interlocking Software
A.1.f.1 Vital Interlocking Application Software (4 to 6 Spoor) 6 Set 0.696 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
A.2 Non Vital Interlocking System
A.2.a Mosaic Type Operator Control
A.2.a.1 Mosaic Tile Local Control Panel (4 to 6 Spoor) 6 Set 2.912 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068
A.2.b IPC Based Operator Control & Maintenance Terminal
A.2.b.1 IPC Based Technician Terminal With KVM Industrial Monitor 6 Set 0.485 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
A.2.c Non Vital Interlocking Software
A.2.c.1 Mosaic LCP Application Software (4 to 6 Spoor) 6 Set 0.237 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
A.2.c.2 Technician Terminal Application Software (4 to 6 Spoor) 6 Set 0.111 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
A.3 Sistem Perangkat Luar Persinyalan
A.3.a LED Signal
A.3.a.1 Distant Signal (Main Aspect) 12 Set 0.772 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
A.3.a.2 Home Signal (Main Aspect + Emergency + Variable Speed Indicator) 12 Set 1.730 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049
A.3.a.3 Starter Signal (Main Aspect + Emergency ) 10 Set 0.849 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024
A.3.a.4 Starter Signal (Main Aspect + Emergency + Fix Speed Indicator ) 3 Set 0.261 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
A.3.a.5 Starter Signal (Main Aspect + Emergency + Contraflow + Fix Speed Indicator) 12 Set 1.458 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042
A.3.a.6 Starter Signal (Main Aspect + Emergency + Shunt + Contraflow) 2 Set 0.221 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
A.3.a.7 Starter Signal (Main Aspect + Emergency + Shunt + Fixed Speed Indicator) 4 Set 0.437 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012

A.3.a.8 Starter Signal (Main Aspect + Emergency + Shunt + Contraflow + Fix Speed Indicator) 4 Set 0.576 80 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016

A.3.a.9 Shunt Signal (2 Aspect) 10 Set 0.573 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
A.3.a.10 Home Signal Contraflow 12 Set 0.543 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
A.3.a.11 Repeater Signal 3 Set 0.118 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
A.3.a.12 Distant Intermediate Block Signal 2 Set 0.129 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
A.3.a.13 Intermediate Block Signal 2 Set 0.129 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
A.3.b Fixed Marker
A.3.b.1 Shunt Stop Marker 5 Set 0.021 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
A.3.b.2 Stop Marker 7 Set 0.030 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
A.3.b.3 Distant Signal Contraflow Marker 12 Set 0.050 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
A.3.c Point Control
A.3.c.1 Electric Point Control System 75 Set 15.957 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456 0.456
A.3.c.2 Point Lock & Detector System 7 Set 0.749 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021
A.3.c.3 Point Detector System 4 Set 0.305 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
A.3.d Train Detection Equipment
A.3.d.1 Wheel Sensor System 172 Set 10.220 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.292
A.3.e Outdoor Cable (Direct Burried)
A.3.e.1 Distant Signal Cable 19041 Meter 0.495 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029
A.3.e.2 Home Signal Cable 9906 Meter 0.330 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
A.3.e.3 Starter Signal Cable 22260 Meter 0.742 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044
A.3.e.4 Shunt Signal Cable 7643 Meter 0.198 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
A.3.e.5 Point Control Cable 37761 Meter 1.665 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098
A.3.e.6 Point Lock & Detector Cable 7286 Meter 0.189 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
A.3.e.7 Wheel Sensor Cable 127165 Meter 1.889 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111
A.3.e.8 Home Signal Contraflow Cable 8016 Meter 0.207 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
A.3.e.9 Repeater signal cable 3416 Meter 0.089 70 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
A.3.e.10 Distant Intermediate Block Signal Cable 1200 Meter 0.030 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
A.3.e.11 Intermediate Block Signal Cable 1200 Meter 0.030 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
A.4 Sistem Catu Daya
A.4.a Sistem Tenaga Listrik
A.4.a.1 UPS System included Rack for Interlocking 6 Set 0.549 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026
A.4.a.2 UPS System included Rack for IB 1 Set 0.042 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
A.4.a.3 UPS System Included Rack for JPL 12 Set 0.074 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
A.4.a.4 Battery System included Rack for Interlocking 6 Set 0.853 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
A.4.a.5 Battery System included Rack for IB 1 Set 0.029 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
A.4.a.6 Genset System for Interlocking 6 Set 0.462 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
A.4.a.7 Genset System for IB 1 Set 0.038 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
A.4.b Sistem Kontrol Catudaya
A.4.b.1 Power Distribution Panel System 7 Set 0.966 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046
A.4.c Sistem Perkabelan Catudaya
A.4.c.1 Power System Cable 7 Set 0.154 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
A.5 Sistem Telekomunikasi
A.5.a Sistem Telekomunikasi Optik
A.5.a.1 SDH Optical Communication System 7 Set 1.684 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099
A.5.a.2 IP Hybrid PABX 7 Set 0.332 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020
A.5.a.3 Back Up Link Module 16 Set 0.390 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023
A.5.a.4 Optical Distribution Frame (ODF) For LX 34 Set 0.469 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036
A.5.a.5 Industrial Switch for JPL 22 Set 0.357 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
A.5.b Sistem Telepon
A.5.b.1 Telephone Handset 25 Unit 0.047 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
A.5.b.2 Telephone Console System 6 Unit 0.200 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
A.5.b.3 Voice Recorder System 6 Unit 0.525 60 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031
A.5.b.4 Communication Rack 7 Unit 0.020 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
A.5.b.5 Communication Rack for JPL 12 Unit 0.022 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
A.5.c Sistem Perkabelan Telekomunikasi
A.5.c.1 Signaling Telekomunikasi Kabel SDH (24 core) 116466 Meter 2.882 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170
A.5.c.2 Signaling Telekomunikasi Kabel SDH (6 core) 58546 Meter 0.946 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056
A.5.c.3 Signaling Telekomunikasi Kabel Telepon System 240 Meter 0.010 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B INSTALASI (Termasuk Material Instalasi dan Jasa Instalasi)
B.1 Instalasi Vital Interlocking System
B.1.a Interlocking Rack System
B.1.a.1 Instalasi Central Interlocking Processing Rack with Vital Processor System 6 Set 0.007 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

B.1.a.2 Instalasi Distributed Axle Counter Rack with Distributed I/O System (up to 3 Evaluator) 20 Set 0.022 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

Instalasi Distributed Block Controller Rack with Distributed I/O System (up to 3 block
B.1.a.3 7 Set 0.008 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
directions)
B.1.a.4 Instalasi Distributed Multi Purposes Rack with Distributed I/O System 24 Set 0.027 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.1.b Instalasi Signal Control Module
Instalasi Home & Distant Signal Control Module (Main Aspect + Emergency + Variable
B.1.b.1 12 Set 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Speed Indicator)
B.1.b.2 Instalasi Starter Signal Control Module (Main Aspect + Emergency ) 13 Set 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Instalasi Starter Signal Control Module (Main Aspect + Emergency + Contraflow + Fix
B.1.b.3 12 Set 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Speed Indicator)
Instalasi Starter Signal Control Module(Main Aspect + Emergency + Shunt +
B.1.b.4 6 Set 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Contraflow)
Instalasi Starter Signal Control Module(Main Aspect + Emergency + Shunt + Fixed
B.1.b.5 4 Set 0.002 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Speed Indicator) 50
B.1.b.6 Instalasi Shunt Signal Control Module (2 Aspect) 10 Set 0.004 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.1.b.7 Instalasi Home Signal Contraflow Control Module 12 Set 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.1.b.8 Instalasi Repeater Signal Control Module 3 Set 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.1.b.9 Instalasi Distant Intermediate Block Signal Control Module 2 Set 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.1.b.10 Instalasi Intermediate Block Signal Control Module 2 Set 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.1.c Instalasi Point Control Module
B.1.c.1 Instalasi Point Control Module 58 Set 0.024 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.1.c.2 Instalasi Electric Lock & Point Detector Control Module 11 Set 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.1.d Instalasi Train Detection Module
B.1.d.1 Instalasi Axle Counter Evaluator Module 52 Set 0.022 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.1.d.2 Instalasi Axle Counter Interface Module 52 Set 0.022 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.1.e Block Control Module
B.1.e.1 Instalasi Block Control Module (1 direction) 13 Set 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.1.e.2 Instalasi Interface Block Module (1 direction) 1 Set 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.1.f Instalasi Vital Interlocking Software
B.1.f.1 Instalasi Vital Interlocking Application Software (4 to 6 Spoor) 6 Set 0.014 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.2 Instalasi Non Vital Interlocking System
B.2.a Instalasi Mosaic Type Operator Control
B.2.a.1 Instalasi Mosaic Tile Local Control Panel (4 to 6 Spoor) 6 Set 0.039 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.2.b Instalasi IPC Based Operator Control & Maintenance Terminal
B.2.b.1 Instalasi IPC Based Technician Terminal With KVM Industrial Monitor 6 Set 0.013 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.2.c Instalasi Non Vital Interlocking Software
B.2.c.1 Instalasi Mosaic LCP Application Software (4 to 6 Spoor) 6 Set 0.011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.2.c.2 Instalasi Technician Terminal Application Software (4 to 6 Spoor) 6 Set 0.007 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.3 Instalasi Sistem Perangkat Luar Persinyalan
40
B.3.a Instalasi LED Signal
B.3.a.1 Instalasi Distant Signal (Main Aspect) 12 Set 0.042 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.3.a.2 Instalasi Home Signal (Main Aspect + Emergency + Variable Speed Indicator) 12 Set 0.042 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.3.a.3 Instalasi Starter Signal (Main Aspect + Emergency) 10 Set 0.035 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.3.a.4 Instalasi Starter Signal (Main Aspect + Emergency + Fix Speed Indicator) 3 Set 0.011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

B.3.a.5 Instalasi Starter Signal (Main Aspect + Emergency + Contraflow + Fix Speed Indicator) 12 Set 0.042 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

B.3.a.6 Instalasi Starter Signal (Main Aspect + Emergency + Shunt + Contraflow) 2 Set 0.007 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

B.3.a.7 Instalasi Starter Signal (Main Aspect + Emergency + Shunt + Fixed Speed Indicator) 4 Set 0.014 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

B.3.a.8 Instalasi Starter Signal (Main Aspect + Emergency + Shunt + Fix Speed Indicator + 4 Set 0.014 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Contraflow)
B.3.a.9 Instalasi Shunt Signal (2 Aspect) 10 Set 0.035 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.3.a.10 Instalasi Home Signal Contraflow 12 Set 0.042 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.3.a.11 Repeater Signal 3 Set 0.011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.3.a.12 Instalasi Distant Intermediate Block Signal 2 Set 0.007 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.3.a.13 Instalasi Intermediate Block Signal 2 Set 0.007 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.3.b Instalasi Fixed Marker
B.3.b.1 Instalasi Shunt Stop Marker 5 Set 0.000 0.000 0.000
B.3.b.2 Instalasi Stop Marker 7 Set 0.000 0.000 0.000
B.3.b.3 Instalasi Distant Signal Contraflow Marker 12 Set 0.001 0.000 0.000
B.3.c Instalasi Point Control
B.3.c.1 Instalasi Electric Point Control System 75 Set 0.567 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
B.3.c.2 Point Lock & Detector System 7 Set 0.043 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
B.3.c.3 Point Detector System 4 Set 0.008 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.3.c.4 Pemadatan Ballast pada bantalan point machine / electric lock 82 Set 0.050 30 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
B.3.d Instalasi Train Detection Equipment
B.3.d.1 Instalasi Wheel Sensor System 172 Set 0.190 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
B.3.d.2 Instalasi Axle Counter Deflector berikut bahan 172 Set 0.326 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
B.3.d.3 Instalasi Trackside Connection Box berikut bahan & pelindung 172 Set 0.475 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023
B.3.e Instalasi Outdoor Cable (Direct Burried)
Menggali dan mengurug kembali saluran kabel berikut bahan pndukung (rubber sheet
B.3.e.1 20241 Meter 0.844 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
dan warning tape)

B.3.e.2 Membuat/ memasang saluran kabel tertutup sistem boring (termasuk bahan pendukung) 97425 Meter 6.638 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214

Membuat/memasang saluran kabel dibawah jalan KA per titik UTX (Under Track
B.3.e.3 155 Titik 0.248 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
Crossing) Metode Bor
B.3.e.4 Membuat/memasang saluran kabel dibawah jalan raya per meter (URX) 650 Meter 0.174 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
B.3.e.5 Membuat/memasang saluran kabel di bawah lantai per meter (UPX) 325 Meter 0.087 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
Membuat/memasang saluran kabel dibawah jembatan / dibawah saluran air per meter
B.3.e.6 650 Meter 0.161 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
(UBX)
B.3.e.7 Membuat/memasang saluran kabel udara 94 Meter 0.221 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
B.3.e.8 Membuat/memasang patok tanda rute kabel termasuk bahan per buah 998 Buah 0.029 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
B.3.e.9 Menggelar Distant Signal Cable 19041 Meter 0.106 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
B.3.e.10 Menggelar Home Signal Cable 9906 Meter 0.055 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
B.3.e.11 Menggelar Starter Signal Cable 22260 Meter 0.124 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
B.3.e.12 Menggelar Shunt Signal Cable 7643 Meter 0.043 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
B.3.e.13 Menggelar Point Control Cable 37761 Meter 0.211 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
B.3.e.14 Menggelar Point Lock & Detector Cable 7286 Meter 0.041 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
B.3.e.15 Menggelar Wheel Sensor Cable 127165 Meter 0.709 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026
B.3.e.16 Menggelar Contraflow Home Signal Cable 8016 Meter 0.045 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
20
B.3.e.17 Menggelar Repeater signal cable 3416 Meter 0.019 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.3.e.18 Menggelar Distant Intermediate Block Signal Cable 1200 Meter 0.007 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.3.e.19 Menggelar Intermediate Block Signal Cable 1200 Meter 0.007 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.3.e.20 Terminasi kabel 345 Titik 0.044 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
B.3.e.21 Jointing Kabel Fiber Optik 91 Titik 0.264 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
B.4 Instalasi Sistem Catu Daya
B.4.a Instalasi Sistem Tenaga Listrik 7 Set 0.078 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
B.4.b Instalasi Sistem Kontrol Catudaya 7 Set 0.011 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.4.c Instalasi Sistem Perkabelan Catudaya 7 Set 0.007 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.4.d Pemasangan Baru PLN 7 Set 0.082 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
B.5 Instalasi Sistem Telekomunikasi
B.5.a Instalasi Sistem Telekomunikasi Optik
B.5.a.1 Instalasi SDH Optical Communication System 7 Set 0.015 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.5.a.2 Instalasi IP Hybrid PABX 7 Set 0.011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.5.a.3 Instalasi Back Up Link Module 16 Set 0.018 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.5.a.4 Instalasi Optical Distribution Frame (ODF) For LX 34 Set 0.054 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
B.5.a.5 Instalasi Industrial Switch for JPL 22 Set 0.035 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.5.b Instalasi Sistem Telepon
B.5.b.1 Instalasi Telephone Handset 25 Unit 0.011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.5.b.2 Instalasi Telephone Console System 6 Unit 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.5.b.3 Instalasi Voice Recorder System 6 Unit 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.5.b.4 Instalasi Communication Rack 7 Unit 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.5.b.5 Instalasi Communication Rack for JPL 12 Unit 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
B.5.c Instalasi / Menggelar Sistem Perkabelan Telekomunikasi
B.5.c.1 Menggelar Kabel Telekomunikasi SDH (24 core) 116466 Meter 0.649 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024
B.5.c.2 Menggelar Kabel Telekomunikasi SDH (6 core) 58546 Meter 0.326 10 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
B.5.c.3 Menggelar Kabel Telepon System 240 Meter 0.001 0.000 0.000 0.000 0.000 0.000
B.6 Instalasi Grounding
B.6.a Instalasi Grounding berikut bahan
B.6.a.1 Instalasi Grounding Sinyal 84 Set 0.222 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
B.6.a.2 Instalasi Grounding Ruang ER 7 Set 0.049 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
B.6.a.3 Instalasi Grounding Axle Counter 169 Set 0.446 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050
B.6.a.4 Instalasi Grounding Sistem Telekomunikasi 7 Set 0.018 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
B.6.a.5 Instalasi Grounding Sistem Pintu Perlintasan 12 Set 0.034 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
C PEKERJAAN NON INSTALASI
C.1 Disain Interlocking
C.1.a Survei Detail Stasiun dan IB 1 Lot 0.034 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
C.1.b Simulasi Prinsip Interlocking (Outdoor & Blok) 1 Lot 0.061 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
C.1.c Simulasi Interlocking Circuit (Outdoor) 1 Lot 0.061 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
C.1.d Simulasi Software LCP 1 Lot 0.034 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
C.1.e Desain Mechanical Support 1 Lot 0.036 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
C.1.f Sistem Integrasi 1 Lot 0.037 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
C.2 Project Management
C.2.a Dokumentasi SIL 1 Lot 0.007 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
C.2.b Direksi Kit 1 Lot 0.028 0.014 0.014
C.2.c Gudang 1 Lot 0.045 0.011 0.011 0.011 0.011
C.2.d Project Administration 1 Lot 0.037 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
C.3 Pekerjaan Sipil
C.3.a Bangunan ER Stasiun 6 Unit 1.603 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
C.3.b Bangunan ER IB 1 Unit 0.225 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
C.4 Mobilisasi dan Demobilisasi 1 Lot 0.134 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0
BOBOT RENCANA 100.000 0.031 0.031 0.017 0.017 0.005 0.005 0.005 0.005 0.005 0.734 0.734 0.734 0.734 1.769 1.769 1.769 1.769 1.992 1.992 1.992 1.992 1.992 2.022 2.022 2.022 2.022 2.136 2.136 2.136 2.136 1.799 1.799 1.799 1.799 1.799 1.805 1.805 1.805 1.805 1.805 1.805 1.805 1.805 2.047 2.047 2.047 2.047 2.047 1.228 1.228 1.228 1.228 1.010 1.010 1.010 1.010 1.098 1.098 1.098 1.098 1.098 1.098 1.098 1.098 1.098 1.098 1.098 1.098 1.098 0.392 0.392 0.392 0.392 0.392 0.244 0.244 0.244 0.244 0.257 0.257 0.257 0.258 0.227 0.107 0.107 0.107 0.107 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.094 0.094 0.094 0.094 0.094 0.087 0.087 0.087 0.087 0.001 0.001 0.001 0.001
TOTAL KUMULATIF BOBOT RENCANA 0 0.031 0.061 0.078 0.094 0.099 0.105 0.110 0.115 0.120 0.854 1.588 2.322 3.056 4.825 6.594 8.364 10.133 12.125 14.117 16.109 18.101 20.093 22.116 24.138 26.161 28.183 30.319 32.455 34.591 36.727 38.526 40.326 42.125 43.924 45.724 47.529 49.334 51.140 52.945 54.750 56.555 58.361 60.166 62.213 64.259 66.306 68.353 70.399 71.628 72.856 74.084 75.312 76.322 77.331 78.341 79.350 80.448 81.546 82.644 83.742 84.840 85.938 87.036 88.134 89.232 90.330 91.428 92.525 93.623 94.016 94.408 94.801 95.193 95.586 95.830 96.073 96.317 96.561 96.818 97.074 97.331 97.589 97.816 97.923 98.029 98.136 98.243 98.336 98.429 98.522 98.615 98.708 98.801 98.894 98.988 99.002 99.016 99.030 99.044 99.058 99.072 99.086 99.100 99.115 99.123 99.131 99.139 99.147 99.155 99.163 99.171 99.179 99.272 99.366 99.460 99.553 99.647 99.734 99.820 99.907 99.994 99.996 99.997 99.999 100.000
BOBOT REALISASI 0.001 0.001 0.001 0.001 0.001 0.005 0.001 0.001 0.001 0.008 0.033 0.006 0.003 2.550 0.442 1.009 4.664 8.792 0.489 0.001 0.001 0.001 0.275 0.003 0.833 6.330 1.108 5.620 0.411 0.509
TOTAL KUMULATIF BOBOT REALISASI 0 0.001 0.003 0.004 0.006 0.007 0.012 0.013 0.015 0.016 0.024 0.057 0.064 0.067 2.617 3.059 4.068 8.732 17.524 18.013 18.014 18.016 18.017 18.292 18.295 19.129 25.459 26.567 32.186 32.597 33.107
CEPAT / (LAMBAT) -0.029 -0.058 -0.073 -0.089 -0.092 -0.093 -0.096 -0.100 -0.104 -0.830 -1.530 -2.258 -2.989 -2.208 -3.535 -4.296 -1.401 5.399 3.896 1.905 -0.085 -2.076 -3.823 -5.843 -7.032 -2.724 -3.752 -0.268 -1.994 -3.620

Diperiksa : Diperiksa : Dibuat :


Konsultan Supervisi Konsultan Supervisi Kontraktor Pelaksana
PT. DAYA CIPTA DIANRANCANA KSO PT. RAYAKONSULT PT. LEN RAILWAY SYSTEMS
PT. BINAMITRA BANGUNSARANA PRATAMA

Ir. Atjep Sudarjanto, MT. Ir. Amizar Gautama, M.I.Kom. Ir. Ferinsyah Zwie Husodo
Ketua Tim Ketua Tim Project Manager

Page 51 of 71
1

PEKERJAAN : Pole 4520 PEKERJAAN :

PEKERJAAN : Pole 4520 PEKERJAAN :


5

PEKERJAAN : Pole 4520 PEKERJAAN :


PEKERJAAN : Membuat/ memasang saluran kabel tertutup sistem PEKERJAAN :
boring (termasuk bahan pendukung)

PEKERJAAN : Membuat/ memasang saluran kabel tertutup sistem PEKERJAAN :


boring (termasuk bahan pendukung)
PEKERJAAN : Membuat/ memasang saluran kabel tertutup sistem PEKERJAAN :
boring (termasuk bahan pendukung)
2

Pole 4520 PEKERJAAN : Membuat/memasang salu


raya per meter (URX)

Pole 4520 PEKERJAAN : Membuat/memasang salu


raya per meter (URX)
6

Pole 4520 PEKERJAAN : Membuat/memasang salu


raya per meter (URX)
Membuat/ memasang saluran kabel tertutup sistem PEKERJAAN : Survei Detail Stasiun dan
boring (termasuk bahan pendukung)

Membuat/ memasang saluran kabel tertutup sistem PEKERJAAN : Survei Detail Stasiun dan
boring (termasuk bahan pendukung)
Membuat/ memasang saluran kabel tertutup sistem PEKERJAAN : Survei Detail Stasiun dan
boring (termasuk bahan pendukung)
g saluran kabel dibawah jalan PEKERJAAN : Membuat/memasang saluran kabel dibawah jalan
X) raya per meter (URX)

g saluran kabel dibawah jalan PEKERJAAN : Membuat/memasang saluran kabel dibawah jalan
X) raya per meter (URX)
g saluran kabel dibawah jalan PEKERJAAN : Membuat/memasang saluran kabel dibawah jalan
X) raya per meter (URX)
un dan IB PEKERJAAN : Survei Detail Stasiun dan IB

un dan IB PEKERJAAN : Survei Detail Stasiun dan IB


un dan IB PEKERJAAN : Survei Detail Stasiun dan IB
jalan PEKERJAAN : Dokumentasi SIL PEKER

jalan PEKERJAAN : Project Administration PEKER


jalan PEKERJAAN : Project Administration PEKER
PEKERJAAN : Mobilisasi dan Demobilisasi PEKER

PEKERJAAN : Mobilisasi dan Demobilisasi PEKER


PEKERJAAN : Mobilisasi dan Demobilisasi PEKER
PEKERJAAN : Dokumentasi SIL

PEKERJAAN : Project Administration


PEKERJAAN : Project Administration
PEKERJAAN : Mobilisasi dan Demobilisasi

PEKERJAAN : Mobilisasi dan Demobilisasi


PEKERJAAN : Mobilisasi dan Demobilisasi