R E K A P I T U L A S I RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA TOTAL HARGA

A PEKERJAAN PERSIAPAN 46.800.000,00


B PEKERJAAN STRUKTUR
I PEKERJAAN PEMATANGAN LAHAN 25.242.690,00
II PEKERJAAN TANAH DAN URUGAN 16.043.130,00
III PEKERJAAN PONDASI 155.328.090,00
IV PEKERJAAN STRUKTUR LANTAI 1 144.464.160,00
V PEKERJAAN STRUKTUR LANTAI 2 296.565.380,00
VI PEKERJAAN STRUKTUR LANTAI ATAP 175.545.985,00
VII PEKERJAAN STRUKTUR KOLAM RENANG 40.299.880,00
853.489.315,00
C PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN LANTAI 1 487.647.070,00
C.2 PEKERJAAN LANTAI 2 517.491.064,00
C.3 PEKERJAAN LANTAI ATAP 191.986.404,00
C.4 PEKERJAAN TANGGA 33.245.030,00
C.5 PEKERJAAN GARASI DAN PAGAR 42.814.051,00
1.273.183.619,00

D PEKERJAAN MEKANIKAL PLUMBING 200.433.000,00

E PEKERJAAN ELEKTRIKAL 208.095.000,00

F PEKERJAAN PENGKONDISIAN UDARA / AC 55.000.000,00

TOTAL JUMLAH Rp. 2.637.000.934,00

Bogor, 23 Juni 2023


Catatan
- penawaran sesuai Boq dan gambar yang diketahui
- masa penawaran harga berlaku 1 bulan
- Pembayaran DP 30% , selanjutnya termin sesuai progres
- harga belum termasuk pajak2
- pemeliharaan 1 bulan retensi 5% Agus Purnama
(Pemborong)
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

A PEKERJAAN PERSIAPAN
1 pengukuran dan bowplank 300,00 m2 10.000,00 3.000.000,00
2 air kerja 1,00 ls 3.000.000,00 3.000.000,00
3 listrik kerja 1,00 ls 3.000.000,00 3.000.000,00
4 gudang dan barak pekerja 36,00 m2 750.000,00 27.000.000,00
5 dokumentasi dan arsip 9,00 bln 1.200.000,00 10.800.000,00
6 mobilisasi dan demobilisasi
7 perijinan IMB dan koordinasi lingkungan by owner
8 pembuatan Sumur dan pompa by owner
9 penyambungan PLN by owner
SUM A 46.800.000,00

B PEKERJAAN STRUKTUR
I PEKERJAAN PEMATANGAN LAHAN
1 Timbunan Tanah Biasa mendatangkan 62,10 m3 175.000,00 10.867.500,00
2 Tembok penahan tanah
- Pek. Galian Tanah biasa 6,19 m3 126.000,00 779.940,00
- Lap. Pasir Urug Bawah Pondasi 1,03 m3 375.000,00 386.250,00
- Pas. Pondasi batu belah campuran 1SP : 4PP 12,58 m3 1.050.000,00 13.209.000,00

SUM B.I 25.242.690,00

II PEKERJAAN TANAH DAN URUGAN


1 Pek. Galian Tanah biasa 86,98 m3 126.000,00 10.959.480,00
2 Pek. Urugan Tanah Kembali Bekas Galian 21,74 m3 85.000,00 1.847.900,00
3 Lap. Pasir Urug Bawah Pondasi 4,05 m3 375.000,00 1.518.750,00
4 Lantai Kerja, t = 5 cm 2,02 m3 850.000,00 1.717.000,00

SUM B. II 16.043.130,00

III PEKERJAAN PONDASI


1 Pek. Cerucuk Bambu D 10 cm. T: 3 m 216,00 btng 45.000,00 9.720.000,00
2 Pek. Plat Pondasi 140 x 140 x 30 cm (PT1)
- Pembesian 138,81 kg 16.500,00 2.290.365,00
- Cor Beton Ready Mix K.250 1,76 m3 1.242.000,00 2.185.920,00
- Begesting Pondasi (2x pakai) 5,04 m2 185.000,00 932.400,00
3 Pek. Plat Pondasi 120 x 120 x 25 cm (PT2)
- Pembesian 169,16 kg 16.500,00 2.791.140,00
- Cor Beton Ready Mix K.250 1,80 m3 1.242.000,00 2.235.600,00
- Begesting Pondasi (2x pakai) 6,00 m2 185.000,00 1.110.000,00
4 Pek. Plat Pondasi 100 x 100 x 25 cm (PT3A)
- Pembesian 149,75 kg 16.500,00 2.470.875,00
- Cor Beton Ready Mix K.250 1,50 m3 1.242.000,00 1.863.000,00
- Begesting Pondasi (2x pakai) 6,00 m2 185.000,00 1.110.000,00
5 Pek. Plat Pondasi 80 x 80 x 20 cm (PT4)
- Pembesian 79,60 kg 16.500,00 1.313.400,00
- Cor Beton Ready Mix K.250 0,77 m3 1.242.000,00 956.340,00
- Begesting Pondasi (2x pakai) 3,84 m2 185.000,00 710.400,00
6 Pek. Plat Pondasi 80 x 80 x 20 cm (PT4A)
- Pembesian 53,07 kg 16.500,00 875.655,00
- Cor Beton Ready Mix K.250 0,51 m3 1.242.000,00 633.420,00
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


- Begesting Pondasi (2x pakai) 2,56 m2 185.000,00 473.600,00
7 Pek. Plat Pondasi 65 x 65 x 20 cm (PT5A)
- Pembesian 51,74 kg 16.500,00 853.710,00
- Cor Beton Ready Mix K.250 0,51 m3 1.242.000,00 633.420,00
- Begesting Pondasi (2x pakai) 3,12 m2 185.000,00 577.200,00
8 Pek. Pasangan Kolom Pedestal 20 x 30 cm (PK3)
- Pembesian 83,95 Kg 16.500,00 1.385.175,00
- Cor Beton Ready Mix K.250 0,40 m3 1.242.000,00 496.800,00
- Begesting Kolom (2x pakai 75%) 6,60 m2 185.000,00 1.221.000,00
9 Pek. Pasangan Kolom Pedestal 30 x 30 cm (PK3A)
- Pembesian 48,24 Kg 16.500,00 795.960,00
- Cor Beton Ready Mix K.250 0,20 m3 1.242.000,00 248.400,00
- Begesting Kolom (2x pakai 75%) 2,64 m2 185.000,00 488.400,00
10 Pek. Pasangan Kolom Pedestal 20 x 35 cm (PK35)
- Pembesian 47,49 Kg 16.500,00 783.585,00
- Cor Beton Ready Mix K.250 0,15 m3 1.242.000,00 186.300,00
- Begesting Kolom (2x pakai 75%) 2,42 m2 185.000,00 447.700,00
11 Pek. Pasangan Kolom Pedestal 20 x 40 cm (PK4)
- Pembesian 278,38 Kg 16.500,00 4.593.270,00
- Cor Beton Ready Mix K.250 1,41 m3 1.242.000,00 1.751.220,00
- Begesting Kolom (2x pakai 75%) 21,12 m2 185.000,00 3.907.200,00
12 Pek. Pasangan Kolom Pedestal 40 x 40 cm (PK4A)
- Pembesian 129,35 Kg 16.500,00 2.134.275,00
- Cor Beton Ready Mix K.250 0,70 m3 1.242.000,00 869.400,00
- Begesting Kolom (2x pakai 75%) 7,04 m2 185.000,00 1.302.400,00
13 Pek. Pasangan Kolom Pedestal 20 x 50 cm (PK5)
- Pembesian 340,16 Kg 16.500,00 5.612.640,00
- Cor Beton Ready Mix K.250 1,54 m3 1.242.000,00 1.912.680,00
- Begesting Kolom (2x pakai 75%) 21,56 m2 185.000,00 3.988.600,00
14 Pek. Pasangan Kolom Pedestal 20 x 55 cm (PK55)
- Pembesian 99,53 Kg 16.500,00 1.642.245,00
- Cor Beton Ready Mix K.250 0,48 m3 1.242.000,00 596.160,00
- Begesting Kolom (2x pakai 75%) 6,60 m2 185.000,00 1.221.000,00
15 Pek. Pasangan Kolom Pedestal 20 x 60 cm (PK6)
- Pembesian 50,94 Kg 16.500,00 840.510,00
- Cor Beton Ready Mix K.250 0,26 m3 1.242.000,00 322.920,00
- Begesting Kolom (2x pakai 75%) 3,52 m2 185.000,00 651.200,00
16 Pek. Pasangan Tie Beam 20 x 30 cm (TB3)
- Pembesian 1.047,11 Kg 16.500,00 17.277.315,00
- Cor Beton Ready Mix K.250 7,26 m3 1.242.000,00 9.016.920,00
- Begesting Sloof (2x pakai 75%) 72,58 m2 185.000,00 13.427.300,00
17 Pek. Pasangan Tie Beam 20 x 40 cm (TB4)
- Pembesian 224,94 Kg 16.500,00 3.711.510,00
- Cor Beton Ready Mix K.250 1,72 m3 1.242.000,00 2.136.240,00
- Begesting Sloof (2x pakai 75%) 17,19 m2 185.000,00 3.180.150,00
18 Pek. Pasangan Tie Beam 20 x 30 cm (TB3K)
- Pembesian 32,30 Kg 16.500,00 532.950,00
- Cor Beton Ready Mix K.250 0,19 m3 1.242.000,00 235.980,00
- Begesting Sloof (2x pakai 75%) 1,86 m2 185.000,00 344.100,00
19 Pek. Dinding Beton bertulang
- Pembesian 707,74 kg 16.500,00 11.677.710,00
- Cor Beton Ready Mix K.250 4,59 m3 1.242.000,00 5.700.780,00
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


- Begesting Dinding (2x pakai 75%) 76,91 m2 185.000,00 14.228.350,00
20 Pemasangan Pondasi rollag bata 1:4 2,41 m3 1.130.000,00 2.723.300,00

SUM B. III 155.328.090,00

IV PEKERJAAN STRUKTUR LANTAI 1


PEKERJAAN KOLOM BETON
1 Pek. Pasangan Kolom 13 x 30 cm (K3)
- Pembesian 122,49 Kg 16.500,00 2.021.085,00
- Cor Beton Ready Mix K.250 0,52 m3 1.242.000,00 645.840,00
- Begesting Kolom (2x pakai 75%) 11,48 m2 195.000,00 2.238.600,00
2 Pek. Pasangan Kolom 20 x 30 cm (K3A)
- Pembesian 53,08 Kg 16.500,00 875.820,00
- Cor Beton Ready Mix K.250 0,27 m3 1.242.000,00 335.340,00
- Begesting Kolom (2x pakai 75%) 4,45 m2 195.000,00 867.750,00
3 Pek. Pasangan Kolom 13 x 35 cm (K35)
- Pembesian 211,06 Kg 16.500,00 3.482.490,00
- Cor Beton Ready Mix K.250 1,01 m3 1.242.000,00 1.254.420,00
- Begesting Kolom (2x pakai 75%) 21,36 m2 195.000,00 4.165.200,00
4 Pek. Pasangan Kolom 13 x 40 cm (K4)
- Pembesian 315,16 Kg 16.500,00 5.200.140,00
- Cor Beton Ready Mix K.250 1,21 m3 1.242.000,00 1.502.820,00
- Begesting Kolom (2x pakai 75%) 25,63 m2 195.000,00 4.997.850,00
5 Pek. Pasangan Kolom 13 x 50 cm (K5)
- Pembesian 457,03 Kg 16.500,00 7.540.995,00
- Cor Beton Ready Mix K.250 1,74 m3 1.242.000,00 2.161.080,00
- Begesting Kolom (2x pakai 75%) 33,64 m2 195.000,00 6.559.800,00
6 Pek. Pasangan Kolom 13 x 55 cm (K55)
- Pembesian 156,66 Kg 16.500,00 2.584.890,00
- Cor Beton Ready Mix K.250 0,64 m3 1.242.000,00 794.880,00
- Begesting Kolom (2x pakai 75%) 12,10 m2 195.000,00 2.359.500,00
7 Pek. Pasangan Kolom 15 x 60 cm (K6A)
- Pembesian 91,66 Kg 16.500,00 1.512.390,00
- Cor Beton Ready Mix K.250 0,40 m3 1.242.000,00 496.800,00
- Begesting Kolom (2x pakai 75%) 6,68 m2 195.000,00 1.302.600,00
8 Pek. Pasangan Kolom 13 x 30 x 30 cm (KL3)
- Pembesian 77,52 Kg 16.500,00 1.279.080,00
- Cor Beton Ready Mix K.250 0,26 m3 1.242.000,00 322.920,00
- Begesting Kolom (2x pakai 75%) 5,16 m2 195.000,00 1.006.200,00
9 Pek. Pasangan Kolom 13 x 40 x 40 cm (KL4)
- Pembesian 104,92 Kg 16.500,00 1.731.180,00
- Cor Beton Ready Mix K.250 0,39 m3 1.242.000,00 484.380,00
- Begesting Kolom (2x pakai 75%) 7,12 m2 195.000,00 1.388.400,00
10 Pek. Pasangan Kolom 13 x 40 x 20 cm (KL4A)
- Pembesian 67,82 Kg 16.500,00 1.119.030,00
- Cor Beton Ready Mix K.250 0,27 m3 1.242.000,00 335.340,00
- Begesting Kolom (2x pakai 75%) 5,34 m2 195.000,00 1.041.300,00
11 Pek. Pasangan Kolom 10 x10 cm (KP) 30,40 m' 85.000,00 2.584.000,00

PEKERJAAN PLAT LANTAI


12 Pek. Plat Lantai Beton, t = 8 cm ( S1A )
- Lap. Pasir Urug Bawah lantai, t = 10 cm 23,68 m3 375.000,00 8.880.000,00
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


- Lantai Kerja, t = 5 cm 11,84 m3 850.000,00 10.064.000,00
- Pembesian 858,07 Kg 16.500,00 14.158.155,00
- Cor Beton Ready Mix K.250 18,94 m3 1.242.000,00 23.523.480,00

PEKERJAAN TANGGA UTAMA


13 Pekerjaan Balok Beton 15 x 30 (BB)
- Pembesian 20,25 Kg 16.500,00 334.125,00
- Cor Beton Ready Mix K.250 0,12 m3 1.242.000,00 149.040,00
- Begesting Balok (2x pakai) 1,70 m2 325.000,00 552.500,00
14 Pek. Plat tangga
- Pembesian 266,63 Kg 16.500,00 4.399.395,00
- Cor Beton Ready Mix K.250 2,08 m3 1.242.000,00 2.583.360,00
- Begesting Tangga (2x pakai) 17,99 m2 325.000,00 5.846.750,00

PEKERJAAN TANGGA LANTAI


15 Pek. Plat tangga
- Pembesian 184,53 Kg 16.500,00 3.044.745,00
- Cor Beton Ready Mix K.250 1,47 m3 1.242.000,00 1.825.740,00
- Begesting Tangga (2x pakai) 15,11 m2 325.000,00 4.910.750,00

SUM B. IV 144.464.160,00

V PEKERJAAN STRUKTUR LANTAI 2


PEKERJAAN BALOK BETON
1 Pek. Pasangan Balok 15 x 25 cm (B25)
- Pembesian 67,46 Kg 16.500,00 1.113.090,00
- Cor Beton Ready Mix K.250 0,42 m3 1.492.000,00 626.640,00
- Begesting Balok (2x pakai 75%) 4,54 m2 325.000,00 1.475.500,00
2 Pek. Pasangan Balok 15 x 30 cm (B3)
- Pembesian 696,07 Kg 16.500,00 11.485.155,00
- Cor Beton Ready Mix K.250 4,41 m3 1.492.000,00 6.579.720,00
- Begesting Balok (2x pakai 75%) 50,01 m2 325.000,00 16.253.250,00
3 Pek. Pasangan Balok 15 x 30 cm (B3K)
- Pembesian 56,79 Kg 16.500,00 937.035,00
- Cor Beton Ready Mix K.250 0,34 m3 1.492.000,00 507.280,00
- Begesting Balok (2x pakai 75%) 3,85 m2 325.000,00 1.251.250,00
4 Pek. Pasangan Balok 20 x 30 cm (B3A)
- Pembesian 236,17 Kg 16.500,00 3.896.805,00
- Cor Beton Ready Mix K.250 1,91 m3 1.492.000,00 2.849.720,00
- Begesting Balok (2x pakai 75%) 17,86 m2 325.000,00 5.804.500,00
5 Pek. Pasangan Balok 20 x 30 cm (B3AK)
- Pembesian 91,27 Kg 16.500,00 1.505.955,00
- Cor Beton Ready Mix K.250 0,58 m3 1.492.000,00 865.360,00
- Begesting Balok (2x pakai 75%) 5,43 m2 325.000,00 1.764.750,00
6 Pek. Pasangan Balok 20 x 30 cm (B3AT)
- Pembesian 64,21 Kg 16.500,00 1.059.465,00
- Cor Beton Ready Mix K.250 0,50 m3 1.492.000,00 746.000,00
- Begesting Balok (2x pakai 75%) 4,63 m2 325.000,00 1.504.750,00
7 Pek. Pasangan Balok 20 x 35 cm (B35A)
- Pembesian 278,66 Kg 16.500,00 4.597.890,00
- Cor Beton Ready Mix K.250 1,97 m3 1.492.000,00 2.939.240,00
- Begesting Balok (2x pakai 75%) 18,61 m2 325.000,00 6.048.250,00
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


8 Pek. Pasangan Balok 20 x 35 cm (B35AT)
- Pembesian 56,40 Kg 16.500,00 930.600,00
- Cor Beton Ready Mix K.250 0,35 m3 1.492.000,00 522.200,00
- Begesting Balok (2x pakai 75%) 3,27 m2 325.000,00 1.062.750,00
9 Pek. Pasangan Balok 20 x 45 cm (B45A)
- Pembesian 82,99 Kg 16.500,00 1.369.335,00
- Cor Beton Ready Mix K.250 0,52 m3 1.492.000,00 775.840,00
- Begesting Balok (2x pakai 75%) 4,92 m2 325.000,00 1.599.000,00
10 Pek. Pasangan Balok 20 x 50 cm (B5A)
- Pembesian 236,38 Kg 16.500,00 3.900.270,00
- Cor Beton Ready Mix K.250 1,69 m3 1.492.000,00 2.521.480,00
- Begesting Balok (2x pakai 75%) 16,22 m2 325.000,00 5.271.500,00
11 Pek. Pasangan Balok 20 x 50 cm (B5AT)
- Pembesian 78,76 Kg 16.500,00 1.299.540,00
- Cor Beton Ready Mix K.250 0,53 m3 1.492.000,00 790.760,00
- Begesting Balok (2x pakai 75%) 5,06 m2 325.000,00 1.644.500,00

PEKERJAAN LANTAI BETON


12 Pek. Plat Lantai Beton, t = 12 cm ( S2 )
- Pembesian 2.865,62 Kg 16.500,00 47.282.730,00
- Cor Beton Ready Mix K.250 18,72 m3 1.492.000,00 27.930.240,00
- Begesting Lantai (2x pakai) 162,81 m2 325.000,00 52.913.250,00

PEKERJAAN KOLOM BETON


13 Pek. Pasangan Kolom 13 x 25 cm (K25)
- Pembesian 238,78 Kg 16.500,00 3.939.870,00
- Cor Beton Ready Mix K.250 1,17 m3 1.492.000,00 1.745.640,00
- Begesting Kolom (2x pakai 75%) 27,36 m2 195.000,00 5.335.200,00
14 Pek. Pasangan Kolom 13 x 30 cm (K3)
- Pembesian 780,59 Kg 16.500,00 12.879.735,00
- Cor Beton Ready Mix K.250 3,28 m3 1.492.000,00 4.893.760,00
- Begesting Kolom (2x pakai 75%) 72,24 m2 195.000,00 14.086.800,00
15 Pek. Pasangan Kolom 13 x 40 cm (K4)
- Pembesian 98,15 Kg 16.500,00 1.619.475,00
- Cor Beton Ready Mix K.250 0,42 m3 1.492.000,00 626.640,00
- Begesting Kolom (2x pakai 75%) 8,48 m2 195.000,00 1.653.600,00
16 Pek. Pasangan Kolom 13 x 50 cm (K5)
- Pembesian 60,98 Kg 16.500,00 1.006.170,00
- Cor Beton Ready Mix K.250 0,26 m3 1.492.000,00 387.920,00
- Begesting Kolom (2x pakai 75%) 5,04 m2 195.000,00 982.800,00
17 Pek. Pasangan Kolom 10 x10 cm (KP) 110,20 m' 85.000,00 9.367.000,00

PEKERJAAN TANGGA UTAMA


18 Pekerjaan Balok Beton 15 x 30 (BB)
- Pembesian 20,25 Kg 16.500,00 334.125,00
- Cor Beton Ready Mix K.250 0,12 m3 1.492.000,00 179.040,00
- Begesting Balok (2x pakai) 1,70 m2 325.000,00 552.500,00
19 Pek. Plat tangga
- Pembesian 266,63 Kg 16.500,00 4.399.395,00
- Cor Beton Ready Mix K.250 2,08 m3 1.492.000,00 3.103.360,00
- Begesting Tangga (2x pakai) 17,99 m2 325.000,00 5.846.750,00
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


SUM B. V 296.565.380,00

VI PEKERJAAN STRUKTUR LANTAI ATAP


PEKERJAAN BALOK BETON
1 Pek. Pasangan Balok 15 x 25 cm (B25)
- Pembesian 191,40 Kg 16.500,00 3.158.100,00
- Cor Beton Ready Mix K.250 1,24 m3 1.492.000,00 1.850.080,00
- Begesting Balok (2x pakai 75%) 13,55 m2 325.000,00 4.403.750,00
2 Pek. Pasangan Balok 15 x 30 cm (B3)
- Pembesian 893,33 Kg 16.500,00 14.739.945,00
- Cor Beton Ready Mix K.250 5,68 m3 1.492.000,00 8.474.560,00
- Begesting Balok (2x pakai 75%) 64,41 m2 325.000,00 20.933.250,00
3 Pek. Pasangan Balok 15 x 30 cm (B3K)
- Pembesian 77,75 Kg 16.500,00 1.282.875,00
- Cor Beton Ready Mix K.250 0,43 m3 1.492.000,00 641.560,00
- Begesting Balok (2x pakai 75%) 4,87 m2 325.000,00 1.582.750,00
4 Pek. Pasangan Balok 20 x 30 cm (B3A)
- Pembesian 291,06 Kg 16.500,00 4.802.490,00
- Cor Beton Ready Mix K.250 2,37 m3 1.492.000,00 3.536.040,00
- Begesting Balok (2x pakai 75%) 22,12 m2 325.000,00 7.189.000,00
5 Pek. Pasangan Balok 20 x 30 cm (B3AK)
- Pembesian 32,78 Kg 16.500,00 540.870,00
- Cor Beton Ready Mix K.250 0,19 m3 1.492.000,00 283.480,00
- Begesting Balok (2x pakai 75%) 1,78 m2 325.000,00 578.500,00
6 Pek. Pasangan Balok 15 x 35 cm (B35)
- Pembesian 134,22 Kg 16.500,00 2.214.630,00
- Cor Beton Ready Mix K.250 0,82 m3 1.492.000,00 1.223.440,00
- Begesting Balok (2x pakai 75%) 9,50 m2 325.000,00 3.087.500,00
7 Pek. Pasangan Balok 15 x 40 cm (B4)
- Pembesian 171,85 Kg 16.500,00 2.835.525,00
- Cor Beton Ready Mix K.250 0,86 m3 1.492.000,00 1.283.120,00
- Begesting Balok (2x pakai 75%) 10,17 m2 325.000,00 3.305.250,00
8 Pek. Pasangan Balok 10 x 15 cm (RB) 30,48 m' -

PEKERJAAN LANTAI BETON


9 Pek. Plat Lantai Beton, t = 12 cm ( S2 )
- Pembesian 2.345,41 Kg 16.500,00 38.699.265,00
- Cor Beton Ready Mix K.250 10,61 m3 1.492.000,00 15.830.120,00
- Begesting Lantai (2x pakai) 88,40 m2 325.000,00 28.730.000,00

PEKERJAAN KOLOM BETON


10 Pek. Pasangan Kolom 13 x 25 cm (K25)
- Pembesian 52,09 Kg 16.500,00 859.485,00
- Cor Beton Ready Mix K.250 0,20 m3 1.492.000,00 298.400,00
- Begesting Kolom (2x pakai 75%) 4,56 m2 325.000,00 1.482.000,00
11 Pek. Pasangan Kolom 10 x10 cm (KP) 3,00 m' 85.000,00 255.000,00
12 Pek. Pasangan Kolom 10 x15 cm (K1) 17,00 m' 85.000,00 1.445.000,00

SUM B. VI 175.545.985,00

VII PEKERJAAN STRUKTUR KOLAM RENANG


PEKERJAAN TANAH DAN URUGAN
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


1 Pek. Galian Tanah biasa 21,60 m3 126.000,00 2.721.600,00
2 Lap. Pasir Urug T: 10 cm 1,44 m3 375.000,00 540.000,00
3 Lantai Kerja, t = 5 cm 0,72 m3 850.000,00 612.000,00

PEKERJAAN BETON
4 Pek. Plat Lantai Beton
- Pembesian 137,34 Kg 16.500,00 2.266.110,00
- Cor Beton Ready Mix K.250 1,89 m3 1.492.000,00 2.819.880,00
5 Pek. Dinding Beton bertulang
- Pembesian 690,48 kg 16.500,00 11.392.920,00
- Cor Beton Ready Mix K.250 4,06 m3 1.492.000,00 6.057.520,00
- Begesting Dinding (2x pakai 75%) 54,47 m2 255.000,00 13.889.850,00

SUM B. VII 40.299.880,00

C PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN LANTAI 1
C.1.A PEKERJAN DINDING
1 Pek. Pasangan Dinding Bata Merah, ad 1 Pc : 5 Ps 381,60 m2 115.000,00 43.884.000,00
2 Pek. Plesteran Dinding, ad 1 Pc : 5 Ps 689,53 m2 68.600,00 47.301.758,00
3 Pek. Plesteran Ciprat 1Pc : 2 Pp 11,81 m2 80.000,00 944.800,00
4 Pek. Acian 689,53 m2 22.000,00 15.169.660,00
5 Meja Beton T: 8 cm 2,34 m2 750.000,00 1.755.000,00
6 Pek. Dinding keramik uk. 60cm x 60cm D Welington Sand
28,39 m2 360.000,00 10.220.400,00
7 Pek. Dinding Basalto Honed 30x60 cm 33,48 m2 522.000,00 17.476.560,00
8 Pengecatan dinding interior (3 lapis) 482,67 m2 65.000,00 31.373.550,00
9 Pengecatan dinding eksterior (3 lapis) 218,67 m2 85.000,00 18.586.950,00
10 Railing Besi Hollow + cat 6,20 m' 750.000,00 4.650.000,00

SUM C. 1.A 191.362.678,00

C.1.B PEKERJAAN LANTAI


1 Pek. Batu Alam Andesit 20x20 cm 69,00 m2 240.000,00 16.560.000,00
2 Pek. Lantai Basalto Honed 30x60 cm 18,30 m2 522.000,00 9.552.600,00
3 Pek. Lantai keramik uk. 60cm x 60cm D Ginza Greay 34,18 m2 362.400,00 12.386.832,00
4 Pek. Lantai keramik uk. 60cm x 60cm D Welington Sand27,71 m2 360.000,00 9.975.600,00
5 Pek. Lantai Keramik Roman D Hybrida Wengue 120x3033,20
cm m2 408.000,00 13.545.600,00
6 Pek.Lantai keramik uk. 60cm x 60cm Roman D Shibuya109,40
ASH m2 362.400,00 39.646.560,00
7 Pek. Lantai keramik Mozaik Hijau Muda 53,45 m2 486.000,00 25.976.700,00

SUM C. 1.B 127.643.892,00

C.1.C PEKERJAAN PLAFOND


1 Pas. Rangka Plafon Hollow , t=0,3mm, modul 60x120cm
155,19 m2 55.000,00 8.535.450,00
2 Pas. Plafon gypsum t = 9mm 129,02 m2 75.000,00 9.676.500,00
3 Pemasangan Plafond PVC 26,17 m2 275.000,00 7.196.750,00
4 Pek. List Gypsum, t: 5 cm 40,30 m' 35.000,00 1.410.500,00
5 Pengecatan plafon (3 lapis) 129,02 m2 65.000,00 8.386.300,00

SUM C. 1.C 35.205.500,00

C.1.D PEKERJAAN PINTU DAN JENDELA


RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


1 Pintu Kayu Type P1 1,00 unit 15.000.000,00 15.000.000,00
2 Pintu Kayu Type P2 1,00 unit 7.200.000,00 7.200.000,00
3 Pintu Kayu Type P4 1,00 unit 7.200.000,00 7.200.000,00
4 Pintu UPVC Type P5 1,00 unit 4.800.000,00 4.800.000,00
5 Pintu Besi Type P6 1,00 unit 3.900.000,00 3.900.000,00
6 Pintu UPVC Type P7 1,00 unit 9.600.000,00 9.600.000,00
7 Jendela Kaca + Kusen UPVC Type J1 3,00 unit 12.360.000,00 37.080.000,00
8 Jendela Kaca + Kusen UPVC Type J2 1,00 unit 26.400.000,00 26.400.000,00
9 Jendela Kaca + Kusen UPVC Type J3 1,00 unit 13.800.000,00 13.800.000,00

SUM C. 1.D 124.980.000,00

C.1.E PEKERJAAN SANITAIR


1 Pemasangan closet duduk TOTO CW 421 1,00 unit 3.750.000,00 3.750.000,00
2 Pemasangan Wastafel LW 230 J 1,00 unit 2.200.000,00 2.200.000,00
3 Pemasangan Shower Set TOTO TX474KEA 1,00 unit 1.300.000,00 1.300.000,00
4 Pemasangan Jet Washer, TOTO TX403SB 1,00 unit 550.000,00 550.000,00
5 Pasang Kran 1/2 in, ONDA CLS - 02 4,00 unit 70.000,00 280.000,00
6 Pemasangan Floor drain TOTO tipe TX 1 DB 1,00 unit 375.000,00 375.000,00

SUM C. 1.E 8.455.000,00


TOTAL ARSITEKTUR LANTAI 1 C.1 487.647.070,00

C.2 PEKERJAAN LANTAI 2


C.2.A PEKERJAN DINDING
1 Pek. Pasangan Dinding Bata Merah, ad 1 Pc : 5 Ps 412,81 m2 115.000,00 47.473.150,00
2 Pek. Plesteran Dinding, ad 1 Pc : 5 Ps 771,93 m2 68.600,00 52.954.398,00
3 Pek. Plesteran Ciprat 1Pc : 2 Pp 33,38 m2 80.000,00 2.670.400,00
4 Pek. Acian 771,93 m2 22.000,00 16.982.460,00
5 Meja Beton T: 8 cm 2,82 m2 750.000,00 2.115.000,00
6 Pek. Dinding Basalto Honed 30x60 cm 7,28 m2 522.000,00 3.800.160,00
7 Pengecatan dinding interior (3 lapis) 540,35 m2 65.000,00 35.122.750,00
89 Pengecatan dinding eksterior (3 lapis) 264,96 m2 85.000,00 22.521.600,00
Pek. Railling Balkon Stainless Steel + kaca 4,80 m' 1.925.000,00 9.240.000,00

SUM C.2.A 192.879.918,00

C.2.B PEKERJAAN LANTAI


1 Lap. Pasir Urug T: 5 cm 14,57 m3 375.000,00 5.463.750,00
2 Pas. Lantai keramik ukuran 60cm x 60cm D California Shell
64,39 m2 324.000,00 20.862.360,00
3 Pek. Lantai keramik uk. 60cm x 60cm D Welington Sand135,79 m2 360.000,00 48.884.400,00
4 Pek. Lantai keramik uk. 60cm x 60cm Roman D Shibuya91,14
ASH m2 362.400,00 33.029.136,00

SUM C.2.B 108.239.646,00

C.2.C PEKERJAAN PLAFOND


1 Pas. Rangka Plafon Hollow , t=0,3mm, modul 60x120cm
195,41 m2 55.000,00 10.747.550,00
2 Pas. Plafon gypsum t = 9mm 177,48 m2 75.000,00 13.311.000,00
3 Pemasangan Plafond PVC 17,93 m2 275.000,00 4.930.750,00
4 Pek. List Gypsum, t: 5 cm 159,60 m' 35.000,00 5.586.000,00
5 Pengecatan plafon (3 lapis) 177,48 m2 65.000,00 11.536.200,00
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


SUM C.2.C 46.111.500,00

C.2.D PEKERJAAN PINTU DAN JENDELA


1 Pintu Kayu Type P2 6,00 unit 7.200.000,00 43.200.000,00
2 Pintu Kayu Type PJ1 1,00 unit 25.200.000,00 25.200.000,00
3 Pintu Kayu Type PJ2 1,00 unit 13.200.000,00 13.200.000,00
4 Pintu UPVC Type P7 1,00 unit 9.600.000,00 9.600.000,00
5 Pintu UPVC Type P8 1,00 unit -
6 Jendela Kaca + Kusen UPVC Type J4 2,00 unit 12.600.000,00 25.200.000,00
7 Jendela Kaca + Kusen UPVC Type J5 1,00 unit -
8 Kisi-kisi kayu rangka besi 4,00 unit 5.580.000,00 22.320.000,00

SUM C.2.D 138.720.000,00

C.2.E PEKERJAAN SANITAIR


1 Pemasangan closet duduk TOTO CW 421 4,00 unit 3.750.000,00 15.000.000,00
2 Pemasangan Wastafel LW 230 J 4,00 unit 2.200.000,00 8.800.000,00
3 Pemasangan Shower Set TOTO TX474KEA 3,00 unit 1.300.000,00 3.900.000,00
4 Pemasangan Jet Washer, TOTO TX403SB 4,00 unit 550.000,00 2.200.000,00
5 Pasang Kran 1/2 in, ONDA CLS - 02 2,00 unit 70.000,00 140.000,00
6 Pemasangan Floor drain TOTO tipe TX 1 DB 4,00 unit 375.000,00 1.500.000,00

SUM C.2.E 31.540.000,00


TOTAL ARSITEKTUR LANTAI 2 C.2 517.491.064,00

C.3 PEKERJAAN LANTAI ATAP


C.3.A PEKERJAN DINDING
1 Pek. Pasangan Dinding Bata Merah, ad 1 Pc : 5 Ps 102,71 m2 115.000,00 11.811.650,00
2 Pek. Plesteran Dinding, ad 1 Pc : 5 Ps 189,34 m2 68.600,00 12.988.724,00
3 Pek. Acian 189,34 m2 22.000,00 4.165.480,00
4 Pengecatan dinding eksterior (3 lapis) 189,34 m2 85.000,00 16.093.900,00

SUM C.3.A 45.059.754,00

C.3.B PEKERJAAN LANTAI


1 Lap. Pasir Urug T: 5 cm 3,29 m3 375.000,00 1.233.750,00
2 Pas. Lantai Keramik Roman D Hybrida Wengue 120x30 65,80
cm m2 408.000,00 26.846.400,00
3 Pek. Water proofing tipe coating 110,80 m2 125.000,00 13.850.000,00

SUM C.3.B 41.930.150,00

C.3.C PEKERJAAN ATAP DAN PLAFOND


1 Pas. Rangka Atap Besi Hollow 200x100 mm 120,72 m2 350.000,00 42.252.000,00
2 Pas. Atap Onduline motif Genteng Bitumen Monolayer,
120,72
Ondulinem2
Villa 290.000,00 35.008.800,00
3 Pas. Rangka Plafon Hollow , t=0,3mm, modul 60x120cm36,97 m2 55.000,00 2.033.350,00
4 Pemasangan Plafond PVC 36,97 m2 255.000,00 9.427.350,00

SUM C.3.C 88.721.500,00

C.3.D PEKERJAAN PINTU DAN JENDELA


1 Pintu Kayu Type P3 1,00 unit 6.600.000,00 6.600.000,00
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


2 Jendela rangka besi siku 1,00 unit 3.900.000,00 3.900.000,00

SUM C.3.D 10.500.000,00

C.3.E PEKERJAAN SANITAIR


1 Pasang Roofdrain 3", San - Ei H01 3 inch 21,00 unit 275.000,00 5.775.000,00

SUM C.3.E 5.775.000,00


TOTAL ARSITEKTUR LANTAI ATAP C.3 191.986.404,00

C.4 PEKERJAAN TANGGA


1 Pek. Acian 29,27 m2 22.000,00 643.940,00
2 Pengecatan interior (3 lapis) 29,27 m2 65.000,00 1.902.550,00
3 Pek. Lantai Keramik Roman D Hybrida Wengue 120x3036,13
cm m2 408.000,00 14.741.040,00
4 Pek. Railling Tangga Stainless Steel 13,85 m' 950.000,00 13.157.500,00
5 Tangga Putar Besi 1,00 unit 2.800.000,00 2.800.000,00

SUM C.4 33.245.030,00

C.5 PEKERJAAN GARASI DAN PAGAR


1 Pasang Atap uPVC Alderon double layer + rangka hollow
27,00
10x5 cmm2 900.000,00 24.300.000,00
2 Pas. Rangka Plafon Hollow , t=0,3mm, modul 60x120cm25,00 m2 55.000,00 1.375.000,00
3 Pemasangan Plafond PVC 25,00 m2 255.000,00 6.375.000,00
4 fininshing cat duco rangka atap 27,00 m2 125.000,00 3.375.000,00

PEKERJAAN PAGAR
1 Pek. Galian Tanah biasa 6,30 m3 126.000,00 793.800,00
2 Lap. Pasir Urug Bawah Pondasi 1,05 m3 375.000,00 393.750,00
3 Pas. Pondasi batu belah campuran 1SP : 4PP 4,73 m3 1.050.000,00 4.966.500,00
4 Pek. Sloof 15 x 20 cm
- Pembesian 78,75 Kg 16.500,00 1.299.375,00
- Cor Beton Site Mix K. 175 0,53 m3 950.000,00 503.500,00
- Begesting Sloof (2x pakai 75%) 4,20 m2 185.000,00 777.000,00
5 Pek. Pasangan Kolom 15 x 15 cm
- Pembesian 67,50 Kg 16.500,00 1.113.750,00
- Cor Beton Site Mix K. 175 0,45 m3 950.000,00 427.500,00
- Begesting Kolom (2x pakai 75%) 4,50 m2 185.000,00 832.500,00
6 Pek. Pasangan Ringbalok 12 x 20 cm
- Pembesian 50,40 Kg 16.500,00 831.600,00
- Cor Beton Site Mix K. 175 0,42 m3 950.000,00 399.000,00
- Begesting Balok (2x pakai 75%) 3,36 m2 185.000,00 621.600,00
7 Pek. Pasangan Dinding Bata Merah, ad 1 Pc : 5 Ps 43,75 m2 115.000,00 5.031.250,00
8 Pek. Plesteran Dinding, ad 1 Pc : 5 Ps 72,21 m2 68.600,00 4.953.606,00
9 Pek. Plesteran Ciprat 1Pc : 2 Pp 15,29 m2 80.000,00 1.223.200,00
10 Pek. Acian 72,21 m2 22.000,00 1.588.620,00
11 Pengecatan dinding eksterior (3 lapis) 87,50 m2 85.000,00 7.437.500,00
12 Pagar geser rangka besi siku L: 4 cm fin. Cat 14,80 m2 650.000,00 9.620.000,00

SUM C.5 42.814.051,00

D PEKERJAAN MEKANIKAL PLUMBING


D.1 Peralatan Utama
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


1 Pengadaan sumur dalam 60 m 60,00 m 300.000,00 18.000.000,00
2 pompa summersible / satelit grundfos 1hp 1,00 unit 20.000.000,00 20.000.000,00
(termasuk kabel2 dan outomatics pump)
3 tangki pendam 2000 Ltr penguin 1,00 unit 10.000.000,00 10.000.000,00
4 pompa transfer grundfos NS 4-23 1,00 unit 4.000.000,00 4.000.000,00
dari PDAM ke torn atas
5 penyambungan PDAM by owner
6 Torn Air 1000 liter stainless + dudukan 1,00 unit 6.000.000,00 6.000.000,00
7 pompa pendorong scala 2 1,00 unit 10.000.000,00 10.000.000,00
8 Solar Water Heater 200 liter ariston 1,00 set 29.000.000,00 29.000.000,00

D.2 Instalasi Pipa air bersih Lantai 1


1 pipa AW 1" wavin
- meteran ke pompa 9,00 m 55.000,00 495.000,00
- pompa ke torn 13,00 m 55.000,00 715.000,00
- torn ke lantai 1 ( main distribusi) 48,00 m 55.000,00 2.640.000,00
2 pipa AW 3/4" wavin
- loop di atas kamar mandi 7 m 45.000,00 315.000,00
- supply kolam dari torn 7 m 45.000,00 315.000,00
- menuju carport 14 m 45.000,00 630.000,00
3 pipa AW 1/2" wavin
- kamar mandi bawah tangga 8 m 35.000,00 280.000,00
- dapur2 5 m 35.000,00 175.000,00
- taman belakang 10 m 35.000,00 350.000,00
- keran2 kamar mandi depan 9 m 35.000,00 315.000,00
4 Assesoris, knee2, penggantung, lem dll 1,00 ls 2.492.000,00 2.492.000,00
5 instalasi pipa air panas ppr pn16 43,00 m 105.000,00 4.515.000,00

D.3 Instalasi Pipa air bersih Lantai 2


1 pipa AW 1" wavin
- torn ke lantai 2 ( main distribusi) 34,00 m 55.000,00 1.870.000,00
2 pipa AW 3/4" wavin
- loop di atas kamar mandi 47,5 m 45.000,00 2.137.500,00
3 pipa AW 1/2" wavin
- ke loundry 3,5 m 35.000,00 122.500,00
- keran2 kamar mandi 38,5 m 35.000,00 1.347.500,00
4 Assesoris, knee2, penggantung, lem dll 1,00 ls 2.191.000,00 2.191.000,00
5 instalasi pipa air panas ppr pn16 66,00 m 105.000,00 6.930.000,00

D.4 System Kolam Renang


1 instalasi pipa air in -out dan asesoris 1,00 ls 5.000.000,00 5.000.000,00
2 pompa sirkulasi 3/4 HP Hayward 1,00 set 15.000.000,00 15.000.000,00
3 tangga kolam renang SS ABS 1,00 set 2.500.000,00 2.500.000,00

D.5 Instalasi Air Kotor lantai 1 dan 2


1 Septick Tank Bio Septick 1500 liter 1,00 set 13.500.000,00 13.500.000,00
( galian pondasi dan asesoris2)
2 sumur resapan dia 100cm dalam 2 meter 1,00 unit 3.000.000,00 3.000.000,00
3 bak Kontrol 50x50 2,00 unit 850.000,00 1.700.000,00
4 Pipa D 4 inch Rucika 96,00 m 105.000,00 10.080.000,00
5 pipa D 3 inch Rucika 166,00 m 95.000,00 15.770.000,00
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


6 aksesoris, knee, dll 1,00 ls 9.047.500,00 9.047.500,00

SUM D 200.433.000,00

E PEKERJAAN ELEKTRIKAL
E.1 Peralatan Utama
1 Penyambungan PLN 16.500VA 3 phase 1,00 unit 21.000.000,00 21.000.000,00
2 Panel Main Distribusi 1,00 unit 5.500.000,00 5.500.000,00
3 Panel MCB lantai 2 + kabel dari panel utama 1,00 unit 3.000.000,00 3.000.000,00
4 genset 20 kva+ panel ATS stamford silent 1,00 unit 68.000.000,00 68.000.000,00
5 Penangkal Petir Kurn R85 + grounding 1,00 set 6.500.000,00 6.500.000,00

E.2 Instalasi Listrik lantai 1


1 instalasi stop kontak 3x1,5 mm supreme 22,00 ttk 475.000,00 10.450.000,00
2 instalasi titik lampu 2x1,5 mm supreme 57,00 ttk 425.000,00 24.225.000,00
3 instalasi power AC 3x1,5mm supreme 2,00 ttk 525.000,00 1.050.000,00
4 instalasi TV 1,00 ttk 350.000,00 350.000,00
5 instalasi Exhaus t fan 1,00 ttk 475.000,00 475.000,00
6 armatur stop kontak schneider 16,00 ttk 75.000,00 1.200.000,00
7 armatur stop kontak AC schneider 2,00 unit 135.000,00 270.000,00
8 outlet TV schneider 1,00 unit 155.000,00 155.000,00
9 saklar double schneider 9,00 unit 80.000,00 720.000,00
10 saklar single schneider 3,00 unit 60.000,00 180.000,00
11 saklar hotel schneider 1,00 unit 65.000,00 65.000,00
12 wall lamp 2,00 unit 275.000,00 550.000,00
13 floor lamp (step tangga) 4,00 unit 275.000,00 1.100.000,00
14 garden spot light 1,00 unit 150.000,00 150.000,00
15 pool light 3,00 unit 450.000,00 1.350.000,00
16 lampu spotlight 7 watt philips 1,00 unit 140.000,00 140.000,00
17 lampu downlight 46,00 unit 140.000,00 6.440.000,00
18 exhaust fan 8 inch KDK 20TGQ 1,00 unit 450.000,00 450.000,00

E.2 Instalasi Listrik lantai 2 dan atap


1 instalasi stop kontak 3x1,5 mm supreme 22,00 ttk 475.000,00 10.450.000,00
2 instalasi titik lampu 2x1,5 mm supreme 61,00 ttk 400.000,00 24.400.000,00
3 instalasi power AC 3x1,5mm supreme 5,00 ttk 525.000,00 2.625.000,00
4 instalasi TV 4,00 ttk 350.000,00 1.400.000,00
5 instalasi Exhaus t fan 3,00 ttk 475.000,00 1.425.000,00
6 armatur stop kontak schneider 22,00 ttk 75.000,00 1.650.000,00
7 armatur stop kontak AC schneider 5,00 unit 135.000,00 675.000,00
8 outlet TV schneider 4,00 unit 155.000,00 620.000,00
9 saklar double schneider 10,00 unit 80.000,00 800.000,00
10 saklar single schneider 4,00 unit 60.000,00 240.000,00
11 saklar hotel schneider 3,00 unit 65.000,00 195.000,00
12 floor lamp (step tangga) 3,00 unit 275.000,00 825.000,00
13 lampu spotlight 7 watt philips 2,00 unit 140.000,00 280.000,00
14 lampu downlight 56,00 unit 140.000,00 7.840.000,00
15 exhaust fan 8 inch KDK 20TGQ 3,00 unit 450.000,00 1.350.000,00

SUM E 208.095.000,00
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA


F PEKERJAAN PENGKONDISIAN UDARA / AC
F.1 Lantai 1
1 AC 2 PK daikin 2,00 set 8.000.000,00 16.000.000,00
2 pemipaan dan asesoris2 1,00 ls 3.500.000,00 3.500.000,00
F.2 lantai 2
1 AC 1 PK daikin 2,00 set 4.000.000,00 8.000.000,00
2 AC 1,5 PK Daikin 2,00 set 6.000.000,00 12.000.000,00
3 AC 2 PK daikin 1,00 set 8.000.000,00 8.000.000,00
4 pemipaan dan asesoris2 1,00 ls 7.500.000,00 7.500.000,00

SUM F 55.000.000,00
188.000 225.000

221.000
187.000

219.000 155.000
Shunda Plafon PVC Serat Kayu PL 3077-1

35000/pcs 66.330 0,900

1.989.900
9
221.100 m2

1.800.000
3.378.000
1.223.000 456.000

315.000

57.500
60.000 lbr
210.000 223.000

railing balkon kaca railing stainless


UPVC pintu jendela
tngga putar servis

torn air 1000 liter tangki pendam 2000 liter


pompa transfer dari goundtank
pompa satelit sumur dalam

SWH 200 liter

SEPTIK TANK
FLOORLAMP WALL LAMP
STEP LAMP

ARMATUR SAKLAR DAN STOP KONTAK

lampu sorot taman h703 12v lampu kolam lantai stainless ip68 tanpa trafo 3wat waterproof
spot light 7 watt downlight 12 watt
Genset Silent Honda 15Kva. Tenka Th 16000 Sgt. 3 Phase

Anda mungkin juga menyukai