Anda di halaman 1dari 3

BILL OF QUANTITY PEKERJAAN STRUKTUR

PERENCANAAN DETAIL TEKNIS PABRIK AMDK ( AIR MINUM DALAM KEMASAN ) KABUPATEN SUBANG JAWA BARAT

BILL OF QUANTITY
PEKERJAAN STRUKTUR PABRIK AMDK RANGKA BAJA 60 X 20 M
Ds.Pakuhaji, Kec. Tanjung Siang,Kab.Subang , Prov.Jawa Barat

No Uraian Pekerjaan Satuan Qty Harga Satuan Jumlah Harga

I. PEKERJAAN STRUKTUR & PERSIAPAN


A Pekerjaan Persiapan
1 Pekerjaan Direksi Keet & Gudang m2 48.00 950,000 45,600,000
2 Air Kerja & Listrik Kerja Bln 3.00 2,500,000 7,500,000
3 Mobilisasi Peralatan Dan Pekerja Ls 1.00 18,000,000 18,000,000
4 Keselamatan Kerja K3 dan Rambu rambu ls 1.00 5,000,000 5,000,000

B Pekerjaan Galian & Pondasi


1 Galian tanah biasa sedalam 1 m m3 26.21 85,000 2,227,680
2 Buang tanah sejauh ±15 m m3 15.72 55,000 864,864
3 Urug kembali tanah galian m3 10.48 35,000 366,912
4 Urugan pasir urug m3 1.57 375,000 589,875
5 Lantai kerja beton tumbuk 1:3:5; t. 50 mm m2 1.57 52,500 82,583
Pilecap P1 uk. 300/1000/1000
6 -Beton Readymix K-300 m3 6.50 1,075,000 6,987,500
7 -Bekisting Pondasi m2 31.20 345,000 10,764,000
-Tulangan besi U-24
8 -dia. 10 mm kg 400.83 13,500 5,411,250
Kolom uk. 1000/1440/1000
9 -Beton Readymix K-300 m3 2.15 1,075,000 2,305,875
10 -Bekisting Kolom m2 28.60 345,000 9,867,000
-Tulangan besi U-24
11 -dia. 8 mm kg 92.43 13,500 1,247,805
12 -dia. 10 mm kg 166.75 13,500 2,251,080

C Pekerjaan Tie Beam


1 Galian tanah biasa sedelam 1 m m3 44.64 85,000 3,794,400
2 Buang tanah sejauh ±15 m m3 17.86 55,000 982,080
3 Urug kembali tanah galian m3 26.78 35,000 937,440
4 Urugan pasir urug m3 4.65 375,000 1,743,750
5 Lantai kerja beton tumbuk 1:3:5; t. 50 mm m2 93.00 52,500 4,882,500
Tiebeam TB1 uk. 200/400
6 -Beton Readymix K-300 m3 29.76 1,075,000 31,992,000
7 -Bekisting Pondasi m2 297.60 345,000 102,672,000
-Tulangan besi U-24
8 -dia. 8 mm kg 979.60 13,500 13,224,600
9 -dia. 12 mm kg 1,990.20 13,500 26,867,700

D Pekerjaan Plat lantai dasar


1 Pemadatan tanah m2 1,200.00 11,500 13,800,000
2 Urugan pasir urug m3 60.00 375,000 22,500,000
3 Lantai kerja beton tumbuk 1:3:5; t. 50 mm m2 1,200.00 52,500 63,000,000
4 Beton Readymix K-300 m3 240.00 1,075,000 258,000,000

PARAF: 1
BILL OF QUANTITY PEKERJAAN STRUKTUR
PERENCANAAN DETAIL TEKNIS PABRIK AMDK ( AIR MINUM DALAM KEMASAN ) KABUPATEN SUBANG JAWA BARAT

No Uraian Pekerjaan Satuan Qty Harga Satuan Jumlah Harga

5 Tulangan wiremesh M8-150 m2 1,200.00 71,000 85,200,000

I. PEKERJAAN STRUKTUR & PERSIAPAN Sub jumlah Rp. 748,662,894

II. PEKERJAAN ATAP


A Pekerjaan Struktur Baja
1 Kolom KB1 HB 250x250X9X14 kg 24,852.48 18,500 459,770,969
2 Rangka Kuda-kuda WF 250X125X6X9 kg 12,426.24 18,500 229,885,484
3 Rangka Ikatan antar Kuda Kuda kg 648.00 18,500 11,988,000
4 Gording C 200x75x20x3,2 kg 12,880.56 22,000 283,372,320
5 Trekstang Besi beton Ø 12 kg 510.03 18,500 9,435,617
6 Ikatan angin Besi beton Ø 12 kg 470.80 18,500 8,709,800
7 Besi siku L 40x40x4 kg 217.88 18,500 4,030,854
8 Baud Ø 12 bh 580.00 22,500 13,050,000
9 - Base Plate t.16 mm kg 252.55 24,500 6,187,526
10 - Stiffener t.10 mm kg 1,863.94 24,500 45,666,441
11 - Angker Baut Ø19 p.600 mm bh 156.00 45,000 7,020,000
12 Cat meni Besi kg 55,333.69 3,000 166,001,079
13 Atap Zinkalum Spandex 0,35 mm kg 1,768.00 59,000 104,312,000
14 Nok ZinKalum m 69.00 55,000 3,795,000
15 Talang Air m1 136.00 75,000 10,200,000
16 Plat Penutup Talang Rangka L 40x40x4 m1 136.00 50,000 6,800,000
17 Atao Canopy 6000x3000 m2 144.00 650,000 93,600,000

B Pekerjaan Penggantian Atap Bangunan Lama


1 Bongkar Atap m2 966.00 45,000 43,470,000
2 Atap Zinkalum Spandex 0,35 mm m2 966.00 59,000 56,994,000
3 Nok ZinKalum m 42.00 55,000 2,310,000
4 Talang Air m 42.00 75,000 3,150,000
-

II. PEKERJAAN ATAP Sub jumlah Rp. 1,569,749,090

III. PEKERJAAN LANTAI DAN DINDING


1 Pas. Batako 40x20x10 m3 873.20 99,500 86,883,400
2 Plesteran + Acian Dinding m3 1,746.40 66,400 115,960,960
3 Kolom Praktis 10x10 m1 1,364.00 45,000 61,380,000
4 Pasangan Keramik Lantai 30x30 cm m2 1,200.00 185,000 222,000,000
5 Pintu Besi Plat D1 m2 18.00 750,000 13,500,000
6 Pintu Besi Plat D2 m3 43.20 750,000 32,400,000
7 Kusen Jendela Alumunium Bh 34.00 1,450,000 49,300,000
8 Pekerjaan Cat Dinding m2 3,492.80 23,500 82,080,800
9 Ventilasi Wiremesh Rangka Siku 80x585 Unit 22.00 1,624,000 35,728,000
10 Rabat Beton Tritisan Keliling Bangunan m1 176.00 275,000 48,400,000

III. PEKERJAAN LANTAI DAN DINDING Sub jumlah Rp. 747,633,160

PARAF: 2
BILL OF QUANTITY PEKERJAAN STRUKTUR
PERENCANAAN DETAIL TEKNIS PABRIK AMDK ( AIR MINUM DALAM KEMASAN ) KABUPATEN SUBANG JAWA BARAT

No Uraian Pekerjaan Satuan Qty Harga Satuan Jumlah Harga

IV. PEKERJAAN INSTALASI LISTRIK & AIR HUJAN


A Pekerjaan Listrik
1 Instalasi Titik Lampu NYM 2x2,5 mm ttk 28.00 300,000 8,400,000
2 Lampu Kap Industri Bh 28.00 265,000 7,420,000
3 Instalasi Stop Kontak NYM 3x2,5 mm Ttk 17.00 255,500 4,343,500
4 Saklar seri bh 12.00 45,000 540,000
5 Saklar Engkel bh 6.00 32,500 195,000
6 Instalasi Penangkal Petir (Lightening Protection) Unit 2.00 4,500,000 9,000,000
7 Box MCB Unit 2.00 7,500,000 15,000,000
8 Kabel Toefoer m1 35.00 89,500 3,132,500

IV. PEKERJAAN INSTALASI LISTRIK & AIR HUJAN Sub jumlah Rp. 48,031,000