REKAPITULASI
Kegiatan : Semenisasi Jalan Cipto Magunkusumo Prum TELKOM Kel Sei Keledang
Pekerjaan : Semenisasi Jalan Cipto Magunkusumo Prum TELKOM Kel Sei Keledang
Lokasi : Jalan Cipto Magunkusumo Prum TELKOM
Sumber Dana : Pendapatan Asli Daerah (P A D)
Tahun Anggaran : 2015
A. UMUM 500,000.00
Samarinda, 2015
Dibuat,
Konsultan Perencana
……………….
………………..
Direktur
ENGINEER ESTIMATE (EE)
DAFTAR KUANTITAS DAN HARGA
Kegiatan : Semenisasi Jalan Cipto Magunkusumo Prum TELKOM Kel Sei Keledang
Pekerjaan : Semenisasi Jalan Cipto Magunkusumo Prum TELKOM Kel Sei Keledang
Lokasi : Jalan Cipto Magunkusumo Prum TELKOM
Sumber Dana : Pendapatan Asli Daerah (P A D)
Tahun Anggaran : 2015
A. UMUM
1 Mobilisasi / Demobilisasi Ls 1.00 500,000.00 500,000.00
C. PEKERJAAN STRUKTUR
1 Beton F'c = 20 Mpa m3 58.40 2,298,229.32 134,216,592.47
2 Joint Sealent m' 54.40 23,803.93 1,294,933.58
10
A. UMUM
1 Papan Nama Kegiatan 500,000.00 Err:509 Err:509 80
C. PEKERJAAN STRUKTUR 60
1 Beton Mutu K-250 102,401,238.79 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
40
2 Err:509 Err:509 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 20
Jumlah Harga
NOMOR Uraian Pekerjaan
(Rupiah)
1 Struktur 136,336,976.50
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 136,336,976.50
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 13,633,697.65
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 149,970,674.15
(D) DIBULATKAN 149,970,000.00
Terbilang : "Seratus Empat Puluh Sembilan Juta Sembilan Ratus Tujuh Puluh Ribu Rupiah"
BUDY SANTOSO, ST
NIP. 197703272009011002
RENCANA ANGGARAN BIAYA
OWNER ESTIMATE (OE)
PROGRAM : PROGRAM REHABILITASI/ PEMELIHARAAN JALAN DAN JEMBATAN
KEGIATAN : PEMELIHARAAN/REHABILITASI JALAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
LOKASI : SAMARINDA
SUMBER DANA :-
THN ANGGARAN : 2019
7. STRUKTUR
Pekerjaan Jalan
1. Beton Mutu K-250 M3 52.976 1,932,974.15 102,401,238.79
2. Baja Tulangan Penutup Drainase Kg 444.842 21,279.50 9,466,023.22
4. Pas. Batu Gunung M3 20.240 1,153,779.71 23,352,501.26
3. Galian Tanah M3 10.120 110,396.56 1,117,213.22
A. MOBILISASI LAINNYA
1 Papan Nama Kegiatan Ls 1.00 500,000.00 500,000.00
I. ASUMSI
1 Penghamparan Menggunakan Tenaga manusia Manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal lapis agregat padat t 0.15 M
6 Faktor kembang material (Padat-Lepas) Fk 1.20 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Kasar Ak 35.00 % Gradasi harus
- Agregat Halus Ah 20.00 % memenuhi Spec.
- Sirtu St 45.00 %
II. URUTAN KERJA
1 Wheel Loader mencampur dan memuat Agregat ke
dalam Dump Truck di Base Camp
2 Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan tenaga manusia
3 Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Tandem
Roller atau Pneumatic Tire Roller
4 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
- Agregat Kasar = Ak x 1 M3 x Fk M03 0.4200 M3
- Agregat Halus = Ah x 1 M3 x Fk M04 0.2400 M3
- Sirtu = St x 1 M3 x Fk M16 0.5400 M3
2. ALAT
2.a. WHEEL LOADER
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Mencampur T1 1.50 menit
- Memuat dan lain-lain T2 0.50 menit
Ts1 2.00 menit
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader jam 0.0357 460,535.35 16,440.35
2. Dump Truck jam 0.1452 409,420.45 59,442.27
3. Three Wheel Roller 6 - 8 T jam 0.0178 320,876.39 5,727.38
4. Alat Bantu Ls 1.0000 1,000.00 1,000.00
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 28.01 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 196.09 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt 0.2499 jam
- Mandor = (Tk x M) : Qt 0.0357 jam
A. TENAGA
1 Pekerja Tidak TerlatiL.101 Jam 1.2500 13,571.43 16,964.29
2 Mandor L.061 Jam 0.2500 25,000.00 6,250.00
B. BAHAN
1 Pasir Urug Pasanga M.081 M3 1.1500 217,075.00 249,636.25
C. PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
I ASUMSI
1 Menggunakan alat Manual
2 Lokasi Kegiatan : sepanjang jalan
3 Kondisi jalan : sedang / baik
4 Jam kerja efektif per hari Tk 7.00 Jam
5 Faktor pengembangan material Fk 1.10 ---
6 Tebal hamparan padat t 0.10 M
II METODE PELAKSANAAN
2 ALAT BANTU
Di perlukan Alat-Alat Bantu Kecil
- Sekop = 3 buah
3 TENAGA
Produksi Menentukan = Pekerja Q1 4.00 M3/Jam
Produksi Per Hari = Tk x Q1 Qt 28.00 M3
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P 5.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101 1.2500 Jam
- Mandor = (Tk x M) : Qt L.061 0.2500 Jam
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 7.0 KM
5 Tebal Lapis Beton t 0.20 m
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Kadar Semen Minimum (Spesifikasi) Ks 340 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp. 1.00 : Semen Sm 15.4 % Berdasarkan
2.25 : Pasir Beton Ps 34.6 % JMF & sesuai
3.25 : Agregat Kasar Pl Kr 50.0 % dgn Spesifikasi
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.40 T/M3
- Pasir Beton D3 1.80 T/M3
- Agregat Kasar ex palu D4 1.80 T/M3
1. BAHAN
1.a. Beton Ready Mix K - 250 1.000 M3
1.d. Kayu Bekisting 0.2000 M3
1.e. Paku 0.0200 Kg
1.f. Plastik Cor 1.0000 M2
2. ALAT
2.a. CONCRETE VIBRATOR
Kebutuhan Alat Penggetar Beton ini disesuaikan dgn
kapasitas produksi beton yang diterima dilapangan
3. TENAGA
Produksi Beton dalam 1 hari Qt 15.85 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt 0.4416 jam
- Tukang = (Tk x Tb) : Qt 0.8833 jam
- Pekerja = (Tk x P) : Qt 3.5331 jam
Rp. 2,298,229.32 / M3
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 7.0 KM
5 Tebal Lapis Beton t 0.20 m
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Kadar Semen Minimum (Spesifikasi) Ks 340 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp. 1.00 : Semen Sm 16.7 % Berdasarkan
2.00 : Pasir Beton Ps 33.3 % JMF & sesuai
3.00 : Agregat Kasar Pl Kr 50.0 % dgn Spesifikasi
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.40 T/M3
- Pasir Beton D3 1.80 T/M3
- Agregat Kasar ex palu D4 1.80 T/M3
1. BAHAN
1.a. Beton Ready Mix K - 175 1.000 M3
2. ALAT
1.b. ALAT BANTU
Diperlukan :
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 2 buah
- Ember Cor = 4 buah
- Gerobak Dorong = 1 buah
- Jidar Dorong = 1 buah
- Garitan Tekstur = 1 buah
3. TENAGA
Produksi Beton dalam 1 hari Qt 20.00 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt 0.3500 jam
- Tukang = (Tk x Tb) : Qt 1.4000 jam
- Pekerja = (Tk x P) : Qt 7.0000 jam
Rp. 1,648,100.00 / M3
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan 1.1000 Kg
1.b. Kawat beton 0.0500 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt 0.0350 jam
- Pekerja = ( P x Tk ) : Qt 0.1050 jam
Rp. 19,345.00 / Kg
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (Aspalt) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan Fh 1.10 -
1. BAHAN
1.a. Diamond Blade 0.0013 Bh
1.b. Sealent 0.2345 Kg
2. ALAT
2.a. CONCRETE CUTTER
Kapasitas Alat di ambil estimasi V 35.00 M¹/jam
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : Ts 25.00 Menit
2.b. COMPRESSOR
Kapasitas Alat di ambil estimasi V 400.00 M²/jam
Aplikasi ke Joint Sealent di ambil rata-rata Ap 0.40 Ltr/M²
3. TENAGA
Produksi kerja 1 hari Qt 84.00 M1
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / M1 :
- Mandor = (Tk x M) : Qt 0.0833 jam
- Pekerja = (Tk x P) : Qt 0.2500 jam
Rp. 23,803.93 / M1
Paket Pekerjaan : Peningkatan Sarana dan Prasarana Jalan A.M. Sangaji Gg. 14 kel. Bandara
Tahun Anggaran : 2018
Pekerjaan : Beton K-250 (Manual)
Satuan : m3
A. TENAGA
1. Pekerja jam 12.86275 13,571.43 174,565.83
2. Tukang jam 6.43137 21,428.57 137,815.13
3. Mandor jam 1.60784 25,000.00 40,196.08
B. BAHAN
Semen 50 kg zak 8.97196 70,000.00 628,037.38
Pasir Beton m3 0.40293 380,000.00 153,114.33
Batu Pecah m3 0.85234 280,250.00 238,867.29
Bekisting M3 0.20000 30,000.00 6,000.00
Paku Kg 1.20000 19,000.00 22,800.00
C. PERALATAN
Alat Bantu ls. 1.00000 1,000.00 1,000.00
Concrete Mixer jam 1.60784 139,060.93 223,588.16
Concrete Vibrator jam 1.60784 65,554.00 105,400.55
Water Tank Truck jam 0.07664 337,500.00 25,864.49
JUMLAH 1,757,249.23
OVERHEAD 10% 175,724.92
JUMLAH + OVERHEAD 1,932,974.15
ANALISA TEKNIS
Paket Pekerjaan : Peningkatan Sarana dan Prasarana Jalan A.M. Sangaji Gg. 14 kel. Bandara
Tahun Anggaran : 2018
Pekerjaan : Beton K-250 (Manual)
Satuan : m3
A ASUMSI
1. Menggunakan alat (cara mekanik)
2. Bahan dasar (batu, pasir dan semen) diterima seluruhnya di lokasi
pekerjaan.
3. Jarak rat-rata Base Camp ke Lokasi Pekerjaan L 0.50 Km
4. Jam kerja Efektif Tk 7.00 Jam
5. Perband. Campuran 1.00 : Semen Sm 18.69 %
1.50 : Pasir Ps 28.04 %
2.85 : Batu Pecah Kr 53.27 %
6. Berat Jenis Material :
- Beton D1 2.40 T/M3
- Semen D2 3.15 T/M3
- Pasir Beton D3 1.67 T/M3
- Batu Pecah D4 1.50 T/M3
B URUTAN KERJA
1. Semen, Pasir, Batu Pecah dan Air dicampur dan diaduk menjadi
beton dengan Concrete Mixer.
2. Beton dicor ke dalam bekisting & pembesian yang telah disiapkan.
3. Penyelesaian dan perapian setelah pengecoran.
2. ALAT
2a. CONCRETE MIXER
Kapasitas Alat V 500.00 Liter
Faktor Efisiensi Alat Fa 0.85
Waktu Siklus Ts
- Memuat T1 15.00 Menit
- Mengaduk T2 12.00 Menit
- Menuang T3 9.00 Menit
- Tunggu dll. T4 5.00 Menit
Ts 41.00 Menit
V x Fa x 60 M3
Kap. Prod./jam = Q1 0.62
1000 x Ts
V x Fa x n Q3 13.0488 M3
Kap. Prod./jam =
Wc
3. TENAGA
Produksi beton dlm 1 hari = Tk x Q1 Qt 4.35 M3
Kebutuhan tenaga kerja
- Mandor M 1.00 Orang
- Tukang Batu T 4.00 Orang
- Pekerja P 8.00 Orang
Koefisien Tenaga/M3 :
- Mandor = (Tk x M) / Qt 1.6078 Jam
- Tukang Batu = (Tk x T) / Qt 6.4314 Jam
- Pekerja = (Tk x P) / Qt 12.8627 Jam
ITEM PEMBAYARAN NO. : 7.1.(7).a Analisa EI-717
JENIS PEKERJAAN : Beton fc' 20 Mpa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (beton fc' 20 Mpa) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Batching Plant ke lokasi pekerjaan L 9.00 KM
5 Jarak rata-rata Langsiran ke lokasi pekerjaan L1 0.70 KM
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat volume beton D 1.5 ton/m3
8 Faktor pengembangan bahan Fk 1.2
2. ALAT
2.a. Concrete Vibrator
Kapasitas Getar bk 15.00 Menit/M3 (padat)
Faktor efesiensi Fa 0.83
Kapasitas prod/jam = Fa x 60 Q1 3.320 M3
bk
Koefesien alat/M3 = 1 : Q1 0.3012 jam
3. TENAGA
Perkiraan produksi dalam 1 Hari Qt 12.00 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.5833 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.9167 jam
- Pekerja = (Tk x P) : Qt (L01) 4.0833 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 2,305,069.94 / M3
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan Tenaga Manusia (cara manual)
2 Lokasi pekerjaan : sepanjang saluran
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
3. TENAGA
Produksi Galian dalam 1 hari Qt 25.00 M3
Kebutuhan tenaga :
- Pekerja P 6.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt 1.6800 Jam
- Mandor = (Tk x M) : Qt 0.2800 Jam
Rp. 100,360.51 / M3
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 20 % Kuat Tekan min.
: - Volume Pasir Ps 80 % 50 kg/cm2
7 Perbandingan Batu & Mortar :
- Batu Bt 60 %
- Mortar (campuran semen & pasir) Mr 40 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu gunung D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.67 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 1.10 M3
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 0.11 M3
x {D5 x (1000)} 161.00 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 0.48 M3
2. ALAT
2.a. ALAT BANTU Lump Sum
Diperlukan :
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 2 buah
- Ember Cor = 6 buah
- Gerobak Dorong = 2 buah
3. TENAGA
Produksi Pas. Batu yang menentukan ( Prod. Manual Mixer ) Q1 0.50 M3/Jam
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 3.50 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt 2.0000 jam
- Tukang = (Tk x Tb) : Qt 4.0000 jam
- Pekerja = (Tk x P) : Qt 8.0000 jam
Rp. 1,048,890.64 / M3
ASUMSI
I.
1 Menggunakan Tenaga Manusia
2 Lokasi pekerjaan sekitar jalan
3 Ulin Diantar oleh supleyer ke lokasi pekerjaan
4 Jarak Rata - Rata base camp kelokasi -pekerjaan L 5.0 Km
5 Jam Kerja Efektif per hari Tk 7.00 Jam
2. ALAT
ALAT BANTU
3. TENAGA
Kapasitas Produksi / Jam ( Asumsi ) Q1 20.00 titik
Produksi Dalam 1 Hari ( TK X Q 1) Qt 140.00 titik
Kebutuhan tenaga tambahan :
- Pekerja P 2.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA
NO UPAH / BAHAN / ALAT SATUAN
SATUAN
(Rp).
1 2 3 4
A UPAH
1 Mandor 1.00 Jam 25,000.00
2 Kepala tukang 1.00 Jam 22,142.86
3 Tukang 1.00 Jam 21,428.57
4 Pekerja 1.00 Jam 13,571.43
5 Operator 1.00 Jam 22,142.86
6 Pembantu operator 1.00 Jam 13,571.43
7 Mekanik 1.00 Jam 22,142.86
8 Pembantu Mekanik 1.00 Jam 13,571.43
9 Sopir 1.00 Jam 22,142.86
10 Pembantu sopir 1.00 Jam 13,571.43
11 Wakar 1.00 Jam 4,522.33
B BAHAN
1 Aggregat kasar ex palu 1.00 M3 625,000.00
2 Pasir beton ex palu 1.00 M3 380,000.00
3 Pasir Pasang 1.00 M3 217,075.00
4 Agregat halus kelas B 1.00 M3 427,500.00
5 Agregat kasar kelas B 1.00 M3 427,500.00
6 Sirtu 1.00 M3 280,250.00
7 Batu Gunung 1.00 M3 430,350.00
8 Bensin 1.00 Ltr 12,250.00
9 Kayu bekisting 1.00 M3 1,430,000.00
10 Bekisting 1.00 Hari 30,000.00
11 Minyak pelumas 1.00 Ltr 43,000.00
12 Paku biasa 1.00 Kg 19,000.00
13 Plastik cor 1.00 M2 1,000.00
14 Semen 1.00 Kg 1,400.00
15 Solar 1.00 Ltr 12,250.00
16 Diamond Blade 1.00 Kg 1,300,000.00
17 Sealent /aspal 1.00 Kg 48,492.61
18 Baja Tulangan 1.00 Kg 12,825.00
19 Kawat Bendrat 1.00 Kg 23,750.00
20 Pipa PVC Ø 3/4" 1.00 Btg 35,625.00
21 Balok Ulin 8/8 1.00 M3 5,700,000.00
22 Beton Ready Mix K - 175 1.00 M3 1,513,350.00
23 Beton Ready Mix K - 225 1.00 M3 1,590,300.00
24 Beton Ready Mix K - 250 1.00 M3 1,700,000.00
25 Beton Ready Mix K - 275 1.00 M3 1,699,550.00
26 Beton Ready Mix K - 300 1.00 M3 1,731,850.00
27 Beton Ready Mix K - 350 1.00 M3 1,824,000.00
28 Beton Ready Mix K - 400 1.00 M3 1,919,000.00
29 Beton Ready Mix K - 500 1.00 M3 2,244,850.00
C ALAT
3 Concrete Mixer 0.3 - 0.6 m3 1.00 Jam 139,060.93
4 Compressor 4000/6500 L/M 1.00 Jam 205,021.23
6 Concrete Vibrator 1.00 Jam 65,554.00
7 Three Wheel Roller 6 - 8 T 1.00 Jam 320,876.39
8 Wheel Loader WA 180 1.00 Jam 460,535.35
9 Dump Truck 3 - 4 M3 1.00 Jam 409,420.45
10 Exavator 80-140 HP 1.00 Jam 721,553.98
11 Tamper 1.00 Jam 68,276.87
12 Concrete Cutter 1.00 Jam 68,950.76
13 Alat Bantu 1.00 Ls 1,000.00
14 Flat Bed Truck 1.00 Jam 337,140.00
ANALISA BIAYA PERALATAN PER JAM KERJA
PROGRAM PROGRAM REHABILITASI/ PEMELIHARAAN JALAN DAN JEMBATAN
KEGIATAN PEMELIHARAAN/REHABILITASI JALAN
PEKERJAAN PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
LOKASI SAMARINDA
SUMBER DANA -
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA TOTAL
ALAT ALAT ALAT JAM SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA
UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK OPERATOR PEMBANTU BIAYA ALAT
ALAT 1 TAHUN ALAT MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
MODAL / SOPIR / JAM JAM KERJA
(HP) - (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
No. JENIS PERALATAN
KODE f1 x HP x 1 Orang 1 Orang
ALAT i(1+i)^A (B - C) x D 0.002 x B 0.125 0.01 Harga BBM 0.125 (g1 x B') Per Per
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d ----------- Jam Kerja Jam Kerja F+G+H+I E+J
(1+i)^A-1 W W 0.175 0.02 f2 x HP x 0.175 W = =
Harga Olie Rp22,142.9 Rp22,142.9
HP Cp B A W B C D e1 e2 E f1 f2 F g1 G H I J K L
1 2 2a 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 Asphalt Maxing Plant 100.0 50.0 T/jam 3,935,000,000 8.0 1,470.0 3,935,000,000 393,500,000 0.26061 627,855.97 5,353.74 633,209.71 0.1250 0.0100 5,341,125.00 0.1250 334,608.84 22,142.86 66,428.57 5,764,305.27 6,397,514.98 Alat Baru
2 Asphalt sprayer 10.0 800.0 Ltr 8,000,000 8.0 1,470.0 8,000,000 800,000 0.26061 1,276.45 10.88 1,287.34 0.1250 0.0100 2,239.29 0.1250 680.27 22,142.86 22,142.86 47,205.27 48,492.61 Alat Baru
3 Batching Plant 100.0 40.0 T/jam 1,300,000,000 10.0 1,470.0 1,300,000,000 130,000,000 0.23852 189,844.64 1,768.71 191,613.35 0.1250 0.0100 196,125.00 0.1250 110,544.22 22,142.86 22,142.86 350,954.93 542,568.28 Alat Baru
4 Concrete Mixer Truck 125.0 9.0 Ton 650,000,000 5.0 1,470.0 650,000,000 65,000,000 0.33438 133,069.47 884.35 133,953.83 0.1250 0.0100 245,156.25 0.1250 55,272.11 22,142.86 22,142.86 344,714.07 478,667.90 Alat Baru
5 Buldozer D 8 215.0 0.0 1,219,000,000 10.0 1,470.0 1,219,000,000 121,900,000 0.23852 178,015.86 1,658.50 179,674.37 0.1250 0.0100 421,668.75 0.1250 103,656.46 22,142.86 22,142.86 569,610.93 749,285.29 Alat Baru
6 Compressor 4000/6500 L/M 77.0 370.0 CFM 21,000,000 8.0 1,470.0 21,000,000 2,100,000 0.26061 3,350.69 28.57 3,379.26 0.1250 0.0100 151,016.25 0.1250 1,785.71 22,142.86 22,142.86 197,087.68 200,466.94 Alat Baru
7 Concrete Mixer 0.3 - 0.6 m3 15.0 500.0 Liter 8,000,000 4.0 1,470.0 8,000,000 800,000 0.38629 1,892.03 10.88 1,902.91 0.1250 0.0100 29,418.75 0.1250 680.27 22,142.86 22,142.86 74,384.74 76,287.65 Alat Baru
8 Concrete Vibrator 9.0 4,000,000 5.0 2,000.0 4,000,000 400,000 0.33438 601.88 4.00 605.88 0.1250 0.0100 17,651.25 0.1250 250.00 22,142.86 22,142.86 62,186.96 62,792.85 Alat Baru
9 Dump Truck 3 - 4 M3 113.0 6.0 Ton 430,350,000 4.0 1,470.0 430,350,000 43,035,000 0.38629 101,779.30 585.51 102,364.81 0.1250 0.0100 221,621.25 0.1250 36,594.39 22,142.86 22,142.86 302,501.35 404,866.16 Alat Baru
10 Excavator PC 200 133.0 0.5 M3 917,000,000 15.0 2,000.0 917,000,000 91,700,000 0.21388 88,258.46 917.00 89,175.46 0.1250 0.0100 260,846.25 0.1250 57,312.50 22,142.86 22,142.86 362,444.46 451,619.92 Alat Baru
11 Flat Bed Truck 3 - 4 M3 100.0 4.0 M3 325,000,000 5.0 1,470.0 325,000,000 32,500,000 0.33438 66,534.74 442.18 66,976.91 0.1250 0.0100 196,125.00 0.1250 27,636.05 22,142.86 22,142.86 268,046.77 335,023.68 Alat Baru
12 Generator Set 135.0 125.0 KVA 55,000,000 5.0 1,470.0 55,000,000 5,500,000 0.33438 11,259.72 74.83 11,334.55 0.1250 0.0100 264,768.75 0.1250 4,676.87 22,142.86 22,142.86 313,731.34 325,065.89 Alat Baru
13 Motor Grader GD 511A-1/S1 135.0 3.1 M1 1,007,000,000 10.0 1,470.0 1,007,000,000 100,700,000 0.23852 147,056.58 1,370.07 148,426.65 0.1250 0.0100 264,768.75 0.1250 85,629.25 22,142.86 22,142.86 394,683.72 543,110.37 Alat Baru
14 Wheel Loader WA 180 110.0 1.5 M3 822,385,000 9.0 1,470.0 822,385,000 82,238,500 0.24808 124,908.26 1,118.89 126,027.15 0.1250 0.0100 215,737.50 0.1250 69,930.70 22,142.86 22,142.86 329,953.91 455,981.06 Alat Baru
15 Three Wheel Roller 6 - 8 T 64.0 8.0 Ton 541,650,000 6.0 1,470.0 541,650,000 54,165,000 0.30071 99,720.78 736.94 100,457.71 0.1250 0.0100 125,520.00 0.1250 46,058.67 22,142.86 22,142.86 215,864.39 316,322.10 Alat Baru
16 Tandem Roller 6 - 8 T 40.0 8.0 Ton 755,000,000 10.0 1,470.0 755,000,000 75,500,000 0.23852 110,255.93 1,027.21 111,283.14 0.1250 0.0100 78,450.00 0.1250 64,200.68 22,142.86 22,142.86 186,936.39 298,219.53 Alat Baru
17 P. Tire Roller 8 - 10 T 90.0 10.0 Ton 890,000,000 10.0 1,470.0 890,000,000 89,000,000 0.23852 129,970.56 1,210.88 131,181.45 0.1250 0.0100 176,512.50 0.1250 75,680.27 22,142.86 22,142.86 296,478.49 427,659.93 Alat Baru
18 Vibratory Roller BW 21 126.0 10.0 Ton 720,000,000 15.0 1,470.0 720,000,000 72,000,000 0.21388 94,282.73 979.59 95,262.32 0.1250 0.0100 247,117.50 0.1250 61,224.49 22,142.86 22,142.86 352,627.70 447,890.03 Alat Baru
19 Concrete Cutter 9.0 10,000,000 8.0 1,470.0 10,000,000 1,000,000 0.26061 1,595.57 13.61 1,609.17 0.1250 0.0100 17,651.25 0.1250 850.34 22,142.86 22,142.86 62,787.30 64,396.48 Alat Baru
20 Water Tanker 3000 - 4500 L 100.0 4,000.0 Ltr 325,000,000 5.0 1,470.0 325,000,000 32,500,000 0.33438 66,534.74 442.18 66,976.91 0.1250 0.0100 196,125.00 0.1250 27,636.05 22,142.86 22,142.86 268,046.77 335,023.68 Alat Baru
KETERANGAN : 1. Tingkat Suku Bunga = 20.00 % per-tahun
2. Upah Operator / Sopir / Mekanik = 22,143 Rupiah per-orang/jam Samarinda, ………….........……2015
3. Upah Pembantu Operator/Sopir/Mekanik = 22,143 Rupiah per-orang/jam
4. Harga Bahan Bakar Bensin = 12,250 Rupiah per-liter
5. Harga Bahan Bakar Solar = 12,250 Rupiah per-liter
6. Minyak Pelumas = 43,000 Rupiah per-liter
7. Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
8. Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16) ...............................
dan untuk biaya Upah (Pembantu Operator/sopir) menjadi 3 orang per jam kerja, (Kolom 20) .............
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAANHARGA JUMLAH
NO. KOMPONEN SATUANKUANTITASSATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
#REF!
1,000.00
#DIV/0!
#DIV/0!
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 0.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan D 1.60 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.00 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.90 -
Faktor Konversi (<40 %) Fv 0.9
Waktu siklus Ts1
- Menggali, memuat dan berputar T1 1.0 menit
Waktu siklus = T1 x Fv Ts1 1.80 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 0.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 0.00 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) #DIV/0! Jam
- Mandor = (Tk x M) : Qt (L03) #DIV/0! Jam
Rp. #DIV/0! / M3
PERKIRAANHARGA JUMLAH
NO. KOMPONEN SATUANKUANTITASSATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
###
###
###
###
#DIV/0!
1,000.00
#DIV/0!
#DIV/0!
JENIS PEKERJAAN : Pasangan Batu Dengan Mortar untuk Saluran
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerj L 0.0 KM
5 Jam kerja efektif per-hari Tk 0.00 jam
6 Perbandingan Pasir : - Volume Semen Sm 20 % Kuat Tekan min.
: - Volume Pasir Ps 80 % 50 kg/cm2
7 Perbandingan Batu & Mortar :
- Batu Bt 60 %
- Mortar (campuran semen & pasir) Mr 40 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.67 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu ----{(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.08 M3 Lepas
1.b. Semen --Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 0.1067
x {D5 x (1000)} (M12) 200 Kg
1.c. Pasir ----Ps x {(Mr x D1 x 1 M3) : D4} x 1. (M01) 0.5978 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 0.00 Liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklu(T1 + T2 + T3 + T4)
- Memuat T1 2.00 menit
- Mengaduk T2 2.00 menit
- Menuang T3 1.00 menit
- Menunggu, dll. T4 1.00 menit
Ts1 6.00 menit
3. TENAGA
Produksi Pas. Batu y ( Prod. C. Mixer ) Q1 0.00 M3/Jam
Produksi Pasangan Batu dalam 1 hari = T Qt 0.00 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) #DIV/0! jam
- Tukang = (Tk x Tb) : Qt (L02) #DIV/0! jam
- Pekerja = (Tk x P) : Qt (L01) #DIV/0! jam
Rp. #DIV/0! / M3
HARGA
NO UPAH / BAHAN / ALAT SATUAN
SATUAN
(Rp).
1 2 3 4
A UPAH
1 Mandor 1.00 Jam 19,000.00
2 Kepala tukang 1.00 Jam 17,100.00
3 Tukang 1.00 Jam 15,700.00
4 Pekerja 1.00 Jam 11,400.00
5 Operator 1.00 Jam 17,100.00
6 Pembantu operator 1.00 Jam 11,400.00
7 Mekanik 1.00 Jam 17,100.00
8 Pembantu Mekanik 1.00 Jam 11,400.00
9 Sopir 1.00 Jam 17,100.00
10 Pembantu sopir 1.00 Jam 11,400.00
11 Wakar 1.00 Jam 5,000.00
B BAHAN
1 Agregat halus ex palu 1.00 M3 385,000.00
2 Agregat kasar ex palu 1.00 M3 380,000.00
3 Agregat halus (lokal) 1.00 M3 350,000.00
4 Agregat kasar (lokal) 1.00 M3 350,000.00
5 Agregat Klas C ( Sirtu Lokal) 1.00 M3 332,000.00
6 Aspal 1.00 Kg 11,500.00
7 Batu gunung 1.00 M3 350,000.00
8 Batu padas 1.00 M3 135,000.00
9 Batu kerikil Palu 1.00 M3 385,000.00
10 Baja tulangan 1.00 Kg 18,637.00
11 Bensin 1.00 Ltr 4,500.00
12 Chiping 1.00 M3 286,760.00
13 Filler 1.00 Kg 1,000.00
14 Kawat Bendrat 1.00 Kg 22,627.00
15 Kayu ulin 1.00 M3 4,800,000.00
16 Kayu bekisting 1.00 M3 2,625,000.00
17 Kayu bakar 1.00 M3 1,181,000.00
18 Kerosen/Minyak Tanah 1.00 Ltr 8,000.00
19 Minyak Pelumas 1.00 Ltr 30,000.00
20 Pasir urug 1.00 M3 110,250.00
21 Pasir pasang 1.00 M3 130,000.00
22 Pasir Beton 1.00 M3 320,000.00
23 Paku biasa 1.00 Kg 18,112.00
24 Plastik Cor 1.00 M2 3,500.00
25 Semen 1.00 Kg 1,600.00
26 Solar 1.00 Ltr 10,600.00
27 Tanah urug biasa 1.00 M3 75,000.00
28 Tanah urug pilihan 1.00 M3 90,000.00
29 Diamond Blade 1.00 Bh 1,200,000.00
30 Sealent 1.00 Kg 50,000.00
31 Pipa PVC ½" - AW 1.00 M1 4,000.00
32 Beton Ready Mix K - 175 1.00 M3 1,200,000.00
33 Beton Ready Mix K - 225 1.00 M3 1,300,000.00
34 Beton Ready Mix K - 250 1.00 M3 1,350,000.00
35 Beton Ready Mix K - 275 1.00 M3 1,400,000.00
36 Beton Ready Mix K - 300 1.00 M3 1,450,000.00
37 Beton Ready Mix K - 350 1.00 M3 1,500,000.00
38 Beton Ready Mix K - 500 1.00 M3 1,700,000.00
C ALAT
1 Asphalt Maxing Plant 1.00 Jam -
2 Asphalt sprayer 1.00 Jam -
3 Batching Plant 1.00 Jam -
4 Concrete Mixer Truck 1.00 Jam -
5 Buldozer D 8 1.00 Jam -
6 Compressor 4000/6500 L/M 1.00 Jam -
7 Concrete Mixer 0.3 - 0.6 m3 1.00 Jam -
8 Concrete Vibrator 1.00 Jam -
9 Dump Truck 3 - 4 M3 1.00 Jam -
10 Excavator PC 200 1.00 Jam -
11 Flat Bed Truck 3 - 4 M3 1.00 Jam -
12 Generator Set 1.00 Jam -
13 Motor Grader GD 511A-1/S1 1.00 Jam -
14 Wheel Loader WA 180 1.00 Jam -
15 Three Wheel Roller 6 - 8 T 1.00 Jam -
16 Tandem Roller 6 - 8 T 1.00 Jam -
17 P. Tire Roller 8 - 10 T 1.00 Jam -
18 Vibratory Roller BW 21 1.00 Jam -
19 Concrete Cutter 1.00 Jam -
20 Water Tanker 3000 - 4500 L 1.00 Jam -
21 Stamper 1.00 Jam 25,000.00
ANALISA BIAYA PERALATAN PER JAM KERJA
PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
SUMBER DANA :
### : Err:509
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA TOTAL
ALAT ALAT ALAT JAM SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA
UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK OPERATOR PEMBANTU BIAYA ALAT
ALAT 1 TAHUN ALAT MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
MODAL / SOPIR / JAM JAM KERJA
(HP) - (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) % % (Rp.) - (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
No. JENIS PERALATAN KODE f1 x HP x 1 Orang 1 Orang
ALAT i(1+i)^A (B - C) x D 0.002 x B 0.12 0.025 Harga BBM 0.0625 (g1 x B') 0.125 (g1 x B') Per Per
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d ----- s/d ----------- Jam Kerja Jam Kerja F+G+H+I E+J
(1+i)^A-1 W W 0.15 0.03 f2 x HP x 0.0875 W 0.175 W = =
Harga Olie Rp22,142.9 Rp13,571.4
HP Cp B A W B C D e1 e2 E f1 f2 F g1 G g1 G H I J K L
1 2 2a 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 17 18 19 20 21 22 23
1 Batching Plant 150.0 20.0 Ton 2,500,000,000 10.0 1,500.0 2,500,000,000 250,000,000 0.19925 298,878.09 3,333.33 302,211.43 0.15 0.015 372,375.00 0.0875 145,833.33 0.15 250,000.00 22,142.86 13,571.43 803,922.62 1,106,134.05 Alat Baru
2 Concrete Mixer Truck 60.0 12.0 Ton 750,000,000 5.0 2,000.0 750,000,000 75,000,000 0.29832 100,681.50 750.00 101,431.50 0.15 0.015 148,950.00 0.0875 32,812.50 0.15 56,250.00 22,142.86 13,571.43 273,726.79 375,158.28 Alat Baru
3 Compressor 4000/6500 L/M 60.0 5,000.0 150,300,000 5.0 2,000.0 150,300,000 15,030,000 0.29832 20,176.57 150.30 20,326.87 0.1200 0.0275 159,150.00 0.0875 6,575.63 0.1250 9,393.75 22,142.86 13,571.43 210,833.66 231,160.53 Alat Baru
4 Concrete Mixer 0.3 - 0.6 m3 20.0 500.0 Liter 243,000,000 2.0 4,000.0 243,000,000 24,300,000 0.61512 33,631.48 121.50 33,752.98 0.1200 0.0275 53,050.00 0.0875 5,315.63 0.1250 7,593.75 22,142.86 13,571.43 101,673.66 135,426.64 Alat Baru
5 Concrete Vibrator 20.0 5.0 7,650,000 4.0 500.0 7,650,000 765,000 0.35027 4,823.15 30.60 4,853.75 0.1500 0.0300 62,550.00 0.0625 956.25 0.1750 2,677.50 22,142.86 13,571.43 101,898.04 106,751.79 Alat Baru
6 Dump Truck 3 - 4 M3 120.0 8.0 Ton 81,000,000 5.0 3,000.0 81,000,000 8,100,000 0.29832 7,249.07 54.00 7,303.07 0.1200 0.0275 318,300.00 0.0875 2,362.50 0.1250 3,375.00 22,142.86 13,571.43 359,751.79 367,054.85 Alat Baru
7 Exavator 80-140 HP 133.0 0.9 M3 1,386,000,000 5.0 2,000.0 1,386,000,000 138,600,000 0.29832 186,059.41 1,386.00 187,445.41 0.1500 0.0150 330,172.50 0.0875 60,637.50 0.1500 103,950.00 22,142.86 13,571.43 530,474.29 717,919.70 Alat Baru
8 Tamper 4.7 121.0 Ton 25,650,000 4.0 1,000.0 25,650,000 2,565,000 0.35027 8,085.88 51.30 8,137.18 0.1500 0.0300 14,699.25 0.0625 1,603.13 0.1750 4,488.75 22,142.86 13,571.43 56,505.41 64,642.59 Alat Baru
9 Concrete Cutter 15.0 10,000,000 8.0 1,000.0 10,000,000 1,000,000 0.22285 2,005.65 20.00 2,025.65 0.1200 0.0250 38,175.00 0.0625 625.00 0.1250 1,250.00 22,142.86 13,571.43 75,764.29 77,789.94 Alat Baru
10 Water Tanker 3000 - 4500 L 75.0 5,000.0 Ltr 90,000,000 3.0 1,075.0 90,000,000 9,000,000 0.43798 33,001.05 167.44 33,168.50 0.1500 0.0300 234,562.50 0.0625 5,232.56 0.1750 14,651.16 22,142.86 13,571.43 290,160.51 323,329.00 Alat Baru
KETERANGAN : 1. Tingkat Suku Bunga = 15.00 % per-tahun
2. Upah Operator / Sopir / Mekanik = 22,143 Rupiah per-orang/jam
3. Upah Pembantu Operator/Sopir/Mekanik = 13,571 Rupiah per-orang/jam
4. Harga Bahan Bakar Bensin = 12,250 Rupiah per-liter
5. Harga Bahan Bakar Solar = 12,250 Rupiah per-liter
6. Minyak Pelumas = 43,000 Rupiah per-liter
7. Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
PERHITUNGAN VOLUME PEKERJAAN
Program : Semenisasi Jalan Cipto Magunkusumo Prum TELKOM Kel Sei Keledang
Kegiatan : Semenisasi Jalan Cipto Magunkusumo Prum TELKOM Kel Sei Keledang
Lokasi : Jalan Cipto Magunkusumo Prum TELKOM
Sumber Dana : Pendapatan Asli Daerah (P A D)
Tahun Anggaran : 2015
SKETSA
a b c d e
Link 2
0+100.00
75.00 1.00 1.00 75.00
0+175.00
TOTAL 75.00
PERHITUNGAN VOLUME PEKERJAAN
Program : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
Kegiatan : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
Lokasi : SAMARINDA
Sumber Dana : Pendapatan Asli Daerah (P A D)
Tahun Anggaran : 2015
SKETSA
CL
Lapis Pondasi Agregat Klas B
Rencana Beton K-250
t = 10 cm
a b c d e
Link 1
0+000.00
220.00 4.00 0.05 44.00
0+220.00
Link 2
0+000.00
96.00 4.00 0.05 19.20
0+096.00
Link 3
0+000.00
42.00 4.00 0.05 8.40
0+042.00
Link 4
0+000.00
166.00 3.50 0.05 29.05
0+166.00
Link 5 (A)
0+000.00
30.00 3.50 0.05 5.25
0+030.00
Link 5 (B)
0+000.00
Err:509 4.00 0.05 Err:509
Err:509
TOTAL Err:509
PERHITUNGAN VOLUME PEKERJAAN
Program : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
Kegiatan : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
Lokasi : SAMARINDA
Sumber Dana : Pendapatan Asli Daerah (P A D)
Tahun Anggaran : 2015
SKETSA
C
L Beton K-250, t = 20 cm
0.20 m
a b c d e
Link 1
0+000.00 4.00
73.00 0.20 58.40
0+073.00 4.00
TOTAL 58.40
PERHITUNGAN VOLUME PEKERJAAN
Program : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
Kegiatan : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
Lokasi : SAMARINDA
Sumber Dana : Pendapatan Asli Daerah (P A D)
Tahun Anggaran : 2015
SKETSA
5.00 m
a b c = ((b/5)-1) d e=cxd
Link 1
0+000.00
73.00 13.60 4.00 54.40
0+073.00
TOTAL 54.40
PERHITUNGAN VOLUME PEKERJAAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC.
SAMARINDA ULU
Data Umum
lebar (m) panjang (m) tebal
BETON 3.00 127.00 0.20 76.20 M3
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
DIMENSI
(m)
UNIT /
NO URAIAN AS VOLUME SAT.
TITIK
Lebar Tinggi/
Panjang
Rata" Tebal
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
DIMENSI
(m)
UNIT /
NO URAIAN AS VOLUME SAT.
TITIK
Lebar Lebar Tinggi/
Panjang
Atas Bawah Tebal
Total 20.240 M3
Total 10.120 M3
PERHITUNGAN VOLUME PEKERJAAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN GG. 8 RT. 35 BLOK A KEL. JAWA KEC. SAMARINDA ULU
DIMENSI
TOTAL UNIT /
NO URAIAN AS (m) JARAK JUMLAH DIA KOEF. VOLUME SAT.
PANJANG TITIK
a b c d
Total 444.842 Kg
DAFTAR KEBUTUHAN BESI TULANGAN DOWEL