Anda di halaman 1dari 40

REKAPULTULASI

NO.
MATA
PEMB.
URAIAN JUMLAH HARGA
(Rp)

DIV. I UMUM 143,500,000.00


DIV. III PEKERJAAN TANAH DAN BAHU JALAN 132,269,054.70
DIV. V LAPIS PERKERASAN BERBUTIR 149,788,764.00
DIV. VI LAPIS PERKERASAN ASPAL 420,240,000.00
DIV. VI PERKERJAAN STRUKTUR 1,967,287,071.57
(A) JUMLAH DEVISI 2,813,084,890.28
(B) PAJAK PERTAMBAHAN NILAI (PPN 10%) 281,308,489.03
(C) JUMLAH KESELURUHAN (A+B) 3,094,393,379.31
(D) JUMLAH BIAYA DIBULATKAN 3,094,393,000.00

TIGA MILIAR SEMBILAN PULUH EMPAT JUTAH


Terbilang :
TIGA RATUS SEMBILAN PULUH TIGA RIBU RUPIAH
Rencana Anggaran Biaya ( RAB )

NO.
MATA
URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA
PEMB. SATUAN KUANTITAS
(Rp) (Rp)

DIV. I UMUM
1.2 Mobilisasi LS 1.00 143,500,000.00 143,500,000.00

JUMLAH HARGA PERKERJAAN DIVISI 1 143,500,000.00

DIV. III PEKERJAAN TANAH DAN BAHU JALAN


3.1.(3) Galian dengan kedalaman 0 - 2 meter M3 8.13 70,040.00 569,145.04

3.2.(1a) Timbunan Biasa dari sumber galian M3 242.63 187,029.00 45,379,637.16

3.3 Bahu Jalan M3 187.50 344,491.00 64,592,062.50

3.4.(1) Penyiapan Badan Jalan M3 5,270.00 4,123.00 21,728,210.00


JUMLAH HARGA PERKERJAAN DIVISI 3 132,269,054.70

DIV. V LAPIS PERKERASAN BERBUTIR


5.1 a Lps. Pond. Ag. Kls. A, CBR Min 80% M3 324.00 462,311.00 149,788,764.00
JUMLAH HARGA PERKERJAAN DIVISI 5 149,788,764.00

DIV. VI LAPIS PERKERASAN ASPAL


6.3 (5) Laston Permukaan (AC-WC) M3 6,000.00 70,040.00 420,240,000.00
JUMLAH HARGA PERKERJAAN DIVISI 6 420,240,000.00

DIV. VI PERKERJAAN STRUKTUR

7.1 (5) a Beton mutu sedang fc’30 Mpa lantai jembatan M3 33.78 2,972,914.64 100,412,332.46

7.1 (5) b Beton mutu sedang fc’30 Mpa untuk balok gelagar dan diafragma M3 28.89 2,972,914.64 85,877,693.33

7.1 (7) a Beton Mutu Sedang fc'20 Mpa M3 31.81 2,972,914.64 94,564,328.78

7.1 (8) Beton Mutu rendah fc'15 Mpa M3 5.37 1,925,262.46 10,342,747.58

7.1 (10) Beton Mutu rendah fc'10 Mpa M3 27.59 1,679,747.99 46,344,247.04

7.1.(9) Beton Siklop fc' 15 Mpa M3 7.64 1,750,302.13 13,372,308.27

7.3(1) Baja Tulangan U 24 Polos Kg 2,745.73 33,456.38 91,862,186.26

7.3 (3) Baja Tulangan U 32 Ulir Kg 37,383.06 35,466.00 1,325,827,605.96

7.9 (1) Pasangan Batu M1 168.49 1,105,320.87 186,235,513.39

7.1 1(6) a Expantion Joint Baja Bersudut M1 28.00 75,000.00 2,100,000.00

7.12 (3) Perletakan elastometrik M3 12.00 75,000.00 900,000.00

7.13 (1) Sandaran (relling) M 51.20 153,839.33 7,876,573.70

7.14 ( 1 ) Papan Nama Jembatan Buah 2.00 785,767.40 1,571,534.80


JUMLAH HARGA PERKERJAAN DIVISI 7 1,967,287,071.57
(A) JUMLAH DEVISI 2,813,084,890.28
(B) PAJAK PERTAMBAHAN NILAI (PPN 10%) 281,308,489.03
(C) JUMLAH KESELURUHAN (A+B) 3,094,393,379.31
(D) JUMLAH BIAYA DIBULATKAN 3,094,393,000.00

Terbilang : TIGA MILIAR SEMBILAN PULUH EMPAT JUTAH TIGA RATUS SEMBILAN PULUH TIGA RIBU RUPIAH
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0988 96,000.00 9,481.48


2. Mandor (L03) Jam 0.0494 134,000.00 6,617.28

JUMLAH HARGA TENAGA 16,098.77

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0494 272,863.27 13,474.73


2. Dump Truck (E08) Jam 0.1715 169,717.53 29,099.22
3. Alat Bantu Ls 1.0000 5,000.00 5,000.00

JUMLAH HARGA PERALATAN 47,573.95

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 63,672.72


E. OVERHEAD & PROFIT 10.0 % x D 6,367.27
F. HARGA SATUAN PEKERJAAN ( D + E ) 70,040.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0669 96,000.00 6,425.70


2. Mandor (L02) Jam 0.0167 134,000.00 2,242.30

JUMLAH HARGA TENAGA 8,668.01

B. BAHAN

1. Material timbunan (M08) M3 1.2000 105,000.00 126,000.00

JUMLAH HARGA BAHAN 126,000.00

C. PERALATAN
1. Whell Loader (E15) Jam 0.0167 309,853.71 5,184.97
2. Dump Truck (E08) Jam 0.1404 169,717.53 23,835.88
3. Motor Grader (E13) Jam 0.0061 323,761.82 1,986.49
3. Vibro Roller (E19) Jam 0.0111 268,812.39 2,986.80
4. Water Tanker (E23) Jam 0.0069 185,750.61 1,284.20
5. Alat Bantu Ls 1.0000 80.00 80.00

JUMLAH HARGA PERALATAN 35,358.35

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 170,026.35


E. OVERHEAD & PROFIT 10.0 % x D 17,002.64
F. HARGA SATUAN PEKERJAAN ( D + E ) 187,029.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0669 96,000.00 6,425.70


2. Mandor (L03) Jam 0.0167 134,000.00 2,242.30

JUMLAH HARGA TENAGA 8,668.01

B. BAHAN

1. Material pilihan (M09) M3 1.2000 240,000.00 288,000.00

JUMLAH HARGA BAHAN 288,000.00

C. PERALATAN
1. Wheel Loader (E15) Jam 0.0167 309,853.71 5,184.97
2. Dump Truck (E08) Jam 0.0409 169,717.53 6,939.56
3. Motor Grader (E13) Jam 0.0117 63,266.43 741.07
3. Vibro Roller (E19) Jam 0.0085 268,812.39 2,275.66
4. Water Tanker (E23) Jam 0.0069 185,750.61 1,284.20
5. Alat Bantu Ls 1.0000 80.00 80.00

JUMLAH HARGA PERALATAN 16,505.46

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 313,173.47


E. OVERHEAD & PROFIT 10.0 % x D 31,317.35
F. HARGA SATUAN PEKERJAAN ( D + E ) 344,491.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0051 96,000.00 487.619


2. Mandor (L02) jam 0.0013 134,000.00 170.16

JUMLAH HARGA TENAGA 657.78

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Motor Grader (E13) jam 0.0025 323,761.82 812.66
2. Vibro Roller (E19) jam 0.0013 268,812.39 341.35
3. Water Tanker (E23) jam 0.0104 185,750.61 1,926.30
4. Alat Bantu Ls 1.0000 10.00 10.00

JUMLAH HARGA PERALATAN 3,090.31

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,748.08


E. OVERHEAD & PROFIT 10.0 % x D 374.81
F. HARGA SATUAN PEKERJAAN ( D + E ) 4,123.000
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
96,000.00
1. Pekerja (L01) jam 0.2343 134,000.00 31,392.24
2. Mandor (L03) jam 0.0335 40,700.00 1,362.12

JUMLAH HARGA TENAGA 32,754.35

B. BAHAN

1. Agregat Kasar (M03) M3 0.6600 300,000.00 198,000.00


2. Agregat Halus (M04) M3 0.5400 300,000.00 162,000.00

JUMLAH HARGA BAHAN 360,000.00

C. PERALATAN
1. Wheel Loader (E15) jam 0.0335 309,853.71 10,369.94
2. Dump Truck (E09) jam 0.0201 193,239.59 3,880.31
3. Motor Grader (E13) jam 0.0117 323,761.82 3,792.39
4. Vibratory Roller (E19) jam 0.0178 268,812.39 4,798.08
5. P. Tyre Roller (E18) jam 0.0043 264,173.58 1,131.67
6. Water Tanker (E23) jam 0.0187 185,750.61 3,481.27
7. Alat Bantu Ls 1.0000 75.00 75.00

JUMLAH HARGA PERALATAN 27,528.66

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 420,283.01


E. OVERHEAD & PROFIT 10.0 % x D 42,028.30
F. HARGA SATUAN PEKERJAAN ( D + E ) 462,311.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-635

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0217 96,000.00 2,081.93


2. Mandor (L03) Jam 0.0022 134,000.00 290.60

JUMLAH HARGA TENAGA 2,372.53

B. BAHAN

1. Agregat Kasar (M03) M3 0.0220 300,000.00 6,600.00


2. Agregat Halus (M04) M3 0.0290 300,000.00 8,712.00
3 Filler (M05) Kg 0.9900 950,000.00 940,500.00
4 Aspal (M10) Kg 5.8590 2,200,000.00 12,889,800.00

JUMLAH HARGA BAHAN 13,845,612.00

C. PERALATAN
1. Wheel Loader (E15) Jam 0.0014 309,853.71 432.08
2. AMP (E01) Jam 0.0022 2,073,789.88 4,497.38
3. Genset (E12) Jam 0.0022 223,567.47 484.85
4. Dump Truck (E09) Jam 0.0110 193,239.59 2,125.93
5. Asp. Finisher (E02) Jam 0.0027 277,181.49 751.40
6. Tandem Roller (E17) Jam 0.0032 189,854.36 609.97
7 P. Tyre Roller (E18) Jam 0.0023 264,173.58 606.25
8 Alat Bantu Ls 1.0000 20.00 20.00

JUMLAH HARGA PERALATAN 9,527.85

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,857,512.38


E. OVERHEAD & PROFIT 10.0 % x D 1,385,751.24
F. HARGA SATUAN PEKERJAAN ( D + E ) 15,243,264.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 4,418 96,000.00 424,096,385.54


2. Tukang (L02) jam 1,473 154,400.00 227,362,784.47
3. Mandor (L03) jam 368 134,000.00 49,330,655.96

JUMLAH HARGA TENAGA 700,789,825.97

B. BAHAN

1. Semen (M12) Kg 345.2055 74,000.00 25,545,205.48


2. Pasir (M01) M3 0.6408 300,000.00 192,240.18
3. Agregat Kasar (M03) M3 300,000.0000 300,000.00 90,000,000,000.00
4. Kayu Perancah (M19) M3 0.0250 2,000,000.00 50,000.00
5. Paku (M18) Kg 0.8000 20,000.00 16,000.00

JUMLAH HARGA BAHAN 90,025,803,445.66

C. PERALATAN

1. Conc. Mixer (E06) jam 368.1392 155,083.00 57,092,133.76


2. Water Tanker (E23) jam 60.2410 185,750.61 11,189,795.87
3. Con. Vibrator (E20) jam 368.1392 57,470.18 21,157,026.66
4. Alat Bantu Ls 1.0000 1,200.00 1,200.00

JUMLAH HARGA PERALATAN 89,440,156.29

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 90,816,033,427.92


E. OVERHEAD & PROFIT 10.0 % x D 9,081,603,342.79
F. HARGA SATUAN PEKERJAAN ( D + E ) 99,897,636,771.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 4,417.6707 96,000.00 424,096,385.54


2. Tukang (L02) jam 1,472.5569 154,400.00 227,362,784.47
3. Mandor (L03) jam 368.1392 134,000.00 49,330,655.96

JUMLAH HARGA TENAGA 700,789,825.97

B. BAHAN

1. Semen (M12) Kg 351.6279 74,000.00 26,020,465.12


2. Pasir (M01) M3 0.3271 300,000.00 98,128.72
3. Agregat Kasar (M03) M3 0.3385 300,000.00 101,563.22
4. Batu Belah (M06) M3 0.1451 605,000.00 87,779.64
5. Kayu Perancah (M19) M3 0.0650 2,000,000.00 130,000.00
6. Paku (M18) Kg 0.5000 20,000.00 10,000.00
JUMLAH HARGA BAHAN 26,447,936.70

C. PERALATAN

1. Conc. Mixer (E06) jam 368.1392 155,083.00 57,092,133.76


2. Water Tanker (E23) jam 26.4780 185,750.61 4,918,305.63
3. Con. Vibrator (E20) jam 368.1392 57,470.18 21,157,026.66
4. Alat Bantu Ls 1.0000 1,200.00 1,200.00

JUMLAH HARGA PERALATAN 83,168,666.05

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 810,406,428.72


E. OVERHEAD & PROFIT 10.0 % x D 81,040,642.87
F. HARGA SATUAN PEKERJAAN ( D + E ) 891,447,072.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 4,417.6707 96,000.00 424,096,385.54


2. Tukang (L02) jam 1,472.5569 154,400.00 227,362,784.47
3. Mandor (L03) jam 368.1392 134,000.00 49,330,655.96

JUMLAH HARGA TENAGA 700,789,825.97

B. BAHAN

1. Semen (M12) Kg 285.2830 74,000.00 21,110,943.40


2. Pasir (M01) M3 0.2654 300,000.00 79,613.87
3. Agregat Kasar (M03) M3 0.3924 300,000.00 117,714.79
5. Kayu Perancah (M19) M3 0.0950 2,000,000.00 190,000.00
6. Paku (M18) Kg 0.5000 20,000.00 10,000.00

JUMLAH HARGA BAHAN 21,508,272.05

C. PERALATAN

1. Conc. Mixer (E06) jam 368.1392 155,083.00 57,092,133.76


2. Water Tanker (E23) jam 24.4897 185,750.61 4,548,968.71
3. Con. Vibrator (E20) jam 368.1392 57,964.43 21,338,979.73
4. Alat Bantu Ls 1.0000 1,200.00 1,200.00

JUMLAH HARGA PERALATAN 82,981,282.20

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 805,279,380.22


E. OVERHEAD & PROFIT 10.0 % x D 80,527,938.02
F. HARGA SATUAN PEKERJAAN ( D + E ) 885,807,318.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0.1050 96,000.00 10,080.00


2. Tukang (L02) jam 0.0350 154,400.00 5,404.00
3. Mandor (L03) jam 0.0350 134,000.00 4,690.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. Baja Tulangan (Polos) (M39a) Kg 1.1000 28,000.00 30,800.00


2. Kawat Beton (M14) Kg 0.0200 22,000.00 440.00

JUMLAH HARGA BAHAN 31,240.00

C. PERALATAN

1. Alat Bantu Ls 1.0000 25.00 25.00

JUMLAH HARGA PERALATAN 25.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 31,265.00


E. OVERHEAD & PROFIT 10.0 % x D 3,126.50
F. HARGA SATUAN PEKERJAAN ( D + E ) 34,392.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 10.5000 96,000.00 1,008,000.00


2. Tukang (L02) Jam 3.5000 154,400.00 540,400.00
3. Mandor (L03) Jam 1.1667 134,000.00 156,333.33

JUMLAH HARGA TENAGA 1,704,733.33

B. BAHAN

1. Beton K-250 (EI-715) M3 1.4451 1,092,748.25 1,579,166.14


2. Baja Tulangan (EI-73) Kg 216.7699 110,000.00 23,844,688.24
3. Kayu Perancah (M19) M3 0.6283 2,000,000.00 1,256,637.06
4. Paku (M18) Kg 3.0000 20,000.00 60,000.00

JUMLAH HARGA BAHAN 26,740,491.44

C. PERALATAN

1. Alat Bantu Ls 1.0000 2,500.00 2,500.00

JUMLAH HARGA PERALATAN 2,500.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 28,447,724.77


E. OVERHEAD & PROFIT 10.0 % x D 2,844,772.48
F. HARGA SATUAN PEKERJAAN ( D + E ) 31,292,497.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 19.6000 96,000.00 1,881,600.00


2. Tukang (L02) jam 5.6000 154,400.00 864,640.00
3. Mandor (L03) jam 1.4000 134,000.00 187,600.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. Batu Kali (M02) M3 1.1700 300,000.00 351,000.00


2. Semen (PC) (M12) zak 176.0000 74,000.00 13,024,000.00
3. Pasir (M01) M3 0.3961 300,000.00 118,832.34

JUMLAH HARGA BAHAN 13,493,832.34

C. PERALATAN

1. Alat Bantu Ls 1.0000 3,250.00 3,250.00

JUMLAH HARGA PERALATAN 3,250.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,497,082.34


E. OVERHEAD & PROFIT 10.0 % x D 1,349,708.23
F. HARGA SATUAN PEKERJAAN ( D + E ) 14,846,791.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
2,972,914.64
2,972,914.64
2,972,914.64
1,925,262.46
1,679,747.99
1,750,302.13
33,456.38
35,466.00
9,511,043.49
1,105,320.87
75,000.00
75,000.00
153,839.33
785,767.40
MUHAMMAD ZULHAM FATARUBA
1318174062
TKJJ 6B

BASIC PRICE
KECAMATAN WER MAKTIAN - KEPULAUAN TANIMBAR
KECAMATAN
NO MACAM TENAGA KERJA SATUAN KET
WER MAKTIAN
1 2 3 4 5
1 Mandor Org/hr Rp 134,000.00
2 Kepala T ukang Org/hr Rp 172,800.00
3 Tukang Org/hr Rp 154,400.00
4 Pekerja Org/hr Rp 96,000.00
5 Mekanik Org/hr Rp 192,000.00
6 Operator Org/hr Rp 192,000.00
7 Pembantu Oprator/Mekanik Org/hr Rp 96,000.00
8 Supir Org/hr Rp 153,600.00
9 Pembantu Supir Org/hr Rp 96,000.00
10 Buruh Lapangan Tertatih Org/hr Rp 96,000.00
11 Buruh lapangan Tak Tertatih Org/hr Rp 75,000.00

KECAMATAN
NO MACAM TENAGA KERJA SATUAN KET
WER MAKTIAN 4
1 2 3 4 5
BAHAN BATU
1 Batu Kali m3 Rp 300,000.00
2 Bulat (Utuh) m3 Rp 300,000.00
3 Bt Pecah (5/7) Cm ( Pakai Mesin ) m3 Rp 510,000.00
4 Bt Pecah (3/5) Cm ( Pakai Mesin ) m3 Rp 535,000.00
5 Bt Pecah (2/5) Cm ( Pakai Mesin ) m3 Rp 565,000.00
6 Bt Pecah (1/2) Cm ( Pakai Mesin ) m3 Rp 680,000.00
7 Bt Pecah (0,5-1) Cm ( Pakai Mesin ) m3 Rp 605,000.00
8 Abu Batu m3 -
9 Bt Pecah (10/15) Cm m3 Rp 425,000.00
10 Batu Karang m3 Rp 300,000.00
KERIKIL
1 Kerikil Sungai m3 Rp 300,000.00
2 Kerikil Pantai m3 Rp 300,000.00
3 Kerikil Sungai/Pantai Tersaring 5/7 Cm m3 Rp 300,000.00
4 Kerikil Sungai/Pantai Tersaring 3/5 Cm m3 Rp 300,000.00
5 Kerikil Sungai/Pantai Tersaring 2/3 Cm m3 Rp 305,000.00
6 Kerikil Sungai/Pantai Tersaring 1/2 Cm m3 Rp 320,000.00
7 Kerikil Sungai/Pantai Tersaring 0 5/1 Cm m3 Rp 325,000.00
8 Kerikil Sungai/Pantai Tersaring 1/2 Cm m3 Rp 320,000.00
(PASIR TANAH)
1 Pasir Urug m3 Rp 300,000.00
2 Pasir Pasang m3 Rp 300,000.00
3 Koral m3 Rp 300,000.00
4 Sirtu m3 Rp 300,000.00
5 Tanah m3 Rp 250,000.00
BATU BATA
1 Batu Bata uk 6x11x22 cm bh Rp 1,200.00
2 Batu Bata uk 5x11x22 cm bh Rp 2,500.00
4 Batako uk (40x10x17) bh Rp 4,000.00
4 Batu Angm bh Rp 95,000.00
SEMEN
1 Semen Tonasa 50 Kg zak Rp 74,000.00
2 Semen Bosowa 50 Kg zak Rp 74,000.00
3 Seman Putih Kg Rp 5,000.00
4 Seman Warna Kg Rp 15,000.00
5 1 Kapur Api Rp 7,500.00
BAHAN BESI
1 Besi polos ᶲ 6 mm / Panjang =12 m star Rp 28,000.00
2 Besi polos ᶲ 8 mm / 12 m star Rp 48,000.00
3 Besi polos ᶲ 10 mm / 12 m Rp 70,000.00

KECAMATAN
NO MACAM TENAGA KERJA SATUAN KET
WER MAKTIAN
1 2 3 4 5
4 Besi polos ᶲ 12 mm / 12 m staf Rp 110,000.00
5 Besi polos ᶲ 15 mm / 12 m staf Rp 24,000.00
6 Besi Plat (3" x 6" ) tbel 1,2 mm staf Rp 1,571,825.00
7 Besi siku 30 x 30 x 3 staf Rp 118,475.00
8 Besi siku 40 x 40 x 4 cm staf Rp 345,450.00
9 Besi siku 50 x 50 x 5 cm staf Rp 257,290.00
10 Besi siku 60 x 60 x 6 cm staf Rp 431,335.00
BATAKO CETAK
1 Kwalitas 1 ( Press ) Buah Rp 8,250.00
2 Kwalitas 2 ( Tangan ) Buah Rp 2,700.00
3 Batako uk 20 x 40 x 10 cm ( Gombok) Buah Rp 3,000.00
BAHAN ATAP
1 Genteng Asbes Buah Rp 63,000.00
2 Genteng Rainbow M' Rp 63,000.00
3 Bumbungan Asbes M' Rp 58,000.00
4 Bumbungan Rainbow M Rp 100,000.00
5 Genteng Sakura Root Buah Rp 68,000.00
6 Bumbungan Sakura Root M Rp 50,000.00
ZINK GELOMBANG
1 Zink Gelombang BJLS 0.20 Ibr Rp 54,000.00
2 Zink Gelombang BJLS 0.25 Ibr Rp 58,000.00
3 Zink Gelombang BJLS 0.30 Ibr Rp 65,000.00
4 Seng Plastik gelombang besar Ibr Rp 45,000.00
5 Zink Gelombang Wama Biru BJLS 0.25 Ibr Rp 58,000.00
6 Zink Datar wama beu. lebar 45 cm m' Rp 20,000.00
7 ZinkDatar BJLS 0.20 uk 92x183.5 cm Ibr Rp 56,000.00
8 Zink datar lebar 85 cm m' Rp 20,000.00
9 Zink datar. lebar 60 cm m' Rp 17,500.00
10 Zink datar . lebar 40 cm m' Rp 15,000.00
11 Talang Sg Empat Abu PVC uk Lebar 12 cm / Btg Rp 87,500.00
12 Pipa Talang PVC 0 3 " / 4 m Staf Rp 24,000.00
13 Corong Talang PVC dia 3" Bh Rp 18,500.00
14 Tutup Talang PVC dia 3'' Bh Rp 6,000.00
15 Belokan Talang PVC dia 3" Bh Rp 16,500.00
16 Sambungan Talang PVC dia 3 " Bh Rp 16,500.00
17 Aisan T alang PVC Bh Rp 20,000.00
18 Aisan Talang Besi Bh Rp 30,000.00
19 Kern PVC AW dia 3 * Bh Rp 8,500.00
20 Karpet Talang Lebar 40 cm M* Rp 20,000.00
21 Karpet T alang Lebar 60 cm M* Rp 30,000.00
BAHAN KAYU
1. - Kayu KIs I m3 Rp 4,750,000.00
2 - Kayu kis II m3 Rp 2,000,000.00
3 - Kayu Besi (kis I) m3 Rp 4,750,000.00
4 - Kayu 10/10 x 3 m m3 Rp 4,200,000.00
5 * Kayu 5/10 x3m m3 Rp 4,200,000.00
6 * Kayu6/12x3m m3 Rp 4,200,000.00
7 • Kayu Langgua/Papan kk 1 m3 Rp 4,200,000.00
8 • Papan 4 cm kis I m3 Rp 4,200,000.00
9 • Papan 3 cm kis I m3 Rp 4,200,000.00
10 * Papan 2 cm kis I m3 Rp 4,200,000.00
11 Papan kayu kh I m3 Rp 4,200,000.00
12 • Papan kayu kk II m3 Rp 2,000,000.00
13 • Balok Kayu 5 x 7 / 3 m kk II m3 Rp 2,000,000.00
14 Balok Kayu 3 x S / 3 m kk II m3 Rp 2,000,000.00
15 • Papan 3 x 5 / 3 m kk II m3 Rp 2,000,000.00
___ BAHAN BETON
1 Pilar Pagar bh Rp 25,000.00
2 Pilar Pagar Beton bh Rp 27,000.00
3 Pilar Tiang Teras bh Rp 350,000.00
KECAMATAN
NO MACAM TENAGA KERJA SATUAN KET
WER MAKTIAN
1 2 3 4 5
4 Beton K125 m3 Rp 25,000.00
5 Beton K175 m3 Rp 27,000.00
6 Beton K225 m3 Rp 350,000.00
TEGEL KERAMIK
1 Keramik Polos 20 x 20 cm (25 bh) dos Rp 70,000.00
2 Keramik Polos 30 x 30 cm (11 bh) dos Rp 80,000.00
3 Keramik Polos 40 x 40 cm (6 bh) dos Rp 95,000.00
4 Keramik Polos 50 x 50 cm (4 bh) dos Rp 155,000.00
5 Keramik Polos 60 x 60 cm (3 bh) dos Rp 240,000.00
6 Nat Tegel Warna/Putih bks Rp 15,000.00
7 Paving Block bh Rp 6,000.00
8 Tegel Anti Slip 20/20 dos Rp 100,000.00
9 Tegel Anti Slip 30/30 dos Rp 120,000.00
PLAT ALMANIUM
1 Kawat ikat besi beton ( Bendrat) Kg Rp 22,000.00
2 Nyamuk Ptasik Kasa M' Rp 12,100.00
3 Nyamuk Kawat M' Rp 25,000.00
4 Harmonika Jos M' Rp 53,500.00
5 Saringan Pasir ( Ayakan ) M’ Rp 40,000.00
6 Kawat Bronjong 3 mm Kg Rp 40,000.00
7 Kawat Bronjong 4 mm Kg Rp 52,000.00
8 Kawat Duri Rol Rp 135,000.00
9 Kawat Angin/ram M Rp 16,500.00
10 Kawat Las Kg Rp 42,500.00
BAHAN LISTRIK
1 Kabel NYM 4 x 2.5 mm M' Rp 15,000.00
2 Kabel NYM 3 x 2.5 mm M' Rp 15,000.00
3 Kabel NYM 2 x 2.5 mm M' Rp 12,000.00
4 Kabel NYM 3 x 1.5 mm - Kabel NYM 2x1.5 mm M' Rp 12,000.00
5 Kabel NYA warna merah ( 1 x 2.5) Rol Rp 360,000.00
6 Kabel NYA warna hitam ( 1 x 2.5 ) Rol Rp 360,000.00
7 Lampu Neon ( Komplit) TL 10 W Bh Rp 60,000.00
8 Lampu Neon ( Komplit) TL 20 W Bh Rp 80,000.00
9 Lampu Neon ( Komplit) TL 40 W Bh Rp 110,000.00
11 Lampu Pijar Ciyoda 5 W Bh Rp 5,000.00
12 Lampu Pijar Ciyoda 10 W Bh Rp 7,000.00
13 Lampu Pjar Ciyoda 15 W Bh Rp 7,500.00
14 Lampu Pijar Ciyoda 25 W Bh Rp 8,000.00
15 Lampu Pijar Ciyoda 40 W Bh Rp 8,000.00
16 - Lampu Neon phiips Essential 5 watt pcs Rp 33,000.00
17 Lampu Neon phiips Essential 8 watt pcs Rp 35,000.00
18 Lampu Neon phiips Essential 11 watt pcs Rp 38,000.00
19 Lampu Neon phiips Essential 23 watt pcs Rp 50,000.00
20 Lampu Neon philips Essential 35 watt PC Rp 140,000.00
21 Lampu Neon phiips Essential 50 watt PC Rp 230,000.00
22 MCB 4 Amper (Ask) Bh Rp 60,000.00
23 MCB 6 Amper (Ask) Bh Rp 60,000.00
24 Boks MCB 1 Lobang Bh Rp 6,000.00
25 Boks MCB 2 Lobang Bh Rp 12,000.00
26 Boks MCB 4 Lnbang/unit (Masako) Bh Rp 50,000.00
27 Round Cable Cup Size 8 mm Doe Rp 13,000.00
28 Round Cable Clip Size 9 mm Doe Rp 15,000.00
29 Round Cable Ckp Size 10 mm Doe Rp 16,500.00
30 Stop Kontak tempel (outbow ) mark Broco Bh Rp 18,000.00
31 Stop Kontak tanam (inbow ) mark Broco Bh Rp 20,000.00
32 Saklar Engkol tempel ( outbow ) mark Broco Bh Rp 18,000.00
KECAMATAN
NO MACAM TENAGA KERJA SATUAN KET
WER MAKTIAN
1 2 3 4 5
33 Saklar Engkel tanam ( inbow) Broco Rp 20,000.00
34 Saklar Sen tempel ( input) Broco Bh Rp 23,000.00
35 Saklar Sen tanam ( inbow) Broco Bh Rp 25,000.00
36 Fitting Tempel Ptafon Bcocco Bh Rp 15,000.00
37 Fiting Segi New Broco Bh Rp 15,000.00
38 Fitmg Segi Brocco Bh Rp 15,000.00
39 - Fitmg Gantung Itami Bh Rp 5,000.00
40 Fitmg Cotok Vottama - Isolator ---- Bh Bh Rp 6,500.00
41 Isalator Rp 15,000.00
42 Tee Dos Bh Rp 2,000.00
43 Travo 10 Watt Bh Rp 58,000.00
44 Travo 20 Watt Bh Rp 62,000.00
45 Travo 30 Watt Bh Rp 65,000.00
46 Selotip Dos Rp 10,000.00
47 Pipa Listrik PVC 5/8 * Staf Rp 10,000.00
ALAT PENGUNCI
1 Kunci tanam kecil ( 2 slaag ) - Union Elite (komplit) Bh Rp 215,000.00
2 Uniom Elite (Komplit) Rp 385,000.00
3 Yale Doble Bh Rp 100,000.00
4 Royal Bh Rp 67,000.00
5 Kuda Terbang uk Kecil Bh Rp 850,000.00
6 Kuda Terbang uk Besar Bh Rp 95,000.00
PENGGANTUNG
1 Kait angin kls A Rp 32,000.00
2 Kait angin kls B Psg Rp 26,000.00
3 Engsei jendela 3 inc Psg Rp 15,000.00
4 Engsel Pintu 4 inc Psg Rp 20,000.00
5 Grendel jendela Bh ' Rp 15,000.00
6 Kunci gembok sedang Bh Rp 50,000.00
7 Baut 6 cm x 1/2 * Bh Rp 20,000.00
8 Baut 10 cm x 1/2" Bh Rp 25,000.00
BAHAN SANITAIR
1 - Closet duduk tanpa tabung Bh Rp 500,000.00
2 - Closet duduk pakai tabung Bh Rp 2,800,000.00
3 - Closet Jongkok merk T oto Bh Rp 350,000.00
4 - Closet Jongkok merk INA Bh Rp 200,000.00
5 - Wastafel Wama Keramik Bh Rp 590,000.00
6 • Tempat Cuci 1 Lobang merit Royal Bh Rp 350,000.00
7 - Tempat Cuci 2 Lobang merk Venepro Bh Rp 600,000.00
8 - Orinior Lokal Putih Bh Rp 1,875,000.00
9 - Orinor Keramik Bh Rp 1,785,000.00
10 - Shower Kls A Bh Rp 600,000.00
11 - Shower Kls B Bh Rp 200,000.00
12 - Saringan Air Besi Bh Rp 125,000.00
13 - Saringan Air Plastik Bh Rp 52,000.00
14 - Mesin Air Zimrtzu PS-130 BIT 125 Watt Bh Rp 675,000.00
15 Mesin Air Zimitzu JET-100 BIT 100 Watt Bh Rp 625,000.00
16 Pompa Air Sanyo PH-130 B Bh Rp 1,750,000.00
17 Bak Mandi Segi Fiber Uk. 47 cm Bh Rp 110,000.00
18 Bak Mandi Segi Fiber Uk 62 cm Bh Rp 125,000.00
19 Tangki air 650 liter I Bh Rp 1,000,000.00
20 Tangki air 1200 liter Bh Rp 1,500,000.00
21 Tangki air 2000 liter Bh Rp 2,800,000.00
22 Drum Air Bh Rp 130,000.00
BAHAN PAKU
1 Paku Zink Kg Rp 45,000.00
2 - Paku Tnpteks Kg Rp 20,000.00
3 - Paku Ganteng Kg Rp 30,000.00
4 Paku Campur Kg Rp 25,000.00
5 Paku Beton Putih Dos Rp 25.00

KECAMATAN
NO MACAM TENAGA KERJA SATUAN KET
WER MAKTIAN
1 2 3 4 5

6 - Paku beton hitam Dos Rp 20,000.00


7 - paku kayu 2 cm - 4 cm Kg Rp 20,000.00
8 - paku kayu 5 cm - 10 cm Kg Rp 15,000.00
BAHAN FINNISSHING
1 - kertas Amplas Lbr Rp 7,000.00
2 - Dumpul Kg Rp 2,000.00
3 - politur vernis Kg Rp 63,000.00
4 - Spirtus Btl Rp 20,000.00
5 - Meni kayu Kg Rp 7,500.00
6 - Meni besi Kg Rp 23,000.00
7 - Cat gloteks Kg Rp 62,000.00
8 - cat avian Kg Rp 62,000.00
9 - okir Kg Rp 40,000.00
10 - thiner avia biru Ltr Rp 30,000.00
11 - thiner super Ltr Rp 35,000.00
12 - kwas cat uk. 1 " Pcs Rp 4,000.00
13 - kwas cat uk. 2 " Pcs Rp 6,000.00
14 - kwas cat uk. 2,5 " Pcs Rp 8,000.00
15 - kwas cat uk. 3 " Pcs Rp 10,000.00
16 - kwas cat uk. 4 " Pcs Rp 12,000.00
17 - kwas rol uk. 9 " Bh Rp 30,000.00
BAHAN MINYAK
1 - Bensin Ltr Rp 10,000.00
2 - Solar Ltr Rp 9,000.00
3 - Minyak tanah Ltr Rp 6,200.00
4 - Oli Ltr Rp 35,000.00
CAT TEMBOK
1 - Kapur Api Kg Rp 10,000.00
2 - Cat Metrolite Kg Rp 30,000.00
3 - Cat metrolite 3 Ltr Gallon Rp 95,000.00
4 - Cat Matex 5 Kg Gallon Rp 92,000.00
5 - cat Aries 4,5 Kg Gallon Rp 85,000.00
6 - -cat Avitex 5 Kg Gallon Rp 115,000.00
7 - Plamir Tembok Big Lion 5 Kg Bks Rp 30,000.00
8 - Plamir Tembok Big Lion Kmg Rp 185,000.00
9 - Cat anti bocor no drop Kg Rp 50,000.00
10 - Cat anti bocor no drop 5 Kg Gallon Rp 200,000.00
11 - Adition Kg Rp 20,000.00
BAHAN PIPA DAN ACCESSORIS
a.pipa PVC :
1 - pipa PVC Maspion AW dia. 1/2 " / 4 m. Btg Rp 35,000.00
2 - pipa PVC Maspion AW dia. 3/4 " / 4 m. Btg Rp 40,000.00
3 - pipa PVC Maspion AW dia. 1 " / 4 m. Btg Rp 50,000.00
4 - pipa PVC Maspion AW dia. 11/2 " / 4 m. Btg Rp 85,000.00
5 - pipa PVC Maspion AW dia. 2 " / 4 m. Btg Rp 135,000.00
6 - pipa PVC Maspion AW dia. 2 1/2 " / 4 m. Btg Rp 175,000.00
7 - pipa PVC Maspion AW dia. 3 " / 4 m. Btg Rp 235,000.00
8 - Pipa PVC Wavin AW 1/2 " / 4m Btng Rp 25,000.00
9 - Pipa PVC Wavin AW 3/4 " / 4m Btng Rp 30,000.00
10 - Pipa PVC Wavin AW 1 " / 4m Btng Rp 35,000.00
11 - Pipa PVC Wavin AW 11/2 " / 4m Btng Rp 50,000.00
12 - Pipa PVC Wavin AW 2" / 4m Btng Rp 80,000.00
13 - Pipa PVC Wavin AW 21/2 " / 4m Btng Rp 110,000.00
14 - Pipa PVC Wavin AW 3 " / 4m Btng Rp 125,000.00
ACCESSORIS pipa PVC
17 - Elbow / keni ( D-DL) 1/2 " Bh Rp 3,000.00
18 - Elbow / keni ( D-DL) 3/4 " Bh Rp 4,000.00
19 - Elbow / keni ( D-DL) 1 " Bh Rp 5,000.00
20 - Elbow / keni ( D-DL) 2 " Bh Rp 7,000.00
21 - Elbow / keni ( D-DL) 3 " Bh Rp 7,000.00

KECAMATAN
NO MACAM TENAGA KERJA SATUAN KET
WER MAKTIAN
1 2 3 4 5
22 - Socket / Sock ( D - DS ) 1/2 " Bh Rp 3,500.00
23 - Socket / Sock ( D - DS ) 3/4 " Bh Rp 3,500.00
24 - Socket / Sock ( D - DS ) 1 " Bh Rp 6,000.00
25 - Socket / Sock ( D - DS ) 2 " Bh Rp 7,000.00
26 - Socket / Sock ( D - DS ) 3 " Bh Rp 8,000.00
27 - Tee ( D-DT) 1/2 " Bh Rp 70,000.00
28 - Tee ( D-DT) 3/4 " Bh Rp 8,000.00
29 - Tee ( D-DT) 1 " Bh Rp 3,500.00
30 - Tee ( D-DT) 2 " Bh Rp 5,000.00
31 - Tee ( D-DT) 3 " Bh Rp 5,000.00
32 - Increaser (D-IN) 11/2 " x 11/4 " Bh Rp 6,000.00
33 - Increaser (D-IN) 2 " x 11/4 " Bh Rp 7,000.00
34 - Increaser (D-IN) 2 " x 11/2 " Bh Rp 8,000.00
35 - Increaser (D-IN) 21/2 " x 11/2 " Bh Rp 8,500.00
36 - Increaser (D-IN) 21/2 " x 11/2 " Bh Rp 2,500.00
37 - Increaser (D-IN) 3 " x 11/4 " Bh Rp 2,750.00
38 - Increaser (D-IN) 3 " x 11/4 " Bh Rp 3,250.00
39 - Cap (D) 1/2 " Bh Rp 3,500.00
40 - Cap (D) 3/4 " Bh Rp 2,500.00
41 - Cap (D) 1 " Bh Rp 3,000.00
42 - Cap (D) 2 " Bh Rp 3,000.00
43 - Valve socket (AW) / Sock drat luar 1/2 " Bh Rp 3,000.00
44 - Valve socket (AW) 3/4 " Bh Rp 3,000.00
45 - Valve socket (AW) 1/2 x 3/4 " Bh Rp 3,000.00
46 - Valve socket (AW) 1" x 1/2 " Bh Rp 3,000.00
47 - Valve socket (AW) 1 " x 3/4 " Bh Rp 3,000.00
48 - Valve socket (AW) 1 " Bh Rp 3,000.00
49 - Faucet socet (AW) / sock drat dalam 1/2 " Bh Rp 2,500.00
50 - Faucet socet (AW) 1/2 " x 3/4 " Bh Rp 2,750.00
51 - Faucet socet (AW) 3/4 " Bh Rp 3,000.00
52 - Faucet socet (AW) 1 '' x 1/2 " Bh Rp 4,500.00
53 - Faucet socet (AW) 1 " Bh Rp 25,000.00
54 - stop kran plastik 1/2 " Bh Rp 10,000.00
55 - Lem pipa PCV isarplas 45 gram Tube Rp 45,000.00
56 - Lem pipa PCV isarplas 400 gram King Rp 13,500.00
57 - Lem pipa PCV isarplas 48 gram Tube Rp 160,000.00
58 - Lem Kayu merk Expoxy Kg Rp 160,000.00
b. pipa besi :
59 - Pipa GIP Medium A dia. 1/2 " / 6 m Staff Rp 195,000.00
60 - Pipa GIP Medium A dia. 3/4 " / 6 m Staff Rp 290,000.00
61 - Pipa GIP Medium A dia. 1 " / 6 m Staff Rp 350,000.00
62 - Pipa GIP Medium A dia. 2 " / 6 m Staff Rp 630,000.00
63 - Pipa GIP Medium A dia. 3 " / 6 m Staff Rp 943,750.00
64 - Pipa GIP Medium A dia. 4 " / 6 m Staff Rp 1,412,500.00
65 - Pipa GIP Medium B dia. 1/2 " / 6 m Staff Rp 115,000.00
66 - Pipa GIP Medium B dia. 3/4 " / 6 m Staff Rp 150,000.00
67 - Pipa GIP Medium B dia. 1 " / 6 m Staff Rp 200,000.00
68 - Pipa GIP Medium B dia. 2 " / 6 m Staff Rp 380,000.00
69 - Pipa GIP Medium B dia. 3 " / 6 m Staff Rp 680,000.00
70 - Pipa GIP Medium B dia. 4 " / 6 m Staff Rp 710,000.00
Accessoris Pipa Besi :
71 - Tee GIP dia, 3/4 " Bh Rp 11,000.00
72 - Tee GIP dia, 1/2 " Bh Rp 8,250.00
73 - Nepel GIP dia. 12,5 mm Bh Rp 5,850.00
74 - Nepel GIP dia. 20 mm Bh Rp 8,000.00
75 - Nepel GIP dia. 25 mm Bh Rp 11,000.00
76 - Nepel GIP dia. 40 mm Bh Rp 22,000.00
77 - water Moer GIP dia. 3/4 " Bh Rp 36,000.00
78 - socket GIP dia. 3/4 " Bh Rp 30,000.00
79 - socket GIP dia. 1/2 " Bh Rp 25,000.00

KECAMATAN
NO MACAM TENAGA KERJA SATUAN KET
WER MAKTIAN
1 2 3 4 5

80 - stop kran handle dia 3/4 " Bh Rp 35,000.00


81 - gate valve socket dia 3/4 " Bh Rp 40,000.00
82 - elbow GIP 1/2 " Bh Rp 13,300.00
83 - elbow GIP 3/4 " Bh Rp 17,150.00
84 - elbow GIP 1 " Bh Rp 25,000.00
85 - elbow GIP 11/2 " Bh Rp 55,655.00
86 - cap GIP 1/2 " Bh Rp 15,000.00
87 - plugs GIP 1/2" Bh Rp 15,000.00
88 - knee GIP dia. 1/2 " Bh Rp 7,000.00
89 - knee GIP dia. 3/4 " Bh Rp 9,500.00
90 - knee GIP dia. 1 " Bh Rp 11,300.00
91 - knee GIP dia. 11/2 " Bh Rp 27,100.00
92 - reducer GIP dia 3/4 " X 1/2 " Bh Rp 9,200.00
93 - reducer GIP dia 1" x 1/4 " Bh Rp 12,275.00
94 - reducer GIP dia 2" x 1 " Bh Rp 32,000.00
95 - reducer GIP dia 2" x 11/4 " Bh Rp 32,000.00
96 - reducer GIP dia 2" x 11/4 " Bh Rp 60,000.00
97 - water mur dia. 1/2 " Bh Rp 21,150.00
98 - water mur dia. 3/4 " Bh Rp 26,100.00
99 - water mur dia. 1 " Bh Rp 31,100.00
BAHAN SELANG
1 - selang air 1/2' Mr Rp 5,000.00
2 - selang air 5/8' Mr Rp 6,000.00
3 - selang air 3/4' Mr Rp 7,000.00
4 - selang sea gull hiprex 3/4 " Mr Rp 21,000.00
5 - selang sea gull hiprex 5/8 " Mr Rp 18,000.00
6 - selang sea gull hiprex 1/2 " Mr Rp 15,000.00
BAHAN LANGIT-LANGIT
1 - tripleks 3 mm Lbr Rp 75,000.00
2 - tripleks 9 mm Lbr Rp 195,000.00
3 - multipleks 10 mm Lbr Rp 105,000.00
4 - list plafond profil Lbr Rp 26,500.00
5 - playwood 3 mm Lbr Rp 192,000.00
6 - teakwood uk. 3x7 Lbr Rp 172,000.00
7 - teakwood uk. 4x8 Lbr Rp 130,000.00
8 - fomika polos uk. 4x8 Lbr Rp 345,000.00
9 - fomika polos uk. 3x6 Lbr Rp 367,000.00
10 - gipsum board Lbr Rp 150,000.00
11 - papan lambersing Lbr Rp 47,000.00
BAHAN KACA
1 - kaca bening 3 mm m2 Rp 165,000.00
2 - kaca bening 5 mm m3 Rp 215,000.00
3 - kaca rayband 3 mm m4 Rp 175,000.00
4 - kaca rayband 5 mm m5 Rp 260,000.00
5 - jendela Nako 4 mata 5 mm set Rp 115,000.00
6 - jendela Nako 5 mata 5 mm set Rp 125,000.00
7 - jendela Nako 4 mata 6 mm set Rp 140,000.00
8 - jendela Nako 4 mata 7 mm set Rp 167,000.00
9 - jendela Nako 7 mata Bh Rp 120,000.00
10 - jendela Nako 5 mata Bh Rp 93,000.00
BAHAN JALAN
1 - aspal pertamina (150 kg ) Drum Rp 2,200,000.00
2 - agregat kasar Mᶟ Rp 300,000.00
3 - agregat halus Mᶟ Rp 300,000.00
4 - filler Kg Rp 950,000.00
5 - gravel Mᶟ Rp 6,500.00
6 - cat marka (non thermoples) Kg Rp 60,000.00
7 - cat marka (thermoples) Kg Rp 97,000.00
8 - plastik filler Mᶟ Rp 135,000.00
9 - pipa galpanis dia 3" Btg Rp 33,000.00

KECAMATAN
NO MACAM TENAGA KERJA SATUAN KET
KECAMATAN
1 2 3 4 5
10 - pipa porus Mᶦ Rp 187,000.00
11 - geo textile M² Rp 37,000.00
12 - Bahan agregat base kls A M³ Rp 825,000.00
13 - Bahan agregat base kls B M³ Rp 720,000.00
14 - Bahan agregat base kls C M³ Rp 545,000.00
15 - Gebalan Rumput M² Rp 500,000.00
16 - Glass bad Kg Rp 45,000.00
17 - Pelat Rambut (eng. Grade) Bh Rp 105,000.00
18 - Pelat Rambut (high I. grade) Bh Rp 285,000.00
19 - Rel pengaman Mᶦ Rp 336,500.00
20 - Pemantul Cahaya Bh Rp 775,000.00
21 - Bunker Oil Ltr Rp 53,000.00
BAHAN TAMBANG PLASTIK
1 - Uk. 3 mm , panjang 190 m / Kg Kg Rp 47,500.00
2 - Uk. 4 mm , panjang 120 m / Kg Kg Rp 47,500.00
3 - Uk. 5 mm , panjang 80 m / Kg Kg Rp 47,500.00
4 - Uk. 6 mm , panjang 53 m / Kg Kg Rp 42,000.00
5 - Uk. 7 mm , panjang 36 m / Kg Kg Rp 42,000.00
6 - Uk. 8 mm , panjang 29 m / Kg Kg Rp 42,000.00
7 - Uk. 10 mm , panjang 18 m / Kg Kg Rp 42,000.00
8 - Uk. 12 mm , panjang 12 m / Kg Kg Rp 42,000.00
9 - Uk. 14 mm , panjang 9 m / Kg Kg Rp 42,000.00
10 - Uk. 16 mm , panjang 7 m / Kg Kg Rp 42,000.00
11 - Uk. 18 mm , panjang 6 m / Kg Kg Rp 42,000.00
12 - Uk. 20 mm , panjang 4,5 m / Kg Kg Rp 42,000.00
PERALATAN KERJA
1 - pipa besar 6 kg Bh Rp 150,000.00
2 - palu konde besar Bh Rp 85,000.00
3 - pahat topi (kecil) 1" Bh Rp 35,000.00
4 - pahat topi (besar) 1,5 " Bh Rp 45,000.00
5 - gergaji besi Bh Rp 50,000.00
6 - gergaji kayu Bh Rp 66,500.00
7 - meteran kayu 7 m Bh Rp 35,000.00
8 - meteran rool (50 m) Bh Rp 100,000.00
9 - ember cor Bh Rp 15,000.00
10 - tropol kecil Bh Rp 20,000.00
11 - -tropol besar Bh Rp 25,000.00
12 - sekop Bh Rp 95,000.00
13 - lingis besar Bh Rp 75,000.00
14 - cangkul Bh Rp 70,000.00
15 - linggis besar Bh Rp 75,000.00
16 - cangkul Bh Rp 70,000.00
17 - pakuwel Bh Rp 85,000.00
18 - benang tukang Rol Rp 8,500.00
19 - selang ukur mᶦ Rp 3,000.00
20 - water pas Bh Rp 80,000.00
21 - sarung tanggan Psng Rp 3,000.00
22 - gerobak dorong Bh Rp 80,000.00
23 - sharpening dorong Bh Rp 30,000.00
24 - kunci besi 8 inci Bh Rp 27,000.00
25 - kunci besi 12 inci Bh Rp 36,000.00
26 - kunci besi 16 inci Bh Rp 37,000.00
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1. P a s i r M01 M3 248,500.00 Base Camp

2. Batu Kali M02 M3 335,200.00 Lokasi Pekerjaan

3. Agregat Kasar M03 M3 286,718.56 Base Camp

4. Agregat Halus M04 M3 297,238.01 Base Camp

5. F i l l e r M05 Kg 1,020.00 Proses/Base Camp

6. Batu Belah / Kerakal M06 M3 363,100.00 Lokasi Pekerjaan

7. G r a v e l M07 M3 316,000.00 Base Camp

8. Bahan Tanah Timbunan M08 M3 105,000.00 Borrow Pit/quarry

9. Bahan Tanah Pilihan M09 M3 120,000.00 Quarry

10. Aspal Cement M10 KG 8,500.00 Base Camp

11. Kerosen / Minyak Tanah M11 LITER 6,068.80 Pertamina

12. Semen / PC (50kg) M12 Zak 51,000.00 Base Camp


M12 Kg 1,020.00 Base Camp
13. Besi Beton M13 Kg 9,500.00 Lokasi Pekerjaan

14. Kawat Beton M14 Kg 20,000.00 Lokasi Pekerjaan

15. Kawat Bronjong M15 Kg 25,000.00 Lokasi Pekerjaan

16. S i r t u M16 M3 271,700.00 Lokasi Pekerjaan

17. Cat Marka (Non Thermoplas) M17a Kg 20,000.00 Lokasi Pekerjaan


Cat Marka (Thermoplastic) M17b Kg 75,000.00 Lokasi Pekerjaan
18. P a k u M18 Kg 13,000.00 Lokasi Pekerjaan

Berlanjut ke halaman berikut


DAFTAR
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

19. Kayu Perancah M19 M3 1,500,000.00 Lokasi Pekerjaan

20. B e n s i n M20 LITER 4,500.00 Pertamina Feb. 2010

21. S o l a r M21 LITER 4,500.00 Pertamina

22. Minyak Pelumas / Olie M22 LITER 25,000.00 Pertamina

23. Plastik Filter M23 M2 25,000.00 Lokasi Pekerjaan

24. Pipa Galvanis Dia. 3" M24 Batang 300,000.00 Lokasi Pekerjaan

25. Pipa Porus M25 M' 35,000.00 Lokasi Pekerjaan

26. Bahan Agr.Base Kelas A M26 M3 298,672.68 Base Camp

27. Bahan Agr.Base Kelas B M27 M3 288,308.58 Base Camp

28. Bahan Agr.Base Kelas C M28 M3 182,949.95 Base Camp

29. Bahan Agr.Base Kelas C2 M29 M3 - Tidak tersedia

30. Geotextile M30 M2 16,500.00 Lokasi Pekerjaan

31. Aspal Emulsi M31 Kg 9,300.00 Base Camp

32. Gebalan Rumput M32 M2 7,500.00 Lokasi Pekerjaan

33. Thinner M33 LITER 19,000.00 Lokasi Pekerjaan

34. Glass Bead M34 Kg 40,000.00 Lokasi Pekerjaan

35. Pelat Rambu (Eng. Grade) M35a BH 150,000.00 Lokasi Pekerjaan


Pelat Rambu (High I. Grade) M35b BH 200,000.00 Lokasi Pekerjaan
36. Rel Pengaman M36 M' 200,000.00 Lokasi Pekerjaan

Berlanjut ke halaman berikut


DAFTAR
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

37. Beton K-250 M37 M3 1,092,748.25 Lokasi Pekerjaan

38. Beton K-225 M38 M3 1,031,288.39 Lokasi Pekerjaan

39. Baja Tulangan (Polos) U24 M39a Kg 20,000.00 Lokasi Pekerjaan


Baja Tulangan (Ulir) D32 M39b Kg 12,000.00 Lokasi Pekerjaan
40. Kapur M40 M3 120,000.00 Hasil Proses

41. Chipping M41 M3 286,718.56 Base Camp


Kg 152.12 Base Camp

42. Cat M42 Kg 15,000.00 Base Camp

43. Pemantul Cahaya (Reflector) M43 Bh. 15,000.00 Base Camp

44. Pasir Urug M44 M3 75,000.00 Base Camp

45. Arbocell M45 Kg. 25,000.00 Base Camp

46. Baja Bergelombang M46 Kg 7,500.00 Lokasi Pekerjaan

47. Beton K-125 M47 M3 857,044.34 Lokasi Pekerjaan

48. Baja Struktur M48 Kg 16,000.00 Pelabuhan terdekat

49. Tiang Pancang Baja M49 M' 2,661,826.86 Lokasi Pekerjaan

50. T. Pancang Beton Pratekan M50 M3 1,492,500 Pelabuhan terdekat

51. Kawat Las M51 Dos 55,000.00 Lokasi Pekerjaan

52. Pipa Baja M52 Kg 7,500.00 Pelabuhan terdekat

53. Minyak Fluks M53 Liter 3,300.00 Base Camp

Berlanjut ke halaman berikut


DAFTAR
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

54. Bunker Oil M54 Liter 1,000.00 Base Camp

55. Asbuton Halus M55 Ton 315,000.00 Base Camp

56. Baja Prategang M56 Kg 12,000.00 Base Camp

57. Baja Tulangan (Polos) U32 M57a Kg 9,000.00 Lokasi Pekerjaan


Baja Tulangan (Ulir) D39 M57b Kg 9,750.00 Lokasi Pekerjaan
Baja Tulangan (Ulir) D48 M57c Kg 10,500.00 Lokasi Pekerjaan

58. PCI Girder L=10m M58a Buah 45,500,000 Pelabuhan terdekat


PCI Girder L=22.5m M58b Buah 57,200,000 Pelabuhan terdekat
PCI Girder L=26m M58c Buah 74,250,000 Pelabuhan terdekat
PCI Girder L=31m M58d Buah 119,570,000 Pelabuhan terdekat
PCI Girder L=36m M58e Buah 139,590,000 Pelabuhan terdekat
PCI Girder L=41m M58f Buah 181,500,000 Pelabuhan terdekat

59 Beton K-350 M59 M3 1,153,967 Lokasi Pekerjaan

60 Beton K-300 M59a M3 1,132,655 Lokasi Pekerjaan

61 Kerb Pracetak K-350 M60 M' 10,000 Lokasi Base Camp

62 Paving Blok M61 M2 60,000.00 Lokasi Base Camp

63 Lampu type son 250 watt M62 buah 1,250,000.00 Lokasi Base Camp
lengkap rumah lampu

64 Ornamen Lampu 2 Lengan M63 buah 316,000.00 Lokasi Base Camp

65 Tiang LPJU M64 buah 1,150,000.00 Lokasi Base Camp

66 Urugan Porous M65 M3 100,000.00 Lokasi Pekerjaan


REKAP ANALISA BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA SEWA ALAT


KODE HARGA PER
No. JENIS PERALATAN KET.
JAM KERJA
ALAT ALAT (di luar PPN)
1 2 3 4 5 6
1. ASPHALT MIXING PLANT E01 Rp 3,200,000,000.00 Rp 2,073,789.88 PEK. Ringan
2. ASPHALT FINISHER E02 Rp 1,100,000,000.00 Rp 277,181.49 PEK. Ringan
3. ASPHALT SPRAYER E03 Rp 225,000,000.00 Rp 78,188.09 PEK.Berat
4. BULLDOZER 100-150 HP E04 Rp 955,000,000.00 Rp 335,949.32 PEK.Berat
5. COMPRESSOR 4000-6500 L\M E05 Rp 283,000,000.00 Rp 143,410.90 PEK.Berat
6. CONCRETE MIXER 0.3-0.6 M3 E06 Rp 510,000,000.00 Rp 155,083.00 PEK. Ringan
7. CRANE 10-15 TON E07 Rp 423,000,000.00 Rp 230,241.82 PEK.Berat
8. DUMP TRUCK 3-4 M3 E08 Rp 330,000,000.00 Rp 169,717.53 PEK.Berat
9. DUMP TRUCK E09 Rp 345,000,000.00 Rp 193,239.59 PEK.Berat
10. EXCAVATOR 80-140 HP E10 Rp 888,000,000.00 Rp 272,863.27 PEK.Berat
11. FLAT BED TRUCK 3-4 M3 E11 Rp 292,000,000.00 Rp 181,899.14 PEK.Berat
12. GENERATOR SET E12 Rp 126,000,000.00 Rp 223,567.47 PEK.Berat
13. MOTOR GRADER >100 HP E13 Rp 955,000,000.00 Rp 323,761.82 PEK.Berat
14. TRACK LOADER 75-100 HP E14 Rp 660,000,000.00 Rp 236,265.41 PEK.Berat
15. WHEEL LOADER 1.0-1.6 M3 E15 Rp 890,000,000.00 Rp 309,853.71 PEK.Berat
16. THREE WHEEL ROLLER 6-8 T E16 Rp 205,000,000.00 Rp 110,471.17 PEK.Berat
17. TANDEM ROLLER 6-8 T. E17 Rp 576,000,000.00 Rp 189,854.36 PEK.Berat
18. TIRE ROLLER 8-10 T. E18 Rp 831,000,000.00 Rp 264,173.58 PEK.Berat
19. VIBRATORY ROLLER 5-8 T. E19 Rp 852,000,000.00 Rp 268,812.39 PEK.Berat
20. CONCRETE VIBRATOR E20 Rp 72,000,000.00 Rp 57,470.18 PEK. Ringan
21. STONE CRUSHER E21 Rp 1,426,000,000.00 Rp 508,872.46 PEK.Berat
22. WATER PUMP 70-100 mm E22 Rp 95,500,000.00 Rp 56,925.48 PEK.Berat
23. WATER TANKER 3000-4500 L. E23 Rp 310,000,000.00 Rp 185,750.61 PEK.Berat
24. PEDESTRIAN ROLLER E24 Rp 86,000,000.00 Rp 47,205.03 PEK.Berat
25. TAMPER E25 Rp 121,000,000.00 Rp 79,353.53 PEK. Ringan
26. JACK HAMMER E26 Rp 43,000,000.00 Rp 40,705.03 PEK.Berat
27. FULVI MIXER E27 Rp 136,000,000.00 Rp 107,894.68 PEK. Ringan
28. CONCRETE PUMP E28 Rp 301,000,000.00 Rp 158,951.24 PEK.Berat
29. TRAILER 20 TON E29 Rp 228,000,000.00 Rp 205,375.05 PEK.Berat
30 PILE DRIVER + HAMMER E30 Rp 171,000,000.00 Rp 74,758.66 PEK.Berat
31. CRANE ON TRACK 35 TON E31 Rp 351,000,000.00 Rp 189,204.62 PEK.Berat
32. WELDING SET E32 Rp 28,000,000.00 Rp 56,348.33 PEK.Berat
33. BORE PILE MACHINE E33 Rp 2,251,000,000.00 Rp 587,270.53 PEK.Berat
34. ASPHALT LIQUID MIXER E34 Rp 36,000,000.00 Rp 30,463.53 PEK.Berat
PERHITUNGANN

VOLUME JALAN DAN JEMBATA N


GALIAN DAN TIMBUNAN

TABEL GALIAN DAN TIMBUNAN


DISTANCE AREA ( M2 ) VOLUMES ( M3 ) COMULATIVE ( M3 )
NO STA
(M) CUT FILL CUT FILL CUT FILL
a b c d e f g h i
1 1+445 5.571
20.00 159.28 242.63 159.28 242.634
Sta. 7+ 455

1.66 3.50 3.50 1.66


0.50

0.50
0.40

0.40
0.40 0.40

DISTANCE AREA ( M2 ) VOLUMES ( M3 ) COMULATIVE ( M3 )


NO STA
(M) CUT FILL CUT FILL CUT FILL
a b c d e f g h i
2 1+465 10.357
10.00 91.32 - 250.60 242.634
Sta. 7+ 465
1.66 3.50 3.50
1.00

1.00
0.50

0.50

0.50 0.50
DISTANCE AREA ( M2 ) VOLUMES ( M3 ) COMULATIVE ( M3 )
NO STA
(M) CUT FILL CUT FILL CUT FILL
3 1+475 7.906
10.00 80.16 - 330.76 242.634
Sta. 7+ 485
1.66 3.50 3.50 1.66

4.37
4.37

DISTANCE AREA ( M2 ) VOLUMES ( M3 ) COMULATIVE ( M3 )


NO STA
(M) CUT FILL CUT FILL CUT FILL
4 1+485 8.126
10.00 582.69 - 913.45 242.634
Sta. 7+ 485
1.66 3.50 3.50 1.66
4.37

4.37

DISTANCE AREA ( M2 ) VOLUMES ( M3 ) COMULATIVE ( M3 )


NO STA
(M) CUT FILL CUT FILL CUT FILL
5 1+495 108.413
10.00 1,132.12
Sta. 7+495
- 2,045.57 242.634
1.66 3.50 3.50 1.66
4.30

4.30
Sta. 7+495
1.66 3.50 3.50 1.66

4.30

4.30
1.00

1.00
3.00

3.00
DISTANCE AREA ( M2 ) VOLUMES ( M3 ) COMULATIVE ( M3 )
NO STA
(M) CUT FILL CUT FILL CUT FILL
6 1+505 118.011
6,010.00 761,762.97 - 763,808.54 242.634
Sta. 7+ 505
1.66 3.50 3.50 1.66
1.93

1.93
0.75

0.75

DISTANCE AREA ( M2 ) VOLUMES ( M3 ) COMULATIVE ( M3 )


NO STA
(M) CUT FILL CUT FILL CUT FILL
7 7+515 135.488

Sta. 7+ 515
1.66 3.50 3.50 1.66
0.50 0.68
Sta. 7+ 515
1.66 3.50 3.50 1.66

0.50 0.68

Keterangan : - Luas Penampang dihitung berdasarkan 767,508.189


data kordinat
- Semua ukuran dalam meter
PERHITUNGAN

VOLUME STRUKTUR JEMBATAN


Tabel Volume Struktur Atas
Dimensi
h total t plat h bersi Luas Panjang Volume Jmlh Vol total
No Uraian b
m m m m m 2
m m 3
bh m3
1 Balok Girder tipe II (K-300) 0.4 1 0.2 0.8 0.32 12.76 4.0832 6 24.499
0.80
1.00

2 Balok Diafragma (K-300) 0.3 0.45 0.135 1.3 0.1755 25 4.388


0.45

0.30
28.887

Dimensi
h total t plat h bersi Luas Panjang Volume Jmlh Vol total
NoUraian b
m m m m m2 m m3 bh m3

3 Lantai Jembatan 2.647 12.76 33.8 1 33.776

12.76

33.776

Dimensi (m) Luas L/tebal Volume Vol total


No Uraian Jmlh
a b c d e m2 m m3 m3
4 Abutment (K-300)
1 0.25 0.99 0.2475 0.935 0.23 4.00 0.93
2 0.9 0.3 0.2700 10.92 2.95 2.00 5.90
3 1.2 0.55 0.6600 10.92 7.21 2.00 14.41
4 0.55 0.99 0.5445 10.92 5.95 2.00 11.89
b
a I
b
a II

5 0.5 1.49 0.7450 10.92 8.14 2.00 16.27


b
b
a III
IV a

6 0.68 0.5 0.17 10.92 1.86 2.00 3.71


b b
V a VI
c

7 a VII

b
0.5 1.49 0.6 0.5225 10.92 5.71 2.00 11.41
c

8 a
VIII
b
IX
a
1.7 0.7 1.1900 10.92 12.99 2.00 25.99
9 0.3 3.5 0.6 0.615 10.92 6.72 2.00 13.43
b

10 0.7 3.5 2.4500 10.92 26.75 2.00 53.51

7.4145 78.50 157.45


Dimensi (m) Luas L/tebal Volume Vol total
No Uraian Jmlh
a b c d e m2 m m3 m3
5 Tangan Jembatan : 0.15 0.16

0.1700 0.15 0.0255 14 0.3570

0 .4 7

0.45

6 Kasnting
0.081 12.76 1.03356 2 2.06712

7 Trotoar 0.25 12.76 3.19 2 6.38

8 Plat Injak (K-250) a


b
b
a
c

0.3 5 1.5 7 10.5 2 21


0.25 0.4 0.2 0.065 7 0.455 2 0.91

9 Wing Wall (K-250)


Kepala Wing Wall
1 0.5 0.3 0.15 1.95 0.2925 4 1.17
2 a I

b
a IV
b
c
0.5 0.2 0.3 0.08 1.95 0.156 4 0.624
b b
I aa II c

Wing Wall
1 2.7 1.95 5.265 0.25 1.31625 4 5.265
2 1 1.18 0.59 0.25 0.1475 4 0.59
3 1 1.45 0.7 1.2325 0.25 0.308125 4 1.2325
4 1.5 0.68 1 0.85 0.25 0.2125 4 0.85
S= 40.446

2. Tabel Volume Struktur Bawah


Dimensi Luas m2 Volume Jmlh Sumuran Vol total
No Uraian
tebal Dia Luar Dia dalam h A luar A dalam m3 bh m3
Pondasi Sumuran :
10 Beton Bertulang (K-250) 0.25 2.5 2.25 3 4.9087 3.9761 2.7980 4 11.1919
11 Beton K-250 0.25 2.5 2.25 2 4.9087 3.9761 7.9522 4 31.8086

0.0000
12 Beton Ciklop f'c = 15 Mpa 0.3 3 2.7 1.50 7.0686 5.7256 2.0145 4 8.0582
13 Beton mutu rendah f'c = 15 Mpa 0.3 3 2.7 1.00 7.0686 5.7256 1.3430 4 5.3721
13.4303

Dimensi
h total h bersi Luas Panjang Volume Jmlh Vol total
No Uraian b t
m m m m m 2
m m 3
m3

1 Galian Struktur
Galian Struktur 2-4 m 3 3.5 7.068583 24.74004 4 98.960

2 Galian Biasa
Galian Abutmen 4 1.5 6 4.7 28.2 2 56.400
56.400

Dimensi
h total t plat h bersi Luas Panjang Volume Jmlh Vol total
No Uraian b
m m m m m 2
m m 3
bh m3

1 Lantai Kerja Sumuran (f'c = 10 Mpa) 3.5 0.1 0.35 10.92 3.822 2 7.644
2 Lantai Kerja Plat Injak (f'c = 10 Mpa) 2.5 0.05 0.125 7 0.875 2 1.750
S= 9.394
Dimensi Jumlah VOL.
No. Gambar Sketsa
LA H P (Bh.) (M3)

1. Parapet Jembatan
0.5 1.25 2.5 4 3.91 2.50 0.50

0.10
0.05
0.05
0.60
1.25

0.05
0.40
Dimensi Jumlah VOL.
No. Gambar Sketsa
LA H P (Bh.) (M3)

2. Parapet Oprit
0.3 0.4 2 18 4.32 2.50 0.50

0.10
0.05
0.05
0.60
1.25

0.05
0.40
8.23

Rekapitulasi Volume Pekerjaan Pasangan Batu

Sat.

2. Pekerjaan Pasangan Batu Parapet Jembatan M3 8.23