Rincian Biaya Pelebaran Jalan Pacitan-Trenggalek
Rincian Biaya Pelebaran Jalan Pacitan-Trenggalek
Nama Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Tahun : 2013
Nama Perusahaan : PT. Pelangi Nusantara
JUMLAH HARGA
No. DIVISI URAIAN
(Rp)
1 2 3
DIVISI 1. UMUM 100,750,000.00
DIVISI 2 DRAINASE 2,133,672,864.00
DIVISI 3 PEKERJAAN TANAH 1,987,179,988.00
DIVISI 4 PELEBARAN PERKERASAN DAN BAHU JALAN 548,356,965.00
DIVISI 5 PERKERASAN NON ASPAL 3,025,659,883.00
DIVISI 6 PERKERASAN ASPAL 11,290,039,767.00
DIVISI 7 STRUKTUR 2,487,619,428.00
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 664,596,392.00
DIVISI 9. PEKERJAAN HARIAN -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN 110,000,000.00
SUB TOTAL I 22,347,875,287.00
JUMLAH HARGA PEKERJAAN 22,347,875,287.00
PPN 10% 2,234,787,528.70
TOTAL NILAI PENAWARAN 24,582,662,815.70
DIBULATKAN 24,582,662,000.00
Terbilang :
DUA PULUH EMPAT MILYAR LIMA RATUS DELAPAN PULUH DUA JUTA ENAM
RATUS ENAM PULUH DUA RIBU RUPIAH
Nama Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Tahun : 2013
Nama Perusahaan : PT. Pelangi Nusantara
DIVISI 2 DRAINASE
2.1.(1) Galian untuk selokan Drainase dan Saluran air 4,034.00 15,000.00 67.50 1,012,500.00 241.88 3,628,200.00 67.50 1,012,500.00
2.2.(1) Pasangan batu dengan mortar 4,498.00 325,000.00 154.69 48,727,350.00 142.88 46,436,000.00 206.70 67,177,500.00 191.78 62,328,500.00 504.27 224,669,350.00
2.3.(2) Gorong - gorong pipa beton bertulang diameter 55 - 65 cm 26.00 230,000.00 12 2,760,000.00
2.3.(3) Gorong - gorong pipa beton bertulang diameter 75 - 85 cm 64.00 275,000.00
2.3.(4) Gorong - gorong pipa beton bertulang diameter 95 - 105 cm 7.00
DIVISI 7 STRUKTUR
7.1(7)a Beton mutu sedang fc' = 20 mpa ( K 250 ) 157.00 600,000.00 0.63 378,000.00 3.03 1,818,000.00 3.66 2,196,000.00
7.3(1) Baja tulangan BJ 24 Polos 15,700.00 9,113.00 44.57 406,166.41 125.868 1,147,035.08 170.438 1,553,201.49
7.9(1) Pasangan batu 4,953.00 320,000.00 764.88 237,112,800.00 289.36 89,701,600.00 117.70 37,665,200.00 86.85 27,792,000.00 86.85 27,793,440.00 1,345.65 420,065,040.00
7.15(1) Pembongkaran pasangan batu 70.00
7.15(2) Pembongkaran beton 26.00
Leneng 500,000.00
Setuju / Dibayar
PT. PELANGI NUSANTARA Dibayar tgl. …….. Diperiksa Oleh Mandor Borong Diajukan Oleh :
14+700.00 1 0.40 1.30 0.50 0.585 0.585 6.80 6.80 6.80 3.98
14+706.80 Kanan 0.40 1.30 0.50 0.585
1' A
1.170
Pondasi 2' 0.30 0.50 0.150 0.150 6.80 6.80 6.80 1.02
2' 0.30 0.50 0.150 C
0.300
Jumlah 5.00
B
14+706.80 1 0.40 0.90 0.40 0.360 0.340 13.00 13.00 13.00 4.42
14+719.80 0 0.40 0.80 0.40 0.320 D
1'
0.680
Pondasi 2' 0.20 0.40 0.080 0.080 13.00 13.00 13.00 1.04
2' 0.20 0.40 0.080
0.160
Jumlah 5.46
TOTAL 10.46
SUB TOTAL 10.46
OPNAME 6 MANDOR : BETY
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
14+719.80 1 0.40 0.80 0.40 0.320 0.300 8.30 8.30 8.30 2.49
14+728.10 Kanan 0.40 0.70 0.40 0.280
1'
0.600 A
Pondasi 2' 0.20 0.40 0.080 0.080 8.30 8.30 8.30 0.66
2' 0.20 0.40 0.080
C
0.160
Jumlah 3.15
14+728.10 1 0.40 0.70 0.40 0.280 0.260 9.70 9.70 9.70 2.52
14+737.80 0 0.40 0.60 0.40 0.240 B
1'
D
0.520
Pondasi 2' 0.20 0.40 0.080 0.080 9.70 9.70 9.70 0.78
2' 0.20 0.40 0.080
0.160
Jumlah 3.30
TOTAL 6.45
SUB TOTAL 16.91
OPNAME 6 MANDOR : BETY
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
A
1.350
Pondasi 2' 0.30 0.50 0.150 0.150 3.40 3.40 3.40 0.51
2' 0.30 0.50 0.150
C
0.300
Jumlah 2.80
14+741.20 1 0.40 0.40 0.30 0.140 0.190 22.30 22.30 22.30 4.24
B
14+763.50 0 0.40 0.60 0.40 0.240
1' D
0.380
Pondasi 2' 0.20 0.30 0.060 0.070 22.30 22.30 22.30 1.56
2' 0.20 0.40 0.080
0.140
Jumlah 5.80
TOTAL 8.60
SUB TOTAL 25.51
OPNAME 6 MANDOR : BETY
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
14+763.50 1 0.40 0.50 0.40 0.200 0.200 15.00 15.00 15.00 3.00
14+778.50 Kanan 0.40 0.50 0.40 0.200
1'
A
0.400
Pondasi 2' 0.20 0.40 0.080 0.080 15.00 15.00 15.00 1.20
2' 0.20 0.40 0.080
C
0.160
Jumlah 4.20
14+778.50 1 0.40 0.40 0.40 0.160 0.150 12.60 12.60 12.60 1.89 B
14+791.10 0 0.40 0.40 0.30 0.140
1'
D
0.300
Pondasi 2' 0.20 0.40 0.080 0.070 12.60 12.60 12.60 0.88
2' 0.20 0.30 0.060
0.140
Jumlah 2.77
TOTAL 6.97
SUB TOTAL 32.48
OPNAME 6 MANDOR : BETY
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
14+791.10 0.40 0.50 0.40 0.200 0.200 1.50 18.50 18.50 3.70 gendong
14+809.60 0.40 0.50 0.40 0.200
A
0.400
Pondasi kiri 2' 0.20 0.40 0.080 0.080 1.50 18.50 10.00 0.80
C
2' 0.20 0.40 0.080
0.160
Jumlah 4.50
B
14+809.60 0.40 1.50 0.60 0.750 0.533 7.60 15.00 15.00 7.99 D
14+824.60 0.40 0.70 0.50 0.315
1.065
0.340
Jumlah 9.91
TOTAL 14.41
SUB TOTAL 46.89
OPNAME 6 MANDOR : BETY
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
14+824.60 0.40 1.00 0.50 0.450 0.450 8.00 8.00 8.00 3.60
14+832.60 0.40 1.00 0.50 0.450
A
0.900
Pondasi kiri 2' 0.30 0.50 0.150 0.150 8.00 8.00 8.00 1.20
C
2' 0.30 0.50 0.150
0.300
Jumlah 4.80
B
14+832.60 0.40 0.70 0.50 0.315 0.315 7.00 7.00 7.00 2.21 D
14+845.20 0.40 0.70 0.50 0.315
0.630
0.200
Jumlah 2.91
TOTAL 7.71
SUB TOTAL 54.60
OPNAME 6 MANDOR : BETY
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
Jumlah 11.91
tangga 2 1.20 0.35 3.00 1.260 1.00 1.00 1.00 1.26
masuk 0.90 0.35 3.00 0.945 1.00 1.00 1.00 0.95
pasar 0.60 0.35 3.00 0.630 1.00 1.00 1.00 0.63
0.30 0.35 3.00 0.315 1.00 1.00 1.00 0.32
Jumlah 15.62
tangga 3
masuk 1.50 0.35 2.50 1.313 1.20 1.20 1.20 1.58
pasar 1.20 0.35 2.50 1.050 1.20 1.20 1.20 1.26
0.90 0.35 2.50 0.788 1.20 1.20 1.20 0.95
0.60 0.35 2.50 0.525 1.20 1.20 1.20 0.63
0.30 0.35 2.50 0.263 1.20 1.20 1.20 0.32
-
Jumlah 4.73
TOTAL 32.26
SUB TOTAL 86.85
( OKNAM 6 MANDOR BETY PEMBESIAN )
### : #REF!
### : #REF!
### : PEMBESIAN
1 JalanMasuk
Kampung
- Memanjang Plat
0.05 6.70 0.05 6.80 15 2 30.00 10 0.617 125.87
b
JalanMasuk
RUMAH
DIVISI 2 DRAINASE
2.1.(1) Galian untuk selokan Drainase dan Saluran air 4,034.00 15,000.00 131.07 1,966,050.00 102.55 1,538,250.00 112.50 1,687,500.00 346.12 5,191,800.00
2.2.(1) Pasangan batu dengan mortar 4,498.00 325,000.00 118.79 37,418,850.00 283.02 89,151,300.00 50.92 16,549,000.00 142.80 46,410,000.00 13.95 4,533,750.00 609.48 194,062,900.00
2.3.(2) Gorong - gorong pipa beton bertulang diameter 55 - 65 cm 26.00 230,000.00
2.3.(3) Gorong - gorong pipa beton bertulang diameter 75 - 85 cm 64.00 275,000.00
2.3.(4) Gorong - gorong pipa beton bertulang diameter 95 - 105 cm 7.00
DIVISI 7 STRUKTUR
7.1(7)a Beton mutu sedang fc' = 20 mpa ( K 250 ) 157.00 600,000.00 6.8 4,080,000.00 1.368 820,800.00 155.61 93,366,000.00 163.78 98,266,800.00
7.3(1) Baja tulangan BJ 24 Polos 15,700.00 9,113.00 649.39 5,917,891.07 140.3058 1,278,606.76 2.34 21,324.42 792.04 7,217,822.25
7.9(1) Pasangan batu 4,953.00 320,000.00 456.59 141,542,900.00 375.32 116,347,998.75 445.34 142,508,800.00 400.55 128,176,000.00 1,677.80 528,575,698.75
7.15(1) Pembongkaran pasangan batu 70.00
7.15(2) Pembongkaran beton 26.00
Setuju / Dibayar
PT. PELANGI NUSANTARA Dibayar tgl. …….. Diperiksa Oleh Mandor Borong Diajukan Oleh :
DIVISI 2 DRAINASE
2.1.(1) Galian untuk selokan Drainase dan Saluran air 4,034.00 15,000.00 104.65 1,569,750.00 187.31 2,809,650.00 291.96 4,379,400.00
2.2.(1) Pasangan batu dengan mortar 4,498.00 325,000.00 124.82 39,316,725.00 205.61 64,767,150.00 343.63 111,679,750.00 86.71 28,180,750.00 760.77 243,944,375.00
2.3.(2) Gorong - gorong pipa beton bertulang diameter 55 - 65 cm 26.00 230,000.00 4 920,000.00 4.00 920,000.00
2.3.(3) Gorong - gorong pipa beton bertulang diameter 75 - 85 cm 64.00 275,000.00 4 1,100,000.00 4.00 1,100,000.00
2.3.(4) Gorong - gorong pipa beton bertulang diameter 95 - 105 cm 7.00
DIVISI 7 STRUKTUR
7.1(7)a Beton mutu sedang fc' = 20 mpa ( K 250 ) 157.00 600,000.00 3.57 2,142,000.00 2.34 1,404,000.00 5.91 3,546,000.00
7.3(1) Baja tulangan BJ 24 Polos 15,700.00 9,113.00 385.01 3,508,596.13 189.3772 1,725,794.42 574.39 5,234,390.55
7.9(1) Pasangan batu 4,953.00 320,000.00 711.17 220,462,700.00 633.35 196,338,887.50 461.65 147,728,000.00 672.64 215,244,800.00 2,478.81 779,774,387.50
7.15(1) Pembongkaran pasangan batu 70.00
7.15(2) Pembongkaran beton 26.00
Setuju / Dibayar
PT. PELANGI NUSANTARA Dibayar tgl. …….. Diperiksa Oleh Mandor Borong Diajukan Oleh :
DIVISI 2 DRAINASE
2.1.(1) Galian untuk selokan Drainase dan Saluran air 4,034.00 15,000.00 73.13 1096875
2.2.(1) Pasangan batu dengan mortar 4,498.00 325,000.00 283.4 89,271,000.00 185.41 60,257,600.00 79.50 25,837,500.00 205.73 66,860,868.75 468.81 152,362,600.00
2.3.(2) Gorong - gorong pipa beton bertulang diameter 55 - 65 cm 26.00 230,000.00 2 460,000.00 3.00 690,000.00 2.00 460,000.00 2 460,000.00
2.3.(3) Gorong - gorong pipa beton bertulang diameter 75 - 85 cm 64.00 275,000.00 7.5 2,062,500.00 7.50 2,062,500.00
2.3.(4) Gorong - gorong pipa beton bertulang diameter 95 - 105 cm 7.00
DIVISI 7 STRUKTUR
7.1(7)a Beton mutu sedang fc' = 20 mpa ( K 250 ) 157.00 600,000.00 3.5 2,100,000.00 0.76 456,000.00 0.68 410,400.00 7.00 4,201,500.00 4.26 2,556,000.00
7.3(1) Baja tulangan BJ 24 Polos 15,700.00 9,113.00 541.7 4,936,512.10 85.89 782,711.92 65.80 599,662.74 532.58 4,853,366.91 627.59 5,719,224.02
7.9(1) Pasangan batu 4,953.00 320,000.00 465.16 144,199,600.00 247.31 76,666,100.00 85.43 26,481,750.00 98.80 31,616,000.00 288.93 92,458,240.00 281.91 90,211,560.00 896.70 286,942,400.00
7.15(1) Pembongkaran pasangan batu 70.00
7.15(2) Pembongkaran beton 26.00
PERHITUNGAN
LUAS PANJANG VOLUME
NO STA LOKASI DIMENSI GAMBAR / SKET
A A' B C D E F G H M2 M' M3
GORONG 2 1M DEA 60
SUB TOTAL 73.13
TOTAL 73.13
OKNAM MANDOR 6 MDR BUDI OP
PERHITUNGAN
LUAS PANJANG VOLUME
NO STA LOKASI DIMENSI GAMBAR / SKET
A A' B C D E F G H M2 M' M3
ketro 15 + 350.0 s/d 15 + 580.80 kiri 0.30 0.30 0.90 0.60 0.30 0.35 0.50 0.35 1.215 kiri
0.90 0.60 0.50 0.420
0.795 230.80 183.49
A B A'
330.800
230.800
C
E F G
SUB TOTAL 183.49 Rumus :
TOTAL 183.49 ((((A+A'+B)+(E+F+G)/2))*(C+D))-((F+B)/2*C)))
Nama Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
PERHITUNGAN VOLUME
Pekerjaan : Pekerjaan Pasangan Batu dengan Mortar
No. Item : 2.2
PERHITUNGAN
LUAS PANJANG VOLUME
NO STA LOKASI DIMENSI GAMBAR / SKET
A A' B C D E F G H M2 M' M3
TOTAL 4.96
TOTAL 12.17
5.10
TOTAL 22.24
SUB TOTAL 205.73
OKNAM 6 MANDOR SUMIRAN (BETON K 250)
B
( OKNAM 6 MANDOR SUMIRAN PEMBESIAN )
c
0.15 0.15 0.15 0.15 0.05 0.05 0.70 19 2 38.00 10 0.617 16.41
d
c
d
Ka Memanjang Plat
0.05 6.95 0.05 7.05 24 1 24.00 10 0.617 104.40
b
Ka Begel Plat
JalanMasuk b 0.15 1.50 0.15 1.70 0.05 0.05 3.60 47 1 47.00 13 1.042 176.31
c
RUMAH
d
Ka Memanjang Plat
0.05 4.00 0.05 4.10 26.00 1 26.00 10 0.617 65.77
b
14+400.00 1 0.40 3.85 1.40 3.465 3.353 6.80 6.80 6.80 22.80
14+406.80 Kanan 0.40 3.60 1.40 3.240
1'
6.705 A
Pondasi 2' 1.00 1.40 1.400 1.400 6.80 6.80 6.80 9.52
2' 1.00 1.40 1.400
C
2.800
Jumlah 32.32
14+406.80 1 0.40 3.60 1.40 3.240 2.425 6.50 6.50 6.50 15.76
14+413.30 Kanan 0.40 2.30 1.00 1.610
1' B
D
4.850
Pondasi 2' 1.00 1.40 1.400 1.100 6.50 6.50 6.50 7.15
2' 0.80 1.00 0.800
2.200
Jumlah 22.91
TOTAL 55.23
SUB TOTAL 55.23
OPNAME 6 MANDOR : SUMIRAN
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
14+413.30 1 0.40 2.30 1.00 1.610 1.130 5.00 5.00 5.00 5.65
14+418.30 Kiri 0.40 1.30 0.60 0.650
1'
2.260 A
Pondasi 2' 0.60 1.00 0.600 0.450 5.00 5.00 5.00 2.25
2' 0.50 0.60 0.300
C
0.900
Jumlah 7.90
14+418.30 1 0.40 1.35 0.70 0.743 0.634 6.60 6.60 6.60 4.18
14+424.90 Kiri 0.40 1.05 0.60 0.525 B
1'
D
1.268
Pondasi 2' 0.50 0.70 0.350 0.325 6.60 6.60 6.60 2.15
2' 0.50 0.60 0.300
0.650
Jumlah 6.33
TOTAL 14.23
SUB TOTAL 69.46
OPNAME 6 MANDOR : SUMIRAN
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
14+649.90 0.40 2.50 1.00 1.750 2.075 7.20 7.20 7.20 14.94
14+657.10 0.40 3.00 1.20 2.400
A
4.150
Pondasi kiri 2' 0.70 1.00 0.700 0.770 7.20 7.20 7.20 5.54
C
2' 0.70 1.20 0.840
1.540
Jumlah 20.48
B
14+657.10 0.40 3.00 1.20 2.400 2.400 5.50 5.50 5.50 13.20 D
14+662.60 0.40 3.00 1.20 2.400
4.800
1.680
Jumlah 17.82
TOTAL 38.30
SUB TOTAL 107.76
OPNAME 6 MANDOR : SUMIRAN
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
14+662.60 0.40 3.00 1.20 2.400 2.194 7.00 7.00 7.00 15.36
14+669.60 0.40 2.65 1.10 1.988
A
4.388
Pondasi kiri 2' 0.70 1.20 0.840 0.750 7.00 7.00 7.00 5.25
C
2' 0.60 1.10 0.660
1.500
Jumlah 20.61
B
14+669.60 0.40 2.65 1.10 1.988 1.709 7.50 7.50 7.50 12.82 D
14+677.10 0.40 2.20 0.90 1.430
3.418
1.400
Jumlah 18.07
TOTAL 38.67
SUB TOTAL 146.43
OPNAME 6 MANDOR : SUMIRAN
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
12+062.00 0.40 1.00 0.50 0.450 0.855 2.20 2.20 2.20 1.88
12+064.20 Kiri 0.40 2.10 0.80 1.260
penutup A
1.710
12+064.20 0.40 2.10 0.80 1.260 1.260 2.60 2.60 2.60 3.28
12+066.80 Kiri 0.40 2.10 0.80 1.260
C
2.520
Jumlah 5.16
B
12+064.20 0.40 2.10 0.80 1.260 1.540 10.50 10.50 10.50 16.17 D
12+074.70 Kiri 0.40 2.60 1.00 1.820
3.080
1.080
Jumlah 21.84
TOTAL 27.00
SUB TOTAL 173.43
OPNAME 6 MANDOR : SUMIRAN
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
12+077.30 0.40 2.60 1.00 1.820 1.820 8.30 8.30 8.30 15.11
12+085.60 Kiri 0.40 2.60 1.00 1.820
A
3.640
1.200
Jumlah 20.09
B
12+085.60 0.40 2.40 1.00 1.680 1.505 1.90 1.90 1.90 2.86
12+087.50 Kiri 0.40 1.90 1.00 1.330 D
3.010
Jumlah -
TOTAL 20.09
SUB TOTAL 193.52
OPNAME 6 MANDOR : SUMIRAN
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
12+010.00 0.40 2.00 0.80 1.200 1.290 14.40 14.40 14.40 18.58
12+024.40 Kiri 0.40 2.30 0.80 1.380
A
2.580
0.960
Jumlah 25.49
B
12+024.40 0.40 2.30 0.80 1.380 1.290 6.00 6.00 6.00 7.74
12+030.40 Kiri 0.40 2.00 0.80 1.200 D
2.580
0.880
Jumlah 10.38
TOTAL 35.87
SUB TOTAL 229.38
OPNAME 6 MANDOR : SUMIRAN
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
12+010.00 0.40 2.00 0.80 1.200 1.290 14.40 14.40 14.40 18.58
12+024.40 Kiri 0.40 2.30 0.80 1.380
A
2.580
0.880
Jumlah 24.91
B
12+024.40 0.40 2.00 0.80 1.200 1.200 1.40 1.40 1.40 1.68
12+025.80 Kiri 0.40 2.00 0.80 1.200 D
2.400
0.800
Jumlah 2.24
TOTAL 27.15
SUB TOTAL 256.54
OPNAME 6 MANDOR : SUMIRAN
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
12+025.80 0.40 2.00 0.80 1.200 0.825 7.00 7.00 7.00 5.78
12+032.80 Kiri 0.40 1.00 0.50 0.450
A
1.650
0.650
Jumlah 8.05
B
12+032.80 0.40 1.50 0.60 0.750 0.750 3.50 3.50 3.50 2.63 D
12+036.30
0.750
Jumlah 2.63
TOTAL 10.68
SUB TOTAL 267.21
OPNAME 6 MANDOR : SUMIRAN
Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : PASANGAN BATU
11+123.30 0.40 1.50 0.60 0.75 0.750 14.00 14.00 14.00 10.50
11+137.30 0.40 1.50 0.60 0.75
A
1.500
0.600
Jumlah 14.70
B
D
-
Jumlah -
TOTAL 14.70
- 281.91
REKAPITULASI OPNAME PEKERJAAN GADRIL
PELEBARAN JALAN Bts. Kota PACITAN - Kab. TRENGGALEK
DIVISI 2 DRAINASE
2.1.(1) Galian untuk selokan Drainase dan Saluran air M3 4,034.00
2.2.(1) Pasangan batu dengan mortar M3 4,498.00
2.3.(2) Gorong - gorong pipa beton bertulang diameter 55 - 65 cm M 26.00
2.3.(3) Gorong - gorong pipa beton bertulang diameter 75 - 85 cm M 64.00
2.3.(4) Gorong - gorong pipa beton bertulang diameter 95 - 105 cm M 7.00
DIVISI 7 STRUKTUR
7.1(7)a Beton mutu sedang fc' = 20 mpa ( K 250 ) M3 157.00
7.3(1) Baja tulangan BJ 24 Polos M3 15,700.00
7.9(1) Pasangan batu M3 4,953.00
7.15(1) Pembongkaran pasangan batu M3 70.00
7.15(2) Pembongkaran beton M3 26.00
Jumlah
Potongan Retensi 5%
Potongan Semem
Jumlah
Dibulatkan
PERHITUNGAN VOLUME
Pekerjaan : Pekerjaan Pasangan Batu dengan Mortar
No. Item : 2.2
PERHITUNGAN
LUAS PANJANG VOLUME
NO STA LOKASI DIMENSI GAMBAR / SKET
A A' B C D E F G H M2 M' M3
TOTAL 24.95
TOTAL 23.17
31.52
TOTAL 79.64
SUB TOTAL
OKNAM 6 MDR TONO
Nama Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : Pekerjaan Pasangan Batu dengan Mortar
No. Item : 2.2
PERHITUNGAN
LUAS PANJANG VOLUME
NO STA LOKASI DIMENSI GAMBAR / SKET
A A' B C D E F G H M2 M' M3
ketro 14 + 850.0 s/d 15 + 50.00 kiri 0.30 0.30 0.90 0.60 0.30 0.35 0.50 0.35 1.215 kiri
0.90 0.60 0.50 0.420
0.795 42.65 33.91
A B A'
DEPAN SUKIR 0.30 0.30 0.90 0.60 0.30 0.35 0.50 0.35 1.215
0.90 0.60 0.50 0.420
0.795 70.00 55.65 C
DEPN WR BU PANGAT 0.30 0.30 0.90 0.60 0.30 0.35 0.50 0.35 1.215
0.90 0.60 0.50 0.420
0.795 146.00 116.07
E F G
SUB TOTAL 205.63 Rumus :
TOTAL 285.27 ((((A+A'+B)+(E+F+G)/2))*(C+D))-((F+B)/2*C)))
OKNAM 6 MDR TONO
Nama Paket : Pelebaran Jalan Bts. Kota. Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT. Pelangi Nusantara
Pekerjaan : Pekerjaan Pasangan Batu dengan Mortar
No. Item : 2.2
PERHITUNGAN
LUAS PANJANG VOLUME
NO STA LOKASI DIMENSI GAMBAR / SKET
A A' B C D E F G H M2 M' M3
Nama Paket : Pelebaran Jalan Bts. Kota Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT.PELANGI NUSANTARA
Pekerjaan : PEMBESIAN
c
d
Nama Paket : Pelebaran Jalan Bts. Kota Pacitan - Bts. Kab. Trenggalek
Penyedia Jasa : PT.PELANGI NUSANTARA
Pekerjaan : BETON
PERHITUNGAN VOLUME
Pekerjaan : Galian untuk selokan Drainase dan Saluran air
No. Item : 2.1(1)
PERHITUNGAN
LUAS PANJANG VOLUME
NO STA LOKASI DIMENSI GAMBAR / SKET
A B C M2 M' M3
JUMLAH
ke 6
MORTAR MORTAR 2
BETY 169.78 #REF! #REF!
BAKAT 80.70 #REF! #REF!
MIN 13.95 #REF! #REF!
BUDI 114.73 #REF! #REF!
TONO 277.02 305.97 28.95
RAN 184.95 205.73 20.77
#REF! #REF!
BATU BATU 2
BETY 40.61 #REF! #REF! #REF! #REF!
RAN 255.96 281.91 25.95 8,304,680.00
#REF!