Sisa / Btg
TABEL PERHITUNGAN RAB BESI
L (m) Jumlah Harga Rp/ Quantity 1 Quantity 2
No Bentuk Tulangan Ø
BTG (kg)
L1 L2 T1 S1 Berat (kg/m) T2 S2 BT
1 2 3 4 5 6 7 8 9 10 11 12 13
5X8 6X9 10 X 11
4427.449
berat total untuk 1 abutment=
berat total untuk 2 abutment= 8854.898
∑= 9411.70
berat besi dalam 1m³ = 70.277
PEMBESIAN PLAT INJAK
545.8815
berat total untuk 1 plat injak=
berat total untuk 2 plat injak= 1091.763
∑= 1148.901
berat besi dalam 1m³ = 177.67
Jumlah Berat Besi Sisa
BS T S
14 Rp15 Rp16
10 X 12 Cl.7 x Cl.13 Cl.7 x Cl.14
1 16 3.75 42 157.5
2 16 2.94 42 123.48
3 16 1.64 42 68.88
4 16 9.3 84 781.2
5 16 8.4 84 705.6
6 12 8.7 45 391.5
7 12 8.4 45 378
7 12 8.4 45 378
PERHITUNGAN VOLUMA ABUTMEN
33
Diketahui : 92
Lebar = 900 cm
Tinggi = 505 cm 28
Jumlah = 2 Buah
50
50
150
30
80
Volume
Pias 1 = 0.2 x 0.33 x 9 = 0.59 m3
Pias 2 = 0.4 x 0.92 x 9 = 3.31 m3
Pias 3 = 0.9 x 0.28 x 9 = 2.26 m3
Pias 4 = 2.16 x 0.5 x 9 = 9.72 m3
Pias 5 = 0.71 + 2.16
x 0.5 x 9 = 6.45 m3
x 0.5 x 9 = 6.45 m3
2
Pias 6 = 0.71 x 1.5 x 9 = 9.58 m3
Pias 7 = 0.71 + 3.5
x 0.3 x 9 = 5.68 m3
2
Pias 8 = 3.5 x 0.8 x 9 = 25.2 m3
= 62.79 m3
= 125.58 m3
UNGAN VOLUMA ABUTMEN
4
5
2 2 2
0 0 0
216
71
350
PERHITUNGAN VOLUME PLAT INJAK
250
2 3
1
Diketahui
Volume
Pias 1 0.225 x 0.25 x 6 = 0.338 m3
Pias 2 0.71 + 2.16
x 0.5 x 9 = 0.034 m3
2
Pias 3 = 2.25 x 0.2 x 6 = 2.7 m3
Jumlah = 3.072 m3
Volume = 45.00 m3
NGAN VOLUME PLAT INJAK
250
20
225
24 12 12 30
25 12 12 30
26 12 12 36
Total
1 16 12 42
2 16 12 42
3 16 12 42
4 16 12 84
5 16 12 84
6 12 12 45
7 12 12 45
Total
552 490.044 46
Panjang/
Berat Jenis Volume Volume Jumlah Batang Beli
BTG
(kg/m) (m) (Kg)
Tulangan
5 6 7 8 9
3x4 7x8 (4 x 5)/3
156 batang
65 batang
DAFTAR
HARGA DASAR SATUAN
Tahun 2016
HARGA Harga
No. URAIAN SATUAN YANG DIGUNAKAN SATUAN
(Rp) ( Rp.)
Bahan
1 Baja Tulangan (Ulir) Kg - Rp 18,000.00
2 Baja Tulangan (Polos) Kg Rp 17,000.00
3 Semen Portland 40 kg zak - Rp 63,000.00
4 Pasir Beton M3 - Rp 184,700.00
5 Kerikil M3 - Rp 249,838.00
6 Air Liter - Rp 160.00
Tenaga Kerja
1 Pekerja jam Rp 12,857.00 Rp 90,000.00
2 Tukang Batu jam Rp 17,857.00 Rp 125,000.00
3 Tukang Besi Jam Rp 15,753.00 Rp 100,000.00
3 Kepala Tukang jam Rp 21,482.00 Rp 150,000.00
4 Mandor jam Rp 17,142.00 Rp 120,000.00
1. Pekerjaan Abutment
PB. SNI : A.4.1.1.12
1 M3 Membuat Beton Mutu f' c = 31,2 Mpa (K 350), Slump (12 ± 2) cm, w/c=0,84
A. Bahan
- Semen Portland 8.60 zak x
- Pasir beton 0.476 m3 x
- kerikil 0.741 m3 x
- Air 215 Liter x
B. Tenaga Kerja
- Pekerja 2.1 OH x
- Tukang Batu 0.35 OH x
- Tukang Besi 1.1 OH x
- Kepala Tukang 0.035 OH x
- Mandor 0.105 OH x
Jumlah
Dibulatkan
Biaya yang dibutuhkan
SNI 7394-2008-6.17
1 Kg Pembesian 1 Kg Dengan Baja ulir
- Baja ulir 1.580 Kg x
- Kawat Beton 0.015 Kg x
- Pekerja 0.007 OH x
- Tukang 0.007 OH x
- Kepala Tukang 0.0007 OH x
- Mandor 0.0004 OH x
Jumlah
Dibulatkan
Biaya yang dibutuhkan
2 Pekerjaan Plat Lantai
Analisa harga satuan SNI 7394:2008 No.6.7
Membuat 1 m3 Beton Mutu f'c=19,3 Mpa (K255), Slump (12 ± 2) cm, w/c
A. Bahan
- Semen Portland 7.123 zak x
- Pasir beton 0.499 m3 x
- kerikil 0.776 m3 x
- Air 215 Liter x
B. Tenaga Kerja
- Pekerja 1.65 OH x
- Tukang Batu 0.275 OH x
- Tukang Besi 1.05 OH x
- Kepala Tukang 0.028 OH x
- Mandor 0.083 OH x
Jumlah
Dibulatkan
Biaya yang dibutuhkan
SNI 7394-2008-6.17
1 Kg Pembesian 1 Kg Dengan Baja ulir
- Baja polos 1.050 Kg x
- Kawat Beton 0.015 Kg x
- Pekerja 0.007 OH x
- Tukang 0.007 OH x
- Kepala Tukang 0.0007 OH x
- Mandor 0.0004 OH x
Jumlah
Dibulatkan
Biaya yang dibutuhkan
A TEKNIS
B. Tenaga
Rp 90,000.00 = Rp 189,000.00 Pekerja
Rp 125,000.00 = Rp 43,750.00 Tukang Batu
Rp 100,000.00 = Rp 110,000.00 Tukang Besi
Rp 150,000.00 = Rp 5,250.00 Kepala Tukang
Rp 120,000.00 = Rp 12,600.00 Mandor
= Rp 1,209,962.34
n = Rp 1,328,000.00
g dibutuhkan = Rp 166,770,240.00
SNI 7394-2008-6.17
1 Kg Pembesian 1 Kg Dengan Baja ulir
Rp 18,000.00 = Rp 28,440.00 - Baja polos
Rp 22,000.00 = Rp 330.00 - Kawat Beton
Rp 90,000.00 = Rp 630.00 - Pekerja
Rp 100,000.00 = Rp 700.00 - Tukang
Rp 150,000.00 = Rp 105.00 - Kepala Tukang
Rp 120,000.00 = Rp 48.00 - Mandor
= Rp 30,253.00
n = Rp 31,000.00
g dibutuhkan = Rp 293,013,550
12 ± 2) cm, w/c=0,58
Rp 63,000.00 = Rp 448,761.60
Rp 184,700.00 = Rp 92,086.14
Rp 249,838.00 = Rp 193,763.25
Rp 160.00 = Rp 34,400.00
Rp 90,000.00 = Rp 148,500.00
Rp 125,000.00 = Rp 34,375.00
Rp 100,000.00 = Rp 105,000.00
Rp 150,000.00 = Rp 4,200.00
Rp 120,000.00 = Rp 9,960.00
= Rp 1,071,045.99
n = Rp 1,158,000.00
g dibutuhkan = Rp 52,110,000.00
Rp 17,000.00 = Rp 17,850.00
Rp 90,000.00 = Rp 1,350.00
Rp 90,000.00 = Rp 630.00
Rp 100,000.00 = Rp 700.00
Rp 150,000.00 = Rp 105.00
Rp 120,000.00 = Rp 48.00
= Rp 20,683.00
n = Rp 21,000.00
g dibutuhkan = Err:509
Beton Mutu f'c=19,3 Mpa (K250), Campuran 1:2:3, Slump (12 ± 2) cm, w/c=0,58
1. Pekerjaan Abutment
PB. SNI : A.4.1.1.12
1 M3 Membuat Beton Mutu f' c = 31,2 Mpa (K 350), Slump (12 ± 2) cm, w/c=0,84
A. Bahan
- Semen Portland 8.60 zak x 125.58
- Pasir beton 0.476 m3 x 125.58
- kerikil 0.741 m3 x 125.58
- Air 215 Liter x 125.58
B. Tenaga Kerja
- Pekerja 2.1 OH x 125.58
- Tukang Batu 0.35 OH x 125.58
- Tukang Besi 1.1 OH x 125.58
- Kepala Tukang 0.035 OH x 125.58
- Mandor 0.105 OH x 125.58
SNI 7394-2008-6.17
1 Kg Pembesian 1 Kg Dengan Baja ulir
- Baja ulir 1.580 Kg x 9452.05
- Kawat Beton 0.015 Kg x 9452.05
- Pekerja 0.007 OH x 9452.05
- Tukang 0.007 OH x 9452.05
- Kepala Tukang 0.0007 OH x 9452.05
- Mandor 0.0004 OH x 9452.05
B. Tenaga Kerja
- Pekerja 1.65 OH x 45
- Tukang Batu 0.275 OH x 45
- Tukang Besi 1.05 OH x 45
- Kepala Tukang 0.028 OH x 45
- Mandor 0.083 OH x 45
SNI 7394-2008-6.17
1 Kg Pembesian 1 Kg Dengan Baja ulir
- Baja polos 1.050 Kg x 3808.78
- Kawat Beton 0.015 Kg x 3808.78
- Pekerja 0.007 OH x 3808.78
- Tukang 0.007 OH x 3808.78
- Kepala Tukang 0.0007 OH x 3808.78
- Mandor 0.0004 OH x 3808.78
3. Pekerjaan Plat Injak
SNI 7394:2008-6.7
Membuat 1 m3 Beton Mutu f'c=19,3 Mpa (K250), Campuran 1:2
A. Bahan
m3 = 1080 zak Semen 7.12
m3 = 60 m3 Air 200.00
m3 = 93 m3 Pasir 0.50
m3 = 27000 Liter Kerikil 0.78
B. Tenaga
m3 = 263.72 OH Pekerja 1.65
m3 = 43.95 OH Tukang Batu 0.275
m3 = 138.14 OH Tukang Besi 0.007
m3 = 4.40 OH Kepala Tukang 0.028
m3 = 13.19 OH Mandor 0.083
SNI 7394-2008-6.17
1 Kg Pembesian 1 Kg Dengan Baja ulir
kg = 14934.24 Kg - Baja polos 1.050
kg = 141.78 Kg - Kawat Beton 0.015
kg = 66.16 OH - Pekerja 0.007
kg = 66.16 OH - Tukang 0.007
kg = 6.62 OH - Kepala Tukang 0.0007
kg = 3.78 OH - Mandor 0.0004
m3 = 320.54 zak
m3 = 22.44 m3
m3 = 34.90 m3
m3 = 9675.00 Liter
m3 = 74.25 OH
m3 = 12.38 OH
m3 = 47.25 OH
m3 = 1.26 OH
m3 = 3.74 OH
kg = 3999.22 Kg
kg = 57.13 Kg
kg = 26.66 OH
kg = 26.66 OH
kg = 2.67 OH
kg = 1.52 OH
u f'c=19,3 Mpa (K250), Campuran 1:2:3, Slump (12 ± 2) cm, w/c=0,58
Oh x 6.144 = 10.14 Oh
Oh x 6.144 = 1.69 Oh
Oh x 6.144 = 0.04 Oh
Oh x 6.144 = 0.17 Oh
Oh x 6.144 = 0.51 Oh
kg x 1148.901 = 1206.35 kg
kg x 1148.901 = 17.23 kg
OH x 1148.901 = 8.04 OH
OH x 1148.901 = 8.04 OH
OH x 1148.901 = 0.80 OH
OH x 1148.901 = 0.46 OH
Kebutuhan bahan dan Tenaga kerja yang dibutuhkan untuk pembangunan abutmen,plat lantai dan plat injak
Bahan
Semen = 1444 zak
Air = 37904 liter
Pasir = 85 m3
Kerikil = 133 m3
Baja ulir = 14934 kg
Kawat Beton = 216 kg
Baja polos = 5206 kg
Tenaga
Pekerja = 449 oh
Tukang Batu = 58 oh
Tukang Besi = 185 oh
Kepala Tukang = 16 oh
Mandor = 23 oh
besi Ø
16 = 314 Batang
20 = 73 Batang
12 = 202 Batang
10 = 75 Batang