Lapis - 1 ( AC - WC ) t = 4 cm
Lapis - 2 ( AC - BC ) t = 6 cm
Lapis - 3 ( LPA ) t = 20 cm
Lapis - 4 ( LPB ) t = 20 cm
Latrit Dipadatkan CBR 30% ( T = 200 mm ) Latrit Dipadatkan CBR 30% ( T = 200 mm )
4% 2% 2% 4%
05-03-2015
DETAIL PENAMPANG
PERKERASAN ASPAL
Lebar : 7,0 m
Panjang : 6.700 m (full aspal)
Tebal : as dwg
B PONDASI 19.701.370.909
3
1 Galian parit (dengan grader) m 4.355 71.500 311.382.500
2 Stripping, pembentukan, dan pemadatan tanah 2 46.900 55.000 2.579.500.000
m
dasar, CBR 6%
3 Timbunan bahu jalan dengan latrit dipadatkan, CBR 3 8.666 120.000 1.039.905.900
m
30% (quarry disediakan kebun)
4 Lapis pondasi bawah (LPB) tebal 30 cm, material m3 13.837 650.000 8.994.023.084
batu pecah uk. 3x5
5 Lapis pondasi atas (LPA) tebal 15 cm, komposisi batu 3 10.425 650.000 6.776.559.426
m
pecah uk. 1x2 70% dan abu batu 30%
C ASPAL 19.614.941.269
1 Prime coating Liter 37.520 9.302 349.024.922
2 Asphalt treated base (AC-BC) tebal 6 cm ton 6.606 2.214.620 14.630.850.457
3 Tack Coating Liter 28.140 9.302 261.768.692
2
4 Asphalt hot mix (AC-WC) tebal 4 cm m 46.900 93.247 4.373.297.198
Note : pembelian batu untuk LPA & LPB di Ds. Maloy, Sangkulirang