Anda di halaman 1dari 41

PT.

TRANSMARGA JATIM PASURUAN


PEMBANGUNAN JALAN TOL GEMPOL-PASURUAN
SEKSI 3B RUAS KARANG PANDAN-REJOSO ( Sta 25+000 s.d Sta 31+000 )

TEST KEPADATAN LAPANGAN DENGAN KERUCUT PASIR


( AASHTO T 191 - 86 )
TANGGAL :

STA : MATERIAL :

* LOKASI TEST POINT

A BERAT PASIR SEBELUM GR

B BERAT PASIR SESUDAH GR

C BERAT PASIR SISA GR (A-B)

D BERAT PASIR DALAM KERUCUT GR ( LAB )

E BERAT PASIR DALAM LUBANG GR (C-D)

F BERAT JENIS PASIR GR/CC ( LAB )

G ISI LUBANG CC (E/F)

H BERAT TANAH BASAH DAN TEMPAT GR

I BERAT TEMPAT GR

J BERAT TANAH BASAH GR (H-I)

K KEPADATAN BASAH GR/CC (J/G)

L KEPADATAN KERING GR/CC ( K .100/ 100 +U )

M KADAR AIR OPTIMUM % ( LAB )

N KEPADATAN MAX GR/CC ( LAB )

O PERSEN KEPADATAN % ( L / N x 100 )

* PENENTUAN KADAR AIR

P BERAT CONTOH BASAH DAN TEMPAT GR

Q BERAT CONTOH KERING DAN TEMPAT GR

R BERAT AIR GR (P-Q)

S BERAT TEMPAT GR

T BERAT TANAH KERING GR (Q-S)

U KADAR AIR % (R/T)

KETERANGAN : LAPIS

LINE

Konsultan Pengawas Kontraktor


PT. TRANSMARGA JATIM PASURUAN
PT.Multi Phi Beta, KSO PT.PP (Persero) Tbk
(……………….………..) (…...…………………….) (……………………)
AN LAPANGAN DENGAN KERUCUT PASIR
( AASHTO T 191 - 86 )

Kontraktor
PT.PP (Persero) Tbk
(……………………)
MHI PROYEK PEMBANGUNAN JALAN TOL
KERTOSONO - MOJOKERTO SEKSI II
Marga Harjaya Infrastruktur

CBR TES LAPANGAN


( AASHTO T. 193 - 90 : SNI. 03 - 1744 - 1989 )

TANGGAL :
JENIS PEKERJAAN : Borrow Material STA :
QUARY Ex. : LAPIS :

KALIBRASI PROVING RING : Lbs/div


WAKTU PENURUNAN PEMBACAAN ARLOJI BEBAN LBS
(MENIT) (INCHI) BAWAH ATAS BAWAH ATAS
GRAFIK CBR
1/4 0.0125 2000
1/2 0.025
1 0.050
1,1/2 0.075
2 0.10
3 0.15
4 0.20 1500

6 0.30

BEBAN ( Lbf )
8 0.40
10 0.50

ATAS X 100 % X 100 % 1000


3 X 1000 3 X 1500

BAWAH X 100 % X 100 %


3 X 1000 3 X 1500

CBR % %
500

PENENTUAN KADAR AIR 1 2

TANAH BASAH + CAWAN gr 0


TANAH KERING + CAWAN gr Spedy Spedy 0.25 0.3 0.35 0.4 0.45 0.

BERAT CAWAN gr Test Test


PENETRASI ( Inch )
BERAT AIR gr
BERAT TANAH KERING gr
KADAR AIR %
RATA - RATA %

Keterangan :
Konsultan Pengawas Kontraktor
PT. Marga Harjaya Infrastruktur
PT. M. C. I PT. Hutama Karya

(………………………………..) (…...…………………….) (…………..……………..)


ES LAPANGAN
- 90 : SNI. 03 - 1744 - 1989 )

GRAFIK CBR
2000

1500
BEBAN ( Lbf )

1000

500

0
0.25 0.3 0.35 0.4 0.45 0.5

PENETRASI ( Inch )
PT. Hutama Karya

(…………..……………..)
MHI PROYEK PEMBANGUNAN JALAN TOL
Marga Harjaya Infrastruktur KERTOSONO - MOJOKERTO SEKSI II

TEST KEPADATAN LAPANGAN DENGAN KERUCUT PASIR


( AASHTO T.191-86 )
TANGGAL :
STA : MATERIAL :

Sta.
Lapisan
A Berat Pasir + Corong (sebelum) ( gr )
B Berat Pasir + Corong (sesudah) ( gr )
C Berat Pasir Yang Terpakai (A-B) ( gr )
D Berat Pasir Dalam Plat + Corong ( gr )
E Berat Pasir Dalam Lubang (C-D) ( gr )
F Berat Isi Pasir ( gr/cm³ )
G Volume Lubang (E/F) ( cm³ )
H Berat Tanah + Tempat ( cm³ )
I Berat Tempat ( gr )
J Berat Tanah (H-I) ( gr )
K Kepadatan Basah (J/G) ( gr/cm³ )
L Kepadatan Kering K / ( g/100 ) + 1 ( gr/cm³ )
M Kepadatan Kering Maks. Lab. ( gr/cm³ )
N OMC (%)
O g D Koreksi ( gr/cc )
P Derajat Kepadatan Lapangan (%)

PEMERIKSAAN KADAR AIR


a Nomor Cawan
b Berat Tanah Basah + Cawan ( gr )
c Berat Tanah Kering + Cawan ( gr )
d Berat Cawan ( gr ) Speedy Speedy Speedy Speedy Speedy
e Berat Air (b-c) ( gr ) Test Test Test Test Test
f Berat Tanah Kering (c-d) ( gr )
g Kadar Air ( e/f ) x 100 % (%)

No.
Gr
MATERIAL TERTAHAN AYAKAN No. 4
%
Konsultan Pengawas Kontraktor
PT. Marga Harjaya Infrastruktur
PT. M.C.I PT. Hutama Karya Inrastruktur

(…………………………...) (…………………………...) (…………………………...)


PEMBANGUNAN JALAN TOL KERTOSONO-MOJOKERTO
MH SEKSI 2 : SS. JOMBANG - MOJOKERTO BARAT
I

AREA PROOF ROLLING


Marga Harjaya Infrastruktur

STA ……..+………… - …..…+………… ( )


Tanggal =
Material =
Layer =
STA………….

STA………….

STA………….

STA………….

STA………….

KENDARAAN - TRUK TANDEM (TRONTON) BERAT TOTAL + MUATAN = …….. TON


- KONFIGURASI LEBAR RODA
- KECEPATAN KENDARAAN 5 KM/JAM
- JUMLAH LINTASAN SATU KALI
- ALAT PENGUKUR LENDUTAN
ALAT PENGUKUR LENDUTAN - METERAN
BESARNYA LENDUTAN =………….mm
KETERANGAN :
= Diperbaiki

LABORAT (Sub) KONTRAKTOR KONSULTAN MHI


(………………….) (………………….) (………………….) (………………….)
MHI PROYEK PEMBANGUNAN JALAN TOL
Marga Harjaya Infrastruktur KERTOSONO - MOJOKERTO SEKSI II

CBR TES LAPANGAN


( AASHTO T. 193 - 90 : SNI. 03 - 1744 - 1989 )

TANGGAL :
JENIS PEKERJAAN : STA :
QUARY Ex. : LAPIS :

KALIBRASI PROVING RING : Lbs/div


WAKTU PENURUNAN PEMBACAAN ARLOJI BEBAN LBS
(MENIT) (INCHI) BAWAH ATAS BAWAH ATAS GRAFIK CBR
1/4 0.0125 6000
1/2 0.025
1 0.050 5500

1,1/2 0.075
5000
2 0.10
3 0.15
4500
4 0.20
6 0.30
BEBAN ( Lbf )

4000
8 0.40
10 0.50 3500

3000
ATAS X 100 % X 100 %
3 X 1000 3 X 1500
2500

BAWAH X 100 % X 100 % 2000


3 X 1000 3 X 1500
1500
CBR % %

1000

500
PENENTUAN KADAR AIR 1 2
TANAH BASAH + CAWAN gr 0
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5
TANAH KERING + CAWAN gr Spedy Spedy
BERAT CAWAN gr Test Test
PENETRASI ( Inch )
BERAT AIR gr
BERAT TANAH KERING gr
KADAR AIR %
RATA - RATA %

Keterangan :
Konsultan Pengawas Kontraktor
PT. Marga Harjaya Infrastruktur
PT. MCI PT. Hutama Karya

(………………………………..) (…...…………………….) (…………..……………..)


PEMBANGUNAN JALAN TOL KERTOSONO-MOJOKERTO
MH SEKSI 2 : SS. JOMBANG - MOJOKERTO BARAT
I
Marga Harjaya Infrastruktur

AREA PROOF ROLLING


STA ……..+………… - …..…+………… ( )
Tanggal =
Material =
Layer =
STA………….

STA………….

STA………….

STA………….

STA………….

KENDARAAN - TRUK TANDEM (TRONTON) BERAT TOTAL + MUATAN = …….. TON


- KONFIGURASI LEBAR RODA
- KECEPATAN KENDARAAN 5 KM/JAM
- JUMLAH LINTASAN SATU KALI
- ALAT PENGUKUR LENDUTAN
ALAT PENGUKUR LENDUTAN - METERAN
BESARNYA LENDUTAN =………….mm
KETERANGAN :
= Diperbaiki
KONTRAKTOR KONSULTAN MHI

(………………….) (………………….) (………………….)


MHI PEMBANGUNAN JALAN TOL KERTOSONO-MOJOKERTO
SEKSI 2 : SS. JOMBANG - MOJOKERTO BARAT
Marga Harjaya Infrastruktur

AREA PROOF ROLLING


STA ……..+………… ~ …..…+………… ( )
Tanggal =
Material =
Layer =
STA………….

STA………….

STA………….

STA………….

STA………….

KENDARAAN - TRUK TANDEM (TRONTON) BERAT TOTAL + MUATAN = …….. TON


- KONFIGURASI LEBAR RODA
- KECEPATAN KENDARAAN 5 KM/JAM
- JUMLAH LINTASAN SATU KALI
- ALAT PENGUKUR LENDUTAN
ALAT PENGUKUR LENDUTAN - METERAN

BESARNYA LENDUTAN =………….mm

KETERANGAN :
= Diperbaiki

KONTAKTOR KONSULTAN OWNER


(_____________) (_____________) (_____________)
OWNER
(_____________)
PT. TRANSMARGA JATIM PASURUAN
PEMBANGUNAN JALAN TOL GEMPOL - PASURUAN
SEKSI 3B RUAS KARANG PANDAN-REJOSO ( Sta 25+000 s.d Sta 31+000

PENYELIDIKAN NILAI CBR


DENGAN DYNAMIC CONE PENETROMETER

Lokasi :
Tanggal Test :
Dilaksanakan Oleh :

DATA LAPANGAN
TUMBUKAN PEMBACAAN MISTAR PENETRASI TUMBUKAN
N (mm) (mm) PER 25 mm
Konsultan Pengawas

( ……………………….. ) (…...…………………….)
ASURUAN
- PASURUAN
a 25+000 s.d Sta 31+000 )

NILAI CBR
NE PENETROMETER

PERHITUNGAN
TUMBUKAN NILAI CBR %
PER 25 mm GRAFIK CBR %
Perhitungan:

25
XI - X0 X N =

ket :
X0 = Pembacaan Mistar
X1 = Pembacaan Mistar
Yg DI
N = Tumbukan
25 = Tumbukan per 25 mm

Pengawas Kontraktor

…………….) (…………………….)
MHI
MHI PT. MARGA HARJAYA INFRASTRUKTUR
Marga Harjaya Infrastruktur

PT. Mitrapacific Consulido International


PT. Hutama Karya Infrastruktur
PT. Guteg Harindo PT. Buana Archicon

PROYEK PEMBANGUNAN JALAN TOL KERTOSONO - MOJOKERTO SEKSI 1


RUAS SS. BANDAR - SS. JOMBANG
STA. 24+900 s.d. 39+600

OPNAM INJECT

Tanggal :
NO STA RUAS JUMLAH INJECT KETERANGAN

TOTAL
Diajukan Oleh, Diperiksa Oleh, Disetujui Oleh,
KONTRAKTOR KONSULTAN PENGAWAS PEMILIK PROYEK
PT. Hutama Karya Infrastruktur PT. Mitrapacific Consulindo International PT. Marga Harjaya Infrastruktur
SO PT. Guteg Harindo & PT. Buana Archicon

(___________________) (___________________) (___________________)


Pelaksana Inspector Ass. Kabag. Struktur / Jalan
Tanggal : Tanggal : Tanggal :
MHI PEMBANGUNAN JALAN TOL KERTOSONO-MOJOKERTO
SEKSI 2 : SS. JOMBANG - MOJOKERTO BARAT
Marga Harjaya Infrastruktur

AREA PROOF ROLLING


STA ..….+…………-……+………...

Tanggal =
Material =
Layer =

Kiri Kanan Sta:………

Sta:………

Sta:………

Main Road To : Kertosono

Median

To : Mojokerto Main Road

Sta:………

Sta:………

Sta:………

KENDARAAN - TRUK TANDEM (TRONTON) BERAT TOTAL + MUATAN = …….. TON


- KONFIGURASI LEBAR RODA
- KECEPATAN KENDARAAN 5 KM/JAM
- JUMLAH LINTASAN SATU KALI
- ALAT PENGUKUR LENDUTAN
ALAT PENGUKUR LENDUTAN - METERAN
BESAR LENDUTAN =………….mm

KETERANGAN - Diperbaiki

Pemilik Proyek : Konsultan Pengawas : Kontraktor :


PT. Marga Harjaya Infrastruktur PT. MCI PT. Hutama Karya Infrastruktur

(……………….…….) (………………….….) (……………….…….)


ktor :
ya Infrastruktur

…….…….)
CBR TES LAPANGAN
( AASHTO T. 193 - 90 : SNI. 03 - 1744 - 1989 )

TANGGAL :
JENIS PEKERJAAN : STA :
QUARY Ex. : LAPIS :

KALIBRASI PROVING RING : Lbs/div


WAKTU PENURUNAN PEMBACAAN ARLOJI BEBAN LBS
(MENIT) (INCHI) BAWAH ATAS BAWAH ATAS GRAFIK CBR
1/4 0.0125 6000
1/2 0.025
1 0.050 5500

1,1/2 0.075
5000
2 0.10
3 0.15
4500
4 0.20
6 0.30
BEBAN ( Lbf )

4000
8 0.40
10 0.50 3500

3000
ATAS X 100 % X 100 %
3 X 1000 3 X 1500
2500

BAWAH X 100 % X 100 % 2000


3 X 1000 3 X 1500
1500
CBR % %

1000

500
PENENTUAN KADAR AIR 1 2
TANAH BASAH + CAWAN gr 0
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5
TANAH KERING + CAWAN gr Spedy Spedy
BERAT CAWAN gr Test Test
PENETRASI ( Inch )
BERAT AIR gr
BERAT TANAH KERING gr
KADAR AIR %
RATA - RATA %

Keterangan :
Konsultan Pengawas Kontraktor
PT. Marga Harjaya Infrastruktur
PT. MCI PT. Hutama Karya

(………………………………..) (…...…………………….) (…………..……………..)


MHI PROYEK PEMBANGUNAN JALAN TOL
Marga Harjaya Infrastruktur KERTOSONO - MOJOKERTO SEKSI II
PROYEK PEMBANGUNAN JALAN TOL
KERTOSONO - MOJOKERTO SEKSI II

TEST KEPADATAN LAPANGAN DENGAN KERUCUT PASIR


( AASHTO T.191-86 )
TANGGAL :
STA : MATERIAL :

Sta.
Lapisan
A Berat Pasir + Corong (sebelum) ( gr )
B Berat Pasir + Corong (sesudah) ( gr )
C Berat Pasir Yang Terpakai (A-B) ( gr )
D Berat Pasir Dalam Plat + Corong ( gr )
E Berat Pasir Dalam Lubang (C-D) ( gr )
F Berat Isi Pasir ( gr/cm³ )
G Volume Lubang (E/F) ( cm³ )
H Berat Tanah + Tempat ( cm³ )
I Berat Tempat ( gr )
J Berat Tanah (H-I) ( gr )
K Kepadatan Basah (J/G) ( gr/cm³ )
L Kepadatan Kering K / ( g/100 ) + 1 ( gr/cm³ )
M Kepadatan Kering Maks. Lab. ( gr/cm³ )
N OMC (%)
O g D Koreksi ( gr/cc )
P Derajat Kepadatan Lapangan (%)

PEMERIKSAAN KADAR AIR


a Nomor Cawan
b Berat Tanah Basah + Cawan ( gr )
c Berat Tanah Kering + Cawan ( gr )
d Berat Cawan ( gr ) Speedy Speedy Speedy Speedy Speedy
e Berat Air (b-c) ( gr ) Test Test Test Test Test
f Berat Tanah Kering (c-d) ( gr )
g Kadar Air ( e/f ) x 100 % (%)

No.
Gr
MATERIAL TERTAHAN AYAKAN No. 4
%
Konsultan Pengawas Kontraktor
PT. Marga Harjaya Infrastruktur
PT. M.C.I PT. Hutama Karya Inrastruktur

(…………………………...) (…………………………...) (…………………………...)


MHI
Marga Harjaya Infrastruktur
PROYEK PEMBANGUNAN JALAN TOL
KERTOSONO - MOJOKERTO SEKSI II

TEST KEPADATAN LAPANGAN DENGAN KERUCUT PASIR


( AASHTO T 191 - 86 )
TANGGAL :

STA : MATERIAL :

* LOKASI TEST POINT

A BERAT PASIR SEBELUM GR

B BERAT PASIR SESUDAH GR

C BERAT PASIR SISA GR (A-B)

D BERAT PASIR DALAM KERUCUT GR ( LAB )

E BERAT PASIR DALAM LUBANG GR (C-D)

F BERAT JENIS PASIR GR/CC ( LAB )

G ISI LUBANG CC (E/F)

H BERAT TANAH BASAH DAN TEMPAT GR

I BERAT TEMPAT GR

J BERAT TANAH BASAH GR (H-I)

K KEPADATAN BASAH GR/CC (J/G)

L KEPADATAN KERING GR/CC ( K .100/ 100 +U )

M KADAR AIR OPTIMUM % ( LAB )

N KEPADATAN MAX GR/CC ( LAB )

O PERSEN KEPADATAN % ( L / N x 100 )

* PENENTUAN KADAR AIR

P BERAT CONTOH BASAH DAN TEMPAT GR

Q BERAT CONTOH KERING DAN TEMPAT GR

R BERAT AIR GR (P-Q)

S BERAT TEMPAT GR

T BERAT TANAH KERING GR (Q-S)

U KADAR AIR % (R/T)

KETERANGAN : LAPIS

LINE

Konsultan Pengawas Kontraktor


PT. Marga Harjaya Infrastruktur
PT. MCI PT. Hutama Karya
(……………….………..) (…...…………………….) (……………………)
AN LAPANGAN DENGAN KERUCUT PASIR
( AASHTO T 191 - 86 )

Kontraktor
PT. Hutama Karya
(……………………)
MHI
Marga Harjaya Infrastruktur

Anda mungkin juga menyukai