Anda di halaman 1dari 7

PENINGKATAN JALAN LOA SAKOH - HAMBAU

NOMOR KONTRAK : 620/117/DPU-BM/5/2019


TANGGAL KONTRAK : 15 MEI 2019
NILAI KONTRAK : RP. 6.239.806.779,22
KONTRAKTOR : PT. MOTOTABIAN
SUMBER DANA : APBD KABUPATEN KUTAI KARTANEGARA
KONSULTAN : CV. JASA PRIBHUNI
ITEM PEMBAYARAN NO. :1.2.
JENIS PEKERJAAN : MOBILISASI

No. URAIAN SATUAN

A SEWA TANAH M2

B PERALATAN
Periksa lembar 1.2

C FASILITAS KONTRAKTOR
1 Base Camp M2
2 Kantor M2

B LAIN-LAIN
1 Papan Nama Proyek Unit

Total Biaya Mobilisasi

KONSULTAN PENGAWAS
CV. JASA PRIBHUNI

IWAN SUKENDRO,ST
Site Engineer
KOH - HAMBAU

HARGA JUMLAH S/D BULAN BULAN INI


VOL. SATUAN HARGA
LALU INI
(Rp.) (Rp.)

5,000 5,000 25,000,000 0.33 -

22,000,000 0.15 0.15

60 200,000 12,000,000 0.16 -


60 250,000 15,000,000 0.20 -

1 1,000,000 1,000,000 0.01 -

75,000,000
0.85 0.15

KONTRAKTOR PELAKSANA
PT. MOTOTABIAN

DIDIE LEYN WURAGIAN,ST


General superintendent
S/D BULAN

INI

0.33

0.29

0.16
0.20

0.01

1.00

PELAKSANA
OTABIAN

URAGIAN,ST
erintendent
PENINGKATAN JALAN LOA SAKOH - HAMBAU

NOMOR KONTRAK : 620/117/DPU-BM/5/2019


TANGGAL KONTRAK : 15 MEI 2019
NILAI KONTRAK : RP. 6.239.806.779,22
KONTRAKTOR : PT. MOTOTABIAN
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONSULTAN : CV. JASA PRIBHUNI
ITEM PEMBAYARAN NO. :1.2.
JENIS PEKERJAAN : MOBILISASI

s/d BULAN LALU


No. JENIS ALAT KODE SATUAN VOL. Jumlah Harga
volume
( Rp.)

A. SEWA TANAH M2 5,000.00 1.00 25,000,000.00

B. PERALATAN
INCLUCE ON
1 TRUSS SCREED PAVER E02 Unit 1.00
TRUCK
2 VIBRATORY ROLLER 5-8 T. E05 Unit 1.00
INCLUCE ON
3 CONCRETE VIBRATOR E20 Unit 2.00 2.00 TRUCK
4 MOTOR GRADER E13 Unit 1.00 - -
5 WATER TANKER 3000-4500 L. E23 Unit 1.00 - -
INCLUCE ON
6 CONCRETE CUTTER E10 Unit 1.00 - TRUCK
7 DUMP TRUCK E08 Unit 4.00 4.00 6,000,000.00
INCLUCE ON
8 CONCRETE MIXER E06 Unit 6.00 6.00 TRUCK
9 EXCAVATOR E10 Unit 1.00 1.00 5,000,000.00

C. FASILITAS KANTRAKTOR
1 BASE CAMP M2 60.00 60.00 12,000,000.00
2 KANTOR M2 60.00 60.00 15,000,000.00

B. MOBILISASI LAINNYA
1 PAPAN NAMA KEGIATAN Buah 1.00 1.00 1,000,000.00

Total untuk Item B pada Lembar 1 64,000,000.00

KONSULTAN PENGAWAS KONT


CV. JASA PRIBHUNI P

IWAN SUKENDRO DIDIE L


Site Engineer
HAMBAU

BULAN INI S/D BULAN INI


Jumlah Harga Jumlah Harga
volume volume
( Rp.) ( Rp.)

- - 1.00 25,000,000.00

INCLUCE ON INCLUCE ON
- -
TRUCK TRUCK
1.00 5,000,000.00 1.00 5,000,000.00
INCLUCE ON INCLUCE ON
2.00 4.00
TRUCK TRUCK
1.00 5,000,000.00 1.00 5,000,000.00
1.00 1,000,000.00 1.00 1,000,000.00
INCLUCE ON INCLUCE ON
- -
TRUCK TRUCK
- - 4.00 6,000,000.00
INCLUCE ON INCLUCE ON
- TRUCK 6.00 TRUCK
- - 1.00 -
- - 60.00 12,000,000.00
- - 60.00 15,000,000.00

1.00 - 2.00 1,000,000.00

11,000,000.00 70,000,000.00

KONTRAKTOR PELAKSANA
PT.MOTOTABIAN

DIDIE LEYN WURANGIAN,ST


Site Manager