Anda di halaman 1dari 7

PT.

ATTARAYA MITRA KONSTRUKSI


Formwork Construction and Specialist
Jl. Basuki Rachmad KM.03 Wonoasri Kab. Madiun

ANALISIS KEKUATAN SCAFFOLDING PADA BALOK & PLAT

PROYEK : PASAR NEGARA


TANGGAL : 04/01/2024

- Layout Bekisting

Hasil verifikasi struktur Okupansi


Tebal COR .1 0.12 m PLYWOOD dibawah tegangan ijin, OK!!! 28.03%
BJ beton 2.50 t/m3 Balok 300X500 dibawah tegangan ijin, OK!!! 57.56%
Balok 250X350 dibawah tegangan ijin, OK!!! 45.06%

- Pembebanan
Beban Mati
Overburden beton 2.50 x 0.12 = 0.30 t/m2
Beban Kerja = 0.10 t/m2
0.40 t/m2

- Beban hidup = 0.10 t/m2


- Beban kombinasi
W = 1.20 D + 1.60 L
= 1.20 x 0.40 + 1.60 x 0.10 = 0.64 t/m2

A. PLYWOOD

Plywood Polyresin 12mm


Ukuran : 122.00 x 244.00 x 1.20 cm
ketentuan ijin :
- s lt = 100.00 kg/cm2

Jarak tumpuan = 0.29 m

dan seterusnya

……………….
0.29 0.29
A B C

Ix = 1/12 x b x h 3

= 0.08 x 122.00 x 1.20 3

= 17.57 cm4 E = 80,000.00 Kg/cm2

Wx = Ix = 29.28 cm3
0,5h

q = 0.64 x 1.22 = 0.78 t/m

Momen maksimum terjadi di tengah bentang


M = 1/8 x q x L2 = 0.13 x 0.78 x 0.08 = 0.01 tm
= 820.82 kgcm

s lt = M/W
= 820.82 : 29.28 = 28.03 kg/cm2 dibawah tegangan ijin, OK!!!
B. Scaffolding (Untuk Balok)

a. Balok B1 300X500
b. Balok B3 250X350

a. Perhitungan Beban Struktur Pada Balok B1 300X500


Beban mati :
1. Balok 300X500 = 6.00 x 0.30 x 0.50 x 2,500.00 kg/m3
= 2,250.00 kg/m'
= 375.00 kg/m'
2. Beban bekisting = 200.00 kg/m'
Total beban mati = 575.00 kg/m'

Beban hidup :
1. Pekerja = 100.00 kg/m'

Kombinasi beban, q = ( 1,2 D + 1,6 L )


= 1.20 x 575.00 + 1.60 x 100.00
= 850.00 kg/m'
(sepanjang 6,00 m, untuk 2 titik)

Besar beban titik (beban struktur) yang harus dipikul oleh tiap Scaffolding adalah sebesar :
P = qxl
4
= 850.00 x 6.00 = 1,275.00 kg
4

Besar total beban yang harus ditahan oleh tiap Scaffolding :


1. Pawal (beban total struktur) = 1,275.00 kg
2. Beban kejut (beban penuangan) = 20.00 kg
TOTAL BEBAN = 1,295.00 kg

Allowable tiap Scaffolding 2250 kg > 1,295.00 kg dibawah tegangan ijin, OK!!!

b. Perhitungan Beban Struktur Pada Balok B3 250X350


Beban mati :
1. Balok 250X350 = 6.00 x 0.25 x 0.35 x 2,500.00 kg/m3
= 1,312.50 kg/m'
= 218.75 kg/m'
2. Beban bekisting = 200.00 kg/m'
Total beban mati = 418.75 kg/m'

Beban hidup :
1. Pekerja = 100.00 kg/m'

Kombinasi beban, q = ( 1,2 D + 1,6 L )


= 1.20 x 418.75 + 1.60 x 100.00
= 662.50 kg/m'
(sepanjang 6,00 m, untuk 2 titik)

Besar beban titik (beban struktur) yang harus dipikul oleh tiap Scaffolding adalah sebesar :
P = qxl
4
= 662.50 x 6.00 = 993.75 kg
4

Besar total beban yang harus ditahan oleh tiap Scaffolding :


1. Pawal (beban total struktur) = 993.75 kg
2. Beban kejut (beban penuangan) = 20.00 kg
TOTAL BEBAN = 1,013.75 kg

Allowable tiap Scaffolding 2250 kg > 1,013.75 kg dibawah tegangan ijin, OK!!!
C. Scaffolding (Plat Lantai)

a. Perhitungan Beban Struktur Pada Plat Lantai


Beban mati :
1. Plat lantai = 36.00 x 0.13 x 2,500.00 kg/m3
= 11,700.00 kg/m'
= 325.00 kg/m'
2. Beban bekisting = 200.00 kg/m'
Total beban mati = 525.00 kg/m'

Beban hidup :
1. Pekerja = 100.00 kg/m'

Kombinasi beban, q = ( 1,2 D + 1,6 L )


= 1.20 x 525.00 + 1.60 x 100.00
= 790.00 kg/m'
(seluas 11,700 m 2 , untuk 12 titik)

Besar beban titik (beban struktur) yang harus dipikul oleh tiap Scaffolding adalah sebesar :
P = 790.00 x 1.80 x 1.20 = 853.20 kg
2

Besar total beban yang harus ditahan oleh tiap Scaffolding :


1. Pawal (beban total struktur) = 853.20 kg
2. Beban kejut (beban penuangan) = 20.00 kg
TOTAL BEBAN = 873.20 kg

Allowable tiap Scaffolding 2250 kg > 873.20 kg dibawah tegangan ijin, OK!!!
PT. ATTARAYA MITRA KONSTRUKSI
Formwork Construction and Specialist
Jl. Basuki Rachmad KM.03 Wonoasri Kab. Madiun

ANALISIS KEKUATAN BEKISTING KOLOM

PROYEK : PASAR NEGARA


TANGGAL : 04/01/2024

DATA UMUM :
1. Concrete weight : 2500.00 kg/m3
2. Concrete type : Fluid mix
3. Concrete slump : 5-16 cm
4. Pouring speed : 3 m'/hr
o
5. Temperature : 25 C
6. Concrete pressure : 4200.00 kg/m2
7. Dimensi kolom : 50.00 x 50.00 x 360.00 cm

A. Plywood Kontrol (Phenolich 18 mm)


- Plywood digunakan kelas kuat II :
b = 122.00 cm
h = 1.80 cm
2
A = 219.60 cm
I = 59.29 cm4
3
W = 65.88 cm
S = 49.41 cm3
Mmax = 5400.00 Kg.cm
Dmax = 1400.00 Kg
E = 100.0E+3 kg/cm2
σ = 100.00 kg/cm2
τ = 12.00 kg/cm2
q= 4200.00 kg/cm'
- Jarak HOLLOW ke HOLLOW = 25.00 cm

- Ketentuan Ijin :

f = L 25.00 cm 25.00 cm
400.00 A B C
= 250.00
400.00
= 0.63 mm

Ix = 1/12 x b x h 3

= 0.08 x 122.00 x 1.80 3

= 59.29 cm4

Wx = Ix
0,5h
= 65.88 cm3

- Load Case :
Concrete Pressure : 4200.00 kg/m2 x 1.00 m = 4200.00 Kg/m'

- Tumpuan adalah sendi - sendi maka berlaku koef momen :

-1/30 -1/10 -1/10 -1/30


1/10 1/12 1/10

- Tumpuan adalah sendi - sendi maka berlaku koef gaya lintang :

1/2 5/8 1/2 1/2 5/8 1/2

Momen maksimal berada pada tumpuan tengah yaitu 1/10 x ql2


Gaya Lintang maksimal berada pada 1/4 L tumpuan tengah yaitu 5/8 x ql

Sehingga :
2
- M max = 1/10 x ql
2
= 0.10 x 4200.00 x 0.25
= 26.25 Kgm
= 2625.00 Kgcm

Teg. Ijin = M
Wx
= 2625.00
65.88
= 39.85 Kg/cm2 < 100.00 Kg/cm2 ................ Ok!!

- D max = 5/8 x ql
(lendutan max) = 0.63 x 4200.00 x 0.25
= 656.25 kg

Geser ijin = (Dmax x S)/(I x b)


= ( 656.25 x 49.41 ) / ( 59.29 x 122.00 )
= 4.48 kg < 12.00 Kg ................ Ok!!

- Lendut, f = ql4
(lendutan ijin) 185.00 x EI
4
= 42.00 x 25.00
185.00 x 100000.00 x 59.29
= 0.15 mm < f= 0.63 mm ................ Ok!!
B. CNP 100 x 50
- Properties CNP 100 x 50 :
b = 6.50 cm
h = 10.00 cm
A = 3.67 cm2
I = 58.40 cm4
W = 11.68 cm3
S = 11.70 cm3
Mmax = 18720.00 Kg/cm2
E = 2.1E+6 kg/cm2

- Hollow 50x50 = 25.00 cm - Beban Q = 4200.00 kg/m2 x 0.250 m = 1050.00 Kg/m'

F - Momen primer :
0.38

Perhitungan momen batang AB (perilaku dianggap jepit - jepit)


2
M-ba = 1/2 x ql
E = 0.50 x 1050.00 x 0.35
2

= 64.31 Kgm

1.00
Perhitungan momen batang BC (perilaku dianggap jepit - jepit) beban merata
2
Mbc = Mcb = 1/12 x ql
D = 0.08 x 1050.00 x 0.70
2

= 42.88 Kgm
0.70

Perhitungan momen batang CD (perilaku dianggap jepit - jepit) beban merata


2
Mcd = Mdc = 1/12 x ql
2
= 0.08 x 1050.00 x 0.70
C = 42.88 Kgm

Perhitungan momen batang DE (perilaku dianggap jepit - jepit) beban merata


0.70

2
Mde = Med = 1/12 x ql
2
= 0.08 x 1050.00 x 1.00
= 87.50 Kgm
B
Perhitungan momen batang EF (perilaku dianggap jepit - kantilever) beban merata
0.35
x 2
Mef = 1/6 x (3xq1 + q2) l
A = 0.17 x 1050.00 x ### 2

= 25.27 Kgm

- Faktor Distribusi :
Titik Tumpu B
KBA = 0.00 EI
KBC = 4EI = 5.71 EI
LBC

μ BA = KBA = 0.00 = 0.00


KBA + KBC 0.00 + 5.71

μ BC = KAB = 5.71 = 1.00


KBA + KBC 0.00 + 5.71

Titik Tumpu C
KCB = 4EI = 5.71 EI
LCB
KCD = 4EI = 5.71 EI
LCD

μ CB = KCB = 5.71 = 0.50


KCB + KCD 5.71 + 5.71

μ CD = KCD = 5.71 = 0.50


KCB + KCD 5.71 + 5.71

Titik Tumpu D
KDC = 4EI = 5.71 EI
LDC
KDE = 4EI = 4.00 EI
LDE

μ DC = KDC = 5.71 = 0.59


KDC + KDE 5.71 + 4.00

μ DE = KDE = 4.00 = 0.41


KDC + KDE 5.71 + 4.00

Titik Tumpu E
KED = 4EI = 4.00 EI
LED
KEF = 0.00 EI

μ ED = KED = 4.00 = 1.00


KED + KEF 4.00 + 0.00

μ EF = KEF = 0.00 = 0.00


KED + KEF 4.00 + 0.00

Selanjutnya digunakan methode cross untuk mencari momen maksimal yang terjadi.

- Hasil perhitungan :

M maksimal yang terjadi = 6431.25 Kg.cm < M ijin = 18720.00 Kg.cm ................ Ok!!

q= 1050.00 Kg/m'

Bentang BA
Vba = q x Lab
= 367.50 Kg
Bentang BC
Ʃ BC = 0 (Vbc xbc) - (q x bc x 1/2bc) - Mbc + Mcb = 0 ;Vbc = 372.88 kg
Ʃ CB = 0 - (Vcb xbc) + (q x bc x 1/2bc) - Mbc + Mcb = 0 ;Vcb = 362.12 kg

Bentang CD
Ʃ CD = 0 (Vcd xcd) - (q x cd x 1/2cd) - Mcd + Mdc = 0 ;Vcd = 374.22 kg
Ʃ DC = 0 - (Vdc xcd) + (q x cd x 1/2cd) - Mcd + Mdc = 0 ;Vdc = 360.78 kg

Bentang DE
Ʃ DE = 0 (Vde xde) - (q x de x 1/2de) - Mde + Med = 0 ;Vde = 502.42 kg
Ʃ ED = 0 - (Ved xde) + (q x de x 1/2de) - Mde + Med = 0 ;Ved = 547.58 kg

Bentang EF
Vef = 1/2 x GH x (2.q1 + q2)
199.50 kg

- Kontrol seluruh konstruksi :


ƩV=0 = (Vba + Vbc + Vcb + Vcd + Vdc + Vde + Ved + Vef
- ((q x ab) + (q x bc) + (q x cd) + (q x de) + (q x 0,5 ef)
= 0.00

Vb = 740.38
Vc = 736.34
Vd = 863.20
Ve = 747.08

Jarak Lendutan Terbesar = 100.00 cm

q= 4200.00 Kg/m2 x 1.00 = 4200.00 Kg/m'


= 42.00 kg/cm'

1.00 m
D max = 1/2 x q x l
= 0.50 x 42.00 x 100.00
= 2100.00 kg

- D maksimal yang terjadi = 547.58 kg < D ijin = 2100.00 kg ................ Ok!!

- Lendut, f = ql4
384.00 x EI
= 10.50 x 100.00 4
384.00 x 2100000.00 x 58.40
= 0.22 mm < f= 1.40 mm ................ Ok!!
C. Hollow 50 x 50
b= 5.00 cm
h= 5.00 cm
A= 3.03 cm2
I = 11.70 cm4
W= 4.68 cm3
3
S = 1.96 cm
Mmax = 2293.20 Kg/cm2
E = 2.1E+6 kg/cm2
2
σ= 1600.00 kg/cm
τ= 928.00 kg/cm2

Jarak Tie Rod 40.00 cm

q= 4200.00 Kg/m2 x 0.85 = 3570.00 Kg/m'


= 35.70 kg/cm'

40.00

2
Momen max = 1/8 x q x l
2
= 0.13 x 35.70 x 40.00
= 7140.00 Kgcm

s lt yg terjadi = M max
Wx
= 7140.00
4.68
= 1525.64 Kg/cm2 < s lt ijin = 1600.00 Kg/cm2 ................ Ok!!

D max = 1/2 x q x l
= 0.50 x 35.70 x 40.00
= 714.00 kg

Geser ijin = (Dmax x S)/(I x b)


= ( 714.00 x 1.96 ) / ( 11.70 x 5.00 )
= 23.92 kg < τ = 928.00 Kg ................ Ok!!

Lendut, f = 5ql4
384.00 x EI
4
= 178.50 x 40.00
384.00 x 2100000.00 x 11.70
= 0.05 cm < f= 0.10 cm ................ Ok!!

D. KONTROL TIE ROD

Kapasitas Tarik Form Tie = 9000.00 Kg

Tekanan pada Form Tie = 1/2 x q x l


= 714.00 kg < 9000.00 kg ................ Ok!!
PT. ATTARAYA MITRA KONSTRUKSI
Formwork Construction and Specialist
Jl. Basuki Rachmad KM.03 Wonoasri Kab. Madiun

ANALISIS KUAT TEKAN BETON DENGAN BONGKARAN BEKISTING

PROYEK : PASAR NEGARA


TANGGAL : 04/01/2024

Umur Beton 3 7 14 21 28 90 365


Semen portland biasa 0.40 0.65 0.88 0.95 1.00 1.20 1.35
Semen portland dengan kekuatan awal tinggi 0.55 0.75 0.90 0.95 1.00 1.15 1.20
Sumber : Koefisien PBI 1971.

A. Kuat tekan karakteristik umur balok & plat umur 7.00 hari
- K- 300.00 Kg/cm2
- fc' = 25.00 Mpa (pada umur 28 hari)

- Koreksi faktor kekuatan pada kuat tekan karakteristik beton :


Sample Umur Pengujian Kuat Tekan Prosentase
7 hari 16.25 Mpa 65% (umur bongkar balok & plat)
14 hari 22.00 Mpa 88%
21 hari 23.75 Mpa 95%
28 hari 25.00 Mpa 100%
Jadi, kuat tekan karakteristik pada pembongkaran bekisting balok & plat umur 7.00 hari adalah 16.25 Mpa

B. Defleksi balok dan plat pada masa konstruksi


- Beban Mati:
Berat sendiri plat, q (Dead) = 3.000 KN/m2

- qd = 4.50 KN/m2
- qu = 6.30 KN/m2

1. Balok
- E= 18,946.31 N/mm2
- I= 1,575,000,000 mm4
- L= 8,000 mm
- qu = 6.30 KN/m2 = 0.00630 N/mm2
- δ.max = 0.011259891 mm
- δ.izin = 16.67 mm
- δ < δ.izin → 0.011 mm < 16.67 mm dibawah defleksi ijin, OK!!!

2. Plat
- Wu = qu = 6.30 KN/m2 = 0.00630 N/mm2
- Fc' = 16.25 Mpa = 16.25 N/mm2
- Ec = 18,946.31 N/mm2
- D= 5,550,675,500.54 N.mm
- δ.max = 0.01 mm
- δ.izin = 22.22 mm
- δ < δ.izin → 0.011 mm < 22.22 mm dibawah defleksi ijin, OK!!!

P= 15.80 kN beban mati = 4,032.00 kg/m'


RA=RB = P/2 = 7.90 kN pekerja= 200.00 kg/m'
Mmax= 31.60 kNm q= 5,158.40 kg/m'
W= 1/2.q.10= 158.00 kNm^2 w= 41,267.20 kg
RA=RB=1/2.w= 79.00 kNm^2

q'=38,5x / 4 = 9.63 x
w' = 1/2.q'.x= 4.81 x^2
Mx= RA.x - w'.1/3x = 9,63x - (4,81 / 3x^3)

Mmax= 48.11 kNm^3 0.05


E= 18,946.31 Nmm2
I= 1,575,000,000.000000 mm4
Lendutan= 0.000000000000002 mm

Anda mungkin juga menyukai