REKAPITULASI

PEKERJAAN : RUMAH TINGGAL LANTAI 2

NO URAIAN PEKERJAAN JUMLAH

I. PRELIMINARIES Rp 4,644,039.24

II. PEKERJAAN TANAH Rp 6,931,201.92

III. PEKERJAAN PONDASI Rp 23,768,682.12

III. PEKERJAAN STRUKTUR Rp 294,596,486.47

IV. PEKERJAAN ARSITEKTUR Rp 116,534,146.95

V. PEKERJAAN ATAP Rp 32,165,992.72

VI. PEKERJAAN FINISHING Rp 193,102,558.79

VII. PEKERJAAN MEP Rp 27,666,171.91

JUMLAH Rp 699,409,280.13
DIBULATKAN Rp 699,409,000.00
TERBILANG :

ENAM RATUS SEMBILAN PULUH SEMBILAN JUTA EMPAT RATUS SEMBILAN RIBU RUPIAH

Harga Per Meter Konstruksi Rp 5,828,408.33


RENCANA ANGGARAN BIAYA

PEKERJAAN : RUMAH TINGGAL LANTAI 2

NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN
1 Pasangan Bouwplank 65.50 m1 Rp. 70,901.36 Rp. 4,644,039.24
TOTAL HARGA Rp. 4,644,039.24
II. PEKERJAAN TANAH
- Pek. Galian tanah pondasi 41.19 m3 Rp. 121,612.29 Rp. 5,009,575.19
- Pek. Urugan pasir bawah pondasi 2.03 m3 Rp. 281,669.92 Rp. 570,381.58
- Pek. Urugan tanah kembali 7.68 m3 Rp. 90,083.18 Rp. 691,658.66
- Pek. Urugan Tanah bawah Lantai 1.12 m3 Rp. 307,246.60 Rp. 344,116.19
- Pek. Urugan Pasir Dibawah Lantai 1.12 m3 Rp. 281,669.92 Rp. 315,470.31
TOTAL HARGA Rp. 6,931,201.92
III PEKERJAAN PONDASI Rp. -

1. Pek. Pondasi Batu Kali


- Pek. Batu Kosong 4.05 m3 Rp. 807,823.33 Rp. 3,271,684.50
- Pek. Pasangan Pondasi Batu Kali 18.23 m3 Rp. 1,124,663.79 Rp. 20,496,997.63
- Pek. Pasangan Pondasi Batu Bata m2 Rp. 185,327.96 Rp. -
TOTAL HARGA Rp. 23,768,682.12
III. PEKERJAAN STRUKTUR

1. Pek. Pondasi Poer Plat Rp. 25,602,323.26


Pondasi Poer Plat 100x100x25 17.00 Bh Rp. 17,684,998.04
- Lantai kerja 2.04 m2 Rp. 111,201.80 Rp. 226,851.68
- Bekisting 4.00 m2/m3 24.48 m2 Rp. 125,022.53 Rp. 3,060,551.50
- Pembesian 111.89 kg/m3 684.75 kg Rp. 21,025.92 Rp. 14,397,594.86
- Cor Beton K-250 6.12 m3 Rp. 1,293,680.59 Rp. 7,917,325.22

Pondasi Poer Plat Tangga 100x35x25 1.20 m1 Rp. 843,752.77


- Lantai kerja 0.66 m2 Rp. 111,201.80 Rp. 73,393.19
- Bekisting 11.43 m2/m3 1.00 m2 Rp. 125,022.53 Rp. 125,022.53
- Pembesian 350.77 kg/m3 30.69 kg Rp. 21,025.92 Rp. 645,337.05
- Cor Beton K-250 0.09 m3 Rp. 1,293,680.59 Rp. 113,197.05

2. Pek. Sloof Rp. 19,604,438.86


Sloof uk. 20x40 47.00 m1 Rp. 19,604,438.86
- Bekisting 2x pakai 10.00 m2/m3 37.60 m2 Rp. 125,022.53 Rp. 4,700,847.07
- Pembesian 126.99 kg/m3 477.48 kg Rp. 21,025.92 Rp. 10,039,352.77
- Cor Beton K - 250 3.76 m3 Rp. 1,293,680.59 Rp. 4,864,239.02

3. Pek. Kolom Rp. 71,602,319.26


Kolom Utama 20x40 17.00 bh Rp. 60,563,313.31
- Bekisting 2x pakai 15.00 m2/m3 142.80 m2 Rp. 159,864.76 Rp. 22,828,687.29
- Pembesian 126.99 kg/m3 1,208.93 kg Rp. 21,025.92 Rp. 25,418,786.79
- Cor Beton K-250 9.52 m3 Rp. 1,293,680.59 Rp. 12,315,839.23

Kolom Praktis 15x15 Lantai 1 2.00 bh Rp. 1,193,552.02


- Bekisting 2x pakai 26.67 m2/m3 3.72 m2 Rp. 159,864.76 Rp. 594,696.90
- Pembesian 142.64 kg/m3 19.90 kg Rp. 21,025.92 Rp. 418,386.68
- Cor Beton K-250 0.14 m3 Rp. 1,293,680.59 Rp. 180,468.44

Kolom Praktis 15x15 Lantai 2 2.00 bh Rp. 1,193,552.02


- Bekisting 2x pakai 26.67 m2/m3 3.72 m2 Rp. 159,864.76 Rp. 594,696.90
- Pembesian 142.64 kg/m3 19.90 kg Rp. 21,025.92 Rp. 418,386.68
- Cor Beton K-250 0.14 m3 Rp. 1,293,680.59 Rp. 180,468.44

Kolom Pedestal 20x40 17.00 bh Rp. 8,651,901.90


- Bekisting 2x pakai 15.00 m2/m3 20.40 m2 Rp. 159,864.76 Rp. 3,261,241.04
- Pembesian 126.99 kg/m3 172.70 kg Rp. 21,025.92 Rp. 3,631,255.26
- Cor Beton K-250 1.36 m3 Rp. 1,293,680.59 Rp. 1,759,405.60
4. Pek. Balok Rp. 27,926,587.86
Balok uk. 20x40 56.46 m1 Rp. 26,334,058.69
- Bekisting 2x pakai 10.00 m2/m3 45.17 m2 Rp. 186,652.56 Rp. 8,430,722.68
- Pembesian 126.99 kg/m3 573.58 kg Rp. 21,025.92 Rp. 12,060,039.52
- Cor Beton K - 250 4.52 m3 Rp. 1,293,680.59 Rp. 5,843,296.50

Balok uk. 15x20 6.61 m1 Rp. 1,592,529.17


- Bekisting 2x pakai 16.67 m2/m3 3.31 m2 Rp. 186,652.56 Rp. 616,886.70
- Pembesian 172.47 kg/m3 34.20 kg Rp. 21,025.92 Rp. 719,105.61
- Cor Beton K - 250 0.20 m3 Rp. 1,293,680.59 Rp. 256,536.86

5. Pek. Ringbalk Rp. 24,393,013.53


Ringbalk uk. 20x40 51.60 m1 Rp. 24,067,258.74
- Bekisting 2x pakai 10.00 m2/m3 41.28 m2 Rp. 186,652.56 Rp. 7,705,017.54
- Pembesian 126.99 kg/m3 524.21 kg Rp. 21,025.92 Rp. 11,021,927.72
- Cor Beton K - 250 4.13 m3 Rp. 1,293,680.59 Rp. 5,340,313.48

Ringbalk uk. 15x20 1.60 m1 Rp. 325,754.79


- Bekisting 2x pakai 10.00 m2/m3 0.48 m2 Rp. 186,652.56 Rp. 89,593.23
- Pembesian 172.47 kg/m3 8.28 kg Rp. 21,025.92 Rp. 174,064.90
- Cor Beton K - 250 0.05 m3 Rp. 1,293,680.59 Rp. 62,096.67

7. Pekerjaan Plat Lantai 2 Rp. 62,002,349.39


- Bekisting 2x pakai 1.00 m2/m3 42.44 m2 Rp. 85,680.37 Rp. 3,636,274.83
- Pembesian 8.01 Kg/m2 339.97 kg Rp. 141,496.02 Rp. 48,104,274.09
- Cor Beton K - 250 7.93 m2 Rp. 1,293,680.59 Rp. 10,261,800.46

8. Pekerjaan Tangga Rp. 12,285,439.10


- Bekisting 2x pakai m2/m3 13.32 m2 Rp. 186,652.56 Rp. 2,486,398.71
- Pembesian 250.00 kg/m3 374.00 kg Rp. 21,025.92 Rp. 7,863,694.23
- Cor Beton K - 250 1.50 m3 Rp. 1,293,680.59 Rp. 1,935,346.17

9. Pekerjaan Plat Kanopi Rp. 51,180,015.21


Plat Kanopi T. 10cm m2
- Pembesian Wermesh M8 8.01 Kg/m2 168.92 m2 Rp. 141,496.02 Rp. 23,900,819.41
- Cor Beton K - 250 21.09 m3 Rp. 1,293,680.59 Rp. 27,279,195.80

TOTAL HARGA Rp. 294,596,486.47


IV. PEKERJAAN ARSITEKTUR

1. Pekerjaan Lantai Rp. 33,774,419.33


- Pek. Rabat Beton 8.18 m2 Rp. 111,201.80 Rp. 909,297.15
- Pas. Tegel Keramik 40x40 105.34 m2 Rp. 312,005.72 Rp. 32,865,122.17
- Pas. Tegel Keramik 30X30 wc 4.40 m2 Rp. 278,756.41 Rp. 1,226,528.21
- Pas. Tegel Dinding Keramik 20x25 wc 15.75 m2 Rp. 422,960.98 Rp. 6,661,635.37
- Pas. Plint Granit 10X60 83.26 m1 Rp. 92,497.39 Rp. 7,701,333.09

2. Pekerjaan Dinding Rp. 58,570,460.62


- Pas. Campuran Trasram 1:2 47.48 m2 Rp. 233,504.11 Rp. 11,086,775.16
- Pas. Dinding Bata merah 1/2 bata (1:4) 133.71 m2 Rp. 185,327.96 Rp. 24,779,274.95
- Pas. Plesteran 245.46 m1 Rp. 92,497.39 Rp. 22,704,410.51

4. Pekerjaan Plafond Rp. 24,189,267.01


- Pas. R. Plafond (hollow 20/40 dan 40/40) 105.34 m2 Rp. 168,887.27 Rp. 17,789,740.61
- Pas. Plafond Gypsum Board 105.34 m2 Rp. 60,754.04 Rp. 6,399,526.40
uk. (120x240)cm. tebal 9mm
TOTAL HARGA Rp. 116,534,146.95
V. PEKERJAAN ATAP

1. PEKERJAAN ATAP Rp. 32,165,992.72


- Pek. Rangka Baja Ringan 46.29 m2 Rp. 279,796.76 Rp. 12,951,792.01
- Pek. Lapisan Karet 46.29 m2 Rp. 87,312.13 Rp. 4,041,678.40
- Pek. Penutup Atap Genteng Beton 46.29 m2 Rp. 146,748.67 Rp. 6,792,996.05
- Pek. Bubungan 21.09 m1 Rp. 151,149.15 Rp. 3,186,979.87
- Pek. Lisplank 27.36 m1 Rp. 189,786.05 Rp. 5,192,546.40
TOTAL HARGA Rp. 32,165,992.72
VI. PEKERJAAN FINISHING

1. Pekerjaan Dinding Rp. 84,759,768.07


- Pas Acian Tembok 668.59 m2 Rp. 60,100.57 Rp. 40,182,551.55
- Pengecatan Dinding Luar 413.23 m2 Rp. 59,301.65 Rp. 24,505,281.59
- Pengecatan Dinding Dalam 255.36 m2 Rp. 52,496.81 Rp. 13,405,453.39
- Pengecatan Plafond 105.34 m2 Rp. 63,288.38 Rp. 6,666,481.54

2. Pekerjaan Kusen Pintu, Jendela Rp. 65,319,430.52


- Pas. Kusen Pintu Alumunium 129.80 m Rp. 258,447.79 Rp. 33,546,523.51
- Pas. Pintu P1 6.67 m2 Rp. 164,032.19 Rp. 1,093,274.57
- Pas. Pintu P2 8.20 m2 Rp. 164,032.19 Rp. 1,345,063.99
- Pas. Pintu P3 8.16 Bh Rp. Rp. -
- Pas. Jendela J1 8.16 m2 Rp. 1,547,590.00 Rp. 12,628,334.40
- Pas. Jendela J2 2.72 m3 Rp. 1,547,590.00 Rp. 4,209,444.80
- Pas. Jendela J3 4.76 m4 Rp. 1,547,590.00 Rp. 7,366,528.40
- Pas. Jendela J4 3.32 m5 Rp. 1,547,590.00 Rp. 5,130,260.85

3. Pekerjaan Perlengkapan Kusen Pintu, Jendela Rp. 43,023,360.19


- Pas. Engsel Pintu 27.00 Bh Rp. 53,235.44 Rp. 1,437,356.89
- Pas. Engsel Jendela 52.00 Bh Rp. 59,285.44 Rp. 3,082,842.89
- Pas. Gagang Pintu + Pengunci 9.00 Bh Rp. 271,255.44 Rp. 2,441,298.96
- Pas. Terali Jendela 26.00 Bh Rp. 250,000.00 Rp. 6,500,000.00
- Pas. Pengunci Jendela 26.00 Bh Rp. 131,225.44 Rp. 3,411,861.45
- Railing Tangga 52.30 m Rp. 500,000.00 Rp. 26,150,000.00

TOTAL HARGA Rp. 193,102,558.79


V. PEKERJAAN MEKANIKAL, ELEKTRIKAL, dan PLUMBING (MEP)

1. Pekerjaan Instalasi Listrik Rp. 5,636,094.68


- Pas. Instalasi Titik Lampu 17.00 Titik Rp. - Rp. -
- Pas. Titik Lampu 17.00 Bh Rp. 124,649.93 Rp. 2,119,048.84
- Pas. Stop Kontak 8 Bh Rp. 272,331.62 Rp. 2,178,652.96
- Pas. Saklar Tunggal 6 Bh Rp. 47,656.62 Rp. 285,939.72
- Pas. Saklar Ganda 4 Bh Rp. 57,578.29 Rp. 230,313.16
- Pas. Mcb 1 Bh Rp. 822,140.00 Rp. 822,140.00
-
2. Pekerjaan Sanitary Rp. 18,560,640.98
- Pas. Closet Duduk 2.00 Bh Rp. 3,673,883.58 Rp. 7,347,767.17
- Pas. Bak Cuci Piring 1.00 Bh Rp. 333,073.58 Rp. 333,073.58
- Pas. Kran Air 2.00 Bh Rp. 156,249.85 Rp. 312,499.70
- Pas. Floor Drain 2.00 Bh Rp. 57,769.96 Rp. 115,539.92
- Pas.Pipa 4'' Air Kotor 16.30 m1 Rp. 268,789.34 Rp. 4,381,266.30
- Pas. Pipa 1/2 Air kotor 35.53 m1 Rp. 52,822.68 Rp. 1,876,789.71
- Pas. Pipa 3/4 Air Bersih 43.86 m1 Rp. 56,856.01 Rp. 2,493,704.61
- Tandom Air 2000 L 1.00 Bh Rp. 1,700,000.00 Rp. 1,700,000.00
- Instalasi Pompa Air 1.00 Ls Rp. 300,000.00 Rp. 300,000.00
- Instalasi Radar Air 1.00 Ls Rp. 200,000.00 Rp. 200,000.00
- Pemasangan Bak Kontrol 1.00 Bh Rp. 1,254,899.45 Rp. 1,254,899.45
-
3. Pekerjaan Septicktank Rp. 3,469,436.25
- Pek. Galian Tanah 4.00 m3 Rp. 121,612.29 Rp. 486,449.17
- Pas. Bata merah 1/2 bata (1:4) 6.00 m2 Rp. 233,504.11 Rp. 1,401,024.66
- Pas. Plasteran 1:3 12.00 m2 Rp. 92,497.39 Rp. 1,109,968.74
- Penutup Beton Rp. 471,993.68
Bekisting 1.00 m2/m3 0.30 m2 Rp. 111,201.80 Rp. 33,360.54
Pembesian 8.01 Kg/m2 2.40 kg Rp. 21,025.92 Rp. 50,528.96
Cor Beton K - 250 0.30 m3 Rp. 1,293,680.59 Rp. 388,104.18
TOTAL HARGA Rp. 27,666,171.91
JUMLAH Rp. 699,409,280.13
Pembulatan Rp. 699,409,000.00
Terbilang:

ENAM RATUS SEMBILAN PULUH SEMBILAN JUTA EMPAT RATUS SEMBILAN RIBU RUPIAH
Harga Per Meter Konstruksi Rp 699,409,280.13
LEBAR
JUMLAH
NO URAIAN PEKERJAAN TINGGI PANJANG VOLUME KURANG TOTAL
LEBAR ATAS LEBAR BAWAH ITEM
PEKERJAAN PERSIAPAN
1 VERTIKAL 45 45
2 HORIZONTAL 20.5 20.5
TOTAL VOLUME 65.5
PEKERJAAN TANAH

I PEKERJAAN GALIAN
A Pondasi Batu Kali 2.025
1 R. TIDUR 1 0.576
- DINDING 1 0.8 0.05 3 0.04 0.12
- DINDING 2 0.8 0.05 3 0.04 0.12
- DINDING 3 0.8 0.05 4.2 0.04 0.168
- DINDING 4 0.8 0.05 4.2 0.04 0.168
2 R. TAMU 0.364
- DINDING 1 0.8 0.05 3 0.04 0.12
- DINDING 2 0.8 0.05 3.1 0.04 0.124
- DINDING 3 0.8 0.05 3 0.04 0.12
3 WC 0.144
- DINDING 1 0.8 0.05 1.8 0.04 0.072
- DINDING 2 0.8 0.05 1.8 0.04 0.072
4 R. TIDUR 2 0.496
- DINDING 1 0.8 0.05 3.2 0.04 0.128
- DINDING 2 0.8 0.05 3.2 0.04 0.128
- DINDING 3 0.8 0.05 3 0.04 0.12
- DINDING 4 0.8 0.05 3 0.04 0.12
5 R. TENGAH 0.445
- DINDING 1 0.8 0.05 2 0.04 0.08
- DINDING 2 0.8 0.05 4.1 0.04 0.164
- DINDING 3 0.8 0.05 5.025 0.04 0.201
B Pondasi Poer 39.168
1 Poer 100x100x25 1.2 1.6 1.2 2.304 17 39.168
C Pondasi Batu Bata 0
1 Teras Depan 0
2 Teras Belakang 0
TOTAL VOLUME 41.193
II PEKERJAAN URUGAN PASIR
A Pondasi Batu Kali 2.025
1 R. TIDUR 1 0.576
- DINDING 1 0.8 0.05 3 0.04 0.12
- DINDING 2 0.8 0.05 3 0.04 0.12
- DINDING 3 0.8 0.05 4.2 0.04 0.168
- DINDING 4 0.8 0.05 4.2 0.04 0.168
2 R. TAMU 0.364
- DINDING 1 0.8 0.05 3 0.04 0.12
- DINDING 2 0.8 0.05 3.1 0.04 0.124
- DINDING 3 0.8 0.05 3 0.04 0.12
3 WC 0.144
- DINDING 1 0.8 0.05 1.8 0.04 0.072
- DINDING 2 0.8 0.05 1.8 0.04 0.072
4 R. TIDUR 2 0.496
- DINDING 1 0.8 0.05 3.2 0.04 0.128
- DINDING 2 0.8 0.05 3.2 0.04 0.128
- DINDING 3 0.8 0.05 3 0.04 0.12
- DINDING 4 0.8 0.05 3 0.04 0.12
5 R. TENGAH 0.445
- DINDING 1 0.8 0.05 2 0.04 0.08
- DINDING 2 0.8 0.05 4.1 0.04 0.164
- DINDING 3 0.8 0.05 5.025 0.04 0.201
B Pondasi Batu Bata 1.20825
1 Teras Depan 0.675 0.05 10.2 0.34425 0.34425
TOTAL VOLUME 2.025
III PEKERJAAN TANAH DIBAWAH LANTAI
1 R. TIDUR 11.2 0.1 1.12 1.12
2 R. TAMU 8.12 0.1 0.812 0.812
3 R. TENGAH 21.12 0.1 2.112 2.112
4 R. TIDUR 1 8.4 0.1 0.84 0.84
5 WC 2.08 0.05 0.104 0.104
TOTAL VOLUME 1.12
III PEKERJAAN PASIR DIBAWAH LANTAI
1 R. TIDUR 11.2 0.1 1.12 1.12
2 R. TAMU 8.12 0.1 0.812 0.812
3 R. TENGAH 21.12 0.1 2.112 2.112
4 R. TIDUR 1 8.4 0.1 0.84 0.84
5 WC 2.08 0.05 0.104 0.104
TOTAL VOLUME 1.12
PEKERJAAN PONDASI

I PEKERJAAN BATU KOSONG


1 R. TIDUR 1 1.152
- DINDING 1 0.8 0.1 3 0.08 0.24
- DINDING 2 0.8 0.1 3 0.08 0.24
- DINDING 3 0.8 0.1 4.2 0.08 0.336
- DINDING 4 0.8 0.1 4.2 0.08 0.336
2 R. TAMU 0.728
- DINDING 1 0.8 0.1 3 0.08 0.24
- DINDING 2 0.8 0.1 3.1 0.08 0.248
- DINDING 3 0.8 0.1 3 0.08 0.24
3 WC 0.288
- DINDING 1 0.8 0.1 1.8 0.08 0.144
- DINDING 2 0.8 0.1 1.8 0.08 0.144
4 R. TIDUR 2 0.992
- DINDING 1 0.8 0.1 3.2 0.08 0.256
- DINDING 2 0.8 0.1 3.2 0.08 0.256
- DINDING 3 0.8 0.1 3 0.08 0.24
- DINDING 4 0.8 0.1 3 0.08 0.24
5 R. TENGAH 0.89
- DINDING 1 0.8 0.1 2 0.08 0.16
- DINDING 2 0.8 0.1 4.1 0.08 0.328
- DINDING 3 0.8 0.1 5.025 0.08 0.402
TOTAL VOLUME 4.05
II PEKERJAAN PONDASI BATU KALI
1 R. TIDUR 1 5.184
- DINDING 1 0.3 0.6 0.8 3 0.36 1.08
- DINDING 2 0.3 0.6 0.8 3 0.36 1.08
- DINDING 3 0.3 0.6 0.8 4.2 0.36 1.512
- DINDING 4 0.3 0.6 0.8 4.2 0.36 1.512
2 R. TAMU 3.276
- DINDING 1 0.3 0.6 0.8 3 0.36 1.08
- DINDING 2 0.3 0.6 0.8 3.1 0.36 1.116
- DINDING 3 0.3 0.6 0.8 3 0.36 1.08
3 WC 1.296
- DINDING 1 0.3 0.6 0.8 1.8 0.36 0.648
- DINDING 2 0.3 0.6 0.8 1.8 0.36 0.648
4 R. TIDUR 2 4.464
- DINDING 1 0.3 0.6 0.8 3.2 0.36 1.152
- DINDING 2 0.3 0.6 0.8 3.2 0.36 1.152
- DINDING 3 0.3 0.6 0.8 3 0.36 1.08
- DINDING 4 0.3 0.6 0.8 3 0.36 1.08
5 R. TENGAH 4.005
- DINDING 1 0.3 0.6 0.8 2 0.36 0.72
- DINDING 2 0.3 0.6 0.8 4.1 0.36 1.476
- DINDING 3 0.3 0.6 0.8 5.025 0.36 1.809
TOTAL VOLUME 18.225
III PEKERJAAN PONDASI BATU BATA
1 TERAS DEPAN 0
- PONDASI 1 0
- PONDASI 2 0
2 TERAS BELAKANG 0
- PONDASI 1 0
- PONDASI 2 0

PEKERJAAN BETON

I PEKERJAAN PONDASI POER


A LANTAI KERJA 2.04
- LANTAI KERJA 120X120 1.2 0.1 1.2 0.12 17 2.04
B PONDASI POER 6.12
- Poer 100x100x25 1.2 0.25 1.2 0.36 17 6.12
II PEKERJAAN SLOOF
1 SLOOF INDUK 20X40 0.2 0.4 47.00 0.08 3.76
III PEKERJAAN KOLOM
1 KOLOM UTAMA 20X40 0.2 7 0.40 0.56 17 9.52
2 KOLOM PRAKTIS 15X15 LANTAI 1 0.15 3.1 0.15 0.07 2 0.14
3 KOLOM PRAKTIS 15X15 LANTAI 2 0.15 3.1 0.15 0.07 2 0.14
4 KOLOM PEDESTAL 0.2 1.63 0.40 0.08 17 1.36
IV PEKERJAAN BALOK
1 BALOK INDUK 20X40 0.2 0.4 56.46 4.52 4.5168
2 BALOK ANAK 15X20 0.15 0.2 6.61 0.20 0.1983
V PEKERJAAN RINGBALK
1 RINGBALK INDUK 20X40 0.2 0.4 51.60 4.13 4.128
2 RINGBALK ANAK 15X20 0.15 0.2 1.60 0.05 0.048
VI PLAT LANTAI
1 R. TIDUR UTAMA 5.39 0.12 0.6468 3.486252
2 R. TIDUR UTAMA 1 5.39 0.12 0.6468 0.6468
2 R. TIDUR 1 8.4 0.12 1.008 1.008
3 R. TENGAH 5.04 0.12 0.6048 0.6048
3 R. TENGAH 1 4.32 0.12 0.5184 0.5184
4 R. DEPAN 7.84 0.12 0.9408 0.9408
4 WC 2.2 0.12 0.264 0.264
5 BALKON 3.86 0.12 0.4632 0.4632
TOTAL VOLUME 7.932252
VII TANGGA
1 ANAK TANGGA 0.175 0.28 1 0.049 13 0.637
2 BORDES 1 0.12 1.15 0.138 1 0.138
2 IBU TANGGA 1 0.1858 0.1858 1 0.1858
3 IBU TANGGA 2 1 0.2676 0.2676 2 0.5352
TOTAL VOLUME 1.496
VIII KANOPI BETON
- TERAS 1.5 4.6 6.9 6.9
- BALKON 3.15 1.5 4.725 4.725
- PROFIL DEPAN 1 3.05 0.2 0.61 0.1185 0.4915
- PROFIL DEPAN 2 3.05 0.4 1.22 1.22
- PROFIL DEPAN 3 2 0.25 0.5 0.5
- PROFIL DEPAN 4 2 0.25 0.5 0.5
- PROFIL BELAKANG 1 3 1 3 3
- PROFIL BELAKANG 2 5 0.5 2.5 2.5
- PROFIL BELAKANG 3 1.25 0.5 0.625 0.625
- PROFIL BELAKANG 4 1.25 0.5 0.625 0.625
TOTAL VOLUME 21.0865
PEKERJAAN ARSITEKTUR

I PEKERJAAN RABAT BETON


1 R. TIDUR 11.2 0.1 1.12 1.12
2 R. TAMU 8.12 0.1 0.812 0.812
3 R. TENGAH 30.57 0.1 3.057 3.057
4 R. TIDUR 1 8.4 0.1 0.84 0.84
5 WC 2.08 0.1 0.208 0.208
6 CARPORT 21.4 0.1 2.14 2.14
TOTAL VOLUME 8.177
II PEKERJAAM PASANG KERAMIK 40X40
LANTAI 1
1 R. TIDUR 11.2 11.2
2 R. TAMU 8.12 8.12
3 R. TENGAH 30.57 30.57
4 R. TIDUR 1 8.4 8.4
TOTAL VOLUME LANTAI 1 58.29
LANTAI 2
1 R. TIDUR UTAMA 11.82 11.82
2 R. TIDUR 1 8.92 8.92
3 R. TENGAH 22.03 22.03
5 BALKON 4.275 4.275
TOTAL VOLUME LANTAI 2 47.045
TOTAL VOLUME 105.335
III PEKERJAAN PASANG KERAMIK 20X20 WC
1 WC 2.2 2.2
LANTAI 1 2.2
1 WC Kamar Utama 2.2 2.2
LANTAI 2 2.2
TOTAL VOLUME 4.4
IV PEKERJAAN PASANG DINDING KERAMIK 30x30 WC
LANTAI 1
1 WC
- DINDING 1 1.375 1.5 2.0625 2.0625
- DINDING 2 1.375 1.5 2.0625 2.0625
- DINDING 3 1.6 1.5 2.4 2.4
- DINDING 4 1.6 1.5 2.4 1.05 1.505 1.35
TOTAL VOLUME LANTAI 1 7.875
LANTAI 2
1 WC
- DINDING 1 1.375 1.5 2.0625 2.0625
- DINDING 2 1.375 1.5 2.0625 2.0625
- DINDING 3 1.6 1.5 2.4 2.4
- DINDING 4 1.6 1.5 2.4 1.05 1.505 1.35
TOTAL VOLUME LANTAI 2 7.875
TOTAL VOLUME 15.75
V PEKERJAAN PASANG PLINT LANTAI 10X20
LANTAI 1
1 R. TIDUR 1 13.2
- DINDING 1 2.8 0.9 1.9
- DINDING 2 2.8 2.8
- DINDING 3 4.1 4.1
- DINDING 4 4.1 4.1
- KOLOM 0.05 6 0.3
2 R. TAMU 21.98
- DINDING 1 3.25 3.25
- DINDING 2 2.8 1.6 1.2
- DINDING 3 3.25 3.25
- DINDING 4 1.525 0.9 0.625
- DINDING 5 1.525 0.9 0.625
- DINDING 6 1.6 0.7 0.9
- DINDING 7 2.23 2.23
- DINDING 8 4.8 0.9 3.9
- DINDING 9 4.1 0.9 3.2
- DINDING 10 2.05 0.7 1.35
- KOLOM 1 0.25 5 1.25
- KOLOM 2 0.05 4 0.2
4 R. TIDUR 2 11.2
- DINDING 1 2.8 0.9 1.9
- DINDING 2 2.8 2.8
- DINDING 3 3.1 3.1
- DINDING 4 3.1 3.1
- KOLOM 0.05 6 0.3
5 TANGGA 57.6
- ANAK TANGGA 0.28 19 5.32
- BORDES 1 1.15 2 2.3
- BORDES 2 0.95 2 1.9
- KOLOM 1 0.05 4 0.2
- KOLOM 2 0.25 6 1.5
TOTAL VOLUME LANTAI 1 46.38
LANTAI 2
1 R. TIDUR 1 13.2
- DINDING 1 2.8 0.9 1.9
- DINDING 2 2.8 2.8
- DINDING 3 4.1 4.1
- DINDING 4 4.1 4.1
- KOLOM 0.05 6 0.3
2 R. TAMU 12.48
- DINDING 1 3.25 3.25
- DINDING 2 2.8 1.6 1.2
- DINDING 3 3.25 3.25
- DINDING 4 1.525 0.9 0.625
- DINDING 5 1.525 0.9 0.625
- DINDING 6 1.6 0.7 0.9
- DINDING 7 2.23 2.23
- KOLOM 1 0.2 1 0.2
- KOLOM 2 0.05 4 0.2
4 R. TIDUR 2 11.2
- DINDING 1 2.8 0.9 1.9
- DINDING 2 2.8 2.8
- DINDING 3 3.1 3.1
- DINDING 4 3.1 3.1
- KOLOM 0.05 6 0.3
TOTAL VOLUME LANTAI 2 36.88
TOTAL VOLUME 83.26
VI KUSEN
1 Pas. Pintu P1 (- TINGGI PAS. TRASRAM) 1.6 2 3.2 3.2
2 Pas. Pintu P2 (- TINGGI PAS. TRASRAM) 0.9 1.9 1.71 1.71
3 Pas. Pintu P3 (- TINGGI PAS. TRASRAM) 0.7 1.8 1.26 1.26
7 Pas. Jendela J1 1.4 1.8 2.52 2.52
8 Pas. Jendela J2 0.5 1.8 0.9 0.9
9 Pas. Jendela J3 1.8 1.8 3.24 3.24
10 Pas. Jendela J4 0.85 1.8 1.53 1.53
VII PEKERJAAN DINDING BATA 1:4
LANTAI 1
1 R. TIDUR 1 25.32
- DINDING 1 2.9 2.8 8.12 2.52 5.6
- DINDING 2 2.9 3.6 10.44 10.44
- DINDING 3 2.9 0.6 1.74 1.74
- DINDING 4 2.9 2.6 7.54 7.54
- DINDING 5 2.9 1.325 3.8425 1.71 2.1325
2 R. TAMU 10.66
- DINDING 1 2.9 2.8 8.12 5 3.12
- DINDING 2 2.9 2.6 7.54 7.54
4 R. TIDUR 2 15.1025
- DINDING 1 2.9 1.325 3.8425 1.71 2.1325
- DINDING 2 2.9 1.6 4.64 4.64
- DINDING 3 2.9 0.6 1.74 1.74
- DINDING 4 2.9 2.8 8.12 1.53 6.59
5 R. TENGAH 11.98
- DINDING 1 2.9 1.8 5.22 2.52 2.7
- DINDING 2 2.9 1.6 4.64 4.64
- DINDING 3 2.9 1.6 4.64 4.64
- DINDING 4 2.9 1.8 5.22 5.22
- DINDING 5 2.9 2.8 8.12 3.24 4.88
TOTAL VOLUME LANTAI 1 63.0625
LANTAI 2
1 R. TIDUR UTAMA 25.32
- DINDING 1 2.9 2.8 8.12 2.52 5.6
- DINDING 2 2.9 3.6 10.44 10.44
- DINDING 3 2.9 0.6 1.74 1.74
- DINDING 4 2.9 2.6 7.54 7.54
- DINDING 5 2.9 1.325 3.8425 1.71 2.1325
2 R. KELUARGA 10.66
- DINDING 1 2.9 2.8 8.12 5 3.12
- DINDING 2 2.9 2.6 7.54 7.54
4 R. TIDUR 2 12.5825
- DINDING 1 2.9 1.325 3.8425 2.52 1.3225
- DINDING 2 2.9 1.6 4.64 4.64
- DINDING 3 2.9 0.6 1.74 1.74
- DINDING 4 2.9 2.8 8.12 3.24 4.88
5 R. TENGAH 22.08
- DINDING 1 2.9 1.8 5.22 2.52 2.7
- DINDING 2 2.9 1.6 4.64 4.64
- DINDING 3 2.9 1.6 4.64 4.64
- DINDING 4 2.9 1.8 5.22 5.22
- DINDING 5 2.9 2.8 8.12 3.24 4.88
TOTAL VOLUME LANTAI 2 70.6425
TOTAL VOLUME 133.705
VIII KUSEN
1 Pas. Pintu P1 (- TINGGI PAS. TRASRAM) 1.6 0.2 0.32 0.32
2 Pas. Pintu P2 (- TINGGI PAS. TRASRAM) 0.9 0.2 0.18 0.18
3 Pas. Pintu P3 (- TINGGI PAS. TRASRAM) 0.7 0.2 0.14 0.14
7 Pas. Jendela J1 1.4 1.8 2.52 2.52
8 Pas. Jendela J2 0.5 1.8 0.9 0.9
9 Pas. Jendela J3 1.8 1.8 3.24 3.24
10 Pas. Jendela J4 0.85 1.8 1.53 1.53
IX PEKERJAAN DINDING TRASRAM
LANTAI 1
1 R. TIDUR 1 2.005
- DINDING 1 0.2 2.8 0.56 0.56
- DINDING 2 0.2 3.6 0.72 0.72
- DINDING 3 0.2 0.6 0.12 0.12
- DINDING 4 0.2 2.6 0.52 0.52
- DINDING 5 0.2 1.325 0.265 0.18 0.085
2 R. TAMU 0.76
- DINDING 1 0.2 2.8 0.56 0.32 0.24
- DINDING 2 0.2 2.6 0.52 0.52
4 R. TIDUR 2 1.085
- DINDING 1 0.2 1.325 0.265 0.18 0.085
- DINDING 2 0.2 1.6 0.32 0.32
- DINDING 3 0.2 0.6 0.12 0.12
- DINDING 4 0.2 2.8 0.56 0.56
5 R. TENGAH 1.74
- DINDING 1 0.2 1.8 0.36 0.36
- DINDING 2 0.2 1.6 0.32 0.32
- DINDING 3 0.2 1.6 0.32 0.32
- DINDING 4 0.2 1.8 0.36 0.36
- DINDING 5 0.2 2.8 0.56 0.18 0.38
6 WC 18.15
- DINDING 1 3.1 1.6 4.96 0.14 4.82
- DINDING 2 3.1 1.6 4.96 4.96
- DINDING 3 3.1 1.35 4.185 4.185
- DINDING 4 3.1 1.35 4.185 4.185
TOTAL VOLUME LANTAI 1 23.74
LANTAI 2
1 R. TIDUR 1 2.005
- DINDING 1 0.2 2.8 0.56 0.56
- DINDING 2 0.2 3.6 0.72 0.72
- DINDING 3 0.2 0.6 0.12 0.12
- DINDING 4 0.2 2.6 0.52 0.52
- DINDING 5 0.2 1.325 0.265 0.18 0.085
2 R. TAMU 0.76
- DINDING 1 0.2 2.8 0.56 0.32 0.24
- DINDING 2 0.2 2.6 0.52 0.52
4 R. TIDUR 2 1.085
- DINDING 1 0.2 1.325 0.265 0.18 0.085
- DINDING 2 0.2 1.6 0.32 0.32
- DINDING 3 0.2 0.6 0.12 0.12
- DINDING 4 0.2 2.8 0.56 0.56
5 R. TENGAH 1.74
- DINDING 1 0.2 1.8 0.36 0.36
- DINDING 2 0.2 1.6 0.32 0.32
- DINDING 3 0.2 1.6 0.32 0.32
- DINDING 4 0.2 1.8 0.36 0.36
- DINDING 5 0.2 2.8 0.56 0.18 0.38
6 WC 18.15
- DINDING 1 3.1 1.6 4.96 0.14 4.82
- DINDING 2 3.1 1.6 4.96 4.96
- DINDING 3 3.1 1.35 4.185 4.185
- DINDING 4 3.1 1.35 4.185 4.185
TOTAL VOLUME LANTAI 2 23.74
TOTAL VOLUME 47.48
X PEKERJAAN PLAFON
LANTAI 1
1 R. TIDUR 11.2 11.2
2 R. TAMU 8.12 8.12
3 R. TENGAH 22.03 22.03
4 R. TIDUR 1 8.4 8.4
TOTAL VOLUME LANTAI 1 49.75
LANTAI 2
1 R. TIDUR UTAMA 11.82 11.82
2 R. TIDUR 1 8.92 8.92
3 R. TENGAH 30.57 30.57
5 BALKON 4.275 4.275
TOTAL VOLUME LANTAI 2 55.585
TOTAL VOLUME 105.335
XI RANGKA PLAFOND
LANTAI 1
1 R. TIDUR 11.2 11.2
2 R. TAMU 8.12 8.12
3 R. TENGAH 22.03 22.03
4 R. TIDUR 1 8.4 8.4
TOTAL VOLUME LANTAI 1 49.75
LANTAI 2
1 R. TIDUR UTAMA 11.82 11.82
2 R. TIDUR 1 8.92 8.92
3 R. TENGAH 30.57 30.57
5 BALKON 4.275 4.275
TOTAL VOLUME LANTAI 2 55.585
TOTAL VOLUME 105.335
PEKERJAAN ATAP

I PEKERJAAN RANGKA BAJA RINGAN


1 RANGKA BAJA RINGAN 40.08 40.08
II PEKERJAAN PENUTUP KARET
1 DEPAN 1 7.81 7.81
2 DEPAN 2 3.93 3.93
3 KANAN 1 8.07 8.07
4 KANAN 2 3.34 3.34
5 BELAKANG 11.73 11.73
6 KIRI 11.41 11.41
TOTAL VOLUME 46.29
III PEKERJAAN PENUTUP ATAP GENTENG
1 DEPAN 1 7.81 7.81
2 DEPAN 2 3.93 3.93
3 KANAN 1 8.07 8.07
4 KANAN 2 3.34 3.34
5 BELAKANG 11.73 11.73
6 KIRI 11.41 11.41
TOTAL VOLUME 46.29
IV PEKERJAAN BUBUNGAN
1 BUBUNGAN 21.09 21.09
V PEKERJAAN LISPLANK
1 LISPLANK 27.36 27.36
PEKERJAAN FINISHING

I KUSEN
1 Pas. Pintu P1 1.6 2.2 3.52 3.52
2 Pas. Pintu P2 0.9 2.1 1.89 1.89
3 Pas. Pintu P3 0.7 2 1.4 1.4
7 Pas. Jendela J1 1.4 1.8 2.52 2.52
8 Pas. Jendela J2 0.5 1.8 0.9 0.9
9 Pas. Jendela J3 1.8 1.8 3.24 3.24
10 Pas. Jendela J4 0.85 1.8 1.53 1.53
II PEKERJAAN PLESTERAN
LANTAI 1
1 R. TIDUR 1 33.565
- DINDING 1 3.1 2.8 8.68 2.52 6.16
- DINDING 2 3.1 3.6 11.16 11.16
- DINDING 3 3.1 0.6 1.86 1.86
- DINDING 4 3.1 2.6 8.06 8.06
- DINDING 5 3.1 1.325 4.1075 1.89 2.2175
- DINDING 6 3.1 1.325 4.1075 4.1075
2 R. TAMU 19.48
- DINDING 1 3.1 2.8 8.68 5.32 3.36
- DINDING 2 3.1 2.6 8.06 8.06
- DINDING 3 3.1 2.6 8.06 8.06
4 R. TIDUR 2 16.1875
- DINDING 1 3.1 1.325 4.1075 1.89 2.2175
- DINDING 2 3.1 1.6 4.96 4.96
- DINDING 3 3.1 0.6 1.86 1.86
- DINDING 4 3.1 2.8 8.68 1.53 7.15
5 R. TENGAH 31.815
- DINDING 1 3.1 1.8 5.58 2.52 3.06
- DINDING 2 3.1 1.6 4.96 4.96
- DINDING 3 3.1 1.6 4.96 4.96
- DINDING 4 3.1 1.8 5.58 5.58
- DINDING 5 3.1 2.8 8.68 3.42 5.26
- DINDING 6 3.1 1.325 4.1075 1.89 2.2175
- DINDING 7 3.1 1.325 4.1075 1.89 2.2175
- DINDING 8 3.1 1.6 4.96 1.4 3.56
6 WC 17.045
- DINDING 1 3.1 1.375 4.2625 4.2625
- DINDING 2 3.1 1.375 4.2625 4.2625
- DINDING 3 3.1 1.6 4.96 1.4 3.56
- DINDING 4 3.1 1.6 4.96 4.96
TOTAL VOLUME LANTAI 1 118.0925
LANTAI 2
1 R. TIDUR 1 36.015
- DINDING 1 3.3 2.8 9.24 2.52 6.72
- DINDING 2 3.3 3.6 11.88 11.88
- DINDING 3 3.3 0.6 1.98 1.98
- DINDING 4 3.3 2.6 8.58 8.58
- DINDING 5 3.3 1.325 4.3725 1.89 2.4825
- DINDING 6 3.3 1.325 4.3725 4.3725
2 R. KELUARGA 21.08
- DINDING 1 3.3 2.8 9.24 5.32 3.92
- DINDING 2 3.3 2.6 8.58 8.58
- DINDING 3 3.3 2.6 8.58 8.58
4 R. TIDUR 2 17.4525
- DINDING 1 3.3 1.325 4.3725 1.89 2.4825
- DINDING 2 3.3 1.6 5.28 5.28
- DINDING 3 3.3 0.6 1.98 1.98
- DINDING 4 3.3 2.8 9.24 1.53 7.71
5 R. TENGAH 34.585
- DINDING 1 3.3 1.8 5.94 2.52 3.42
- DINDING 2 3.3 1.6 5.28 5.28
- DINDING 3 3.3 1.6 5.28 5.28
- DINDING 4 3.3 1.8 5.94 5.94
- DINDING 5 3.3 2.8 9.24 3.42 5.82
- DINDING 6 3.3 1.325 4.3725 1.89 2.4825
- DINDING 7 3.3 1.325 4.3725 1.89 2.4825
- DINDING 8 3.3 1.6 5.28 1.4 3.88
6 WC 18.235
- DINDING 1 3.3 1.375 4.5375 4.5375
- DINDING 2 3.3 1.375 4.5375 4.5375
- DINDING 3 3.3 1.6 5.28 1.4 3.88
- DINDING 4 3.3 1.6 5.28 5.28
TOTAL VOLUME LANTAI 2 127.3675
TOTAL VOLUME 245.46
III KUSEN
1 Pas. Pintu P1 1.6 2.2 3.52 3.52
2 Pas. Pintu P2 0.9 2.1 1.89 1.89
3 Pas. Pintu P3 0.7 2 1.4 1.4
7 Pas. Jendela J1 1.4 1.8 2.52 2.52
8 Pas. Jendela J2 0.5 1.8 0.9 0.9
9 Pas. Jendela J3 1.8 1.8 3.24 3.24
10 Pas. Jendela J4 0.85 1.8 1.53 1.53
IV PEKERJAAN ACIAN BAGIAN DALAM
LANTAI 1
1 R. TIDUR 1 31.985
- DINDING 1 2.9 2.8 8.12 2.52 5.6
- DINDING 2 2.9 3.6 10.44 10.44
- DINDING 3 2.9 0.6 1.74 1.74
- DINDING 4 2.9 2.6 7.54 7.54
- DINDING 5 2.9 1.325 3.8425 1.89 1.9525
- DINDING 6 2.9 1.325 3.8425 3.8425
- KOLOM 2.9 0.05 0.145 6 0.87
2 R. TAMU 18.17
- DINDING 1 2.9 2.8 8.12 5.32 2.8
- DINDING 2 2.9 2.6 7.54 7.54
- DINDING 3 2.9 2.6 7.54 7.54
- KOLOM 2.9 0.05 0.145 2 0.29
4 R. TIDUR 2 15.7925
- DINDING 1 2.9 1.325 3.8425 1.89 1.9525
- DINDING 2 2.9 1.6 4.64 4.64
- DINDING 3 2.9 0.6 1.74 1.74
- DINDING 4 2.9 2.8 8.12 1.53 6.59
- KOLOM 2.9 0.05 0.145 6 0.87
5 R. TENGAH 43.46
- DINDING 1 2.9 1.8 5.22 2.52 2.7
- DINDING 2 2.9 1.6 4.64 4.64
- DINDING 3 2.9 1.6 4.64 4.64
- DINDING 4 2.9 1.8 5.22 5.22
- DINDING 5 2.9 2.8 8.12 3.42 4.7
- DINDING 6 2.9 1.325 3.8425 1.89 1.9525
- DINDING 7 2.9 1.325 3.8425 1.89 1.9525
- DINDING 8 2.9 1.6 4.64 1.4 3.24
- KOLOM 1 3.1 0.25 0.775 5 3.875
- KOLOM 2 3.1 0.05 0.155 4 0.62
- KOLOM 3 3.1 0.4 1.24 5 6.2
- KOLOM 4 3.1 0.2 0.62 6 3.72
6 WC 16.145
- DINDING 1 2.9 1.375 3.9875 3.9875
- DINDING 2 2.9 1.375 3.9875 3.9875
- DINDING 3 2.9 1.6 4.64 1.4 3.24
- DINDING 4 2.9 1.6 4.64 4.64
- KOLOM 2.9 0.05 0.145 2 0.29
TOTAL VOLUME LANTAI 1 125.5525
LANTAI 2
1 R. TIDUR 1 33.24
- DINDING 1 3 2.8 8.4 2.52 5.88
- DINDING 2 3 3.6 10.8 10.8
- DINDING 3 3 0.6 1.8 1.8
- DINDING 4 3 2.6 7.8 7.8
- DINDING 5 3 1.325 3.975 1.89 2.085
- DINDING 6 3 1.325 3.975 3.975
- KOLOM 3 0.05 0.15 6 0.9
2 R. KELUARGA 18.98
- DINDING 1 3 2.8 8.4 5.32 3.08
- DINDING 2 3 2.6 7.8 7.8
- DINDING 3 3 2.6 7.8 7.8
- KOLOM 3 0.05 0.15 2 0.3
4 R. TIDUR 2 16.455
- DINDING 1 3 1.325 3.975 1.89 2.085
- DINDING 2 3 1.6 4.8 4.8
- DINDING 3 3 0.6 1.8 1.8
- DINDING 4 3 2.8 8.4 1.53 6.87
- KOLOM 3 0.05 0.15 6 0.9
5 R. TENGAH 44.38
- DINDING 1 3 1.8 5.4 2.52 2.88
- DINDING 2 3 1.6 4.8 4.8
- DINDING 3 3 1.6 4.8 4.8
- DINDING 4 3 1.8 5.4 5.4
- DINDING 5 3 2.8 8.4 3.42 4.98
- DINDING 6 3 1.325 3.975 1.89 2.085
- DINDING 7 3 1.325 3.975 1.89 2.085
- DINDING 8 3 1.6 4.8 1.4 3.4
- KOLOM 1 3 0.25 0.75 5 3.75
- KOLOM 2 3 0.05 0.15 4 0.6
- KOLOM 3 3 0.4 1.2 5 6
- KOLOM 4 3 0.2 0.6 6 3.6
6 WC 16.75
- DINDING 1 3 1.375 4.125 4.125
- DINDING 2 3 1.375 4.125 4.125
- DINDING 3 3 1.6 4.8 1.4 3.4
- DINDING 4 3 1.6 4.8 4.8
- KOLOM 3 0.05 0.15 2 0.3
TOTAL VOLUME LANTAI 2 129.805
TOTAL VOLUME 255.3575
V KUSEN
1 Pas. Pintu P1 1.6 2.2 3.52 3.52
2 Pas. Pintu P2 0.9 2.1 1.89 1.89
3 Pas. Pintu P3 0.7 2 1.4 1.4
7 Pas. Jendela J1 1.4 1.8 2.52 2.52
8 Pas. Jendela J2 0.5 1.8 0.9 0.9
9 Pas. Jendela J3 1.8 1.8 3.24 3.24
10 Pas. Jendela J4 0.85 1.8 1.53 1.53
VI PEKERJAAN ACIAN BAGIAN LUAR
DINDING
1 DEPAN 29.233
- CARPORT 3.2 7.3 23.36 13.197 10.163
- TERAS 3 7.3 21.9 11.99 9.91
- SAMPING KANAN 2 7.3 14.6 5.44 9.16
2 SAMPING KANAN 118.47
- TERAS 1 7.3 7.3 0.45 6.85
- R. TAMU 3 7.3 21.9 21.9
- R. TENGAH 4.4 7.3 32.12 32.12
- BELAKANG 1 7.3 7.3 0.325 6.975
- PAGAR LUAR 16 1.5 24 24
- PAGAR DALAM 16 1.5 24 24
- PAGAR ATAS 16 0.15 2.4 2.4
- PAGAR DEPAN 1.5 0.15 0.225 0.225
4 BELAKANG 73.105
- DAPUR 5 7.3 36.5 7.29 29.21
- R. TIDUR 3.2 7.3 23.36 3.06 20.3
- PAGAR LUAR 8.2 1.5 12.3 12.3
- PAGAR DALAM 8.05 1.5 12.075 1.53 10.545
- PAGAR ATAS 5 0.15 0.75 0.75
5 SAMPING KIRI 119.245
- R. TENGAH 9.4 7.3 68.62 68.62
- PAGAR LUAR 16 1.5 24 24
- PAGAR DALAM 16 1.5 24 24
- PAGAR ATAS 16 0.15 2.4 2.4
- PAGAR DEPAN 1.5 0.15 0.225 0.225
TOTAL VOLUME PENGECETAN DINDING 340.053
KANOPI BETON
1 TERAS 20.595
- DEPAN 1.0875 0
- ATAS 1.5 4.6 6.9 6.9
- BAWAH 1.5 4.6 6.9 6.9
- KIRI 0.4 0.15 0.06 0.06
- KANAN LUAR 1.5 3.1 1.325 4.65 1.89 2.76
- KANAN DALAM 1.5 2.65 1.325 3.975 3.975
2 BALKON 30.365
- DEPAN 1.64 1.64
- ATAS 3.15 1.5 4.725 4.725
- ATAS DALAM 2.85 1.5 4.275 4.275
- BAWAH 3.15 1.5 4.725 4.725
- KANAN LUAR 2.65 1.5 3.975 3.975
- KANAN DALAM 2.35 1.5 3.525 3.525
- KIRI LUAR 2.65 1.5 3.975 3.975
- KIRI DALAM 2.35 1.5 3.525 3.525
3 PROFIL DEPAN 1 1.6515
- DEPAN 3.05 0.2 0.61 0.61
- ATAS 3.05 0.2 0.61 0.1185 0.4915
- BAWAH 3.05 0.2 0.61 0.1 0.51
- KIRI 0.2 0.2 0.04 0.04
4 PROFIL DEPAN 2 2.6665
- DEPAN 3.05 0.1 0.305 0.305
- ATAS 3.05 0.4 1.22 1.22
- BAWAH 3.05 0.4 1.22 0.1185 1.1015
- KIRI 0.1 0.4 0.04 0.04
5 PROFIL DEPAN 3 1.225
- DEPAN 2 0.1 0.2 0.2
- ATAS 2 0.25 0.5 0.5
- BAWAH 2 0.25 0.5 0.5
- KIRI 0.1 0.25 0.025 0.025
5 PROFIL DEPAN 4 1.225
- DEPAN 2 0.1 0.2 0.2
- ATAS 2 0.25 0.5 0.5
- BAWAH 2 0.25 0.5 0.5
- KIRI 0.1 0.25 0.025 0.025
6 PROFIL BELAKANG 1 6.6
- DEPAN 3 0.15 0.45 0.45
- ATAS 3 1 3 3
- BAWAH 3 1 3 3
- KIRI 1 0.15 0.15 0.15
7 PROFIL BELAKANG 2 5.825
- DEPAN 5 0.15 0.75 0.75
- ATAS 5 0.5 2.5 2.5
- BAWAH 5 0.5 2.5 2.5
- KIRI 0.5 0.15 0.075 0.075
8 PROFIL BELAKANG 3 1.5125
- DEPAN 1.25 0.15 0.1875 0.1875
- ATAS 1.25 0.5 0.625 0.625
- BAWAH 1.25 0.5 0.625 0.625
- KIRI 0.5 0.15 0.075 0.075
9 PROFIL BELAKANG 4 1.5125
- DEPAN 1.25 0.15 0.1875 0.1875
- ATAS 1.25 0.5 0.625 0.625
- BAWAH 1.25 0.5 0.625 0.625
- KIRI 0.5 0.15 0.075 0.075
TOTAL VOLUME KANOPI BETON 73.178
TOTAL VOLUME 413.231
VII KUSEN
1 Pas. Pintu P1 1.6 2.2 3.52 3.52
2 Pas. Pintu P2 0.9 2.1 1.89 1.89
3 Pas. Pintu P3 0.7 2 1.4 1.4
7 Pas. Jendela J1 1.4 1.8 2.52 2.52
8 Pas. Jendela J2 0.5 1.8 0.9 0.9
9 Pas. Jendela J3 1.8 1.8 3.24 3.24
10 Pas. Jendela J4 0.85 1.8 1.53 1.53
VIII PEKERJAAN PENGECETAN BAGIAN DALAM
LANTAI 1
1 R. TIDUR 1 31.985
- DINDING 1 2.9 2.8 8.12 2.52 5.6
- DINDING 2 2.9 3.6 10.44 10.44
- DINDING 3 2.9 0.6 1.74 1.74
- DINDING 4 2.9 2.6 7.54 7.54
- DINDING 5 2.9 1.325 3.8425 1.89 1.9525
- DINDING 6 2.9 1.325 3.8425 3.8425
- KOLOM 2.9 0.05 0.145 6 0.87
2 R. TAMU 18.17
- DINDING 1 2.9 2.8 8.12 5.32 2.8
- DINDING 2 2.9 2.6 7.54 7.54
- DINDING 3 2.9 2.6 7.54 7.54
- KOLOM 2.9 0.05 0.145 2 0.29
4 R. TIDUR 2 15.7925
- DINDING 1 2.9 1.325 3.8425 1.89 1.9525
- DINDING 2 2.9 1.6 4.64 4.64
- DINDING 3 2.9 0.6 1.74 1.74
- DINDING 4 2.9 2.8 8.12 1.53 6.59
- KOLOM 2.9 0.05 0.145 6 0.87
5 R. TENGAH 43.46
- DINDING 1 2.9 1.8 5.22 2.52 2.7
- DINDING 2 2.9 1.6 4.64 4.64
- DINDING 3 2.9 1.6 4.64 4.64
- DINDING 4 2.9 1.8 5.22 5.22
- DINDING 5 2.9 2.8 8.12 3.42 4.7
- DINDING 6 2.9 1.325 3.8425 1.89 1.9525
- DINDING 7 2.9 1.325 3.8425 1.89 1.9525
- DINDING 8 2.9 1.6 4.64 1.4 3.24
- KOLOM 1 3.1 0.25 0.775 5 3.875
- KOLOM 2 3.1 0.05 0.155 4 0.62
- KOLOM 3 3.1 0.4 1.24 5 6.2
- KOLOM 4 3.1 0.2 0.62 6 3.72
6 WC 16.145
- DINDING 1 2.9 1.375 3.9875 3.9875
- DINDING 2 2.9 1.375 3.9875 3.9875
- DINDING 3 2.9 1.6 4.64 1.4 3.24
- DINDING 4 2.9 1.6 4.64 4.64
- KOLOM 2.9 0.05 0.145 2 0.29
TOTAL VOLUME LANTAI 1 125.5525
LANTAI 2
1 R. TIDUR 1 33.24
- DINDING 1 3 2.8 8.4 2.52 5.88
- DINDING 2 3 3.6 10.8 10.8
- DINDING 3 3 0.6 1.8 1.8
- DINDING 4 3 2.6 7.8 7.8
- DINDING 5 3 1.325 3.975 1.89 2.085
- DINDING 6 3 1.325 3.975 3.975
- KOLOM 3 0.05 0.15 6 0.9
2 R. KELUARGA 18.98
- DINDING 1 3 2.8 8.4 5.32 3.08
- DINDING 2 3 2.6 7.8 7.8
- DINDING 3 3 2.6 7.8 7.8
- KOLOM 3 0.05 0.15 2 0.3
4 R. TIDUR 2 16.455
- DINDING 1 3 1.325 3.975 1.89 2.085
- DINDING 2 3 1.6 4.8 4.8
- DINDING 3 3 0.6 1.8 1.8
- DINDING 4 3 2.8 8.4 1.53 6.87
- KOLOM 3 0.05 0.15 6 0.9
5 R. TENGAH 44.38
- DINDING 1 3 1.8 5.4 2.52 2.88
- DINDING 2 3 1.6 4.8 4.8
- DINDING 3 3 1.6 4.8 4.8
- DINDING 4 3 1.8 5.4 5.4
- DINDING 5 3 2.8 8.4 3.42 4.98
- DINDING 6 3 1.325 3.975 1.89 2.085
- DINDING 7 3 1.325 3.975 1.89 2.085
- DINDING 8 3 1.6 4.8 1.4 3.4
- KOLOM 1 3 0.25 0.75 5 3.75
- KOLOM 2 3 0.05 0.15 4 0.6
- KOLOM 3 3 0.4 1.2 5 6
- KOLOM 4 3 0.2 0.6 6 3.6
6 WC 16.75
- DINDING 1 3 1.375 4.125 4.125
- DINDING 2 3 1.375 4.125 4.125
- DINDING 3 3 1.6 4.8 1.4 3.4
- DINDING 4 3 1.6 4.8 4.8
- KOLOM 3 0.05 0.15 2 0.3
TOTAL VOLUME LANTAI 2 129.805
TOTAL VOLUME 255.3575
IX KUSEN
1 Pas. Pintu P1 1.6 2.2 3.52 3.52
2 Pas. Pintu P2 0.9 2.1 1.89 1.89
3 Pas. Pintu P3 0.7 2 1.4 1.4
7 Pas. Jendela J1 1.4 1.8 2.52 2.52
8 Pas. Jendela J2 0.5 1.8 0.9 0.9
9 Pas. Jendela J3 1.8 1.8 3.24 3.24
10 Pas. Jendela J4 0.85 1.8 1.53 1.53
X PEKERJAAN PENGECETAN BAGIAN LUAR
DINDING
1 DEPAN 29.233
- CARPORT 3.2 7.3 23.36 13.197 10.163
- TERAS 3 7.3 21.9 11.99 9.91
- SAMPING KANAN 2 7.3 14.6 5.44 9.16
2 SAMPING KANAN 118.47
- TERAS 1 7.3 7.3 0.45 6.85
- R. TAMU 3 7.3 21.9 21.9
- R. TENGAH 4.4 7.3 32.12 32.12
- BELAKANG 1 7.3 7.3 0.325 6.975
- PAGAR LUAR 16 1.5 24 24
- PAGAR DALAM 16 1.5 24 24
- PAGAR ATAS 16 0.15 2.4 2.4
- PAGAR DEPAN 1.5 0.15 0.225 0.225
4 BELAKANG 73.105
- DAPUR 5 7.3 36.5 7.29 29.21
- R. TIDUR 3.2 7.3 23.36 3.06 20.3
- PAGAR LUAR 8.2 1.5 12.3 12.3
- PAGAR DALAM 8.05 1.5 12.075 1.53 10.545
- PAGAR ATAS 5 0.15 0.75 0.75
5 SAMPING KIRI 119.245
- R. TENGAH 9.4 7.3 68.62 68.62
- PAGAR LUAR 16 1.5 24 24
- PAGAR DALAM 16 1.5 24 24
- PAGAR ATAS 16 0.15 2.4 2.4
- PAGAR DEPAN 1.5 0.15 0.225 0.225
TOTAL VOLUME PENGECETAN DINDING 340.053
KANOPI BETON
1 TERAS 20.595
- DEPAN 1.0875 0
- ATAS 1.5 4.6 6.9 6.9
- BAWAH 1.5 4.6 6.9 6.9
- KIRI 0.4 0.15 0.06 0.06
- KANAN LUAR 1.5 3.1 1.325 4.65 1.89 2.76
- KANAN DALAM 1.5 2.65 1.325 3.975 3.975
2 BALKON 30.365
- DEPAN 1.64 1.64
- ATAS 3.15 1.5 4.725 4.725
- ATAS DALAM 2.85 1.5 4.275 4.275
- BAWAH 3.15 1.5 4.725 4.725
- KANAN LUAR 2.65 1.5 3.975 3.975
- KANAN DALAM 2.35 1.5 3.525 3.525
- KIRI LUAR 2.65 1.5 3.975 3.975
- KIRI DALAM 2.35 1.5 3.525 3.525
3 PROFIL DEPAN 1 1.6515
- DEPAN 3.05 0.2 0.61 0.61
- ATAS 3.05 0.2 0.61 0.1185 0.4915
- BAWAH 3.05 0.2 0.61 0.1 0.51
- KIRI 0.2 0.2 0.04 0.04
4 PROFIL DEPAN 2 2.6665
- DEPAN 3.05 0.1 0.305 0.305
- ATAS 3.05 0.4 1.22 1.22
- BAWAH 3.05 0.4 1.22 0.1185 1.1015
- KIRI 0.1 0.4 0.04 0.04
5 PROFIL DEPAN 3 1.225
- DEPAN 2 0.1 0.2 0.2
- ATAS 2 0.25 0.5 0.5
- BAWAH 2 0.25 0.5 0.5
- KIRI 0.1 0.25 0.025 0.025
5 PROFIL DEPAN 4 1.225
- DEPAN 2 0.1 0.2 0.2
- ATAS 2 0.25 0.5 0.5
- BAWAH 2 0.25 0.5 0.5
- KIRI 0.1 0.25 0.025 0.025
6 PROFIL BELAKANG 1 6.6
- DEPAN 3 0.15 0.45 0.45
- ATAS 3 1 3 3
- BAWAH 3 1 3 3
- KIRI 1 0.15 0.15 0.15
7 PROFIL BELAKANG 2 5.825
- DEPAN 5 0.15 0.75 0.75
- ATAS 5 0.5 2.5 2.5
- BAWAH 5 0.5 2.5 2.5
- KIRI 0.5 0.15 0.075 0.075
8 PROFIL BELAKANG 3 1.5125
- DEPAN 1.25 0.15 0.1875 0.1875
- ATAS 1.25 0.5 0.625 0.625
- BAWAH 1.25 0.5 0.625 0.625
- KIRI 0.5 0.15 0.075 0.075
9 PROFIL BELAKANG 4 1.5125
- DEPAN 1.25 0.15 0.1875 0.1875
- ATAS 1.25 0.5 0.625 0.625
- BAWAH 1.25 0.5 0.625 0.625
- KIRI 0.5 0.15 0.075 0.075
TOTAL VOLUME KANOPI 73.178
TOTAL VOLUME 413.231
XI PENGECETAN PLAFOND
LANTAI 1
1 R. TIDUR 11.2 11.2
2 R. TAMU 8.12 8.12
3 R. TENGAH 22.03 22.03
4 R. TIDUR 1 8.4 8.4
TOTAL VOLUME LANTAI 1 49.75
LANTAI 2
1 R. TIDUR UTAMA 11.82 11.82
2 R. TIDUR 1 8.92 8.92
3 R. TENGAH 30.57 30.57
5 BALKON 4.275 4.275
TOTAL VOLUME LANTAI 2 55.585
TOTAL VOLUME 105.335
PEKERJAAN PERLENGKAPAN / AKSESORIS

I KUSEN
1 Pas. Pintu P1 1.6 2.2 3.52 3.52
2 Pas. Pintu P2 0.9 2.1 1.89 1.89
3 Pas. Pintu P3 0.7 2 1.4 1.4
4 Pas. Jendela J1 1.4 1.8 2.52 2.52
5 Pas. Jendela J2 0.5 1.8 0.9 0.9
6 Pas. Jendela J3 1.8 1.8 3.24 3.24
7 Pas. Jendela J4 0.85 1.8 1.53 1.53
II VOLUME PINTU DAN JENDELA
1 Pas. Pintu P1 0.775 2.15 1.66625 4 6.665
2 Pas. Pintu P2 0.8 2.05 1.64 5 8.2
3 Pas. Jendela J1 0.6 1.7 1.02 8 8.16
4 Pas. Jendela J2 0.4 1.7 0.68 4 2.72
5 Pas. Jendela J3 0.35 1.7 0.595 8 4.76
6 Pas. Jendela J4 0.325 1.7 0.5525 6 3.315
II VOLUME DAUN KUSEN
1 Pas. Pintu P1 6 2 12
2 Pas. Pintu P2 5.1 5 25.5
3 Pas. Jendela J1 8.2 4 32.8
4 Pas. Jendela J2 4.6 4 18.4
5 Pas. Jendela J3 12.6 2 25.2
6 Pas. Jendela J4 5.3 3 15.9
TOTAL VOLUME LANTAI 2 129.8
III ENGSEL PINTU
1 Pas. Pintu P1 6 Bh 2 12
2 Pas. Pintu P2 3 Bh 5 15
JUMLAH 27
III ENGSEL JENDELA
3 Pas. Jendela J1 4 Bh 4 16
4 Pas. Jendela J2 2 Bh 4 8
5 Pas. Jendela J3 8 Bh 2 16
6 Pas. Jendela J4 4 Bh 3 12
JUMLAH 52
IV HANDEL PINTU + PENGUNCI
1 Pas. Pintu P1 2 Bh 2 4
2 Pas. Pintu P2 1 Bh 5 5
JUMLAH 9
V TERALI JENDELA
1 Pas. Jendela J1 2 Bh 4 8
2 Pas. Jendela J2 1 Bh 4 4
3 Pas. Jendela J3 4 Bh 2 8
4 Pas. Jendela J4 2 Bh 3 6
JUMLAH 26
VI PENGUNCI JENDELA
1 Pas. Jendela J1 2 Bh 4 8
2 Pas. Jendela J2 1 Bh 4 4
3 Pas. Jendela J3 4 Bh 2 8
4 Pas. Jendela J4 2 Bh 3 6
JUMLAH 26
PONDASI POER PLAT 100 X100 X 25
dimensi 1 1 luas 0.25 PEMAKAIAN BEKISTING
jmlh Diameter panjang volume berat besi berat 4
tulangan 12 19 4 48 2.22 107
OVERHEAD BESI 5% 5
TOTAL 112

PONDASI TANGGA
dimensi 1 0.35 luas 0.0875 PEMAKAIAN BEKISTING
jmlh Diameter panjang volume berat besi berat 11.4285714285714
tulangan 12 19 11.4285714 137.14285714 2.22 304
begel dia 8 - 20 57 2.34 133.38 0.222 29.61
TOTAL 334
OVERHEAD BESI 5% 17
TOTAL 351

SLOEF, BALOK INDUK


dimensi 0.2 0.4 luas 0.08 PEMAKAIAN BEKISTING
jmlh Diameter panjang volume berat besi berat 10
tulangan 8 12 12.5 100 0.89 89
begel dia 8 - 20 63 1.3 81.9 0.39 31.94
TOTAL 121
OVERHEAD BESI 5% 6
TOTAL 127

KOLOM UTAMA 20X40


dimensi 0.2 0.4 luas 0.08 PEMAKAIAN BEKISTING
jmlh Diameter panjang volume berat besi berat 15
tulangan 8 12 12.5 100 0.89 89
begel dia 6 - 20 63 1.3 81.9 0.39 31.94
TOTAL 121
5% 6
total berat besi / 1 m3 127

KOLOM PRAKTIS
dimensi 0.15 0.15 luas 0.0225 PEMAKAIAN BEKISTING
jmlh Diameter panjang volume berat besi berat 26.6666666666667
tulangan 4 10 44.4444444 177.77777778 0.62 110
begel dia 6 - 20 222 0.296 65.712 0.39 25.63
TOTAL 136
5% 7
total berat besi / 1 m3 143

BALOK ANAK & Ringbalk


dimensi 0.15 0.2 luas 0.03 PEMAKAIAN BEKISTING
jmlh dia panjang volume berat besi berat 16.6666666666667
tulangan 4 12 33.3333333 133.33333333 0.89 119
begel dia 6 - 20 167 0.7 116.9 0.39 45.59
TOTAL 164
5% 8
total berat besi / 1 m3 172

PEMAKAIAN BEKISTING TANGGA


URAIAN TINGGI LEBAR PANJANG VOLUME JMLH ITEM TOTAL 0.5
ANAK TANGGA 0.175 0.28 1 0.63 20 12.6
IBU TANGGA 1 0.1858 1 0.1858
IBU TANGGA 1 0.2676 2 0.5352
TOTAL 13.321
ANALISA HARGA

I PEKERJAAN PRELIMINARIES
T.02.b.2) Pengkuran dan pemasangan 1 m' Bouwplank : RUMAH TINGGAL LANTAI 2
A TENAGA
Pekerja L.01 OH 0.1000 142,424.00
Tukang Kayu L.02 OH 0.0100 178,030.00
Kepala Tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0100 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso 5/7 cm m3 0.0130 2,200,000.00
Paku 5 cm dan 7 cm kg 0.0200 18,700.00
Papan 3/20 m3 0.0070 2,200,000.00
###
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

II PEKERJAAN TANAH
T.06.a.2) 1 m3 galian tanah biasa sedalam > 1 m s.d. 2 m
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.675 142,424.00
Mandor L.04 OH 0.068 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pengurugan 1 m³ dengan Urugan Pasir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.30 142,424.00
Mandor L.04 OH 0.01 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug m3 1.20 176,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pengurugan 1 m³ dengan Tanah Timbunan


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.25 142,424.00
Mandor L.04 OH 0.01 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Tanah Timbunan m3 1.10 220,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m³ batu kosong (anstamping)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7800 142,424.00
Tukang batu L.02 OH 0.3900 178,030.00
Kepala Tukang L.03 OH 0.0390 192,272.40
Mandor L.04 OH 0.0390 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Kali m3 1.2000 385,000.00
Pasir Urug m3 0.4320 176,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m³ pondasi batu belah campuran 1SP:4PP


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.5000 142,424.00
Tukang batu L.02 OH 0.7500 178,030.00
Kepala Tukang L.03 OH 0.0750 192,272.40
Mandor L.04 OH 0.0750 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Kali m3 1.2000 385,000.00
Semen Portland Kg 41.000 1,320.00
Pasir pasang m3 0.5200 247,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pengurugan kembali 1 m³ galian tanah


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.50 142,424.00
Mandor L.04 OH 0.05 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

III PEKERJAAN STRUKTUR

Pembesian 1 kg dengan besi polos


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0700 142,424.00
Tukang besi L.02 OH 0.0700 178,030.00
Kepala Tukang L.03 OH 0.0070 192,272.40
Mandor L.04 OH 0.0040 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton Polos Ø12 Kg 10.5000 15,583.33
Kawat beton Kg 0.1500 19,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)
G Harga Satuan untuk 1 kg

Membuat 1 m3 beton mutu f’c = 21,7 Mpa


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 142,424.00
Tukang batu L.02 OH 0.2750 178,030.00
Kepala Tukang L.03 OH 0.0280 192,272.40
Mandor L.04 OH 0.0830 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Ready mix K-250 M3 1.0000 869,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² bekisting untuk Pondasi Dan Sloef Dengan Multiplex 12mm 2x Pakai
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2000 142,424.00
Tukang Kayu L.02 OH 0.1000 178,030.00
Kepala Tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0200 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Paku 5 - 10 cm Kg 0.1280 18,700.00
Minyak bekisting Ltr 0.2500 5,000.00
Kaso 5/7 m3 0.0160 2,200,000.00
Multiplex Tebal 12mm Lbr 0.2030 110,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)
G Untuk 2x pakai (A+1/2B+C)
H Overhead & Profit 10.00%
I Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² bekisting untuk lantai Dengan Multiplex 12mm 2x Pakai


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2000 142,424.00
Tukang Kayu L.02 OH 0.1000 178,030.00
Kepala Tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0200 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Paku 5 - 10 cm Kg 0.2800 18,700.00
Minyak bekisting Ltr 0.2500 5,000.00
Kaso 5/7 m3 0.0100 2,200,000.00
Multiplex Tebal 12mm Lbr 0.2030 110,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)
G Untuk 2x pakai (A+1/2B+C)
H Overhead & Profit 10.00%
I Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² bekisting untuk Kolom Dengan Multiplex 12mm 2x Pakai


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3300 142,424.00
Tukang Kayu L.02 OH 0.3300 178,030.00
Kepala Tukang L.03 OH 0.0330 192,272.40
Mandor L.04 OH 0.0330 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Paku 5 - 10 cm Kg 0.1280 18,700.00
Minyak bekisting Ltr 0.2500 5,000.00
Kaso 5/7 m3 0.0120 2,200,000.00
Multiplex Tebal 12mm Lbr 0.2030 110,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)
G Untuk 2x pakai (A+1/2B+C)
H Overhead & Profit 10.00%
I Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² bekisting untuk Balok Dan Ringbalk Dengan Multiplex 12mm 2x Pakai
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3600 142,424.00
Tukang Kayu L.02 OH 0.3600 178,030.00
Kepala Tukang L.03 OH 0.0360 192,272.40
Mandor L.04 OH 0.0360 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Paku 5 - 10 cm Kg 0.2800 18,700.00
Minyak bekisting Ltr 0.2500 5,000.00
Kaso 5/7 m3 0.0230 2,200,000.00
Multiplex Tebal 9mm Lbr 0.2030 110,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)
G Untuk 2x pakai (A+1/2B+C)
H Overhead & Profit 10.00%
I Harga Satuan Pekerjaaan (D+E)

Pemasangan M2 kg jaring kawat baja (wiremesh)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0250 142,424.00
Tukang besi L.02 OH 0.0250 178,030.00
Kepala Tukang L.03 OH 0.0250 192,272.40
Mandor L.04 OH 0.0010 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Wire mesh M-10 M2 1.0000 114,638.45
Kawat beton Kg 0.0500 19,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

IV PEKERJAAN ARSITEKTUR

Membuat 1 m2 Rabat beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58 t = 5cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2857 142,424.00
Tukang batu L.02 OH 0.0714 178,030.00
Kepala Tukang L.03 OH 0.0071 192,272.40
Mandor L.04 OH 0.0143 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 9.2821 1,320.00
Pasir beton Kg 54.0000 176.79
Kerikil (Maks. 30 mm) Kg 87.7500 198.61
Air Ltr 16.1250 250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² lantai keramik 40 x 40cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.7000 142,424.00
Tukang batu L.02 OH 0.3500 178,030.00
Kepala tukang L.03 OH 0.0350 192,272.40
Mandor L.04 OH 0.0350 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 40x40 bh 6.2500 11,916.67
Semen portland kg 8.1900 1,320.00
Pasir pasang m3 0.0450 247,500.00
Semen Warna kg 0.5000 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² lantai Keramik ukuran 30x30 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.7000 142,424.00
Tukang batu L.02 OH 0.3500 178,030.00
Kepala tukang L.03 OH 0.0350 192,272.40
Mandor L.04 OH 0.0350 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 bh 11.1111 4,972.73
Semen portland kg 8.1900 1,320.00
Pasir pasang m3 0.0450 247,500.00
Semen Warna kg 0.5000 9,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² dinding Keramik 20x20cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.9000 142,424.00
Tukang batu L.02 OH 0.4500 178,030.00
Kepala tukang L.03 OH 0.0450 192,272.40
Mandor L.04 OH 0.0450 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
keramik 20x20 bh 26.5000 3,872.00
Semen portland kg 9.3000 1,320.00
Pasir pasang m3 0.0180 247,500.00
Semen Warna kg 1.3000 29,700.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m' plint granit tile 10x60cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0900 142,424.00
Tukang batu L.02 OH 0.0900 178,030.00
Kepala tukang L.03 OH 0.0350 192,272.40
Mandor L.04 OH 0.0050 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 10/60 m' 1.6667 6,325.00
Semen portland kg 12.4400 1,320.00
Semen warna kg 0.6500 22,000.00
Pasir pasang m3 0.0250 247,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP:2PP


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.02 OH 0.3000 142,424.00
Tukang batu L.02 OH 0.1000 178,030.00
Kepala tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0150 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 102.0000 1,100.00
Semen portland kg 18.9500 1,320.00
Pasir pasang m3 0.0380 247,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP:4PP


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.02 OH 0.3000 142,424.00
Tukang batu L.02 OH 0.1000 178,030.00
Kepala tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0150 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.0000 1,100.00
Semen portland kg 11.5000 1,320.00
Pasir pasang m3 0.0430 247,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² plesteran 1SP:3PP tebal 15mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.3000 142,424.00
Tukang batu L.02 OH 0.1000 178,030.00
Kepala tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0150 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 7.7760 1,320.00
Pasir pasang m3 0.0230 247,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² acian
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.2000 142,424.00
Tukang batu L.02 OH 0.1000 178,030.00
Kepala tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0100 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 3.2500 1,320.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m2 rangka hollow mudul 60x60 cM (40.40.2mm)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.3500 142,424.00
Tukang besi L.02 OH 0.3500 178,030.00
Kepala tukang L.03 OH 0.0350 192,272.40
Mandor L.04 OH 0.0180 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40.2 mm m' 4.0000 3,850.00
assesoris (perkuatan, las, dll) Ls 100% 15,400.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² langit-langit gypsum board ukuran (120x240x9)mm. tebal 9mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.1000 142,424.00
Tukang kayu L.02 OH 0.0500 178,030.00
Kepala tukang L.03 OH 0.0050 192,272.40
Mandor L.04 OH 0.0050 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lbr 0.3640 82,500.00
Paku skrup kg 0.1100 250.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pengecatan 1 m² tembok luar (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0200 142,424.00
Tukang Cat L.02 OH 0.0630 178,030.00
Kepala tukang L.02 OH 0.0063 192,272.40
Mandor L.02 OH 0.0030 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur ltr 0.1000 49,500.00
Cat dasar kg 0.1000 33,000.00
Cat Tembok Setara Mowilex Kg 0.2600 114,400.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)
Pengecatan 1 m² tembok dalam (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0200 142,424.00
Tukang cat L.02 OH 0.0630 178,030.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur ltr 0.1000 49,500.00
Cat dasar kg 0.1000 33,000.00
Cat Tembok Setara Mowilex lter 0.3500 72,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pengecatan 1 m² Plafond
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0300 142,424.00
Tukang cat L.02 OH 0.0945 178,030.00
Kepala tukang L.03 OH 0.0095 192,272.40
Mandor L.04 OH 0.0045 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur ltr 0.1000 49,500.00
Cat Dasar kg 0.1000 33,000.00
Cat Penutup Kg 0.3500 72,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

V PEKERJAAN ATAP

Pemasangan 1 m2 Rangka Atap Baja Ringan + Reng


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.2000 142,424.00
Tukang Besi L.02 OH 0.4500 178,030.00
Kepala tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0500 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Kanal C 8 cm, 0.75mm P = 6m m1 1.4880 15,583.33
Kanal C 8 cm, 0.6mm P = 6m m1 2.2320 13,016.67
Baut (Srew driver) bh 28.0000 1,000.00
Dynabolt bh 1.6000 5,000.00
Reng m1 7.0000 6,416.67
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

1 M2 Pasang Lapisan Karet Atap Genteng Beton


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.2000 142,424.00
Tukang kayu L.02 OH 0.1000 178,030.00
Kepala tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0100 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Lapisan Karet m2 1.1000 15,888.89
Paku Biasa kg 0.0300 385,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

1 M2 Pasang Atap Genteng Beton


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.2000 142,424.00
Tukang kayu L.02 OH 0.1000 178,030.00
Kepala tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0100 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng Beton bh 11.0000 7,500.00
Paku Biasa kg 0.0300 18,700.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m’ bubung genteng palentong


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.4000 142,424.00
Tukang kayu L.02 OH 0.2000 178,030.00
Kepala tukang L.03 OH 0.0200 192,272.40
Mandor L.04 OH 0.0020 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 4.0000 7,500.00
Semen Portland Kg 8.0000 1,320.00
Pasir Pasang M3 0.0320 247,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m' Lisplank


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.1000 142,424.00
Tukang kayu L.02 OH 0.2000 178,030.00
JUMLAH TENAGA KERJA
B BAHAN
Calsiboard m1 1.1000 94,531.25
Paku Biasa kg 1.0000 18,700.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

VI PEKERJAAN FINISHING

Pemasangan 1 m Kusen Alumunium


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0430 142,424.00
Tukang Alumunium Khusus L.02 OH 0.4300 178,030.00
Kepala tukang L.03 OH 0.0043 192,272.40
Mandor L.04 OH 0.0021 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Profil Alumunium m 1.1000 132,000.00
Skrup Fiber Bh 2.0000 2,000.00
Sealant Tube 0.0600 30,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m2 Pintu Alumunium Strip


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0850 142,424.00
Tukang Alumunium Khusus L.02 OH 0.0850 178,030.00
Kepala tukang L.03 OH 0.0085 192,272.40
Mandor L.04 OH 0.0042 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Profil Alumunium m 1.1000 38,500.00
Strip Alumunium m 2.0000 38,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m2 Jendela Alumunium


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0850 0.00
Tukang Alumunium Khusus L.02 OH 0.0850 0.00
Kepala tukang L.03 OH 0.0090 0.00
Mandor L.04 OH 0.0050 0.00
JUMLAH TENAGA KERJA
B BAHAN
Profil Alumunium m 4.4000 38,500.00
Profil Kaca m 4.5000 275,000.00
Sealant Tube 0.0600 30,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 buah engsel pintu


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0150 142,424.00
Tukang kayu L.02 OH 0.1500 178,030.00
Kepala tukang L.03 OH 0.0150 192,272.40
Mandor L.04 OH 0.0008 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel Pintu Bh 1.0000 16,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 buah engsel Jendela


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0150 142,424.00
Tukang kayu L.02 OH 0.1500 178,030.00
Kepala tukang L.03 OH 0.0150 192,272.40
Mandor L.04 OH 0.0008 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel Jendela Bh 1.0000 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 buah Gagang Pintu + Pengunci Besar


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0150 142,424.00
Tukang kayu L.02 OH 0.1500 178,030.00
Kepala tukang L.03 OH 0.0150 192,272.40
Mandor L.04 OH 0.0008 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Gagang Pintu Bh 1.0000 49,700.00
Pengunci Bh 1.0000 165,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 buah Kait Jendela + Pengunci Jendela


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0150 142,424.00
Tukang kayu L.02 OH 0.1500 178,030.00
Kepala tukang L.03 OH 0.0150 192,272.40
Mandor L.04 OH 0.0008 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Kait Jendela Bh 2.0000 17,300.00
Pengunci Jendela Bh 1.0000 52,800.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

VII PEKERJAAN MEP

Pemasangan Lampu
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.2000 142,424.00
Tukang Listrik L.02 OH 0.0200 178,030.00
Kepala tukang Listrik L.03 OH 0.0200 192,272.40
Mandor L.04 OH 0.0020 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Lampu Bh 2.0000 38,500.00
JUMLAH HAR]
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan Saklar Tunggal


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Tukang Listrik L.02 OH 0.0500 178,030.00
Kepala tukang Listrik L.03 OH 0.0500 192,272.40
Mandor L.04 OH 0.0300 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Saklar Tunggal Bh 1.0000 18,400.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan Saklar Ganda


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Tukang Listrik L.02 OH 0.0500 142,424.00
Kepala tukang Listrik L.03 OH 0.0500 192,272.40
Mandor L.04 OH 0.0300 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Saklar Ganda Bh 1.0000 29,200.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan Stop Kontak


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Tukang Listrik L.02 OH 0.0500 178,030.00
Kepala tukang Listrik L.03 OH 0.0500 192,272.40
Mandor L.04 OH 0.0300 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYM 3x2.5mm m 8.0000 10,400.00
Pipa Conduit m 8.0000 14,900.00
Soket Pipa Bh 1.0000 2,000.00
T Dos Bh 2.0000 3,000.00
Klem Pipa Bh 3.0000 1,000.00
Fiser Bh 6.0000 1,000.00
Las Dop Bh 2.0000 1,000.00
Isolasi Ban Bh 0.2500 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan MCB
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
UPAH 100% LS 1.0000 373,700.00
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYM 3x2.5mm m 3.0000 10,400.00
Pipa Conduit m 15.0000 14,900.00
T Dos Bh 1.0000 3,000.00
Klem Pipa Bh 2.0000 1,000.00
L bow Bh 24.0000 2,000.00
MCB Bh 1.0000 66,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 buah Kloset Duduk


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.1000 142,424.00
Tukang Batu L.02 OH 0.1500 178,030.00
Kepala tukang L.03 OH 0.0150 192,272.40
Mandor L.04 OH 0.0050 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Kloset Duduk Unit 1.0000 3,284,600.00
Semen Portland Kg 6.0000 1,320.00
Pasir Pasang M3 0.0100 247,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 buah Bak Cuci Piring


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.1000 142,424.00
Tukang Batu L.02 OH 0.1500 178,030.00
Kepala tukang L.03 OH 0.0150 192,272.40
Mandor L.04 OH 0.0050 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Bak Cuci Piring Unit 1.0000 247,500.00
Semen Portland Kg 6.0000 1,320.00
Pasir Pasang M3 0.0100 247,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 buah Kran Air


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0100 142,424.00
Tukang Batu L.02 OH 0.4000 178,030.00
Kepala tukang L.03 OH 0.0400 192,272.40
Mandor L.04 OH 0.0050 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Kran Air Unit 1.0000 59,400.00
Sealtape Buah 0.2500 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)
Pemasangan 1 buah Kran Air
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0100 142,424.00
Tukang Batu L.02 OH 0.1000 178,030.00
Kepala tukang L.03 OH 0.0100 192,272.40
Mandor L.04 OH 0.0050 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Floor Drain Unit 1.0000 30,300.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1m Pipa PVC 4"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0810 142,424.00
Tukang Batu L.02 OH 0.1350 178,030.00
Kepala tukang L.03 OH 0.0135 192,272.40
Mandor L.04 OH 0.0040 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" m 1.0000 102,666.67
Perlengkapan 35% ls 1.0000 102,666.67
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1m Pipa PVC 1/2"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0810 142,424.00
Tukang Batu L.02 OH 0.1350 178,030.00
Kepala tukang L.03 OH 0.0135 192,272.40
Mandor L.04 OH 0.0040 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2 m 1.0000 4,500.00
Perlengkapan 35% ls 1.0000 4,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1m Pipa PVC 3/4"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 0.0810 142,424.00
Tukang Batu L.02 OH 0.1350 178,030.00
Kepala tukang L.03 OH 0.0135 192,272.40
Mandor L.04 OH 0.0040 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3/4 m 1.0000 6,333.33
Perlengkapan 35% ls 1.0000 6,333.33
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 buah Bak Kontrol Ukuran 60x60x65


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.02 OH 3.2000 142,424.00
Tukang Batu L.02 OH 1.1500 178,030.00
Kepala tukang L.03 OH 0.0110 192,272.40
Mandor L.04 OH 0.0160 213,636.00
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 123.0000 1,100.00
Semen Portland Kg 114.0000 1,320.00
Pasir Pasang m3 0.1840 247,500.00
Pasir Beton m3 0.1200 247,500.00
Kerikil m3 0.0330 357,500.00
Tulangan Besi Kg 4.8500 21,025.92
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaaan (D+E)
14,242.40
1,780.30
1,922.72
2,136.36
20,081.78

28,600.00
374.00
15,400.00
44,374.00

64,455.78
6,445.58
70,901.36

Jumlah Harga
(Rp)

96,136.20
14,420.43
110,556.63

110,556.63
11,055.66
121,612.29

Jumlah Harga
(Rp)

42,727.20
2,136.36
44,863.56

211,200.00
211,200.00

256,063.56
25,606.36
281,669.92

Jumlah Harga
(Rp)
35,606.00
1,709.09
37,315.09

242,000.00
242,000.00

279,315.09
27,931.51
307,246.60

Jumlah Harga
(Rp)

111,090.72
69,431.70
7,498.62
8,331.80
196,352.85

462,000.00
76,032.00
538,032.00

734,384.85
73,438.48
807,823.33

Jumlah Harga
(Rp)

213,636.00
133,522.50
14,420.43
16,022.70
377,601.63

462,000.00
54,120.00
128,700.00
644,820.00

1,022,421.63
102,242.16
1,124,663.79

Jumlah Harga
(Rp)

71,212.00
10,681.80
81,893.80

81,893.80
8,189.38
90,083.18

Jumlah Harga
(Rp)

9,969.68
12,462.10
1,345.91
854.54
24,632.23

163,625.00
2,887.50
166,512.50

191,144.73
19,114.47
210,259.20
21,025.92

Jumlah Harga
(Rp)

234,999.60
48,958.25
5,383.63
17,731.79
307,073.27

869,000.00
869,000.00

1,176,073.27
117,607.33
1,293,680.59

Jumlah Harga
(Rp)

28,484.80
17,803.00
1,922.72
4,272.72
52,483.24

2,393.60
1,250.00
35,200.00
22,330.00
61,173.60

113,656.84
11,365.68
125,022.53
83,070.04
8,307.00
91,377.05

Jumlah Harga
(Rp)

28,484.80
17,803.00
1,922.72
4,272.72
52,483.24

5,236.00
1,250.00
22,000.00
22,330.00
50,816.00

103,299.24
10,329.92
113,629.17
77,891.24
7,789.12
85,680.37

Jumlah Harga
(Rp)

46,999.92
58,749.90
6,344.99
7,049.99
119,144.80

2,393.60
1,250.00
26,400.00
22,330.00
52,373.60

-
171,518.40
17,151.84
188,670.24
145,331.60
14,533.16
159,864.76

Jumlah Harga
(Rp)

51,272.64
64,090.80
6,921.81
7,690.90
129,976.14

5,236.00
1,250.00
50,600.00
22,330.00
79,416.00

209,392.14
20,939.21
230,331.36
169,684.14
16,968.41
186,652.56

Jumlah Harga
(Rp)

3,560.60
4,450.75
4,806.81
213.64
13,031.80

114,638.45
962.50
115,600.95

128,632.74
12,863.27
141,496.02

Jumlah Harga
(Rp)

40,692.57
12,716.43
1,373.37
3,051.94
57,834.32

12,252.43
9,546.43
17,428.13
4,031.25
43,258.23

101,092.55
10,109.25
111,201.80

Jumlah Harga
(Rp)

99,696.80
62,310.50
6,729.53
7,477.26
176,214.09

74,479.17
10,810.80
11,137.50
11,000.00
107,427.47

283,641.56
28,364.16
312,005.72

Jumlah Harga
(Rp)

99,696.80
62,310.50
6,729.53
7,477.26
176,214.09

55,252.53
10,810.80
11,137.50
4,800.00
77,200.83

253,414.92
25,341.49
278,756.41
Jumlah Harga
(Rp)

128,181.60
80,113.50
8,652.26
9,613.62
226,560.98

102,608.00
12,276.00
4,455.00
38,610.00
157,949.00

384,509.98
38,451.00
422,960.98

Jumlah Harga
(Rp)

12,818.16
16,022.70
6,729.53
1,068.18
36,638.57

10,541.67
16,420.80
14,300.00
6,187.50
47,449.97

84,088.54
8,408.85
92,497.39

Jumlah Harga
(Rp)

42,727.20
17,803.00
1,922.72
3,204.54
65,657.46

112,200.00
25,014.00
9,405.00
146,619.00

212,276.46
21,227.65
233,504.11

Jumlah Harga
(Rp)

42,727.20
17,803.00
1,922.72
3,204.54
65,657.46

77,000.00
15,180.00
10,642.50
102,822.50

168,479.96
16,848.00
185,327.96

Jumlah Harga
(Rp)

42,727.20
17,803.00
1,922.72
3,204.54
65,657.46

10,264.32
5,692.50
15,956.82

81,614.28
8,161.43
89,775.71

Jumlah Harga
(Rp)

28,484.80
17,803.00
1,922.72
2,136.36
50,346.88

4,290.00
4,290.00

54,636.88
5,463.69
60,100.57

Jumlah Harga
(Rp)

49,848.40
62,310.50
6,729.53
3,845.45
122,733.88

15,400.00
15,400.00
30,800.00

153,533.88
15,353.39
168,887.27

Jumlah Harga
(Rp)

14,242.40
8,901.50
961.36
1,068.18
25,173.44

30,030.00
27.50
30,057.50

55,230.94
5,523.09
60,754.04

Jumlah Harga
(Rp)

2,848.48
11,215.89
1,211.32
640.91
15,916.59

4,950.00
3,300.00
29,744.00
37,994.00

53,910.59
5,391.06
59,301.65
Jumlah Harga
(Rp)

2,848.48
11,215.89
14,064.37

4,950.00
3,300.00
25,410.00
33,660.00

47,724.37
4,772.44
52,496.81

Jumlah Harga
(Rp)

4,272.72
16,823.84
1,816.97
961.36
23,874.89

4,950.00
3,300.00
25,410.00
33,660.00

57,534.89
5,753.49
63,288.38

Jumlah Harga
(Rp)

28,484.80
80,113.50
1,922.72
10,681.80
121,202.82

23,188.00
29,053.20
28,000.00
8,000.00
44,916.67
133,157.87

254,360.69
25,436.07
279,796.76

Jumlah Harga
(Rp)

28,484.80
17,803.00
1,922.72
2,136.36
50,346.88

17,477.78
11,550.00
29,027.78

79,374.66
7,937.47
87,312.13

Jumlah Harga
(Rp)

28,484.80
17,803.00
1,922.72
2,136.36
50,346.88

82,500.00
561.00
83,061.00

133,407.88
13,340.79
146,748.67

Jumlah Harga
(Rp)

56,969.60
35,606.00
3,845.45
427.27
96,848.32

30,000.00
10,560.00
7,920.00
40,560.00

-
137,408.32
13,740.83
151,149.15

Jumlah Harga
(Rp)

14,242.40
35,606.00
49,848.40

103,984.38
18,700.00
122,684.38

172,532.78
17,253.28
189,786.05

Jumlah Harga
(Rp)

6,124.23
76,552.90
826.77
448.64
83,952.54

145,200.00
4,000.00
1,800.00
151,000.00

234,952.54
23,495.25
258,447.79

Jumlah Harga
(Rp)

12,106.04
15,132.55
1,634.32
897.27
29,770.18

42,350.00
77,000.00
119,350.00

-
149,120.18
14,912.02
164,032.19

Jumlah Harga
(Rp)

-
-
-
-
-

169,400.00
1,237,500.00
1,800.00
1,406,900.00

1,406,900.00
140,690.00
1,547,590.00

Jumlah Harga
(Rp)

2,136.36
26,704.50
2,884.09
170.91
31,895.85

16,500.00
16,500.00

48,395.85
4,839.59
53,235.44

Jumlah Harga
(Rp)

2,136.36
26,704.50
2,884.09
170.91
31,895.85

22,000.00
22,000.00

-
53,895.85
5,389.59
59,285.44

Jumlah Harga
(Rp)

2,136.36
26,704.50
2,884.09
170.91
31,895.85

49,700.00
165,000.00
214,700.00

246,595.85
24,659.59
271,255.44

Jumlah Harga
(Rp)

2,136.36
26,704.50
2,884.09
170.91
31,895.85

34,600.00
52,800.00
87,400.00

119,295.85
11,929.59
131,225.44

Jumlah Harga
(Rp)

28,484.80
3,560.60
3,845.45
427.27
36,318.12

77,000.00
77,000.00

-
113,318.12
11,331.81
124,649.93

Jumlah Harga
(Rp)

8,901.50
9,613.62
6,409.08
24,924.20

18,400.00
18,400.00

43,324.20
4,332.42
47,656.62

Jumlah Harga
(Rp)

7,121.20
9,613.62
6,409.08
23,143.90

29,200.00
29,200.00

52,343.90
5,234.39
57,578.29

Jumlah Harga
(Rp)

8,901.50
9,613.62
6,409.08
24,924.20

83,200.00
119,200.00
2,000.00
6,000.00
3,000.00
6,000.00
2,000.00
1,250.00
222,650.00
-

247,574.20
24,757.42
272,331.62

Jumlah Harga
(Rp)

373,700.00
373,700.00

31,200.00
223,500.00
3,000.00
2,000.00
48,000.00
66,000.00
373,700.00

747,400.00
74,740.00
822,140.00

Jumlah Harga
(Rp)

14,242.40
26,704.50
2,884.09
1,068.18
44,899.17

3,284,600.00
7,920.00
2,475.00
3,294,995.00

3,339,894.17
333,989.42
3,673,883.58

Jumlah Harga
(Rp)

14,242.40
26,704.50
2,884.09
1,068.18
44,899.17

247,500.00
7,920.00
2,475.00
257,895.00

302,794.17
30,279.42
333,073.58

Jumlah Harga
(Rp)

1,424.24
71,212.00
7,690.90
1,068.18
81,395.32

59,400.00
1,250.00
60,650.00

142,045.32
14,204.53
156,249.85

Jumlah Harga
(Rp)

1,424.24
17,803.00
1,922.72
1,068.18
22,218.14

30,300.00
30,300.00

52,518.14
5,251.81
57,769.96

Jumlah Harga
(Rp)

11,536.34
24,034.05
2,595.68
854.54
39,020.62

102,666.67
102,666.67
205,333.33
-

244,353.95
24,435.39
268,789.34

Jumlah Harga
(Rp)

11,536.34
24,034.05
2,595.68
854.54
39,020.62

4,500.00
4,500.00
9,000.00

48,020.62
4,802.06
52,822.68

Jumlah Harga
(Rp)

11,536.34
24,034.05
2,595.68
854.54
39,020.62

6,333.33
6,333.33
12,666.67

51,687.28
5,168.73
56,856.01

Jumlah Harga
(Rp)

455,756.80
204,734.50
2,115.00
3,418.18
666,024.47

135,300.00
150,480.00
45,540.00
29,700.00
11,797.50
101,975.71
474,793.21

1,140,817.69
114,081.77
1,254,899.45
HARGA SATUAN BAHAN & UPAH KERJA
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I
1 2 3 4
A. BAHAN ATAP

1 Genteng Flat Corak / garis/ polos Natural (tidak dicat) 33x39x20 cm - 10 Bh/M2 Buah Rp 4,900.00
2 Genteng Flat Corak / garis/ polos Warna Standar 33x39x20 cm - 10 Bh/M2 Buah Rp 6,400.00
3 Genteng Flat Corak / garis/ polos Warna Spesial 33x39x20 cm - 10 Bh/M2 Buah Rp 7,000.00
4 Genteng Elabana Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2 Buah Rp 4,900.00
5 Genteng Elabana Warna Standar 42x33x15 cm - 9 Bh/M2 Buah Rp 6,400.00
6 Genteng Elabana Warna Spesial ### Buah Rp 7,000.00
7 Genteng Kiat Beton Natural (tidak dicat) 36x32x15 cm - 12 Bh/M2 Buah Rp 4,900.00
8 Genteng Kiat Beton Warna Standar 36x32x15 cm - 12 Bh/M2 Buah Rp 6,400.00
9 Genteng Kiat Beton Warna Spesial 36x32x15 cm - 12 Bh/M2 Buah Rp 7,000.00
10 Genteng Kiat Beton Warna Khusus 36x32x15 cm - 12 Bh/M2 Buah Rp 7,500.00
11 Genteng Garuda Permata Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2 Buah Rp 4,900.00
12 Genteng Garuda Permata Warna Standar 42x33x15 cm - 9 Bh/M2 Buah Rp 6,400.00
13 Genteng Garuda Permata Warna Spesial 42x33x15 cm - 9 Bh/M2 Buah Rp 7,000.00
14 Genteng Royal Permata Natural (tidak dicat) 38x31x15 cm - 12 Bh/M2 Buah Rp 4,900.00
15 Genteng Royal Permata Warna Standar 38x31x15 cm - 12 Bh/M2 Buah Rp 6,400.00
16 Genteng Royal Permata Warna Spesial 38x31x15 cm - 12 Bh/M2 Buah Rp 7,000.00
17 Nok Genteng Biasa tanpa warna Buah Rp 16,500.00
18 Nok Genteng Keramik Buah Rp 18,700.00
19 Atap Genteng Keramik Standar Buah Rp 12,100.00
20 Atap Genteng Keramik Warna Buah Rp 16,500.00
21 Nok Segi Natural (tidak dicat) 35x27x15 cm - 3,3 Bh/M' Buah Rp 15,300.00
22 Nok Segi Warna Standar 35x27x15 cm - 3,3 Bh/M' Buah Rp 20,900.00
23 Nok Segi Warna Spesial 35x27x15 cm - 3,3 Bh/M' Buah Rp 21,100.00
24 Nok Segi Warna Khusus 35x27x15 cm - 3,3 Bh/M' Buah Rp 27,500.00
25 Nok Bulat Natural (tidak dicat) 30x24x15 cm - 3,5 Bh/ M' Buah Rp 16,200.00
26 Nok Bulat Warna Standar 30x24x15 cm - 3,5 Bh/ M' Buah Rp 20,800.00
27 Nok Bulat Warna Spesial 30x24x15 cm - 3,5 Bh/ M' Buah Rp 22,400.00
28 Nok Samping/T.Flat Natural (tidak dicat) 2,5 Bh/ M' Buah Rp 13,800.00
29 Nok Samping/T.Flat Warna Standar 2,5 Bh/ M' Buah Rp 19,300.00
30 Nok Samping/T.Flat Warna Spesial 2,5 Bh/ M' Buah Rp 19,000.00
31 Nok Samping/T.Flat Warna Khusus 2,5 Bh/ M' Buah Rp 22,000.00
32 Nok Cabang 3/Ujung Natural (tidak dicat) Buah Rp 93,500.00
33 Nok Cabang 3/Ujung Warna Standar Buah Rp 104,500.00
34 Nok Cabang 3/Ujung Warna Spesial Buah Rp 126,500.00
35 Nok Genteng Multi Roof Kasar, pjg 80 cm Buah Rp 63,300.00
36 Nok Genteng Multi Roof Licin, pjg 80 cm Buah Rp 68,800.00
37 Nok Genteng Surya, pjg 80 cm Buah Rp 52,300.00
38 Nok Genteng Sakura, pjg 80 cm Buah Rp 36,300.00
39 Genteng Metal Multi Roof Kasar pjg. 77, lb. 100 cm Lembar Rp 118,800.00
40 Genteng Metal Multi Roof Kasar pjg 77, lb. 80 cm Lembar Rp 118,300.00
41 Genteng Metal Multi Roof Licin pjg 77 lb. 100 cm Lembar Rp 99,000.00
42 Genteng Metal Multi Roof Licin pjg 77 lb. 80 cm Lembar Rp 99,000.00
43 Genteng Metal Surya Licin pjg 77 lb, 80 cm Lembar Rp 60,500.00
44 Genteng Metal Sakura Kasar pjg 77 lb, 80 cm Lembar Rp 83,600.00
45 Genteng Metal Star Licin pjg 77 lb. 80 cm Lembar Rp 33,000.00
46 Seng BWG 33 BJLS 0,20 MM kaki Rp 8,000.00
47 Seng BWG 28 BJLS 0,35 MM kaki Rp 88,000.00
48 Seng Gelombang bjls 0,35 (6 Kaki) Lembar Rp 88,000.00
49 Seng Gelombang bjls 0,30 (6 Kaki) Lembar Rp 77,000.00
50 Seng Gelombang bjls 0,25 (6 Kaki) Lembar Rp 50,200.00
51 Seng Gelombang bjls 0,20 (7 Kaki) Lembar Rp 53,900.00
52 Seng Gelombang bjls 0,20 (10 Kaki) Lembar Rp 79,200.00
53 Seng Plat bjls 0,35 (6 KK) Lembar Rp 93,500.00
54 Seng Plat bjls 0,30 (6 KK) Lembar Rp 82,500.00
55 Seng Plat bjls 0,20 (6 KK) Lembar Rp 58,300.00
56 Seng Fiber KK Rp 19,800.00
57 Fiber Semen Harflex ( 240x105x0,4 ) Lembar Rp 88,000.00
58 Eternit Jibesmen 1 m x 1 m Lembar Rp 16,500.00
59 Eternit Harflex 1 m x 1 m Lembar Rp 19,800.00
60 Eternit Atrisco 1 m x 1 m Lembar Rp 13,200.00
61 Karet Lapis Paku Asbes Biji Rp 8,000.00
62 Karet Talang (50 cm) M Rp 8,300.00
63 Karet Lapisan Genteng ( 50 cm) M Rp 8,800.00
64 Karet Lapisan Genteng ( 90 cm) M Rp 14,300.00
65 Karet Lapisan Genteng Tipis (110 mm) Uk. 1 x 20 m Rol Rp 385,000.00
66 Karet Lapisan Genteng Tebal (150 mm) Uk. 1 x 20 m Rol Rp 440,000.00
67 Onduline panjang 2 m + baut Lbr Rp 181,500.00
68 Nok onduline 1 m Lbr Rp 86,900.00
69 Ondulclear 95 x 2 m + baut Lbr Rp 352,000.00

B. BAHAN DASAR
1 Batu Kali M3 Rp 385,000.00
2 Batu kali Belah M3 Rp 275,000.00
3 Batu Gunung M3 Rp 385,000.00
4 Batu gunung Belah 10 - 15 cm M3 Rp 275,000.00
5 Batu Pecah 7 - 10 cm M3 Rp 440,000.00
6 Batu Pecah 5 - 7 cm M3 Rp 385,000.00
7 Batu Pecah 3 - 5 cm M3 Rp 385,000.00
8 Batu Pecah 2 - 3 cm M3 Rp 385,000.00
9 Batu Pecah 1- 2 cm M3 Rp 385,000.00
10 Batu Pecah 0,5 - 1 cm M3 Rp 385,000.00
11 Batu Merah Standar Biji Rp 1,100.00
12 Bata Ringan M3 Rp 990,000.00
13 Batako 40x20x10 cm - 13 Bh/M2 @Rp.4950 M2 Rp 70,800.00
14 Roster Beton 20 x 20 cm Biji Rp 27,500.00
15 Roster Keramik 20 x 20 cm Biji Rp 57,200.00
16 Roster Keramik 30 x 30 cm Biji Rp 68,200.00
17 Roster Keramik 20 x 40 cm Biji Rp 68,200.00
18 Glass Block Biji Rp 33,000.00
19 Gravel M3 Rp 165,000.00
20 Pasir Kasar/Pasir Beton/Pasir Pasangan M3 Rp 247,500.00
21 Sirtu A M3 Rp 286,000.00
22 Sirtu B M3 Rp 286,000.00
23 Sirtu C M3 Rp 286,000.00
24 Pasir Timbunan M3 Rp 176,000.00
25 Tanah Timbunan M3 Rp 220,000.00
26 Kerikil Sungai M3 Rp 357,500.00
27 Semen 50 kg (Tonasa) PC Sak Rp 71,500.00
28 Semen 40 kg (Tonasa) PC Sak Rp 52,800.00
29 Semen (Bosowa 40 kg) PC Zak Rp 51,700.00
30 Semen Tiga Roda 40 Kg PC Zak Rp 51,700.00
31 Semen Holcim 40 Kg PC Zak Rp 49,500.00
32 Semen Putih 40 kg per sak Sak Rp 77,000.00
33 Pigmen Warna Sak Rp 275,000.00
34 Semen Nat Tegel Kg Rp 22,000.00
35 Semen Abu Tiga Roda 40 Kg Kg Rp 49,500.00
36 Semen Abu Tiga Roda 50 Kg Kg Rp 62,200.00
37 Semen Putih Tiga Roda 40 Kg Kg Rp 126,300.00
38 Semen Acian Mortar Putih 40 Kg Kg Rp 121,300.00
39 Water Proofing M2 Rp 54,500.00
40 Paku jembatan kg Rp 33,000.00
41 Plastik untuk beton M2 Rp 88,000.00
42 Batu Kecil Gravel Batu Pecah atau Batu Tumbuk (Batu Gunung) M3 Rp 385,000.00

C. BAHAN BAMBU DAN GORONG - GORONG


1 Bambu - Petung Batang Rp 110,000.00
2 Bambu - Besar Batang Rp 44,000.00
3 Bambu - Sedang Batang Rp 33,000.00
4 Bambu - Kecil Batang Rp 27,500.00
5 Rotan Pengikat Ikat Rp 38,500.00
6 Gorong-gorong ᶲ 30/ m Buah Rp 165,000.00
7 Gorong-gorong ᶲ 40/ m Buah Rp 220,000.00
8 Gorong-gorong ᶲ 70/ m Buah Rp 330,000.00
9 Gorong-gorong ᶲ 80/ m Buah Rp 385,000.00

D 'BAHAN BESI
1 Angker Mur Baut Kecil Bh Rp 9,600.00
2 Angker Baut Tinggi 70 cm Bh Rp 8,000.00
3 Baut Diameter 12 mm x 10 cm (stainless) wf 150 Batang/Biji Rp 14,300.00
4 Baut Diameter 12 mm x 12,50 cm (stainless) Batang Rp 23,100.00
5 Baut Diameter 12 mm x 18 cm Batang Rp 14,800.00
6 Baut Diameter 12 mm x 20 cm Batang Rp 15,500.00
7 Baut Diameter 12 mm x 25 cm Batang Rp 19,200.00
8 Baut Diameter 12 mm x 30 cm Batang Rp 22,000.00
9 Baut Skrup Bh Rp 6,100.00
10 Baut Baja Bh Rp 27,500.00
11 Besi Streep 30 x 3 mm M'/ Btg Rp 209,000.00
12 Besi Hollow 40.60.1,2 mm P = 6 m Btg Rp 201,300.00
13 Besi Hollow 40.60.1 mm P = 6 m Btg Rp 203,500.00
14 Besi Hollow 40.40. 2 mm P = 6 m /40.40. 1,8 P = 6 m Btg Rp 209,000.00
15 Besi Hollow 40.40.1,5 mm P = 6 m Btg Rp 176,000.00
16 Besi Hollow 40.20.2 mm P =6 m Btg Rp 148,500.00
17 Besi Hollow 40.20.1,5 mm P =6 m Btg Rp 126,500.00
18 Besi Hollow 40.20.1,2 mm P = 6 m Btg Rp 104,500.00
19 Besi Hollow 20.20.1,5 mm P = 6 m Btg Rp 93,500.00
20 Besi Hollow 2x4 (12x31), 0.25mm P = 4m Btg Rp 19,800.00
21 Besi Hollow 2x4 (15x35), 0.25mm P = 4m Btg Rp 20,900.00
22 Besi Hollow 2x4 (18x38), 0.25mm P = 4m Btg Rp 23,100.00
23 Besi Hollow 2x4 (18x38), 0.30mm P = 4m Btg Rp 26,400.00
24 Besi Hollow 2x4 (18x38), 0.35mm P = 4m Btg Rp 29,700.00
25 Besi Hollow 4x4 (34x37), 0.25mm P = 4m Btg Rp 27,500.00
26 Besi Hollow 4x4 (34x37), 0.30mm P = 4m Btg Rp 31,900.00
27 Besi Hollow 4x4 (34x37), 0.40mm P = 4m Btg Rp 40,700.00
28 Besi Kanal C 8 cm, 0.55mm P = 6m Btg Rp 71,500.00
29 Besi Kanal C 8 cm, 0.60mm P = 6m Btg Rp 78,100.00
30 Besi Kanal C 8 cm, 0.65mm P = 6m Btg Rp 82,500.00
31 Besi Kanal C 8 cm, 0.70mm P = 6m Btg Rp 88,000.00
32 Besi Kanal C 8 cm, 0.75mm P = 6m Btg Rp 93,500.00
33 Besi Kanal C 8 cm, 1mm P = 6m Btg Rp 127,600.00
34 Besi Kanal C 8 cm, 0.55mm P = 5,8m Btg Rp 69,300.00
35 Besi Kanal C 8 cm, 0.60mm P = 5,8m Btg Rp 75,900.00
36 Besi Kanal C 8 cm, 0.65mm P = 5,8m Btg Rp 80,300.00
37 Besi Kanal C 8 cm, 0.70mm P = 5,8m Btg Rp 85,300.00
38 Besi Kanal C 8 cm, 0.75mm P = 5,8m Btg Rp 90,800.00
39 Besi Reng 3 cm, 0,4mm P = 6m Btg Rp 38,500.00
40 Besi Reng 3 cm, 0,45mm P = 6m Btg Rp 40,700.00
41 Besi Reng 3 cm, 0,4mm P = 5,8m Btg Rp 37,400.00
42 Besi Reng 3 cm, 0,45mm P = 5,8m Btg Rp 39,600.00
43 Besi Reng 3,8 cm, 0,4mm P = 6m Btg Rp 51,700.00
44 Besi Reng 3,8 cm, 0,45mm P = 6m Btg Rp 57,200.00
45 Besi Reng 3,8 cm, 0,4mm P = 5,8m Btg Rp 50,600.00
46 Besi Reng 3,8 cm, 0,45mm P = 5,8m Btg Rp 55,600.00
47 Plat Besi Kembang 2,3 mm M2 Rp 869,000.00
48 Besi Metal Stud L. 76 mm Btg Rp 77,000.00
49 Besi Siku L. 30.30.3/ 2,8 mm banci Btg Rp 112,800.00
50 Besi siku L. 40.40.4/ 3,8 mm Btg Rp 187,000.00
51 Besi siku L. 50.50.5/ 4,8 mm Btg Rp 275,000.00
52 Besi Siku L. 60. 60. 6/ 5,8 mm Btg Rp 495,000.00
53 Besi Siku L. 70. 70. 7 / 6,8 mm Btg Rp 676,500.00
54 Besi Siku L. 70.70.6 / 5 mm Btg Rp 574,200.00
55 Besi Siku L.100.100.10 Btg Rp 1,177,000.00
56 Besi Beton Polos 6 mm ( 0, 22 kg / M' ) (5,7) Btg Rp 30,800.00
57 Besi Beton Polos 8 mm ( 0,39 kg / M' ) (7,8) Btg Rp 52,800.00
58 Besi Beton polos 10 mm ( 0, 62 kg / M' ) (9,8) Btg Rp 71,500.00
59 Besi Beton Polos 12 mm ( 0, 89 kg / M' ) (11,8) Btg Rp 93,500.00
60 Besi Beton 14 mm ( 1, 21 kg / M' ) (13,8) Btg Rp 159,500.00
61 Besi Beton 16 mm ( 1, 39 kg / M' ) (15,8) Btg Rp 204,600.00
62 Besi Beton 19 mm ( 2, 23 kg / M' ) Btg Rp 269,500.00
63 Besi Beton 20 mm ( 2, 46 kg / M' ) Btg Rp 407,000.00
64 Besi Beton Ulir Dia 8 mm ( 0, 39 kg / M' ) ulir 10 full Btg Rp 86,300.00
65 Besi Beton Ulir Dia. 16 mm SNI Btg Rp 211,700.00
66 Besi Plat 1,5mm 1,2 mm M2 Rp 500,500.00
67 Besi Plat 2 mm (1,8) M2 Rp 711,700.00
68 Besi Plat 2,5mm M2 Rp 803,000.00
69 Besi Plat 3 mm (2,8) M2 Rp 1,001,000.00
70 Besi Plat 3,5mm M2 Rp 1,430,000.00
71 Besi Plat 4 mm M2 Rp 1,540,000.00
72 Besi Plat 4,5mm M2 Rp 1,782,000.00
73 Besi Plat 5 mm (4,8) M2 Rp 1,903,000.00
74 Besi Plat 5,5mm M2 Rp 2,145,000.00
75 Besi Plat 6 mm (5,8) M2 Rp 2,255,000.00
76 Besi Plat 8 mm (7,8) M2 Rp 2,871,000.00
77 Besi Plat 9 mm 10 mm (9,8) M2 Rp 3,685,000.00
78 Besi Plat T = 12 mm Ukr. 120x240 Lembar Rp 4,139,600.00
79 Besi Plat T = 16 mm Ukr. 120x240 Lembar Rp 5,482,400.00
80 Besi Plat T = 18 mm Ukr. 120x240 Lembar Rp 6,283,200.00
81 Baja Tulangan ( Polos ) U24 ᶲ 6 Batang Rp 36,900.00
82 Baja Tulangan ( Polos ) U24 ᶲ 8 Batang Rp 48,400.00
83 Baja Tulangan ( Polos ) U24 ᶲ 10 Batang Rp 72,600.00
84 Baja Tulangan ( Polos ) U24 ᶲ 12 Batang Rp 110,000.00
85 Baja Tulangan ( Polos ) U24 ᶲ 16 Batang Rp 198,000.00
86 Baja Tulangan ( Polos ) U24 ᶲ 16 Batang Rp 172,700.00
87 Baja Tulang ( Ulir ) D32, D39 16 Batang Rp 181,500.00
88 Baja Tulang ( Ulir ) D32, D39 18 Batang Rp 297,000.00
89 Besi Profil H 200x200 P = 12 meter Batang Rp 11,642,400.00
90 Besi Profil H 100x100 P = 12 meter Batang Rp 4,090,300.00
91 Besi IWF 300 P = 12 meter Batang Rp 8,106,600.00
92 Besi IWF 200 P = 12 meter Batang Rp 4,638,500.00
93 Besi UNP 100 P = 6 meter Batang Rp 542,100.00
94 Beugel kap V Plat Besi kg Rp 15,200.00
95 Kawat Ikat Beton 1 roll 20 Kg kg Rp 385,000.00
96 Kawat Dul ( 1 Roll = M ') Roll Rp 192,500.00
97 Kawat Ram Lubang 3,0 cm ( Rang Armonika ) M' Rp 38,500.00
98 Kawat Nyamuk plastik Rang 1 cm L. 1,20 Rang 2 cm M Rp 11,000.00
99 Kawat Nyamuk Aluminium M Rp 27,500.00
100 Kawat Nyamuk Baja M Rp 38,500.00
101 Kawat Las 2,6 nikko Dos Rp 143,000.00
102 Kawat Saringan Pasir / Ayakan M Rp 19,800.00
103 Kawat Bronjong kg Rp 27,500.00
104 Karet Untuk Pintu dan Jendela Aluminium PVC M'/Roll Rp 71,500.00
105 Door Closer Set Unit Rp 203,500.00
106 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 400 per roll M2 Rp 632,500.00
107 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 500 M2 Rp 275,000.00
108 Lem Kayu Dan Karet ( Fox ) Besar ( 800 gr ) Tube Rp 16,500.00
109 Lem Karet ( Fox ) Besar 450 10 kg Tube Rp 203,500.00
110 Lem Seng M Rp 17,600.00
111 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 6 mm Roll Rp 1,622,500.00
112 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 5 mm Roll Rp 3,300,000.00
113 Paku Campuran ( 5-10 cm ) Kg Rp 18,700.00
114 Paku Asbes dan Karet Kg Rp 60,500.00
115 Paku 5 cm 7 cm 10 cm Kg Rp 18,700.00
116 Paku ( 1 1/2 - 2 1/2 cm ) ( setara Paku 2-3 cm ) Kg Rp 22,000.00
117 Paku 4 cm Kg Rp 19,800.00
118 Paku 2-3 cm Kg Rp 20,900.00
119 Paku Sirap ( Setara Paku 2-3 cm ) Kg Rp 24,200.00
120 Paku Seng ( 1 kg/ Dos ) Kg Rp 55,000.00
121 Paku Skrup 5 cm Biji Rp 275,000.00
122 Paku Skrup Besi Hollow - 1000 Biji Per dos ( bdrilling 450 b = 4,5 cm ) Dos/ Bgks Rp 192,500.00
123 Paku skrup Gyapsum - 500 biji per dos bungkus Dos/ Bgks Rp 66,000.00
124 Paku Jembatan Kg Rp 15,400.00
125 Paku Beton 5 cm Dos Rp 16,500.00
126 Paku Beton 6 cm Dos Rp 16,500.00
127 Paku Beton 7 cm - 10 cm Dos Rp 16,500.00
128 Paku Payung Berulir ( 1 kg/ Dos ) Kg Rp 38,500.00
129 Paku Asbes Berulir Dos Rp 52,300.00
130 Paku Asbes Biasa Dos Rp 55,000.00
131 Paku Tripl ( Setara Paku 2-3 cm) Kg Rp 27,500.00
132 Paku Eter ( Setara Paku 2-3 Cm ) Kg Rp 27,500.00
133 Paku Ripet Biji Rp 1,100.00
134 Skamp ( Paku Tembak Hollow alumunium ) Bh Rp 27,500.00
135 pagar Jadi Besi ( Tinggi 1 M ) M' Rp 440,000.00
136 Pagar Pracetak - 5 panel M' Rp 495,000.00
137 Pagar Pracetak - 6 panel M' Rp 550,000.00
138 Pagar Pracetak - 7 panel M' Rp 631,400.00
139 Tiang Beton untuk 5 Daun Buah Rp 264,000.00
140 Tiang Beton untuk 6 Daun Buah Rp 316,800.00
141 Tiang Beton untuk 7 Daun Buah Rp 369,600.00
142 Rangka Baja Ringan 0,75 M2/ 6 Rp 85,800.00
143 Spandek 0,25 silver M Rp 41,800.00
144 Spandek 0,35 silver M Rp 57,200.00
145 Spandek 0,4 silver M Rp 60,500.00
146 Spandek 0,45 0,35 M Rp 61,600.00
147 Nok Spandek M Rp 49,500.00
148 Hollow Aluminium Rangka Plafond 0,25 (2x4) Btg Rp 20,900.00
149 Hollow Aluminium Rangka Plafond 0,3 2x4/4x4 Btg Rp 33,000.00
150 Hollow Aluminium Rangka Plafond 40 X 20 X 2 mm Btg Rp 26,400.00
151 Hollow Aluminium Rangka Plafond 40 X 40 X 2 mm Btg Rp 23,100.00
152 Hollow Aluminium Rangka Plafond 40 X 20 X 8 mm Btg Rp 71,500.00
153 Kawat Penggantung Hollow Aluminium Kg Rp 33,000.00
154 Aluminium 4'' Brown - 6 Meter Btg Rp 231,000.00
155 Aluminium 3'' Brown - 6 Meter Btg Rp 137,500.00
156 Aluminium Slimar 4'' Brown Untuk Daun Jendela Btg Rp 175,500.00
157 Aluminium Slimar 3'' Brown Untuk Daun Jendela Btg Rp 99,900.00
158 Pas. Kusen Aluminium 4' M' Rp 132,000.00
159 Pas. Daun Jendela Alumunium + Kaca Tabel 5 mm + Karet dan Sealent M2 Rp 1,403,200.00
160 Pas. Daun Pintu Aluminium panil Kaca Tebal 5 mm ( Lengkap Accessories ) Unit Rp 302,500.00
161 Pintu KM/WC Alumunium ( lengkap Accessories ) lebar 6 cm Unit Rp 275,000.00
162 Pintu KM/WC PVC kw.1( lengkap Accessories ) lebar 10 cm Unit Rp 253,000.00
163 Pintu fiberglass KM/WC Lembar Rp 242,000.00
164 Pintu KM/WC bahan PVC Lengkap Accessories ex MASPION star Unit Rp 231,000.00

E. BAHAN FINISHING :
1 Cat Minyak Afduner 1kg Liter/botol Rp 5,500.00
2 Cat Kayu Ex Avian (0,9 kg) Kaleng Rp 69,300.00
3 Cat Minyak Ex Emco Kg Rp 71,500.00
4 Cat kKayu Ex Mowilex 1kg Kaleng Rp 46,200.00
5 Cat Minyak Liter Rp 19,800.00
6 Cat Minyak Super klg liter Rp 39,600.00
7 Cat Kayu Dulux 1kg Kg Rp 58,300.00
8 Cat Dasar 3,5 kg Kaleng Rp 130,400.00
9 Cat Dasar Meni 3,5 Kg Kaleng Rp 150,700.00
10 Cat Meni Glatik 3,5 kg Kaleng Rp 105,600.00
11 Cat Tenner Kg Rp 31,000.00
12 Cat Genteng Cap Belmas 1kg Kg Rp 51,700.00
13 Cat Genteng yoko 4kg Kaleng Rp 110,000.00
14 Cat Genteng Biasa AGA (4 kg) Kaleng Rp 203,500.00
15 Cat Genteng Minyak Nippon 2,5 liter Kaleng Rp 220,000.00
16 Cat Residu/ cloter (10 kg) 30.000/ kg Kaleng Rp 330,000.00
17 Cat seng Nippon (2,5 kg) Kaleng Rp 77,000.00
18 Cat Tembok Sahara / Kembang / Postek Aries (25 Kg) Kg Rp 176,000.00
19 Cat Tembok Wintex / Maxilite (5kg) Kaleng Rp 19,800.00
20 Cat Tembok ICI (Dalam) Kaleng Rp 176,000.00
21 Cat Tembok Mowilex (Cat Dalam ) 2,5 Kg soff Kaleng Rp 181,500.00
22 Cat Tembok Mowilex (Cat Luar ) 2,5 Kg gelap & terang Kaleng Rp 286,000.00
23 Cat Tembok Aries 5kg Kaleng Rp 71,500.00
24 Cat Minyak Avian Liter Rp 181,500.00
25 Cat Tembok Kimex (5kg) Kaleng Rp 133,100.00
26 Cat Tembok Dulux (luar) 2,5 kg Kaleng Rp 143,000.00
27 Cat Tembok Warna Kuning , Hitam ,Merah (Belmax) kg Rp 88,000.00
28 Vernis/Plitur (24 Klg) kg Rp 62,700.00
29 Cat Altex Kg Rp 145,200.00
30 Cat Anti Lumut (Aquaseal) (Klg 20kg) Nodrop 20 kg Pail Rp 797,500.00
31 Cat Anti Lumut (No drop) (Klg 20 kg) Pail Rp 792,000.00
32 Cat Dasar Glatik kembang 1 kg Kg Rp 33,000.00
33 Plamur Tembok Boyo Dan Setara (5kg) Kaleng Rp 49,500.00
34 Minyak Cat (aff Dunner) Liter Rp 8,800.00
35 Dempul Kayu Cap Kuning / Merah (1 Kg) klg Kg Rp 44,000.00
36 Dempul Ex Impra Kg Rp 44,000.00
37 Dempul Ex Isamu Kg Rp 60,500.00
38 Tenner A ( Ex Avian) super Liter Rp 35,200.00
39 Minyak Te Botol Liter Rp 9,400.00
40 Kertas Gosok Lembar Rp 5,500.00
41 Pewarna Natural Kaleng Rp 104,500.00
42 pewarna brown Kaleng Rp 77,000.00
43 Pewarna Ex Impra Kaleng Rp 71,500.00
44 Wood Filler Ex Impra Kaleng Rp 71,500.00
45 Clear Kaleng Rp 79,500.00
46 Clear ex Impra Ltr Rp 66,000.00
47 Sending kg Rp 66,000.00
48 Sending ex Impra Ltr Rp 66,000.00
49 Cat Kayu Ex Dullux Mengkilap Kg Rp 93,500.00
50 Melamin Ex Impra kg Rp 148,500.00
51 Cat Air Untuk Genteng, Bataco, Paving Block (AGA) kg Rp 214,500.00
52 Cat Minyak Untuk Genteng, Bataco, Paving Block (AGA) kg Rp 111,700.00
53 Kuas 2" (Eterna) Buah Rp 8,800.00
54 Kuas 3" (Eterna) Buah Rp 13,200.00
55 Kuas 4" (Eterna) Buah Rp 19,800.00
56 Bahan Anti Karat Kg Rp 55,000.00
57 Comice - 20 kg (dingding eksterior ) kg Rp 82,500.00
58 Comice - 20 kg (dingding interior) kg Rp 62,700.00
59 Lem Fox Kaleng kg Rp 159,500.00
60 Lem Efoxi ltr Rp 203,500.00
61 Perban Conpon Roll/Bh Rp 13,200.00
62 Bubuk + air pelarut Ex Aqugart untuk Waterproofing kg Rp 29,700.00
63 Cat Waterproof eks aquaproo- kw.1 kg Rp 176,000.00
64 Cat waterproof- biasa Liter Rp 145,200.00
65 Cat Marka Jalan (aries gold 5kg) kg Rp 74,300.00
66 Aluminium Composite Panel (ACP) Seven Polyster 0,21 (Indoor) Lembar Rp 522,500.00
67 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Doft Lembar Rp 763,400.00
68 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Glossy Lembar Rp 781,000.00
69 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Metalic Lembar Rp 799,700.00
70 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Sparking, Safron, Olive Brown Lembar Rp 812,900.00
71 Aluminium Composite Panel (ACP) Seven Marble, Wood, Brush Lembar Rp 1,059,300.00

F BAHAN KAYU
1 Kayu Kls. I Bayam (balok) Chain Saw M3 Rp 14,300,000.00
2 Kayu Kls. I Bayam (balok) Sawmill M3 Rp 16,500,000.00
3 Kayu Kls. I Ulin (papan) M3 Rp 26,620,000.00
4 Kayu Kls. I Ulin (tiang) M3 Rp 27,500,000.00
5 Kayu Kls. I Bayam (papan) Shain Saw M3 Rp 22,000,000.00
6 Kayu Kls I Bayam(papan) sawmil M3 Rp 22,000,000.00
7 Kayu Klas. II Samarinda (papan)/ Lokal M3 Rp 4,125,000.00
8 Kayu Klas. II Samarinda (balok)/ Lokal M3 Rp 3,850,000.00
9 Kayu Kls. III Kapur (balok)/ Kemiri M3 Rp 2,200,000.00
10 Kayu Kls. III (papan) M3 Rp 2,200,000.00
11 Kayu Mangga/Kemiri (papan) M3 Rp 2,750,000.00
12 Kayu Kumea Balok M3 Rp 9,350,000.00
13 Kayu Kumea Papan M3 Rp 10,450,000.00
14 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,4 x 122 x 244)cm Lembar Rp 66,000.00
15 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,3 x 122 x 244)cm Lembar Rp 55,000.00
16 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,6 x 122 x 244)cm Lembar Rp 88,000.00
17 Kayu lapis Tripleks Lapis Kayu Lainnya (18 mm) Lembar Rp 308,000.00
18 Kayu lapis Tripleks Lapis Kayu Lainnya (12 mm) Lembar Rp 198,000.00
19 Kayu lapis Tripleks Lapis Kayu Lainnya ( 9 mm) Lembar Rp 132,000.00
20 Kayu lapis Tripleks Lapis Kayu Lainnya 2 mm Lembar Rp 55,000.00
21 Kayu lapis Tripleks Lapis Kayu Mewah jati Teakwood (0,3 x 122 x 244) cm Lembar Rp 220,000.00

G BAHAN PENGGANTUNG
1 Engsel Baja Biji Rp 27,500.00
Engsel Baja (Dumont) Biji Rp 181,500.00
2 Engsel Kuningan 4 Lubang Psg Rp 27,500.00
Engsel Kuningan 4 Lubang (Dumont) Psg Rp 84,700.00
3 Engsel Stainless Steel Psg Rp 49,500.00
4 Engsel H3 Lubang Psg Rp 16,500.00
5 Engsel Kupu-kupu Psg Rp 11,000.00
6 Engsel antik jendela Psg Rp 16,500.00
7 Engsel Pintu Biasa (Merk 777) Psg Rp 16,500.00
Engsel Pintu Biasa (Dumont) Psg Rp 84,700.00
8 Engsel Pintu Lemari Biasa Psg Rp 12,100.00
Engsel Pintu Lemari Biasa (Dakson) Psg Rp 66,000.00
9 Engsel Jendela Biasa (Merk 777) Psg Rp 13,800.00
Engsel Jendela Biasa (Dumont) Psg Rp 57,200.00
10 Engsel Jendela Kuningan (merk Kuningan) Psg Rp 22,000.00
Engsel Jendela Kuningan (Dakson) Psg Rp 63,800.00
11 Engsel Pintu 4" (SES) Bh Rp 38,500.00
Engsel Pintu 4" (Dumont) Bh Rp 58,100.00
12 Engsel Jendela 3"(SES) Bh Rp 27,500.00
Engsel Jendela 3"(Dumont) Bh Rp 57,200.00
13 Engsel Pintu Kuningan SES Psg Rp 84,700.00
Engsel Pintu Kuningan (Dumont) Psg Rp 84,700.00
14 Gagang Pintu Lemari Bh Rp 27,500.00
Gagang Pintu Lemari (Dakson) Bh Rp 37,400.00
15 Grendel jendela Kuningan Bh Rp 52,800.00
Grendel jendela Kuningan (Dakson) Bh Rp 52,800.00
16 Grendel Pintu Biasa Bh Rp 38,500.00
Grendel Pintu Biasa (Dumont) Bh Rp 49,700.00
17 Grendel Pintu Kuningan/ Vertikal Bh Rp 22,000.00
18 Grendel Pintu Besar Bh Rp 72,600.00
19 Grendel Pintu Tanam (Expanyolet) Bh Rp 165,000.00
20 Kunci Tanam Yale 1 x Putar Bh Rp 729,700.00
21 Kunci Tanam Yale 2 x Putar Bh Rp 275,000.00
22 Kunci Tanam Pintu 2 x Putar Besar Biasa Bh Rp 165,000.00
23 Kunci Tanam Pintu 2 x Putar kecil Biasa Bh Rp 110,000.00
24 Kunci Tanam Pintu 2 x Putar SES Bh Rp 321,900.00
25 Hak Angin Kecil Antik Bh Rp 55,000.00
26 Hak Angin Besar Bh Rp 44,000.00
Hak Angin Besar (Dumont) Bh Rp 74,800.00
27 Hak Angin Kecil Bh Rp 27,500.00
Hak Angin Kecil (Dumont) Bh Rp 122,300.00
28 Kait angin Jendela Alumunium Kualias 1 Bh Rp 17,300.00
Kait angin Jendela Alumunium (Dumont) Bh Rp 188,800.00
29 Kait angin Jendela Alumunium biasa Bh Rp 8,300.00
Kait angin Jendela Alumunium (Dumont) Bh Rp 101,800.00

H BAHAN KACA
1 Kaca Bening 3 mm M2 Rp 121,000.00
2 Kaca Bening 5 mm M2 Rp 148,500.00
3 Kaca Bening 6 mm M2 Rp 275,000.00
4 Kaca Bening 8 mm M2 Rp 363,000.00
5 Kaca Bening 10 mm M2 Rp 484,000.00
6 Kaca Ryben Tebal 5 mm M2 Rp 154,000.00
7 Kaca Ryben Tebal 6 mm M2 Rp 462,000.00
8 Kaca Ryben Tebal 3 mm M2 Rp 121,000.00
9 Kaca Ryben Tebal 8 mm M2 Rp 632,500.00
10 Kaca Ryben Tebal 10 mm M2 Rp 660,000.00
11 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,8 m x 0,2 m 4 lbr terpasang + Stand M2 Rp 59,400.00
12 Kaca Es Buram 5 mm/ 10 mm M2 Rp 264,000.00
13 Kaca Lembaran Bening Tidak Berwarna FL Tebal 2 MM M2 Rp 71,500.00
14 Kaca Lembaran Bening Tidak Berwarna FL Tebal 3 MM M2 Rp 170,500.00
15 Kaca Lembaran Bening Tidak Berwarna FL Tebal 5 MM M2 Rp 187,000.00
Ukuran (1221 x 153) Lembar Rp 203,500.00
Ukuran (200 x 90) Lembar Rp 203,500.00
Ukuran (200 x 100) Lembar Rp 236,500.00
Ukuran (213 x 122) Lembar Rp 297,000.00
Ukuran (183 x 122) Lembar Rp 236,500.00
Ukuran (244 x 183) Lembar Rp 533,500.00
Kaca Lembaran Bening Tidak Berwarna FL Tebal 10 MM M2 Rp 2,491,500.00
16 Kaca Bening 12 mm M2 Rp 522,500.00
I BAHAN SANITER / SALURAN AIR
1 Kloset Duduk Lengkap(putih) Tangki Batu American standart Unit Rp 1,650,000.00
2 Kloset Duduk Ex KIA Lengkap (warna) Tanhki Batu Unit Rp 2,530,000.00
3 Kloset Duduk ex TOTO Lengkap Accessories warna Putih Unit Rp 3,284,600.00
4 Kloset Duduk ex TOTO Lengkap Accessories warna gelap Unit Rp 2,970,000.00
5 Kloset Jongkok KIA Bh Rp 385,000.00
6 Kloset Jongkok Biasa (American Standar) Bh Rp 313,500.00
7 Wastafel polos / putih lengkap Bh Rp 715,000.00
8 Wastafel warna lengkap Bh Rp 726,000.00
9 Slypon Wastafel Biasa Bh Rp 385,000.00
10 Urinoir Polos /Putih American Standart Unit Rp 550,000.00
11 Urinoir ex TOTO (lengkap) Unit Rp 1,540,000.00
12 Bak Tube Fiber Biasa Bh Rp 247,500.00
13 Bak Tube Fiber ex TOTO Bh Rp 3,300,000.00
14 Tangki Air Fiberglass Kap 0,25 M3 Bh Rp 550,000.00
15 Tangki Air Fiberglass Kap 0,50 M3 Bh Rp 825,000.00
16 Tangki Air Fiberglass Kap 1 M3 Bh Rp 1,320,000.00
17 Tangki Air Alumunium Kap 1 M3 Bh Rp 3,685,000.00
18 Kran Air Kuningan DIA 3/4 Biasa Bh Rp 59,400.00
19 Kran Air Kuningan DIA 1/2 Biasa Bh Rp 44,000.00
20 Kran Air Vernrkel DIA 3/4 Biasa Bh Rp 44,000.00
21 Kran Air Antik DIA 1/2 Bh Rp 253,000.00
22 Bak Cuci Piring Stain -Kosong Tanpa Saluran Pembuangan & Kran Air Bh Rp 247,500.00
23 Kran air 2 / Biasa / bisa Bh Rp 121,000.00
24 Seal Tape Bh Rp 5,500.00
25 Bak Mandi Unit Rp 330,000.00
26 Kloset Jongkok Biasa Bh Rp 121,000.00
27 Wallpaper & Penutup Dinding Rol Rp 330,000.00
28 Foil (Kertas Alumunium Foil) M Rp 176,000.00
29 Kloset Duduk (Data) Bh Rp 495,000.00
30 Kloset Jongkok TOTO (Putih) Bh Rp 379,500.00
31 Toilet Portable Fiberglass 400 Liter Unit Rp 23,100,000.00
32 Toilet Portable Fiberglass 400 Liter Unit Rp 29,260,000.00

J BAHAN LANGIT-LANGIT
1 Teakwood 120 x 240 cm t.3mm Lembar Rp 220,000.00
2 Triplex 3 mm 120 x 240 cm Lembar Rp 55,000.00
3 Triplex 4 mm 120 x 240 cm Lembar Rp 66,000.00
4 Triplex 5 ml Lembar Rp 93,500.00
5 Triplex 6 mm 120 x 240 cm Lembar Rp 99,000.00
6 Triplex 7 ml Lembar Rp 148,500.00
7 Triplex 10 ml Lembar Rp 209,000.00
8 Triplex 15 ml Lembar Rp 242,000.00
9 Triplex 20 ml Lembar Rp 291,500.00
10 Triplex Ukuran Pintu Lembar Rp 137,500.00
11 Triplex Melamin 120 x 240 cm 3 mm Lembar Rp 121,000.00
12 Teakwood 120 x 240 cm t.4mm Lembar Rp 165,000.00
13 Multiplex 120 x 240 cm t. 6 mm Lembar Rp 77,000.00
14 Multiplex 120 x 240 cm t. 9 mm Lembar Rp 110,000.00
15 Multiplex 120 x 240 cm t. 12 mm Lembar Rp 181,500.00
16 Multiplex 120 x 240 cm t. 18 mm Lembar Rp 291,500.00
17 Gypsum Board 122x244x tebal 9 mm ex Jayaboard untuk Plafond Gpyro Lembar Rp 82,500.00
18 Kalsiboard tebal 3,5 mm Lembar Rp 74,800.00
19 Kalsiboard tebal 4,5 mm Lembar Rp 100,100.00
20 Kalsiboard tebal 6 mm Lembar Rp 139,700.00
21 Kalsiboard tebal 8 mm Lembar Rp 192,500.00
22 Kalsiboard tebal 10 mm Lembar Rp 245,300.00
23 Kalsiboard tebal 20 mm Lembar Rp 653,400.00
24 Kalsiplank 8mm (10cm x 3m) Lembar Rp 29,200.00
25 Kalsiplank 8mm (10cm x 3m) Polos Lembar Rp 49,000.00
26 Kalsiplank 8mm (20cm x 3m) Jati Lembar Rp 51,700.00
27 Kalsiplank 8mm (30cm x 3m) Polos Lembar Rp 72,600.00
28 Kalsiplank 8mm (30cm x 4m) Jati Lembar Rp 74,800.00
29 Kalsiplank 9mm (20cm x 4m) Polos Lembar Rp 70,400.00
30 Kalsiplank 9mm (20cm x 4m) Cedar Lembar Rp 73,700.00
31 Lambriziring t:4mm, (4m') Lembar Rp 49,500.00
32 HPL Lembar Rp 242,000.00
33 Les Kayu Profil Lebar 5 cm ( 4 M' ) Batang Rp 22,000.00
34 Les Kayu Profil Lebar 3 cm ( 4 M' ) Batang Rp 40,300.00
35 Les Kayu Profil Lebar 11/2 cm ( 4 M' ) Batang Rp 22,000.00
36 Les Kayu 1 x 10 x 400 cm Btg Rp 63,300.00
37 Les Kayu Profil 4 x 4 x 400 cm Btg Rp 35,000.00
38 Les Kayu Biasa 0,5 x 3 cm Btg Rp 78,300.00
39 Les Gypsum Polos Batang Rp 22,000.00
40 Les Gypsum Polos - Kecil M' Rp 11,000.00
41 Les Gypsum Motif - Kecil - lebar 7 cm/10 cm M' Rp 13,800.00
42 Les Gypsum - Sedang M' Rp 19,300.00
43 Les Gypsum - lebar 10 cm M' Rp 22,000.00
44 Les Gypsum - Besar - lebar 15 cm M' Rp 27,500.00
45 Les Gypsum Profil Batang Rp 27,800.00
46 Beding Gypsum - Kecil M' Rp 11,000.00
47 Beding Gypsum - Sedang M' Rp 16,500.00
48 Beding Gypsum - Besar M' Rp 27,500.00
K BAHAN LANTAI
1 Tegel PC 30 x30 cm Dos Rp 93,500.00
2 Tegel Motif 30 x30 cm Platinum Diego grey / brown 2 Dos Rp 101,200.00
3 Tegel Keramik Putih 10 x 20 cm Dos Rp 63,000.00
4 Tegel Keramik Putih 20 x 20 cm Dos Rp 63,800.00
5 Tegel Keramik Putih 20 x 25 cm Dos Rp 65,600.00
6 Tegel Keramik Putih 30 x 30 cm Dos Rp 54,700.00
7 Tegel Keramik Putih 40 x 40 cm (accura) Dos Rp 117,700.00
8 Tegel Keramik Putih 50 x 50 cm # Platinum (accura motif) Dos Rp 117,700.00
9 Tegel Keramik Putih 60 x 60 cm Ex Granito (granit sandimas mega white) Dos Rp 261,800.00
10 Tegel Keramik Putih 60 x 60 cm Ex Garuda Dos Rp 176,000.00
11 Tegel Keramik Putih 30 x 60 cm Ex Granito (granit eleganza new vorio) Dos Rp 290,300.00
12 Tegel Keramik Warna 60 x 60 cm Ex Granito Top Gress Top Gress Dos Rp 390,500.00
13 Tegel Keramik Warna 60 x 60 cm EX Garuda/Pangress Double wodding (sandimas) Dos Rp 192,500.00
14 Tegel Keramik warna 30 x 60 cm Ex Garuda /Roman (kwalitas LebihBagus) Dos Rp 324,500.00
15 Tegel Keramik Putih 30 x 60 cm Dos Rp 118,700.00
16 Tegel Keramik Warna 20 x 20 cm Dos Rp 96,800.00
17 Tegel Keramik Warna 30 x 30 cm Dos Rp 66,000.00
18 Tegel Keramik Warna 20 x 25 cm M2 Rp 63,800.00
19 Tegel Keramik Warna 40 x 40 cm M2 Rp 71,500.00
20 Tegel Keramik Warna 50 x 50 cm Dos Rp 125,400.00
21 Tegel Keramik Warna 60 x 60 cm Dos Rp 151,800.00
22 Tegel Keramik Warna 30 x 60 cm Dos Rp 220,000.00
23 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (GNS Ruffian) Dos Rp 462,000.00
24 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (Topaz) Dos Rp 350,900.00
25 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (Cottonwood) Dos Rp 379,500.00
26 Granit Uku 60 x 185 60 x 185 cm Dasar Putih M2 Rp 1,333,500.00
27 Granit Uku 60 x 185 cm Dasar Hitam / 63 X 198 cm (sandimas 60x60) M2 Rp 880,000.00
28 Granit ukuran 30 x 30 cm Asia Tile Dos Rp 55,200.00
29 Granit ukuran 40 x 40 cm Granito Asia Tile Dos Rp 74,800.00
30 Granit ukuran 60 x 60 cm (sandimas) Dos Rp 198,000.00
31 Keramik WC 20 x 20 cm Dos Rp 68,200.00
32 Keramik WC 20 x 25 cm Dos Rp 66,000.00
33 Keramik WC 30 x 30 cm Asia Tile Dos Rp 63,800.00
34 Keramik uku 30 x 30 cm Dos Rp 551,100.00
35 Keramik uku 40 x 40 cm Dos Rp 66,000.00
36 Keramik Warna uk. 25 x 40 cm (accura) Dos Rp 84,700.00
37 Batu Alam 10 x 20 cm Polos M2 Rp 176,000.00
38 Batu Alam 20 x 20 cm Polos 10x30 cm M2 Rp 212,800.00
39 Batu Alam Motif Sirip/Garis-garis di pahat 10x30 cm / 15 X 30 20x40 cm M2 Rp 264,700.00
40 Batu Alam Motif Sirip/Garis-garis di pahat 20x40 cm Bj Rp 115,500.00
41 Batu Alam ukuran 10 x 20 cm Polos / 30 X 60 CM Polos M2 Rp 192,500.00
42 Marmer Ukuran Slabs(type Burito/acaro/Great I) / 100 x 100 cm Dos Rp 881,700.00
43 Marmer Ukuran Slabs(type Burito/acaro/Great II) Dos Rp 692,800.00
44 Marmer Ukuran Slabs(type Burito/acaro/Great III) Dos Rp 691,900.00
45 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great I) / cream urat kayu Dos Rp 660,000.00
46 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great II) Dos Rp 495,000.00
47 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great III) Dos Rp 377,900.00
48 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great I) Dos Rp 315,000.00
49 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great II) Dos Rp 264,600.00
50 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great III) Dos Rp 189,000.00
51 Ubin Lantai dari Tanah Liat diglazur Accura 40 x 40 cm M2 Rp 74,800.00
52 Ubin Lantai dari Tanah Liat diglazur KIA Polos 40 x 40 cm Dos Rp 80,600.00
53 Ubin Lantai dari Tanah Liat diglazur Keramik Merk Arwana M2 Rp 74,800.00
54 Ubin Lantai dari Tanah Liat diglazur Asiatile Kw 40 x40 cm M2 Rp 80,600.00
55 Ubin Lantai dari Tanah Liat diglazur Impresso uku. 40 x40 cm M2 Rp 74,800.00
56 Ubin Lantai dari Tanah Liat diglazur Masterina Polos uku. 30 x 30 cm M2 Rp 49,500.00
57 Ubin Lantai dari Tanah Liat diglazur Mulia KW 1 uku. 30 x 30 cm M2 Rp 49,500.00
58 Ubin Lantai dari Tanah Liat diglazur Kia Polos uku. 30 x 30 cm M2 Rp 51,900.00
59 Ubin Lantai dari Tanah Liat diglazur Asia Tile Kw 1 uku. 30 x 30 cm M2 Rp 57,600.00
60 Ubin Lantai dari Tanah Liat diglazur Impresso Kw 1 uku. 30 x 30 cm M2 Rp 55,300.00
61 Ubin Lantai dari Tanah Liat diglazur Accura Kw 1 uku. 30 x 30 cm M2 Rp 51,900.00
62 Ubin Lantai dari Tanah Liat diglazur Masterina Kw 1 uku. 30 x 30 cm M2 Rp 48,300.00
63 Ubin Lantai dari Tanah Liat diglazur Mulia Kw 1 uku. 30 x 30 cm M2 Rp 55,300.00

L BAHAN LAIN-LAIN
1 Paving Blok Segi Empat 6 cm ( K 225 ) M2 Rp 72,400.00
2 Paving Blok Segi Empat 6 cm ( K 250 ) Standar M2 Rp 75,600.00
3 Paving Blok Segi Empat 6 cm ( K 250 ) Warna M2 Rp 154,000.00
4 Paving Blok Segi Empat 6 cm ( K 300 ) Standar M2 Rp 77,800.00
5 Paving Blok Segi Empat 6 cm ( K 300 ) Warna M2 Rp 165,000.00
6 Paving Blok Segi Empat 8 cm ( K 225 ) Standar M2 Rp 92,300.00
7 Paving Blok Segi Empat 8 cm ( K 225 ) Warna M2 Rp 141,900.00
8 Paving Blok Segi Empat 8 cm ( K 250 ) Standar M2 Rp 96,700.00
9 Paving Blok Segi Empat 8 cm ( K 250 ) Warna M2 Rp 186,100.00
10 Paving Blok Segi Empat 8 cm ( K 300 ) Standar M2 Rp 99,300.00
11 Paving Blok Segi Empat 8 cm ( K 300 ) Warna M2 Rp 198,600.00
12 Paving Blok Segi Empat 8 cm ( K 400 ) Standar M2 Rp 107,600.00
13 Paving Blok Segi Empat 8 cm ( K 400 ) Warna M2 Rp 190,300.00
14 Paving Blok Segi Empat 10 cm ( K 300 ) Standar M2 Rp 141,600.00
15 Paving Blok Segi Empat 10 cm ( K 300 ) Warna M2 Rp 197,500.00
16 Paving Blok Segi Empat 10 cm ( K 400 ) Standar M2 Rp 149,400.00
17 Paving Blok Segi Empat 10 cm ( K 400 ) Warna M2 Rp 216,700.00
18 Paving Blok SegiTiga Uskup 6 cm Biji Rp 6,900.00
19 Paving Blok SegiTiga Uskup 8 cm Biji Rp 7,500.00
20 Paving Blok Segi Enam 8 cm ( K 225 ) Standar M2 Rp 96,500.00
21 Paving Blok Segi Enam 8 cm ( K 225 ) Warna M2 Rp 146,100.00
22 Paving Blok Segi Enam 8 cm ( K 300 ) Standar M2 Rp 103,400.00
23 Paving Blok Segi Enam 8 cm ( K 300 ) Warna M2 Rp 173,800.00
24 Paving Blok Segi Enam 8 cm ( K 400 ) Standar M2 Rp 111,800.00
25 Paving Blok Segi Enam 8 cm ( K 400 ) Warna M2 Rp 192,500.00
26 Paving Kombinasi 6 cm ( K 300 ) M2 Rp 105,100.00
27 Paving 20 x 20 8 cm ( K 300 ) M2 Rp 117,700.00
28 1 tegel pedestrian untuk pengarah difabel 30 x 30 Buah Rp 28,900.00
29 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Standar Buah Rp 18,100.00
30 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam Buah Rp 22,900.00
31 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat Buah Rp 25,300.00
32 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar Buah Rp 18,100.00
33 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam Buah Rp 22,900.00
34 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat Buah Rp 25,300.00
35 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar Buah Rp 18,100.00
36 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam Buah Rp 22,900.00
37 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat Buah Rp 25,300.00
38 Grass Block 8 cm Standar Bj Rp 33,800.00
39 Kanstin Type Segi 10-15 x 3 0 x 40 cm - 2,5 Bh/M' M' Rp 96,200.00
40 Kanstin Type Kotak 10 x 2 0 x 40 cm - 2,5 Bh/M' M' Rp 84,200.00
41 Kanstin Type Kotak 10 x 2 5 x 50 cm - 2 Bh/M' M' Rp 103,000.00
42 Kanstin Pracetak 60 x 25 x 15 cm Buah Rp 62,300.00
43 Kanstin Pracetak Segitiga 40 x 20 x 10 cm Buah Rp 31,600.00
44 Kanstin Pracetak 15 x 20 x 40 cm Buah Rp 24,200.00
45 Kanstin Pracetak 15 x 25 x 40 cm Buah Rp 40,100.00
46 Kanstin Pracetak 15 x 30 x 40 cm Buah Rp 40,100.00
47 Kanstin Pracetak 15 x 30 x 50 cm 15x25x50cm Buah Rp 34,100.00
48 Kanstin Pracetak 12 x 25 x 40 cm Buah Rp 44,200.00
49 Kanstin Pracetak 25 x 30 x 50 cm 20x30x50cm Buah Rp 49,500.00
50 Kanstin Pracetak 22 x 25 x 60 cm Buah Rp 63,100.00
51 U-Ditch K350 kg/cm2
B400 x H600 x L1200; tebal = 50 mm Buah Rp 502,000.00
B500 x H600 x L1200; tebal = 70 mm Buah Rp 548,000.00
B500 x H700 x L1200; tebal = 70 mm Buah Rp 646,000.00
B600 x H400 x L1200; tebal = 70 mm Buah Rp 448,000.00
B600 x H600 x L1200; tebal = 70 mm Buah Rp 558,000.00
B600 x H700 x L1200; tebal = 70 mm Buah Rp 686,000.00
B600 x H800 x L1200; tebal = 70 mm Buah Rp 746,000.00
B800 x H800 x L1200; tebal = 70 mm Buah Rp 809,000.00
B800 x H1000 x L1200; tebal = 70 mm Buah Rp 1,114,000.00
B1000 x H800 x L1200; tebal = 100 mm Buah Rp 1,267,000.00
B1000 x H1000 x L1200; tebal = 100 mm Buah Rp 1,415,000.00
B1000 x H1200 x L1200; tebal = 100 mm Buah Rp 1,837,000.00

52 Cover U-Ditch K-350 kg/cm2


B600 x L600; tebal = 140 mm Buah Rp 335,000.00
B800 x L600; tebal = 140 mm Rp 502,000.00
B1000 x L600; tebal = 200 mm Rp 713,000.00

53 Box Culvert
B400 x H400 x L1200; (K350) Rp 1,834,000.00
B500 x H500 x L1200; (K350) Rp 2,216,000.00
B600 x H600 x L1200; (K350) Rp 2,523,000.00
B800 x H800 x L1200; (K350) Rp 3,084,000.00
B1500 x H1500 x L1200; (K400) Rp 10,532,000.00
B2000 x H2000 x L1000; (K400) Rp 20,191,000.00
B3000 x H3500 x L2000; tebal - 250 mm (K500) Rp 44,000,000.00

54 Gutter Crub 2.5 Bh/M' M' Rp 126,000.00


55 Topi Uskup T = 6 cm M' Rp 14,900.00
56 Topi Uskup T = 8 cm 3 Bh/M' M' Rp 16,500.00
57 Tali Nilon Kg Rp 5,500.00
58 Aspal Emulsi Kg Rp 16,400.00
59 Aspal Bitumen Kg Rp 16,400.00
60 Aspal Curah (ton) Kg Rp 16,400.00
61 Aspal Drum 1 Drum. 155 kg / Drum kg Rp 1,375,000.00
62 Aspal cement Kg Rp 16,400.00
63 B.0 M3 Rp 671,000.00
64 Solar Non Industri Ltr Rp 5,700.00
65 Solar Industri Ltr Rp 9,400.00
66 Minyak Pelumas Ltr Rp 44,000.00
67 Bensin Ltr Rp 7,100.00
68 Minyak bakesting Ltr Rp 26,400.00
69 Mortar M3 Rp 792,000.00
70 Filler/abu batu M3 M3 Rp 258,500.00
71 Kerosen/Minyak Tanah Ltr Rp 14,300.00
72 Beton Mutu K500 M3 Rp 1,166,000.00
73 Beton Mutu K450 M2 Rp 1,105,500.00
74 Beton Mutu K400 M3 Rp 1,050,500.00
75 Beton Mutu K350 M3 Rp 1,006,500.00
76 Beton Mutu K300 M3 Rp 957,000.00
77 Beton Mutu K275 M3 Rp 880,000.00
78 Beton Mutu K 250 M3 Rp 869,000.00
79 Beton Mutu K 225 M3 Rp 836,000.00
80 Beton Mutu K175 M3 Rp 786,500.00
81 Beton Mutu K125 M3 Rp 704,000.00
82 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Single Buah Rp 1,157,800.00
83 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Double Buah Rp 1,448,500.00
84 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Single Buah Rp 1,351,900.00
85 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Double Buah Rp 1,496,000.00
86 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm 5 TON Besi Single Buah Rp 1,938,200.00
87 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm Besi Double Buah Rp 1,540,000.00
88 Box Culvert L 80 Cm, T 80 Cm, P 100 Cm Tebal : 16 cm 5 TON Besi Single Buah Rp 4,088,700.00
89 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm 5 TON Besi Single Buah Rp 11,105,600.00
90 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm Besi Double Buah Rp 10,920,300.00
91 Deuker T 6 cm, L 60 cm M' Rp 151,400.00
92 Deuker T 6 cm, L 80 cm M' Rp 223,700.00
93 Deuker T 10 cm, L 60 cm M' Rp 257,700.00
94 Deuker T 10 cm, L 80 cm M' Rp 193,300.00
95 Deuker T 12 cm, L 60 cm M' Rp 222,700.00
96 Deuker T 12 cm, L 80 cm M' Rp 296,900.00
97 Deuker T 15 cm, L 60 cm M' Rp 396,800.00
98 Deuker T 15 cm, L 80 cm M' Rp 529,000.00
99 Sewa C. Pump Standard M3 Rp 64,900.00
100 Sewa C. Pump Long Boom M3 Rp 137,500.00
101 Plastik Untuk Beton L.1M P. 40 M =65.000/ L.1,20M P.25 M = 100.000 M2 Rp 2,000.00
102 Kantung Plastik Uk 46 Isi 50 Bungkus Rp 110,000.00
103 Kantung Plastik Uk 15 Isi 10 Ikat Rp 22,000.00
104 Aspal (Asphal grade 60/70) Drum Rp 12,100,000.00
105 Aspal (curah grade 60/70 Lokal) 6 drum 1 Ton Rp 8,250,000.00
106 Exkontainer (Peti Kemas) Ukuran 20 Feet Kondisi 80 % Buah Rp 33,000,000.00
107 Exkontainer (Peti Kemas) Ukuran 40 Feet Kondisi 80 % Buah Rp 49,500,000.00
U-Ditch (ukuran lain)
111 B600 x H400 x L1200 ; tebal = 70 mm 1.2 M Berat 0,360 ton Buah Rp 641,600.00
112 B600 x H500 x L1200 ; tebal = 70 mm 1.2 M Berat 0,400 ton Buah Rp 705,300.00
113 B600 x H600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,440 ton Buah Rp 1,083,500.00
114 B600 x H700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton Buah Rp 1,182,500.00
115 B600 x H800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,530 ton Buah Rp 1,280,400.00
116 B800 x B600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton Buah Rp 981,000.00
117 B800 x B700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,540 ton Buah Rp 1,048,900.00
118 B800 x B800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,580 ton Buah Rp 1,665,400.00
119 B800 x B1000 x L1200 ; tebal = 70 mm 1.2 M Berat 0,670 ton Buah Rp 1,910,700.00
120 B1000 x H800 x L1200 ; tebal =100 mm 1.2 M Berat 0,980 ton Buah Rp 1,702,800.00
121 B1000 x H1000 x L1200 ; tebal =100 mm 1.2 M Berat 1,090 ton Buah Rp 2,718,100.00
Tutup U-Ditch
122 B600 x L600 : Tebal = 70 mm 0,6 M Berat 0,063 Ton Buah Rp 238,400.00
123 B800 x L600 : Tebal = 70 mm 0,6 M Berat 0,084 Ton Buah Rp 287,300.00
124 B1000 x L600 : Tebal = 100 mm 0,6 M Berat 0,150 Ton Buah Rp 365,900.00
B500 x H500 x L1000 : Tebal = 80 mm 1 M Berat 0,468 Buah Rp 1,380,000.00
RC Panel / Pagar Beton
125 Column Precast Kolom 200 x 200 x 4000 4 M Berat 0,400 Ton Buah Rp 495,000.00
126 Wall Precast / Dinding 80 x 2920 x 450 2,9 M Berat 0,260 Ton Buah Rp 509,900.00
127 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 6 cm K 400 M2 Rp 72,500.00
128 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 8 cm K 400 M2 Rp 89,800.00
129 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 10 cm K 400 M2 Rp 158,700.00
130 Hexagon (Segi Enam) Ukuran 6 cm M2 Rp 31,200.00
131 Urug (terima jadi) Ukuran 8 cm M2 Rp 42,400.00
132 Pemasangan M2 Rp 16,500.00

M ALAT BANTU PEMELIHARAAN


1 Sekop Bh Rp 71,500.00
2 Gerobak Dorong Artco Bh Rp 572,000.00
3 Betel Bh Rp 33,000.00
4 Palu Bh Rp 77,000.00
5 Sendok Semen Bh Rp 27,500.00
6 Sikat Baja Bh Rp 16,500.00
7 Cerek Aspal Bh Rp 137,500.00
8 Garu Bh Rp 16,500.00
9 Sapu Lidi Bh Rp 5,500.00
10 Drum Pemasak Aspal Bh Rp 192,500.00
11 Kayu Bakar M3 Rp 60,000.00
12 Cangkul Bh Rp 66,000.00
13 Gergaji Kayu Cap Mata Unit Rp 93,500.00
14 Sekop Sampah Merk VTR Unit Rp 8,300.00
15 Sekop Cap Mata Bh Rp 91,300.00
16 Palu / Martil Uk. 1,5 inci Bh Rp 60,500.00

N BAHAN PIPA DAN SUMUR BOR


1.A PIPA PRALON PVC 1/2 Inci -4M Batang Rp 27,500.00
( SII ) 3/4 Inci -4M Batang Rp 35,800.00
1 Inci -4M Batang Rp 46,800.00
1 1/4 Inci -4M Batang Rp 63,300.00
1 1/2 Inci -4M Batang Rp 52,800.00
2 Inci -4M Batang Rp 81,400.00
2 1/2 Inci -4M Batang Rp 99,000.00
3 Inci -4M Batang Rp 121,000.00

1.B. PIPA PRALON uPVC 1/2 " -6M S - 10 Batang Rp 27,500.00


3/4 " -6M S - 10 Batang Rp 49,500.00
1" -6M S - 10 Batang Rp 74,300.00
1 1/4 " -6M S - 10 Batang Rp 111,100.00
1 1/2 " -6M S - 10 Batang Rp 275,000.00
2" -6M S - 10 Batang Rp 269,500.00
3" -6M S - 10 Batang Rp 552,800.00
3" -6M S - 12.5 Batang Rp 451,000.00
4" -6M S - 12.5 Batang Rp 665,500.00

2 1/2 " -6M S - 10 Batang Rp 385,000.00


S - 10 Batang Rp 409,200.00
S - 12.5 Batang Rp 313,500.00
S - 12.5 Batang Rp 338,300.00

3" -6M S - 10 Batang Rp 577,500.00


S - 10 Batang Rp 572,000.00
S - 12.5 Batang Rp 501,100.00
S - 12.5 Batang Rp 467,500.00

4" -6M S - 10 Batang Rp 341,000.00


S - 10 Batang Rp 831,900.00
S - 12.5 Batang Rp 753,500.00
S - 12.5 Batang Rp 673,800.00

1C Pipa SUPRALON PVC 1/2" -6M S-8 Batang Rp 22,000.00


S - 10 MOF Batang Rp 27,500.00
S - 12,5 MOF Batang Rp 22,600.00
3/4" -6M S-8 Batang Rp 33,000.00
S - 10 MOF Batang Rp 40,700.00
S - 12,5 MOF Batang Rp 38,500.00

1" -6M S-8 Batang Rp 60,500.00


S - 10 MOF Batang Rp 71,500.00
S - 10 Batang Rp 39,100.00

-6M S-8 Batang Rp 95,700.00


S - 10 MOF Batang Rp 77,000.00
S - 12,5 Batang Rp 69,900.00

1 1/2" -6M S-8 Batang Rp 148,500.00


S - 10 MOF Batang Rp 170,500.00
S - 12,5 MOF Batang Rp 140,300.00
S - 16 Batang Rp 121,000.00

2" -6M S-8 Batang Rp 242,000.00


S - 10 MOF Batang Rp 249,700.00
S - 10 RR Batang Rp 269,500.00
S - 12,5 MOF Batang Rp 203,500.00
S - 12,5 RR Batang Rp 225,500.00
S - 16 Batang Rp 181,500.00

2 1/2" -6M S-8 Batang Rp 338,300.00


S-8 Batang Rp 379,500.00
S - 10 MOF Batang Rp 357,500.00
S - 10 RR Batang Rp 379,500.00
S - 12,5 MOF Batang Rp 289,900.00
S - 12,5 RR Batang Rp 319,000.00
S - 16 Batang Rp 247,500.00
S - 16 Batang Rp 270,100.00

3" -6M S-8 Batang Rp 478,500.00


S-8 Batang Rp 509,300.00
S - 10 MOF Batang Rp 330,000.00
S - 10 RR Batang Rp 363,000.00
S - 12,5 MOF Batang Rp 264,000.00
S - 12,5 RR Batang Rp 286,000.00
S - 16 Batang Rp 350,400.00
S - 16 Batang Rp 385,600.00

4" -6M S-8 Batang Rp 723,800.00


S-8 Batang Rp 756,800.00
S - 10 MOF Batang Rp 522,500.00
S - 10 RR Batang Rp 561,000.00
S - 12,5 MOF Batang Rp 396,000.00
S - 12,5 RR Batang Rp 423,500.00
S - 16 Batang Rp 528,000.00
S - 16 Batang Rp 561,000.00

1D Pipa MASPION PVC 3/8 " S - 6,3 M' Rp 11,000.00


S-8 M' Rp 8,800.00
S - 10 M' Rp 8,300.00
S - 12,5 M' Rp 5,500.00

1/2" S - 6,3 M' Rp 16,500.00


S-8 M' Rp 9,400.00
S - 10 M' Rp 8,300.00
-6M S - 12,5 M' Rp 6,600.00

3/4" S - 6,3 M' Rp 16,500.00


S-8 M' Rp 11,000.00
S - 10 M' Rp 8,300.00
-6M S - 12,5 M' Rp 13,800.00

1" S - 6,3 M' Rp 22,600.00


S-8 M' Rp 19,800.00
S - 10 M' Rp 16,500.00
S - 10 M' Rp 10,500.00
-6M S - 10 Mof M' Rp 11,000.00

1 1/4" S - 6,3 M' Rp 44,600.00


S-8 M' Rp 33,000.00
S - 10 M' Rp 17,100.00
-6M S - 10 Mof M' Rp 14,900.00
S - 12,5 M' Rp 22,000.00

1 1/2" S - 6,3 M' Rp 57,800.00


S-8 M' Rp 41,300.00
S - 10 M' Rp 22,000.00
-6M S - 10 Mof M' Rp 20,400.00
S - 12,5 M' Rp 33,000.00
-6M S - 12,5 Mof M' Rp 24,800.00
S - 16 M' Rp 27,500.00

2" S-8 M' Rp 71,500.00


S-8 M' Rp 66,000.00
S - 10 M' Rp 24,800.00
-6M S - 10 Mof M' Rp 44,600.00
S - 10 M' Rp 250,300.00
-6M S - 10 RR M' Rp 38,500.00
S - 12,5 M' Rp 25,900.00
-6M S - 12,5 Mof M' Rp 46,800.00

2 1/2" S-8 M' Rp 93,500.00


S-8 M' Rp 96,300.00
S - 10 M' Rp 71,500.00
-6M S - 10 Mof M' Rp 55,600.00
S - 10 M' Rp 88,000.00
-6M S - 10 RR M' Rp 52,300.00
S - 12,5 M' Rp 55,000.00
-6M S - 12,5 Mof M' Rp 39,100.00
S - 12,5 M' Rp 66,000.00
-6M S - 12,5 RR M' Rp 44,000.00
S - 16 M' Rp 61,100.00
S - 16 M' Rp 46,800.00

3" S-8 M' Rp 121,600.00


S-8 M' Rp 132,000.00
S - 10 M' Rp 1,050,500.00
-6M S - 10 Mof M' Rp 46,800.00
S - 10 M' Rp 126,500.00
-6M S - 10 RR M' Rp 258,500.00
S - 12,5 M' Rp 74,300.00
-6M S - 12,5 M' Rp 90,800.00
-6M S - 12,5 RR M' Rp 60,500.00
S - 16 M' Rp 74,300.00
S - 16 M' Rp 88,000.00

4" S-8 M' Rp 200,200.00


S-8 M' Rp 187,000.00
S - 10 M' Rp 96,300.00
-6M S - 10 Mof M' Rp 63,800.00
S - 10 M' Rp 165,600.00
-6M S - 10 RR M' Rp 71,500.00
S - 12,5 M' Rp 127,100.00
-6M S - 12,5 Mof M' Rp 55,000.00
S - 12,5 M' Rp 129,300.00
-6M S - 12,5 RR M' Rp 374,000.00
S - 16 M' Rp 107,800.00
S - 16 M' Rp 121,600.00

5" -6M S - 10 Mof M' Rp 165,000.00


-6M S - 10 RR M' Rp 163,400.00

6" -6M S - 10 Mof M' Rp 165,000.00


-6M S - 10 RR M' Rp 220,600.00
-6M S - 12,5 RR M' Rp 162,300.00

8" -6M S - 10 Mof M' Rp 330,000.00


-6M S - 10 RR M' Rp 336,100.00
-6M S - 12,5 Mof M' Rp 269,500.00
-6M S - 12,5 RR M' Rp 239,300.00

10" -6M S - 10 Mof M' Rp 515,400.00


-6M S - 10 RR M' Rp 537,400.00
-6M S - 12,5 Mof M' Rp 426,800.00
-6M S - 12,5 RR M' Rp 352,000.00

12" -6M S - 10 Mof M' Rp 825,000.00


-6M S - 10 RR M' Rp 847,000.00
-6M S - 12,5 Mof M' Rp 673,800.00

14" -6M S - 10 RR M' Rp 1,098,300.00


-6M S - 12,5 RR M' Rp 658,300.00

16" -6M S - 10 RR M' Rp 1,396,500.00


-6M S - 12,5 RR M' Rp 868,500.00

18" -6M S - 10 RR M' Rp 1,749,000.00


-6M S - 12,5 RR 6M' Rp 1,089,000.00

20" -6M S - 10 RR M' Rp 2,310,600.00


-6M S - 12,5 RR M' Rp 1,430,600.00

24" -6M S - 10 RR M' Rp 2,172,500.00


-6M S - 12,5 RR M' Rp 2,167,600.00

28" -6M S - 12,5 RR M' Rp 3,168,600.00

1E Pipa Wavin SNI Wavinsafe 1/2" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang Rp 27,000.00
3/4" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang Rp 38,000.00
1" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang Rp 49,500.00
11/4" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang Rp 71,800.00
11/2" -6M S - 10 / 10 Bar (1,0 Mpa ) Batang Rp 123,200.00

2" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 195,800.00


3" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 393,800.00
4" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 616,000.00
6" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 1,265,000.00

2" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 157,900.00


3" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 328,400.00
4" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 484,000.00
6" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 1,034,000.00

11/2" -6M S - 12,5 / 8 Bar (0,8 Mpa ) Batang Rp 107,800.00

1F Pipa Wavin SNI Wavinlok 2" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 194,200.00
3" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 414,200.00
4" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 623,200.00
6" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 1,294,200.00
8" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 1,998,200.00
10" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 3,099,800.00
12" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 4,936,800.00
16" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 8,126,800.00
20" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 12,669,800.00
24" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 20,955,000.00

2" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 162,800.00


3" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 349,800.00
4" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 492,800.00
6" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 1,064,800.00
8" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 1,625,800.00
10" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 2,549,800.00
12" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 4,056,800.00
16" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 6,502,100.00
20" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 10,183,800.00
24" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 17,008,200.00

1G Pipa GIP ( Galvanis ) 1/2" -6M Batang Rp 192,500.00


Med.A Super sni 3/4" -6M Batang Rp 242,000.00
1" -6M Batang Rp 374,000.00
1 1/4" -6M Batang Rp 473,000.00
1 1/2" -6M Batang Rp 550,000.00
2" -6M Batang Rp 742,500.00
21/2" -6M Batang Rp 962,500.00
3" -6M Batang Rp 1,265,000.00
4" -6M Batang Rp 1,980,000.00
5" -6M Batang Rp 1,820,500.00
6" -6M Batang Rp 2,037,200.00
8" -6M Batang Rp 3,140,500.00
10" -6M Batang Rp 6,110,500.00
12" -6M Batang Rp 7,826,500.00
16" -6M Batang Rp 12,237,500.00

1H Pipa GIP ( Galvanis ) 1/2" -6M Batang Rp 143,000.00


Med.A 3/4" -6M Batang Rp 187,000.00
1" -6M Batang Rp 242,000.00
1 1/4" -6M Batang Rp 308,000.00
1 1/2" -6M Batang Rp 357,500.00
2" -6M Batang Rp 440,000.00
21/2" -6M Batang Rp 561,000.00
3" -6M Batang Rp 715,000.00
4" -6M Batang Rp 935,000.00

1I Pipa GIP ( Galvanis ) 1/2" -6M Batang Rp 93,500.00


Med.B 3/4" -6M Batang Rp 121,000.00
1" -6M Batang Rp 192,500.00
1 1/4" -6M Batang Rp 220,000.00
1 1/2" -6M Batang Rp 242,000.00
2" -6M Batang Rp 275,000.00
21/2" -6M Batang Rp 357,500.00
3" -6M Batang Rp 467,500.00
4" -6M Batang Rp 605,000.00

1J Pipa PE 100 1 1/2" -6M SDR 17 PN 14 Batang Rp 30,800.00


2" -6M SDR 17 PN 15 Batang Rp 49,500.00
21/2" -6M SDR 17 PN 16 Batang Rp 69,300.00
3" -6M SDR 17 PN 17 Batang Rp 101,800.00

2 JENIS "D" UNTUK SALURAN 3/4" -4M Batang Rp 27,500.00


PEMBUANGAN AIR 1" -4M Batang Rp 35,800.00
1 1/2" -4M Batang Rp 38,500.00
2" -4M Batang Rp 44,000.00
21/2" -4M Batang Rp 58,300.00
3" -4M Batang Rp 77,000.00
4" -4M Batang Rp 121,000.00
5" -4M Batang Rp 198,000.00
6" -4M Batang Rp 253,000.00
8" -4M Batang Rp 467,500.00
10" -4M Batang Rp 770,000.00

3 PIPA JENIS "C' UNTUK 5/8 Inci -4M Batang Rp 16,500.00


INSTALASI LISTRIK 3/4 Inci -4M Batang Rp 19,300.00
PIPA PVC 1/2" (M.P.) Batang Rp 33,600.00
PIPA PVC 3/4 " (Maspion) Batang Rp 40,700.00
PIPA PVC 1 " Batang Rp 49,500.00
PIPA PVC 2 " M' Rp 68,800.00
PIPA PVC 2 1/2 M' Rp 88,000.00
PIPA PVC Wavin Kual D(4"x 4 M) Batang Rp 137,500.00
PIPA PVC Winlon Kual D (4"'x 4 M) Batang Rp 148,500.00
PIPA PVC vinilon Kual D (4'' x 4 M) Batang Rp 137,500.00
PIPA PVC Maspion Kual D ( 4"x 4 M) Batang Rp 253,000.00
Plastik Lembaran dari Polimer Etilena (Polos Lebar 1 M) M' Rp 374,000.00
Pipa PVC Wavin Kual D (4 x 4 M) Batang Rp 183,700.00
Pipa PVC Maspion Kual AW ( 4 x 4 M) Batang Rp 456,500.00
Pipa PVC Maspion Kual D( 4 x 4 M) Batang Rp 226,100.00
Pipa PVC Wavin AW ( 4 x 4 M) Batang Rp 352,000.00
Pipa PVC Wavin Kual D (4 x 4 M) Batang Rp 148,500.00
Pipa PVC Maspion Kual (4 x 4 M) Batang Rp 187,000.00
Pipa PVC Pravilon 4 Inci Batang Rp 41,300.00
Pipa PVC Pravilon End 6 Mi Batang Rp 46,800.00

4 PIPA PVC KLAS B ( PIPA LIMBAH ) SUPRALON


Pipa PVC Klas B RRJ 2" 6M Batang Rp 214,500.00
Pipa PVC Klas B RRJ 3" 6M Batang Rp 302,500.00
Pipa PVC Klas B RRJ 4" 6M Batang Rp 383,400.00

5 AKSESORIS UNTUK PIPA KELAS B SUPRALON


Elbow RRJ 90 2" Bh Rp 41,300.00
Elbow RRJ 90 3" Bh Rp 5,300.00
Elbow RRJ 90 4" Bh Rp 82,500.00
Tee RRJ 2" Bh Rp 53,400.00
Tee RRJ 3" Bh Rp 57,800.00
Tee RRJ 4" Bh Rp 121,000.00
Endcap/ Dop 2" Bh Rp 31,400.00
Endcap/ Dop 3" Bh Rp 52,300.00
Endcap/ Dop 4" Bh Rp 53,400.00

6 Pipa Beton
ᶲ 40 Panjang 110 cm, tebal 7 cm NRCP Pcs Rp 253,000.00
ᶲ 40 Panjang 110 cm, tebal 7 cm RCP Pcs Rp 324,500.00
ᶲ 60 Panjang 110 cm, tebal 8 cm NRCP Pcs Rp 409,200.00
ᶲ 60 Panjang 110 cm, tebal 8 cm RCP Pcs Rp 542,300.00
ᶲ 80 Panjang 110 cm, tebal 9 cm NRCP Pcs Rp 585,200.00
ᶲ 80 Panjang 110 cm, tebal 9 cm RCP Pcs Rp 810,700.00
ᶲ 100 Panjang 110 cm, tebal 10 cm NRCP Pcs Rp 891,000.00
ᶲ 100 Panjang 110 cm, tebal 10 cm RCP Pcs Rp 1,331,000.00

7 Pipa Instalasi 5/8 Batang Rp 14,900.00


8 Pipa Listrik 5/8 Batang Rp 11,000.00
9 Sambungan Pipa Lurus 1/2 Bh Rp 13,200.00
10 Sambungan Pipa L 1/2 Bh Rp 3,300.00
11 Sambungan Pipa Besi 3/4"T Bh Rp 27,500.00
12 Knee 3/4" Bh Rp 17,100.00
13 Knee 1" Bh Rp 19,300.00
14 Knee PVC Diameter 2" Bh Rp 16,500.00
15 Saringan Pasir M' Rp 30,300.00
16 Saringan Kotoran Bh Rp 27,500.00
17 Saringan Kotoran Kamar Mandi - Bahan Plastik (Floor Drain) Bh Rp 16,500.00
18 Saringan Kotoran Kamar Mandi - Bahan Besi/Kuningan (Floor Drain) Bh Rp 30,300.00
19 Lem FOX Kg Rp 49,500.00
20 Lem Pipa PVC Tube Rp 19,300.00
21 Lem Pipa PVC Kg Rp 79,800.00
22 Lem Besi - kw 1 Tube Rp 38,500.00
23 Lem Besi - biasa Tube Rp 27,500.00
24 Talang PVC Meter Rp 126,500.00
25 Double Nipple GIV 1/2" Buah Rp 8,300.00
26 Double Nipple GIV 3/4" Buah Rp 16,500.00
27 Double Nipple 4" Buah Rp 148,500.00
28 Doubble Nipple 2" Buah Rp 44,600.00
29 Dop PVC 3/4" Buah Rp 3,900.00
30 Dop PVC 1" Buah Rp 8,300.00
31 Dop PVC 2" Buah Rp 16,500.00
32 Dop PVC 4" Buah Rp 30,300.00
33 Elbow GIV 3/4" Buah Rp 22,000.00
34 Elbow GIV 2" Buah Rp 83,100.00

O DAFTAR HARGA UNTUK PIPA DAN ALAT BANTU BESI


1 KNEE BESI 1/2" Buah Rp 11,600.00
3/4" Buah Rp 11,000.00
1" Buah Rp 17,100.00

2 PIPA BESI MEDIUM A. SUPER 1/2" Batang Rp 194,200.00


3/4" Batang Rp 216,200.00
1" Batang Rp 359,200.00
2' Batang Rp 62,200.00
3" Batang Rp 1,338,200.00
4" Batang Rp 1,745,200.00

3 PIPA GALVANISIR A. SUPER 1/2" Batang Rp 159,500.00


3/4" Batang Rp 203,500.00
1" Batang Rp 330,000.00
2' Batang Rp 688,100.00

4 STOP KRAN - BIASA 1/2" Buah Rp 52,300.00


3/4" Buah Rp 71,500.00
1" Buah Rp 107,300.00

5 STOP KRAN - KW.1 1/2" Buah Rp 231,000.00


3/4" Buah Rp 74,800.00
1" Buah Rp 126,500.00

6 TEE 1/2" Buah Rp 10,500.00


3/4" Buah Rp 18,700.00

7 V. KNIE 3/4" Buah Rp 16,500.00


1" Buah Rp 17,100.00

8 V NEPLE 3/4" Buah Rp 11,000.00


1" Buah Rp 27,500.00

9 WATER MUR 1/2" Buah Rp 30,300.00


10 WATER MUR 3/4" Buah Rp 51,700.00
11 Pipa Gip 1 1/2" (air bersih) Batang Rp 8,800.00
12 Pipa Baja Hitam -6M 1/2" tbl=2 mm Batang Rp 239,800.00
13 Pipa Baja Putih -6M 1/2" tbl=2 mm Batang Rp 308,000.00
14 Pipa Baja Hitam -6M 3/4" tbl=2 mm Batang Rp 305,800.00
15 Pipa Baja Putih -6M 3/4" tbl=2 mm Batang Rp 382,800.00
16 Pipa Baja Hitam -6M 1" tbl=2 mm Batang Rp 381,700.00
17 Pipa Baja Putih -6M 1" tbl=2 mm Batang Rp 487,300.00
18 Pipa Baja Hitam -6M 2" tbl=2 mm Batang Rp 704,000.00
19 Pipa Baja Putih -6M 2" tbl=2 mm Batang Rp 896,500.00
20 Pipa Baja Hitam -6M 3" tbl=2 mm Batang Rp 1,487,000.00
21 Pipa Baja Putih -6M 3" tbl=2 mm Batang Rp 1,889,800.00
22 Pipa Baja Hitam -6M 4" tbl=2 mm Batang Rp 2,010,800.00
23 Pipa Baja Putih -6M 4" tbl=2 mm Batang Rp 2,453,000.00
24 Pipa PVP dlm 2" Resapan Batang Rp 71,500.00
25 Pipa PVP dlm 3" Resapan Batang Rp 172,700.00
26 Pipa PVP dlm 4" Resapan Batang Rp 317,900.00

P MATERIAL POMPA
1 Pompa Air Shimiznu130 ( 125 Watt ) Buah Rp 577,500
2 Pompa Air Shimizu 230 ( 200 Watt ) Buah Rp 990,000
3 Pompa Air Panasonik 130 Jak ( 125 Watt ) Buah Rp 616,000
4 Pompa Air Panasonik 200 Jak Buah Rp 676,500
5 Pompa Air Sanyo 137 AC Buah Rp 621,500
6 Pompa Air Sanyo PH 130 AC Buah Rp 1,336,500
7 Pompa Air Wasser 139 EA Buah Rp 2,876,500
8 Pompa Air Lakoni 129 A Buah Rp 572,000
9 Pompa Air Inoto I Hp + Kabel 50 Meter Buah Rp 2,942,500
10 Pompa Air Evak I Hp Buah Rp 5,692,500
11 Pompa Air Franklin I Hp Buah Rp 11,220,000
12 Pompa Wasser 60 Ea Buah Rp 704,000
13 Pompa Wasser 169 EA Buah Rp 1,056,000
14 Pompa Air Tsutumi 3 Buah Rp 3,850,000
15 Mesin Las Hambatan dari Logam Otomatis (Las Listrik Yanmar TS 155 C 13 H Unit Rp 28,665,200.00
16 Generator SET ABB Mesin Diesel 8,5 PK Yanmar Unit Rp 21,265,800.00
17 Generator SET ABB Mesin Diesel 8,5 PK Kubota Unit Rp 20,576,100.00

Q BAHAN INSTALASI LISTRIK


1 Aram Lampu kap Hijau Bh Rp 82,500
2 Aram Mercury Bh Rp 159,500
3 Balon HPIT 250 W PH Bh Rp 247,500
4 Balon HPIT 400 W PH Bh Rp 275,000
5 Balon HPLN 125 W PH Bh Rp 66,000
6 Balon HQL 80 Watt Osram Bh Rp 55,000
7 Balon Neon panjang TL 40 / 36 W PH Bh Rp 16,500
8 Balon Son T 150 W Bh Rp 165,000
9 Balon Son T 250 W Bh Rp 170,500
10 Balon Son T 400 W Bh Rp 192,500
11 Body HPIT 400 W Lengkap Set Rp 935,000
12 Body Lampu Taman TO-2 Bh Rp 214,500
13 Body Lampu Taman TO-1 Bh Rp 203,500
14 Balon HPLN 250 W Bh Rp 99,000
15 Body Mercury Hannock Bh Rp 770,000
16 Body Balon Son.T Bh Rp 522,500
17 Begel Per Pasang u/ tiang Beton Bh Rp 82,500
18 Begel Per Pasang u/ tiang Besi Bh Rp 82,500
19 Box Panel Meter Bh Rp 24,200
20 Box Panel Distribusi Bh Rp 819,500
21 Contactor 80 A Mitsubishi Bh Rp 1,072,500
22 Contactor 100 A Mitsubishi Bh Rp 1,430,000
23 Fitting Mercury E 27 Bh Rp 11,000
24 Fitting Lampu Elektra segi Empat Bh Rp 5,500
25 Fitting Lampu Taman E 27 Bh Rp 7,700
26 Fitting Lampu E 40 Bh Rp 33,000
27 Fotosell 6 A Bh Rp 110,000
28 Ignitor HPIT 400 W ( SI.51 ) PH Bh Rp 60,500
29 Injektor 3 Kutub Bh Rp 93,500
30 Injektor SN 58 Bh Rp 71,500
31 Isolasi Kabel Tanah (Bahan Karet) Roll Rp 82,500
32 Isolasi Unibell Roll Rp 9,400
33 Kabel NYA - 1 x 1,5 mm (Eterna) Meter Rp 2,800
34 Kabel NYA - 1 x 2,5 mm (Eterna) Meter Rp 5,500
35 Kabel NYA - 1 x 2,5 mm (Extrana) Meter Rp 4,400
36 Kabel NYY 4 x 10 mm Meter Rp 71,500
37 Kabel NYY 4 x 6 mm Meter Rp 44,000
38 Kabel NYY 2 x 2,5 mm Meter Rp 13,800
39 Kabel WLC NYY 3 x 1,5 mm (Untuk Sumur Bor) Meter Rp 12,100
40 Kabel NYM 2 x 1,5 mm Meter Rp 7,200
41 Kabel NYM 2 x 1,5 mm Meter Rp 7,200
42 Kabel NYM 2 x 2,5 mm Meter Rp 9,900
43 Kabel NYM 2 x 2,5 mm Meter Rp 10,400
44 Kabel NYFGBY 4 x 6 mm Meter Rp 82,500
45 Kabel NYFGBY 4 x 10 mm Meter Rp 103,200
46 Kabel NYFGBY 4 x 16 mm Meter Rp 137,500
47 Kabel Twistik 2 x 10 mm Meter Rp 5,200
48 Kabel Twistik 2 x 16 mm Meter Rp 7,700
49 Kap E 27 Hijau Bh Rp 31,100
50 Kapasitor HPIT 250 W PH Bh Rp 60,500
51 Kapasitor HPIT 400 W PH Bh Rp 60,500
52 Kapasitor SON T 400 W Bh Rp 63,300
53 Kapasitor SON T 250 W Bh Rp 63,300
54 Kapasitor SON T 150 W Bh Rp 77,000
55 Kapasitor 8 Mf Bh Rp 33,000
56 Kapasitor 25 Mf Bh Rp 66,000
57 Kapasitor 32 Mf Bh Rp 74,700
58 Konektor Double Baut Bh Rp 29,200
59 Konektor Kedap Air 1 Baut Bh Rp 12,100
60 Kontaktor SN 50/80 Ampere Bh Rp 770,000
61 Klem Service Plastik Bh Rp 5,500
62 Kawat Seng Kg Rp 28,800
63 Lampu Hemat Energi 18 W Bh Rp 38,500
64 Lampu Hemat Energi 23 W Bh Rp 49,500
65 Lampu Hemat Energi 85 W Bh Rp 203,500
66 Lampu Hemat Energi 75 W Bh Rp 148,500
67 Lampu Hemat Energi 70 W Bh Rp 198,000
68 Lampu Hemat Energi 65 W Bh Rp 330,000
69 Lampu Hemat Energi 50 W Bh Rp 173,800
70 Lampu LED Hemat Energi 7 W Bh Rp 51,700
71 Lampu LED Hemat Energi 10 W Bh Rp 62,700
72 Lampu LED Hemat Energi 13 W Bh Rp 74,800
73 Lampu Selang Hias Meter Rp 19,800
74 MCB 1 A MG 1 Phase Bh Rp 77,000
75 MCB 2 - 20 A MG 1 Phase Bh Rp 60,500
76 MCB 25 - 32 A MG 1 Phase Bh Rp 66,000
77 MCB 1 A 1 Phase Bh Rp 49,500
78 MCB 6 A 1 Phase Bh Rp 66,000
79 MCB 16 A 1 Phase Bh Rp 66,000
80 MCB 20 A 1 Phase Bh Rp 66,000
81 MCB 50 A 1 Phase Bh Rp 187,000
82 Mour / Baut Bh Rp 600
83 NFB 75 A Mitsubishi 3 Phase Bh Rp 880,000
84 NFB 80 A Mitsubishi 3 Phase Bh Rp 880,000
85 NFB 100 A Mitsubishi 3 Phase Bh Rp 880,000
86 Pipa Gip 1 1/2" (listrik) Batang Rp 396,500
87 Rang Lampu Taman TO.2 Bh Rp 229,900
88 Relay lampu Selang Bh Rp 28,800
89 Saklar Engkel In Clipsal Bh Rp 18,400
90 Saklar Engkel In Broco Bh Rp 13,800
91 Saklar Seri II In Clipsal Bh Rp 29,200
92 Saklar Seri II In Broco Bh Rp 17,300
93 Skun Kabel 10 mm Bh Rp 2,200
94 Skun Kabel 16 mm Bh Rp 2,800
95 Skun Kabel 25 mm Bh Rp 3,900
96 Skun Kabel 50 mm Bh Rp 6,600
97 Selonsong 10 Bh Rp 3,300
98 Selonsong 16 Bh Rp 5,500
99 Stop Kontak Broco Bh Rp 14,900
100 Stop Kontak Clipsal Bh Rp 36,800
101 Terminal Elegram 25mm Papan Rp 165,000
102 Tiang PJU 9 M Galvanis Single David Bh Rp 4,125,000
103 Tiang PJU 9 M Galvanis Double David Bh Rp 5,390,000
104 Tiang Besi 7 M Bh Rp 2,200,000
105 Tiang Besi 9 M Bh Rp 2,420,000
106 Tiang Lampu Taman Bh Rp 93,500
107 Timer Sweet Thebend Bh Rp 467,500
108 Travo HPIT 400 Watt Philips Bh Rp 286,000
109 Travo HPLN 125 Watt PH / HQL 80 Watt Bh Rp 330,000
110 Travo Son T 400 W Bh Rp 500,500
111 Travo Son T 250 W Bh Rp 291,500
112 Travo Son T 150 W Bh Rp 275,000
113 Travo TL 40 W PH Bh Rp 46,000
114 Bohlam (Lampu Penerangan) TL Simbat 18 W Pcs Rp 13,200
115 Bohlam (Lampu Penerangan) PCC 23 Watt Ecuat Pcs Rp 45,100
116 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad) Ton Rp 18,100
117 Kawat Non Galbani Lainnya (Kawat Las) Kg Rp 34,600
118 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad) Kg Rp 18,400
119 Stop Kontak dan Soket (Broco 2 Saklar) Buah Rp 28,800
120 Control Desk / Meja Kontrol KWH METER 450 WATT Buah Rp 130,300
121 Control Desk / Meja Kontrol KWH METER 900 WATT Buah Rp 130,300
122 Kabel Listrik NYM (2 MM x 2.5 MM) M Rp 9,900
123 Kabel Listrik NYA Kabel Listrik NYA ( 1 MM x 2,5 MM) M Rp 5,500
124 Kabel Listrik NYY (3 x 2,5) MM M Rp 22,000
125 Kabel Lainnya Eterna (3 x 2,5) 50 M M Rp 16,500
126 Bohlam (Lampu Penerangan) Philips Pijar 40 Watt Buah Rp 8,300
127 Lampu Neon Philips 40 Watt 100 Buah Buah Rp 16,500
128 Lampu Neon Philips TL 40 Watt Buah Rp 16,500

R ALAT PENUNJANG INSTALASI LISTRIK


1 Accumulater Cell Tester Buah Rp 246,000.00
2 Detektor Kabel Buah Rp 10,173,200.00
3 Helm Proyek Buah Rp 77,000.00
4 Kaos Tangan Kerja Psng Rp 33,000.00
5 Kaos Tangan Tegangan Tinggi 20 KV Psng Rp 440,000.00
6 Kunci Pipa Besar Buah Rp 126,500.00
7 Linggis Buah Rp 60,500.00
8 Mantel Parasut Buah Rp 287,500.00
9 Megger Meter Insulation Tester 3111V Buah Rp 4,719,000.00
10 Mesin Las Listrik Buah Rp 1,045,000.00
11 MultiMeter Sanwa asli Buah Rp 506,000.00
12 Pakaian Kerja (Cattel Pak) Psng Rp 597,800.00
13 Palu-Palu Buah Rp 71,500.00
14 Pisau Cutter Buah Rp 16,500.00
15 Senter Kepala Buah Rp 104,500.00
16 Sepatu Kerja (listrik) Psng Rp 528,000.00
17 Sepatu Tegangan Tinggi 20 KV Psng Rp 550,000.00
18 Skop Buah Rp 93,500.00
19 Solder Buah Rp 16,500.00
20 Tang Ampere 600 A Buah Rp 1,265,000.00
21 Tang Press Skun Besar Buah Rp 1,210,000.00
22 Tang Press Skun Kecil Buah Rp 770,000.00
23 Tangga Aluminium untuk lampu jalan Buah Rp 1,705,000.00
24 Tangga Bambu 2,5 Meter Buah Rp 86,300.00
25 Tangga Bambu 5 Meter Buah Rp 149,500.00
26 Tangga Fiber Buah Rp 6,902,500.00
27 Tools Kit Set Rp 6,083,000.00
28 Topi Buah Rp 33,000.00

S UPAH KERJA
1 Mandor Lapangan O/H Rp 213,636.00
2 Kepala tukang O/H Rp 192,272.40
3 Kepala Tukang Listrik O/H Rp 192,272.40
4 Tukang Batu /Cat O/H Rp 178,030.00
5 Tukang Kayu / besi O/H Rp 178,030.00
6 Tukang pasang paving O/H Rp 178,030.00
7 Pembantu Sopir O/H Rp 156,666.40
8 Pembantu Mekanik O/H Rp 189,423.92
9 Pembantu Tukang Listrik O/H Rp 156,666.40
10 Pembantu Operator O/H Rp 206,514.80
11 Mekanik O/H Rp 178,030.00
12 Operator Terlatih O/H Rp 213,636.00
13 Pekerja O/H Rp 142,424.00
14 Sopir Terampil O/H Rp 192,272.40
15 Biaya Pasang Canstein /M' Rp 156,666.40
16 Biaya Pasang Paving /M2 Rp 192,272.40

Makassar, Januari 2021

Plt. KEPALA DINAS PEKERJAAN UMUM KEPALA BIDANG BINA TEKNIK


KOTA MAKASSAR DINAS PU KOTA MAKASSAR

Drs. H. IRWAN R. ADNAN, M.Si ANSUARD, ST. M.Si


Pembina Utama Muda Pangkat : Penata Tk. I
Nip. 19710303 199803 1 014 Nip. 19691031 200312 1 001
Volume Kusen

Bh Pek. Pintu Type 1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Volume
(Rp) (Rp)
A PEKERJAAN
Pek. Daun Pintu Multipleks m2
Pek. Kusen Aluminium m1
Pas. Kunci bh
Pas. Handel Pintu bh
Pas. Engsel Pintu bh
JUMLAH TENAGA KERJA
B PERALATAN
Alat bantu ls 1.000 7500
JUMLAH HARGA ALAT 7,500.00
C Jumlah (A+B) 5,122,887.37

Bh Pek. Pintu dan Jendela Type 1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Volume
(Rp) (Rp)
A PEKERJAAN
Pek. Pintu Kaca 8 mm Rangka Aluminium m2
Pek. Kusen Aluminium m3
Pas. Kunci bh
Pas. Handel Pintu bh
Pas. Rel Pintu bh
Pas. Kaca Tebal 5 mm m2
JUMLAH TENAGA KERJA
B PERALATAN
Alat bantu ls 1.000 7500
JUMLAH HARGA ALAT

C Jumlah (A+B)

Bh Pek. Jendela Type 1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Volume
(Rp) (Rp)
A PEKERJAAN
Pek. Kusen Aluminium m1
Pas. Rangka Jendela Aluminium m2
Pas. Kaca Tebal 5 mm m2
Pas. Engsel Jendela bh
Pas. Grendel Jendela bh
JUMLAH TENAGA KERJA
B PERALATAN
Alat bantu 1.000 7500
JUMLAH HARGA ALAT

C Jumlah (A+B)
S UPAH KERJA
1 Pekerja O/H Rp 142,424.00
2 Tukang Batu /Cat O/H Rp 178,030.00
3 Kepala tukang O/H Rp 192,272.40
4 Mandor Lapangan O/H Rp 213,636.00